CARLA SUJANTO
ArchitecturalGraduate
Melbourne,Aus | carlasujanto@gmail.com linkedin.com/in/csujanto | instagram.com/csu.img
MasterofArchitecture
TheUniversityofMelbourne
2019-2021
NewColomboPlanMobilityGrant
TheUniversityofMelbourne
Awardedto25B.Des/B.Envsstudents
2017
BachelorofEnvironments
TheUniversityofMelbourne
2016-2018
PRO-ARKArchitects:ArchitecturalGraduate
Sep2021
-ongoing
•Assistarchitectinmaterialselections, initialconcepts,andarchitectural drawings.
•Documentationofeducationaland residentialprojectsfromTown PlanningtoConstruction Documentation.
•Problem-solvebudgetconstraintsin liaisonwitharchitect,project managers,andconsultants.
•Producerendersandvideo presentationsforclients.
•Streamlinedocumentationworkflow, increasingefficiencyandaccuracy.
•Independentredesignofcompany website,increasingsitetrafficby70%.
BIM/CAD
SKILLS EDUCATION EXPERIENCE
Rothelowman:ArchitecturalIntern
•Meettightdeadlineswithinateamfor REVITdocumentationofmultiresidentialandtownhouseprojects.
•Adminduties-planstaffevents, respondtoclientsandcollaborators.
ArchicleVolunteerTeam
Jul-Dec 2021
Platformforstudentstore-purposemodelmakingmaterialsanddeveloptechnical skills.
•LeadvideoeditingteamforArchicle YouTubechannel.
•Coordinatewithteamtosetup communicationchannels.
HumanitarianDesignInternship
IntensivestudioinVijayawada,India.
•Liaisewithvillagetodesignsustainable watercollectionsystemusing vernacularmethodsandmaterials.
REVIT|AutoCad
Lumion|Vray|Enscape
SketchUp|Rhinoceros Photoshop|Illustrator|Indesign|Premiere
Modelling AdobeCC Rendering
Jan-Mar 2020 Jan-Feb 2018
CurriculumVitae
CONTENTS
LOST/FOUND
Triplebottomlinesustainability
S.O.S.
Thesisproject|Heritage,culture
HEARTOFUNIMELB
Cross-disciplinarylearningbuilding
‘THEARGYLE’
High-riseconstruction
NON-ACADEMICWORK
Workexperience|Renders,documentation
Academicwork
LOST/FOUND
2021MasterofArchitecture,year2
High-densitymega-hybridtowerfor makersandartiststolive/work/play
Podiummarket
IDENTITY
CONTROLLEDCHAOS
SUPER-HUMANSCALE INTERACTIVITY
Lost/Foundrespondstotheloss ofartistsandmakersfromthe CBD.Itaimstorecovertheparts ofMelbourne’scultureand identitythathasbeenlost,and enhancewhathasbeenfound throughoutrapidurbangrowth.
Thisprojectexplorestheideaofa ‘mega-hybrid’buildingwhich diversifiesandintensifiesthe activitiesandexperiencesofthe communitywithinittobecomea vibrantvillage,andacreativecore withinthecity.
Toweronsite
PerspectivesectionthroughTextilescluster
Rooftopgarden
Academicwork
S.O.S. (THESTOUNDOFSTOUSH)
2021MasterofArchitecture,Thesis
Adaptivereuseof‘HouseofStoush’,a culturallysignificantheritagebuilding.
ViewfromRosslynst
THESIS STATEMENT:
Thisprojectaimstore-establish FestivalHall’simportancewithin Melbourne’smusiccommunity.
ItshiftsFestivalHall’sfocusfrom globaltolocalmusictoelevatethe Melbournesoundtotheworldstage. FestivalHall’srichhistorywillbe evokedthroughpreservationofboth itsphysicalremnantsandthemusic communitywhichitresonatedwith.
REVITALISINGTHELOCALMUSIC SCENE
FestivalHall’slargefootprintwillbe dividedintosmallerspacestointegrate functionswhichsupportthefutureof Melbourne’slocalmusicscene.This includesspacesforbroadcastingand performingmusic,barsandcafesas venuesforlivemusic,retailspacesfor sellingrecordedmusic,andstudiosfor recordingandrehearsing.
AGENCY CLUSTER LOCAL JUNCTION BROADCAST
Heritageplandiagram HERITAGEPLAN >Elementswhichwereofhigh usewereidentifiedtobe retainedeitherfullyorpartially.
Identifytracestoretain Createplazasandbuffer zonesaroundthesite boundary Createcirculation throughoutsite Addelevatedmass Reflectthe neighbourhood
MassingonsitebetweenDudleyandRosslynSt
GroundLevel
Longsectionthroughbuilding SecondLevel
Performancespaceatcluster“Queen” Performancespaceat cluster“Bassey” Smallperformance atmusiccluster ‘Sinatra’
Sectionthroughmusiccluster Interactivebuildingfabricandoutdoor furnitureencouraginginteraction
Academicwork-Groupwork
‘THEARGYLE’ APPLIEDARCHITECTURALTECHNOLOGY
2019,MasterofArchitecture,year1
Constructionandstructureandcommercial highrisebuildings.
Group:HanJiang,ArchanaRamesh,CarlaSujanto
This65-storeytowersitsinthenorth-eastof MelbourneCBD.Thedesigncomesfromthe ‘Argyle’patternofthediagridstructuralsystem whichtakesonbothlateralandverticalloads, decreasingtheneedforperimetercolumnsand providingmorefloorspace.
1.1 STACKING STRATEGY
Han Jiang
Team Member
Academicwork-Groupwork
Completedphysicalmodel Sitemap
Sun&wind
Greenery
Compliance
Isovist
LOWRISE MIDRISE HIGHRISE SKY RISE CROW N PODIUM 1 2 3 4 5 6 7 8 MECHANICALFLOOR MECHANICALFLOOR MECHANICALFLOOR MECHANICALFLOOR RL+0L1 RL +4.00L2 RL +8.00L3 RL+12.00 L4 RL+16.00 L5 RL+20.00 L6 RL+24.00 L7 RL+28.00 L8 RL+32.00 L9 RL+36.00 L10 RL+40.00 L11 RL+48.00 L12 RL+52.00 L13 RL+56.00 L14 RL+60.00 L15 RL+64.00 L16 RL+68.00 L17 RL+72.00 L18 RL+76.00 L19 RL+80.00 L20 RL+84.00 L21 RL+88.00 L22 RL+92.00 L23 RL+96.00 L24 RL+100.0 L25 RL+104.0 L26 RL+108.0 L27 RL+112.0 L28 RL+116.0 L29 RL+120.0 L30 RL+124.0 L31 RL+128.0 L32 RL+136.0 L33 RL+140.0 L34 RL+144.0 L35 RL+148.0 L36 RL+152.0 L37 RL+152.0 L38 RL+158.0 L39 RL+164.0 L40 RL+168.0 L41 RL+172.0 L42 RL+176.0 L43 RL+180.0 L44 RL+184.0 L45 RL+188.0 L46 RL+192.0 L47 RL+196.0 L48 RL+200.0 L49 RL+204.0 L50 RL+208.0 L51 RL+212.0 L52 RL+224.0 L54 RL+228.0 L55 RL+216.0 L53 RL+232.0 L56 RL+236.0 L57 RL+240.0 L58 RL+244.0 L59 RL+248.0 L60 RL+252.0 L61 RL+256.0 L62 RL+260.0 L63 RL+264.0 L64 RL+268.0 L65 RL+280.0 L68 RL+272.0 L66 RL+284.0L69 RL +296.0 STRUCTURALSECTION BONDEK150 REINFORCEDCONCRETE600mm DIAGRID:HISTAR 460HD400X314 4600 8400 10,800 10,800 8400 4600 A B C D E 3 4 5 7 6 TYPICALFLOORFRAMING 9600 9600 12000 4600 8400 10,800 10,800 8400 4600 12000 610UB125PRIMARYBEAM 460UB82SECONDARYBEAM REINFORCEDCONCRETE300mm 3 4 5 7 6 STRUCTURALFRAMEATDIAGRIDMODULETOP
Membrane
Aluminiumparapetcapping Substrate Blocking
310UC158
Opaque PVlaminated glasspanel
Alucobondpanels
SHS65x65x3
StructuralSteel
Diagridhistar
Aluminiumparapet flashing
Aluminiumcladding 1250x1500 Balustrade
Opaque PVlaminated glasspanelinvision area(2760x970)
4 A5.3
2 PARTIALEASTELEVATION-NORTHEASTCORNER SCALE1:50 A4.3
3 A5.3
2 A5.3
1 A5.3
Hydraulic TelescopicBMUShaft
hd400
BMUI-beamtrack
1:100fall 1:100fall
FloorWaste Outlet
4 PARTIALSECTION-NORTHEASTCORNER SCALE1:50 A4.3
FloorWaste Outlet
Aluminiumcladding TopHatsection 20x35x75
TileTechAdjustablePedestal System
TileTechPaversConcretetiles (500x500x5)
Screed
Bondek150 KoolthermK10 Soffitinsulation
1:100fall
Bracket
Aluminiummullionwith internalcabling
Aluminiumtransom
Colourbackedinnerlite
Opaque PVlaminated glasspanelinvisionarea (2760x970)
2 UNITISEDSYSTEMCONNECTIONTOSLABDETAIL SCALE1:10 A4.3
SHS65x65x3
Upstand
Aluminiumsideflashingwith poleplate
Aluminiumtransomwith internalcabling
Firestop
Halfencast-in channel
Bracket
Roofpaversandpedestals
Bondek150
KoolthermK10Soffit insulation
35mmwasher 250UB26
Insulation
Vaporbarrier
Suspended Ceiling
Alucobondpanels
Sealant
Backerrod TopHatsection 20x35x75
Membrane Baseplate 90x90 SHS65x65x3
StructuralSteel Diagridhistar hd400
Floorslab
UA125x75x6
UA75x50x6
Aluminiumchannel 50x50x3
M10Bolt
EA45x45x3
4 SECTIONEDPLAN SCALE1:5
A4.3
Brisbane,Melbourne,Sydney Revisions RotheLowmanPropertyPty.Ltd.retainsallcommolaw,statutorylawandotherrightsincludingcopyrightandintellectualpropertyrightsinrespect this document.TherecipientindemnifiesRotheLowmanPropertyPty.Ltd.againstallclaimsresultingfrom seofthisdocumentforanypurposeotherthanits DrawingNo. Author Scale:@A1 ProjectNo Project Drawing Date 1:100 P1 TP02.01a AA 217156 MOONEEVALLEY PARK SITEELEVATION01South-MCPHERSON STREETELEVATIONS StageA(FeehanRowTownhouses) 25/03/20 1S-SiteElevation-West(McPhersonST)(NewExtension) McPHERSON STREET 1S-SiteElevation-West(McPhersonST) P113.03.20MarketingPurposesCS INDICATIVEPURPOSEONLY CONTINUED BELOW CONTINUED ABOVE Brisbane,Melbourne,Sydney www.rothelowman.com.au DisclaimerRotheLowmanPropertyPty.Ltd.retainsallcommolaw,statutorylawandotherrightsincludingcopyrightandintellectualpropertyrightsinrespect this document.TherecipientindemnifiesRotheLowmanPropertyPty.Ltd.againstallclaimsresultingfrom seofthisdocumentforanypurposeotherthanits unauthorizedchangesorreuseofthedocumentonotherprojectswithoutthepermissionofRotheLowmanPropertyPty.Ltd.Undernocircumstanceshalltransferofthis DrawingNo. Scale:@A1 ProjectNo Project Drawing 1:100 P1 TP02.03 CA 217156 MOONEEVALLEY PARK SITEELEVATIONS3& 4 StageA(FeehanRowTownhouses) 25/03/20 3S-SiteElevation-South(CoatsSt) KEYPLAN 3 4 McPHERSON STREET 4N-SiteElevation-North(childcare) -29.03.18TownPlanningSubmissionPG P113.03.20MarketingPurposesCS INDICATIVEPURPOSEONLY Townhouses,2020 Documentationofproposedtownhouseson REVIT. Software:REVIT NON-ACADEMICWORK,2020-23 Non-academicwork Rendersanddrawingsfromworkexperience.
Residential/commercialbuilding,2022 Documentationandvisualisationof commercial/residentialbuilding. Software:SketchUp,Lumion,AutoCAD, Photoshop,PremierePro
Thisisaproposeddesignfortwo residentialunitswithanofficespaceon thegroundfloor.Throughoutmy experienceinthisrole,Ihaverefinedmy documentationandrenderingskills,and honedmyknowledgeofAustralian buildingstandards.
Primaryschoolupgrade,2021-22
Documentationandvisualisationof$8M upgrade/refurbishmenttofivebuildings.
Software:SketchUp,Lumion,AutoCAD,Photoshop
FromSketchDesigntoConstruction
Documentation,Icontributedaccurate documentationandvisualisationforVSBA submissions,aswellasfly-throughvideosfor presentationstotheschoolandstakeholders.
PEDESTRIAN CIRCULATION (MAJOR)
PEDESTRIAN ENTRY (MINOR)
PEDESTRIAN CIRCULATION (MINOR)
VEHICLE ENTRY
GATHERING SPACES
EXISTING TREES & LANDSCAPING
NEW TREES & LANDSCAPING
Quietnookforteachingandlearninginsmallgroups.
Receptionareaandentry.
Newsmalllibrary&presentationarea.
Masterplanproposal,2022
Documentationandgraphicsforproposed primaryschoolmasterplan.
Software:AutoCAD,Photoshop,Illustrator
Thismasterplanproposedanupgradeto existinglandscapeandplayareas,aswellasa newadminandarts/performancebuilding.
NEW ADMIN BUILDING NEW ARTS & PERFORMANCE BUILDING NEW VEGE GARDEN/ GREEN HOUSE NEW SENSORY GARDEN NEW COVERED STRUCTURE REFURBISH COURTS NEW FENCE (MAJOR) (MINOR) N PROPOSED MASTERPLAN SCALE 1:500 @A3 St
Apostle
Hills
LEGEND CLOSED ZONE SEMI-OPEN ZONE OPEN ZONE N St Paul Apostle North Endeavour Hills SPATIAL RELATIONSHIPS | NEW ARTS & PERFORMANCE BUILDING SCALE 1:200 @A3 76 MOSSGIEL PARK DRIVE ENDEAVOUR HILLS VIC 3802 LEGEND CLOSED ZONE SEMI-OPEN ZONE OPEN ZONE
Paul
North Endeavour
76 MOSSGIEL PARK DRIVE ENDEAVOUR HILLS VIC 3802
MISCELLANEOUS
2018-2022
Handdrawings,photography
GreatOceanRoad,Victoria,Australia,2018
SouthIsland,NewZealand,2018
Non-academicwork
UniversityofMelbourneOldQuad,handsketch,2021
VespersIIbyOXMAN,handsketch
Kitchenbenchparaphernelia,watercolour