The Hard Interchange ST Portsmouth

Page 1


1

2

3

4

5

6

7

8

9

10

1 AHR-AR-B01-90-121

69716 47700

5300

5300

5300

5300

5300

5300

5300

5300

5300

AHR-AR-B01-20-300 1

AHR-AR-B01-21-311 1 5540 A

ED.115

2 AHR-AR-B01-27-112 A

A

A

ED.114

A

A

ED.113

A

A

ED.112

A

A

ED.111

A

A

ED.110

A

A

ED.109

A

A

ED.108

A

A

ED.107

A B

B

5000

AHR-AR-BXX-32-623 5575 5575

5575

1 B B01.01 LOBBY

B

B01.03 LOBBY

12 m²

2215

B 5644

ED.102

Incoming Comms Through Old Gulley Location

Electrical Panel

MH

6763

2 m²

RWP

D.109

C

5745

D.104

2 m²

D.120 B01.04

B01.08 TRAVEL SHOP

B01.12 WC

SP

CONCOURSE

2 m²

693 m²

17 m²

7 m²

D.115 D.112

B01.10 CIRCULATION 7 m²

D.113 B01.13 WC 2 m²

B

B01.17 COMMS

D.111 B01.11 WC

MH D.107

D.103

Incoming Water

D.116

B01.15 CLEANER

B

5745 D.117

4 m²

D.114

B SP

B01.14 DIS. WC

To be read in conjunction with the following scoping drawings:

3 m²

B

SP

4174

C1

1020

6 m²

B

D.108

4 m²

D.102 B01.06 KITCHENETTE

D.101

5708

B01.07 WC

9 m²

B

MH

D.110

B B01.05 CONTROL

Zone for outgoing Site Service Ducts

4 m²

ETFE CONTROL ROOM

SP

Proposed Route for Condenser Pipework

B01.16 TICKET MACHINE ROOM

B01.10

B1

1 AHR-AR-B01-21-121

B

B01.19 RETAIL STORE

B01.18

RWP

D.105

B01.09 RETAIL

B

37 m²

D.106

D

B

D.119

35 m²

AHR-AR-B01-21-110 - Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings

SP

2 m²

RETAIL

5745

AHR-AR-B01-23-110 - Scoping Drawing - New Terminal Building Flooring

D.121

AHR-AR-B01-35-110 - Scoping Drawing - New Terminal Building Ceilings

D.118 B

B

Security Screens Rail

B

B

1

3764

12 m²

5644

AHR-AR-B01-40-110 - Scoping Drawing - New Terminal Building Finishes

3

AHR-AR-B01-70-110 - Scoping Drawing - New Terminal Building FF&E

AHR-AR-B01-21-312 5745

AHR-AR-B01-21-312

For Planks Setting Out Layout see Drawing: AHR-AR-B01-20-099

B B

7087

D1

B B

B

1 AHR-AR-B01-22-123 E

B

5800

5800 B

ED.104

5825 B

B

3580

1 AHR-AR-B01-22-124

B

B

LOBBY

4 3 2 1 Rev

B

3 AHR-AR-B01-21-122

5866

F

Tender Issue Tender Issue Issued for Consultants Review Issued for Stage E Description

original by

JE

24/11/2014 21/11/2014 17/10/2014 15/09/2014 Date

D.M B.B D.M B.B D.M B.B J.E B.B Dr by App by

date created

09/05/14

approved by

BB

5875 AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

3 AHR-AR-B01-20-300

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com

Floor Ventilation Grilles A Keynote

Count

Type

client name

Portsmouth City Council

A

18

Floor Grilles 1700 X 290 Floor Ventilation Grilles B

Keynote B

Count 30

Type Floor Grilles 1920 X 290

project

The Hard Interchange Portsmouth

drawing

General Arrangement - New Terminal Ground Floor Plan computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

1

Ground Floor Plan 1 : 100

project number

2013.01080.002 drawing number

AHR-AR-B01-20-100

scale

1 : 100 rev

4

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


10

9

8

5300

7

5300

6

5300

5

5300

4

5300

5300

20-10-10/110 Plasterboard Ceiling

20-50-30/135 Liquid Applied Inverted Roof Covering System

2 5300

1 5300

Mechanical Extract Ventilation

Stretched fabric Barrisol Ceiling Insulated Pressed Metal Coping

3 5300

20-10-20/130 Fabric Membrane Ceiling System

Suspended real time information Screen

Structure Zone

Latchway

Suspended real time information Screen

Structural Cross Bracing

11380.0 11380.0 Top Col 10300 10597.8 10300.0 9045.0 9045.0 8145.0 8145.0

25-80-15/175 Glazed Curtain Wall 5875.0 5875.0

5540.0 5540.0 Safeguarding Zone for Touch Screen Journey Planner

1

Help Point E2

Stainless Steel Structural Cross Bracing

Building Sections C-C

National Express Ticket Machines

1 : 75

Metsec framed pod with roof allowing for some access. Clad with plasterboard internally and vertical timber cladding externally

Safeguarding Zone for Touch Screen Journey Planner

Sim 1 AHR-AR-B01-22-402

Suspended real time information Screen

Sim 1 AHR-AR-B01-22-401

Smart card Ticket machine

Mirrored Window to Control Room

Metsec framed pod with roof allowing for some access. Clad with plasterboard internally and vertical timber cladding externally

To be read in conjunction with the following drawings: ¡AHR-AR-B01-21-110 - Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings ¡AHR-AR-B01-23-110 - Scoping Drawing - New Terminal Building Flooring ¡AHR-AR-B01-27-110 - Scoping Drawing - New Terminal Building Roof ¡AHR-AR-B01-27-111 - Detailed Drawings - ETFE Canopy ¡AHR-AR-B01-35-110 - Scoping Drawing - New Terminal Building Ceilings ¡AHR-AR-B01-40-110 - Scoping Drawing - New Terminal Building Finishes ¡AHR-AR-B01-70-110 - Scoping Drawing - New Terminal Building FF&E Insulated Pressed Metal Coping

20-50-30/135 Liquid Applied Inverted Roof Covering System

F

Suspended real time information Screen

E

20-10-20/130 Stretched Fabric Barrisol Ceiling

7087

Structure Zone

Steel Structure ETFE Canopy

1 21-210 D

3580

Mechanical Extract Ventilation

C 4174

B 6763

A 5000

Steel Structure Glass Canopy

Sim 2 AHR-AR-B01-21-122

11380.0 11380.0 Top Col 10597.8

10300 10300.0

25-80-15/175 Glazed Curtain Wall

8945.0

5 4 3 2 1 Rev

Tender Issue Amendments Tender Issue Issued for Consultants Review Updated Issue Issued for Stage E Description

original by

8945.0 4760

8145.0 8145.0

5875.0

3764

2

1 : 75

5364

Plasterboard Ceiling

09/05/14

approved by

BB

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com

5540.0

D1

date created

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

5540.0

5708.0

Building Section A-A

DM

D.M B.B D.M B.B D.M B.B J.E B.B J.E B.B Dr by App by

Bus Barrier

WC Level 5708

5875.0

Bus bay real time information Screen mounted to transom

03/12/2014 21/11/2014 17/10/2014 16/09/2014 15/09/2014 Date

1020

C1 Metsec framed pod with roof allowing for some access. Clad with plasterboard internally and vertical timber cladding externally

2215

client name

Portsmouth City Council

B1 Suspended real time information Screen

35-05-35/135 Back to Back Fixed Seating with Tables

project

The Hard Interchange Portsmouth

drawing

General Arrangement - New Terminal Building Building Sections A-A and Section C-C computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

2013.01080.002 drawing number

AHR-AR-B01-20-200

scale

1 : 75 rev

5

@A1 issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


Stainless Steel Panels Fascia

10

9

8

5300

7

5300

6

5300

5

5300

4

5300

3

5300

2

5300

5300

1

Steel Structure ETFE Canopy

5300

11380.0 11380.0 Top Col 10300 10597.8 10300.0 9045.0 8945.0 9045.0 8945.0 8145.0 8145.0 25-80-15/175 Glazed Curtain Wall 5875.0 5540.0 5875.0 5540.0

1

Bus Barrier

5745.0 5745.0

Elevation 1 - a 1 : 100 Steel Structure Glass Canopy

Mechanical Extract Ventilation

Steel Structure ETFE Canopy Insulated Pressed Metal Coping

1

2

3

5300

4

5300

5

5300

6

5300

7

5300

8

5300

11380.0 11380.0 Top Col 10300 10597.8 10300.0

9

5300

5300

10 Stainless Steel Panels

5300

9075

9045.0 8945.0 9045.0 8945.0 8145.0 8145.0

Stainless Steel Structural Cross Bracing 25-80-15/175 Glazed Curtain Wall

5540.0 5540.0

3

5745.0 5745.0

5875.0 5875.0

Elevation 1 - a1 1 : 100

20-50-75/110 Steel Structure Glass Canopy

F

E 3580

To be read in conjunction with the following drawings:

Stainless Steel Structural Cross Bracing

Caping

D 7087

Mechanical Extract Ventilation

C

B

4174

6763

Steel Structure ETFE Canopy

Stainless Steel Panels

A

¡AHR-AR-B01-21-110 - Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings ¡AHR-AR-B01-27-110 - Scoping Drawing - New Terminal Building Roof

5000

¡AHR-AR-B01-27-111 - Detailed Drawings - ETFE Canopy ¡AHR-AR-B01-40-110 - Scoping Drawing - New Terminal Building Finishes

11380.0 11380.0

Top Col 10597.8

10300 10300.0 8945.0 8945.0 8145.0 8145.0

25-80-15/175 Glazed Curtain Wall Bus Barrier

5875.0

5745.0 5745.0

5540.0 5540.0

6918

D1 Steel Structure ETFE Canopy

Stainless Steel Panels

A

Mechanical Extract Ventilation

B

C

5000

Stainless Steel Structural Cross Bracing

4174

Tender Issue Issued for Consultants Review Issued for Stage E Description

original by

B1 20-50-75/110 Steel Structure Glass Canopy

E 7087

5568

C1

Insulated Pressed Metal Coping

D

6763

3 2 1 Rev

5875.0

JE

4

Elevation 1 - d1

21/11/2014 D.M B.B 17/10/2014 D.M B.B 15/09/2014 J.E B.B Date Dr by App by date created

09/05/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

1 : 100

F 3580 T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com

11380.0 11380.0 Top Col 10300 10597.8 10300.0

client name

Portsmouth City Council

project

9045.0 9045.0 8145.0 8145.0

8945.0 8945.0

The Hard Interchange Portsmouth

25-80-15/175 Glazed Curtain Wall Bus Barrier 5745.05875.0 5745.05875.0

5540.0 5540.0

drawing

General Arrangement - New Terminal Building Elevations computer file

project number

B1

C1

D1

2013.01080.002 drawing number

2

Elevation 1 - d 1 : 100

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

AHR-AR-B01-20-300

scale

1 : 100 rev

3

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


1

2

5300

3

5300

4

5300

5

5300

6

5300

7

5300

8

5300

9

5300

10

5300

5000

A

B

6763

B1

C

4174

C1

D1

7087

D

3580

E

3 2 1 Rev

F

Tender Issue Issued for Consultants Review Issued for Stage E Description

original by

DM

21/11/2014 D.M B.B 17/10/2014 D.M B.B 15/09/2014 J.E B.B Date Dr by App by date created

14/09/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

2

Wall Types 1 : 100

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

Type P01 Metsec Framing with plasterboard lining with acoustical insulation- 25-15-35/145

Type WL01 Timber wall lining- 25-85-45/190

Type P02 Metsec Framing with Insulation, vapour barrier and plasterboard lining to achieve 0.35 W/m2.K- 25-15-35/145

Type WL02 / WL03 Laminate Panel Clip Clad or IPS system to public toilets- 25-85-45/120

Type P03 1HR Fire Rated partition – metal stud with plasterboard lining- 25-15-25/135

Stainless Steel Fascia Panel at high level- 25-80-50/175

Type P04 Metal stud with moisture resistant plasterboard lining to toilets and acoustical insulation- 25-15-25/135

Portsmouth City Council

project

The Hard Interchange Portsmouth

drawing

CW01 Curtain Walling- 25-80-15/175 CW02 Curtain Walling- 25-05-75/120

Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

2013.01080.002 drawing number

AHR-AR-B01-21-110

scale

As indicated rev

3

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


Hangers Support for Cantilievered section of POD 11380.0 11380.0

11380.0 11380.0

1 AHR-AR-B01-35-622

Top Col 10597.8 10300 10300.0

Top Col

20-10-20/130 Fabric Membrane Ceiling System

10597.8 10300 10300.0

Ceiling Trough

Ceiling Trough

20-10-20/130 Fabric Membrane Ceiling System

Plywood Sheet Roof with Vinyl Flooring Finish to Roof

LED Lighting Strip

9045.0

8945.0 8795.0 8945.0 8795.0

9045.0

Vertical Timber Cladding

8145.0 8145.0

9045.0 8945.0 9045.0 8945.0

SHS Perimeter Beam

8145.0

Vertical Timber Cladding

LED Lighting Strip

8145.0

3 AHR-AR-B01-22-223

4 AHR-AR-B01-22-223

3300

Sliding Foldable Screen Track System Plasterboard Ceiling

2400

6945.0 6945.0

Sliding Folding Screen

Steel Purlins POD Roof Structure

6945.0 6945.0

SHS Windpost POS Structure Support

WC Level 5708 5708.0

Stainless Steel Skirting

Metsec Framed Partition

Stainless Steel Schluter Profile Stainless Steel Skirting

5745.0 5745.0

SHS Baseplate

1

Pod Transverse Section 1

2

1 : 50

1

2

Pod Transverse Section 2 1 : 50

3

11380.0 11380.0 20-10-20/130 Stretched Fabric Barrisol Ceiling

Top Col 10597.8 10300

Key Retail Pod

5

10300.0

1 : 125

Plywood Sheet Roof with Vinyl Flooring Finish to Roof LED Lighting Strip Stainless Steel Flashing

9045.0 8795.0 9045.0 8795.0

Area of Insulated POD Roof

Fire Rated Ceiling Timber Lining

8145.0 8145.0

Plasterboard Ceiling

Line of Sliding Folding Partition

Fire Rated Partitions 6945.0 6945.0

B01.04 CONCOURSE

B01.18 RETAIL

693 m²

B01.19 RETAIL STORE

35 m²

2 m²

B01.14 DIS. WC 3 m²

B01.15 CLEANER

B01.17 COMMS

4 m²

7 m²

Stainless Steel Skirting 5745.0 5745.0

3

4

WC Level 5708 5708.0

Longitudinal Section 3

6

1 : 50 Insulate Roof Void Between Joist Above Rooms: B01.05 - B01.06 - B01.07 - B01.08 - B01.10

Key Travel Pod 1 : 125

Plasreboard Lining to Underside of Purlins

11380.0 11380.0

2 1 Rev

Tender Issue Issued for Consultants Review Description

20-10-20/130 Stretched Fabric Barrisol Ceiling

original by

Top Col 10597.8 10300

Ceiling Through

Author

10300.0

Barrisol Retention Angle / Unistrut and fixing Angle Plywood Roof

21/11/2014 D.M B.B 4/11/2014 D.M B.B Date Dr by App by date created

11/03/14

approved by

Approver

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

LED Lighting Strip Stainless Steel Flashing

8945.0 8795.0 8945.0 8795.0

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com

Timber Lining

8145.0 8145.0

client name

Security Screen Track Rail Plasterboard Ceiling Fire Rated Partitions B01.05 CONTROL

6945.0 6945.0

9 m²

B01.06 KITCHENETTE 6 m²

B01.08 TRAVEL SHOP 17 m²

B01.09 RETAIL 37 m²

B01.04 CONCOURSE 693 m²

Travel Pod Fit-Out by Others Line of Sliding Folding Partition

Portsmouth City Council

project

The Hard Interchange Portsmouth

drawing

Section Details -Typical Pod Sections

5745.0 5745.0

computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

4

Longitudinal Section 4 1 : 50

2013.01080.002 drawing number

AHR-AR-B01-22-221

scale

As indicated rev

2

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


3 AHR-AR-B01-22-224 20-10-20/130 Fabric Membrane Ceiling System Stainless Steel Capping 120mm SHS POD Perimeter Structure

20-10-20/130 Fabric Membrane Ceiling System

LED Lighting Strip

Stainless Steel Capping

Barrisol Retention Angle and Steel Angle Support 9045.0 9045.0 8945.0

120mm SHS POD Perimeter Structure

9045.0

LED Lighting Strip

9045.0 8945.0 8945.0

Plywood Sheet Roof with Vinyl Flooring Finish

8945.0 Plywood Sheet Roof with Vinyl Flooring Finish

8825

150mm Steel Purlins 340

8795.0 8795.0 40 x 16mm Horizontal Flex-ply Fixing Strips

1 AHR-AR-B01-22-224

Top of Doors Curtain Wall 8340.0

8795.0

2 AHR-AR-B01-22-224

Vertical Timber Cladding Bracing / Stiffeners as required

Vertical Timber Cladding

Softwood Batten

60 x 16mm Horizontal Flexi-ply Battens at 600 CTS

Vertical Softwood Batten Packing 340

60 x 16mm Horizontal Flexi-ply Battens

150mm Steel Purlins 8795.0

SHS Post POD Support

Metal Stub Top of Doors Curtain Wall 8340.0 40 x 16mm Horizontal Flex-ply Fixing Strips

RHS - Cladding / Screen Track Support Profiled Plate - Support for Screen Track Screen Track

RHS - Cladding / Screen Track Support Profiled Plate - Support for Screen Track

8145.0

8145.0 8145.0

8145.0

Suspended Metal Tile Ceiling

Plasterboard Ceiling Screen Track (Within Storage Pocket)

Dry Lining Edge Bead Stainless Steel Angle

7885 7885.0

Sliding Folding Security Screen (Stored Position) Internal POD Partition and Stud

Sliding Folding Security Screen

Metsec Partition Horizontal Flexi-ply Battens at 600 CTS

SHS Post POD Support Stainless Steel Skirting

3

Cantilever Section 1

5875.0 5875.0

1 : 10 5745.0 5745.0

Tiles Floor Finishes WC Level 5708 5708.0 5540.0 5540.0

Post Baseplate

4

Typical Section 2 1 : 10

3 2 1 Rev

Tender Issue Amendments Tender Issue Issued for Consultants Review Description

original by

Author

03/12/2014 21/11/2014 4/11/2014 Date

D.M B.B D.M B.B D.M B.B Dr by App by

date created

10/29/14

approved by

Approver

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

Portsmouth City Council

project

The Hard Interchange Portsmouth

drawing

Section Details - Pods - Sheet 1 computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

2013.01080.002 drawing number

AHR-AR-B01-22-223

scale

1 : 10 rev

3

@A1 issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


20-10-20/130 Fabric Membrane Ceiling System Vinyl Flooring to Top of Roof

Vinyl Flooring to Top of Roof 20-10-20/130 Fabric Membrane Ceiling System Plywood Sheet Roof

Plywood Sheet Roof

LED Lighting Strip

50

100

LED Lighting Strip

75

Staimless Steel Capping

Stiffener 1 0 0

Continuous Curved PPC 150 x 100mm Angle to Follow Profile of Ceiling Setting -out to Fully Support Barrisol Retention Angle

Horizontal Flex-ply Fixing Strips

8945.0 8945.0

Horizontal Flexi-ply Battens

120mm SHS POD Perimeter Structure

150mm Steel Purlins

Barrisol Retention Angle

Stainless Steel Capping 5 0

9045.0 9045.0

Metsec Cleader Angle 100 x 100mm (Follows Barrisol Spring Footprint) Between Roof Purlins

120mm SHS POD Perimeter Structure 8795.0 8795.0

120mm SHS Posts Pod Structure 150mm Steel Purlins

Bracing / Stiffeners as required Vertical Timber Cladding

Metsec Framing with Plasterboard Lining Partition

Horizontal Flex-ply Fixing Strips

3

Vertical Timber Cladding Horizontal Flexi-ply Battens Vertical Softwood Batten Packing

Vertical Softwood Batten Packing

100mm SHS

100mm SHS (Cantilever and Screen Pockets Section of Pod Only)

Barrisol Support Detail 1:5

Internal Pod Partition

Profiled Plate - Support for Screen Track

Profiled Plate - Support for Screen Track RHS - Cladding / Screen Track Support

RHS - Cladding / Screen Track Support (Cantilever and Screen Pockets Section of Pod Only

Galvanised Metal Support Pressing 8145.0 8145.0 5mm Stainlsess Steel Angle Dry Lining Edge Screen Track Screen Track Plasterboard Ceiling 7885 7885.0

1

Cantilever Section Details

Sliding Folding Security Screen (Stored in Pocket)

1:5

4 3 2 1 Rev

Tender Issue Amendments Tender Issue Tender Issue Issued for Consultants Review Description

original by

Author Stailess Steel Skirting Galvanised Metal Support Pressings Sealant Tiles Floor Finishes

WC Level 5708 5708.0

03/12/2014 26/11/2014 21/11/2014 4/11/2014 Date

D.M B.B D.M B.B D.M B.B D.M B.B Dr by App by

date created

11/03/14

approved by

Approver

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

Va r i es

Sliding Folding Security Screen

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

Portsmouth City Council

SHS Posts Baseplate project

The Hard Interchange Portsmouth

drawing

2

Typical Section Details

Section Details - Pods - Sheet 2

1:5 computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

2013.01080.002 drawing number

AHR-AR-B01-22-224

scale

1:5 rev

4

@A1 issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


CO2 Temp Sensor

900

900

9045.0 9045.0

8145.0 8145.0

5745.0

5745

E9

Concealed Power Socket Refer to Electrical Spec.

1

2400

800 200

450

SS Caping / Skirting

5745.0

Sim 14 AHR-AR-BXX-32-624

2073

2400

1000

Stretched fabric Barrisol Ceiling

Sim 3 AHR-AR-B01-70-632

D.105

D.109 Sim 4 AHR-AR-B01-70-632

Safeguarding Zone for Touch Screen Journey Planner

Pods Screen Doors

Mirrored Window to Control Room

Travel Shop Pod Exterior Elevation 1

2

1 : 50

Travel Pod Fit-Out by Others Door Access Card Reader

Pods Screen Doors

Travel Shop Pod Exterior Elevation 2 1 : 50

CO2 Temp Sensor

9045.0 9045.0

1400

3300

8145.0 8145.0

5745.0 5745.0

D.101

Door Access Card Reader

E9

Concealed Power Socket Refer to Electrical Spec.

Fire Alarm

Mirrored Window to Control Room

Metsec framed pod with roof allowing for some access. Clad with plasterboard internally and vertical timber cladding externally

3

Travel Shop Pod Exterior Elevation 3

4

1 : 50

Travel Shop Pod Exterior Elevation 4 1 : 50

3 2 1 Rev

Equipment

AHR-AR-B01-22-401 4

E1 E2 E3a E3b E3c E4 E5 E6 E7 E8 E9 E10 E11 E12 E13

AHR-AR-B01-22-401 1

National Express Ticket Machines Help Point Real Time Information Screens (46� screen) Group of 4 Real Time Information Screens (55� screen) Group of 2 Real Time Information Screens (55� screen) Server Cabinet 600W x 1100D x 2300H * Mobile Phone Charging Stand Under Counter Fridge (by others) Microwave (by others) ETFE Air Handling Unit with UPS Smart Card Machine Induction Loop in Bus Bay (final setting out TBC) * Fire Alarm Panel * Safeguarding Zone for Touch Screen Journey Planner Safeguarding Zone for News Screen

Tender Issue Amendments Tender Issue Issued for Consultants Review Description

original by

JE

03/12/2014 21/11/2014 4/11/2014 Date

D.M B.B D.M B.B D.M B.B Dr by App by

date created

09/23/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

Portsmouth City Council

* Refer to Elecrical Specification 3

(RTI screens are free issue by PCC, mounting brackets power and data and installation by main contractor)

AHR-AR-B01-22-401

project

The Hard Interchange Portsmouth

drawing

2 AHR-AR-B01-22-401

Detailed Drawings - Internal Elevations - Travel Shop Pod Exterior computer file

project number

2013.01080.002

5

Key Travel Shop Pod 1 : 100

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

drawing number

AHR-AR-B01-22-401

scale

As indicated rev

3

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


900

9045.0 9045.0

900

CO2 Temp Sensor

2400

925

Stretched fabric Barrisol Ceiling

2400

3300

8145.0 8145.0

200

5745.0

450

685

SS Caping / Skirting

5745.0 E1 Safeguarding Zone for Touch Screen Journey Planner

D.119

D.110

E1

Sim 1 AHR-AR-B01-70-632

Help Point E2

SS Pushplate Disabled WC Alarm

Pods Screen Doors

Concealed Power Socket Refer to Electrical Spec.

Sim 2 AHR-AR-B01-70-632

Retail Pod Exterior Elevation 1

1

2

1 : 50

Metsec Framing partition with plasterboard lining with acoustical insulation

Pods Screen Doors

Retail Pod Exterior Elevation 2 1 : 50

CO2 Temp Sensor

900

9045.0 9045.0

2073

2400

8145.0 8145.0

5745.0 5745.0

D.117

Concealed Power Socket Refer to Electrical Spec.

E1

Door Access Card Reader

E1

Metsec framed pod with roof allowing for some access. Clad with plasterboard internally and vertical timber cladding externally

3

Retail Pod Exterior Elevation 3

4

1 : 50

AHR-AR-B01-22-402 4 AHR-AR-B01-22-402 1

Equipment E1 E2 E3a E3b E3c E4 E5 E6 E7 E8 E9 E10 E11 E12 E13

National Express Ticket Machines Help Point Real Time Information Screens (46� screen) Group of 4 Real Time Information Screens (55� screen) Group of 2 Real Time Information Screens (55� screen) Server Cabinet 600W x 1100D x 2300H * Mobile Phone Charging Stand Under Counter Fridge (by others) Microwave (by others) ETFE Air Handling Unit with UPS Smart Card Machine Induction Loop in Bus Bay (final setting out TBC) * Fire Alarm Panel * Safeguarding Zone for Touch Screen Journey Planner Safeguarding Zone for News Screen

* Refer to Elecrical Specification (RTI screens are free issue by PCC, mounting brackets power and data and installation by main contractor) 3 AHR-AR-B01-22-402

2 AHR-AR-B01-22-402

Retail Pod Exterior Elevation 4 1 : 50

3 2 1 Rev

Tender Issue Amendments Tender Issue Issued for Consultants Review Description

original by

DM

03/12/2014 21/11/2014 4/11/2014 Date

D.M B.B D.M B.B D.M B.B Dr by App by

date created

09/23/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

Portsmouth City Council

project

The Hard Interchange Portsmouth

drawing

Detailed Drawings - Internal Elevations - Retail Pod Exterior computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

5

Key Retail Pod 1 : 100

project number

2013.01080.002 drawing number

AHR-AR-B01-22-402

scale

As indicated rev

3

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


S12

A

A

A

B Alarm Cord

Sanitary

500

F9

1

571

5

EQ 551

EQ 0

1080

0

EQ 473

81

Disabled Toilet Elev 1

550

600

500

352

5

5

400

Access Panel

3

1 : 20

B

A

5

WC Disabled WC- Doc M Pack Stainless Steel Disabled WC- Doc M Pack Wash Basin Wash Basin Tap Soap Dispenser Hand Dryer Standard Mirror Disabled Mirror Full Height Mirror Grab Rail (set) Toilet Paper Holder Baby Change Bin – Sanitary Waste (by others) Air freshener (by others) Sluice Sink and Tap

A

Laminate Panel Cladding 25-05-45/10

B

Laminate Panel IPS System 25-05-45/120

800

800 400

400

1563

5

750

745

Disabled Toilet Elev 3

4

1 : 20

5

745

Disabled Toilet Elev 4 1 : 20

A

A

B

S12

S2a

5708

Disabled Toilet Elev 2

2

1 : 20

S7

S8

S4

600

800

740 0

S9

730

S5

900

2 4 0 0

S7

S11

EQ

Alarm Reset

S6b

S9

S1a S2a S2b S3a S4c S4 S5 S6a S6b S6c S7 S8 S9 S10 S12 S13a

Access Panel

F9

S6a

Dual Flush

2 4 0 0

S5

S5 1750

S4

Access Panel

S8

1000

S3a

550

S1a

100

S2a

S4c

EQ

EQ 873

5

EQ 5

872

Public Toilet Elev 1 1 : 20

550

1066

6

Public Toilet Elev 2

7

1 : 20

5

EQ 640

5

550

Public Toilet Elev 3 1 : 20

70

8

996

835

Public Toilet Elev 4

9

1 : 20

980

5

360

5

980

5

360

5

5

980

Circ Elev 1 1 : 20

2 1 Rev

A

Disabled WC Alarm

A

A

Tender Issue Issued for Consultants Review Description

original by

DM

21/11/2014 D.M B.B 12/11/2014 D.M B.B Date Dr by App by date created

09/23/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

2 4 0 0

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

Portsmouth City Council

project

The Hard Interchange Portsmouth

drawing

100

Detail Drawings - Internal Elevations - Retail Pod Internal Elevations and Sections computer file

project number

5

457

5

980

5 242 5

980

5

332

126 5

1080

5

434

2013.01080.002 drawing number

AHR-AR-B01-22-403

10

Circ Elev 2 1 : 20

11

Circ Elev 3 1 : 20

12

Circ Elev 4 1 : 20

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

scale

As indicated rev

2

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


Sanitary Disabled WC Alarm

S1a S2a S2b S3a S4c S4 S5 S6a S6b S6c S7 S8 S9 S10 S12 S13a

S12

Wall Tiling 25-85-97/140

Wall Tiling 25-85-97/140

Alarm pull cord with two red bangles Alarm Reset

F9

S6b

900

2400

S7

S7

S4

S5

WC Disabled WC- Doc M Pack Stainless Steel Disabled WC- Doc M Pack Wash Basin Wash Basin Tap Soap Dispenser Hand Dryer Standard Mirror Disabled Mirror Full Height Mirror Grab Rail (set) Toilet Paper Holder Baby Change Bin – Sanitary Waste (by others) Air freshener (by others) Sluice Sink and Tap

S8 1400

S11

1 : 20

440

600

600

2

F1a F1b F1c F2 F3 F3a F3b F3c F3d F4 F5 F6 F7 F8 F9 F10 F11 F12

740 S10

S2a

100

Disabled Toilet Elevation 1

1

Fittings

950

800

900

730

800

600

600

S2a

Disabled Toilet Elevation 2 1 : 20

3

S10

Disabled Toilet Elevation 3 1 : 20

4

Disabled Toilet Elevation 4 1 : 20

Back to Back Fixed Seating Fixed Seating Fixed Seating to Taxi Shelter Litter Bins Kitchenette Kitchenette Base Units Kitchenette Counter Kitchenette Upper Units Kitchenette Sink and Tap Shelving (by others) Office Chair (by others) Built in Work Counter Built in Desk (by others) Built in Retail Display Units (by others) Coat Hook Ashtray Post Cycle Rack Brompton Cycle Dock

600

Filler Panel

Upper Cabinets

F3c

720

F3c

2400

Wall Tiling 25-85-97/140 600

F3b

F3b

F3d

F3a Fridge (By Others)

850

Fridge (By Others)

Filler Panel

F3a E6

E6

Kitchen Elev 1

6

600

1 : 20

Lighting Troffer

600

7

Kitchen Elev 2 1 : 20

8

Kitchen Elev 3 1 : 20

9

Kitchen Elev 4 1 : 20

Single Pane Control Window 2 1 Rev

Tender Issue Issued for Consultants Review Description

original by

DM

21/11/2014 D.M B.B 12/11/2014 D.M B.B Date Dr by App by date created

09/23/14

approved by

Approver

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com

2400

client name

Portsmouth City Council Counter (F6)

project

The Hard Interchange Portsmouth

drawing

720

Support Gables (F6)

Detail Drawings - Internal Elevations - Travel Shop Pod Internal Elevations and Sections computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

5

Control Room 1 : 20

2013.01080.002 drawing number

AHR-AR-B01-22-404

scale

As indicated rev

2

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


252 15 15 Deflection Head

Insulate Roof Void Between Joist Above Rooms: B01.05 - B01.06 - B01.07 - B01.08 - B01.10 Horizontal Flex-ply Fixing Strips

Head Track fixed to underside of Structure

Horizontal Flex-ply Fixing Strips

Horizontal Flexi-ply Battens

70mm Metal Stud

Horizontal Flexi-ply Battens 120mm SHS POD Perimeter Structure 120mm SHS Posts Pod Structure

Acoustic Fleece

Deflection Head

Deflection Head

Fire Rating

Head Track

Head Track

Wall Board

100 SFS Framing

100 SFS Framing

50mm Insulation

Metsec Framing with Plasterboard Lining Partition

Vertical Timber Cladding

Vapour Barrier

120mm SHS POD Perimeter Structure 100

25

100

25

100

Acoustic Insulation

120mm SHS Posts Pod Structure

Acoustic Fleece

Acoustic Insulation

25

100

25 Suspended Ceiling 122

Vertical Timber Cladding

Metsec Framing with Plasterboard Lining Partition

Softwood Batten Vertical Packing

Softwood Batten Vertical Packing Horizontal Flex-ply Fixing Strips

Horizontal Flex-ply Fixing Strips

Horizontal Flexi-ply Battens

Horizontal Flexi-ply Battens

2 Layers 12.5mm Wallboard with Staggered Joints to meet overall Fire Rating of 60 Minutes 70mm Metal Stud

Stailess Steel Skirting / Ply Backing

Stailess Steel Skirting / Ply Backing

100 x 38mm PT Timber sole plate

100 x 38mm PT Timber sole plate

72mm U Channel with Intumescent Mastic

Sealant

Sealant Vinyl Skirting Tiles Floor Finishes

Type P01 + WL01

1

1:5

Metsec Framing with plasterboard lining with acoustical insulation- 25-15-35/145

WL02

Vinyl Skirting Vinyl Skirting

Tiles Floor Finishes

Type P02 + WL01

2

1:5

Metsec Framing with Insulation, vapour barrier and plasterboard lining to achieve 0.35 W/m2.K- 25-15-35/145

WL02

P03

Deflection Head

Deflection Head

Head Track fixed to underside of Structure

Head Track fixed to underside of Structure

P04

Vinyl Floor Finishes

3

Type P03 1:5

To be read in conjunctiion with the following Documents: 1HR Fire Rated partition – metal stud with plasterboard lining- 25-15-25/135

Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings

AHR-AR-B01-21-110

Scoping Drawing - New Terminal Building Flooring

AHR-AR-B01-23-110

Scoping Drawing - New Terminal Building Ceilings

AHR-AR-B01-35-110

WL02

Deflection Head

Head Track fixed to underside of Structure 25mm Acoustic Insulation

70mm Metal Stud 70mm Metal Stud 70mm Metal Stud 50mm Insulation

25mm Acoustic Insulation

Fire Rating

Clipclad Rail Horizontal Fixing Channel

Clipclad Rail Horizontal Fixing Channel

Suspended Ceiling

Suspended Ceiling

3 2 1 Rev

Suspended Ceiling

Tender Issue Amendments Tender Issue Issued for Consultants Review Description

original by

Author

Compact Grade Laminate With Clipclad Inserts Fixed To Clipclad Rails

Compact Grade Laminate With Clipclad Inserts Fixed To Clipclad Rails 50

122

2 Layers 12.5mm Wallboard With Staggered Joints to Meet Overall Fire Rating Of 60 Minutes

112

Fire Rated Room

Toilet

122

50

72 mm Base U Channel

72 mm Base U Channel

70 x 38mm PT Timber sole plate

70 x 38mm PT Timber sole plate

Clipclad Rail Horizontal Fixing Channel

Clipclad Rail Horizontal Fixing Channel

Sealant

Sealant

Tiles Floor Finishes / Skirting

Tiles Floor Finishes / Skirting

date created

11/05/14

approved by

Approver

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com

Moisture Resistant Plasterboard

Services Zone Cubicle

D.M B.B D.M B.B D.M B.B Dr by App by

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

Moisture Resistant Plasterboard

Vinyl Skirting

03/12/2014 21/11/2014 7/11/2014 Date

Cubicle

70mm Metal Stud

Tiles Wall Finish

client name

Portsmouth City Council

project

Stailess Steel Skirting / Ply Backing

The Hard Interchange Portsmouth 72mm U Channel

Vinyl Skirting

Tiles Floor Finishes

drawing

Detailed Drawings - Wall Type Details computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

4

Type P03 + WL02 1:5

Metal stud with moisture resistant plasterboard lining to toilets and acoustical insulation- 25-15-25/135

5

Type P04 + WL02 1:5

6

Type P04 + Tile Finish 1:5

2013.01080.002 drawing number

AHR-AR-B01-22-521

scale

As indicated rev

3

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


1

2

5300

3

4

5300

5300

5

6

5300

5300

7

8

5300

9

5300

5300

10

5300

5000

A

B01.03 LOBBY

B01.01 LOBBY

B

12 m²

12 m²

Manhole with Tile Finish

B1 6763

ETFEB01.10 CONTROL ROOM

Manhole with Vinyl Finish TICKET MACHINE B01.16 ROOM

2 m²

B01.05 CONTROL

4 m²

B01.07 WC

9 m²

B01.11 WC

4 m²

2 m²

B01.06 KITCHENETTE

7 m²

B01.17 COMMS

Tiles (A)- 20-55-35/140/FL04

7 m²

B01.15 CLEANER

Tiles (B)- 20-55-35/140/FL03

4 m²

2 m²

B01.08 TRAVEL SHOP

B01.13 WC

17 m²

C1

B01.10 CIRCULATION

B01.12 WC

6 m²

C

Manhole with Vinyl Finish

2 m²

Vinyl Flooring- 20-55-75/165/FL01

B01.14 DIS. WC

4174

3 m²

Lobby Matting- 35-05-35/135/FL05 B01.18 RETAIL 35 m²

Ventilation Grille- 25-80-15/175 For Floor Grilles Schedule see Drawing AHR-AR-B01-20-100

B01.09 RETAIL

D

37 m²

200mm High Stainless Steel Skirting 5mm Control Joint (Sealant)

D1

7087

B01.04 CONCOURSE

Schluter Profile

693 m²

Profile between tile and vinyl Insulation Under Screed Area

Note: Induction Loop to be installed in Structural Topping Refer to Electrical Specification for Details

3580

E

F

B01.02 LOBBY 20 m²

4 3 2 1 Rev

Tender Issue Issued for Consultants Review Issued for Consultants Review Issued for Stage E Description

original by

JE

21/11/2014 20/10/2014 17/10/2014 15/09/2014 Date

D.M B.B D.M B.B D.M B.B J.E B.B Dr by App by

date created

09/05/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

Portsmouth City Council

project

The Hard Interchange Portsmouth

drawing

Scoping Drawing - New Terminal Building Flooring computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

1

Ground Floor Plan Flooring 1 : 100

project number

2013.01080.002 drawing number

AHR-AR-B01-23-110

scale

As indicated rev

4

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


2

Tiles - Column Detail Plan 1:5

Water Cut Section of Tile around Steel Columns Sealant control Joint 5mm Induction Loop array zone refer to Electrical Specification for Details. Final installation Layout to Specialist Details

Tiles SOP for location of Control Joints to line up with Concourse Column Layout Steel Column Kicker

Steel Column Kicker

Stainless Steel Schluter Profile 10mm

Sealant control Joint on backing Rod

Concourse Tile Finish 10mm

Adhesive 5mm

Adhesive 5mm

Concrete Screed Nom. 100mm

Concrete Screed Nom. 100mm

Concourse Tile Finish 10mm

Sealant control Joint 5mm on backing Rod

Concourse Tile Finish 10mm

Induction Loop

Induction Loop

Adhesive 5mm

Induction Loop

1

Tiles - Column Detail

3

1:2

Control Joint Detail

Capping Seal

Toilet Tiles Skirting

Concourse Tile Finish 1:2

Centre Floor Joint on Door Leaf

CL

Cove Skirting Schluter Reno - V

Cove Former

Concrete Screed

Concrete Screed Nom. 100mm

4

1:2

Schluter Jolly Edge Protection Profile

100

Tiles Joint Grout to match Tiles Colour

Toilet Tiles Floor Finishes

75mm Unbonded Screed

Adhesive

Resilent Sheet Flooring Adhesive Bed in Covering Compound

3 2 1 Rev

Tender Issue Amendments Tender Issue Issued for Consultants Review Description

original by

Author

Joint Grout to Match Tiles Colour

03/12/2014 21/11/2014 7/11/2014 Date

D.M B.B D.M B.B D.M B.B Dr by App by

date created

11/05/14

approved by

Approver

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

25mm Insulation

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

Portsmouth City Council

project

The Hard Interchange Portsmouth 10mm Foam Edge Strips

drawing

Detailed Drawings - Floor Details

5

Toilet Tile Finish 1:2

6

Vinyl Flooring + Tiles Treshold 1:2

computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

2013.01080.002 drawing number

AHR-AR-B01-23-611

scale

As indicated rev

3

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


Steel Structure ETFE Canopy

1

2

3

4

5

6

7

8

9

10

2 Typical ETFE Support AHR-AR-B01-27-114 Roof Condition

Steel Structure ETFE Canopy

Coping to be profiled to Radius

Coping to be profiled to Radius

5300

5300

5300

5300

5300

5300

5300

5300

5300

A

12 25

25 12

Outline of Coping Below

1194

5000

11 94

Roof Drain

Method: The method of access by means of powered access (e.g. Cherry picker), where the access platform is set down adjacent to the system, allowing the user direct attachment prior to exiting the platform.

B

No. Of users: 3 users (maximum) at any one time Lanyard type: 1.75m twin energy absorbing lanyard

6763

B1 3 AHR-AR-B01-27-114 Typical Mansafe Support Post Detail 100mm high angle clamped into ETFE roofing system to divert rainwater back to main roof.

Ballast

Ballast

1 AHR-AR-B01-27-119 Extract Vent Kerb Detail

Mechanical Extract Ventilation

C

4174

C1 1 AHR-AR-B01-27-114 Typical Roof Outlet Detail

Latchway

To be read in conjunction with the following drawings: ¡AHR-AR-B01-27-110 - Scoping Drawing - New Terminal Building Roof ¡AHR-AR-B01-27-111 - Detailed Drawings - ETFE Canopy

D

Aluminium powder coated coping

D1

7087

Proposed MEWP set down location

Ballast 41 57

4 3 2 1 Rev

E

Tender Issue Amendments Tender Issue Issued for Consultants Review Issued for Stage E Description

original by

3580

Author

Proposed MEWP parking position

F 5520

D.M B.B D.M B.B D.M B.B J.E B.B Dr by App by

date created

09/05/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

Roof drain for low level roof

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com

Sim 1 AHR-AR-B01-27-117

03/12/2014 21/11/2014 17/10/2014 15/09/2014 Date

client name

Portsmouth City Council

project

Coping to be profiled to Radius

Steel Structure Glass Canopy with spider fixings and silicone sealed joints.

The Hard Interchange Portsmouth

drawing

General Arrangement - New Terminal Building Roof Plan computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

1

Roof Plan 1 : 100

project number

2013.01080.002 drawing number

AHR-AR-B01-27-100

scale

1 : 100 rev

4

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


1

2

5300

3

5300

4

5300

5

5300

6

5300

7

5300

8

5300

9

5300

10

Line of main building roof and coping below ETFE canopy.

5300

5000

A

B Steel Coping30-85-50/105 Latchway 6763

B1

Roof Drain

Mechanical Extract Ventilation

C

Liquid Applied Inverted Roof System with Ballast20-50-30/135

4174

C1

Steel Structure Canopy

ETFE Canopy 20-50-85/120

D

D1

7087

Glass Canopy 20-50-75/110

3 2 1 Rev

3580

E

Tender Issue Issued for Consultants Review Issued for Stage E Description

original by

DM

21/11/2014 D.M B.B 17/10/2014 D.M B.B 15/09/2014 J.E B.B Date Dr by App by date created

09/05/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

F

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

Portsmouth City Council

project

The Hard Interchange Portsmouth

drawing

Scoping Drawing - New Terminal Building Roof computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

1

Roof Scoping Plan 1 : 100

2013.01080.002 drawing number

AHR-AR-B01-27-110

scale

As indicated rev

3

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


5

6

E

Drainage

811

0

65 30

4 0

811

Silicone Joints Channel Gutter

78

4460

F

3480

75

3300

Glass Sections Canopy Structure Support 1946

1682

1682

1682

1946

8937

1

Back Canopy Plan 1 : 50

Back Canopy 3D

2 5

6

E

F

5 AHR-AR-B01-27-117 11380.0 11380.0

11380.0 11380.0 Chanel Gutter Drainage Glass Sections

8945.0

8945.0

8945.0

8945.0

6 AHR-AR-B01-27-117 Spiders Glass Support with Trough Glass Fixings

PIR

Canopy Structure Support with Paint Finish 6945.0

6945.0

6945.0

6945.0

5875.0 5875.0

5875.0 5875.0

Outriggers

3 2 1 Rev

Tender Issue Issued for Consultants Review Issued for Coordination Description

original by

Author

3

Canopy Elevation 1 : 50

4

D.M B.B D.M B.B D.M B.B Dr by App by

date created

10/13/14

approved by

Approver

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

Canopy Section 1 : 50

6

21/11/2014 17/10/2014 15/10/2014 Date

F

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com

8945.0 8945.0

441

8945.0 8945.0

240 150 170

client name

Portsmouth City Council

project

The Hard Interchange Portsmouth

drawing

Detailed Drawings - Rear Glass Canopy Plan and Details computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

5

Detail Canopy Elevation 1 : 25

6

Detail Canopy Section 1 : 25

2013.01080.002 drawing number

AHR-AR-B01-27-117

scale

As indicated rev

3

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


To be read in conjunction with the following scoping drawings:

1

2

3

4

Accessible ceiling panels

5300

5

Real Time Information Screens

5300

6

7

8

9

10

¡AHR-AR-B01-21-110 - Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings ¡AHR-AR-B01-35-110 - Scoping Drawing - New Terminal Building Ceilings

Safeguarding Zone for News Screen

5300

5300

¡AHR-AR-B01-40-110 - Scoping Drawing - New Terminal Building Finishes

5300

5300

5300

5300

¡AHR-AR-B01-70-110 - Scoping Drawing - New Terminal Building FF&E

5300

Double Sided Real Time Information Screen NOTE: CCTV, Speakers and Smoke Detectors to be agreed

CCTV 13

Ceiling Layout Indicative Confirmation of Final Layout by Subcontractor

CCTV 12

1

1

AHR-AR-B01-21-561

AHR-AR-B01-27-116

A 1 WIFI

2

CCTV 1

5000

AHR-AR-B01-21-561

Sim WIFI

AHR-AR-B01-35-622

CCTV 3

CCTV 2

CCTV 5

CCTV 7

CCTV 6

1

B01.01 LOBBY

11265 12 m²

12 m²

B

AHR-AR-B01-27-118

B01.03 LOBBY

11265

CCTV Schedule (Interior) 10300

Horizontal run in Pod Ceiling Void to Rain Water Pipe downpipe 6763

B1

Rain Water Pipe through Deck

B01.05 CONTROL

B01.10 ETFE CONTROL ROOM

9 m²

Extent of Insulated POD Roof Structure

4 m²

Fire Rated MF Ceiling Above Suspended Grid

C

B01.06 KITCHENETTE

4174

CCTV 4

B01.11 WC 2 m² B01.12 WC

17 m²

CCTV 11

B01.15

7 m²

AHR-AR-B01-27-116

CLEANER 4 m²

B01.13 WC

Barrisol Spring Outline (Above POD's Roof)

3 m²

2 AHR-AR-B01-22-124

B01.19 RETAIL STORE

693 m²

8145

B01.14 DIS. WC

2 m²

B01.04 CONCOURSE

Drop

B01.18 RETAIL

2 m²

35 m²

B01.09

Horizontal run in Pod Ceiling Void to Rain Water Pipe downpipes

CCTV Mount Height

CCTV Camera Height 4525.8 4525.8 4525.8 4525.8 4525.8 4525.8 4525.8 4525.8 4525.8 4525.8 2347.0 6500.0 6500.0

5000.0 5000.0 5000.0 5000.0 5000.0 5000.0 5000.0 5000.0 5000.0 5000.0 2550.0 7000.0 7000.0

Mark

Type

CCTV 1 CCTV 2 CCTV 3 CCTV 4 CCTV 5 CCTV 6 CCTV 7 CCTV 8 CCTV 9 CCTV 10 CCTV 11 CCTV 12 CCTV 13

CCTV Type A CCTV Type A CCTV Type A CCTV Type A CCTV Type A CCTV Type A CCTV Type A CCTV Type A CCTV Type A CCTV Type A CCTV Type C CCTV Type B CCTV Type B

RETAIL 37 m²

Footprint of stretched fabric on pod roof

CCTV 10

7087

2 AHR-AR-B01-22-123 D1

2

B01.10 CIRCULATION

2 m²

Rain Water Pipe through Deck

D

B01.17 COMMS 7 m²

B01.08 TRAVEL SHOP

6 m²

C1

4 m²

WIFI

160mm diameter Roof Drain Pipe above fabric ceilng connecting to three outlets

2 m²

B01.07 WC

B01.16 TICKET MACHINE ROOM

160mm diameter Roof Drain Pipe above ceiling connecting to three outlets

CCTV 9

Light

CCTV 8

Real Time Information Screens

Security Screen Track WIFI

Security Screen Track

3580

E

B01.02 LOBBY 20 m²

5 4 3 2 1 Rev

8535

F

Tender Issue Amendments Tender Issue Tender Issue Issued for Consultants Review Issued for Stage E Description

original by

Glass and steel Canopy, refer to Drawing AHR-AR-B01-27-117

1

JE

2

D.M B.B D.M B.B D.M B.B D.M B.B J.E B.B Dr by App by

date created

09/05/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

Reflected Ceiling Plan 1 : 100

03/12/2014 25/11/2014 21/11/2014 17/10/2014 15/09/2014 Date

Sim

AHR-AR-B01-21-122

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

Portsmouth City Council

project

The Hard Interchange Portsmouth

drawing

General Arrangement - New Terminal Reflected Ceiling Plan computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

2013.01080.002 drawing number

AHR-AR-B01-35-100

scale

1 : 100 rev

5

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


1

2

5300

3

5300

4

5300

5

5300

6

5300

7

5300

8

5300

9

5300

10

Note: ETFE Canopy. Refer to DWG AHR-AR-BO1-27-111

5300

5000

A

B

Painted Plasterboard: MF-01-20-10-10/ 110

6763

B1

Stretched Fabric Barrisol Ceiling: CLG-02-20-10-20/ 130

Metal Tile Ceiling: CLG-01-20-10-20/ 190

C Fire Rated Plasterboard: MF-02-20-10-10/ 110

4174

C1

Fire Rated MF Ceiling Above Suspended Grid

Soffit with Acrilic Render: MF-03-20-10-10/ 170

D Removable PPC finished expanded metal mesh CLG-03 20- 10- 20/ 190

Extent of Pod Roof Structure to be Insulated CLG-04 7087

Insulated Roof Structure CLG-04 20- 10- 10/ 170

D1

Access Panels

E

3580

5 4 3 2 1 Rev

Tender Issue Amendments Tender Issue Tender Issue Issued for Consultants Review Issued for Stage E Description

original by

F

JE

03/12/2014 25/11/2014 21/11/2014 17/10/2014 15/09/2014 Date

D.M B.B D.M B.B D.M B.B D.M B.B J.E B.B Dr by App by

date created

09/05/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

Note: Glass and Steel Canopy. Refer to DWG AHR-AR-BO1-27-117

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

Portsmouth City Council

project

The Hard Interchange Portsmouth

drawing

Scoping Drawing - New Terminal Building Ceilings computer file

1

Reflected Ceiling Plan Scoping 1 : 100

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

2013.01080.002 drawing number

AHR-AR-B01-35-110

scale

As indicated rev

5

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


2

3

796

5300

4

5

5300

5300

1155 3635

3 AHR-AR-B01-35-622

4 AHR-AR-B01-35-621

4 AHR-AR-B01-35-622

3 AHR-AR-B01-35-621

10300 10300.0 1255

6275

5

9045.0 9045.0

AHR-AR-B01-35-621

2

Barrisol Section 5 1 : 50

2513

Note: Penitration through stretched ceiling for structural column

70 37

7659

B

9

2215

1849

6511

10300 10300.0

Note: Column penitration through stretched ceiling for RTI screen support

9045.0 9045.0

B1

3

Barrisol Section 4 1 : 50

4548

7600

3

Extract Vent on Roof. This section of Barrisol Stretched Fabric to be removable for maintenance access

Sim

AHR-AR-B01-22-224

Sim 1 AHR-AR-B01-35-622

10300 10300.0 20302

9045.0 9045.0

C

4

Barrisol Section 7 1 : 50

22633

C1

4174

8100

10300 10300.0

57

68 5

20599

2

9045.0 9045.0

AHR-AR-B01-35-621

D

5

Barrisol Section 6 1 : 50

3764

1998 6 AHR-AR-B01-35-621

2 1 Rev

97 25

10300 10300.0

Tender Issue Issued for Consultants Review Description

original by

JE 12 32

841

841

D1

date created

10/10/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

9045.0 9045.0

6

26/11/2014 D.M B.B 17/10/2014 D.M B.B Date Dr by App by

Barrisol Section 3

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com

1 : 50 client name

1155

Portsmouth City Council

project

The Hard Interchange Portsmouth

E

drawing

Detailed Drawings - Ceiling Details - Barrisol Ceiling Setting Out computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

1

Barrisol Ceiling Setting Out 1 : 50

2013.01080.002 drawing number

AHR-AR-B01-35-621

scale

1 : 50 rev

2

@A1 issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


AF2

1

Prefinished Metal Deck AF2

Taxi Shelter Plan Building Finishes 1 : 100

AF3-W

2

AF1-W

Ground Floor Plan Building Finishes 1 : 100

Prefinished Metal Deck

Canopy above 1

2

3

4

5

6

7

8

9

10

AF2 5300

All Exposed Steelwork

5300

5300

5300

5300

5300

5300

AF2

5300

5300

All Exposed Steelwork

AF2 AF2

A AF4-C

AF4-C

Note:

5000

1. Drawing to be read in conjuction with room finishes schedule See: AHR-AR-BXX-40-710 2. To all rooms, silicon seal to all architraves, planted stops/frames, sanitary fittings, worktops, cupboards, skirtings etc...

B

AF1-W

AF3-W

AF1-W

AF1-W

AF1-W

Vinyl Emulsion Paint to Walls 35-85-60/195

AF1-C

Vinyl Emulsion Paint to Ceiling 35-85-60/195

6763

B1

AF1-C

AF1-C AF1-C

AF1-C AF2

Anti-corrosion Coating to Steelwork- 35-85-60/180

AF4-C

Acrylic Anti-crack Render 45-35-84/301

AF3-W

Wall Tiling- 25-85-97/140

AF1-W AF1-C

C

4174

C1 AF3-W

AF1-W

AF1-W

AF3-W AF1-C

AF1-W AF1-C

AF1-C

AF1-W

D

4 3 2 1 Rev

Tender Issue Issued for Consultants Review Updated Issue Issued for Stage E Description

original by

DM

21/11/2014 D.M B.B 17/10/2014 D.M B.B 16/09/2014 J.E B.B 15/09/2014 J.E B.B Date Dr by App by date created

09/05/14

approved by

BB

7087

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

D1

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

E

3580

Portsmouth City Council

F

AF1-C

project

The Hard Interchange Portsmouth

drawing

Scoping Drawing - New Terminal Building Finishes computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

2013.01080.002 drawing number

AHR-AR-B01-40-110

scale

As indicated rev

4

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


1

Taxi Shelter Plan FF&E 1 : 100

To be read in conjunction with the following drawings: AHR-AR-B01-22-401 - Detailed Drawings - Internal Elevations - Travel Shop Pod Exterior AHR-AR-B01-22-402 - Detailed Drawings - Internal Elevations - Retail Pod Exterior

E3a

F1.c

B02.02 DIS. WC 5 m²

Equipment

B02.04 DIS. WC B02.03 STORE

5 m²

S9

1 m²

S3b

S7

S3b

S2

Ground Floor Plan Building FF&E

2

1 : 100

E1 E2 E3a E3b E3c E4 E5 E6 E7 E8 E9 E10 E11 E12 E13

National Express Ticket Machines Help Point Real Time Information Screens (46� screen) Group of 4 Real Time Information Screens (55� screen) Group of 2 Real Time Information Screens (55� screen) Server Cabinet 600W x 1100D x 2300H * Mobile Phone Charging Stand Under Counter Fridge (by others) Microwave (by others) ETFE Air Handling Unit with UPS Smart Card Machine Induction Loop in Bus Bay (final setting out TBC) * Fire Alarm Panel * Safeguarding Zone for Touch Screen Journey Planner Safeguarding Zone for News Screen

* Refer to Elecrical Specification

1

2

3

4

5

6

7

8

9

(RTI screens are free issue by PCC, mounting brackets power and data and installation by main contractor)

10

E10

5300

5300 E10

5300 E10

E3a

5300 E10

E3a

5300

5300

E10

E3a

E10

E3a

5300

5300

E10

E3a

5300

E10

E3a

E10

E3a

E10

Fittings F1a F1b F1c F2 F3 F3a F3b F3c F3d F4 F5 F6 F7 F8 F9 F10 F11 F12

Back to Back Fixed Seating Fixed Seating Fixed Seating to Taxi Shelter Litter Bins Kitchenette Kitchenette Base Units Kitchenette Counter Kitchenette Upper Units Kitchenette Sink and Tap Shelving (by others) Office Chair (by others) Built in Work Counter Built in Desk (by others) Built in Retail Display Units (by others) Coat Hook Ashtray Post Cycle Rack Brompton Cycle Dock

E3a E3a

E3a

Sanitary

A F1.b

F2 F1.c

F2

F1.b

5000

F1.c

B01.03 LOBBY

B01.01 LOBBY

12 m²

E13

12 m²

E3b

E3b

B S8 S2a F7

E12

B1

E1

6763

2 m²

4 m²

E2

E9

B01.07 WC

9 m²

B01.17 COMMS

4 m²

B01.08 TRAVEL SHOP

6 m²

F3b F3c

C1

B01.11 WC

S3a

S3b B01.06 KITCHENETTE

4174

E1

B01.16 TICKET MACHINE ROOM

F4 B01.05 CONTROL

C

WC Disabled WC- Doc M Pack Stainless Steel Disabled WC- Doc M Pack Wash Basin Wash Basin Tap Soap Dispenser Hand Dryer Standard Mirror Disabled Mirror Full Height Mirror Grab Rail (set) Toilet Paper Holder Baby Change Bin – Sanitary Waste (by others) Air freshener (by others) Sluice Sink and Tap

E8 B01.10 ETFE CONTROL ROOM

S7

S1a S2a S2b S3a S4c S4 S5 S6a S6b S6c S7 S8 S9 S10 S12 S13a

F9

2 m²

F6

17 m²

S1a

F8

7 m²

B01.13 WC 2 m²

S1a S1a

E11

S8 B01.18 RETAIL

F8

B01.15 CLEANER 4 m²

B01.12 WC 2 m²

35 m²

E4

7 m²

B01.10 CIRCULATION

B01.14 DIS. WC 3 m²

S13a S9

B01.19 RETAIL STORE

S3b

2 m²

S8

5 4 3 2 1 Rev

Tender Issue Amendments Tender Issue Issued for Consultants Review Updated Issue Issued for Stage E Description

original by

JE

B01.09 RETAIL 37 m²

D.M B.B D.M B.B D.M B.B J.E B.B J.E B.B Dr by App by

date created

09/05/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

S2a

D

03/12/2014 21/11/2014 17/10/2014 16/09/2014 15/09/2014 Date

E3c

7087

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com

D1

client name

E5

Portsmouth City Council project

The Hard Interchange Portsmouth

E B01.02 LOBBY

3580

20 m²

drawing

Scoping Drawing - New Terminal Building FF&E computer file

F

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

2013.01080.002 drawing number

AHR-AR-B01-70-110

scale

As indicated rev

5

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


6 AHR-AR-B01-70-632

* *

* *

6 AHR-AR-B01-70-632

1147

6 AHR-AR-B01-70-632

* *

SIM

1012

926

623

203

E2

* *

723

1047

ø 495.0

* *

1000

540

* *

700

1100

800 640

5

E12

E9

AHR-AR-B01-70-632

1400

E1

*

696

790

837

*

WC Level 5708 5708.0

Ticket Machine

WC Level 5708 5708.0

2

1 : 10

Help Point

WC Level 5708 5708.0

3

1 : 10

Smart Card Machine

4

1 : 10

Screen Journey Planner 1 : 10 Equipment

TBC by Supplier

*

Ticket Machine

All Dimensions to be Confirmed based on final Product information supplied by Portsmouth City Council and Operators

Timber Frame Metsec Framing with Plasterboard Lining Partition

5

Ticket Machine Plan 1 : 10

Acoustic Fleece

E1 E2 E3a E3b E3c E4 E5 E6 E7 E8 E9 E10 E11 E12 E13

National Express Ticket Machines Help Point Real Time Information Screens (46� screen) Group of 4 Real Time Information Screens (55� screen) Group of 2 Real Time Information Screens (55� screen) Server Cabinet 600W x 1100D x 2300H * Mobile Phone Charging Stand Under Counter Fridge (by others) Microwave (by others) ETFE Air Handling Unit with UPS Smart Card Machine Induction Loop in Bus Bay (final setting out TBC) * Fire Alarm Panel * Safeguarding Zone for Touch Screen Journey Planner Safeguarding Zone for News Screen

* Refer to Elecrical Specification Timber Lining

(RTI screens are free issue by PCC, mounting brackets power and data and installation by main contractor)

SS Framing for Timber Lining mounted FFE

Sim 6 AHR-AR-B01-70-632

Timber Packing

Timber Frame

Metsec Framing + Plasterboard Lining Partition

Acoustic Fleece 1 Rev

Tender Issue

03/12/2014 D.M B.B Date Dr by App by

Description

original by

Author

date created

10/14/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

SS Countersunk Screw

SS Framing for Timber Lining mounted FFE T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

100

6

Typical SS Frame Detail

Portsmouth City Council

1:2 project

100

The Hard Interchange Portsmouth

drawing

Detailed Drawings - FFE - Timber Wall Lining FFE Equipment Interface Details

2 0

1

WC Level 5708 5708.0

25

7

50

3D

computer file

project number

2013.01080.002 Ticket Machine

SS Framing for Timber Lining mounted FFE

100 X 50 X 5mm Stainless Steel Anngle All edges ground flush and smoth

Timber Lining

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

drawing number

AHR-AR-B01-70-632

scale

As indicated rev

1

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


CW02

W01 SS rainscreen system

RTI Screen

7885

Single Glazed Glass Façade

7885.0 B02.03 Taxi Shelter

7145 6945.0 7145.0 6945.0

21 m²

ED.201

ED.203

ED.203

W03 B02.02 DIS. WC

B02.04 DIS. WC

5 m²

Sim 1 AHR-AR-B02-22-405

5 m²

200mm Reinforced Concrete Wall

ED.201

4685 4685.0

B02.03 STORE 1 m²

ED.202

W02

4995

3

Elevation 2 - a 1 : 50

Galvanised Steel Grating Floor

1

Shelter

Single laminate clear toughened glass screen with 10mm silicone joint between glass panels.

2

Taxi Shelter Plan 1 : 50

Single Glazed Glass Façade

PPC flat pressed aluminium coping RAL 9018

Roof Overflow Extract Louvers

7885 7885.0 7145 6945.0 7145.0 6945.0 SS rainscreen system

4545 4545.0 ED202 refer to AHRAR-BXX-32-623

4

Elevation 4 - a1

5

1 : 50

Taxi Shelter Elevation

6

1 : 50 PPC flat pressed aluminium coping RAL 9018

Exposed painted steelwork RAL9018

Prefinished metal deck RAL 9010

Surface mounted light fittings

Elevation 4 - a 1 : 50

Sim 4 AHR-AR-B01-22-225

Sim 2 AHR-AR-B01-22-225

Sim 1 AHR-AR-B01-22-225

7885 7885.0

3 2 1 Rev

Tender Issue Amendments Tender Issue Issued for Consultants Review Description

original by

7145 6945.0 7145.0 6945.0

1:40 Falls

DM

D.M B.B D.M B.B D.M B.B Dr by App by

date created

09/30/14

approved by

Approver

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com

4966

600 square metal tile ceiling CLG01 20-10-20/ 190

4545 4545.0

Galvanised Steel Grating Floor Gutter area created to the appropriate volume according to relavent Building Regulations and BSs

03/12/2014 24/11/2014 17/10/2014 Date

client name

Portsmouth City Council

project

The Hard Interchange Portsmouth

9

Taxi Shelter Section 1 : 50

drawing

General Arrangement - Taxi Toilets General Arrangements - Plans, Sections, Elevations computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

7

Reflected Ceiling 1 : 50

8

Taxi Shelter Roof Plan 1 : 50

2013.01080.002 drawing number

AHR-AR-B02-20-100

scale

1 : 50 rev

3

@A1 issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


1 Rev

Tender Issue

25/11/2014 D.M B.B Date Dr by App by

Description

original by

JE

date created

11/25/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

Portsmouth City Council

project

The Hard Interchange Portsmouth

drawing

Exploded Axonometric computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

scale

2013.01080.002 drawing number

AHR-AR-BXX-00-100

@A1 rev

1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


ain

No Entry

ad Ro

Qu ee n

M

Str ee t

Royal Naval Association

t tree ck S Clo

NO EN

TRY NO EN

e Th

TRY

rd Ha

3

4

5

6

7

8

9

10

Street College

BUSES & TAXIS

BUSES ONLY

1

2

BUSE TA XIS S &

2 1 Rev

Tender Issue Issued for Stage E Description

original by

DM uth smo P ort

tio n or Sta Harb

24/11/2014 D.M B.B 15/09/2014 J.E B.B Date Dr by App by date created

15/09/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

Or

dn an ce Ro ad

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

Portsmouth City Council

project

The Hard Interchange Portsmouth

North

drawing

General Arrangement - Site Location Plan computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

1

Site Location Plan 1 : 1250

2013.01080.002 drawing number

AHR-AR-BXX-10-100

scale

1 : 1250 rev

2

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.


Dropped Kerb for Cycle Service Vehicle Access

N or th

D CCTV 14

Bollards

1

Overall Site Plan 1 : 250

CCTV 15

CCTV 18

A

NO ENT RY

CCTV Schedule (Exterior)

D

CCTV 20

B

NO ENT RY

D CCTV 21

CCTV 17

CCTV 16

4200.0 4200.0 4002.0 4002.0 4002.0 4189.0 4189.0 4189.0 3842.0 3842.0 3842.0 3500.0 3500.0 3500.0 3850.0

Taxi Rank Public Pick Up Drop Off

Th e rd Ha

A

CCTV 19

Fire Hydrant

B

Taxi Shelter and Toilets See Drawing: AHR-AR-B02-22-405

Bollards

CCTV Mount Height

CCTV Canera Height

White Line Road Markings

Line of ETFE Canopy Above

3700.0 3700.0 3502.0 3502.0 3502.0 3689.0 3689.0 3689.0 3342.0 3342.0 3342.0 2865.0 2865.0 2865.0 3500.0

Mark

Type

CCTV 14 CCTV 15 CCTV 16 CCTV 17 CCTV 18 CCTV 19 CCTV 20 CCTV 21 CCTV 22 CCTV 23 CCTV 24 CCTV 25 CCTV 26 CCTV 27 CCTV 28

Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type E

Taxi Queue

5533

B

10

Double Yellow Line Road Markings

Millenium Lighting Columns Reused

B

Double Headed Lighting Columns

C

8m Lighting Columns

D

CCTV Pole

9

A

A

White Line Road Markings

7

8

5619

6

B

5

Bus Layby

4

B

2

BUSES ONLY

3

The Hard Interchange See Drawing: AHR-AR-B01-20-100

BUSES TAXIS &

5781

A

Trief Kerb Edge Protection

5480

1

CCTV 27

NR Station Structure PCC Structure Boundary

National Express Coach Bay

CCTV 28

D

Air Intake Vents under Banches AHR-AR-B01-90-122

CCTV 25

A

CCTV 23

For Site Finishes Refer To landscaping Drawings: AHR-AR-B01-90-100

Coach Drop Off / Layby

D

5607

Condensor Enclosure AHR-AR-BXX-21-658

UP

C

CCTV 26

Brompton Dock for 40 Bikes

BUSES & TAXIS

Fire Hydrant

CCTV 24

CCTV 22

2 1 Rev

B

Tender Issue Issued for Stage E Description

original by

White Line Road Markings

D.M

date created

09/05/14

approved by

BB

AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom

C Cycle Parking for 40 Bikes

24/11/2014 D.M B.B 15/09/2014 J.E B.B Date Dr by App by

C

A

Project Scope Boundary Line Exit NR Station Stairs and Ramp Retained

T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name

Portsmouth City Council Bin Store See Drawing: ARH-AR-BXX-90-660

UP

Proposed Future Station Entrance

project

The Hard Interchange Portsmouth

Temporary Hoarding at Edge of New Deck Slab

drawing

General Arrangement - Overall Site Plan Existing Station Entrance

P

or Harb outh ortsm

Stat

ion

computer file

plot date

& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW

project number

2013.01080.002 drawing number

AHR-AR-BXX-10-102

scale

As indicated rev

2

@A1

issue status

Tender

This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.