Fulton County Sheriff’s Office & Detention Center 2006 Sweetgum Rd, Rochester, IN 46975
SPRING 2021
ILLINOIS INSTITUTE OF TECHNOLOGY DEPARTMENT OF CIVIL, ARCHITECTURAL, AND ENVIRONMENTAL ENGINEERING
Daniel Turel García CAE471 - Construction, Planning and Scheduling Raymind Lemming Illinois Institute of Technology Department of Civil, Architectural, and Environmental Engineering
Daniel Turel
59 E Van Buren St 2203 • Chicago, IL 60605 • (773) 543-2847 • daniel.turel@gmail.com • linkedin.com/in/danielturel
ABOUT ME
Ǧ Ǧ Ǧ Ǥ Ǥ Ǥ ǡ ǡ ǡ Ǥ Ǧ Ǥ Ǧ Ǥ ǡ Ǥ _________________________________________________________________________________________________________________________________________
EDUCATION 2020-2021
ILLINOIS INSTITUTE OF TECHNOLOGY Bachelors of Architecture, Expected May 2022 GPA of 4.00 Dean’s List Certificate – Fall 2020
Chicago, IL
2017-2022
POLYTECHNIC UNIVERSITY OF MADRID Bachelors of Architecture, Expected May 2022 GPA of 3.40 Honorable Mentions: Studio II, English.
Madrid, Spain
SKILLS
REVIT, AUTOCAD 2D, PHOTOSHOP, ILLUSTRATOR, INDESIGN, RHINOCEROS 3D, SKETCH UP, 3DS MAX.
EXPERIENCE Jun-Jul 2020
MTRES STUDIO Madrid, Spain Architectural designer and Revit Modeler – Summer intern • Collaborated with the design team and clients to meet overall project objectives. • Developed project design concepts for architectural building practice, including large-scale, commercial projects including apartment buildings, and mixed-use developments. • Produced graphic presentations, 3D renderings, and scaled construction drawings using REVIT.
Jul 2019
MIND FACILITIES MANAGEMENT Architectural designer – Summer intern • Identified distribution problems of the office. • Planned and executed office design proposals. • Created graphic presentations using PHOTOSHOP.
Madrid, Spain
PROJECTS/PUBLICATIONS 2020
BIOCLIMATIC DESIGN OF PUBLIC SPACES Pezuela de las Torres, Madrid, Spain School Project – Subject: The City and the Environment • The proposal integrates several actions distributed through the perimeter of the municipality of Pezuela de las Torres connecting them all with a cycling and pedestrian path implementing bioclimatic design strategies.
2016 – 2017
BECAS EUROPA PROGRAM Madrid, Spain Project in collaboration between Francisco de Vitoria University and Santander Bank • The 50 best pre-university students in Spain are chosen to share with them the experience of a journey around Europe, visiting the main universities and participating in a program of conferences, meetings with top personalities of the academic, political, and cultural world, and participating in cultural and leisure activities.
PERSONAL
• Language abilities: Spanish (Native), English (Advanced Proficiency), French (Intermediate), Chinese (Basic)
• Volunteer work experience: Volunteer in the conservation project of the marine turtle in Santiago de Veraguas, Panama.
• Community service: Helped to set the Christmas dinner table for homeless people with the Community of Saint Egidio. • Course delegate at the Polytechnic University of Madrid for the past three years. Samples of my work can be found in my website: DT Architects
Content
01. Schedule Narrative
Project Summary Project Plan Work Breakdown Structure Critical Path Calendars/Constraints/Unique Features
8 8 8 8 15 15
02. Bar Chart
16
03. Activity Report
44
04. Early cash flow curve and Monthly Payment Report to the Contractor
70
SCHEDULE NARRATIVE
Schedule Narrative
8
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
Project Summary The Fulton County Sheriff’s Office And Detention Center is a new facility that will be constructed in the city of Rochester, Indiana. The project consits of three connected buildings. Sections A and B are one story in height, and host the office space. The cells are located in Section C of the prject. This is a two-story building. This report provides a baseline schedule for the project, covering construction as well as all activities before and after construction.
Project Plan The Notice-to-Proceed date for the project is April 1, 2022. It is expected to reach substantial completion by December 8, 2023 and final completion by December 22, 2023, with a total duration of 450 days. The first phase is Pre-construction which includes documentation, implantation, aprovals of temporary utilities supply and site related activities such as work center opening, fencing license, and site security plan and mobilization. This phase takes almost one month as aprovals can take up to two weeks. The second phase is Construction, which has been broken up by the three portions of the building. Site is further divided into civil activities, utilities and exterior improvements. The major portion of site work is the excavation for the foundation. The Work Breakdown Structure was further split up by the sequence of work: mechanical, plumbing, fire protection, electrical, structural, architectural and equipment installation. The work starts with the substructure of the building, followed by rough-ins for the MEP, installation of drywall and then finishes. Work is scheduled in groups and staggered for the three buildings, meaning that, for example, mechanical work starts in a after it finishes in A and it starts in C after it finishes in B. When the structural elements are placed on-site in Section C of the building, the space for the cells is remeasured to avoid later problems when they arrive on-site, and it is time to install them. Some activities take place in parallel to save on time. Activities are more or less the same throughout Buildings A, B and C but the durations change for Building C as, for example, the roof cannot be completed until the prefabricated cells are installed. The cells are expected to be installed on June 12th, 2023. The construction phase is expected to begin on April 19th, 2022. The third phase is Post-Construction, which includes the punch list, testing and balancing, cleaning, substantial and final completion inspections, demobilizing, and substantial and final completion milestones. The specifications define that the final completion should be no more than 30 days after the substantial completion.
Work Breakdown Structure The work breakdown structure (WBS) is broken down into three main parts: Pre-Construction, Construction and Post-Construction. It is further broken down into General and Site work for Pre- and Post-Construction and by area for Construction. As the building clearly consists of three wings, the Construction phase was broken down by Buildings A, B and C with further divisions into the WBS by Mechanical, Plumbing, Fire Protection, Electrical, Structural, Architectural and Equipment. The complete WBS is shown in the following pages.
9
SCHEDULE NARRATIVE
10
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
11
SCHEDULE NARRATIVE
12
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
13
SCHEDULE NARRATIVE
14
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
Critical Path All the activities on the critical path must be planned carefully as delaying them will delay the overall project. The critical path of this project starts from Pre-Construction and gos until mobilization and then moves to the structure of the building. It then shifts to the MEP, followed by architecture and finishes, coming to an end at Post-Construction. The activities on the critical path include site fencing license, layout and excavation. After this, laying down the foundation and setting up structural items is critical. As the sequence for the buildings is staggered, the critical path goes from structure of A to B and then to C, bypassing the rest of the activities for A and B. After electrical and plumbing rough-ins, the drywall and flooring are critical. Painting is a major critical activity right before project completion and it affects other finishes and equipment.
Calendars, Constraints and Unique Features Work continues throughout the year except for on Statutory Holidays. A standard 5-day work week has been used for all activities with 8 working hours per day. Activities mostly use Finish-to-Start relationships which drive most of the schedule. Some concurrently occurring activities have Startto-Start relationships. The constraints for this project are that the jail cells are pre-fabricated and have a 6 month lead time, and all mechanical HVAC equipment has a 3 month lead time.The cells are expected to be installed on June 12th, 2023, and the HVAC systems on August 4th, 2022.
15
BAR CHART
Bar Chart
16
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
17
BAR CHART
FULTON COUNTY DETENTION CENTER 2022 Apr
May
Jun
Classic Sche Jul
Aug
Sep
Oct
Nov
Dec
Jan
Fe
START, 01-Apr-22 02-May-22, PRECONSTRUCTION 14-Apr-22, DOCUMENTATION Work center opening Security plan Rehearing act 21-Apr-22, IMPLANTATION Fencing license Fencing Booths' bases Booths' paths and accesses 21-Apr-22, UTILITIES Request temporary electrical onslaught Request temporary clean water onslaught Request temporary grey water onslaught Create recycling area Set site security 02-May-22, CRANE Coverage project Foundations Sweeping and occupying surrounding lands Air navigation permit Permit and fees 02-May-22, SITE PREPARATION Slashing Vegetation removal or transplantation General excavation of the plot Padding/tinged open sky Sub-base polyethylene sheet 19-May-22, LAND MOVEMENT Shadow emptying of the building with slacks for outdoor drains and formwork walls Excavation of wall footing and isolated pillars Excavation of facility ditches Trench fillings Filled and compacted indoors building Supply and extended taxes Compaction and cleaning bottom excavation 23-Jun-22, SUBSTRUCTURE 09-Jun-22, SUBSTRUCTURE - A Footings formwrork Cleaning concrete Concrete fillers Rebars installation Placement of metalplates for pillars Footing concrete Supporting elements Pilars Beams 16-Jun-22, SUBSTRUCTURE - B Footings formwrork Actual Level of Effort
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
18
Page 1
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
edule Layout
eb
1 of 13
29-Apr-21 19:00
2023 Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
22-Dec-23, FULT
30-Oct-23, SITEWORK
TASK filter: All Activities © Oracle Corporation
19
BAR CHART
FULTON COUNTY DETENTION CENTER 2022 Apr
May
Classic Sche
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Fe
Cleaning concrete Concrete fillers Rebars installation Placement of metalplates for pillars Footing concrete Supporting elements Pilars Beams 23-Jun-22, SUBSTRUCTURE - C Footings formwrork Cleaning concrete Concrete fillers Rebars installation Placement of metalplates for pillars Footing concrete Supporting elements Pilars Beams 13-Jul-22, SLAB 07-Jun-22, SLAB - A Ground preparation Trench excavation Drainage wells Drainage trenches Drainage channeling Drain installation Insulation extend PVC sheet Mesh Foam on pillar edges, walls, and sturctural zones Pour concrete Joints Expansion cuts 24-Jun-22, SLAB - B Ground preparation Trench excavation Drainage wells Drainage trenches Drainage channeling Drain installation Insulation extend PVC sheet Mesh Foam on pillar edges, walls, and sturctural zones Pour concrete Joints Expansion cuts 13-Jul-22, SLAB - C Ground preparation Trench excavation Drainage wells Drainage trenches Drainage channeling Drain installation Actual Level of Effort
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
20
Page 2
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
edule Layout
eb
2 of 13
29-Apr-21 19:00
2023 Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
TASK filter: All Activities © Oracle Corporation
21
BAR CHART
FULTON COUNTY DETENTION CENTER 2022 Apr
May
Jun
Classic Sche Jul
Aug
Sep
Oct
Nov
Dec
Jan
Fe
Insulation extend PVC sheet Mesh Foam on pillar edges, walls, and sturctural zones Pour concrete Joints Expansion cuts 15-Nov-22, MASONRY 10-Oct-22, MASONRY - A Block-formed cargoes Desquids and anchors Reinforcements in coronation Partition type A Partition type B Partition type C Partition type D Partition type E Partition type F Partition type G Partition type H Partition type I Partition type J Partition type K Partition type L Partition type M Single door carpentry preinstallation Double door carpentry preinstallation Window carpentry preinstallation Insulation Air barrier Cladding 27-Oct-22, MASONRY - B Block-formed cargoes Desquids and anchors Reinforcements in coronation Partition type A Partition type B Partition type C Partition type D Partition type E Partition type F Partition type G Partition type H Partition type I Partition type J Partition type K Partition type L Partition type M Single door carpentry preinstallation Double door carpentry preinstallation Window carpentry preinstallation Insulation Air barrier Actual Level of Effort
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
22
Page 3
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
edule Layout
eb
3 of 13
29-Apr-21 19:00
2023 Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
TASK filter: All Activities © Oracle Corporation
23
BAR CHART
FULTON COUNTY DETENTION CENTER 2022 Apr
May
Jun
Classic Sche Jul
Aug
Sep
Oct
Nov
Dec
Jan
Fe
Cladding 15-Nov-22, MASONRY - C Block-formed cargoes Desquids and anchors Reinforcements in coronation Partition type A Partition type B Partition type C Partition type D Partition type E Partition type F Partition type G Partition type H Partition type I Partition type J Partition type K Partition type L Partition type M Single door carpentry preinstallation Double door carpentry preinstallation Window carpentry preinstallation Insulation Air barrier Cladding 21-Oct-22, ROOF 21-Oct-22, ROOF - A Steel sheet Insulation Drain foil Roof aprons Skylight installation Apron coping Rain sinks Water overflows 07-Jul-22, ROOF - B Steel sheet Insulation Drain foil Roof aprons Skylight installation Apron coping Rain sinks Water overflows 14-Jul-22, ROOF - C Steel sheet Insulation Drain foil Roof aprons Skylight installation Apron coping Rain sinks Water overflows 04-Oct-22, FAÇADES 01-Aug-22, FAÇADES - A Actual Level of Effort
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
24
Page 4
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
edule Layout
eb
4 of 13
29-Apr-21 19:00
2023 Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
TASK filter: All Activities © Oracle Corporation
25
BAR CHART
FULTON COUNTY DETENTION CENTER 2022 Apr
May
Jun
Classic Sche Jul
Aug
Sep
Oct
Nov
Dec
Jan
Fe
Board Structure Insulation Coating Side mezzanine Unit A Refenced door and windows Boot profile manufactures Corner profiles Facilities openings High impact board 15-Sep-22, FAÇADES - B Board Structure Insulation Coating Side mezzanine Unit A Refenced door and windows Boot profile manufactures Corner profiles Facilities openings High impact board 04-Oct-22, FAÇADES - C Board Structure Insulation Coating Side mezzanine Unit A Refenced door and windows Boot profile manufactures Corner profiles Facilities openings High impact board
07 02-Jan-23, FLOORS Polished concrete Vinyl Carpet Baseboards Concrete on steps
Profiles change pave
19-Jan-23, F Polished concrete Vinyl Actual Level of Effort
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
26
Page 5
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
edule Layout
29-Apr-21 19:00
2023
eb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
30-Oct-23, CEILINGS 30-Oct-23, CEILINGS - A Acoustical ceiling system Washable acoustical Gypsum board ceiling paint Hight impact gypsum board ceiling Metal security system Metal ceiling Hight impact gypsum board
7-Feb-23, FLOORS -A
ements
FLOORS - B
5 of 13
TASK filter: All Activities © Oracle Corporation
27
BAR CHART
FULTON COUNTY DETENTION CENTER 2022 Apr
May
Jun
Classic Sche Jul
Aug
Sep
Oct
Nov
Dec
Jan
Fe
Carpet Baseboards Concrete on steps
Profiles chan
07 Polished concrete Vinyl Carpet Baseboards Concrete
Pro
Tile s PVC panels Plaster
Tile s PVC panels
Plas
Tiles PVC panels
09-Dec-22, EXTERIOR DOORS A 06-Oct-22, EXTERIOR DOORS AND WINDOWS - A Handrail Railings Handrail mouning Safety mesh wall system Security wall on stairs Stand pipes protection Angles and reinforcements on scooter Facilities Base boards
22-Nov-22, EXTERIOR DOORS AND WIN Handrail Railings Handrail mouning Safety mesh wall system Security wall on stairs Stand pipes protection Angles and reinforcements on scooter Facilities Base boards
09-Dec-22, EXTERIOR DOORS A Handrail Railings Handrail mouning Safety mesh wall system Security wall on stairs Actual Level of Effort
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
28
Page 6
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
edule Layout
29-Apr-21 19:00
2023
eb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
nge pavements
7-Feb-23, FLOORS - C
on steps
ofiles change pavements 31-Mar-23, INTERIOR WALLS FINISHES 23-Feb-23, INTERIOR WALLS FINISHES - A
Gipboard 14-Mar-23, INTERIOR WALLS FINISHES - B
ster Gipboard 31-Mar-23, INTERIOR WALLS FINISHES - C
Plaster Gipboard
AND WINDOWS
NDOWS - B
AND WINDOWS - C
6 of 13
TASK filter: All Activities © Oracle Corporation
29
BAR CHART
FULTON COUNTY DETENTION CENTER 2022 Apr
May
Jun
Classic Sche Jul
Aug
Sep
Oct
Nov
Dec
Jan
Fe
Stand pipes protection Angles and reinforcements on scooter Facilities Base boards
31-Jan
26-Dec-22, INTERIOR D Handrail Railings Handrail mouning Safety mesh wall system Security wall on stairs Stand pipes protection
Angles and reinforcements on s Facilities Base boards
12-Jan-23, INTE Handrail Railings Handrail mouning Safety mesh wall system Security wall on stairs Stand pipes protection
Angles and reinforceme Facilities Base boards
31-Jan Handrail Railings Handrail mouning
Safety mesh wall system
Security wall on stairs
Stand pipes prote
Angles and re Facilities Base
0 Preinstalation
R
R
F Preinstalation
Preinstalation
0
04-Jan-23, GLASS Windows Actual Level of Effort
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
30
Page 7
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
edule Layout
29-Apr-21 19:00
2023
eb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
n-23, INTERIOR DOORS AND WINDOWS
DOORS AND WINDOWS - A
scooter
ERIOR DOORS AND WINDOWS - B
ents on scooter
n-23, INTERIOR DOORS AND WINDOWS - C
m
s
ection
einforcements on scooter boards 17-Mar-23, METAL DOORS
09-Feb-23, METAL DOORS - A
RF doors
RF registrers
Facility closet 28-Feb-23, METAL DOORS - B RF doors RF registrers Facility closet 17-Mar-23, METAL DOORS - C RF doors RF registrers Facility closet
09-Feb-23, GLASS
-A
7 of 13
TASK filter: All Activities © Oracle Corporation
31
BAR CHART
FULTON COUNTY DETENTION CENTER 2022 Apr
May
Jun
Classic Sche Jul
Aug
Sep
Oct
Nov
Dec
Jan
Fe
Security glass Security mirrors
23-Jan-23 Windows Security glass
Security m
0 Windows Security glass
S
31-Jan On pla
On ce
RF pa
Exterio
Enam
Enam
Parkin
Handi
04-Jan-23, ELEVATO Elevator installation Auxiliary structure Maintenance contract Gound wiring Electric box
Telephone connectio License of use Ceramic built-in washbasin Actual Level of Effort
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
32
Page 8
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
edule Layout
29-Apr-21 19:00
2023
eb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
3, GLASS - B
mirrors
09-Feb-23, GLASS - C
Security mirrors 08-Mar-23, PAINT
n-23, PAINT - A aster
eiling
aint on structure
or on concrete
mel on locksmithing
mel on facilities
ng lines
icapped signs 17-Feb-23, PAINT - B On plaster On ceiling RF paint on structure Exterior on concrete Enamel on locksmithing Enamel on facilities Parking lines Handicapped signs 08-Mar-23, PAINT - C On plaster On ceiling RF paint on structure Exterior on concrete Enamel on locksmithing Enamel on facilities Parking lines Handicapped signs 07-Jul-23, CELLS Fabricate cells Install cells Electrical connection Plumbing connection 22-Feb-23, MEP
OR
on 22-Feb-23, PLUMBING FIXTURES
8 of 13
TASK filter: All Activities © Oracle Corporation
33
BAR CHART
FULTON COUNTY DETENTION CENTER 2022 Apr
May
Jun
Classic Sche Jul
Aug
Sep
Oct
Nov
Dec
Jan
Fe
Porcelain toilet Shower tray
Handicapped ba
Bathroom
W
02-Jan-23, WATER D Cupboard Counters box Polyethilene pipes Distribution pipes Pressure group Deposits Collector Pumping room
15-Dec-22, HEATING AND CO Request HVAC systems Water entry Benches Coolers Recoverers Impulsion ducts Return ducts Fancoil Vent Regulators Firewall vents Impulse pipeline channeling Return pipeline channeling Duct insulation Valves Thermostats 08-Nov-22, VENTILATION Extraction box Silencer Interior distribution
Electrical onslaught Transformatio n center Cell sectioning
Main electrica
Actual Level of Effort
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
34
Page 9
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
edule Layout
29-Apr-21 19:00
2023
eb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
ars
m accessories
Water sources Steel Sanitary appliances
DISTRIBUTION
OOLING
28-Sep-23, ELECTRICAL AND COMUNICATIONS 31-Jul-23, SYSTEM
al box Secondary electrical box per floor
9 of 13
Secondary electrical box per building External wiring distribution Interior wiring trays Force circuit Exterior lightning circuit 29-Jun-23, MECANISIMS Outlets Swithches Commuter switch 28-Sep-23, FIXTURES TASK filter: All Activities © Oracle Corporation
35
BAR CHART
FULTON COUNTY DETENTION CENTER 2022 Apr
May
Classic Sche
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Fe
Canalization Circuits Electrogen group Circuit luminaires Central fire alarm
Extinguishing pump
Intrusion in
Kitchen fa
04-Jul-22, GROUND CONNECTION Naked wire Cadweld welds Land caskets Steel ground connection
28-Dec-22, VIDEO SUR Video direct city doux Central concierge Doux wifi video kit
Doors and windows security syst Exterior installation
19-Dec-22, IT INFRAESTRU Entrance casket Buried installation of external pipeline Supply RITU installation Rack Main channeling Secondary caskets Recessed installation 08-Dec-22, VIDEO SYSTEM Outdoor installation infrestructure TV/Radio/ Antenna/mast/parabola Cabinet, amplifiers..... Distribuitor Repeaters Main channeling Recessed pipeline
30-Dec-22, SPEAKER Speakers Canalization Switchboard Megaphony equipment Amplifier Breeding equipment 15-Dec-22, LIGHTNING ROD Lightning rod installation Tubed copper cable Bare copper cable Actual Level of Effort
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
36
Page 1
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
edule Layout
29-Apr-21 19:00
2023
eb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Recessed in false ceilings 60x60 Stair surfaces 14-Sep-23, EMERGENCY
Luminaires
ps room
nstallation
an IT network Audiovisual system
RVELLIANCE
tem
UCTURE
RS SYSTEM
10 of 13
11-Dec-23, GENERAL
TASK filter: All Activities © Oracle Corporation
37
BAR CHART
FULTON COUNTY DETENTION CENTER 2022 Apr
May
Jun
Classic Sche Jul
Aug
Sep
Oct
Nov
Dec
Jan
Fe
Sspades on land (triangle) Lightning counter
Water onsla ught Cistern deposit Pumps room Exterior buried net Casket/post Hydrants Interior network distribution Electrovalvules
Switchboard Wired bus
06Ext
Pu
Sire
Exi
No
Eva
Oth 02-Dec-22, NATURAL GAS Regulator Polyethylene pipe Cut valve Flow limiter Copper tubing Rack 15-Nov-22, EXTERIOR Dome pole Fiberglass ducting Security wardroves
Actual Level of Effort
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
38
Page 1
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
edule Layout
eb
29-Apr-21 19:00
2023 Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
24-Nov-23, FIRE PROTECTIO 24-Nov-23, EXTINCTION
Rings Spriklers CO2 Fire stinguishers Water Fire stinguishers Dust Fire stinguishers 05-Sep-23, DETECTION
Ionic detectors Volumetric smoke Sirens Pushbuttons
-Feb-23, SIGNALS tinguishers
ushbuttons
ens
it
o exit
acuation direction
her
11 of 13
14-Aug-23, SECURITY
14-Aug-23, INTERIOR Fiberglass ducting Automation systems Presence detector Pushbutton Sirens Electromagnet on doors 19-Jul-23, SECURITY ROOM Tape recorer Screens TASK filter: All Activities © Oracle Corporation
39
BAR CHART
FULTON COUNTY DETENTION CENTER 2022 Apr
May
Jun
Classic Sche Jul
Aug
Sep
Oct
Nov
Dec
Jan
Fe
22-Dec-22, EXTRACTOR Extractor fan Pipeline Sink Water onsla ught Pumps room
Interi
27-Dec-22, FURNITURE Chamber Pot Stove Hot table Cold table Oven Working tables Countertops Shelves
Sig
M
Actual Level of Effort
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
40
Page 1
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
edule Layout
29-Apr-21 19:00
2023
eb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Computers Door controls 10-Mar-23, KITCHEN
10-Mar-23, FIRE EXTINGUISH SYSTEM
ior network distribution Electrovalvules Rings Spriklers CO2 Fire stinguishers Water Fire stinguishers Dust Fire stinguishers
E
01-Mar-23, OTHERS
gnage
Mailboxes Furniture Doortops
12 of 13
Remote controls
07-Dec-23, LANDSCAP Earth movement Drains Enclosures, masonry Locksmith enclosure Curbs Slab on grade Sanitation network Irrigation network Pipeline electrical installation for lightning Signaling installation for instrusions Pipeline security instalation Sidewalk pavements Gravel Asphalt Luminaires Cameras Barriers Vertical signage
11-Dec-23, WASTE M Stone materials TASK filter: All Activities © Oracle Corporation
41
BAR CHART
FULTON COUNTY DETENTION CENTER 2022 Apr
May
Jun
Classic Sche Jul
Aug
Sep
Actual Level of Effort
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
42
Oct
Nov
Dec
Jan
Fe
Page 1
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
edule Layout
eb
13 of 13
29-Apr-21 19:00
2023 Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec Natural soil Polluted soil Debris Wood Metal
Plastic scraps, chemic Machinery oils
08-Dec-23, SUSTANTIA Substantial completion
22-Dec-23, COM Punch list Cleaning Testing Elevator testing Inspecting
Final Completion
TASK filter: All Activities © Oracle Corporation
43
ACTIVITY REPORT
Activity Report
44
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
45
ACTIVITY REPORT
Activity ID 0 1000 1010 1020 1030 1070 1080 1090 1120 1150 1160 4055 4209 1050 1040 1060 1110 1140 1100 1130 2000 6850 6860 6870 6880 6890 6900 6910 6920 2010 2020 2030 2070 2080 2090 2040 2100 2110 2120 2130 2140 2210 6050 2150 2220 2160 2168 2165 2240
WBS Code CAE 471 CAE 471.1.1.1 CAE 471.1.1.1 CAE 471.1.1.1 CAE 471.1.1.2 CAE 471.1.3 CAE 471.1.3 CAE 471.1.3 CAE 471.1.4 CAE 471.1.4 CAE 471.1.4 CAE 471.3.1 CAE 471.3.4 CAE 471.1.1.2 CAE 471.1.1.2 CAE 471.1.1.2 CAE 471.1.3 CAE 471.1.4 CAE 471.1.3 CAE 471.1.4 CAE 471.2.1 CAE 471.5.8 CAE 471.5.8 CAE 471.5.8 CAE 471.5.8 CAE 471.5.8 CAE 471.5.8 CAE 471.5.8 CAE 471.5.8 CAE 471.2.1 CAE 471.2.1 CAE 471.2.1 CAE 471.2.2 CAE 471.2.2 CAE 471.2.2 CAE 471.2.1 CAE 471.2.2 CAE 471.2.2 CAE 471.2.2 CAE 471.2.2 CAE 471.2.3.1 CAE 471.2.5.1 CAE 471.5.2.1 CAE 471.2.3.1 CAE 471.2.5.1 CAE 471.2.3.1 CAE 471.2.3.1 CAE 471.2.3.1 CAE 471.2.5.1
WBS Name DOCUMENTATION DOCUMENTATION DOCUMENTATION IMPLANTATION UTILITIES UTILITIES CRANE CRANE CRANE ELEVATOR HEATING AND COOLING IMPLANTATION IMPLANTATION IMPLANTATION UTILITIES CRANE UTILITIES CRANE SITE PREPARATION WASTE MANAGEMENT WASTE MANAGEMENT WASTE MANAGEMENT WASTE MANAGEMENT WASTE MANAGEMENT WASTE MANAGEMENT WASTE MANAGEMENT WASTE MANAGEMENT SITE PREPARATION SITE PREPARATION SITE PREPARATION LAND MOVEMENT LAND MOVEMENT LAND MOVEMENT SITE PREPARATION LAND MOVEMENT LAND MOVEMENT LAND MOVEMENT LAND MOVEMENT SUBSTRUCTURE - A SLAB - A EXTINCTION SUBSTRUCTURE - A SLAB - A SUBSTRUCTURE - A SUBSTRUCTURE - A SUBSTRUCTURE - A SLAB - A 46
Activity Name
START Work center opening Security plan Rehearing act Fencing license Request temporary electrical onslaught Request temporary clean water onslaught Request temporary grey water onslaught Coverage project Air navigation permit Permit and fees License of use Request HVAC systems Booths' bases Fencing Booths' paths and accesses Set site security Sweeping and occupying surrounding lands Create recycling area Foundations Slashing Stone materials Natural soil Polluted soil Debris Wood Metal Plastic scraps, chemicals, aerosols and paints Machinery oils Vegetation removal or transplantation General excavation of the plot Padding/tinged open sky Shadow emptying of the building with slacks for o Excavation of wall footing and isolated pillars Excavation of facility ditches Sub-base polyethylene sheet Trench fillings Filled and compacted indoors building Supply and extended taxes Compaction and cleaning bottom excavation Footings formwrork Ground preparation Water onslaught Cleaning concrete Trench excavation Concrete fillers Placement of metalplates for pillars Rebars installation Drainage wells
TF OD ES 0 0 4/1/2022 08:00 448 2 4/1/2022 08:00 442 8 4/1/2022 08:00 440 10 4/1/2022 08:00 0 10 4/1/2022 08:00 440 10 4/1/2022 08:00 239 10 4/1/2022 08:00 308 10 4/1/2022 08:00 430 10 4/1/2022 08:00 440 10 4/1/2022 08:00 440 10 4/1/2022 08:00 415 25 4/1/2022 08:00 225 90 4/1/2022 08:00 437 3 4/15/2022 08:00 0 2 4/15/2022 08:00 435 5 4/15/2022 08:00 435 5 4/15/2022 08:00 430 10 4/15/2022 08:00 437 1 4/19/2022 08:00 428 10 4/19/2022 08:00 0 1 4/19/2022 08:00 8 430 4/19/2022 08:00 8 430 4/19/2022 08:00 8 430 4/19/2022 08:00 8 430 4/19/2022 08:00 8 430 4/19/2022 08:00 8 430 4/19/2022 08:00 8 430 4/19/2022 08:00 8 430 4/19/2022 08:00 0 1 4/20/2022 08:00 0 4 4/21/2022 08:00 428 6 4/21/2022 08:00 outdoor walls 08:00 2 drains and 11 formwork 4/27/2022 9 4 4/27/2022 08:00 0 4 4/27/2022 08:00 428 2 4/29/2022 08:00 0 5 5/3/2022 08:00 0 4 5/10/2022 08:00 419 4 5/10/2022 08:00 0 4 5/16/2022 08:00 5 1 5/20/2022 08:00 0 1 5/20/2022 08:00 214 4 5/20/2022 08:00 5 1 5/23/2022 08:00 0 3 5/23/2022 08:00 5 1 5/24/2022 08:00 82 1 5/25/2022 08:00 5 2 5/25/2022 08:00 410 1 5/26/2022 08:00
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
EF 4/4/2022 16:00 4/12/2022 16:00 4/14/2022 16:00 4/14/2022 16:00 4/14/2022 16:00 4/14/2022 16:00 4/14/2022 16:00 4/14/2022 16:00 4/14/2022 16:00 4/14/2022 16:00 5/5/2022 16:00 8/4/2022 16:00 4/19/2022 16:00 4/18/2022 16:00 4/21/2022 16:00 4/21/2022 16:00 4/28/2022 16:00 4/19/2022 16:00 5/2/2022 16:00 4/19/2022 16:00 12/11/2023 16:00 12/11/2023 16:00 12/11/2023 16:00 12/11/2023 16:00 12/11/2023 16:00 12/11/2023 16:00 12/11/2023 16:00 12/11/2023 16:00 4/20/2022 16:00 4/26/2022 16:00 4/28/2022 16:00 5/11/2022 16:00 5/2/2022 16:00 5/2/2022 16:00 5/2/2022 16:00 5/9/2022 16:00 5/13/2022 16:00 5/13/2022 16:00 5/19/2022 16:00 5/20/2022 16:00 5/20/2022 16:00 5/25/2022 16:00 5/23/2022 16:00 5/25/2022 16:00 5/24/2022 16:00 5/25/2022 16:00 5/26/2022 16:00 5/26/2022 16:00
LS 4/1/2022 08:00 12/20/2023 08:00 12/12/2023 08:00 12/8/2023 08:00 4/1/2022 08:00 12/8/2023 08:00 3/2/2023 08:00 6/7/2023 08:00 11/24/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 11/3/2023 08:00 2/10/2023 08:00 12/19/2023 08:00 4/15/2022 08:00 12/15/2023 08:00 12/15/2023 08:00 12/8/2023 08:00 12/21/2023 08:00 12/8/2023 08:00 4/19/2022 08:00 4/29/2022 08:00 4/29/2022 08:00 4/29/2022 08:00 4/29/2022 08:00 4/29/2022 08:00 4/29/2022 08:00 4/29/2022 08:00 4/29/2022 08:00 4/20/2022 08:00 4/21/2022 08:00 12/12/2023 08:00 4/29/2022 08:00 5/10/2022 08:00 4/27/2022 08:00 12/20/2023 08:00 5/3/2022 08:00 5/10/2022 08:00 12/18/2023 08:00 5/16/2022 08:00 5/27/2022 08:00 5/20/2022 08:00 3/16/2023 08:00 5/30/2022 08:00 5/23/2022 08:00 5/31/2022 08:00 9/16/2022 08:00 6/1/2022 08:00 12/21/2023 08:00
47
LF 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 4/14/2022 16:00 12/21/2023 16:00 3/15/2023 16:00 6/20/2023 16:00 12/7/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/7/2023 16:00 6/15/2023 16:00 12/21/2023 16:00 4/18/2022 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 4/19/2022 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 4/20/2022 16:00 4/26/2022 16:00 12/19/2023 16:00 5/13/2022 16:00 5/13/2022 16:00 5/2/2022 16:00 12/21/2023 16:00 5/9/2022 16:00 5/13/2022 16:00 12/21/2023 16:00 5/19/2022 16:00 5/27/2022 16:00 5/20/2022 16:00 3/21/2023 16:00 5/30/2022 16:00 5/25/2022 16:00 5/31/2022 16:00 9/16/2022 16:00 6/2/2022 16:00 12/21/2023 16:00
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
BTC ($) 200.00 800.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2,500.00 9,000.00 300.00 200.00 500.00 1,250.00 1,000.00 100.00 1,000.00 625.00 43,000.00 43,000.00 43,000.00 43,000.00 43,000.00 43,000.00 43,000.00 43,000.00 200.00 2,500.00 6,250.00 2,500.00 2,500.00 2,500.00 625.00 500.00 400.00 400.00 2,500.00 7,000.00 6,312.50 400.00 10,500.00 3,500.00 8,750.00 12,250.00 24,500.00 3,500.00
ACTIVITY REPORT
2250 2260 4210 6060 2170 2270 5260 7890 2280 2290 7900 2180 2300 2190 7910 7930 7920 2310 2320 5270 7940 7980 2200 7990 2330 2340 2350 2360 2680 7950 7960 8000 7550 8020 8010 7560 5280 8030 2690 7970 7570 7580 7590 8040 8050 7600 7610 7620 7630 7810
CAE 471.2.5.1 CAE 471.2.5.1 CAE 471.3.4 CAE 471.5.2.1 CAE 471.2.3.1 CAE 471.2.5.1 CAE 471.4.5 CAE 471.2.3.2 CAE 471.2.5.1 CAE 471.2.5.1 CAE 471.2.3.2 CAE 471.2.3.1 CAE 471.2.5.1 CAE 471.2.3.1 CAE 471.2.3.2 CAE 471.2.3.2 CAE 471.2.3.2 CAE 471.2.5.1 CAE 471.2.5.1 CAE 471.4.5 CAE 471.2.3.2 CAE 471.2.3.3 CAE 471.2.3.1 CAE 471.2.3.3 CAE 471.2.5.1 CAE 471.2.5.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.8.1 CAE 471.2.3.2 CAE 471.2.3.2 CAE 471.2.3.3 CAE 471.2.5.2 CAE 471.2.3.3 CAE 471.2.3.3 CAE 471.2.5.2 CAE 471.4.5 CAE 471.2.3.3 CAE 471.2.8.1 CAE 471.2.3.2 CAE 471.2.5.2 CAE 471.2.5.2 CAE 471.2.5.2 CAE 471.2.3.3 CAE 471.2.3.3 CAE 471.2.5.2 CAE 471.2.5.2 CAE 471.2.5.2 CAE 471.2.5.2 CAE 471.2.7.2
SLAB - A SLAB - A HEATING AND COOLING EXTINCTION SUBSTRUCTURE - A SLAB - A GROUND CONNECTION SUBSTRUCTURE - B SLAB - A SLAB - A SUBSTRUCTURE - B SUBSTRUCTURE - A SLAB - A SUBSTRUCTURE - A SUBSTRUCTURE - B SUBSTRUCTURE - B SUBSTRUCTURE - B SLAB - A SLAB - A GROUND CONNECTION SUBSTRUCTURE - B SUBSTRUCTURE - C SUBSTRUCTURE - A SUBSTRUCTURE - C SLAB - A SLAB - A MASONRY - A MASONRY - A FAÇADES - A SUBSTRUCTURE - B SUBSTRUCTURE - B SUBSTRUCTURE - C SLAB - B SUBSTRUCTURE - C SUBSTRUCTURE - C SLAB - B GROUND CONNECTION SUBSTRUCTURE - C FAÇADES - A SUBSTRUCTURE - B SLAB - B SLAB - B SLAB - B SUBSTRUCTURE - C SUBSTRUCTURE - C SLAB - B SLAB - B SLAB - B SLAB - B ROOF - B
Drainage trenches Drainage channeling Water entry Cistern deposit Footing concrete Drain installation Naked wire Footings formwrork Insulation extend PVC sheet Cleaning concrete Supporting elements Mesh Pilars Concrete fillers Placement of metalplates for pillars Rebars installation Foam on pillar edges, walls, and sturctural zones Pour concrete Cadweld welds Footing concrete Footings formwrork Beams Cleaning concrete Joints Expansion cuts Block-formed cargoes Desquids and anchors Board Supporting elements Pilars Concrete fillers Ground preparation Placement of metalplates for pillars Rebars installation Trench excavation Land caskets Footing concrete Structure Beams Drainage wells Drainage trenches Drainage channeling Supporting elements Pilars Drain installation Insulation extend PVC sheet Mesh Steel sheet 48
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
410 0 214 250 81 0 216 380 408 0 380 407 0 81 380 381 380 0 0 216 380 375 81 375 402 260 0 0 141 402 380 375 202 376 375 202 216 375 141 380 397 397 202 397 375 202 395 202 202 380
1 1 20 10 2 1 5 1 1 1 1 1 2 4 1 1 2 1 2 5 2 1 4 1 1 1 28 28 4 1 4 1 1 1 2 3 10 2 8 4 1 1 1 1 4 1 1 1 2 5
5/26/2022 08:00 5/26/2022 08:00 5/26/2022 08:00 5/26/2022 08:00 5/27/2022 08:00 5/27/2022 08:00 5/27/2022 08:00 5/27/2022 08:00 5/30/2022 08:00 5/30/2022 08:00 5/30/2022 08:00 5/31/2022 08:00 5/31/2022 08:00 5/31/2022 08:00 5/31/2022 08:00 6/1/2022 08:00 6/1/2022 08:00 6/2/2022 08:00 6/3/2022 08:00 6/3/2022 08:00 6/3/2022 08:00 6/3/2022 08:00 6/6/2022 08:00 6/6/2022 08:00 6/7/2022 08:00 6/7/2022 08:00 6/7/2022 08:00 6/7/2022 08:00 6/7/2022 08:00 6/7/2022 08:00 6/7/2022 08:00 6/7/2022 08:00 6/8/2022 08:00 6/8/2022 08:00 6/8/2022 08:00 6/9/2022 08:00 6/10/2022 08:00 6/10/2022 08:00 6/13/2022 08:00 6/13/2022 08:00 6/14/2022 08:00 6/14/2022 08:00 6/14/2022 08:00 6/14/2022 08:00 6/14/2022 08:00 6/15/2022 08:00 6/16/2022 08:00 6/16/2022 08:00 6/17/2022 08:00 6/17/2022 08:00
5/26/2022 16:00 5/26/2022 16:00 6/22/2022 16:00 6/8/2022 16:00 5/30/2022 16:00 5/27/2022 16:00 6/2/2022 16:00 5/27/2022 16:00 5/30/2022 16:00 5/30/2022 16:00 5/30/2022 16:00 5/31/2022 16:00 6/1/2022 16:00 6/3/2022 16:00 5/31/2022 16:00 6/1/2022 16:00 6/2/2022 16:00 6/2/2022 16:00 6/6/2022 16:00 6/9/2022 16:00 6/6/2022 16:00 6/3/2022 16:00 6/9/2022 16:00 6/6/2022 16:00 6/7/2022 16:00 6/7/2022 16:00 7/14/2022 16:00 7/14/2022 16:00 6/10/2022 16:00 6/7/2022 16:00 6/10/2022 16:00 6/7/2022 16:00 6/8/2022 16:00 6/8/2022 16:00 6/9/2022 16:00 6/13/2022 16:00 6/23/2022 16:00 6/13/2022 16:00 6/22/2022 16:00 6/16/2022 16:00 6/14/2022 16:00 6/14/2022 16:00 6/14/2022 16:00 6/14/2022 16:00 6/17/2022 16:00 6/15/2022 16:00 6/16/2022 16:00 6/16/2022 16:00 6/20/2022 16:00 6/23/2022 16:00
12/21/2023 08:00 5/26/2022 08:00 3/22/2023 08:00 5/11/2023 08:00 9/19/2022 08:00 5/27/2022 08:00 3/27/2023 08:00 11/10/2023 08:00 12/21/2023 08:00 5/30/2022 08:00 11/13/2023 08:00 12/21/2023 08:00 5/31/2022 08:00 9/21/2022 08:00 11/14/2023 08:00 11/16/2023 08:00 11/15/2023 08:00 6/2/2022 08:00 6/3/2022 08:00 4/3/2023 08:00 11/17/2023 08:00 11/10/2023 08:00 9/27/2022 08:00 11/13/2023 08:00 12/21/2023 08:00 6/6/2023 08:00 6/7/2022 08:00 6/7/2022 08:00 12/21/2022 08:00 12/21/2023 08:00 11/21/2023 08:00 11/14/2023 08:00 3/17/2023 08:00 11/16/2023 08:00 11/15/2023 08:00 3/20/2023 08:00 4/10/2023 08:00 11/17/2023 08:00 12/27/2022 08:00 11/27/2023 08:00 12/21/2023 08:00 12/21/2023 08:00 3/23/2023 08:00 12/21/2023 08:00 11/21/2023 08:00 3/24/2023 08:00 12/21/2023 08:00 3/27/2023 08:00 3/28/2023 08:00 12/1/2023 08:00 49
12/21/2023 16:00 5/26/2022 16:00 4/18/2023 16:00 5/24/2023 16:00 9/20/2022 16:00 5/27/2022 16:00 3/31/2023 16:00 11/10/2023 16:00 12/21/2023 16:00 5/30/2022 16:00 11/13/2023 16:00 12/21/2023 16:00 6/1/2022 16:00 9/26/2022 16:00 11/14/2023 16:00 11/16/2023 16:00 11/16/2023 16:00 6/2/2022 16:00 6/6/2022 16:00 4/7/2023 16:00 11/20/2023 16:00 11/10/2023 16:00 9/30/2022 16:00 11/13/2023 16:00 12/21/2023 16:00 6/6/2023 16:00 7/14/2022 16:00 7/14/2022 16:00 12/26/2022 16:00 12/21/2023 16:00 11/24/2023 16:00 11/14/2023 16:00 3/17/2023 16:00 11/16/2023 16:00 11/16/2023 16:00 3/22/2023 16:00 4/21/2023 16:00 11/20/2023 16:00 1/5/2023 16:00 11/30/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 3/23/2023 16:00 12/21/2023 16:00 11/24/2023 16:00 3/24/2023 16:00 12/21/2023 16:00 3/27/2023 16:00 3/29/2023 16:00 12/7/2023 16:00
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
4,900.00 2,450.00 2,000.00 1,000.00 31,500.00 2,450.00 500.00 7,000.00 2,450.00 2,450.00 10,500.00 12,250.00 2,450.00 31,500.00 8,750.00 12,250.00 24,500.00 2,450.00 3,500.00 500.00 31,500.00 7,000.00 31,500.00 10,500.00 2,450.00 2,450.00 2,562.50 2,562.50 13,650.00 12,250.00 31,500.00 8,750.00 6,312.50 12,250.00 24,500.00 3,500.00 1,000.00 31,500.00 13,650.00 31,500.00 3,500.00 4,900.00 2,450.00 12,250.00 31,500.00 2,450.00 2,450.00 2,450.00 2,450.00 60,375.00
ACTIVITY REPORT
8060 7640 7650 2700 4220 5290 7660 7670 7820 7870 7880 8070 8530 8540 7680 7690 2710 7830 7850 7700 7710 7720 7840 8080 8130 8140 7730 2720 7740 7750 7760 7860 8090 8110 7770 8100 2730 7780 7790 7800 8120 8750 8760 2370 2740 3050 2750 3060 8150 2760
CAE 471.2.3.3 CAE 471.2.5.2 CAE 471.2.5.2 CAE 471.2.8.1 CAE 471.3.4 CAE 471.4.5 CAE 471.2.5.2 CAE 471.2.5.2 CAE 471.2.7.2 CAE 471.2.7.2 CAE 471.2.7.2 CAE 471.2.7.3 CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.2.5.3 CAE 471.2.5.3 CAE 471.2.8.1 CAE 471.2.7.2 CAE 471.2.7.2 CAE 471.2.5.3 CAE 471.2.5.3 CAE 471.2.5.3 CAE 471.2.7.2 CAE 471.2.7.3 CAE 471.2.7.3 CAE 471.2.7.3 CAE 471.2.5.3 CAE 471.2.8.1 CAE 471.2.5.3 CAE 471.2.5.3 CAE 471.2.5.3 CAE 471.2.7.2 CAE 471.2.7.3 CAE 471.2.7.3 CAE 471.2.5.3 CAE 471.2.7.3 CAE 471.2.8.1 CAE 471.2.5.3 CAE 471.2.5.3 CAE 471.2.5.3 CAE 471.2.7.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.1 CAE 471.2.8.1 CAE 471.2.12.1 CAE 471.2.8.1 CAE 471.2.12.1 CAE 471.2.8.2 CAE 471.2.8.1
SUBSTRUCTURE - C SLAB - B SLAB - B FAÇADES - A HEATING AND COOLING GROUND CONNECTION SLAB - B SLAB - B ROOF - B ROOF - B ROOF - B ROOF - C MASONRY - B MASONRY - B SLAB - C SLAB - C FAÇADES - A ROOF - B ROOF - B SLAB - C SLAB - C SLAB - C ROOF - B ROOF - C ROOF - C ROOF - C SLAB - C FAÇADES - A SLAB - C SLAB - C SLAB - C ROOF - B ROOF - C ROOF - C SLAB - C ROOF - C FAÇADES - A SLAB - C SLAB - C SLAB - C ROOF - C MASONRY - C MASONRY - C MASONRY - A FAÇADES - A EXTERIOR DOORS AND WINDOWS - A FAÇADES - A EXTERIOR DOORS AND WINDOWS - A FAÇADES - B FAÇADES - A 50
Beams Foam on pillar edges, walls, and sturctural zones Pour concrete Insulation Benches Steel ground connection Joints Expansion cuts Insulation Rain sinks Water overflows Steel sheet Block-formed cargoes Desquids and anchors Ground preparation Trench excavation Coating Drain foil Skylight installation Drainage wells Drainage trenches Drainage channeling Roof aprons Insulation Rain sinks Water overflows Drain installation Side mezzanine Unit A Insulation extend PVC sheet Mesh Apron coping Drain foil Skylight installation Foam on pillar edges, walls, and sturctural zones Roof aprons Refenced door and windows Pour concrete Joints Expansion cuts Apron coping Block-formed cargoes Desquids and anchors Reinforcements in coronation Boot profile manufactures Handrail Corner profiles Railings Board Facilities openings
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
375 202 202 141 214 216 389 329 380 388 388 375 202 202 189 189 141 380 385 384 384 189 380 375 383 383 189 141 382 189 189 380 375 380 189 375 141 189 376 316 375 189 189 0 141 315 141 315 282 141
4 1 2 4 10 7 1 1 3 2 2 5 28 28 1 3 4 2 2 1 1 1 3 3 2 2 1 4 1 1 2 2 2 2 1 3 4 2 1 1 2 28 28 28 4 20 2 20 4 4
6/20/2022 08:00 6/21/2022 08:00 6/22/2022 08:00 6/23/2022 08:00 6/23/2022 08:00 6/24/2022 08:00 6/24/2022 08:00 6/24/2022 08:00 6/24/2022 08:00 6/24/2022 08:00 6/24/2022 08:00 6/24/2022 08:00 6/24/2022 08:00 6/24/2022 08:00 6/27/2022 08:00 6/28/2022 08:00 6/29/2022 08:00 6/29/2022 08:00 6/29/2022 08:00 7/1/2022 08:00 7/1/2022 08:00 7/1/2022 08:00 7/1/2022 08:00 7/1/2022 08:00 7/1/2022 08:00 7/1/2022 08:00 7/4/2022 08:00 7/5/2022 08:00 7/5/2022 08:00 7/5/2022 08:00 7/6/2022 08:00 7/6/2022 08:00 7/6/2022 08:00 7/6/2022 08:00 7/8/2022 08:00 7/8/2022 08:00 7/11/2022 08:00 7/11/2022 08:00 7/13/2022 08:00 7/13/2022 08:00 7/13/2022 08:00 7/13/2022 08:00 7/13/2022 08:00 7/15/2022 08:00 7/15/2022 08:00 7/15/2022 08:00 7/21/2022 08:00 7/22/2022 08:00 7/22/2022 08:00 7/25/2022 08:00
6/23/2022 16:00 6/21/2022 16:00 6/23/2022 16:00 6/28/2022 16:00 7/6/2022 16:00 7/4/2022 16:00 6/24/2022 16:00 6/24/2022 16:00 6/28/2022 16:00 6/27/2022 16:00 6/27/2022 16:00 6/30/2022 16:00 8/2/2022 16:00 8/2/2022 16:00 6/27/2022 16:00 6/30/2022 16:00 7/4/2022 16:00 6/30/2022 16:00 6/30/2022 16:00 7/1/2022 16:00 7/1/2022 16:00 7/1/2022 16:00 7/5/2022 16:00 7/5/2022 16:00 7/4/2022 16:00 7/4/2022 16:00 7/4/2022 16:00 7/8/2022 16:00 7/5/2022 16:00 7/5/2022 16:00 7/7/2022 16:00 7/7/2022 16:00 7/7/2022 16:00 7/7/2022 16:00 7/8/2022 16:00 7/12/2022 16:00 7/14/2022 16:00 7/12/2022 16:00 7/13/2022 16:00 7/13/2022 16:00 7/14/2022 16:00 8/19/2022 16:00 8/19/2022 16:00 8/23/2022 16:00 7/20/2022 16:00 8/11/2022 16:00 7/22/2022 16:00 8/18/2022 16:00 7/27/2022 16:00 7/28/2022 16:00
11/27/2023 08:00 3/30/2023 08:00 3/31/2023 08:00 1/6/2023 08:00 4/19/2023 08:00 4/24/2023 08:00 12/21/2023 08:00 9/28/2023 08:00 12/8/2023 08:00 12/20/2023 08:00 12/20/2023 08:00 12/1/2023 08:00 4/4/2023 08:00 4/4/2023 08:00 3/17/2023 08:00 3/20/2023 08:00 1/12/2023 08:00 12/13/2023 08:00 12/20/2023 08:00 12/21/2023 08:00 12/21/2023 08:00 3/23/2023 08:00 12/15/2023 08:00 12/8/2023 08:00 12/20/2023 08:00 12/20/2023 08:00 3/24/2023 08:00 1/18/2023 08:00 12/21/2023 08:00 3/27/2023 08:00 3/28/2023 08:00 12/20/2023 08:00 12/13/2023 08:00 12/20/2023 08:00 3/30/2023 08:00 12/15/2023 08:00 1/24/2023 08:00 3/31/2023 08:00 12/21/2023 08:00 9/28/2023 08:00 12/20/2023 08:00 4/4/2023 08:00 4/4/2023 08:00 7/15/2022 08:00 1/30/2023 08:00 9/29/2023 08:00 2/3/2023 08:00 10/6/2023 08:00 8/22/2023 08:00 2/7/2023 08:00 51
11/30/2023 16:00 3/30/2023 16:00 4/3/2023 16:00 1/11/2023 16:00 5/2/2023 16:00 5/2/2023 16:00 12/21/2023 16:00 9/28/2023 16:00 12/12/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/7/2023 16:00 5/11/2023 16:00 5/11/2023 16:00 3/17/2023 16:00 3/22/2023 16:00 1/17/2023 16:00 12/14/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 3/23/2023 16:00 12/19/2023 16:00 12/12/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 3/24/2023 16:00 1/23/2023 16:00 12/21/2023 16:00 3/27/2023 16:00 3/29/2023 16:00 12/21/2023 16:00 12/14/2023 16:00 12/21/2023 16:00 3/30/2023 16:00 12/19/2023 16:00 1/27/2023 16:00 4/3/2023 16:00 12/21/2023 16:00 9/28/2023 16:00 12/21/2023 16:00 5/11/2023 16:00 5/11/2023 16:00 8/23/2022 16:00 2/2/2023 16:00 10/26/2023 16:00 2/6/2023 16:00 11/2/2023 16:00 8/25/2023 16:00 2/10/2023 16:00
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
31,500.00 2,450.00 3,500.00 13,650.00 1,000.00 700.00 2,450.00 2,450.00 60,375.00 60,375.00 60,375.00 60,375.00 2,562.50 2,562.50 6,312.50 3,500.00 13,650.00 60,375.00 60,375.00 3,500.00 4,900.00 2,450.00 60,375.00 60,375.00 60,375.00 60,375.00 2,450.00 13,650.00 2,450.00 2,450.00 2,450.00 60,375.00 60,375.00 60,375.00 2,450.00 60,375.00 13,650.00 3,500.00 2,450.00 2,450.00 60,375.00 2,562.50 2,562.50 2,562.50 13,650.00 13,300.00 13,650.00 13,300.00 13,650.00 13,650.00
ACTIVITY REPORT
8160 2770 3080 8550 3090 4230 8170 8250 3100 8180 4240 8260 3110 8190 8770 2380 2390 2400 2410 2420 2430 2440 2450 2460 2470 2480 2490 2500 2510 2520 2530 4250 8200 2540 3120 8270 2550 8210 8350 2560 8280 3130 4260 8220 8290 8360 8230 3140 4265 8560
CAE 471.2.8.2 CAE 471.2.8.1 CAE 471.2.12.1 CAE 471.2.6.2 CAE 471.2.12.1 CAE 471.3.4 CAE 471.2.8.2 CAE 471.2.8.3 CAE 471.2.12.1 CAE 471.2.8.2 CAE 471.3.4 CAE 471.2.8.3 CAE 471.2.12.1 CAE 471.2.8.2 CAE 471.2.6.3 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.2.6.1 CAE 471.3.4 CAE 471.2.8.2 CAE 471.2.6.1 CAE 471.2.12.1 CAE 471.2.8.3 CAE 471.2.6.1 CAE 471.2.8.2 CAE 471.2.12.2 CAE 471.2.6.1 CAE 471.2.8.3 CAE 471.2.12.1 CAE 471.3.4 CAE 471.2.8.2 CAE 471.2.8.3 CAE 471.2.12.2 CAE 471.2.8.2 CAE 471.2.12.1 CAE 471.3.4 CAE 471.2.6.2
FAÇADES - B FAÇADES - A EXTERIOR DOORS AND WINDOWS - A MASONRY - B EXTERIOR DOORS AND WINDOWS - A HEATING AND COOLING FAÇADES - B FAÇADES - C EXTERIOR DOORS AND WINDOWS - A FAÇADES - B HEATING AND COOLING FAÇADES - C EXTERIOR DOORS AND WINDOWS - A FAÇADES - B MASONRY - C MASONRY - A MASONRY - A MASONRY - A MASONRY - A MASONRY - A MASONRY - A MASONRY - A MASONRY - A MASONRY - A MASONRY - A MASONRY - A MASONRY - A MASONRY - A MASONRY - A MASONRY - A MASONRY - A HEATING AND COOLING FAÇADES - B MASONRY - A EXTERIOR DOORS AND WINDOWS - A FAÇADES - C MASONRY - A FAÇADES - B EXTERIOR DOORS AND WINDOWS - B MASONRY - A FAÇADES - C EXTERIOR DOORS AND WINDOWS - A HEATING AND COOLING FAÇADES - B FAÇADES - C EXTERIOR DOORS AND WINDOWS - B FAÇADES - B EXTERIOR DOORS AND WINDOWS - A HEATING AND COOLING MASONRY - B 52
Structure High impact board Handrail mouning Reinforcements in coronation Safety mesh wall system Coolers Insulation Board Security wall on stairs Coating Recoverers Structure Stand pipes protection Side mezzanine Unit A Reinforcements in coronation Partition type A Partition type B Partition type C Partition type D Partition type E Partition type F Partition type G Partition type H Partition type I Partition type J Partition type K Partition type L Partition type M Single door carpentry preinstallation Double door carpentry preinstallation Window carpentry preinstallation Impulsion ducts Refenced door and windows Insulation Angles and reinforcements on scooter Insulation Air barrier Boot profile manufactures Handrail Cladding Coating Facilities Return ducts Corner profiles Side mezzanine Unit A Railings Facilities openings Base boards Fancoil Partition type A
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
282 363 315 202 315 225 282 269 315 282 225 269 315 282 189 89 319 319 319 319 319 319 319 319 319 319 319 0 89 89 89 225 282 89 315 269 89 330 282 89 269 315 225 330 269 282 330 315 265 202
8 2 20 28 20 7 4 4 20 4 7 8 20 4 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 6 4 28 20 4 28 4 20 28 4 20 6 2 4 20 4 20 5 28
7/28/2022 08:00 8/8/2022 16:00 8/28/2023 08:00 9/6/2023 16:00 $ 13,650.00 7/29/2022 08:00 8/1/2022 16:00 12/20/2023 08:00 12/21/2023 16:00 $ 13,650.00 7/29/2022 08:00 8/25/2022 16:00 10/13/2023 08:00 11/9/2023 16:00 $ 13,300.00 8/3/2022 08:00 9/9/2022 16:00 5/12/2023 08:00 6/20/2023 16:00 $ 2,562.50 8/5/2022 08:00 9/1/2022 16:00 10/20/2023 08:00 11/16/2023 16:00 $ 13,300.00 8/5/2022 08:00 8/15/2022 16:00 6/16/2023 08:00 6/26/2023 16:00 $ 700.00 8/9/2022 08:00 8/12/2022 16:00 9/7/2023 08:00 9/12/2023 16:00 $ 13,650.00 8/10/2022 08:00 8/15/2022 16:00 8/22/2023 08:00 8/25/2023 16:00 $ 13,650.00 8/12/2022 08:00 9/8/2022 16:00 10/27/2023 08:00 11/23/2023 16:00 $ 13,300.00 8/15/2022 08:00 8/18/2022 16:00 9/13/2023 08:00 9/18/2023 16:00 $ 13,650.00 8/16/2022 08:00 8/24/2022 16:00 6/27/2023 08:00 7/5/2023 16:00 $ 700.00 8/16/2022 08:00 8/25/2022 16:00 8/28/2023 08:00 9/6/2023 16:00 $ 13,650.00 8/19/2022 08:00 9/15/2022 16:00 11/3/2023 08:00 11/30/2023 16:00 $ 13,300.00 8/19/2022 08:00 8/24/2022 16:00 9/19/2023 08:00 9/22/2023 16:00 $ 13,650.00 8/22/2022 08:00 9/28/2022 16:00 5/12/2023 08:00 6/20/2023 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 12/27/2022 08:00 2/2/2023 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 11/14/2023 08:00 12/21/2023 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 11/14/2023 08:00 12/21/2023 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 11/14/2023 08:00 12/21/2023 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 11/14/2023 08:00 12/21/2023 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 11/14/2023 08:00 12/21/2023 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 11/14/2023 08:00 12/21/2023 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 11/14/2023 08:00 12/21/2023 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 11/14/2023 08:00 12/21/2023 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 11/14/2023 08:00 12/21/2023 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 11/14/2023 08:00 12/21/2023 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 11/14/2023 08:00 12/21/2023 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 8/24/2022 08:00 9/30/2022 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 12/27/2022 08:00 2/2/2023 16:00 $ 2,562.50 8/24/2022 08:00 9/30/2022 16:00 12/27/2022 08:00 2/2/2023 16:00 $ 2,562.50 8/25/2022 08:00 10/3/2022 16:00 12/28/2022 08:00 2/3/2023 16:00 $ 2,562.50 8/25/2022 08:00 9/1/2022 16:00 7/6/2023 08:00 7/13/2023 16:00 $ 600.00 8/25/2022 08:00 8/30/2022 16:00 9/25/2023 08:00 9/28/2023 16:00 $ 13,650.00 8/26/2022 08:00 10/4/2022 12:23 12/29/2022 08:00 2/6/2023 12:23 $ 2,562.50 8/26/2022 08:00 9/22/2022 16:00 11/10/2023 08:00 12/7/2023 16:00 $ 13,300.00 8/26/2022 08:00 8/31/2022 16:00 9/7/2023 08:00 9/12/2023 16:00 $ 13,650.00 8/30/2022 08:00 10/6/2022 12:00 1/2/2023 08:00 2/8/2023 12:00 $ 2,562.50 8/31/2022 08:00 9/5/2022 16:00 12/6/2023 08:00 12/11/2023 16:00 $ 13,650.00 8/31/2022 08:00 9/27/2022 16:00 9/29/2023 08:00 10/26/2023 16:00 $ 13,300.00 9/1/2022 08:00 10/10/2022 16:00 1/4/2023 08:00 2/10/2023 16:00 $ 2,562.50 9/1/2022 08:00 9/6/2022 16:00 9/13/2023 08:00 9/18/2023 16:00 $ 13,650.00 9/2/2022 08:00 9/29/2022 16:00 11/17/2023 08:00 12/14/2023 16:00 $ 13,300.00 9/2/2022 08:00 9/9/2022 16:00 7/14/2023 08:00 7/21/2023 16:00 $ 600.00 9/6/2022 08:00 9/7/2022 16:00 12/12/2023 08:00 12/13/2023 16:00 $ 13,650.00 9/7/2022 08:00 9/12/2022 16:00 9/19/2023 08:00 9/22/2023 16:00 $ 13,650.00 9/7/2022 08:00 10/4/2022 16:00 10/6/2023 08:00 11/2/2023 16:00 $ 13,300.00 9/8/2022 08:00 9/13/2022 16:00 12/14/2023 08:00 12/19/2023 16:00 $ 13,650.00 9/9/2022 08:00 10/6/2022 16:00 11/24/2023 08:00 12/21/2023 16:00 $ 13,300.00 9/12/2022 08:00 9/16/2022 16:00 9/18/2023 08:00 9/22/2023 16:00 $ 500.00 9/12/2022 08:00 10/19/2022 16:00 6/21/2023 08:00 7/28/2023 16:00 $ 2,562.50 53
ACTIVITY REPORT
8570 8580 8590 8600 8610 8620 8630 8640 8650 8660 8670 8680 8690 8700 8300 8710 8240 8370 8720 8730 4270 8310 8440 8740 8380 8320 8450 4280 8330 8390 8780 8790 8800 8810 8820 8830 8840 8850 8860 8870 8880 8890 8900 8910 8920 8930 2570 3150 3291 8340
CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.2.8.3 CAE 471.2.6.2 CAE 471.2.8.2 CAE 471.2.12.2 CAE 471.2.6.2 CAE 471.2.6.2 CAE 471.3.4 CAE 471.2.8.3 CAE 471.2.12.3 CAE 471.2.6.2 CAE 471.2.12.2 CAE 471.2.8.3 CAE 471.2.12.3 CAE 471.3.4 CAE 471.2.8.3 CAE 471.2.12.2 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.7.1 CAE 471.2.14.1 CAE 471.2.17 CAE 471.2.8.3
MASONRY - B MASONRY - B MASONRY - B MASONRY - B MASONRY - B MASONRY - B MASONRY - B MASONRY - B MASONRY - B MASONRY - B MASONRY - B MASONRY - B MASONRY - B MASONRY - B FAÇADES - C MASONRY - B FAÇADES - B EXTERIOR DOORS AND WINDOWS - B MASONRY - B MASONRY - B HEATING AND COOLING FAÇADES - C EXTERIOR DOORS AND WINDOWS - C MASONRY - B EXTERIOR DOORS AND WINDOWS - B FAÇADES - C EXTERIOR DOORS AND WINDOWS - C HEATING AND COOLING FAÇADES - C EXTERIOR DOORS AND WINDOWS - B MASONRY - C MASONRY - C MASONRY - C MASONRY - C MASONRY - C MASONRY - C MASONRY - C MASONRY - C MASONRY - C MASONRY - C MASONRY - C MASONRY - C MASONRY - C MASONRY - C MASONRY - C MASONRY - C ROOF - A METAL DOORS - A CELLS FAÇADES - C 54
Partition type B Partition type C Partition type D Partition type E Partition type F Partition type G Partition type H Partition type I Partition type J Partition type K Partition type L Partition type M Single door carpentry preinstallation Double door carpentry preinstallation Refenced door and windows Window carpentry preinstallation High impact board Handrail mouning Insulation Air barrier Vent Boot profile manufactures Handrail Cladding Safety mesh wall system Corner profiles Railings Regulators Facilities openings Security wall on stairs Partition type A Partition type B Partition type C Partition type D Partition type E Partition type F Partition type G Partition type H Partition type I Partition type J Partition type K Partition type L Partition type M Single door carpentry preinstallation Double door carpentry preinstallation Window carpentry preinstallation Steel sheet Preinstalation Fabricate cells High impact board
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
306 306 306 306 306 306 306 306 306 306 306 306 202 202 269 202 330 282 202 202 265 317 269 202 282 317 269 265 317 282 189 293 293 293 293 293 293 293 293 293 293 293 293 189 189 189 0 218 119 317
28 28 28 28 28 28 28 28 28 28 28 28 28 28 4 28 2 20 28 28 6 4 20 28 20 2 20 6 4 20 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 5 44 180 2
9/12/2022 08:00 9/12/2022 08:00 9/12/2022 08:00 9/12/2022 08:00 9/12/2022 08:00 9/12/2022 08:00 9/12/2022 08:00 9/12/2022 08:00 9/12/2022 08:00 9/12/2022 08:00 9/12/2022 08:00 9/12/2022 08:00 9/12/2022 08:00 9/12/2022 08:00 9/13/2022 08:00 9/13/2022 08:00 9/14/2022 08:00 9/14/2022 08:00 9/14/2022 08:00 9/16/2022 08:00 9/19/2022 08:00 9/19/2022 08:00 9/19/2022 08:00 9/20/2022 08:00 9/21/2022 08:00 9/23/2022 08:00 9/26/2022 08:00 9/27/2022 08:00 9/27/2022 08:00 9/28/2022 08:00 9/29/2022 08:00 9/29/2022 08:00 9/29/2022 08:00 9/29/2022 08:00 9/29/2022 08:00 9/29/2022 08:00 9/29/2022 08:00 9/29/2022 08:00 9/29/2022 08:00 9/29/2022 08:00 9/29/2022 08:00 9/29/2022 08:00 9/29/2022 08:00 9/29/2022 08:00 9/29/2022 08:00 9/30/2022 08:00 10/3/2022 08:00 10/3/2022 08:00 10/3/2022 08:00 10/3/2022 08:00
10/19/2022 16:00 10/19/2022 16:00 10/19/2022 16:00 10/19/2022 16:00 10/19/2022 16:00 10/19/2022 16:00 10/19/2022 16:00 10/19/2022 16:00 10/19/2022 16:00 10/19/2022 16:00 10/19/2022 16:00 10/19/2022 16:00 10/19/2022 16:00 10/19/2022 16:00 9/16/2022 16:00 10/20/2022 16:00 9/15/2022 16:00 10/11/2022 16:00 10/21/2022 12:23 10/25/2022 12:00 9/26/2022 16:00 9/22/2022 16:00 10/14/2022 16:00 10/27/2022 16:00 10/18/2022 16:00 9/26/2022 16:00 10/21/2022 16:00 10/4/2022 16:00 9/30/2022 16:00 10/25/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 11/8/2022 16:00 10/7/2022 16:00 12/1/2022 16:00 6/9/2023 16:00 10/4/2022 16:00
11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 6/21/2023 08:00 6/21/2023 08:00 9/25/2023 08:00 6/22/2023 08:00 12/20/2023 08:00 10/13/2023 08:00 6/23/2023 08:00 6/27/2023 08:00 9/25/2023 08:00 12/6/2023 08:00 9/29/2023 08:00 6/29/2023 08:00 10/20/2023 08:00 12/12/2023 08:00 10/6/2023 08:00 10/3/2023 08:00 12/14/2023 08:00 10/27/2023 08:00 6/21/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 11/14/2023 08:00 6/21/2023 08:00 6/21/2023 08:00 6/22/2023 08:00 10/3/2022 08:00 8/3/2023 08:00 3/17/2023 08:00 12/20/2023 08:00 55
12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 7/28/2023 16:00 7/28/2023 16:00 9/28/2023 16:00 7/31/2023 16:00 12/21/2023 16:00 11/9/2023 16:00 8/1/2023 12:23 8/3/2023 12:00 10/2/2023 16:00 12/11/2023 16:00 10/26/2023 16:00 8/7/2023 16:00 11/16/2023 16:00 12/13/2023 16:00 11/2/2023 16:00 10/10/2023 16:00 12/19/2023 16:00 11/23/2023 16:00 7/28/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 7/28/2023 16:00 7/28/2023 16:00 7/31/2023 16:00 10/7/2022 16:00 10/3/2023 16:00 11/23/2023 16:00 12/21/2023 16:00
$ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 13,650.00 $ 2,562.50 $ 13,650.00 $ 13,300.00 $ 2,562.50 $ 2,562.50 $ 600.00 $ 13,650.00 $ 13,300.00 $ 2,562.50 $ 13,300.00 $ 13,650.00 $ 13,300.00 $ 600.00 $ 13,650.00 $ 13,300.00 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 2,562.50 $ 60,375.00 $ 4,400.00 $ 100,000.00 $ 13,650.00
ACTIVITY REPORT
8460 8940 3190 6930 4290 8400 8950 8960 2580 2630 2640 4350 5000 5150 8470 2950 3010 4000 4130 5300 5350 5420 6070 6180 6310 6940 8410 2590 2610 4140 4300 4360 5360 6320 2600 8480 5310 6950 4150 4370 8420 2620 6080 9510 5370 9330 9590 5010 5490 6000
CAE 471.2.12.3 CAE 471.2.6.3 CAE 471.2.15.1 CAE 471.2.13.1 CAE 471.3.4 CAE 471.2.12.2 CAE 471.2.6.3 CAE 471.2.6.3 CAE 471.2.7.1 CAE 471.2.7.1 CAE 471.2.7.1 CAE 471.3.5 CAE 471.4.1 CAE 471.4.4 CAE 471.2.12.3 CAE 471.2.10.1 CAE 471.2.11.1 CAE 471.3.1 CAE 471.3.3 CAE 471.4.6 CAE 471.4.7 CAE 471.4.8 CAE 471.5.2.1 CAE 471.5.2.2 CAE 471.5.3 CAE 471.2.13.1 CAE 471.2.12.2 CAE 471.2.7.1 CAE 471.2.7.1 CAE 471.3.3 CAE 471.3.4 CAE 471.3.5 CAE 471.4.7 CAE 471.5.3 CAE 471.2.7.1 CAE 471.2.12.3 CAE 471.4.6 CAE 471.2.13.1 CAE 471.3.3 CAE 471.3.5 CAE 471.2.12.2 CAE 471.2.7.1 CAE 471.5.2.1 CAE 471.2.14.2 CAE 471.4.7 CAE 471.2.13.2 CAE 471.2.15.2 CAE 471.4.1 CAE 471.4.9 CAE 471.5.1
EXTERIOR DOORS AND WINDOWS - C MASONRY - C GLASS - A INTERIOR DOORS AND WINDOWS - A HEATING AND COOLING EXTERIOR DOORS AND WINDOWS - B MASONRY - C MASONRY - C ROOF - A ROOF - A ROOF - A VENTILATION SYSTEM EMERGENCY EXTERIOR DOORS AND WINDOWS - C FLOORS - A INTERIOR WALLS FINISHES - A ELEVATOR WATER DISTRIBUTION VIDEO SURVELLIANCE IT INFRAESTRUCTURE VIDEO SYSTEM EXTINCTION DETECTION NATURAL GAS INTERIOR DOORS AND WINDOWS - A EXTERIOR DOORS AND WINDOWS - B ROOF - A ROOF - A WATER DISTRIBUTION HEATING AND COOLING VENTILATION IT INFRAESTRUCTURE NATURAL GAS ROOF - A EXTERIOR DOORS AND WINDOWS - C VIDEO SURVELLIANCE INTERIOR DOORS AND WINDOWS - A WATER DISTRIBUTION VENTILATION EXTERIOR DOORS AND WINDOWS - B ROOF - A EXTINCTION METAL DOORS - B IT INFRAESTRUCTURE INTERIOR DOORS AND WINDOWS - B GLASS - B SYSTEM SPEAKERS SYSTEM LIGHTNING ROD 56
Handrail mouning Insulation Windows Handrail Firewall vents Stand pipes protection Air barrier Cladding Insulation Rain sinks Water overflows Extraction box Electrical onslaught Canalization Safety mesh wall system Polished concrete Tiles Elevator installation Cupboard Video direct city doux Entrance casket Outdoor installation infrestructure TV/Radio/ Pumps room Switchboard Regulator Railings Angles and reinforcements on scooter Drain foil Skylight installation Counters box Impulse pipeline channeling Silencer Buried installation of external pipeline Polyethylene pipe Roof aprons Security wall on stairs Central concierge Handrail mouning Polyethilene pipes Interior distribution Facilities Apron coping Exterior buried net Preinstalation Supply RITU installation Handrail Windows Transformation center Speakers Lightning rod installation
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
269 189 251 258 265 282 189 189 104 312 312 183 0 176 269 171 125 142 102 89 138 171 162 182 133 258 282 127 104 102 265 183 138 133 127 269 89 258 102 183 282 304 162 212 179 245 238 0 177 125
20 28 20 20 7 20 28 28 3 2 2 4 10 16 20 10 27 15 3 5 3 10 7 10 3 20 20 2 2 3 8 3 5 10 3 20 5 20 10 15 20 2 7 44 7 20 20 12 5 12
10/3/2022 08:00 10/3/2022 08:00 10/4/2022 08:00 10/4/2022 08:00 10/5/2022 08:00 10/5/2022 08:00 10/5/2022 08:00 10/7/2022 08:00 10/10/2022 08:00 10/10/2022 08:00 10/10/2022 08:00 10/10/2022 08:00 10/10/2022 08:00 10/10/2022 08:00 10/10/2022 08:00 10/11/2022 08:00 10/11/2022 08:00 10/11/2022 08:00 10/11/2022 08:00 10/11/2022 08:00 10/11/2022 08:00 10/11/2022 08:00 10/11/2022 08:00 10/11/2022 08:00 10/11/2022 08:00 10/11/2022 08:00 10/12/2022 08:00 10/13/2022 08:00 10/13/2022 08:00 10/14/2022 08:00 10/14/2022 08:00 10/14/2022 08:00 10/14/2022 08:00 10/14/2022 08:00 10/17/2022 08:00 10/17/2022 08:00 10/18/2022 08:00 10/18/2022 08:00 10/19/2022 08:00 10/19/2022 08:00 10/19/2022 08:00 10/20/2022 08:00 10/20/2022 08:00 10/20/2022 08:00 10/21/2022 08:00 10/21/2022 08:00 10/21/2022 08:00 10/24/2022 08:00 10/24/2022 08:00 10/24/2022 08:00
10/28/2022 16:00 11/9/2022 12:23 10/31/2022 16:00 10/31/2022 16:00 10/13/2022 16:00 11/1/2022 16:00 11/11/2022 12:00 11/15/2022 16:00 10/12/2022 16:00 10/11/2022 16:00 10/11/2022 16:00 10/13/2022 16:00 10/21/2022 16:00 10/31/2022 16:00 11/4/2022 16:00 10/24/2022 16:00 11/16/2022 16:00 10/31/2022 16:00 10/13/2022 16:00 10/17/2022 16:00 10/13/2022 16:00 10/24/2022 16:00 10/19/2022 16:00 10/24/2022 16:00 10/13/2022 16:00 11/7/2022 16:00 11/8/2022 16:00 10/14/2022 16:00 10/14/2022 16:00 10/18/2022 16:00 10/25/2022 16:00 10/18/2022 16:00 10/20/2022 16:00 10/27/2022 16:00 10/19/2022 16:00 11/11/2022 16:00 10/24/2022 16:00 11/14/2022 16:00 11/1/2022 16:00 11/8/2022 16:00 11/15/2022 16:00 10/21/2022 16:00 10/28/2022 16:00 12/20/2022 16:00 10/31/2022 16:00 11/17/2022 16:00 11/17/2022 16:00 11/8/2022 16:00 10/28/2022 16:00 11/8/2022 16:00
10/13/2023 08:00 6/23/2023 08:00 9/20/2023 08:00 9/29/2023 08:00 10/11/2023 08:00 11/3/2023 08:00 6/27/2023 08:00 6/29/2023 08:00 3/3/2023 08:00 12/20/2023 08:00 12/20/2023 08:00 6/22/2023 08:00 10/10/2022 08:00 6/13/2023 08:00 10/20/2023 08:00 6/7/2023 08:00 4/4/2023 08:00 4/27/2023 08:00 3/2/2023 08:00 2/13/2023 08:00 4/21/2023 08:00 6/7/2023 08:00 5/25/2023 08:00 6/22/2023 08:00 4/14/2023 08:00 10/6/2023 08:00 11/10/2023 08:00 4/10/2023 08:00 3/8/2023 08:00 3/7/2023 08:00 10/20/2023 08:00 6/28/2023 08:00 4/26/2023 08:00 4/19/2023 08:00 4/12/2023 08:00 10/27/2023 08:00 2/20/2023 08:00 10/13/2023 08:00 3/10/2023 08:00 7/3/2023 08:00 11/17/2023 08:00 12/20/2023 08:00 6/5/2023 08:00 8/14/2023 08:00 6/29/2023 08:00 9/29/2023 08:00 9/20/2023 08:00 10/24/2022 08:00 6/28/2023 08:00 4/17/2023 08:00 57
11/9/2023 16:00 8/1/2023 12:23 10/17/2023 16:00 10/26/2023 16:00 10/19/2023 16:00 11/30/2023 16:00 8/3/2023 12:00 8/7/2023 16:00 3/7/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 6/27/2023 16:00 10/21/2022 16:00 7/4/2023 16:00 11/16/2023 16:00 6/20/2023 16:00 5/10/2023 16:00 5/17/2023 16:00 3/6/2023 16:00 2/17/2023 16:00 4/25/2023 16:00 6/20/2023 16:00 6/2/2023 16:00 7/5/2023 16:00 4/18/2023 16:00 11/2/2023 16:00 12/7/2023 16:00 4/11/2023 16:00 3/9/2023 16:00 3/9/2023 16:00 10/31/2023 16:00 6/30/2023 16:00 5/2/2023 16:00 5/2/2023 16:00 4/14/2023 16:00 11/23/2023 16:00 2/24/2023 16:00 11/9/2023 16:00 3/23/2023 16:00 7/21/2023 16:00 12/14/2023 16:00 12/21/2023 16:00 6/13/2023 16:00 10/12/2023 16:00 7/7/2023 16:00 10/26/2023 16:00 10/17/2023 16:00 11/8/2022 16:00 7/4/2023 16:00 5/2/2023 16:00
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
13,300.00 2,562.50 2,000.00 4,750.00 700.00 13,300.00 2,562.50 2,562.50 60,375.00 60,375.00 60,375.00 400.00 1,000.00 1,600.00 13,300.00 11,600.00 7,812.50 6,250.00 1,000.00 500.00 300.00 1,000.00 700.00 1,000.00 300.00 4,750.00 13,300.00 60,375.00 60,375.00 300.00 800.00 300.00 500.00 1,000.00 60,375.00 13,300.00 500.00 4,750.00 1,000.00 1,500.00 13,300.00 60,375.00 700.00 4,400.00 700.00 4,750.00 2,000.00 1,200.00 500.00 1,200.00
ACTIVITY REPORT
6370 6380 8490 2960 5320 5430 6190 6960 4310 8430 5440 6330 8970 9090 9340 5500 6090 8500 3200 4010 5170 5380 5450 6970 4160 9350 5460 6340 8510 2970 5330 5390 6100 6980 9550 4320 5020 6010 6390 9420 9620 4020 5470 6350 8980 9360 8520 5400 6990 4170
CAE 471.5.4.1 CAE 471.5.4.1 CAE 471.2.12.3 CAE 471.2.10.1 CAE 471.4.6 CAE 471.4.8 CAE 471.5.2.2 CAE 471.2.13.1 CAE 471.3.4 CAE 471.2.12.2 CAE 471.4.8 CAE 471.5.3 CAE 471.2.10.3 CAE 471.2.11.2 CAE 471.2.13.2 CAE 471.4.9 CAE 471.5.2.1 CAE 471.2.12.3 CAE 471.2.15.1 CAE 471.3.1 CAE 471.4.4 CAE 471.4.7 CAE 471.4.8 CAE 471.2.13.1 CAE 471.3.3 CAE 471.2.13.2 CAE 471.4.8 CAE 471.5.3 CAE 471.2.12.3 CAE 471.2.10.1 CAE 471.4.6 CAE 471.4.7 CAE 471.5.2.1 CAE 471.2.13.1 CAE 471.2.14.3 CAE 471.3.4 CAE 471.4.1 CAE 471.5.1 CAE 471.5.4.1 CAE 471.2.13.3 CAE 471.2.15.3 CAE 471.3.1 CAE 471.4.8 CAE 471.5.3 CAE 471.2.10.3 CAE 471.2.13.2 CAE 471.2.12.3 CAE 471.4.7 CAE 471.2.13.1 CAE 471.3.3
EXTERIOR EXTERIOR EXTERIOR DOORS AND WINDOWS - C FLOORS - A VIDEO SURVELLIANCE VIDEO SYSTEM DETECTION INTERIOR DOORS AND WINDOWS - A HEATING AND COOLING EXTERIOR DOORS AND WINDOWS - B VIDEO SYSTEM NATURAL GAS FLOORS - B INTERIOR WALLS FINISHES - B INTERIOR DOORS AND WINDOWS - B SPEAKERS SYSTEM EXTINCTION EXTERIOR DOORS AND WINDOWS - C GLASS - A ELEVATOR EMERGENCY IT INFRAESTRUCTURE VIDEO SYSTEM INTERIOR DOORS AND WINDOWS - A WATER DISTRIBUTION INTERIOR DOORS AND WINDOWS - B VIDEO SYSTEM NATURAL GAS EXTERIOR DOORS AND WINDOWS - C FLOORS - A VIDEO SURVELLIANCE IT INFRAESTRUCTURE EXTINCTION INTERIOR DOORS AND WINDOWS - A METAL DOORS - C HEATING AND COOLING SYSTEM LIGHTNING ROD EXTERIOR INTERIOR DOORS AND WINDOWS - C GLASS - C ELEVATOR VIDEO SYSTEM NATURAL GAS FLOORS - B INTERIOR DOORS AND WINDOWS - B EXTERIOR DOORS AND WINDOWS - C IT INFRAESTRUCTURE INTERIOR DOORS AND WINDOWS - A WATER DISTRIBUTION 58
Dome pole Fiberglass ducting Stand pipes protection Vinyl Doux wifi video kit Antenna/mast/parabola Wired bus Safety mesh wall system Return pipeline channeling Base boards Cabinet, amplifiers..... Cut valve Polished concrete Tiles Railings Canalization Casket/post Angles and reinforcements on scooter Security glass Auxiliary structure Circuits Rack Distribuitor Security wall on stairs Distribution pipes Handrail mouning Repeaters Flow limiter Facilities Carpet Doors and windows security system Main channeling Hydrants Stand pipes protection Preinstalation Duct insulation Cell sectioning Tubed copper cable Security wardroves Handrail Windows Maintenance contract Main channeling Copper tubing Vinyl Safety mesh wall system Base boards Secondary caskets Angles and reinforcements on scooter Pressure group
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
303 270 269 253 89 171 182 258 265 282 171 154 240 202 245 177 162 269 251 142 176 179 171 258 102 245 171 154 269 253 89 179 162 258 199 265 0 265 270 232 225 142 171 154 240 245 269 263 258 102
1 12 20 10 10 2 12 20 10 20 3 6 10 27 20 13 6 20 20 7 13 5 4 20 10 20 4 4 20 10 25 5 10 20 44 20 25 7 5 20 20 7 10 12 10 20 20 10 20 10
10/24/2022 08:00 10/24/2022 08:00 10/24/2022 08:00 10/25/2022 08:00 10/25/2022 08:00 10/25/2022 08:00 10/25/2022 08:00 10/25/2022 08:00 10/26/2022 08:00 10/26/2022 08:00 10/27/2022 08:00 10/28/2022 08:00 10/28/2022 08:00 10/28/2022 08:00 10/28/2022 08:00 10/31/2022 08:00 10/31/2022 08:00 10/31/2022 08:00 11/1/2022 08:00 11/1/2022 08:00 11/1/2022 08:00 11/1/2022 08:00 11/1/2022 08:00 11/1/2022 08:00 11/2/2022 08:00 11/4/2022 08:00 11/7/2022 08:00 11/7/2022 08:00 11/7/2022 08:00 11/8/2022 08:00 11/8/2022 08:00 11/8/2022 08:00 11/8/2022 08:00 11/8/2022 08:00 11/8/2022 08:00 11/9/2022 08:00 11/9/2022 08:00 11/9/2022 08:00 11/9/2022 08:00 11/9/2022 08:00 11/9/2022 08:00 11/10/2022 08:00 11/11/2022 08:00 11/11/2022 08:00 11/11/2022 08:00 11/11/2022 08:00 11/14/2022 08:00 11/15/2022 08:00 11/15/2022 08:00 11/16/2022 08:00
10/24/2022 16:00 11/8/2022 16:00 11/18/2022 16:00 11/7/2022 16:00 11/7/2022 16:00 10/26/2022 16:00 11/9/2022 16:00 11/21/2022 16:00 11/8/2022 16:00 11/22/2022 16:00 10/31/2022 16:00 11/4/2022 16:00 11/10/2022 16:00 12/5/2022 16:00 11/24/2022 16:00 11/16/2022 16:00 11/7/2022 16:00 11/25/2022 16:00 11/28/2022 16:00 11/9/2022 16:00 11/17/2022 16:00 11/7/2022 16:00 11/4/2022 16:00 11/28/2022 16:00 11/15/2022 16:00 12/1/2022 16:00 11/10/2022 16:00 11/10/2022 16:00 12/2/2022 16:00 11/21/2022 16:00 12/12/2022 16:00 11/14/2022 16:00 11/21/2022 16:00 12/5/2022 16:00 1/6/2023 16:00 12/6/2022 16:00 12/13/2022 16:00 11/17/2022 16:00 11/15/2022 16:00 12/6/2022 16:00 12/6/2022 16:00 11/18/2022 16:00 11/24/2022 16:00 11/28/2022 16:00 11/24/2022 16:00 12/8/2022 16:00 12/9/2022 16:00 11/28/2022 16:00 12/12/2022 16:00 11/29/2022 16:00
12/21/2023 08:00 11/6/2023 08:00 11/3/2023 08:00 10/13/2023 08:00 2/27/2023 08:00 6/21/2023 08:00 7/6/2023 08:00 10/20/2023 08:00 11/1/2023 08:00 11/24/2023 08:00 6/23/2023 08:00 6/1/2023 08:00 9/29/2023 08:00 8/8/2023 08:00 10/6/2023 08:00 7/5/2023 08:00 6/14/2023 08:00 11/10/2023 08:00 10/18/2023 08:00 5/18/2023 08:00 7/5/2023 08:00 7/10/2023 08:00 6/28/2023 08:00 10/27/2023 08:00 3/24/2023 08:00 10/13/2023 08:00 7/4/2023 08:00 6/9/2023 08:00 11/17/2023 08:00 10/27/2023 08:00 3/13/2023 08:00 7/17/2023 08:00 6/22/2023 08:00 11/3/2023 08:00 8/14/2023 08:00 11/15/2023 08:00 11/9/2022 08:00 11/15/2023 08:00 11/22/2023 08:00 9/29/2023 08:00 9/20/2023 08:00 5/29/2023 08:00 7/10/2023 08:00 6/15/2023 08:00 10/13/2023 08:00 10/20/2023 08:00 11/24/2023 08:00 11/17/2023 08:00 11/10/2023 08:00 4/7/2023 08:00 59
12/21/2023 16:00 11/21/2023 16:00 11/30/2023 16:00 10/26/2023 16:00 3/10/2023 16:00 6/22/2023 16:00 7/21/2023 16:00 11/16/2023 16:00 11/14/2023 16:00 12/21/2023 16:00 6/27/2023 16:00 6/8/2023 16:00 10/12/2023 16:00 9/13/2023 16:00 11/2/2023 16:00 7/21/2023 16:00 6/21/2023 16:00 12/7/2023 16:00 11/14/2023 16:00 5/26/2023 16:00 7/21/2023 16:00 7/14/2023 16:00 7/3/2023 16:00 11/23/2023 16:00 4/6/2023 16:00 11/9/2023 16:00 7/7/2023 16:00 6/14/2023 16:00 12/14/2023 16:00 11/9/2023 16:00 4/14/2023 16:00 7/21/2023 16:00 7/5/2023 16:00 11/30/2023 16:00 10/12/2023 16:00 12/12/2023 16:00 12/13/2022 16:00 11/23/2023 16:00 11/28/2023 16:00 10/26/2023 16:00 10/17/2023 16:00 6/6/2023 16:00 7/21/2023 16:00 6/30/2023 16:00 10/26/2023 16:00 11/16/2023 16:00 12/21/2023 16:00 11/30/2023 16:00 12/7/2023 16:00 4/20/2023 16:00
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
100.00 1,200.00 13,300.00 11,600.00 1,000.00 200.00 1,200.00 4,750.00 1,000.00 13,300.00 300.00 600.00 11,600.00 7,812.50 4,750.00 1,300.00 600.00 13,300.00 2,000.00 1,250.00 1,300.00 500.00 400.00 4,750.00 1,000.00 4,750.00 400.00 400.00 13,300.00 11,600.00 2,500.00 500.00 1,000.00 4,750.00 4,400.00 2,000.00 2,500.00 700.00 500.00 4,750.00 2,000.00 625.00 1,000.00 1,200.00 11,600.00 4,750.00 13,300.00 1,000.00 4,750.00 1,000.00
ACTIVITY REPORT
9030 9130 9430 3020 4060 5510 5180 6020 9370 9600 4030 2980 4040 6110 7000 9440 4050 5190 5480 8990 9380 3210 5410 6030 6360 6500 7010 4180 9040 9450 4070 5520 3160 3170 3180 6510 9390 2990 6040 9100 4330 9460 9630 6120 5200 9000 9400 3030 4190 5340
CAE 471.2.10.2 CAE 471.2.11.3 CAE 471.2.13.3 CAE 471.2.11.1 CAE 471.3.2 CAE 471.4.9 CAE 471.4.4 CAE 471.5.1 CAE 471.2.13.2 CAE 471.2.15.2 CAE 471.3.1 CAE 471.2.10.1 CAE 471.3.1 CAE 471.5.2.1 CAE 471.2.13.1 CAE 471.2.13.3 CAE 471.3.1 CAE 471.4.4 CAE 471.4.8 CAE 471.2.10.3 CAE 471.2.13.2 CAE 471.2.15.1 CAE 471.4.7 CAE 471.5.1 CAE 471.5.3 CAE 471.5.5.1 CAE 471.2.13.1 CAE 471.3.3 CAE 471.2.10.2 CAE 471.2.13.3 CAE 471.3.2 CAE 471.4.9 CAE 471.2.14.1 CAE 471.2.14.1 CAE 471.2.14.1 CAE 471.5.5.1 CAE 471.2.13.2 CAE 471.2.10.1 CAE 471.5.1 CAE 471.2.11.2 CAE 471.3.4 CAE 471.2.13.3 CAE 471.2.15.3 CAE 471.5.2.1 CAE 471.4.4 CAE 471.2.10.3 CAE 471.2.13.2 CAE 471.2.11.1 CAE 471.3.3 CAE 471.4.6
FLOORS - C INTERIOR WALLS FINISHES - C INTERIOR DOORS AND WINDOWS - C INTERIOR WALLS FINISHES - A PLUMBING FIXTURES SPEAKERS SYSTEM EMERGENCY LIGHTNING ROD INTERIOR DOORS AND WINDOWS - B GLASS - B ELEVATOR FLOORS - A ELEVATOR EXTINCTION INTERIOR DOORS AND WINDOWS - A INTERIOR DOORS AND WINDOWS - C ELEVATOR EMERGENCY VIDEO SYSTEM FLOORS - B INTERIOR DOORS AND WINDOWS - B GLASS - A IT INFRAESTRUCTURE LIGHTNING ROD NATURAL GAS EXTRACTOR INTERIOR DOORS AND WINDOWS - A WATER DISTRIBUTION FLOORS - C INTERIOR DOORS AND WINDOWS - C PLUMBING FIXTURES SPEAKERS SYSTEM METAL DOORS - A METAL DOORS - A METAL DOORS - A EXTRACTOR INTERIOR DOORS AND WINDOWS - B FLOORS - A LIGHTNING ROD INTERIOR WALLS FINISHES - B HEATING AND COOLING INTERIOR DOORS AND WINDOWS - C GLASS - C EXTINCTION EMERGENCY FLOORS - B INTERIOR DOORS AND WINDOWS - B INTERIOR WALLS FINISHES - A WATER DISTRIBUTION VIDEO SURVELLIANCE 60
Polished concrete Tiles Railings PVC panels Ceramic built-in washbasin Switchboard Electrogen group Bare copper cable Security wall on stairs Security glass Gound wiring Baseboards Electric box Interior network distribution Facilities Handrail mouning Telephone connection Circuit luminaires Recessed pipeline Carpet Stand pipes protection Security mirrors Recessed installation Sspades on land (triangle) Rack Extractor fan Base boards Deposits Vinyl Safety mesh wall system Porcelain toilet Megaphony equipment RF doors RF registrers Facility closet Pipeline Angles and reinforcements on scooter Concrete on steps Lightning counter PVC panels Valves Security wall on stairs Security glass Electrovalvules Central fire alarm Baseboards Facilities Plaster Collector Exterior installation
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
227 189 232 125 216 254 195 265 245 238 142 253 142 162 258 232 142 195 270 240 245 251 263 265 274 154 258 102 227 232 216 254 218 225 225 154 245 253 265 202 265 232 225 245 195 240 245 125 121 89
10 27 20 17 10 10 5 7 20 20 1 10 2 12 20 20 30 10 10 10 20 27 15 5 4 3 20 8 10 20 10 8 50 50 50 12 20 10 8 17 5 20 20 7 10 10 20 27 6 12
11/16/2022 08:00 11/16/2022 08:00 11/16/2022 08:00 11/17/2022 08:00 11/17/2022 08:00 11/17/2022 08:00 11/18/2022 08:00 11/18/2022 08:00 11/18/2022 08:00 11/18/2022 08:00 11/21/2022 08:00 11/22/2022 08:00 11/22/2022 08:00 11/22/2022 08:00 11/22/2022 08:00 11/23/2022 08:00 11/24/2022 08:00 11/25/2022 08:00 11/25/2022 08:00 11/25/2022 08:00 11/25/2022 08:00 11/29/2022 08:00 11/29/2022 08:00 11/29/2022 08:00 11/29/2022 08:00 11/29/2022 08:00 11/29/2022 08:00 11/30/2022 08:00 11/30/2022 08:00 11/30/2022 08:00 12/1/2022 08:00 12/1/2022 08:00 12/2/2022 08:00 12/2/2022 08:00 12/2/2022 08:00 12/2/2022 08:00 12/2/2022 08:00 12/6/2022 08:00 12/6/2022 08:00 12/6/2022 08:00 12/7/2022 08:00 12/7/2022 08:00 12/7/2022 08:00 12/8/2022 08:00 12/9/2022 08:00 12/9/2022 08:00 12/9/2022 08:00 12/12/2022 08:00 12/12/2022 08:00 12/13/2022 08:00
11/29/2022 16:00 12/22/2022 16:00 12/13/2022 16:00 12/9/2022 16:00 11/30/2022 16:00 11/30/2022 16:00 11/24/2022 16:00 11/28/2022 16:00 12/15/2022 16:00 12/15/2022 16:00 11/21/2022 16:00 12/5/2022 16:00 11/23/2022 16:00 12/7/2022 16:00 12/19/2022 16:00 12/20/2022 16:00 1/4/2023 16:00 12/8/2022 16:00 12/8/2022 16:00 12/8/2022 16:00 12/22/2022 16:00 1/4/2023 16:00 12/19/2022 16:00 12/5/2022 16:00 12/2/2022 16:00 12/1/2022 16:00 12/26/2022 16:00 12/9/2022 16:00 12/13/2022 16:00 12/27/2022 16:00 12/14/2022 16:00 12/12/2022 16:00 2/9/2023 16:00 2/9/2023 16:00 2/9/2023 16:00 12/19/2022 16:00 12/29/2022 16:00 12/19/2022 16:00 12/15/2022 16:00 12/28/2022 16:00 12/13/2022 16:00 1/3/2023 16:00 1/3/2023 16:00 12/16/2022 16:00 12/22/2022 16:00 12/22/2022 16:00 1/5/2023 16:00 1/17/2023 16:00 12/19/2022 16:00 12/28/2022 16:00
9/29/2023 08:00 8/8/2023 08:00 10/6/2023 08:00 5/11/2023 08:00 9/15/2023 08:00 11/8/2023 08:00 8/18/2023 08:00 11/24/2023 08:00 10/27/2023 08:00 10/18/2023 08:00 6/7/2023 08:00 11/10/2023 08:00 6/8/2023 08:00 7/6/2023 08:00 11/17/2023 08:00 10/13/2023 08:00 6/12/2023 08:00 8/25/2023 08:00 12/8/2023 08:00 10/27/2023 08:00 11/3/2023 08:00 11/15/2023 08:00 12/1/2023 08:00 12/5/2023 08:00 12/18/2023 08:00 7/3/2023 08:00 11/24/2023 08:00 4/21/2023 08:00 10/13/2023 08:00 10/20/2023 08:00 9/29/2023 08:00 11/22/2023 08:00 10/4/2023 08:00 10/13/2023 08:00 10/13/2023 08:00 7/6/2023 08:00 11/10/2023 08:00 11/24/2023 08:00 12/12/2023 08:00 9/14/2023 08:00 12/13/2023 08:00 10/27/2023 08:00 10/18/2023 08:00 11/16/2023 08:00 9/8/2023 08:00 11/10/2023 08:00 11/17/2023 08:00 6/5/2023 08:00 5/30/2023 08:00 4/17/2023 08:00 61
10/12/2023 16:00 9/13/2023 16:00 11/2/2023 16:00 6/2/2023 16:00 9/28/2023 16:00 11/21/2023 16:00 8/24/2023 16:00 12/4/2023 16:00 11/23/2023 16:00 11/14/2023 16:00 6/7/2023 16:00 11/23/2023 16:00 6/9/2023 16:00 7/21/2023 16:00 12/14/2023 16:00 11/9/2023 16:00 7/21/2023 16:00 9/7/2023 16:00 12/21/2023 16:00 11/9/2023 16:00 11/30/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/11/2023 16:00 12/21/2023 16:00 7/5/2023 16:00 12/21/2023 16:00 5/2/2023 16:00 10/26/2023 16:00 11/16/2023 16:00 10/12/2023 16:00 12/1/2023 16:00 12/12/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 7/21/2023 16:00 12/7/2023 16:00 12/7/2023 16:00 12/21/2023 16:00 10/6/2023 16:00 12/19/2023 16:00 11/23/2023 16:00 11/14/2023 16:00 11/24/2023 16:00 9/21/2023 16:00 11/23/2023 16:00 12/14/2023 16:00 7/11/2023 16:00 6/6/2023 16:00 5/2/2023 16:00
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
11,600.00 7,812.50 4,750.00 7,812.50 1,000.00 1,000.00 1,500.00 700.00 4,750.00 2,000.00 625.00 11,600.00 200.00 1,200.00 4,750.00 4,750.00 3,000.00 1,000.00 1,000.00 11,600.00 4,750.00 2,700.00 1,500.00 500.00 400.00 300.00 4,750.00 800.00 11,600.00 4,750.00 1,000.00 800.00 5,000.00 5,000.00 5,000.00 1,200.00 4,750.00 11,575.00 800.00 7,812.50 500.00 4,750.00 2,000.00 700.00 1,000.00 11,600.00 4,750.00 7,812.50 600.00 1,200.00
ACTIVITY REPORT
5530 4340 5030 9050 9470 4080 9410 9610 5540 3000 4200 6520 6530 6540 6550 6560 6570 6580 6590 6600 6610 9480 9520 9530 9540 5210 9010 9140 9060 9490 4090 9110 7020 9500 9640 5220 9020 7040 9560 9570 9580 9070 4100 9150 3040 3220 3230 3240 3250 3260
CAE 471.4.9 CAE 471.3.4 CAE 471.4.1 CAE 471.2.10.2 CAE 471.2.13.3 CAE 471.3.2 CAE 471.2.13.2 CAE 471.2.15.2 CAE 471.4.9 CAE 471.2.10.1 CAE 471.3.3 CAE 471.5.5.1 CAE 471.5.5.3 CAE 471.5.5.3 CAE 471.5.5.3 CAE 471.5.5.3 CAE 471.5.5.3 CAE 471.5.5.3 CAE 471.5.5.3 CAE 471.5.5.3 CAE 471.5.5.3 CAE 471.2.13.3 CAE 471.2.14.2 CAE 471.2.14.2 CAE 471.2.14.2 CAE 471.4.4 CAE 471.2.10.3 CAE 471.2.11.3 CAE 471.2.10.2 CAE 471.2.13.3 CAE 471.3.2 CAE 471.2.11.2 CAE 471.5.5.2 CAE 471.2.13.3 CAE 471.2.15.3 CAE 471.4.4 CAE 471.2.10.3 CAE 471.5.5.2 CAE 471.2.14.3 CAE 471.2.14.3 CAE 471.2.14.3 CAE 471.2.10.2 CAE 471.3.2 CAE 471.2.11.3 CAE 471.2.11.1 CAE 471.2.16.1 CAE 471.2.16.1 CAE 471.2.16.1 CAE 471.2.16.1 CAE 471.2.16.1
SPEAKERS SYSTEM HEATING AND COOLING SYSTEM FLOORS - C INTERIOR DOORS AND WINDOWS - C PLUMBING FIXTURES INTERIOR DOORS AND WINDOWS - B GLASS - B SPEAKERS SYSTEM FLOORS - A WATER DISTRIBUTION EXTRACTOR FURNITURE FURNITURE FURNITURE FURNITURE FURNITURE FURNITURE FURNITURE FURNITURE FURNITURE INTERIOR DOORS AND WINDOWS - C METAL DOORS - B METAL DOORS - B METAL DOORS - B EMERGENCY FLOORS - B INTERIOR WALLS FINISHES - C FLOORS - C INTERIOR DOORS AND WINDOWS - C PLUMBING FIXTURES INTERIOR WALLS FINISHES - B FIRE EXTINGUISH SYSTEM INTERIOR DOORS AND WINDOWS - C GLASS - C EMERGENCY FLOORS - B FIRE EXTINGUISH SYSTEM METAL DOORS - C METAL DOORS - C METAL DOORS - C FLOORS - C PLUMBING FIXTURES INTERIOR WALLS FINISHES - C INTERIOR WALLS FINISHES - A PAINT - A PAINT - A PAINT - A PAINT - A PAINT - A 62
Amplifier Thermostats Main electrical box Carpet Stand pipes protection Shower tray Base boards Security mirrors Breeding equipment Profiles change pavements Pumping room Sink Chamber Pot Stove Hot table Cold table Oven Working tables Countertops Shelves Angles and reinforcements on scooter RF doors RF registrers Facility closet Extinguishing pumps room Concrete on steps PVC panels Baseboards Facilities Handicapped bars Plaster Water onslaught Base boards Security mirrors Intrusion installation Profiles change pavements Pumps room RF doors RF registrers Facility closet Concrete on steps Bathroom accessories Plaster Gipboard On plaster On ceiling RF paint on structure Exterior on concrete Enamel on locksmithing
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
254 265 0 227 232 216 245 238 254 253 121 260 259 260 260 260 260 260 260 259 257 232 212 212 212 195 240 189 227 232 216 202 121 232 225 195 240 121 199 199 199 227 216 189 125 142 142 142 142 142
4 2 25 10 20 10 20 27 10 10 10 3 4 3 3 3 3 3 3 4 6 20 50 50 50 10 10 17 10 20 10 27 4 20 27 12 10 7 50 50 50 10 10 27 27 10 10 10 10 10
12/13/2022 08:00 12/14/2022 08:00 12/14/2022 08:00 12/14/2022 08:00 12/14/2022 08:00 12/15/2022 08:00 12/16/2022 08:00 12/16/2022 08:00 12/19/2022 08:00 12/20/2022 08:00 12/20/2022 08:00 12/20/2022 08:00 12/20/2022 08:00 12/20/2022 08:00 12/20/2022 08:00 12/20/2022 08:00 12/20/2022 08:00 12/20/2022 08:00 12/20/2022 08:00 12/20/2022 08:00 12/20/2022 08:00 12/21/2022 08:00 12/21/2022 08:00 12/21/2022 08:00 12/21/2022 08:00 12/23/2022 08:00 12/23/2022 08:00 12/23/2022 08:00 12/28/2022 08:00 12/28/2022 08:00 12/29/2022 08:00 12/29/2022 08:00 1/3/2023 08:00 1/4/2023 08:00 1/4/2023 08:00 1/6/2023 08:00 1/6/2023 08:00 1/9/2023 08:00 1/9/2023 08:00 1/9/2023 08:00 1/9/2023 08:00 1/11/2023 08:00 1/12/2023 08:00 1/17/2023 08:00 1/18/2023 08:00 1/18/2023 08:00 1/18/2023 08:00 1/18/2023 08:00 1/18/2023 08:00 1/18/2023 08:00
12/16/2022 16:00 12/15/2022 16:00 1/17/2023 16:00 12/27/2022 16:00 1/10/2023 16:00 12/28/2022 16:00 1/12/2023 16:00 1/23/2023 16:00 12/30/2022 16:00 1/2/2023 16:00 1/2/2023 16:00 12/22/2022 16:00 12/23/2022 16:00 12/22/2022 16:00 12/22/2022 16:00 12/22/2022 16:00 12/22/2022 16:00 12/22/2022 16:00 12/22/2022 16:00 12/23/2022 16:00 12/27/2022 16:00 1/17/2023 16:00 2/28/2023 16:00 2/28/2023 16:00 2/28/2023 16:00 1/5/2023 16:00 1/5/2023 16:00 1/16/2023 16:00 1/10/2023 16:00 1/24/2023 16:00 1/11/2023 16:00 2/3/2023 16:00 1/6/2023 16:00 1/31/2023 16:00 2/9/2023 16:00 1/23/2023 16:00 1/19/2023 16:00 1/17/2023 16:00 3/17/2023 16:00 3/17/2023 16:00 3/17/2023 16:00 1/24/2023 16:00 1/25/2023 16:00 2/22/2023 16:00 2/23/2023 16:00 1/31/2023 16:00 1/31/2023 16:00 1/31/2023 16:00 1/31/2023 16:00 1/31/2023 16:00
12/4/2023 08:00 12/20/2023 08:00 12/14/2022 08:00 10/27/2023 08:00 11/3/2023 08:00 10/13/2023 08:00 11/24/2023 08:00 11/15/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 6/7/2023 08:00 12/19/2023 08:00 12/18/2023 08:00 12/19/2023 08:00 12/19/2023 08:00 12/19/2023 08:00 12/19/2023 08:00 12/19/2023 08:00 12/19/2023 08:00 12/18/2023 08:00 12/14/2023 08:00 11/10/2023 08:00 10/13/2023 08:00 10/13/2023 08:00 10/13/2023 08:00 9/22/2023 08:00 11/24/2023 08:00 9/14/2023 08:00 11/10/2023 08:00 11/17/2023 08:00 10/27/2023 08:00 10/9/2023 08:00 6/21/2023 08:00 11/24/2023 08:00 11/15/2023 08:00 10/6/2023 08:00 12/8/2023 08:00 6/27/2023 08:00 10/13/2023 08:00 10/13/2023 08:00 10/13/2023 08:00 11/24/2023 08:00 11/10/2023 08:00 10/9/2023 08:00 7/12/2023 08:00 8/4/2023 08:00 8/4/2023 08:00 8/4/2023 08:00 8/4/2023 08:00 8/4/2023 08:00 63
12/7/2023 16:00 12/21/2023 16:00 1/17/2023 16:00 11/9/2023 16:00 11/30/2023 16:00 10/26/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 6/20/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/7/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 10/5/2023 16:00 12/7/2023 16:00 10/6/2023 16:00 11/23/2023 16:00 12/14/2023 16:00 11/9/2023 16:00 11/14/2023 16:00 6/26/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 10/23/2023 16:00 12/21/2023 16:00 7/5/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/7/2023 16:00 11/23/2023 16:00 11/14/2023 16:00 8/17/2023 16:00 8/17/2023 16:00 8/17/2023 16:00 8/17/2023 16:00 8/17/2023 16:00 8/17/2023 16:00
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
400.00 200.00 2,500.00 11,600.00 4,750.00 1,000.00 4,750.00 2,700.00 1,000.00 11,600.00 1,000.00 300.00 400.00 300.00 300.00 300.00 300.00 300.00 300.00 400.00 600.00 4,750.00 5,000.00 5,000.00 5,000.00 1,000.00 11,575.00 7,812.50 11,600.00 4,750.00 1,000.00 7,812.50 400.00 4,750.00 2,700.00 1,200.00 11,600.00 700.00 5,000.00 5,000.00 5,000.00 11,575.00 1,000.00 7,812.50 7,812.50 2,800.00 2,800.00 2,800.00 2,800.00 2,800.00
ACTIVITY REPORT
3270 3280 3290 5040 7080 5230 9080 4110 5240 6240 6250 6260 6270 6280 6290 6300 6620 7090 9120 9170 9180 9190 9200 9210 9220 9230 9240 6630 4120 6640 5250 7100 6650 7110 5050 6660 9160 9250 9260 9270 9280 9290 9300 9310 9320 5100 7120 7130 7140 5060
CAE 471.2.16.1 CAE 471.2.16.1 CAE 471.2.16.1 CAE 471.4.1 CAE 471.5.5.2 CAE 471.4.4 CAE 471.2.10.2 CAE 471.3.2 CAE 471.4.4 CAE 471.5.2.3 CAE 471.5.2.3 CAE 471.5.2.3 CAE 471.5.2.3 CAE 471.5.2.3 CAE 471.5.2.3 CAE 471.5.2.3 CAE 471.5.6 CAE 471.5.5.2 CAE 471.2.11.2 CAE 471.2.16.2 CAE 471.2.16.2 CAE 471.2.16.2 CAE 471.2.16.2 CAE 471.2.16.2 CAE 471.2.16.2 CAE 471.2.16.2 CAE 471.2.16.2 CAE 471.5.6 CAE 471.3.2 CAE 471.5.6 CAE 471.4.4 CAE 471.5.5.2 CAE 471.5.6 CAE 471.5.5.2 CAE 471.4.1 CAE 471.5.6 CAE 471.2.11.3 CAE 471.2.16.3 CAE 471.2.16.3 CAE 471.2.16.3 CAE 471.2.16.3 CAE 471.2.16.3 CAE 471.2.16.3 CAE 471.2.16.3 CAE 471.2.16.3 CAE 471.4.2 CAE 471.5.5.2 CAE 471.5.5.2 CAE 471.5.5.2 CAE 471.4.1
PAINT - A PAINT - A PAINT - A SYSTEM FIRE EXTINGUISH SYSTEM EMERGENCY FLOORS - C PLUMBING FIXTURES EMERGENCY SIGNALS SIGNALS SIGNALS SIGNALS SIGNALS SIGNALS SIGNALS OTHERS FIRE EXTINGUISH SYSTEM INTERIOR WALLS FINISHES - B PAINT - B PAINT - B PAINT - B PAINT - B PAINT - B PAINT - B PAINT - B PAINT - B OTHERS PLUMBING FIXTURES OTHERS EMERGENCY FIRE EXTINGUISH SYSTEM OTHERS FIRE EXTINGUISH SYSTEM SYSTEM OTHERS INTERIOR WALLS FINISHES - C PAINT - C PAINT - C PAINT - C PAINT - C PAINT - C PAINT - C PAINT - C PAINT - C MECANISIMS FIRE EXTINGUISH SYSTEM FIRE EXTINGUISH SYSTEM FIRE EXTINGUISH SYSTEM SYSTEM 64
Enamel on facilities Parking lines Handicapped signs Secondary electrical box per floor Interior network distribution Kitchen fan Profiles change pavements Water sources IT network Extinguishers Pushbuttons Sirens Exit No exit Evacuation direction Other Signage Electrovalvules Gipboard On plaster On ceiling RF paint on structure Exterior on concrete Enamel on locksmithing Enamel on facilities Parking lines Handicapped signs Mailboxes Steel Sanitary appliances Furniture Audiovisual system Rings Doortops Spriklers Secondary electrical box per building Remote controls Gipboard On plaster On ceiling RF paint on structure Exterior on concrete Enamel on locksmithing Enamel on facilities Parking lines Handicapped signs Outlets CO2 Fire stinguishers Water Fire stinguishers Dust Fire stinguishers External wiring distribution
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
142 211 211 0 121 195 227 216 195 228 228 228 228 228 228 228 211 204 202 219 219 219 219 219 219 219 219 211 216 211 195 204 211 204 0 211 189 206 206 206 206 206 206 206 206 125 204 204 204 0
10 10 10 25 12 2 10 10 13 4 4 4 4 4 4 4 4 7 27 10 10 10 10 10 10 10 10 2 10 5 11 4 5 12 25 5 27 10 10 10 10 10 10 10 10 30 1 1 1 25
1/18/2023 08:00 1/18/2023 08:00 1/18/2023 08:00 1/18/2023 08:00 1/18/2023 08:00 1/24/2023 08:00 1/25/2023 08:00 1/26/2023 08:00 1/26/2023 08:00 2/1/2023 08:00 2/1/2023 08:00 2/1/2023 08:00 2/1/2023 08:00 2/1/2023 08:00 2/1/2023 08:00 2/1/2023 08:00 2/1/2023 08:00 2/3/2023 08:00 2/6/2023 08:00 2/6/2023 08:00 2/6/2023 08:00 2/6/2023 08:00 2/6/2023 08:00 2/6/2023 08:00 2/6/2023 08:00 2/6/2023 08:00 2/6/2023 08:00 2/7/2023 08:00 2/9/2023 08:00 2/9/2023 08:00 2/14/2023 08:00 2/14/2023 08:00 2/16/2023 08:00 2/20/2023 08:00 2/22/2023 08:00 2/23/2023 08:00 2/23/2023 08:00 2/23/2023 08:00 2/23/2023 08:00 2/23/2023 08:00 2/23/2023 08:00 2/23/2023 08:00 2/23/2023 08:00 2/23/2023 08:00 2/23/2023 08:00 2/24/2023 08:00 3/8/2023 08:00 3/9/2023 08:00 3/10/2023 08:00 3/29/2023 08:00
1/31/2023 16:00 1/31/2023 16:00 1/31/2023 16:00 2/21/2023 16:00 2/2/2023 16:00 1/25/2023 16:00 2/7/2023 16:00 2/8/2023 16:00 2/13/2023 16:00 2/6/2023 16:00 2/6/2023 16:00 2/6/2023 16:00 2/6/2023 16:00 2/6/2023 16:00 2/6/2023 16:00 2/6/2023 16:00 2/6/2023 16:00 2/13/2023 16:00 3/14/2023 16:00 2/17/2023 16:00 2/17/2023 16:00 2/17/2023 16:00 2/17/2023 16:00 2/17/2023 16:00 2/17/2023 16:00 2/17/2023 16:00 2/17/2023 16:00 2/8/2023 16:00 2/22/2023 16:00 2/15/2023 16:00 2/28/2023 16:00 2/17/2023 16:00 2/22/2023 16:00 3/7/2023 16:00 3/28/2023 16:00 3/1/2023 16:00 3/31/2023 16:00 3/8/2023 16:00 3/8/2023 16:00 3/8/2023 16:00 3/8/2023 16:00 3/8/2023 16:00 3/8/2023 16:00 3/8/2023 16:00 3/8/2023 16:00 4/6/2023 16:00 3/8/2023 16:00 3/9/2023 16:00 3/10/2023 16:00 5/2/2023 16:00
8/4/2023 08:00 11/9/2023 08:00 11/9/2023 08:00 1/18/2023 08:00 7/6/2023 08:00 10/24/2023 08:00 12/8/2023 08:00 11/24/2023 08:00 10/26/2023 08:00 12/18/2023 08:00 12/18/2023 08:00 12/18/2023 08:00 12/18/2023 08:00 12/18/2023 08:00 12/18/2023 08:00 12/18/2023 08:00 11/23/2023 08:00 11/16/2023 08:00 11/15/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 11/29/2023 08:00 12/8/2023 08:00 12/1/2023 08:00 11/14/2023 08:00 11/27/2023 08:00 12/8/2023 08:00 12/1/2023 08:00 2/22/2023 08:00 12/15/2023 08:00 11/15/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 8/18/2023 08:00 12/19/2023 08:00 12/20/2023 08:00 12/21/2023 08:00 3/29/2023 08:00 65
8/17/2023 16:00 11/22/2023 16:00 11/22/2023 16:00 2/21/2023 16:00 7/21/2023 16:00 10/25/2023 16:00 12/21/2023 16:00 12/7/2023 16:00 11/13/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 11/28/2023 16:00 11/24/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 11/30/2023 16:00 12/21/2023 16:00 12/7/2023 16:00 11/28/2023 16:00 11/30/2023 16:00 12/14/2023 16:00 12/18/2023 16:00 3/28/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 9/28/2023 16:00 12/19/2023 16:00 12/20/2023 16:00 12/21/2023 16:00 5/2/2023 16:00
$ 2,800.00 $ 2,800.00 $ 2,800.00 $ 2,500.00 $ 1,200.00 $ 200.00 $ 11,600.00 $ 1,000.00 $ 1,300.00 $ 400.00 $ 400.00 $ 400.00 $ 400.00 $ 400.00 $ 400.00 $ 400.00 $ 400.00 $ 700.00 $ 7,812.50 $ 2,800.00 $ 2,800.00 $ 2,800.00 $ 2,800.00 $ 2,800.00 $ 2,800.00 $ 2,800.00 $ 2,800.00 $ 200.00 $ 1,000.00 $ 500.00 $ 1,100.00 $ 400.00 $ 500.00 $ 1,200.00 $ 2,500.00 $ 500.00 $ 7,812.50 $ 2,800.00 $ 2,800.00 $ 2,800.00 $ 2,800.00 $ 2,800.00 $ 2,800.00 $ 2,800.00 $ 2,800.00 $ $ 100.00 $ 100.00 $ 100.00 $ 2,500.00
ACTIVITY REPORT
5110 5070 6670 5120 5080 6400 3292 3302 3312 5090 2880 6410 6460 6470 6480 2890 6200 6420 6490 6430 6680 6690 6700 6710 6210 2900 6440 6720 6220 6450 6730 6230 2910 6740 2920 5130 5175 6750 5140 2930 6760 6770 2940 6780 6790 6800 6130 6810 6140 6820
CAE 471.4.2 CAE 471.4.1 CAE 471.5.7 CAE 471.4.2 CAE 471.4.1 CAE 471.5.4.2 CAE 471.2.17 CAE 471.2.17 CAE 471.2.17 CAE 471.4.1 CAE 471.2.9.1 CAE 471.5.4.2 CAE 471.5.4.3 CAE 471.5.4.3 CAE 471.5.4.3 CAE 471.2.9.1 CAE 471.5.2.2 CAE 471.5.4.2 CAE 471.5.4.3 CAE 471.5.4.2 CAE 471.5.7 CAE 471.5.7 CAE 471.5.7 CAE 471.5.7 CAE 471.5.2.2 CAE 471.2.9.1 CAE 471.5.4.2 CAE 471.5.7 CAE 471.5.2.2 CAE 471.5.4.2 CAE 471.5.7 CAE 471.5.2.2 CAE 471.2.9.1 CAE 471.5.7 CAE 471.2.9.1 CAE 471.4.3 CAE 471.4.4 CAE 471.5.7 CAE 471.4.3 CAE 471.2.9.1 CAE 471.5.7 CAE 471.5.7 CAE 471.2.9.1 CAE 471.5.7 CAE 471.5.7 CAE 471.5.7 CAE 471.5.2.1 CAE 471.5.7 CAE 471.5.2.1 CAE 471.5.7
MECANISIMS SYSTEM LANDSCAPING MECANISIMS SYSTEM INTERIOR CELLS CELLS CELLS SYSTEM CEILINGS - A INTERIOR SECURITY ROOM SECURITY ROOM SECURITY ROOM CEILINGS - A DETECTION INTERIOR SECURITY ROOM INTERIOR LANDSCAPING LANDSCAPING LANDSCAPING LANDSCAPING DETECTION CEILINGS - A INTERIOR LANDSCAPING DETECTION INTERIOR LANDSCAPING DETECTION CEILINGS - A LANDSCAPING CEILINGS - A FIXTURES EMERGENCY LANDSCAPING FIXTURES CEILINGS - A LANDSCAPING LANDSCAPING CEILINGS - A LANDSCAPING LANDSCAPING LANDSCAPING EXTINCTION LANDSCAPING EXTINCTION LANDSCAPING
Swithches Interior wiring trays Earth movement Commuter switch Force circuit Fiberglass ducting Install cells Electrical connection Plumbing connection Exterior lightning circuit Acoustical ceiling system Automation systems Tape recorer Screens Computers Washable acoustical Ionic detectors Presence detector Door controls Pushbutton Drains Enclosures, masonry Locksmith enclosure Curbs Volumetric smoke Gypsum board ceiling paint Sirens Slab on grade Sirens Electromagnet on doors Sanitation network Pushbuttons Hight impact gypsum board ceiling Irrigation network Metal security system Recessed in false ceilings 60x60 Luminaires Pipeline electrical installation for lightning Stair surfaces Metal ceiling Signaling installation for instrusions Pipeline security instalation Hight impact gypsum board Sidewalk pavements Gravel Asphalt Rings Luminaires Spriklers Cameras 66
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
125 19 0 125 103 19 119 119 119 103 19 93 111 111 111 19 77 93 111 93 92 92 92 0 77 19 93 0 77 93 0 77 19 0 19 60 70 0 60 19 0 0 19 0 0 0 19 0 19 0
30 27 55 30 10 12 20 20 20 27 10 10 2 4 4 10 7 4 7 7 20 20 20 5 7 14 7 7 7 7 12 20 14 12 14 10 10 10 10 14 4 10 14 7 4 5 4 10 12 7
4/7/2023 08:00 5/3/2023 08:00 5/3/2023 08:00 5/19/2023 08:00 6/9/2023 08:00 6/9/2023 08:00 6/12/2023 08:00 6/12/2023 08:00 6/12/2023 08:00 6/23/2023 08:00 6/27/2023 08:00 6/27/2023 08:00 6/27/2023 08:00 6/29/2023 08:00 7/5/2023 08:00 7/11/2023 08:00 7/11/2023 08:00 7/11/2023 08:00 7/11/2023 08:00 7/17/2023 08:00 7/19/2023 08:00 7/19/2023 08:00 7/19/2023 08:00 7/19/2023 08:00 7/20/2023 08:00 7/25/2023 08:00 7/26/2023 08:00 7/26/2023 08:00 7/31/2023 08:00 8/4/2023 08:00 8/4/2023 08:00 8/9/2023 08:00 8/14/2023 08:00 8/22/2023 08:00 9/1/2023 08:00 9/1/2023 08:00 9/1/2023 08:00 9/7/2023 08:00 9/15/2023 08:00 9/21/2023 08:00 9/21/2023 08:00 9/27/2023 08:00 10/11/2023 08:00 10/11/2023 08:00 10/20/2023 08:00 10/26/2023 08:00 10/31/2023 08:00 11/2/2023 08:00 11/6/2023 08:00 11/16/2023 08:00
5/18/2023 16:00 6/8/2023 16:00 7/18/2023 16:00 6/29/2023 16:00 6/22/2023 16:00 6/26/2023 16:00 7/7/2023 16:00 7/7/2023 16:00 7/7/2023 16:00 7/31/2023 16:00 7/10/2023 16:00 7/10/2023 16:00 6/28/2023 16:00 7/4/2023 16:00 7/10/2023 16:00 7/24/2023 16:00 7/19/2023 16:00 7/14/2023 16:00 7/19/2023 16:00 7/25/2023 16:00 8/15/2023 16:00 8/15/2023 16:00 8/15/2023 16:00 7/25/2023 16:00 7/28/2023 16:00 8/11/2023 16:00 8/3/2023 16:00 8/3/2023 16:00 8/8/2023 16:00 8/14/2023 16:00 8/21/2023 16:00 9/5/2023 16:00 8/31/2023 16:00 9/6/2023 16:00 9/20/2023 16:00 9/14/2023 16:00 9/14/2023 16:00 9/20/2023 16:00 9/28/2023 16:00 10/10/2023 16:00 9/26/2023 16:00 10/10/2023 16:00 10/30/2023 16:00 10/19/2023 16:00 10/25/2023 16:00 11/1/2023 16:00 11/3/2023 16:00 11/15/2023 16:00 11/21/2023 16:00 11/24/2023 16:00
9/29/2023 08:00 5/30/2023 08:00 5/3/2023 08:00 11/10/2023 08:00 11/1/2023 08:00 7/6/2023 08:00 11/24/2023 08:00 11/24/2023 08:00 11/24/2023 08:00 11/15/2023 08:00 7/24/2023 08:00 11/3/2023 08:00 11/29/2023 08:00 12/1/2023 08:00 12/7/2023 08:00 8/7/2023 08:00 10/26/2023 08:00 11/17/2023 08:00 12/13/2023 08:00 11/23/2023 08:00 11/24/2023 08:00 11/24/2023 08:00 11/24/2023 08:00 7/19/2023 08:00 11/6/2023 08:00 8/21/2023 08:00 12/4/2023 08:00 7/26/2023 08:00 11/15/2023 08:00 12/13/2023 08:00 8/4/2023 08:00 11/24/2023 08:00 9/8/2023 08:00 8/22/2023 08:00 9/28/2023 08:00 11/24/2023 08:00 12/8/2023 08:00 9/7/2023 08:00 12/8/2023 08:00 10/18/2023 08:00 9/21/2023 08:00 9/27/2023 08:00 11/7/2023 08:00 10/11/2023 08:00 10/20/2023 08:00 10/26/2023 08:00 11/27/2023 08:00 11/2/2023 08:00 12/1/2023 08:00 11/16/2023 08:00 67
11/9/2023 16:00 7/5/2023 16:00 7/18/2023 16:00 12/21/2023 16:00 11/14/2023 16:00 7/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 8/4/2023 16:00 11/16/2023 16:00 11/30/2023 16:00 12/6/2023 16:00 12/12/2023 16:00 8/18/2023 16:00 11/3/2023 16:00 11/22/2023 16:00 12/21/2023 16:00 12/1/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 7/25/2023 16:00 11/14/2023 16:00 9/7/2023 16:00 12/12/2023 16:00 8/3/2023 16:00 11/23/2023 16:00 12/21/2023 16:00 8/21/2023 16:00 12/21/2023 16:00 9/27/2023 16:00 9/6/2023 16:00 10/17/2023 16:00 12/7/2023 16:00 12/21/2023 16:00 9/20/2023 16:00 12/21/2023 16:00 11/6/2023 16:00 9/26/2023 16:00 10/10/2023 16:00 11/24/2023 16:00 10/19/2023 16:00 10/25/2023 16:00 11/1/2023 16:00 11/30/2023 16:00 11/15/2023 16:00 12/18/2023 16:00 11/24/2023 16:00
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
2,700.00 5,500.00 1,000.00 1,200.00 2,500.00 2,500.00 2,500.00 2,700.00 10,812.50 1,000.00 200.00 400.00 400.00 10,812.50 700.00 400.00 700.00 700.00 2,000.00 2,000.00 2,000.00 500.00 700.00 10,812.50 700.00 700.00 700.00 700.00 1,200.00 2,000.00 10,812.50 1,200.00 10,812.50 1,000.00 1,000.00 1,000.00 1,000.00 10,812.50 400.00 1,000.00 10,812.50 700.00 400.00 500.00 400.00 1,000.00 1,200.00 700.00
ACTIVITY REPORT
6150 6160 6170 6830 6840 7500 7510 7520 7530 7540 SC FC
CAE 471.5.2.1 CAE 471.5.2.1 CAE 471.5.2.1 CAE 471.5.7 CAE 471.5.7 CAE 471.6 CAE 471.6 CAE 471.6 CAE 471.6 CAE 471.6 CAE 471.5.9 CAE 471.6
EXTINCTION EXTINCTION EXTINCTION LANDSCAPING LANDSCAPING COMMISIONING COMMISIONING COMMISIONING COMMISIONING COMMISIONING SUSTANTIAL COMPLETION COMMISIONING
68
CO2 Fire stinguishers Water Fire stinguishers Dust Fire stinguishers Barriers Vertical signage Punch list Cleaning Testing Elevator testing Inspecting Substantial completion Final Completion
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
19 19 19 0 0 0 0 0 0 0 0 0
1 1 1 7 2 10 10 10 10 10 0 0
11/22/2023 08:00 11/23/2023 08:00 11/24/2023 08:00 11/27/2023 08:00 12/6/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/22/2023 08:00
11/22/2023 16:00 11/23/2023 16:00 11/24/2023 16:00 12/5/2023 16:00 12/7/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/8/2023 08:00 12/22/2023 08:00
12/19/2023 08:00 12/20/2023 08:00 12/21/2023 08:00 11/27/2023 08:00 12/6/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/8/2023 08:00 12/7/2023 16:00 12/21/2023 16:00
69
12/19/2023 16:00 12/20/2023 16:00 12/21/2023 16:00 12/5/2023 16:00 12/7/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/21/2023 16:00 12/7/2023 16:00 12/21/2023 16:00
$ $ $ $ $ $ $ $ $ $ $ $
100.00 100.00 100.00 700.00 200.00 1,250.00 1,250.00 2,500.00 1,250.00 1,875.00 -
EARLY CASH FLOW CURVE
Early Cash Flow Curve and Monthly Payment Report to the Contractor
70
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
71
FULTON COUNTY DETENTION CENTER
Classic Schedule Layout Original Remaining Start Schedule Total Finish Duration % Float Duration Complete 450 450 01-Apr-22 0% 0 22-Dec-23 DETENTION CENTER A 0 0 01-Apr-22 0% 0
02-May-21 17:27
MONTHLY PAYMENT REPORT Activity ID Activity Name
Budgeted Total Cost
FULTON COUNTY
$4,352,150.00
0000
START
PRECONSTRUCTION
$0.00
22
22 01-Apr-22
0%
428 02-May-22
$13,350.00
DOCUMENTATION
10
10 01-Apr-22
0%
440 14-Apr-22
$2,000.00
IMPLANTATION UTILITIES CRANE
15
15 01-Apr-22
0%
435 21-Apr-22
$2,000.00
15
15 01-Apr-22
0%
435 21-Apr-22
$4,350.00
22
22 01-Apr-22
0%
428 02-May-22
$5,000.00
400
400 19-Apr-22 A
0%
38 30-Oct-23
SITE PREPARATION LAND MOVEMENT SUBSTRUCTURE
10
10 19-Apr-22
0%
428 02-May-22
$10,200.00
17
17 27-Apr-22
0%
415 19-May-22
$11,300.00
25
25 20-May-22
0%
390 23-Jun-22
$509,250.00
SLAB MASONRY ROOF FAÇADES CEILINGS FLOORS
39
39 20-May-22
0%
376 13-Jul-22
$123,937.50
116
116 07-Jun-22
0%
287 15-Nov-22
$169,125.00
91
91 17-Jun-22
0%
304 21-Oct-22
$1,449,000.00
86
86 07-Jun-22
0%
317 04-Oct-22
$409,500.00
90
90 27-Jun-23
0%
19 30-Oct-23
$75,687.50 $208,725.00
SITEWORK
INTERIOR WALLS FINISHES EXTERIOR DOORS AND WINDOWS INTERIOR DOORS AND WINDOWS METAL DOORS GLASS PAINT CELLS
MEP ELEVATOR PLUMBING FIXTURES WATER DISTRIBUTION HEATING AND COOLING VENTILATION
86
86 11-Oct-22
0%
227 07-Feb-23
124
124 11-Oct-22
0%
189 31-Mar-23
$93,750.00
106
106 15-Jul-22
0%
269 09-Dec-22
$359,100.00
86
86 04-Oct-22
0%
232 31-Jan-23
$128,250.00
120
120 03-Oct-22
0%
199 17-Mar-23
$58,200.00
93
93 04-Oct-22
0%
225 09-Feb-23
$20,100.00
36
36 18-Jan-23 A
0%
206 08-Mar-23
$67,200.00
200
200 03-Oct-22
0%
119 07-Jul-23
$107,500.00
234
234 01-Apr-22
0%
216 22-Feb-23
$51,850.00
199
199 01-Apr-22
0%
241 04-Jan-23
$14,450.00
70
70 17-Nov-22
0%
216 22-Feb-23
$7,000.00
60
60 11-Oct-22
0%
121 02-Jan-23
$6,700.00
185
185 01-Apr-22
0%
265 15-Dec-22
$21,500.00
22
22 10-Oct-22
0%
183 08-Nov-22
$2,200.00
350 27-May-22
0%
60 28-Sep-23
$67,000.00
211
211 10-Oct-22
0%
103 31-Jul-23
$21,100.00
90
90 24-Feb-23
0%
125 29-Jun-23
$9,000.00
20
20 01-Sep-23
0%
60 28-Sep-23
$2,000.00
244
244 10-Oct-22
0%
70 14-Sep-23
$12,200.00
350 ELECTRICAL AND COMUNICATIONS
SYSTEM MECANISIMS FIXTURES EMERGENCY GROUND CONNECTION VIDEO SURVELLIANCE
$3,800,825.00
27
27 27-May-22
0%
57
57 11-Oct-22
0%
89 28-Dec-22
$5,700.00
IT INFRAESTRUCTURE VIDEO SYSTEM SPEAKERS SYSTEM
50
50 11-Oct-22
0%
263 19-Dec-22
$5,000.00
43
43 11-Oct-22
0%
270 08-Dec-22
$4,300.00
50
50 24-Oct-22
0%
254 30-Dec-22
$5,000.00
GENERAL BUILDING
430
430 19-Apr-22
0%
8 11-Dec-23
$411,000.00
39
39 24-Oct-22
0%
265 15-Dec-22
$3,900.00
396
396 20-May-22
0%
19 24-Nov-23
$17,300.00
LIGHTNING ROD FIRE PROTECTION NATURAL GAS SECURITY KITCHEN OTHERS LANDSCAPING WASTE MANAGEMENT SUSTANTIAL COMPLETION
COMMISIONING
216 04-Jul-22
$2,700.00
39
39 11-Oct-22
0%
274 02-Dec-22
$3,900.00
211
211 24-Oct-22
0%
93 14-Aug-23
$8,200.00
74
74 29-Nov-22
0%
204 10-Mar-23
$9,900.00
21
21 01-Feb-23
0%
211 01-Mar-23
$2,100.00
157
157 03-May-23
0%
10 07-Dec-23
$21,700.00
430
430 19-Apr-22
0%
8 11-Dec-23
$344,000.00
0
0 08-Dec-23
0%
0 08-Dec-23
$0.00
10
10 08-Dec-23
0%
0 22-Dec-23
$8,125.00
Page 1 of 1
72
TASK filter: All Activities © Oracle Corporation
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
After analyzing the data obtained from Primavera, I realized that the program was dividing the cost load of the activity equally between all the days of the activity duration. That is not how it works in reality. It is more reasonable to assume that a division won’t be marked as completed and, therefore, as paid the day the activity is completed according to the planning. There is always part of the job left to be finished. The first month there are a lot of initial costs, but production is very low, understanding productions as the money to be paid to the contractor. When the structure is started, production speeds up fast. With the plumber division, for example, production decreases, while it increases when installing the fixtures due to the high cost of the equipment. At the end of the project, there are a lot of divisions close to being completed, which means a lot of work on-site but not as much production. The final months it is when most of the production happens because it is to be assumed that the planning is not going to be followed in detail.
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
386,550.00 202,662.50 897,400.00 731,662.00 228,950.00 337,100.00 215,037.50 221,175.00 188,150.00 104,750.00 75,225.00 2,800.00 3,000.00 11,200.00 24,812.50 33,825.00 15,912.50 28,225.00 12,812.50 3,900.00 8,325.00
2022
April May June July August September October November December January February March April May June July August September October November December
2023
2023
2022
In conclusion, I realized that I could not base the monthly payments to the contractor based on the planning only because the amount to be paid on day one is not the same as what is to be paid when the division leaves the construction site after completing their task. Therefore, I estimated a second cash flow that I believe is closer to reality.
$ 3,733,474.50
April May June July August September October November December January February March April May June July August September October November December
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
50,000.00 150,000.00 250,000.00 320,000.00 360,000.00 350,000.00 320,000.00 270,000.00 230,000.00 200,000.00 160,000.00 150,000.00 140,000.00 135,000.00 125,000.00 120,000.00 115,000.00 110,000.00 95,000.00 55,000.00 28,000.00
$ 3,733,000.00 73
EARLY CASH FLOW CURVE
Cash flow curve straight out from Primavera
74
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
75
MONTHLY PAYMENT REPORT
Adapted cash flow curve
Título del 400,000.00 350,000.00 250,000.00 200,000.00 150,000.00 100,000.00
2022
76
December
November
October
September
August
July
June
0.00
May
50,000.00 April
DOLLARS
300,000.00
2023
77
December
November
October
September
August
July
June
May
April
March
February
January
FULTON COUNTY SHERIFF’S OFFICE & DETENTION CENTER
l gráfico