P
O
R
T
F
O
L
I
O
D A N I E L
T U R E L
ABOUT ME Passionate-driven fourth-year student of architecture with excellent creative and hard-working skills. Able to work in different and hard situations. Proven skills in meeting tight deadlines and with a special eye for details. Versatile, patient, organized and tenacious. Highly results-focused with excellent communication skills. Very open-minded team leader with deep experience in technical drawing and architectural software. Specially interested in construction techniques, urbanism and sustainability.
DANIEL TUREL GARCIA
EDUCATION
LANGUAGES AND SKILLS
2020 – 2021 Illinois Institute of Technology
Spanish English French Chinese
Bachelors of Architecture GPA: 4.00 2017 – 2022 Polytechnic University of Madrid Bachelors of Architecture GPA: 3.32 Honorable Mentions: Studio II, English Excellence Scholarship - Regional Government of Madrid (2018) 2014 Unity Christian High School, Michigan 2002 – 2017 School Santa Joaquina de Vedruna Mirasierra (FEC) GPA: 4.00 - With Honors
Native Cambridge University C1 / TOEFL 90 Institut Français level B2 Confucio Institute HSK-2
Microsoft Office Revit/BIM Autocad 2D Photoshop Illustrator InDesign Rhinoceros 3D
ESOARCH ESOARCH ESOARCH
Sketchup
CONTACT INFORMATION
WORK EXPERIENCE
Address:
Jun-Jul 2020
Mtres Studio Architectural designer and BIM Manager – Summer intern - Collaborated with the design team and clients to meet overall project objectives. - Developed project design concepts for architectural building practice, including large-scale, com mercial projects including apartment buildings, and mixed-use developments. - Produced graphic presentations, 3D renderings, and scaled construction drawings using REVIT.
E-mail:
Jul. 2019
Mind Facilities Management Architectural designer – Summer intern - Identified distribution problems of the office. - Planned and executed office design proposals. - Created graphic presentations using PHOTOSHOP
LinkedIn:
VOLUNTEER WORK EXPERIENCE
59 E Van Buren St Chicago, IL 60605
Date of birth: 07-15-1999
Phone:
(773) 543-2847
daniel.turel@gmail.com
linkedIn.com/in/danielturel
Issuu:
issuu.com/daniel_turel
Jul. 2017 Dec. 2015
Adventure Volunteers Volunteer in the conservation project of the marine turtle Santiago de Veraguas, Panama Comunity of San Egidio Helped setting the Christmas dinner table for homeless people
CONTENT
Graphic Building Bronzeville Lakefront The Tripod. Mixed-use high rise building. Chicago, IL, US Revit Rendering the Turégano House Alberto Campo Baeza, 1988. Madrid, Spain 3DS Max and Revit Modeling and Rendering the Ruf House Sep Ruf, 1958. Tegernsee, Germany Revit Technical 30 low cost government funding housing Residential complex. Madrid, Spain Revit & AutoCad The Limits Of The Urban. Inhabitating Soria Residence building for students, a hotel, and multi-family housing. Soria, Spain Revit & AutoCad Three scales, three landscapes Beach walkway, holiday residences & thermal baths. Mallorca, Spain AutoCad Analyzing the Moncloa-Aravaca district Madrid, Spain AutoCad & Photoshop
G
R
A
P
H
I
C
Building Bronzeville Lakefront In this Studio we explored different visions of a home for the 21st Century, the new workplace, and elements of an equitable and just community in Chicago. Urban density is assumed to be valued if balanced by humanistic environments that emphasize health and wellbeing. Tangible design measures for wellness is developed integral to a more sustainable and resilient world. High performance comes from an understanding and integration of related disciplines, research, and science. During the design process, rigorous tectonics and craftsmanship lead to clear design intent and expression.
ARCHITECTURAL STUDIO The Tripod Vertical Aggregation
RESIDENTIAL
HOTEL
OFFICE
Reviews
Architect
BRIAN LEE
DANIEL TUREL GARCIA
Date of issue of the sheet 12/02/2020
Builds -
ILLINOIS INSTITUTE OF TECHNOLOGY
Property -
Address 3050 Moe Dr, Chicago, IL 60616
Orientation Title N VERTICAL AGGREGATION
Project status STUDIO
Title of the project BRONZEVILLE LAKFRONT - BUILDING THE EDGE
Scale
Date FALL 2020
Sheet
3D.1 Ref. ARCH419
ARCHITECTURAL STUDIO The Tripod Drop off access
ARCHITECTURAL STUDIO The Tripod Base of tower access 2
ARCHITECTURAL STUDIO The Tripod Top of tower
Rendering The Turégano House This course is an in-depth exploration of new visualization techniques to support and express architectural design through 3D rendering. Topics include 3D modeling, cameras, lighting, material mapping and rendering output in Autodesk 3ds Max and model linking workflows between 3ds Max and other modeling platforms. Presentation concepts include rendering style and image compositions. I chose to work on the Turégano House designed by Alberto Campo Baeza in 1988 and located in Madrid, Spain.
DESIGN VISUALIZATION Rendering the Turégano House Exterior render
DESIGN VISUALIZATION Rendering the Turégano House Exterior render
DESIGN VISUALIZATION Rendering the Turégano House Exterior render
DESIGN VISUALIZATION Rendering the Turégano House Interior render
Modeling And Rendering The Ruf House This course is an in-depth exploration of new visualization techniques to support and express architectural design through 3D rendering. Topics include 3D modeling, cameras, lighting, material mapping, and rendering output in Autodesk Revit and model linking workflows between Revit and other modeling platforms. Presentation concepts include rendering style and image compositions. I chose to work on the Ruf House designed for himself by Sep Ruf in 1954 and located in Gmund, Tegernsee, Germany.
MODELING AND RENDERING THE RUF HOUSE Ruf House, Sep Ruf, 1954 Deployed axonometric
MODELING AND RENDERING THE RUF HOUSE Ruf House, Sep Ruf, 1954 North-east view
MODELING AND RENDERING THE RUF HOUSE Ruf House, Sep Ruf, 1954 Interior render
CLICK HERE OR SCAN FOR VR!
MODELING AND RENDERING THE RUF HOUSE Ruf House, Sep Ruf, 1954 Interior render
CLICK HERE OR SCAN FOR VR!
T
E
C
H
N
I
C
A
L
Construction II: 30 low cost government funding housing The objective of this project was to acquire the basic knowledge of the construction process and how to apply them to an Execution Project. We focused on building construction, land movement and containment, foundation, structure, facade, and roofing. The goals were four: to resolve in detail the construction solutions proposed to respond to the established requirements, to apply the principles of construction for concrete solutions in Architecture, to correctly represent the constructive system and details graphically, and to develop personal criteria. My partner and I proposed a building system based on concrete honeycomb slabs combined with steel beams and pillars. For the outer layer, we used an ETICS-type façade system with a stone cladding.
CONSTRUCTION II Multi-family residential Perspective 1
CONSTRUCTION II Multi-family residential Perspective 2
CONSTRUCTION II Multi-family residential Section perspective
CONSTRUCTION II Multi-family residential Section 1
CONSTRUCTION II Multi-family residential Constructive details DETALLE FACHADA VENTILADA Y FORJADO DE PLACA ALVEOLAR - PLANTA BAJA
AISLAMIENTO TÉRMICO POLIESTIRENO ESPANDIDO 50 mm
DETALLE FACHADA VENTILADA Y CUBIERTA
TABIQUE 1/2 PIE LADRILLO PERFORADO
TRASDOSADO AUTOPORTANTE A UNA CARA, FORMADO POR: - PERFILES VERTICALES DE 70 mm, SEPARADOS 400mm. Y ARRIOSTRADOS A TABIQUERÍA PORTANTE - AISLAMIENTO INTERIOR DE LANA MINERAL SEMIRÍGIDA DE 65 mm. DE ESPESOR (l=0,035 W/mK) ENTRE MONTANTES
ALBARDILLA: PILAR HEB 300
PERFIL EXTRUSIONADO DE ALUMINIO ACABADO RAL A ELEGIR DF. CON FORMACIÓN DE GOTERÓN
DOBLE PLACA DE YESO LAMINADO PYL e= 13 mm (DENSIDAD 30KG/M3) ACABADO DE PETO MEDIANTE ENFOSCADO DE MORTERO DE CEMENTO BLANCO
CÁMARA DE AIRE
RODAPIÉ
LOSA FLOTANTE ARMADA 40 mm
LAMINA BETUN MODIFICADA LBM(SBS)-40/FP
PAVIMENTO
MORTERO DE AGARRE
CUBIERTA NO TRANSITABLE, FORMADA POR : - CAPA DE GRAVA BLANCA ESPESOR MÍN. 8 cm - CAPA ANTIPUNZANTE GEOTEXTIL DE 200 g/m² DE FIBRA CORTA DE POLIÉSTER NO TEJIDO - AISLAMIENTO DE CUBIERTA DE POLIESTIRENO EXTRUIDO DOS LAMINAS CONTRAPEADAS 6+8 - IMPERMEABILIZACIÓN DE CUBIERTA MEDIANTE DOBLE LÁMINA ASFÁLTICA DE BETÚN MODIFICADO CON ELASTÓMEROS SBS - DOBLE CAPA ANTIPUNZANTE GEOTEXTIL DE 200 g/m² DE FIBRA CORTA DE POLIÉSTER NO TEJIDO ENCIMA Y DEBAJO DE LA IMPERMEABILIZACIÓN - IMPRIMACIÓN ASFÁLTICA - FORMACIÓN DE PENDIENTE CON MORTERO DE CEMENTO 1,5%
PETO DE CUBIERTA FORMADO POR 1 PIE DE LADRILLO PERFORADO TOSCO AISLAMIENTO TÉRMICO POLIESTIRENO ESPANDIDO 50 mm
IMPERMEABILIZACIÓN AUTOPROTEGIDA PARA REMATE DE PETOS
SISTEMA DE FACHADA VENTILADA PANEL COMPOSITE
CÁMARA DE AIRE
PLACA ALVEOLAR 120
HP310X93
PLACA ALVEOLAR 120
PILAR HEB 300
SISTEMA DE FACHADA VENTILADA PANEL COMPOSITE HP310X93
FALSO TECHO DE PLACAS DE YESO LAMINADO SUSTENTADO MEDIANTE PERFILERIA MEALICA T-47. SEPARACION MAXIMA 60 cm
DETALLE FACHADA VENTILADA Y FORJADO DE PLACA ALVEOLAR - PLANTAS 1 A 5
COLECTOR COLGADO DE SANEAMIENTO
DETALLE FACHADA VENTILADA Y FORJADO DE PLACA ALVEOLAR - PLANTAS 1 A 5
PILAR HEB 300
AISLAMIENTO TÉRMICO POLIESTIRENO ESPANDIDO 50 mm
TABIQUE 1/2 PIE LADRILLO PERFORADO
TRASDOSADO AUTOPORTANTE A UNA CARA, FORMADO POR: - PERFILES VERTICALES DE 70 mm, SEPARADOS 400mm. Y ARRIOSTRADOS A TABIQUERÍA PORTANTE - AISLAMIENTO INTERIOR DE LANA MINERAL SEMIRÍGIDA DE 65 mm. DE ESPESOR (l=0,035 W/mK) ENTRE MONTANTES
DOBLE PLACA DE YESO LAMINADO PYL e= 13 mm (DENSIDAD 30KG/M3)
AISLAMIENTO TÉRMICO POLIESTIRENO ESPANDIDO 50 mm
TABIQUE 1/2 PIE LADRILLO PERFORADO CÁMARA DE AIRE
TRASDOSADO AUTOPORTANTE A UNA CARA, FORMADO POR: - PERFILES VERTICALES DE 70 mm, SEPARADOS 400mm. Y ARRIOSTRADOS A TABIQUERÍA PORTANTE - AISLAMIENTO INTERIOR DE LANA MINERAL SEMIRÍGIDA DE 65 mm. DE ESPESOR (l=0,035 W/mK) ENTRE MONTANTES
RODAPIÉ
LOSA FLOTANTE ARMADA 40 mm
LAMINA BETUN MODIFICADA LBM(SBS)-40/FP
DOBLE PLACA DE YESO LAMINADO PYL e= 13 mm (DENSIDAD 30KG/M3)
CÁMARA DE AIRE
RODAPIÉ
LOSA FLOTANTE ARMADA 40 mm
LAMINA BETUN MODIFICADA LBM(SBS)-40/FP
PAVIMENTO
MORTERO DE AGARRE PLACA ALVEOLAR 120
SISTEMA DE FACHADA VENTILADA PANEL COMPOSITE HP310X93
FALSO TECHO DE PLACAS DE YESO LAMINADO SUSTENTADO MEDIANTE PERFILERIA MEALICA T-47. SEPARACION MAXIMA 60 cm
PLACA ALVEOLAR 120
SISTEMA DE FACHADA VENTILADA PANEL COMPOSITE HP310X93
FALSO TECHO DE PLACAS DE YESO LAMINADO SUSTENTADO MEDIANTE PERFILERIA MEALICA T-47. SEPARACION MAXIMA 60 cm
CHAPA DE REMATE DINTEL
CAJON DE PERSIANA ENROLLABLE COMPACTO DE 155 MONOBLOC CON PVC, CON AISLAMIENTO TERMICO Y AISLANTE ACUSTICO
PAVIMENTO
MORTERO DE AGARRE
CONSTRUCTION II Multi-family residential Constructive details DETALLE DE ZAPATA AISLADA Y ARRANQUE DE PILAR DE HORMIGON ARMADO - VASO PISCINA
ARRANQUE DE PILAR METÁLICO EN VIGA DE CORONACION DE PANTALLA DE PILOTES SECCION
ALZADO
PERSPECTIVA ESQUEMATICA
PERNOS DE ANCLAJE
MORTERO DE NIVELACION
SECCION
BISELAR TALADRO PARA RECIBIR LA SOLDADURA
SOLDADURA PLACA DE ANCLAJE
Ls MORTERO DE NIVELACION
DETALLE DE SOLDADURA DE PERNOS DE ANCLAJE
PILAR METALICO
ARMADO PILAR
PILAR METALICO
PLACA DE ANCLAJE
PILAR METALICO HE300B
SECCION
DETALLE DE ZAPATA AISLADA Y ARRANQUE DE PILAR METALICO - ESTRUCTURA GARAJE
PILAR
ESTRIBOS PILAR
PLACA DE ANCLAJE
MORTERO DE NIVELACION
MORTERO DE NIVELACION CIMENTACION
ZAPATA
VIGA DE CORONACION
PERNOS DE ANCLAJE
0.20m.
0.10m.
PILOTE
0.30m.
ARMADO INFERIOR ZAPATA ARMADO INFERIOR ZAPATA
PILOTE Ø50 PILOTE Ø50
0.10m.
VIGA DE CORONACION
VIGA DE CORONACION
0.20m.
PERNOS DE ANCLAJE
SEPARADORES ≥5cm.
SEPARADORES ≥5cm.
HORMIGON DE LIMPIEZA HA-25/P/20/IIa
PLANTA
HORMIGON DE LIMPIEZA HA-25/P/20/IIa
PLANTA
ARRANQUE DE VIGA METÁLICA EN VIGA DE CORONACION DE PANTALLA DE PILOTES - FORJADO SOTANO -1 DETALLE DE SOLDADURA DE PERNOS DE ANCLAJE
PLACA Y PERNOS DE ANCLAJE VIGA METALICA HP310X93
250mm.
50mm. 100mm. 410mm.
310mm.
BISELAR TALADRO PARA RECIBIR LA SOLDADURA
ARMADO INFERIOR ZAPATA
ARMADO DE ARRANQUE DEL PILAR
ARMADO INFERIOR ZAPATA
PERNOS DE ANCLAJE
SOLDADURA PLACA DE ANCLAJE
50mm. 310mm.
50mm.
410mm.
50mm.
PLACA DE ANCLAJE e = 15mm.
PERNOS DE ANCLAJE 6Ø16
MURO
► SOLDADURA: SE SOLDARA EL PERFIL A LA PLACA DE ANCLAJE EN TODO EL PERIMETRO DE CONTACTO ► EL CORDON
DE SOLDADURA SERA CONTINUO Y DE PENETRACION COMPLETA
SECCION
ALZADO
PERSPECTIVA ESQUEMATICA
PAVIMENTO MORTERO DE AGARRE LAMINA BETUN MODIFICADA LBM(SBS)-40/FP
DETALLE DE FORMACION DE SOLERA - SOTANO -2
VIGA DE CORONACION
LOSA FLOTANTE ARMADA 40 mm
JUNTA DE RETRACCION SELLADA
PLACA ALVEOLAR 120
VIGA DE CORONACION
VIGA METALICA HP310x93
PERFIL HP310X93
PILOTE Ø50
ENCACHADO DE GRAVAS BASE COMPACTADA
► RECUBRIMIENTO SUPERIOR MALLA ELECTROSOLDADA: 5 cm
PILOTE Ø50
ALZADO
LAMINA DE POLIETILENO
PILOTE
ENLUCIDO DE YESO LAMINADO
ARMADO VERTICAL Ø12a15cm.
► EL CORTE DE LA JUNTA DE RETRACCION SE REALIZRA CON MAQUINA DE DISCO Y SU PROFUNDIDAD SERA INFERIOR A 5 cm
ARRANQUE DE FORJADO DE PLACA ALVEOLAR EN ZUNCHO PERIMETRAL DE PANTALLA DE PILOTES - FORJADO SÓTANO -2 SECCION
MALLA ELECTROSOLDADA #Ø6a20cmts.
0.15m.
0.15m.
PERNOS DE ANCLAJE
TABIQUE 1/2 PIE LADRILLO PERFORADO
PANTALLA DE HORMIGON - ARMAZON ESTRUCTURAL TIRO DEL ASCENSOR
LOSA DE HORMIGON
ALZADO
MURO PANTALLA HA-25/P/20/IIa
CAMARA BUFA SECCION
PERSPECTIVA ESQUEMATICA
PLANTA
TABIQUE 1/2 PIE LADRILLO PERFORADO ENLUCIDO DE YESO LAMINADO LOSA FLOTANTE ARMADA 80 mm PLACA ALVEOLAR 120
TABIQUE 1/2 PIE LADRILLO PERFORADO VIGA DE CORONACION
VIGA METALICA HP310x93
DOBLE CAPA DE ENLUCIDO DE YESO LAMINADO VIGA DE CORONACION
MORTERO DE NIVELACION
ZUNCHO PERIMETRAL
TABIQUE 1/2 PIE LADRILLO PERFORADO ENLUCIDO DE YESO LAMINADO PILOTE Ø50
1.95m.
PERFIL HP310X93
PERNOS DE ANCLAJE
PILOTE Ø50
PILOTE Ø50
PILOTE
ARMADO VERTICAL Ø12a15cm.
SOLERA
ARMADO HORIZONTAL Ø10a15cm.
0.20m. 2.40m.
The Limits Of The Urban: Inhabitating Soria We travel to Soria, a city paradigm of what is known as “The Wallowing of the Emptied.” The goal is to put on the game board the need for climate change in the territory model and correct the de-generated by obsolete and decompensated models focusing on territorial, cultural, and economic perspectives. The project takes place in the eastern edge of Soria, Spain, on the banks of the Duero river, between the hill of a castle and the hill of the Miró Hotel. The objective is to focus on the limits of the urban and the concept of inhabiting the city. The objective of this exercise is to develop a new solution type or housing. We developed a residential project combining a residence building for students or seniors, a hotel, and multi-family housing.
THE LIMITS OF THE URBAN Inhabitating Soria Perspective Island #3
Pillars and platforms establish a system that develops as a tapestry parallel to the hillside to alter the topography as little as possible. Several multi-function patios are opened on the platforms. They allow light to enter the lower levels, house vegetation contributing to the humidification of spaces, and enhance diagonal visions increasing spatial continuity between levels.
THE LIMITS OF THE URBAN Inhabitating Soria
Through a system of platforms at different levels, five islands are created to close the void generated between the Hill of the Mirón and the hill of the castle. The arrangement of the islands responds to bioclimatic questions such as the sun, winds, or slope, as well as the views that occur from each of them in its relationship with the river and the city of Soria.
Elevantion
0
3
6m
Site Plan
0
240 m
THE LIMITS OF THE URBAN Inhabitating Soria Exterior renders
THE LIMITS OF THE URBAN Inhabitating Soria Interior renders
Architectural Design II: Three scales, three landscapes This course focused on the relationship between architecture and landscape. Three exercises were proposed at three different scales on Menorca island. 01. Walkway in a protected natural area: the objective was to propose a light walkway that fulfilled several functions at the same time: allow the access to the beach, preserve the native flora of the dune area and constitute a privileged place for the views. It’s a small-scale exercise in the coastal landscape. This project had to be thought as a light construction in wood, with a consecutive repetition of parts and a very strong geometric system. The situation parallel or perpendicular to the beach had to be decided by us personally. 02. Tapestry of patio houses: the objective was to design holiday homes focusing on the idea of temporary housing with the programmatic and spatial freedom that is entailed. It is an medium scale exercise in an area farther from the coast on a terrain with a slight slope and overlooking to the sea. This project considered individual housing without forgetting about the collectiveness of the project as a whole. It had to be understood as a tapestry on the natural landscape. Several aspects had to be taken into account: the geometric systems used, the extension of the tapestry, the density and position of the filled and empty spaces... All in all, the approach to a complex section. 03. Thermal baths will be designed in the interior of Menorca. It is a large scale project and will therefore be arranged in the interior landscape, in an steeper area and far from the fragile coast. It’s a spacial exercise. The goal was to reflect the relationship between water and architecture; the spatial and subtractive system, the relationship with the light and the possibility or not of opening up to the surrounding landscape.
ARCHITECTURAL DESIGN II Beach walkway Floor plan, elevation and cross section
PLANTA ALZADO Y SECCIÓN / PASARELA DE PLAYA / PLAYA DE BINIGAUS - MENORCA
DANIEL TUREL GARCÍA / PROYECTOS 2 / SEMESTRE DE OTOÑO / CURSO 2018-2019 / ETSAM
ESCALA 1:50
0
1
2
3M
ARCHITECTURAL DESIGN II Beach walkway Model pictures and site plan
ARCHITECTURAL DESIGN II Summer residence Roof plan
N EMPLAZAMIENTO / TAPIZ DE CASAS PATIO / BINIGAUS, MENORCA
DANIEL TUREL GARCIA / PROYECTOS 2 / CURSO 2018-2019 / ETSAM
ESCALA 1:250
01 2
5
10 M
ARCHITECTURAL DESIGN II Summer residence Model pictures and site plan
ARCHITECTURAL DESIGN II Thermal baths Model picture
ARCHITECTURAL DESIGN II Thermal baths Site plan
Urbanism I: Urban analysis This course was thought as a first contact with the multiple and complex dimensions of city and territory production, studying the following aspects: the social, economic and political factors that condition and run the city, the interaction of these factors with the functional structure and configuration of the pre-existing city, the ways in which these processes decline into a new city project and a specific urban morphology, the role that urban planning techniques play in regulating these processes and projects, and how they, in turn, are determined by them. Organized by groups, students had to conduct a SWOT analysis extracting the Strengths, Weaknesses, Opportunities and Threats of one of the districts of Madrid: the Moncloa-Aravaca district.
URBANISM I Moncloa -Aravaca district Urban analysis
1 altura 2 alturas 3 alturas 4 alturas 5 alturas 6 alturas 7 alturas 8 alturas 9 alturas +9 alturas
PLANO DE ESPACIOS: En este plano se analizan las alturas de todos los edificios del barrio, en su mayoría de cinco o seis plantas. Con esta información se observará posteriormente que zonas tienen mayor densidad de población, ya que casi todos los edificios son residenciales, algunos con bajos comerciales; zonas sin edificios (de ocio, zonas verdes, etc), y otros datos como barrios de chalets adosados, bloques de pisos, etc.
URBANISM I Moncloa -Aravaca district Urban analysis