DCM Denton Corker Marshall - Melbourne AUS
Scape Student Accommodation Projects. Feasibility, Sketch and Planning Applications. Consultants Liaison Swanston St - Melbourne Metro CBD North Staion - State Library - Masterplaning Developement Proposal (2016)
Scape Student Accomodation proposal for CUB Site - Swanston St - Melbourne Planning Applicatiom Proposal (2016)
Woods Bagot Architects - Melbourne AUS
CCEC– Christchurch Convention and Exhibition Centre - Christchurch NZ (2017) Hotel and Convention Centres team Role: Revit Technician - Project professional Scoping exercise for Ceiling Types – Revit Scheduling Codes – Buildability and Services Coordination
LEVEL 02 RCP
LEVEL 03 RCP
LEVEL 01 RCP
LEVEL 00 RCP
Deakin University Burwood Campus – Melbourne Learning Commons Building Construction Detail Development – Coordination - Tender Issue
Enabling works Ground Plane - Basement Level B1 Plan Drawing
Enabling works Ground Plane - Level 01 Plan Drawing
West Elevation - Revit Curtain Wall Precast Panel Modelling
West Elevation 3D View - Pedestrian Bridge Link to CP12
HOK Architects, London – UK
Lusail City Project– Doha - Qatar (2015) Planning, Urban and Landscape Design Team Role: Revit Technician - BIM Modeller
Central Boulevard
Street Furniture Details
Structure Details - Carpark Staircases / Ramps
AHR - London UK
The Hard Interchange – Portsmouth UK (2014) Role: Project Architect – BIM Modeller Value: GBP 7M - Client: Portsmouth City Council
Exploded Axonometric
3D Views
The Hard Interchange – Portsmouth UK (2014) Role: Project Architect – BIM Modeller
GA New Terminal Ground Floor Plan
The Hard Interchange – Portsmouth UK (2014) Role: Project Architect – BIM Modeller
New Terminal Sections
The Hard Interchange – Portsmouth UK (2014) Role: Project Architect – BIM Modeller
External Elevations
Site Plans
The Hard Interchange – Portsmouth UK (2014) Role: Project Architect – BIM Modeller
Reflected Ceiling Plan
FFE Scoping Plan
Finishes Scoping Plan
Floor Finishes Scoping Plan
The Hard Interchange – Portsmouth UK (2014) Role: Project Architect – BIM Modeller
Roof Plan
Wall Types Scoping Plan
Ceiling Finishes Scoping Plan
Roof Finishes Scoping Plan
The Hard Interchange – Portsmouth UK (2014) Role: Project Architect – BIM Modeller Rear Glass Canopy Details
Detail Drawings - Internal Pods elevations: Public Toilets
FFE - POD Timber Lining Details
The Hard Interchange – Portsmouth UK (2014) Role: Project Architect – BIM Modeller External Envelope Curtain Walling Details
3D Views
Aedas - London UK
MSCP - Heathrow T2 London UK (2013) Role: Package Architect – Technician Value: GBP 139M - Client: Laing O’Rourke / BAA
Sculptor Richard Wilson’s Slipstream
Partitions Panels Wall Lining Details
MSCP - Heathrow T2 London UK (2013) Role: Package Architect – Technician
West Elevation
T2 - MSPC Site Office Voyager House Options Studies Report
Covered Court Section - East Elevation
MSCP - Heathrow T2 London UK (2013) Role: Package Architect – Technician
Level 00 Overall Plan - Phase 1A
MSCP - Heathrow T2 London UK (2013) Role: Package Architect – Technician
Cores Partition Panels Elevations
Facade Screen Mesh Details
Covered Court between MSCP and T2A
Blampied - Areen - London UK
KAIA – King Abdulaziz International Airport – Jeddah, Saudi Arabia (2012) Role: Designer - Technician Value US 7.2BN - Client: KSA General Authority of Aviation
Column Types Scoping
Wall Lining Glass Panels Details
KAIA – King Abdulaziz International Airport – Jeddah, Saudi Arabia (2012) Role: Designer - Technician QS / Wall Lining Panels Module Rationalization exercise
3D Wall Lining Details - Internal Envelope Fit-out
Suspended Ceiling Pattern Panels Scoping and Interface
Atkins - London UK
Gateway - Birmingham New Street Railway Station Redevelopment (2011) Role: Architectural Technician Value GBP 550M - Client: Network Rail
Section - Concourse North Ramp Birmingham New Street Grand Central
GA Concourse Level Floor Plan
Gateway - Birmingham New Street Railway Station Redevelopment (2011) Role: Architectural Technician
External Envelope Curtain Walling Details
Existing FFL Survey Contours for new Screed Weight calculations
FFE Details Column Seating Resting Point
Pascall and Watson - London UK
DLR (Docklands Light Railway) 3 Car Capacity Enhancement Programme (2008) Role: Project Architect for Blackwall and Royal Victoria Stations, East London Value GBP 200M (23 Stations) - Client: DLR / Vinci Taylor Woodrow
Internal Platform Elevations Fittings and Signage Types
Royal Victoria Station
DLR (Docklands Light Railway) 3 Car Capacity Enhancement Programme (2008) Role: Project Architect for Blackwall and Royal Victoria Stations, East London
Platform Details
Blackwall Station
Pascall and Watson - London UK
Channel Tunnel Rail Link – St Pancras International Station Redevelopment. - On-site based (2005) Role: Design - Package Architect Value GBP 380M - Client: RLE / CORBER / Eurostar 3D Facade Details - External Envelope
Carpark Entrance Room Interfaces Drawing
Undercroft Level - Departures
Channel Tunnel Rail Link – St Pancras International Station Redevelopment. - On-site based (2005) Role: Design - Package Architect External Envelope Louvered Screens Door Details
Barlow Shed Original 1870
GA Platform Level Floor Plan - Longitudinal Section
Axia - Crosby Architects - Melbourne - AUS Mixed Use Redevelopments (2002 - 2005) Sketch, Feasibility, Planning Applications, Design Development and Details
Academic Own Architectural Design Work Mixed Use - Factory Building Revit Modelling Example (2010)
Academic Own Work
Concept and Freehand Travel Sketch
Academic Own Work Physical Modelmaking