1 AHR-AR-B01-90-121
69716 47700
5300
5300
5300
5300
5300
5300
5300
5300
5300
AHR-AR-B01-20-300 1
AHR-AR-B01-21-311 1 5540 A
ED.115
2 AHR-AR-B01-27-112 A
A
A
ED.114
A
A
ED.113
A
A
ED.112
A
A
ED.111
A
A
ED.110
A
A
ED.109
A
A
ED.108
A
A
ED.107
A B
B
5000
AHR-AR-BXX-32-623 5575 5575
5575
1 B B01.01 LOBBY
B
B01.03 LOBBY
12 m²
2215
B 5644
ED.102
Incoming Comms Through Old Gulley Location
Electrical Panel
MH
6763
2 m²
RWP
D.109
C
5745
D.104
2 m²
D.120 B01.04
B01.08 TRAVEL SHOP
B01.12 WC
SP
CONCOURSE
2 m²
693 m²
17 m²
7 m²
D.115 D.112
B01.10 CIRCULATION 7 m²
D.113 B01.13 WC 2 m²
B
B01.17 COMMS
D.111 B01.11 WC
MH D.107
D.103
Incoming Water
D.116
B01.15 CLEANER
B
5745 D.117
4 m²
D.114
B SP
B01.14 DIS. WC
To be read in conjunction with the following scoping drawings:
3 m²
B
SP
4174
C1
1020
6 m²
B
D.108
4 m²
D.102 B01.06 KITCHENETTE
D.101
5708
B01.07 WC
9 m²
B
MH
D.110
B B01.05 CONTROL
Zone for outgoing Site Service Ducts
4 m²
ETFE CONTROL ROOM
SP
Proposed Route for Condenser Pipework
B01.16 TICKET MACHINE ROOM
B01.10
B1
1 AHR-AR-B01-21-121
B
B01.19 RETAIL STORE
B01.18
RWP
D.105
B01.09 RETAIL
B
37 m²
D.106
D
B
D.119
35 m²
AHR-AR-B01-21-110 - Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings
SP
2 m²
RETAIL
5745
AHR-AR-B01-23-110 - Scoping Drawing - New Terminal Building Flooring
D.121
AHR-AR-B01-35-110 - Scoping Drawing - New Terminal Building Ceilings
D.118 B
B
Security Screens Rail
B
B
1
3764
12 m²
5644
AHR-AR-B01-40-110 - Scoping Drawing - New Terminal Building Finishes
3
AHR-AR-B01-70-110 - Scoping Drawing - New Terminal Building FF&E
AHR-AR-B01-21-312 5745
AHR-AR-B01-21-312
For Planks Setting Out Layout see Drawing: AHR-AR-B01-20-099
B B
7087
D1
B B
B
1 AHR-AR-B01-22-123 E
B
5800
5800 B
ED.104
5825 B
B
3580
1 AHR-AR-B01-22-124
B
B
LOBBY
4 3 2 1 Rev
B
3 AHR-AR-B01-21-122
5866
F
Tender Issue Tender Issue Issued for Consultants Review Issued for Stage E Description
original by
JE
24/11/2014 21/11/2014 17/10/2014 15/09/2014 Date
D.M B.B D.M B.B D.M B.B J.E B.B Dr by App by
date created
09/05/14
approved by
BB
5875 AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
3 AHR-AR-B01-20-300
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
Floor Ventilation Grilles A Keynote
Count
Type
client name
Portsmouth City Council
A
18
Floor Grilles 1700 X 290 Floor Ventilation Grilles B
Keynote B
Count 30
Type Floor Grilles 1920 X 290
project
The Hard Interchange Portsmouth
drawing
General Arrangement - New Terminal Ground Floor Plan computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
1
Ground Floor Plan 1 : 100
project number
2013.01080.002 drawing number
AHR-AR-B01-20-100
scale
1 : 100 rev
4
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
10
9
8
5300
7
5300
6
5300
5
5300
4
5300
5300
20-10-10/110 Plasterboard Ceiling
20-50-30/135 Liquid Applied Inverted Roof Covering System
2 5300
1 5300
Mechanical Extract Ventilation
Stretched fabric Barrisol Ceiling Insulated Pressed Metal Coping
3 5300
20-10-20/130 Fabric Membrane Ceiling System
Suspended real time information Screen
Structure Zone
Latchway
Suspended real time information Screen
Structural Cross Bracing
11380.0 11380.0 Top Col 10300 10597.8 10300.0 9045.0 9045.0 8145.0 8145.0
25-80-15/175 Glazed Curtain Wall 5875.0 5875.0
5540.0 5540.0 Safeguarding Zone for Touch Screen Journey Planner
1
Help Point E2
Stainless Steel Structural Cross Bracing
Building Sections C-C
National Express Ticket Machines
1 : 75
Metsec framed pod with roof allowing for some access. Clad with plasterboard internally and vertical timber cladding externally
Safeguarding Zone for Touch Screen Journey Planner
Sim 1 AHR-AR-B01-22-402
Suspended real time information Screen
Sim 1 AHR-AR-B01-22-401
Smart card Ticket machine
Mirrored Window to Control Room
Metsec framed pod with roof allowing for some access. Clad with plasterboard internally and vertical timber cladding externally
To be read in conjunction with the following drawings: ¡AHR-AR-B01-21-110 - Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings ¡AHR-AR-B01-23-110 - Scoping Drawing - New Terminal Building Flooring ¡AHR-AR-B01-27-110 - Scoping Drawing - New Terminal Building Roof ¡AHR-AR-B01-27-111 - Detailed Drawings - ETFE Canopy ¡AHR-AR-B01-35-110 - Scoping Drawing - New Terminal Building Ceilings ¡AHR-AR-B01-40-110 - Scoping Drawing - New Terminal Building Finishes ¡AHR-AR-B01-70-110 - Scoping Drawing - New Terminal Building FF&E Insulated Pressed Metal Coping
20-50-30/135 Liquid Applied Inverted Roof Covering System
F
Suspended real time information Screen
E
20-10-20/130 Stretched Fabric Barrisol Ceiling
7087
Structure Zone
Steel Structure ETFE Canopy
1 21-210 D
3580
Mechanical Extract Ventilation
C 4174
B 6763
A 5000
Steel Structure Glass Canopy
Sim 2 AHR-AR-B01-21-122
11380.0 11380.0 Top Col 10597.8
10300 10300.0
25-80-15/175 Glazed Curtain Wall
8945.0
5 4 3 2 1 Rev
Tender Issue Amendments Tender Issue Issued for Consultants Review Updated Issue Issued for Stage E Description
original by
8945.0 4760
8145.0 8145.0
5875.0
3764
2
1 : 75
5364
Plasterboard Ceiling
09/05/14
approved by
BB
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
5540.0
D1
date created
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
5540.0
5708.0
Building Section A-A
DM
D.M B.B D.M B.B D.M B.B J.E B.B J.E B.B Dr by App by
Bus Barrier
WC Level 5708
5875.0
Bus bay real time information Screen mounted to transom
03/12/2014 21/11/2014 17/10/2014 16/09/2014 15/09/2014 Date
1020
C1 Metsec framed pod with roof allowing for some access. Clad with plasterboard internally and vertical timber cladding externally
2215
client name
Portsmouth City Council
B1 Suspended real time information Screen
35-05-35/135 Back to Back Fixed Seating with Tables
project
The Hard Interchange Portsmouth
drawing
General Arrangement - New Terminal Building Building Sections A-A and Section C-C computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
2013.01080.002 drawing number
AHR-AR-B01-20-200
scale
1 : 75 rev
5
@A1 issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
Stainless Steel Panels Fascia
10
9
8
5300
7
5300
6
5300
5
5300
4
5300
3
5300
2
5300
5300
1
Steel Structure ETFE Canopy
5300
11380.0 11380.0 Top Col 10300 10597.8 10300.0 9045.0 8945.0 9045.0 8945.0 8145.0 8145.0 25-80-15/175 Glazed Curtain Wall 5875.0 5540.0 5875.0 5540.0
1
Bus Barrier
5745.0 5745.0
Elevation 1 - a 1 : 100 Steel Structure Glass Canopy
Mechanical Extract Ventilation
Steel Structure ETFE Canopy Insulated Pressed Metal Coping
1
2
3
5300
4
5300
5
5300
6
5300
7
5300
8
5300
11380.0 11380.0 Top Col 10300 10597.8 10300.0
9
5300
5300
10 Stainless Steel Panels
5300
9075
9045.0 8945.0 9045.0 8945.0 8145.0 8145.0
Stainless Steel Structural Cross Bracing 25-80-15/175 Glazed Curtain Wall
5540.0 5540.0
3
5745.0 5745.0
5875.0 5875.0
Elevation 1 - a1 1 : 100
20-50-75/110 Steel Structure Glass Canopy
F
E 3580
To be read in conjunction with the following drawings:
Stainless Steel Structural Cross Bracing
Caping
D 7087
Mechanical Extract Ventilation
C
B
4174
6763
Steel Structure ETFE Canopy
Stainless Steel Panels
A
¡AHR-AR-B01-21-110 - Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings ¡AHR-AR-B01-27-110 - Scoping Drawing - New Terminal Building Roof
5000
¡AHR-AR-B01-27-111 - Detailed Drawings - ETFE Canopy ¡AHR-AR-B01-40-110 - Scoping Drawing - New Terminal Building Finishes
11380.0 11380.0
Top Col 10597.8
10300 10300.0 8945.0 8945.0 8145.0 8145.0
25-80-15/175 Glazed Curtain Wall Bus Barrier
5875.0
5745.0 5745.0
5540.0 5540.0
6918
D1 Steel Structure ETFE Canopy
Stainless Steel Panels
A
Mechanical Extract Ventilation
B
C
5000
Stainless Steel Structural Cross Bracing
4174
Tender Issue Issued for Consultants Review Issued for Stage E Description
original by
B1 20-50-75/110 Steel Structure Glass Canopy
E 7087
5568
C1
Insulated Pressed Metal Coping
D
6763
3 2 1 Rev
5875.0
JE
4
Elevation 1 - d1
21/11/2014 D.M B.B 17/10/2014 D.M B.B 15/09/2014 J.E B.B Date Dr by App by date created
09/05/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
1 : 100
F 3580 T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
11380.0 11380.0 Top Col 10300 10597.8 10300.0
client name
Portsmouth City Council
project
9045.0 9045.0 8145.0 8145.0
8945.0 8945.0
The Hard Interchange Portsmouth
25-80-15/175 Glazed Curtain Wall Bus Barrier 5745.05875.0 5745.05875.0
5540.0 5540.0
drawing
General Arrangement - New Terminal Building Elevations computer file
project number
B1
C1
D1
2013.01080.002 drawing number
2
Elevation 1 - d 1 : 100
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
AHR-AR-B01-20-300
scale
1 : 100 rev
3
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
1
2
5300
3
5300
4
5300
5
5300
6
5300
7
5300
8
5300
9
5300
10
5300
5000
A
B
6763
B1
C
4174
C1
D1
7087
D
3580
E
3 2 1 Rev
F
Tender Issue Issued for Consultants Review Issued for Stage E Description
original by
DM
21/11/2014 D.M B.B 17/10/2014 D.M B.B 15/09/2014 J.E B.B Date Dr by App by date created
14/09/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
2
Wall Types 1 : 100
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Type P01 Metsec Framing with plasterboard lining with acoustical insulation- 25-15-35/145
Type WL01 Timber wall lining- 25-85-45/190
Type P02 Metsec Framing with Insulation, vapour barrier and plasterboard lining to achieve 0.35 W/m2.K- 25-15-35/145
Type WL02 / WL03 Laminate Panel Clip Clad or IPS system to public toilets- 25-85-45/120
Type P03 1HR Fire Rated partition – metal stud with plasterboard lining- 25-15-25/135
Stainless Steel Fascia Panel at high level- 25-80-50/175
Type P04 Metal stud with moisture resistant plasterboard lining to toilets and acoustical insulation- 25-15-25/135
Portsmouth City Council
project
The Hard Interchange Portsmouth
drawing
CW01 Curtain Walling- 25-80-15/175 CW02 Curtain Walling- 25-05-75/120
Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
2013.01080.002 drawing number
AHR-AR-B01-21-110
scale
As indicated rev
3
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
Hangers Support for Cantilievered section of POD 11380.0 11380.0
11380.0 11380.0
1 AHR-AR-B01-35-622
Top Col 10597.8 10300 10300.0
Top Col
20-10-20/130 Fabric Membrane Ceiling System
10597.8 10300 10300.0
Ceiling Trough
Ceiling Trough
20-10-20/130 Fabric Membrane Ceiling System
Plywood Sheet Roof with Vinyl Flooring Finish to Roof
LED Lighting Strip
9045.0
8945.0 8795.0 8945.0 8795.0
9045.0
Vertical Timber Cladding
8145.0 8145.0
9045.0 8945.0 9045.0 8945.0
SHS Perimeter Beam
8145.0
Vertical Timber Cladding
LED Lighting Strip
8145.0
3 AHR-AR-B01-22-223
4 AHR-AR-B01-22-223
3300
Sliding Foldable Screen Track System Plasterboard Ceiling
2400
6945.0 6945.0
Sliding Folding Screen
Steel Purlins POD Roof Structure
6945.0 6945.0
SHS Windpost POS Structure Support
WC Level 5708 5708.0
Stainless Steel Skirting
Metsec Framed Partition
Stainless Steel Schluter Profile Stainless Steel Skirting
5745.0 5745.0
SHS Baseplate
1
Pod Transverse Section 1
2
1 : 50
1
2
Pod Transverse Section 2 1 : 50
3
11380.0 11380.0 20-10-20/130 Stretched Fabric Barrisol Ceiling
Top Col 10597.8 10300
Key Retail Pod
5
10300.0
1 : 125
Plywood Sheet Roof with Vinyl Flooring Finish to Roof LED Lighting Strip Stainless Steel Flashing
9045.0 8795.0 9045.0 8795.0
Area of Insulated POD Roof
Fire Rated Ceiling Timber Lining
8145.0 8145.0
Plasterboard Ceiling
Line of Sliding Folding Partition
Fire Rated Partitions 6945.0 6945.0
B01.04 CONCOURSE
B01.18 RETAIL
693 m²
B01.19 RETAIL STORE
35 m²
2 m²
B01.14 DIS. WC 3 m²
B01.15 CLEANER
B01.17 COMMS
4 m²
7 m²
Stainless Steel Skirting 5745.0 5745.0
3
4
WC Level 5708 5708.0
Longitudinal Section 3
6
1 : 50 Insulate Roof Void Between Joist Above Rooms: B01.05 - B01.06 - B01.07 - B01.08 - B01.10
Key Travel Pod 1 : 125
Plasreboard Lining to Underside of Purlins
11380.0 11380.0
2 1 Rev
Tender Issue Issued for Consultants Review Description
20-10-20/130 Stretched Fabric Barrisol Ceiling
original by
Top Col 10597.8 10300
Ceiling Through
Author
10300.0
Barrisol Retention Angle / Unistrut and fixing Angle Plywood Roof
21/11/2014 D.M B.B 4/11/2014 D.M B.B Date Dr by App by date created
11/03/14
approved by
Approver
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
LED Lighting Strip Stainless Steel Flashing
8945.0 8795.0 8945.0 8795.0
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
Timber Lining
8145.0 8145.0
client name
Security Screen Track Rail Plasterboard Ceiling Fire Rated Partitions B01.05 CONTROL
6945.0 6945.0
9 m²
B01.06 KITCHENETTE 6 m²
B01.08 TRAVEL SHOP 17 m²
B01.09 RETAIL 37 m²
B01.04 CONCOURSE 693 m²
Travel Pod Fit-Out by Others Line of Sliding Folding Partition
Portsmouth City Council
project
The Hard Interchange Portsmouth
drawing
Section Details -Typical Pod Sections
5745.0 5745.0
computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
4
Longitudinal Section 4 1 : 50
2013.01080.002 drawing number
AHR-AR-B01-22-221
scale
As indicated rev
2
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
3 AHR-AR-B01-22-224 20-10-20/130 Fabric Membrane Ceiling System Stainless Steel Capping 120mm SHS POD Perimeter Structure
20-10-20/130 Fabric Membrane Ceiling System
LED Lighting Strip
Stainless Steel Capping
Barrisol Retention Angle and Steel Angle Support 9045.0 9045.0 8945.0
120mm SHS POD Perimeter Structure
9045.0
LED Lighting Strip
9045.0 8945.0 8945.0
Plywood Sheet Roof with Vinyl Flooring Finish
8945.0 Plywood Sheet Roof with Vinyl Flooring Finish
8825
150mm Steel Purlins 340
8795.0 8795.0 40 x 16mm Horizontal Flex-ply Fixing Strips
1 AHR-AR-B01-22-224
Top of Doors Curtain Wall 8340.0
8795.0
2 AHR-AR-B01-22-224
Vertical Timber Cladding Bracing / Stiffeners as required
Vertical Timber Cladding
Softwood Batten
60 x 16mm Horizontal Flexi-ply Battens at 600 CTS
Vertical Softwood Batten Packing 340
60 x 16mm Horizontal Flexi-ply Battens
150mm Steel Purlins 8795.0
SHS Post POD Support
Metal Stub Top of Doors Curtain Wall 8340.0 40 x 16mm Horizontal Flex-ply Fixing Strips
RHS - Cladding / Screen Track Support Profiled Plate - Support for Screen Track Screen Track
RHS - Cladding / Screen Track Support Profiled Plate - Support for Screen Track
8145.0
8145.0 8145.0
8145.0
Suspended Metal Tile Ceiling
Plasterboard Ceiling Screen Track (Within Storage Pocket)
Dry Lining Edge Bead Stainless Steel Angle
7885 7885.0
Sliding Folding Security Screen (Stored Position) Internal POD Partition and Stud
Sliding Folding Security Screen
Metsec Partition Horizontal Flexi-ply Battens at 600 CTS
SHS Post POD Support Stainless Steel Skirting
3
Cantilever Section 1
5875.0 5875.0
1 : 10 5745.0 5745.0
Tiles Floor Finishes WC Level 5708 5708.0 5540.0 5540.0
Post Baseplate
4
Typical Section 2 1 : 10
3 2 1 Rev
Tender Issue Amendments Tender Issue Issued for Consultants Review Description
original by
Author
03/12/2014 21/11/2014 4/11/2014 Date
D.M B.B D.M B.B D.M B.B Dr by App by
date created
10/29/14
approved by
Approver
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council
project
The Hard Interchange Portsmouth
drawing
Section Details - Pods - Sheet 1 computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
2013.01080.002 drawing number
AHR-AR-B01-22-223
scale
1 : 10 rev
3
@A1 issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
20-10-20/130 Fabric Membrane Ceiling System Vinyl Flooring to Top of Roof
Vinyl Flooring to Top of Roof 20-10-20/130 Fabric Membrane Ceiling System Plywood Sheet Roof
Plywood Sheet Roof
LED Lighting Strip
50
100
LED Lighting Strip
75
Staimless Steel Capping
Stiffener 1 0 0
Continuous Curved PPC 150 x 100mm Angle to Follow Profile of Ceiling Setting -out to Fully Support Barrisol Retention Angle
Horizontal Flex-ply Fixing Strips
8945.0 8945.0
Horizontal Flexi-ply Battens
120mm SHS POD Perimeter Structure
150mm Steel Purlins
Barrisol Retention Angle
Stainless Steel Capping 5 0
9045.0 9045.0
Metsec Cleader Angle 100 x 100mm (Follows Barrisol Spring Footprint) Between Roof Purlins
120mm SHS POD Perimeter Structure 8795.0 8795.0
120mm SHS Posts Pod Structure 150mm Steel Purlins
Bracing / Stiffeners as required Vertical Timber Cladding
Metsec Framing with Plasterboard Lining Partition
Horizontal Flex-ply Fixing Strips
3
Vertical Timber Cladding Horizontal Flexi-ply Battens Vertical Softwood Batten Packing
Vertical Softwood Batten Packing
100mm SHS
100mm SHS (Cantilever and Screen Pockets Section of Pod Only)
Barrisol Support Detail 1:5
Internal Pod Partition
Profiled Plate - Support for Screen Track
Profiled Plate - Support for Screen Track RHS - Cladding / Screen Track Support
RHS - Cladding / Screen Track Support (Cantilever and Screen Pockets Section of Pod Only
Galvanised Metal Support Pressing 8145.0 8145.0 5mm Stainlsess Steel Angle Dry Lining Edge Screen Track Screen Track Plasterboard Ceiling 7885 7885.0
1
Cantilever Section Details
Sliding Folding Security Screen (Stored in Pocket)
1:5
4 3 2 1 Rev
Tender Issue Amendments Tender Issue Tender Issue Issued for Consultants Review Description
original by
Author Stailess Steel Skirting Galvanised Metal Support Pressings Sealant Tiles Floor Finishes
WC Level 5708 5708.0
03/12/2014 26/11/2014 21/11/2014 4/11/2014 Date
D.M B.B D.M B.B D.M B.B D.M B.B Dr by App by
date created
11/03/14
approved by
Approver
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
Va r i es
Sliding Folding Security Screen
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council
SHS Posts Baseplate project
The Hard Interchange Portsmouth
drawing
2
Typical Section Details
Section Details - Pods - Sheet 2
1:5 computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
2013.01080.002 drawing number
AHR-AR-B01-22-224
scale
1:5 rev
4
@A1 issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
CO2 Temp Sensor
900
900
9045.0 9045.0
8145.0 8145.0
5745.0
5745
E9
Concealed Power Socket Refer to Electrical Spec.
1
2400
800 200
450
SS Caping / Skirting
5745.0
Sim 14 AHR-AR-BXX-32-624
2073
2400
1000
Stretched fabric Barrisol Ceiling
Sim 3 AHR-AR-B01-70-632
D.105
D.109 Sim 4 AHR-AR-B01-70-632
Safeguarding Zone for Touch Screen Journey Planner
Pods Screen Doors
Mirrored Window to Control Room
Travel Shop Pod Exterior Elevation 1
2
1 : 50
Travel Pod Fit-Out by Others Door Access Card Reader
Pods Screen Doors
Travel Shop Pod Exterior Elevation 2 1 : 50
CO2 Temp Sensor
9045.0 9045.0
1400
3300
8145.0 8145.0
5745.0 5745.0
D.101
Door Access Card Reader
E9
Concealed Power Socket Refer to Electrical Spec.
Fire Alarm
Mirrored Window to Control Room
Metsec framed pod with roof allowing for some access. Clad with plasterboard internally and vertical timber cladding externally
3
Travel Shop Pod Exterior Elevation 3
4
1 : 50
Travel Shop Pod Exterior Elevation 4 1 : 50
3 2 1 Rev
Equipment
AHR-AR-B01-22-401 4
E1 E2 E3a E3b E3c E4 E5 E6 E7 E8 E9 E10 E11 E12 E13
AHR-AR-B01-22-401 1
National Express Ticket Machines Help Point Real Time Information Screens (46� screen) Group of 4 Real Time Information Screens (55� screen) Group of 2 Real Time Information Screens (55� screen) Server Cabinet 600W x 1100D x 2300H * Mobile Phone Charging Stand Under Counter Fridge (by others) Microwave (by others) ETFE Air Handling Unit with UPS Smart Card Machine Induction Loop in Bus Bay (final setting out TBC) * Fire Alarm Panel * Safeguarding Zone for Touch Screen Journey Planner Safeguarding Zone for News Screen
Tender Issue Amendments Tender Issue Issued for Consultants Review Description
original by
JE
03/12/2014 21/11/2014 4/11/2014 Date
D.M B.B D.M B.B D.M B.B Dr by App by
date created
09/23/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council
* Refer to Elecrical Specification 3
(RTI screens are free issue by PCC, mounting brackets power and data and installation by main contractor)
AHR-AR-B01-22-401
project
The Hard Interchange Portsmouth
drawing
2 AHR-AR-B01-22-401
Detailed Drawings - Internal Elevations - Travel Shop Pod Exterior computer file
project number
2013.01080.002
5
Key Travel Shop Pod 1 : 100
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
drawing number
AHR-AR-B01-22-401
scale
As indicated rev
3
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
900
9045.0 9045.0
900
CO2 Temp Sensor
2400
925
Stretched fabric Barrisol Ceiling
2400
3300
8145.0 8145.0
200
5745.0
450
685
SS Caping / Skirting
5745.0 E1 Safeguarding Zone for Touch Screen Journey Planner
D.119
D.110
E1
Sim 1 AHR-AR-B01-70-632
Help Point E2
SS Pushplate Disabled WC Alarm
Pods Screen Doors
Concealed Power Socket Refer to Electrical Spec.
Sim 2 AHR-AR-B01-70-632
Retail Pod Exterior Elevation 1
1
2
1 : 50
Metsec Framing partition with plasterboard lining with acoustical insulation
Pods Screen Doors
Retail Pod Exterior Elevation 2 1 : 50
CO2 Temp Sensor
900
9045.0 9045.0
2073
2400
8145.0 8145.0
5745.0 5745.0
D.117
Concealed Power Socket Refer to Electrical Spec.
E1
Door Access Card Reader
E1
Metsec framed pod with roof allowing for some access. Clad with plasterboard internally and vertical timber cladding externally
3
Retail Pod Exterior Elevation 3
4
1 : 50
AHR-AR-B01-22-402 4 AHR-AR-B01-22-402 1
Equipment E1 E2 E3a E3b E3c E4 E5 E6 E7 E8 E9 E10 E11 E12 E13
National Express Ticket Machines Help Point Real Time Information Screens (46� screen) Group of 4 Real Time Information Screens (55� screen) Group of 2 Real Time Information Screens (55� screen) Server Cabinet 600W x 1100D x 2300H * Mobile Phone Charging Stand Under Counter Fridge (by others) Microwave (by others) ETFE Air Handling Unit with UPS Smart Card Machine Induction Loop in Bus Bay (final setting out TBC) * Fire Alarm Panel * Safeguarding Zone for Touch Screen Journey Planner Safeguarding Zone for News Screen
* Refer to Elecrical Specification (RTI screens are free issue by PCC, mounting brackets power and data and installation by main contractor) 3 AHR-AR-B01-22-402
2 AHR-AR-B01-22-402
Retail Pod Exterior Elevation 4 1 : 50
3 2 1 Rev
Tender Issue Amendments Tender Issue Issued for Consultants Review Description
original by
DM
03/12/2014 21/11/2014 4/11/2014 Date
D.M B.B D.M B.B D.M B.B Dr by App by
date created
09/23/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council
project
The Hard Interchange Portsmouth
drawing
Detailed Drawings - Internal Elevations - Retail Pod Exterior computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
5
Key Retail Pod 1 : 100
project number
2013.01080.002 drawing number
AHR-AR-B01-22-402
scale
As indicated rev
3
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
S12
A
A
A
B Alarm Cord
Sanitary
500
F9
1
571
5
EQ 551
EQ 0
1080
0
EQ 473
81
Disabled Toilet Elev 1
550
600
500
352
5
5
400
Access Panel
3
1 : 20
B
A
5
WC Disabled WC- Doc M Pack Stainless Steel Disabled WC- Doc M Pack Wash Basin Wash Basin Tap Soap Dispenser Hand Dryer Standard Mirror Disabled Mirror Full Height Mirror Grab Rail (set) Toilet Paper Holder Baby Change Bin – Sanitary Waste (by others) Air freshener (by others) Sluice Sink and Tap
A
Laminate Panel Cladding 25-05-45/10
B
Laminate Panel IPS System 25-05-45/120
800
800 400
400
1563
5
750
745
Disabled Toilet Elev 3
4
1 : 20
5
745
Disabled Toilet Elev 4 1 : 20
A
A
B
S12
S2a
5708
Disabled Toilet Elev 2
2
1 : 20
S7
S8
S4
600
800
740 0
S9
730
S5
900
2 4 0 0
S7
S11
EQ
Alarm Reset
S6b
S9
S1a S2a S2b S3a S4c S4 S5 S6a S6b S6c S7 S8 S9 S10 S12 S13a
Access Panel
F9
S6a
Dual Flush
2 4 0 0
S5
S5 1750
S4
Access Panel
S8
1000
S3a
550
S1a
100
S2a
S4c
EQ
EQ 873
5
EQ 5
872
Public Toilet Elev 1 1 : 20
550
1066
6
Public Toilet Elev 2
7
1 : 20
5
EQ 640
5
550
Public Toilet Elev 3 1 : 20
70
8
996
835
Public Toilet Elev 4
9
1 : 20
980
5
360
5
980
5
360
5
5
980
Circ Elev 1 1 : 20
2 1 Rev
A
Disabled WC Alarm
A
A
Tender Issue Issued for Consultants Review Description
original by
DM
21/11/2014 D.M B.B 12/11/2014 D.M B.B Date Dr by App by date created
09/23/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
2 4 0 0
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council
project
The Hard Interchange Portsmouth
drawing
100
Detail Drawings - Internal Elevations - Retail Pod Internal Elevations and Sections computer file
project number
5
457
5
980
5 242 5
980
5
332
126 5
1080
5
434
2013.01080.002 drawing number
AHR-AR-B01-22-403
10
Circ Elev 2 1 : 20
11
Circ Elev 3 1 : 20
12
Circ Elev 4 1 : 20
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
scale
As indicated rev
2
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
Sanitary Disabled WC Alarm
S1a S2a S2b S3a S4c S4 S5 S6a S6b S6c S7 S8 S9 S10 S12 S13a
S12
Wall Tiling 25-85-97/140
Wall Tiling 25-85-97/140
Alarm pull cord with two red bangles Alarm Reset
F9
S6b
900
2400
S7
S7
S4
S5
WC Disabled WC- Doc M Pack Stainless Steel Disabled WC- Doc M Pack Wash Basin Wash Basin Tap Soap Dispenser Hand Dryer Standard Mirror Disabled Mirror Full Height Mirror Grab Rail (set) Toilet Paper Holder Baby Change Bin – Sanitary Waste (by others) Air freshener (by others) Sluice Sink and Tap
S8 1400
S11
1 : 20
440
600
600
2
F1a F1b F1c F2 F3 F3a F3b F3c F3d F4 F5 F6 F7 F8 F9 F10 F11 F12
740 S10
S2a
100
Disabled Toilet Elevation 1
1
Fittings
950
800
900
730
800
600
600
S2a
Disabled Toilet Elevation 2 1 : 20
3
S10
Disabled Toilet Elevation 3 1 : 20
4
Disabled Toilet Elevation 4 1 : 20
Back to Back Fixed Seating Fixed Seating Fixed Seating to Taxi Shelter Litter Bins Kitchenette Kitchenette Base Units Kitchenette Counter Kitchenette Upper Units Kitchenette Sink and Tap Shelving (by others) Office Chair (by others) Built in Work Counter Built in Desk (by others) Built in Retail Display Units (by others) Coat Hook Ashtray Post Cycle Rack Brompton Cycle Dock
600
Filler Panel
Upper Cabinets
F3c
720
F3c
2400
Wall Tiling 25-85-97/140 600
F3b
F3b
F3d
F3a Fridge (By Others)
850
Fridge (By Others)
Filler Panel
F3a E6
E6
Kitchen Elev 1
6
600
1 : 20
Lighting Troffer
600
7
Kitchen Elev 2 1 : 20
8
Kitchen Elev 3 1 : 20
9
Kitchen Elev 4 1 : 20
Single Pane Control Window 2 1 Rev
Tender Issue Issued for Consultants Review Description
original by
DM
21/11/2014 D.M B.B 12/11/2014 D.M B.B Date Dr by App by date created
09/23/14
approved by
Approver
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
2400
client name
Portsmouth City Council Counter (F6)
project
The Hard Interchange Portsmouth
drawing
720
Support Gables (F6)
Detail Drawings - Internal Elevations - Travel Shop Pod Internal Elevations and Sections computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
5
Control Room 1 : 20
2013.01080.002 drawing number
AHR-AR-B01-22-404
scale
As indicated rev
2
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
252 15 15 Deflection Head
Insulate Roof Void Between Joist Above Rooms: B01.05 - B01.06 - B01.07 - B01.08 - B01.10 Horizontal Flex-ply Fixing Strips
Head Track fixed to underside of Structure
Horizontal Flex-ply Fixing Strips
Horizontal Flexi-ply Battens
70mm Metal Stud
Horizontal Flexi-ply Battens 120mm SHS POD Perimeter Structure 120mm SHS Posts Pod Structure
Acoustic Fleece
Deflection Head
Deflection Head
Fire Rating
Head Track
Head Track
Wall Board
100 SFS Framing
100 SFS Framing
50mm Insulation
Metsec Framing with Plasterboard Lining Partition
Vertical Timber Cladding
Vapour Barrier
120mm SHS POD Perimeter Structure 100
25
100
25
100
Acoustic Insulation
120mm SHS Posts Pod Structure
Acoustic Fleece
Acoustic Insulation
25
100
25 Suspended Ceiling 122
Vertical Timber Cladding
Metsec Framing with Plasterboard Lining Partition
Softwood Batten Vertical Packing
Softwood Batten Vertical Packing Horizontal Flex-ply Fixing Strips
Horizontal Flex-ply Fixing Strips
Horizontal Flexi-ply Battens
Horizontal Flexi-ply Battens
2 Layers 12.5mm Wallboard with Staggered Joints to meet overall Fire Rating of 60 Minutes 70mm Metal Stud
Stailess Steel Skirting / Ply Backing
Stailess Steel Skirting / Ply Backing
100 x 38mm PT Timber sole plate
100 x 38mm PT Timber sole plate
72mm U Channel with Intumescent Mastic
Sealant
Sealant Vinyl Skirting Tiles Floor Finishes
Type P01 + WL01
1
1:5
Metsec Framing with plasterboard lining with acoustical insulation- 25-15-35/145
WL02
Vinyl Skirting Vinyl Skirting
Tiles Floor Finishes
Type P02 + WL01
2
1:5
Metsec Framing with Insulation, vapour barrier and plasterboard lining to achieve 0.35 W/m2.K- 25-15-35/145
WL02
P03
Deflection Head
Deflection Head
Head Track fixed to underside of Structure
Head Track fixed to underside of Structure
P04
Vinyl Floor Finishes
3
Type P03 1:5
To be read in conjunctiion with the following Documents: 1HR Fire Rated partition – metal stud with plasterboard lining- 25-15-25/135
Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings
AHR-AR-B01-21-110
Scoping Drawing - New Terminal Building Flooring
AHR-AR-B01-23-110
Scoping Drawing - New Terminal Building Ceilings
AHR-AR-B01-35-110
WL02
Deflection Head
Head Track fixed to underside of Structure 25mm Acoustic Insulation
70mm Metal Stud 70mm Metal Stud 70mm Metal Stud 50mm Insulation
25mm Acoustic Insulation
Fire Rating
Clipclad Rail Horizontal Fixing Channel
Clipclad Rail Horizontal Fixing Channel
Suspended Ceiling
Suspended Ceiling
3 2 1 Rev
Suspended Ceiling
Tender Issue Amendments Tender Issue Issued for Consultants Review Description
original by
Author
Compact Grade Laminate With Clipclad Inserts Fixed To Clipclad Rails
Compact Grade Laminate With Clipclad Inserts Fixed To Clipclad Rails 50
122
2 Layers 12.5mm Wallboard With Staggered Joints to Meet Overall Fire Rating Of 60 Minutes
112
Fire Rated Room
Toilet
122
50
72 mm Base U Channel
72 mm Base U Channel
70 x 38mm PT Timber sole plate
70 x 38mm PT Timber sole plate
Clipclad Rail Horizontal Fixing Channel
Clipclad Rail Horizontal Fixing Channel
Sealant
Sealant
Tiles Floor Finishes / Skirting
Tiles Floor Finishes / Skirting
date created
11/05/14
approved by
Approver
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
Moisture Resistant Plasterboard
Services Zone Cubicle
D.M B.B D.M B.B D.M B.B Dr by App by
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
Moisture Resistant Plasterboard
Vinyl Skirting
03/12/2014 21/11/2014 7/11/2014 Date
Cubicle
70mm Metal Stud
Tiles Wall Finish
client name
Portsmouth City Council
project
Stailess Steel Skirting / Ply Backing
The Hard Interchange Portsmouth 72mm U Channel
Vinyl Skirting
Tiles Floor Finishes
drawing
Detailed Drawings - Wall Type Details computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
4
Type P03 + WL02 1:5
Metal stud with moisture resistant plasterboard lining to toilets and acoustical insulation- 25-15-25/135
5
Type P04 + WL02 1:5
6
Type P04 + Tile Finish 1:5
2013.01080.002 drawing number
AHR-AR-B01-22-521
scale
As indicated rev
3
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
1
2
5300
3
4
5300
5300
5
6
5300
5300
7
8
5300
9
5300
5300
10
5300
5000
A
B01.03 LOBBY
B01.01 LOBBY
B
12 m²
12 m²
Manhole with Tile Finish
B1 6763
ETFEB01.10 CONTROL ROOM
Manhole with Vinyl Finish TICKET MACHINE B01.16 ROOM
2 m²
B01.05 CONTROL
4 m²
B01.07 WC
9 m²
B01.11 WC
4 m²
2 m²
B01.06 KITCHENETTE
7 m²
B01.17 COMMS
Tiles (A)- 20-55-35/140/FL04
7 m²
B01.15 CLEANER
Tiles (B)- 20-55-35/140/FL03
4 m²
2 m²
B01.08 TRAVEL SHOP
B01.13 WC
17 m²
C1
B01.10 CIRCULATION
B01.12 WC
6 m²
C
Manhole with Vinyl Finish
2 m²
Vinyl Flooring- 20-55-75/165/FL01
B01.14 DIS. WC
4174
3 m²
Lobby Matting- 35-05-35/135/FL05 B01.18 RETAIL 35 m²
Ventilation Grille- 25-80-15/175 For Floor Grilles Schedule see Drawing AHR-AR-B01-20-100
B01.09 RETAIL
D
37 m²
200mm High Stainless Steel Skirting 5mm Control Joint (Sealant)
D1
7087
B01.04 CONCOURSE
Schluter Profile
693 m²
Profile between tile and vinyl Insulation Under Screed Area
Note: Induction Loop to be installed in Structural Topping Refer to Electrical Specification for Details
3580
E
F
B01.02 LOBBY 20 m²
4 3 2 1 Rev
Tender Issue Issued for Consultants Review Issued for Consultants Review Issued for Stage E Description
original by
JE
21/11/2014 20/10/2014 17/10/2014 15/09/2014 Date
D.M B.B D.M B.B D.M B.B J.E B.B Dr by App by
date created
09/05/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council
project
The Hard Interchange Portsmouth
drawing
Scoping Drawing - New Terminal Building Flooring computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
1
Ground Floor Plan Flooring 1 : 100
project number
2013.01080.002 drawing number
AHR-AR-B01-23-110
scale
As indicated rev
4
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
2
Tiles - Column Detail Plan 1:5
Water Cut Section of Tile around Steel Columns Sealant control Joint 5mm Induction Loop array zone refer to Electrical Specification for Details. Final installation Layout to Specialist Details
Tiles SOP for location of Control Joints to line up with Concourse Column Layout Steel Column Kicker
Steel Column Kicker
Stainless Steel Schluter Profile 10mm
Sealant control Joint on backing Rod
Concourse Tile Finish 10mm
Adhesive 5mm
Adhesive 5mm
Concrete Screed Nom. 100mm
Concrete Screed Nom. 100mm
Concourse Tile Finish 10mm
Sealant control Joint 5mm on backing Rod
Concourse Tile Finish 10mm
Induction Loop
Induction Loop
Adhesive 5mm
Induction Loop
1
Tiles - Column Detail
3
1:2
Control Joint Detail
Capping Seal
Toilet Tiles Skirting
Concourse Tile Finish 1:2
Centre Floor Joint on Door Leaf
CL
Cove Skirting Schluter Reno - V
Cove Former
Concrete Screed
Concrete Screed Nom. 100mm
4
1:2
Schluter Jolly Edge Protection Profile
100
Tiles Joint Grout to match Tiles Colour
Toilet Tiles Floor Finishes
75mm Unbonded Screed
Adhesive
Resilent Sheet Flooring Adhesive Bed in Covering Compound
3 2 1 Rev
Tender Issue Amendments Tender Issue Issued for Consultants Review Description
original by
Author
Joint Grout to Match Tiles Colour
03/12/2014 21/11/2014 7/11/2014 Date
D.M B.B D.M B.B D.M B.B Dr by App by
date created
11/05/14
approved by
Approver
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
25mm Insulation
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council
project
The Hard Interchange Portsmouth 10mm Foam Edge Strips
drawing
Detailed Drawings - Floor Details
5
Toilet Tile Finish 1:2
6
Vinyl Flooring + Tiles Treshold 1:2
computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
2013.01080.002 drawing number
AHR-AR-B01-23-611
scale
As indicated rev
3
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
Steel Structure ETFE Canopy
1
2
3
4
5
6
7
8
9
10
2 Typical ETFE Support AHR-AR-B01-27-114 Roof Condition
Steel Structure ETFE Canopy
Coping to be profiled to Radius
Coping to be profiled to Radius
5300
5300
5300
5300
5300
5300
5300
5300
5300
A
12 25
25 12
Outline of Coping Below
1194
5000
11 94
Roof Drain
Method: The method of access by means of powered access (e.g. Cherry picker), where the access platform is set down adjacent to the system, allowing the user direct attachment prior to exiting the platform.
B
No. Of users: 3 users (maximum) at any one time Lanyard type: 1.75m twin energy absorbing lanyard
6763
B1 3 AHR-AR-B01-27-114 Typical Mansafe Support Post Detail 100mm high angle clamped into ETFE roofing system to divert rainwater back to main roof.
Ballast
Ballast
1 AHR-AR-B01-27-119 Extract Vent Kerb Detail
Mechanical Extract Ventilation
C
4174
C1 1 AHR-AR-B01-27-114 Typical Roof Outlet Detail
Latchway
To be read in conjunction with the following drawings: ¡AHR-AR-B01-27-110 - Scoping Drawing - New Terminal Building Roof ¡AHR-AR-B01-27-111 - Detailed Drawings - ETFE Canopy
D
Aluminium powder coated coping
D1
7087
Proposed MEWP set down location
Ballast 41 57
4 3 2 1 Rev
E
Tender Issue Amendments Tender Issue Issued for Consultants Review Issued for Stage E Description
original by
3580
Author
Proposed MEWP parking position
F 5520
D.M B.B D.M B.B D.M B.B J.E B.B Dr by App by
date created
09/05/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
Roof drain for low level roof
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
Sim 1 AHR-AR-B01-27-117
03/12/2014 21/11/2014 17/10/2014 15/09/2014 Date
client name
Portsmouth City Council
project
Coping to be profiled to Radius
Steel Structure Glass Canopy with spider fixings and silicone sealed joints.
The Hard Interchange Portsmouth
drawing
General Arrangement - New Terminal Building Roof Plan computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
1
Roof Plan 1 : 100
project number
2013.01080.002 drawing number
AHR-AR-B01-27-100
scale
1 : 100 rev
4
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
1
2
5300
3
5300
4
5300
5
5300
6
5300
7
5300
8
5300
9
5300
10
Line of main building roof and coping below ETFE canopy.
5300
5000
A
B Steel Coping30-85-50/105 Latchway 6763
B1
Roof Drain
Mechanical Extract Ventilation
C
Liquid Applied Inverted Roof System with Ballast20-50-30/135
4174
C1
Steel Structure Canopy
ETFE Canopy 20-50-85/120
D
D1
7087
Glass Canopy 20-50-75/110
3 2 1 Rev
3580
E
Tender Issue Issued for Consultants Review Issued for Stage E Description
original by
DM
21/11/2014 D.M B.B 17/10/2014 D.M B.B 15/09/2014 J.E B.B Date Dr by App by date created
09/05/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
F
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council
project
The Hard Interchange Portsmouth
drawing
Scoping Drawing - New Terminal Building Roof computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
1
Roof Scoping Plan 1 : 100
2013.01080.002 drawing number
AHR-AR-B01-27-110
scale
As indicated rev
3
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
5
6
E
Drainage
811
0
65 30
4 0
811
Silicone Joints Channel Gutter
78
4460
F
3480
75
3300
Glass Sections Canopy Structure Support 1946
1682
1682
1682
1946
8937
1
Back Canopy Plan 1 : 50
Back Canopy 3D
2 5
6
E
F
5 AHR-AR-B01-27-117 11380.0 11380.0
11380.0 11380.0 Chanel Gutter Drainage Glass Sections
8945.0
8945.0
8945.0
8945.0
6 AHR-AR-B01-27-117 Spiders Glass Support with Trough Glass Fixings
PIR
Canopy Structure Support with Paint Finish 6945.0
6945.0
6945.0
6945.0
5875.0 5875.0
5875.0 5875.0
Outriggers
3 2 1 Rev
Tender Issue Issued for Consultants Review Issued for Coordination Description
original by
Author
3
Canopy Elevation 1 : 50
4
D.M B.B D.M B.B D.M B.B Dr by App by
date created
10/13/14
approved by
Approver
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
Canopy Section 1 : 50
6
21/11/2014 17/10/2014 15/10/2014 Date
F
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
8945.0 8945.0
441
8945.0 8945.0
240 150 170
client name
Portsmouth City Council
project
The Hard Interchange Portsmouth
drawing
Detailed Drawings - Rear Glass Canopy Plan and Details computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
5
Detail Canopy Elevation 1 : 25
6
Detail Canopy Section 1 : 25
2013.01080.002 drawing number
AHR-AR-B01-27-117
scale
As indicated rev
3
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
To be read in conjunction with the following scoping drawings:
1
2
3
4
Accessible ceiling panels
5300
5
Real Time Information Screens
5300
6
7
8
9
10
¡AHR-AR-B01-21-110 - Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings ¡AHR-AR-B01-35-110 - Scoping Drawing - New Terminal Building Ceilings
Safeguarding Zone for News Screen
5300
5300
¡AHR-AR-B01-40-110 - Scoping Drawing - New Terminal Building Finishes
5300
5300
5300
5300
¡AHR-AR-B01-70-110 - Scoping Drawing - New Terminal Building FF&E
5300
Double Sided Real Time Information Screen NOTE: CCTV, Speakers and Smoke Detectors to be agreed
CCTV 13
Ceiling Layout Indicative Confirmation of Final Layout by Subcontractor
CCTV 12
1
1
AHR-AR-B01-21-561
AHR-AR-B01-27-116
A 1 WIFI
2
CCTV 1
5000
AHR-AR-B01-21-561
Sim WIFI
AHR-AR-B01-35-622
CCTV 3
CCTV 2
CCTV 5
CCTV 7
CCTV 6
1
B01.01 LOBBY
11265 12 m²
12 m²
B
AHR-AR-B01-27-118
B01.03 LOBBY
11265
CCTV Schedule (Interior) 10300
Horizontal run in Pod Ceiling Void to Rain Water Pipe downpipe 6763
B1
Rain Water Pipe through Deck
B01.05 CONTROL
B01.10 ETFE CONTROL ROOM
9 m²
Extent of Insulated POD Roof Structure
4 m²
Fire Rated MF Ceiling Above Suspended Grid
C
B01.06 KITCHENETTE
4174
CCTV 4
B01.11 WC 2 m² B01.12 WC
17 m²
CCTV 11
B01.15
7 m²
AHR-AR-B01-27-116
CLEANER 4 m²
B01.13 WC
Barrisol Spring Outline (Above POD's Roof)
3 m²
2 AHR-AR-B01-22-124
B01.19 RETAIL STORE
693 m²
8145
B01.14 DIS. WC
2 m²
B01.04 CONCOURSE
Drop
B01.18 RETAIL
2 m²
35 m²
B01.09
Horizontal run in Pod Ceiling Void to Rain Water Pipe downpipes
CCTV Mount Height
CCTV Camera Height 4525.8 4525.8 4525.8 4525.8 4525.8 4525.8 4525.8 4525.8 4525.8 4525.8 2347.0 6500.0 6500.0
5000.0 5000.0 5000.0 5000.0 5000.0 5000.0 5000.0 5000.0 5000.0 5000.0 2550.0 7000.0 7000.0
Mark
Type
CCTV 1 CCTV 2 CCTV 3 CCTV 4 CCTV 5 CCTV 6 CCTV 7 CCTV 8 CCTV 9 CCTV 10 CCTV 11 CCTV 12 CCTV 13
CCTV Type A CCTV Type A CCTV Type A CCTV Type A CCTV Type A CCTV Type A CCTV Type A CCTV Type A CCTV Type A CCTV Type A CCTV Type C CCTV Type B CCTV Type B
RETAIL 37 m²
Footprint of stretched fabric on pod roof
CCTV 10
7087
2 AHR-AR-B01-22-123 D1
2
B01.10 CIRCULATION
2 m²
Rain Water Pipe through Deck
D
B01.17 COMMS 7 m²
B01.08 TRAVEL SHOP
6 m²
C1
4 m²
WIFI
160mm diameter Roof Drain Pipe above fabric ceilng connecting to three outlets
2 m²
B01.07 WC
B01.16 TICKET MACHINE ROOM
160mm diameter Roof Drain Pipe above ceiling connecting to three outlets
CCTV 9
Light
CCTV 8
Real Time Information Screens
Security Screen Track WIFI
Security Screen Track
3580
E
B01.02 LOBBY 20 m²
5 4 3 2 1 Rev
8535
F
Tender Issue Amendments Tender Issue Tender Issue Issued for Consultants Review Issued for Stage E Description
original by
Glass and steel Canopy, refer to Drawing AHR-AR-B01-27-117
1
JE
2
D.M B.B D.M B.B D.M B.B D.M B.B J.E B.B Dr by App by
date created
09/05/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
Reflected Ceiling Plan 1 : 100
03/12/2014 25/11/2014 21/11/2014 17/10/2014 15/09/2014 Date
Sim
AHR-AR-B01-21-122
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council
project
The Hard Interchange Portsmouth
drawing
General Arrangement - New Terminal Reflected Ceiling Plan computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
2013.01080.002 drawing number
AHR-AR-B01-35-100
scale
1 : 100 rev
5
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
1
2
5300
3
5300
4
5300
5
5300
6
5300
7
5300
8
5300
9
5300
10
Note: ETFE Canopy. Refer to DWG AHR-AR-BO1-27-111
5300
5000
A
B
Painted Plasterboard: MF-01-20-10-10/ 110
6763
B1
Stretched Fabric Barrisol Ceiling: CLG-02-20-10-20/ 130
Metal Tile Ceiling: CLG-01-20-10-20/ 190
C Fire Rated Plasterboard: MF-02-20-10-10/ 110
4174
C1
Fire Rated MF Ceiling Above Suspended Grid
Soffit with Acrilic Render: MF-03-20-10-10/ 170
D Removable PPC finished expanded metal mesh CLG-03 20- 10- 20/ 190
Extent of Pod Roof Structure to be Insulated CLG-04 7087
Insulated Roof Structure CLG-04 20- 10- 10/ 170
D1
Access Panels
E
3580
5 4 3 2 1 Rev
Tender Issue Amendments Tender Issue Tender Issue Issued for Consultants Review Issued for Stage E Description
original by
F
JE
03/12/2014 25/11/2014 21/11/2014 17/10/2014 15/09/2014 Date
D.M B.B D.M B.B D.M B.B D.M B.B J.E B.B Dr by App by
date created
09/05/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
Note: Glass and Steel Canopy. Refer to DWG AHR-AR-BO1-27-117
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council
project
The Hard Interchange Portsmouth
drawing
Scoping Drawing - New Terminal Building Ceilings computer file
1
Reflected Ceiling Plan Scoping 1 : 100
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
2013.01080.002 drawing number
AHR-AR-B01-35-110
scale
As indicated rev
5
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
2
3
796
5300
4
5
5300
5300
1155 3635
3 AHR-AR-B01-35-622
4 AHR-AR-B01-35-621
4 AHR-AR-B01-35-622
3 AHR-AR-B01-35-621
10300 10300.0 1255
6275
5
9045.0 9045.0
AHR-AR-B01-35-621
2
Barrisol Section 5 1 : 50
2513
Note: Penitration through stretched ceiling for structural column
70 37
7659
B
9
2215
1849
6511
10300 10300.0
Note: Column penitration through stretched ceiling for RTI screen support
9045.0 9045.0
B1
3
Barrisol Section 4 1 : 50
4548
7600
3
Extract Vent on Roof. This section of Barrisol Stretched Fabric to be removable for maintenance access
Sim
AHR-AR-B01-22-224
Sim 1 AHR-AR-B01-35-622
10300 10300.0 20302
9045.0 9045.0
C
4
Barrisol Section 7 1 : 50
22633
C1
4174
8100
10300 10300.0
57
68 5
20599
2
9045.0 9045.0
AHR-AR-B01-35-621
D
5
Barrisol Section 6 1 : 50
3764
1998 6 AHR-AR-B01-35-621
2 1 Rev
97 25
10300 10300.0
Tender Issue Issued for Consultants Review Description
original by
JE 12 32
841
841
D1
date created
10/10/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
9045.0 9045.0
6
26/11/2014 D.M B.B 17/10/2014 D.M B.B Date Dr by App by
Barrisol Section 3
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
1 : 50 client name
1155
Portsmouth City Council
project
The Hard Interchange Portsmouth
E
drawing
Detailed Drawings - Ceiling Details - Barrisol Ceiling Setting Out computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
1
Barrisol Ceiling Setting Out 1 : 50
2013.01080.002 drawing number
AHR-AR-B01-35-621
scale
1 : 50 rev
2
@A1 issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
AF2
1
Prefinished Metal Deck AF2
Taxi Shelter Plan Building Finishes 1 : 100
AF3-W
2
AF1-W
Ground Floor Plan Building Finishes 1 : 100
Prefinished Metal Deck
Canopy above 1
2
3
4
5
6
7
8
9
10
AF2 5300
All Exposed Steelwork
5300
5300
5300
5300
5300
5300
AF2
5300
5300
All Exposed Steelwork
AF2 AF2
A AF4-C
AF4-C
Note:
5000
1. Drawing to be read in conjuction with room finishes schedule See: AHR-AR-BXX-40-710 2. To all rooms, silicon seal to all architraves, planted stops/frames, sanitary fittings, worktops, cupboards, skirtings etc...
B
AF1-W
AF3-W
AF1-W
AF1-W
AF1-W
Vinyl Emulsion Paint to Walls 35-85-60/195
AF1-C
Vinyl Emulsion Paint to Ceiling 35-85-60/195
6763
B1
AF1-C
AF1-C AF1-C
AF1-C AF2
Anti-corrosion Coating to Steelwork- 35-85-60/180
AF4-C
Acrylic Anti-crack Render 45-35-84/301
AF3-W
Wall Tiling- 25-85-97/140
AF1-W AF1-C
C
4174
C1 AF3-W
AF1-W
AF1-W
AF3-W AF1-C
AF1-W AF1-C
AF1-C
AF1-W
D
4 3 2 1 Rev
Tender Issue Issued for Consultants Review Updated Issue Issued for Stage E Description
original by
DM
21/11/2014 D.M B.B 17/10/2014 D.M B.B 16/09/2014 J.E B.B 15/09/2014 J.E B.B Date Dr by App by date created
09/05/14
approved by
BB
7087
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
D1
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
E
3580
Portsmouth City Council
F
AF1-C
project
The Hard Interchange Portsmouth
drawing
Scoping Drawing - New Terminal Building Finishes computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
2013.01080.002 drawing number
AHR-AR-B01-40-110
scale
As indicated rev
4
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
1
Taxi Shelter Plan FF&E 1 : 100
To be read in conjunction with the following drawings: AHR-AR-B01-22-401 - Detailed Drawings - Internal Elevations - Travel Shop Pod Exterior AHR-AR-B01-22-402 - Detailed Drawings - Internal Elevations - Retail Pod Exterior
E3a
F1.c
B02.02 DIS. WC 5 m²
Equipment
B02.04 DIS. WC B02.03 STORE
5 m²
S9
1 m²
S3b
S7
S3b
S2
Ground Floor Plan Building FF&E
2
1 : 100
E1 E2 E3a E3b E3c E4 E5 E6 E7 E8 E9 E10 E11 E12 E13
National Express Ticket Machines Help Point Real Time Information Screens (46� screen) Group of 4 Real Time Information Screens (55� screen) Group of 2 Real Time Information Screens (55� screen) Server Cabinet 600W x 1100D x 2300H * Mobile Phone Charging Stand Under Counter Fridge (by others) Microwave (by others) ETFE Air Handling Unit with UPS Smart Card Machine Induction Loop in Bus Bay (final setting out TBC) * Fire Alarm Panel * Safeguarding Zone for Touch Screen Journey Planner Safeguarding Zone for News Screen
* Refer to Elecrical Specification
1
2
3
4
5
6
7
8
9
(RTI screens are free issue by PCC, mounting brackets power and data and installation by main contractor)
10
E10
5300
5300 E10
5300 E10
E3a
5300 E10
E3a
5300
5300
E10
E3a
E10
E3a
5300
5300
E10
E3a
5300
E10
E3a
E10
E3a
E10
Fittings F1a F1b F1c F2 F3 F3a F3b F3c F3d F4 F5 F6 F7 F8 F9 F10 F11 F12
Back to Back Fixed Seating Fixed Seating Fixed Seating to Taxi Shelter Litter Bins Kitchenette Kitchenette Base Units Kitchenette Counter Kitchenette Upper Units Kitchenette Sink and Tap Shelving (by others) Office Chair (by others) Built in Work Counter Built in Desk (by others) Built in Retail Display Units (by others) Coat Hook Ashtray Post Cycle Rack Brompton Cycle Dock
E3a E3a
E3a
Sanitary
A F1.b
F2 F1.c
F2
F1.b
5000
F1.c
B01.03 LOBBY
B01.01 LOBBY
12 m²
E13
12 m²
E3b
E3b
B S8 S2a F7
E12
B1
E1
6763
2 m²
4 m²
E2
E9
B01.07 WC
9 m²
B01.17 COMMS
4 m²
B01.08 TRAVEL SHOP
6 m²
F3b F3c
C1
B01.11 WC
S3a
S3b B01.06 KITCHENETTE
4174
E1
B01.16 TICKET MACHINE ROOM
F4 B01.05 CONTROL
C
WC Disabled WC- Doc M Pack Stainless Steel Disabled WC- Doc M Pack Wash Basin Wash Basin Tap Soap Dispenser Hand Dryer Standard Mirror Disabled Mirror Full Height Mirror Grab Rail (set) Toilet Paper Holder Baby Change Bin – Sanitary Waste (by others) Air freshener (by others) Sluice Sink and Tap
E8 B01.10 ETFE CONTROL ROOM
S7
S1a S2a S2b S3a S4c S4 S5 S6a S6b S6c S7 S8 S9 S10 S12 S13a
F9
2 m²
F6
17 m²
S1a
F8
7 m²
B01.13 WC 2 m²
S1a S1a
E11
S8 B01.18 RETAIL
F8
B01.15 CLEANER 4 m²
B01.12 WC 2 m²
35 m²
E4
7 m²
B01.10 CIRCULATION
B01.14 DIS. WC 3 m²
S13a S9
B01.19 RETAIL STORE
S3b
2 m²
S8
5 4 3 2 1 Rev
Tender Issue Amendments Tender Issue Issued for Consultants Review Updated Issue Issued for Stage E Description
original by
JE
B01.09 RETAIL 37 m²
D.M B.B D.M B.B D.M B.B J.E B.B J.E B.B Dr by App by
date created
09/05/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
S2a
D
03/12/2014 21/11/2014 17/10/2014 16/09/2014 15/09/2014 Date
E3c
7087
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
D1
client name
E5
Portsmouth City Council project
The Hard Interchange Portsmouth
E B01.02 LOBBY
3580
20 m²
drawing
Scoping Drawing - New Terminal Building FF&E computer file
F
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
2013.01080.002 drawing number
AHR-AR-B01-70-110
scale
As indicated rev
5
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
6 AHR-AR-B01-70-632
* *
* *
6 AHR-AR-B01-70-632
1147
6 AHR-AR-B01-70-632
* *
SIM
1012
926
623
203
E2
* *
723
1047
ø 495.0
* *
1000
540
* *
700
1100
800 640
5
E12
E9
AHR-AR-B01-70-632
1400
E1
*
696
790
837
*
WC Level 5708 5708.0
Ticket Machine
WC Level 5708 5708.0
2
1 : 10
Help Point
WC Level 5708 5708.0
3
1 : 10
Smart Card Machine
4
1 : 10
Screen Journey Planner 1 : 10 Equipment
TBC by Supplier
*
Ticket Machine
All Dimensions to be Confirmed based on final Product information supplied by Portsmouth City Council and Operators
Timber Frame Metsec Framing with Plasterboard Lining Partition
5
Ticket Machine Plan 1 : 10
Acoustic Fleece
E1 E2 E3a E3b E3c E4 E5 E6 E7 E8 E9 E10 E11 E12 E13
National Express Ticket Machines Help Point Real Time Information Screens (46� screen) Group of 4 Real Time Information Screens (55� screen) Group of 2 Real Time Information Screens (55� screen) Server Cabinet 600W x 1100D x 2300H * Mobile Phone Charging Stand Under Counter Fridge (by others) Microwave (by others) ETFE Air Handling Unit with UPS Smart Card Machine Induction Loop in Bus Bay (final setting out TBC) * Fire Alarm Panel * Safeguarding Zone for Touch Screen Journey Planner Safeguarding Zone for News Screen
* Refer to Elecrical Specification Timber Lining
(RTI screens are free issue by PCC, mounting brackets power and data and installation by main contractor)
SS Framing for Timber Lining mounted FFE
Sim 6 AHR-AR-B01-70-632
Timber Packing
Timber Frame
Metsec Framing + Plasterboard Lining Partition
Acoustic Fleece 1 Rev
Tender Issue
03/12/2014 D.M B.B Date Dr by App by
Description
original by
Author
date created
10/14/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
SS Countersunk Screw
SS Framing for Timber Lining mounted FFE T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
100
6
Typical SS Frame Detail
Portsmouth City Council
1:2 project
100
The Hard Interchange Portsmouth
drawing
Detailed Drawings - FFE - Timber Wall Lining FFE Equipment Interface Details
2 0
1
WC Level 5708 5708.0
25
7
50
3D
computer file
project number
2013.01080.002 Ticket Machine
SS Framing for Timber Lining mounted FFE
100 X 50 X 5mm Stainless Steel Anngle All edges ground flush and smoth
Timber Lining
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
drawing number
AHR-AR-B01-70-632
scale
As indicated rev
1
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
CW02
W01 SS rainscreen system
RTI Screen
7885
Single Glazed Glass Façade
7885.0 B02.03 Taxi Shelter
7145 6945.0 7145.0 6945.0
21 m²
ED.201
ED.203
ED.203
W03 B02.02 DIS. WC
B02.04 DIS. WC
5 m²
Sim 1 AHR-AR-B02-22-405
5 m²
200mm Reinforced Concrete Wall
ED.201
4685 4685.0
B02.03 STORE 1 m²
ED.202
W02
4995
3
Elevation 2 - a 1 : 50
Galvanised Steel Grating Floor
1
Shelter
Single laminate clear toughened glass screen with 10mm silicone joint between glass panels.
2
Taxi Shelter Plan 1 : 50
Single Glazed Glass Façade
PPC flat pressed aluminium coping RAL 9018
Roof Overflow Extract Louvers
7885 7885.0 7145 6945.0 7145.0 6945.0 SS rainscreen system
4545 4545.0 ED202 refer to AHRAR-BXX-32-623
4
Elevation 4 - a1
5
1 : 50
Taxi Shelter Elevation
6
1 : 50 PPC flat pressed aluminium coping RAL 9018
Exposed painted steelwork RAL9018
Prefinished metal deck RAL 9010
Surface mounted light fittings
Elevation 4 - a 1 : 50
Sim 4 AHR-AR-B01-22-225
Sim 2 AHR-AR-B01-22-225
Sim 1 AHR-AR-B01-22-225
7885 7885.0
3 2 1 Rev
Tender Issue Amendments Tender Issue Issued for Consultants Review Description
original by
7145 6945.0 7145.0 6945.0
1:40 Falls
DM
D.M B.B D.M B.B D.M B.B Dr by App by
date created
09/30/14
approved by
Approver
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
4966
600 square metal tile ceiling CLG01 20-10-20/ 190
4545 4545.0
Galvanised Steel Grating Floor Gutter area created to the appropriate volume according to relavent Building Regulations and BSs
03/12/2014 24/11/2014 17/10/2014 Date
client name
Portsmouth City Council
project
The Hard Interchange Portsmouth
9
Taxi Shelter Section 1 : 50
drawing
General Arrangement - Taxi Toilets General Arrangements - Plans, Sections, Elevations computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
7
Reflected Ceiling 1 : 50
8
Taxi Shelter Roof Plan 1 : 50
2013.01080.002 drawing number
AHR-AR-B02-20-100
scale
1 : 50 rev
3
@A1 issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
1 Rev
Tender Issue
25/11/2014 D.M B.B Date Dr by App by
Description
original by
JE
date created
11/25/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council
project
The Hard Interchange Portsmouth
drawing
Exploded Axonometric computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
scale
2013.01080.002 drawing number
AHR-AR-BXX-00-100
@A1 rev
1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
ain
No Entry
ad Ro
Qu ee n
M
Str ee t
Royal Naval Association
t tree ck S Clo
NO EN
TRY NO EN
e Th
TRY
rd Ha
3
4
5
6
7
8
9
10
Street College
BUSES & TAXIS
BUSES ONLY
1
2
BUSE TA XIS S &
2 1 Rev
Tender Issue Issued for Stage E Description
original by
DM uth smo P ort
tio n or Sta Harb
24/11/2014 D.M B.B 15/09/2014 J.E B.B Date Dr by App by date created
15/09/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
Or
dn an ce Ro ad
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council
project
The Hard Interchange Portsmouth
North
drawing
General Arrangement - Site Location Plan computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
1
Site Location Plan 1 : 1250
2013.01080.002 drawing number
AHR-AR-BXX-10-100
scale
1 : 1250 rev
2
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
Dropped Kerb for Cycle Service Vehicle Access
N or th
D CCTV 14
Bollards
1
Overall Site Plan 1 : 250
CCTV 15
CCTV 18
A
NO ENT RY
CCTV Schedule (Exterior)
D
CCTV 20
B
NO ENT RY
D CCTV 21
CCTV 17
CCTV 16
4200.0 4200.0 4002.0 4002.0 4002.0 4189.0 4189.0 4189.0 3842.0 3842.0 3842.0 3500.0 3500.0 3500.0 3850.0
Taxi Rank Public Pick Up Drop Off
Th e rd Ha
A
CCTV 19
Fire Hydrant
B
Taxi Shelter and Toilets See Drawing: AHR-AR-B02-22-405
Bollards
CCTV Mount Height
CCTV Canera Height
White Line Road Markings
Line of ETFE Canopy Above
3700.0 3700.0 3502.0 3502.0 3502.0 3689.0 3689.0 3689.0 3342.0 3342.0 3342.0 2865.0 2865.0 2865.0 3500.0
Mark
Type
CCTV 14 CCTV 15 CCTV 16 CCTV 17 CCTV 18 CCTV 19 CCTV 20 CCTV 21 CCTV 22 CCTV 23 CCTV 24 CCTV 25 CCTV 26 CCTV 27 CCTV 28
Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type E
Taxi Queue
5533
B
10
Double Yellow Line Road Markings
Millenium Lighting Columns Reused
B
Double Headed Lighting Columns
C
8m Lighting Columns
D
CCTV Pole
9
A
A
White Line Road Markings
7
8
5619
6
B
5
Bus Layby
4
B
2
BUSES ONLY
3
The Hard Interchange See Drawing: AHR-AR-B01-20-100
BUSES TAXIS &
5781
A
Trief Kerb Edge Protection
5480
1
CCTV 27
NR Station Structure PCC Structure Boundary
National Express Coach Bay
CCTV 28
D
Air Intake Vents under Banches AHR-AR-B01-90-122
CCTV 25
A
CCTV 23
For Site Finishes Refer To landscaping Drawings: AHR-AR-B01-90-100
Coach Drop Off / Layby
D
5607
Condensor Enclosure AHR-AR-BXX-21-658
UP
C
CCTV 26
Brompton Dock for 40 Bikes
BUSES & TAXIS
Fire Hydrant
CCTV 24
CCTV 22
2 1 Rev
B
Tender Issue Issued for Stage E Description
original by
White Line Road Markings
D.M
date created
09/05/14
approved by
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
C Cycle Parking for 40 Bikes
24/11/2014 D.M B.B 15/09/2014 J.E B.B Date Dr by App by
C
A
Project Scope Boundary Line Exit NR Station Stairs and Ramp Retained
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council Bin Store See Drawing: ARH-AR-BXX-90-660
UP
Proposed Future Station Entrance
project
The Hard Interchange Portsmouth
Temporary Hoarding at Edge of New Deck Slab
drawing
General Arrangement - Overall Site Plan Existing Station Entrance
P
or Harb outh ortsm
Stat
ion
computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
2013.01080.002 drawing number
AHR-AR-BXX-10-102
scale
As indicated rev
2
@A1
issue status
Tender
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.