WCW Conference & Trade Show ▪ Winnipeg ▪ September 20 - 23 ▪ 2009
Infrastructure Serving Dawson City, Yukon – The New Klondike Gold Ken Johnson ABSTRACT Dawson City’s water and sewer services are provided by a buried, insulated high density polyethylene pipe (HDPE) utility system which was completed around 1980. The water and sewer infrastructure is reasonably complex in both its construction and operation. Beyond the piping systems that are associated with the infrastructure, there are 12 facilities that are an integral part of the infrastructure. The facilities handle approximately 850,000 cubic metres (190 million Imperial gallons) each of water and sewage in a year. Freeze protection for the water system is needed during the winter; the water in the pipes cools as it flows through the distribution piping, therefore additional heat is required to prevent the water in the pipes from freezing. The water is also re-circulated by pumping to confirm the water temperature in the pipe, and provide additional freeze protection. Subsoil conditions in Dawson City typically consist of organic silts, and silts, and this layer has an ice content varying from zero to greater than 50 percent excess ice content. This area is in the widespread discontinuous permafrost zone, with mean ground temperatures in the range of -1.5 C, which is considered to be “warm” permafrost. Problems with respect to water and sewer systems in these soil conditions have caused ground subsidence due to thaw of the ice rich permafrost, seasonal frost heave of buried foundations and utility pipes, or groundwater conditions. The soil conditions in Dawson City have required the development of unique and expensive water and sewer piping materials and installation techniques. The installation of the pipe requires consideration of the permafrost conditions to ensure that the area around the excavation is not significantly disturbed, particularly in areas where the permafrost has a lot of ice lensing. Dawson City continues to incrementally address the challenges of operating and maintaining a water and sewer facilities in the heart of Klondike. Bleeder reduction has been a priority over the past several years and water metering has been implemented to reduce water down in the range of 500 litres/capital/day from winter extremes of 1500 litres/capita/day. A comprehensive water and sewer facility assessment was completed in 2006, which has provided Dawson with the framework for system improvements over the next 20 years. The most significant infrastructure improvement in the next several years will be an upgrade in the sewage treatment system, which will cost approximately $25 million.
Page 1 of 7