Dear Investor, On behalf of the developer, we provide you with the latest images and information as of May 2018 from the One Wolstenholme Square construction site.
Work is continuing at a good pace at Wolstenholme square. A summary of the works taken place: Block A • Complete. Block B • Complete. Block C • Snagging complete and back-checking commenced Block D • Substructures completed • Steel frame complete • Steel decking complete and concreted • Staircases installed • Windows 75% complete • Brickwork 50% complete • First fix M+E at Level 3 • Plastering commenced on Level 2 • Kitchens, tiling and floor finishes at Level 1
Block E • Site clearance commenced • Substructures to start in June 2018 Please see below the anticipated practical completion dates for each block: Block A Block B Block C Block D Block E
December 2017 (complete) April 2018 (complete) June 2018 August 2018 March 2019
www.csiprop.com
UK Buy-to-Let Investment
ne Wolstenholme Square
Progress Update May 2018
www.csiprop.com
UK Buy-to-Let Investment
Progress Update May 2018
ne Wolstenholme Square
One Wolstenholme Square
www.csiprop.com
UK Buy-to-Let Investment
Progress Update May 2018
ne Wolstenholme Square
One Wolstenholme Square
www.csiprop.com
UK Buy-to-Let Investment
Progress Update May 2018
ne Wolstenholme Square
One Wolstenholme Square
www.csiprop.com
UK Buy-to-Let Investment
Progress Update May 2018
ne Wolstenholme Square
One Wolstenholme Square