PORTFOLIO Shawn Chen
2
3
CONTENTS [GREG LYNN STUDIO]
[UNDERGRADUATE]
The whole studio contains three related projects. Starting from moving space studying, each student develops their space/motion idea into two kinds of architectures. Robots are used to assist in the motion and animation parts. Videos are the main media to record the process. Physical model making is considered as the most important way to present ideas here.
I. VERTICAL BLOCKS
60
I. SLIDING RECOMBINATION
II. COMPLEX OF PUBLIC
68
2
II. PROJECTING EVENTS
10
III.ATTACH TO THE HISTORY
78
III.ANIMATED COMPLEX
22
IV. WATERSIDE
90
V. BETWEEN GAPS
Fabrication Lab Greg Lynn Studio has been an innovator in redefining the medium of design with digital technology as well as pioneering the fabrication and manufacture of complex functional and ergonomic forms using Computer Numerically Controlled machinery.
100
[PROFESSIONAL WORKS]
IV. PROGRAMABLE RANDOM
32
I.WORKS IN NIKKO
112
V. GEOLOGICAL TIMEANIMATED CASTING
38
II.WORKS IN GS&P
120
OTHER WORKS
122
6
7
GREG LYNN STUDIO Robotical Architecture
8
1
SLIDING RECOMBINATION Academic/Space&Motion Study Individual Work My idea aims to use the most basic form to achieve the most effective space impact. In this case, I can change deform the units depends on different kinds of demands and keep the important space idea. On this point, Metabolism architect in 1960s accomplished some great jobs. Although their imagine of the future considered to be unrealistic, but the form and space of their works identical to my main idea. As a greet to Metabolism, I choose cuboid as the basic element of my project. The project start with a main room – an empty cuboid space with boundaries at each surface. Then I insert several small rooms into the main room, make holes on the surface. With simple motions of sliding and rotation, the small room can extremely change the typology of the interior and exterior space of the main room, also the relationship between the two kinds of rooms .
2
3
HERITAGE
These two ways to realize "units - stacked" architecture structurally. One is stack them in a structural stable way. Whcih means every unit has to support each other like building blocks. The second way is the building the frame first and insert units into the frame. In this model, the units are supported by the frame.
Modularization architectures are architectures combined by a series of units. For example, an apartment is combined by hundreds of rooms, which can classified to four to five house types. These house types are the basic units of the building. Units usually have fundamental architectural shapes and multipal functrion, whcih vary the form and function the whole building when they stacked togehter.
In 1960s, Metabolism propose a series of unprecedented images of future buildings with the method of Modularization. Cuboid has a strong sense of presence in these buildings. Their works has reached a new level of architecture formally and functionally.
FORM GENERATION
CONCEPT GENERATION Use cuboids as basic elements. Scale to different size.
Create frame box as the boundry and support.
Change the shape and scale of oppenning to create in side space of the frame.
Insert units to vary the space.
Slide & rotate the units to change the space inside and outside the frame box.
MOTION TYPE 01 Phycally Supportive 02\03 Rotate 04 Slide Use cuboids as basic elements. Scale to different size.
Use cuboids as basic elements. Scale to different size.
Use cuboids as basic elements. Scale to different size.
4
Use cuboids as basic elements. Scale to different size.
01
02
5
03
04
SPACE STUDY
To study the variation of space, I use two robot to control the motion of each block, and use three cameras to record the process. The robot’s ability to move smoothly and precisely is regard to be the most advantage over stop motion or any other manually motion. Smooth and continent motions by robot are way more attractive on screen than intermittently motion by manually and definitely illustrate the motion idea more successfully. The BD move also allows us to program motions that can be hardly achieved be man hand.
6
7
SCALE STUDY
DUPLICATION
adatable to different kinds of scale.
When be multiplicated, the space between two structure box become variable. We can image there is a invisible box there and transform the spacial characters of the frame box into it.
8
9
PROJECTING EVENTS Academic/Theatre Design/Cirque De Solei Individual Work From the second project we start to collaborate with Cirque De Solei and the first project requires us to apply our ideas into a theatre with the capacity of 3000 – 5000 peoples. My aim is to design a theatre that has a strong relation to the city and involve the audience into the show. Although we have different kinds of ideas at the beginning, we eventually split into two sides – either moving the stages or auditorium, partially or wholly. My idea belongs to the former group. In my project, horizontal motions of stages create a relation between theatre and the street and vertical motions change the space inside the building dramatically. Together, the two kinds of motion can constantly reverse and reform the active space.
10
11
CIRQUE DU SOLEIL
Cirque De Solei is famous for its innovative show in Las Vegas and traveling shows. They are devoted into experiment to apply all kinds of mechanical machine into cirque show like the huge mechanical stage in KA show and the lifting system in LOVE show. They turn cirque show into a complicated and precise 3D cooperation of people and machine. In this case, all kinds of detail-oriented design about stage or auditorium seem mean less when lacking of knowledge about the operation and design of cirque show. Thus, space variations seems to be the best point for architect to focus on.
OVERLAP
CONCEPT GENERATION
01
01 Street Show 02 Traveling Tent 03 Theatre Cirque Show
02
ST AG
ST AG E
E
ST AG E
HISTORICAL HERITAGE
Mix the position of stage and auditorium to enclose audience and artisits.
Penetrate the building to make space for theatre and open the buidling to the city.
Projective stage provide circumstances for street show.
Motion stage also rearrenge the space inside the theatre.
03
During my research about cirque, I found one thing interesting. Street show is the original form of cirque show, usually people just stand in a circle and artists performing in the center. In this form of cirque show, audience has a strong relation with the artists. Later on, cirque develop into traveling tent, which brings joy wherever it stops and eventually into theatres in Las Vegas. This process of the evolution is interesting but also a process separate the audience and the artists, cirque and city. Inspired by this point of view, I’m trying to overlap the history of cirque on onto one building. During the day time, the stages will project onto the street to have street show. During the night, people will come into theatre to experience show combined with professional cirque performance and monument space changing. The project aims to overlap historical symbols of cirque into one building.
12
13
DESIGN GENERATION
01 Start with the basic form of theatre. Evevate the theatre to have a bird-eye view in the city.
02 Plug in support rooms to provide space for extra stags, back stages and auditoriums.
03 Locate the auditoriums around the stage to mix the performance and audience spaclialy.
RENDERING
04 Use the tent language to form the surface.
04 Insert sliding stages. Sliding stages can sliding horizontally, funtion as street show stage, bridge between back stage and main stage, and recombinational elements.
05 Insert elevating stages, which slide vertically and mainly reform the volume of the interior space of the theatre.
MAIN STAGE SHOW
07 Open the surface btween two sliding stages and insert bridge stage to create the main street show surface.
08 Create outdoor auditorium for pedestrian.
14
09 Open the rooftop for after show party.
15
16
17
SLIDING STAGE
ELEVATING STAGE
PROJECTING STAGE
18
19
20
21
ANITMATED COMPLEX Academic/Complex/Cirque De Solei Individual Work After the presentation of the theatre with Cirque De Solei, we found it is hard to operate a cirque with the capacity of 5000 audiences in any other place than Las Vegas, with out the huge amount of tourists attracted by casino. So we decide to scale down the project and find a more propitious form for Cirque De Solei. Three sites in Los Angeles are chosen to for researching. We are aim to find an advanced form of cirque for each site based on our space and motion ideas. My site located on Wilshire Blvd, inside a large shopping area. Commercial complex is thought to be the best kind of architecture for this area.
22
23
N
Dr
Dr
o de
Ro
on an C
N
The site located on Wilshire Blve, one of the most important road in LA. Commercial are very popular in this area. Thousands of travelers come to this area everyday brings unusual density of pedestrians here compares to other parts of LA. This phenomena also hasten the develop of recreation.
Wilshire
Beverly Dr
SITE
Like most of the communities in LA, residential area are around the commercial area, right behind the shops. Houses and rental apartments are basic types of residential.
There are rarely pulic space like parks or squares here. Only several small green land between the gaps of buildings.
As an complement to the area, most parts of the building are open to the city to create an environment like a park. The first floor of the complex is lifted and directly connected with the street. The surfaces of the building are transparant and have huge openning to build visual connection to the city. I'm try to intrude flow, light, wind into the building. The cirque "boat" travels inside the buidling to animate differernt parts of the complex. Park like form encourage events happen on any part of the builing.
STREET
Building
RECREATION
CIRQUE
RETAIL
GALLERY
Lobby
CIRQUE Commercial occupied over 60% parts of this area. Superfluity shop are the most popular kind of retail here. Small street shops are the typical form of commercial.
CIRQUE
Two kinds of the texture of city junct at Wilshire Blvd. Entrance Holl
24
25
CIRQUE
DESIGN GENERATION
Main Flow
Wide View
Main Road
Most popular shops are on the north est part of the site. Wilshire Blvd also located on north, which indicate to attract more people, these parts of surfaces should be well designed. I choose to open the building to the city to create a visual connection between the complex and people.
26
01 Caculate the volume of the building and take the whole stie as the Nike Town.
02 Insert the curve walls to define space for moving stage. These walls also serve as structure parts.
03 Elevate the first floor to create a huge lobby for events.
04 Elevate the north east part to create the entrance plaza.
05 Open the surface according to the flow of pedestrians.
06 Make two holes on top to introduce sun light into the building.
07 Sink part of the first floor to create a stair way to underground gallery.
08 Plug in the cirque part. It moves along three railways and animate space where it stops.
09 In sert open spaces into the building. These space function as auditorium squire inside the building when events happen.
27
01 Entrance Plaza Show 02 Support Stage Show 03 Special Plantform Show 04 Main Lobby Show Main Stage Back Stage Inside
05 Private Room Show 06 Street Show
01
02
03
04
05
06
Support Stage
In this project, cirque is all in this "boat". It contains a large main stage on top, back stage inside and a small stage for the first floor people. It travels along a circle, animating every spot it stops. The position changes mostly according to time , according to the gathering and distribution of people.
28
29
FABRICATION LAB Research on Material and Form Teamwork
30
31
Trail Pattern Program is always a loop, so we use a pattern like the shape of '8' to leave circulation possibility for the future programable robotic test.
Progrmable Random This techseminar is about limit. And we think go over limit is a very cool thing. What robot always does id going through a programed path within a specific time and a certain load. So we want to produce something over the path, which means using a very simple path to create something really complex and beautiful.
3 people team work\academic\fabrication physical model manufication\video recording
Layers in timeline By presice calculation of motion of the bottle which provided by robot, and time of each motion stop to produce drawing, the robot produces almost the same complex pattern if we keep the length of the line and wight of the bottle. The sixth pattern might be a little due to the accumulated error.
32
33
Object Taking the advantage of programable or repeatable, we go further to explore the application of this production method. Starting from the original '8' pattern, the object is built up layer by layer with related reference to the grid and curve,
Tests This three tests are made by the same 8 pattern, but different time settings and stop times settings. although it is overlap, but it is still easy to distinguish each set. And each center of different sers are perfectly located in the projection of the 2D trail.
Related Layers
Material The bottle are carefullty designed. We have to control the speed if pigment. The diameter of the openning and the ratio of the pigment and water is extremely difficult to control. In order to keep the result on the canvas as same as when the pigment reach the surface, we carefully selected the media. Because the more sparse the pigment is the more fluent it can come out, but it would also be more difficult to keep precise drawing on canvas.
We use flat drawings on the canvas with three-dimensional wood and resin produced by CNC and casting to create the container for the drawing. The robot can keep producing the same drawings to work in concert with the other objects designed differently. By adding three dimensional objects, the object is not only keeping the programable result, but also creating spacial characters like mess and light.
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
UNDERGRADUATE Individual/Team Work
58
59
VERTICAL BLOCKS Dec.2012 - Jan.2013/4th Year Housing/Competition/Team Work Tong Qi/Jia Wenzhao/Xiao Chen Design/Diagram Tutor/Libao Chen Our plan procceed from vertical block which extends the normal block on the vertical dimension to build a serial street. 4 floors serve as a unit with some public space for the residents to communicate with each other. In this comfortably snug space, children can disport with their parents lightheartedly. Connected tall space is exist in each units and good for ventilation, while each units are rotated regularly. In the house types, the whole amalgamated dwelling set the sizes according to the household size, it contains 5 house types(single,a couple, the couple with a child, the couple with a child and an aged parent(s)).These 5 types offer different needs for different people,letting them to choose the most suitable and comfortable space for themselves. Inside the room, the vertical spiral stairs make the space more abundant.
60
61
ANALYSIS OF THE PUBLIC SPACE
one unit
open space throughout the block connection between two open space
vertical traffic space As I had mentioned that,the idea of this block is trying to creat a more interactive space. People can release themselves in this kind of open space in the vertical block.
Fire stair to connect each block
courtyard open space
courtyard inside the block stairs inside every room
62
63
perspective of courtyard
Block-b lobby: entrances of units (up to level 1 or down to bloch-d below), with some children room located on this level and two accessible units for senior tenants with a green-house facility
Block-d level 1: occupants reach thier units on this level from lobby level below,while some units entered from fire escape stairs.
level 1
Block-d level 2: which is extended space from units below and some are extended units from level 3 above.
level 2 64
Block-d level 3: highest level of blocka and most occupants on this level enter from the level above (blockb level lobby)
level 3
level 4 65
Every block was devided into several cubes which has different function,at the same time residence can chose different room type to fullfill their needs.
different types of different home types
interior perspective Single person
one couple
one child + one couple
one couple + 1 child + an aged parent
At the same time,in order to introduce enough sunlight to fullfill people’s need, every single box has windows of different sizes.
66
67
one couple + two child + an aged parent
COMPLEX OF PUBLIC Hulun Buir/China/Museum/Academic/Individual Work March.2012-April.2012/3rd Year Studio Tutor/Chang Jian Hongdu Screen Culture Creative Industry Center borders commercial district, residential area and school. It provides not only work places for screen culture creative enterprises, but also services for the public. The design emphasizes on building relationships between the center and surrounding public areas. It aims to create an open space that can enable all sorts of people to enjoy various public activities. The construction site is located in the amphitheater. This aims to build the site into an openair performance center. Organized or spontaneous activities can be held outdoors. The main building surrounds the amphitheater. It has openings in south and north sides, and well connects surrounding space including the campus square, open air theater and the public lawn.
68
69
PROLOGUE
Hongdu Screen Culture Creative Industry Center borders commercial district, residential area and school. It provides not only work places for screen culture creative enterprises, but also services for the public. The design emphasizes on building relationships between the center and surrounding public areas. It aims to create an open space that can enable all sorts of people to enjoy various public activities. The construction site is located in the amphitheater. This aims to build the site into an open-air performance center. Organized or spontaneous activities can be held outdoors. The main building surrounds the amphitheater. It has openings in south and north sides, and well connects surrounding space including the campus square, open air theater and the public lawn.
Co
mm
Residential
Res
erc
ial
iden
tial
University
Residential
University
University
DESIGN STRATEGY
university
OA D
residential area
GREEN AREA
MA IN R
commercial area
The design aims to build up a connection between the surrounding buildings and public areas to increase the quantity and quality of public space in the region. The complex serves as a space hub of the region.
CAMPUS ROAD SQUARE public space
traffic point
70
main people flow path
71
3m 4m
Site
Parking lot
Connect two sides of the site
Amphitheatre in the center 72
Mass of the complex
Courtyard
Bottom overhead
Uplift toward people flow 73
2
1
2 2 2
2
2 3
2
2
4
3
1
2 2
2 5
1 Theater 2 Commercial & Dining 3 Resaurant 4 Office
4
2
5
3
4
3
4 1 Theater 2 Commercial & Dining 3 Resaurant 4 Office 5 Entrance Hall
1 7
8
8
6 9
1 Theater 6 Spermarket 7 Exhibition 8 Video Room 9 Entance Hall
74
75
FUNTION ANALYSIS
N
0 4 9 20
Theater
Public Space
Office
Commercial
Exhibition
Master Plan
pedestrian's path of ground level
Complex
Section II
Section I 76
77
ATTACHEMENT TO THE HISTORY Hulun Buir/China/Museum/Academic/Individual Work March.2012-April.2012/3rd Year Studio Tutor/Chang Jian To memorize the historical value of the Middle East Railway, local government planned to build a culture experience center. The Middle East Railway Architectural Culture Heritage Experience Pavilion serves as a place for culture collection, exhibition, educational research, and academic exchanges activities. Through those events, the government tries to revitalize Middle East Railway culture. This architectural design emphasizes on the establishment of a relationship between the newlybuilt structure and the historical one. Besides, the structure is a public building and constructed in the frigid region. Thus, fulfillment of functions and energy issues should also be paid attention to. Adhering to the continuation of the original urban fabric and street faรงade, the design wants to express the sense of harmonious coexistence of the old and new buildings. In addition, the design provides two public squares in the areas with large flow of people. This can not only better serve the public but also attract more visitors.
78
79
SITE
Zalantun located in east of Inner Mongolia. Although it is surrounded by mountains, it is one of most important cities of Inner Mongolia. That's because it's a important transportation nodes of this region.
The site located in the north part of Zalantun. The Zalantun railway station, which is regarded as an important role of Mid-eastern railway, was next to the site in the northwest.
Train Station Square
DESIGN STRATEGY Museum
Civic Square
PUBLIC
I imagine the museum will arouse people's awareness of the value of history. So I took the public nature of the museum into consideration, trying to attract more people to the museum. And in order to coordinate with historical buildings, I use local elements of facades in the design.
HISTORY
MUSEUM SQUARE
HISTORICAL BUILDING
Club The site is also surrounded by highschool, government agency and civil squares. There were two historical architectures within the site, one is a museum and the other is a club.
HISTORICAL BUILDINGS DISTRIBUTION
Open square toward people flow
Connect historical buildings
Connect public square
The site located in the north of China. As a significant factor, the climite influnced the design a lot, especially the energy saving problem caused by the low temperature in the winter.
heat
Many historical buildings of immigration era located near the railway. However, many of them are not well preserved.
80
Use elements of local historical buildings
Dispersion structure lose more heat
81
Joint form has fewer radiating surface
Central Courtyard
Lighting
Junction
Exihibition
Event Stage
DESIGN GENERATION
Two historical buildings in site
Zone of the museum
Volum of the museum
Elements of local historycal building
Open more space for crowd
Couryard at the connection point with historical buildings
Courtyard at the center of the museum
Connect three courtyards
Connect central courtyard with hallway and squares
Creat out door exhibition hall
82
83
N
TRAIN STATION SQUARE 0
6
14
24m
MAIN RAOD
MAIN RAOD
CIVIC SQUARE
MAIN RAOD
Master Plan
A-A Section
84
85
Logistics/Office
11
12
13
Exnibition Room
15
14
10 28
27 2
Open Area
1 25 9 6
6
Supporting Function
5 7
8 A
Function
A 6 3 4
6
6
1 9
2
28
26
6 kinds of exhibition halls 24 16
Locate them around the courtyard
23
24
17 18
19
20
Plan
20
21
22
0
1 Entrance Hall 2 Information Desk 3 Restaurant 4 Rest Area 5Temporary Exhibition Hall 6 Exhibition Hall 7 Panoramas Exhibition Hall 8 Courtyard 9 Vestibule/Temporary Exhibition 10 Theater 11 Electronic Reading Room 12 Laboratory 13 Control Room 14 Office 15 Reception Room 16 Security Control Room
86
3
7
12m
17 Duty Office 18 Reference Room 19 Creative Room 20 Creative Room 21 Fire control Room 22 Distribution Room 23 Computer Room 24 Storage 25 History Experience Hall 26 Club 27 Outdoor Exhibition Hall 28 Garden
87
Creat circular channel
88
89
WATERSIDE Academic/Complex/Cirque De Solei Individual Work Situated in the East Lake scenic area of Wuhan City, the Lakeside Club offers busy urban residents a satisfactory place for entertainment and leisure. The site is constructed in a peaceful environment but also adjacent to the downtown. Building the construction site in the lakeside, the design attaches importance to establishing connection with surrounding environment, which creates abundant indoor and outdoor space. Consecutive slope roof stretches to the lakeshore. This produces a hydrophilic environment. The slop reaches to a 4-story height in the northeast side, which can work as an observation deck to view the beauty of the East Lake scenic area.
90
91
PROLOGUE
Situated in the East Lake scenic area of Wuhan City, the Lakeside Club offers busy urban residents a satisfactory place for entertainment and leisure. The site is constructed in a peaceful environment but also adjacent to the downtown. Building the construction site in the lakeside, the design attaches importance to establishing connection with surrounding environment, which creates abundant indoor and outdoor space. Consecutive slope roof stretches to the lakeshore. This produces a hydrophilic environment. The slop reaches to a 4-story height in the northeast side, which can work as an observation deck to view the beauty of the East Lake scenic area.
RESORT
SITE
WET LAND
CURRENT SITUATION& PROBLEM Wuhan has rich water resource and enjoys the reputation of “City of Hundard Lakes�. Yangtze River and Han River flow through it. However, extensive economy growth mode has decreased the number of lakes and threatened the water quality. As the largest lake and also a scenic area in Wuhan City, East Lake is best preserved water resource there. But it still faces the criss of destruction because of the overexpended real estate.
EAST LAKE
SCENIC AREA
Human beings have born with hydrotropism and are fond of areas close to water. But some factors have lessened our access to water. For instance, the fluctuating water level brings about the construction of dams. Such site so close to water can seldom be found in Wuhan City now.
DESIGN STRATEGY The design attempts to offer more water side space for urban residents, and also enable them to get a boarder view to grasp the beauty of east lake.
Architectural forms provided limited hydrophilic space
Slope roof to get more out door space
VIEW
The construction site is located in the beautiful East Last scenic area, about 5 kilometers from the downtown. The traffic system now under construction will facilitate people to get there.
92
Viewing platform
93
The site located along the water side.
Taking advantage of the ascending slope design, the building stretches from east to the west. This creates a spacious hydrophilic platform.
By virtue of slope, the north side of the building generates another volume to hold essential functional units.
The center of the building volume is subtracted, leading sunshine in and linking the two ends of the site.
The building can serve as a small event stage where colorful public activities can be held.
In the south of the building, large Frenchwindow is adopted for people to have a good view of the beautiful wet land.
94
The eastern part of the slope extends into the water, producing a space like manmade beach for water-playing.
The successive slope crest provides a walk path and rich sightseeing spots.
The south-east of the building and the observation deck face to the best angle of the construction site for beauty seeing.
95
LEVEL 1
LEVEL 4
6
3 1
LEVEL 3
LEVEL 2
1 4
9
7
11
2 8
5
1.Private Room 2.Beauty Salons 3.Video Room 5.Table Tennis Room
4.Gym
1. Private Room 6. Snooker Club 7. Bar 8. Cafe
96
10
9. HK Cafe 10. Resaurant
11. Library
97
Structure Analysis
Function Analysis
flow line
roof
curtain wall
public function room
colum
repast
floor recreation & leisure
base private rooms
98
99
BETWEEN GAPS Wuhan/China/Bus Station/Academic/Team Work Xing Yiwen/Xiao Chen Designer/Analysis/Rendering Tutor/Wang Xiao/Nov.2011-Dec.2011 This is the design of a bus station which is affiliated to Wuhan railway station. The site is located in the city's new planing area, far away from the dowtwon of Wuhan city but next to the railway transportation hub in this region. The station serves as the transfer station for passengers getting off Wuhan railway station to change lines. The design focuses on the function of the transportation building layout and its flow line arrangements to find a way to ensure smooth flow line function as well as provid ample rest room and bright public space.
100
101
PROLOGUE This is the design of a bus station which is affiliated to Wuhan railway station. The site is located in the city's new planing area, far away from the dowtwon of Wuhan city but next to the railway transportation hub in this region. The station serves as the transfer station for passengers getting off Wuhan railway station to change lines. The design focuses on the function of the transportation building layout and its flow line arrangements to find a way to ensure smooth flow line function as well as provid ample rest room and bright public space.
Wuhan Station
The position of entrance/exit for buses and the station square are designed based on field investigation.
We determine the size and shape of each space according to the nature of workplace.
Support
FACADE ANALYSIS
Support function
Waiting
Public space
Main road
Resting
Drawee
Waiting
Resting
Drawee
auxiliary
function auxiliary
function
There are different levels between functions space and auxiliary space.
Green area Function
Insert support space function
function auxiliary
function auxiliary
Tilt the bottom wall to get more space and a broader horizon. export square entrance function auxiliary
Bus stop
Cross roads
102
Master plan
The distribution of passengers
function
function auxiliary
Determine the size of building based on functional requirements.
Reconstruct the space
103
Master Plan 1:2000 Wuhan railway station
Bus parking lot
glass envelope
OFF
Main
Bus exit
road ON
Bus parking lot
Main entrance
concrete envelope
Passenger flow lines
Station square
Bus parking lot Officer
Driver
bearing structure
Bus entrance Parking lot
Officer function partition
Staff flow lines
104
105
[ FUNCTION ] Ticket Hall
Resting Hall
106
Waiting Room
Public Area
107
Office
South Facade
Shadow
Crowd
View
108
109
PROFESSIONAL WORKS NIKKO/GS&P
110
111
WORKS IN NIKKO DONGCAN PROGRAM Facade Design/Modeling/Plan Design
Basement Plan
1st Floor Plan
2nd Floor Plan
112
3rd Floor Plan
113
WORKS IN NIKKO DONCHEN DEPARTMENT PHASE 2 Plan Design
1st Floor Plan
8th Floor Plan
9th Floor Plan
114
2nd Floor Plan
115
WORKS IN NIKKO Detail Design
116
117
WORKS IN NIKKO Detail Design
PLAN
SECTION
SLOP DETAIL DRAWING
118
119
Second Floor Plan
120
Third Floor Plan 阳台
清洁间
洗衣房
室
1床
晾晒
电梯机房
污洗间
污洗间
污洗间
会议室
医生办公
清洁间
洗衣房
清洁间
洗衣房
1床
化
科
室
储藏
1床
前室
1床
副主任办公室
室
储藏
更衣室
荧光
大
医生办公室
污物电梯
主任办公室
PCR
机房
机房
医生办公室
会议室
1床
护士站
1床
医生办公室
医生办公室
储藏
室
医生办公
室
1床
护士长室
1床
医生办公室
医生办公室
室
电
医生办公室
间
医生办公
医生办公室
室
1床
医生办工
室
机机房
卫生间
大
1床
屋顶花园
休息室
更衣室
空
1床
1床
卫生间
更衣室
休息室
机房
息中心
医生办公室
机 室
屋顶花园
心
医疗中
接
谈话
1床
检查室
1床
息科办公
VIP
配置
1床
处置
治疗
1床
机房
物
前室
储
储藏
前室
接
1床
护士站
1床
话
手术
室
机房
1床
1床
空
站
护士
更衣
员工电梯
卫生间
公共电梯
办
床
机房
电梯
电梯
电梯
住院
电梯
住院
室
接
室
机房
电梯
12
室
电梯
前室
电梯
污物
前室
电梯
污物
洗
污物
电梯
污物
室
办公
医生
OPR-
机房
更衣
副主任办
厅
污物
污物
副主任办
污物
任办
副主
电梯
洁物
办
主任
员工休息
物
电梯
床
电梯
室
员工休息
住院
洗
清洗
主任办
间
卫生
电梯
洁物
前室
大厅
电梯
更衣
花园
屋顶
室
洁净
会议示教
住院
站
室
办公
住院
前室
大厅
电梯
住院
更衣
示教
会议
间
卫生
室
更衣
洁物
电梯
住院
室
主任办
员工休息
电梯
住院
前室
大厅
电梯
更衣
会议示教
住院
家属休息
更衣
工
医生
主任
值班
电梯
员工
公共电梯
洁物电梯
卫生间
阳台
更衣
更衣
公共电梯
更衣
值班
更衣室
中心
公共电梯
洁物电梯
卫生间
阳台
更衣室
更衣
值班
员工电梯
公共电梯
公共电梯
洁物电梯
更衣室
电梯厅
VIP公共
室
医生休息
配
办公
主任办公室
检
阳台
卫生间
物
清洁
PCR
室
物
空调
室
净
试剂
2床
11
OPR-
01
OPR-
化学
室
办公
医生
室
办公
主任
洁净
2床
污洗间
B
室
3床
污物
3床
机房
前室
污物电梯
值班
中心
更衣
室
间
站
值班
3床
室
04
前室
B
08
3床
3床
室
办工
医生
前室
OPR-
办
更衣 更衣
3床 3床
配置
长室
护士
3床
房
更衣
06
OPR-
站
护士
室
3床
3床
室
间
3床
2床
清洗
站
护士
辅助
间
清洗
卫生
电
间
Forth Floor Plan
121
花园
屋顶
6床
员工电梯
卫生间
前室
储藏室
间
室
电梯
空调室
前室
员工电梯
室
办公室
办公室
办公室
办公室
办公室
电梯厅
会议室
室
会议室
公共电梯
公共电梯
洁物电梯
洁物电梯
机房
接待处
室
更衣
机房
科研中心
前室
会议中心
会议室
电梯机房
大厅
6床
洁物电梯
前室
主任办
办公
电梯厅
更衣
卫生间
休息室
会议室
卫生间
电梯
电梯
电
电
荧光显微镜 化学试剂
会议室
屋顶花园
配餐
会议示教
大厅
公 电梯
室
室
室
主任办
洁物电梯 厅
前室
室
室
室
电梯厅
护士站
卫生间
电
电
洁物电梯 厅
机房
室
室
室
室
室
室
室
室
电梯
洁物电梯 洁物电梯
间
电梯
电梯
卫生间
公 电梯
接待处
接待室
接待室
员工电梯 员工电梯
室
休息
员工
护士站
公共电梯
住院电梯
住院电梯
主任办
接待室
接待室
电梯
公 电梯
公
电梯
洁物电梯
配置
洁物电梯
洗
屋顶花园
室
室
室
储藏室
储藏室
会议室
员工电梯 员工电梯
家属休息
接待处
卫生间
电梯
电梯厅
示教
会议
卫生间
住院公
电梯
公共
大厅
公共
主任办
手术电梯
更衣
副主任办
电梯
住院
更衣
副院长办公室
副院长办公室
电梯厅
室
室
室
员工电梯 员工电梯
手术电梯
更衣
公 电梯
厅
副院长办公室
值班
员工休息
休息
站
院长办公室
空调室
前室
工
公
会议
谈话
储藏室
副主任办
手术电梯
电
更衣
休息室
室
室
卫生间
室
室
更衣
卫生间
室
室
休息室
室
室
室
室
储藏室
电梯厅
卫生间
住院公
电梯
手术
更衣
电梯
手术
更衣
物配置
公 电梯 公 电梯
卫生间
电
厅
物配置
手术电梯
更衣
家属
电
医生
员工电梯
间
站
床
护士
洁净
厅
值班
室
员工休息
医生办公室
医生办公室
医生办公室
医生办公室
休息室
空调室
前室
员工电梯
员工电梯
公
生办
科医
间
床
电梯
员工
电
卫生间
储藏室
更衣室
厅
员工电梯
空调室
更衣室
员工电梯
值班
值班
站
护士
间
卫生
室
办公
办公室
洗
主任
辅房
手术
卫生
谈话
办公
医生
洗
室
办公
检
检查
室
会议
住院
手术 医生 中心 休息 室
办公
3床
电
室
储藏
储藏
接待
污物
更衣
3床
处置
治疗
室
办公
辅房
室
电
心电
室
办公
处
处
站
护士
10床
治疗
手术
07
OPR-
05
OPR-
室
检查
3床
站
室
ICU
心电
办
主任
站
护士
办公
护士
护士
室
储藏
ICU
镜
试剂
室
储藏
心电
任办
副主
机房
化学
B
显微
荧光
室
休息
医生
室
会议
间
卫生
OPR-
更衣
3床
储藏
机房
试剂
间
卫生
机房
净化
手术
3床
护士
晾晒
09
03
OPR-
洁净
间
卫生
B
间
卫生
化学
储藏
室
值班
间
卫生
间
卫生
办
主任
卫生
OPR-
机房
晾晒
休息
B
值班
清洁间
清洁间
室
科
更衣
更衣
检
机房
前室
公室
长办
护士
10
OPR-
B
污物电梯
室
更衣
室
空调
手术
02
OPR-
办公
主任
污洗间
间
污洗
前室
电梯
污物
会议室
会议室
会议室
更衣
3床
前室
办公室
办公室
会议室
会议室
卫生间
值班
会议室
会议室
3床
员工卫生间
员工卫生 间
主 办公室
主 办公室
2床
3床
护士站
辅助护士站
房
护士站
辅助护士站
1床
办公
医生办
6床
间
主 办公室
荧光显微镜
屋顶花园
员工电梯
3床
值班
员工休息 室
/
值班
护士站
护士办公
洁物储藏
储藏
员工卫生 间
更衣
护士站
办公室
员工电梯
员工休息 室
值班
员工电梯
副主任办
员工电梯 厅
更衣
副主任办
员工电梯 厅
房
处置
处置
3床
3床
检查室
3床
3床
储藏室
储藏室
镜
卫生间
镜/
镜
值班室
6床
3床
医生办工室
3床
医生办工室
6床
污物
会议室
卫生间
洁物储藏
护士长室
3床
检查室
护士长室
前室
洁物储藏
手
更衣
副主任办
镜
配置
治疗
3床
6床
6床
配置
治疗
更衣
更衣
更衣
主任办 休息室
3床
电梯
3床
3床
手术室
手术室
谈话
护士站
储藏室
3床
6床
谈话
护士站
储藏室
6床
手术
污物
电梯厅
2床
机房
清洁间
晾晒
1床
机房
清洁 间
晾晒
空调室
空调室
污物
污洗间
前室
前室
2床
污洗间
污物电梯
1床
污洗 间
污物电梯
前室
WORKS IN GS&P
TIANJIN TAISHAN CANCER BIOLOGICAL TREATMENT HOSPITAL Plan Design
OTHER WORKS
Measurement and Maintenance Work of command post in Hongan Location: Hongan, Hubei, China Tutor: Wang Fatang Teammember: Xu Tianju, Wang huan Time: 4weeks Type: Teamwork/ Research Role: Structure, facade, and parts of the detail drawing
Photograph
details of front facade
I'm always wandering on the street, hunting absorbing place, Indulged in unstoppable shooting.
structure model
details of doors
side facade
front facade 122
123
124
125