02FIRSTFLOORROOMSSCHEDULE NameDepartmentLevelArea
FFMUSICMUSICFIRSTFLOOR81m²
STOREUTILITIESFIRSTFLOOR7m²
LIFTCIRCULATIONFIRSTFLOOR7m²
FFCIRCULATIONCIRCULATIONFIRSTFLOOR89m²
AIRLOCKFIRSTFLOOR5m²
ACWCWCFIRSTFLOOR8m²
FFGLA13GLAFIRSTFLOOR73m² FFGLA12GLAFIRSTFLOOR64m²
SMALLBREAKOUTBREAKOUTFIRSTFLOOR26m²
FFSTEAM/GLASTEM LEARNING FIRSTFLOOR63m²
FFBREAKOUT OPENLEARNING BREAKOUTFIRSTFLOOR205m²
FFGLA10GLAFIRSTFLOOR65m²
FFGLA11GLAFIRSTFLOOR60m² FFRESOURCERECOURCEFIRSTFLOOR35m²
FFTPTEACHER PREP FIRSTFLOOR30m²
AIRLOCKFIRSTFLOOR6m²
MALEWCWCFIRSTFLOOR5m²
FEMALEWCWCFIRSTFLOOR5m²
FFGLA8GLAFIRSTFLOOR68m²
FFGLA9GLAFIRSTFLOOR64m² FFRESOURCERECOURCEFIRSTFLOOR13m²
01GROUNDFLOORROOMSSCHEDULE
NameDepartmentLevelArea
GFGLA7GLAGROUND FLOOR 80m²
GFRESOURCERECOURCEGROUND FLOOR 7m²
LIFTCIRCULATIONGROUND FLOOR 7m²
GFGLA6GLAGROUND FLOOR 70m²
GFGLA5GLAGROUND FLOOR 64m²
GFGLA4GLAGROUND FLOOR 70m²
GFGLA3GLAGROUND FLOOR 59m²
GFGLA1GLAGROUND FLOOR 67m²
GFGLA2GLAGROUND FLOOR 77m²
GFTPTEACHER PREP GROUND FLOOR 30m²
GFWCWCGROUND FLOOR 25m²
GFBREAKOUT2BREAKOUTGROUND FLOOR 90m²
GFCIRCULATIONCIRCULATIONGROUND FLOOR 19m²
GFSMALLBREAKOUTBREAKOUTGROUND FLOOR 26m²
GFKITCHENETTEUTILITIESGROUND FLOOR 12m²
GFBREAKOUT1BREAKOUTGROUND FLOOR 255m²
ELCOFFICEOFFICEGROUND FLOOR 24m²
ELCWCWCGROUND FLOOR 19m²
ELCFOYERFOYERGROUND FLOOR 17m²
ELCRECEPTIONCIRCULATIONGROUND FLOOR 32m²
ELCLAUNDRYUTILITIESGROUND FLOOR 9m²
ELCTP/STAFFROOMTEACHER PREP GROUND FLOOR 17m²
ELCSTORERECOURCEGROUND FLOOR 15m²
ELCWITHDRAWALELCACTIVITYGROUND FLOOR 68m²
ELCACTIVITYELCACTIVITYGROUND FLOOR 72m²
ELCKITCHENETTEUTILITIESGROUND FLOOR 10m²
OFFICEOFFICEGROUND FLOOR 8m²
GFTOLIETDISABLE1WCGROUND FLOOR 7m²
GFTOLIET9WCGROUND FLOOR 4m²
GFTOLIET8WCGROUND FLOOR 4m²
MALEWCNotPlacedNotPlaced
GFTOLIET1WCGROUND FLOOR 2m²
GFTOLIET2WCGROUND FLOOR 2m²
GFTOLIET3WCGROUND FLOOR 2m²
GFTOLIET4WCGROUND FLOOR 2m²
GFTOLIET5WCGROUND FLOOR 3m²
GFTOLIET6WCGROUND FLOOR 2m²
GFTOLIET7WCGROUND FLOOR 2m²
UP UP DN DN GFGLA GFRESOURCE LIFT GFGLA6GFGLA GFGLA4GFGLA GFGLA GFGLA GFTPGFWC GFBREAKOUT GFCIRCULATION GFKITCHENETTE GFBREAKOUT1 ELCOFCE ELCWC ELCFOYER ELCRECEPON ELCLAUNDRY ELCTPSAFFROOM ELCSORE ELCWITHDRAWA ELCACTVTY ELCKTCHENETTE BREAKOUT CIRCULATION ELCACTIVITY FOYER GLA OFFICE RECOURCE TEACHERPREP UTILITIES WC 14589 10 11 12 13 A B C D E F G H I J K 53122 5493435438003146323899347166100010201100111611756 671675757300330052746516453611010 2518925952222505856816600 VWING VWING VWING 53122 674180064004918915156892736816356912123 67167575730033005274651645367556 25952222505856816600 27333 3857 3900 3514 2556 N ORT H 760 8182 3878 S1 A02 S1 A02 S2 A02 D3 A03 FFMUSIC STORE LIFT FFCIRCULATION AIRLOCK ACWC FFGLA13FFGLA12 SMALLBREAKOUT FFSTEAMGLA FFBREAKOUTOPENLEARNING FFGLA10 FFGLA11 FFRESOURCE FFTP AIRLOCK FFGLA8FFGLA FFRESOURCE 14589 A B C D E F BREAKOUT CIRCULATION GLA MUSIC RECOURCE STEMLEARNING TEACHERPREP UTILITIES WC 2155 1100 652 1100 1553 6313 1100 787 1100 3100 145 2600 1100 25952222505856816600 959923863158110060011003400137222190469811005001100 67167575730033005274651645367556 53122 549311762065100838003251636100040010006227196748804228100010201100111611756 2222505856816600 N ORT H S1 A02 S1 A02 S2 A02 S2 A02 FIREEXTINGULISHERFIREEXITREGROUPASSEMBLYPOINTEGRESSPATH EMERGENCYFIRESTAIRCASEEXIT FIREEXTINGULISHERFIREEXITREGROUPASSEMBLYPOINTEGRESSPATH EMERGENCYFIRESTAIRCASEEXIT PROJECT TITLE STUDENT NO. DRAWING TITLE DATE: SCALE: DRAWING NUMBER 20 10 10 20 30 40 50 60 70 80 90 100mm CONSTRUCTION III 2021 2022/6/9 7:35:52 As indicated C:\AUSTRALIA\UNI OF ADELAIDE\Construction\CONSTRUCTION 3\CONSTRUCTION 3\CONS ASSIGNMENT 3B\12_07am KATE FINAL SERVICES.rvt ASSIGNMENT 3B VITURAL MODELING & DETAILING A1760370 DANNING ZHU PLAN & SCHEDULES A01 1:200 GROUNDFLOOR 2 1:200 FIRSTFLOOR 1
1:500 GROUNDFLOORFIREEGRESSPATH 14 :500 FIRSTFLOORFIREEGRESSPATH 3
03DOORSCHEDULE MarkHeightWidth 12134915 22134915 32134915 521001800 1424001800 152134915 162134915 172134915 182134915 192134915 202134915 2121431700 222134915 2421001800 2521431700 2621431700 2721433500
03DOORSCHEDULE MarkHeightWidth 2821433500 3021433500 322134915 332134915 342134915 352134915 3621433500 3721433500 3821433500 3921433500 5221433500 532134915 542134915 5519811830 5621433500 5721433500 5821433500
03DOORSCHEDULE MarkHeightWidth 5921433500 6021433500 6121433500 6221433500 6321433500 6421431700 6521431700 662134915 672134915 6821431700 692134915 702134915 712134915 722134915 732134915 742134915 752134915
03DOORSCHEDULE MarkHeightWidth 762134915 772134915 7821431700 7921431700 8021431700 8121431700 8221431700 8321431700 842134915 8521431700 8621431700 8721431700
04WINDOWSCHEDULE MarkHeightWidth 62500915 72500915 82500915 92500915
GROUNDFLOOR FIRSTFLOOR 3300 ROOF 6600 FEDCBA 10719 7198 34464 255898875 5083 5636 S1 A02 GROUNDFLOOR FIRSTFLOOR 3300 ROOF 6600 876431 53122 5636 S2 A02 GROUNDFLOOR FIRSTFLOOR 3300 ROOF 6600 23457 5312229929 10719 S2 A02 GROUNDFLOOR 0 FIRSTFLOOR 3300 ROOF 6600 ABCDEF 10719 5636 25589 S1 A02 GROUNDFLOOR 0 FIRSTFLOOR 3300 ROOF 6600 2345678 S2 A02 D1 A03 GROUNDFLOOR 0 FIRSTFLOOR 3300 ROOF 6600 FEDCBA S1 A02 D2 A03 PROJECT TITLE STUDENT NO. DRAWING TITLE DATE: SCALE: DRAWING NUMBER 20 10 10 20 30 40 50 60 70 80 90 100mm CONSTRUCTION III 2021 2022/6/9 7:37:20 As indicated C:\AUSTRALIA\UNI OF ADELAIDE\Construction\CONSTRUCTION 3\CONSTRUCTION 3\CONS ASSIGNMENT 3B\12_07am KATE FINAL SERVICES.rvt ASSIGNMENT 3B VITURAL MODELING & DETAILING A1760370 DANNING ZHU ELEVATIONS & SECTIONS A02 1200 EASTELEVATION 11:200 NORTHELEVATION 3 1:200 SOUTHELEVATION 14 200 WESTELEVATION 2 1100 NORTHSECTION S1 1100 WESTSECTION S2
GROUNDFLOOR ROOF 6600 D4 A03 GROUNDFLOOR FIRSTFLOOR 3300 CONPACTGRAVELANDSAND DAMPPROOFMEMBRANE 505MM600MMCONCRETEFOOTINGWITHSTEELCHS IMBEDDEDWITHIN250MMDEEPWHILSTBOLTEDTOA 240MM240MM50MMMETALTILECONNECTEDVIA BOLTED FURTHERDETAILSREFERTOENGINEER'S SPECIFICATIONS 29.6MM3.2MMSTEELCIRCULARHOLLOWSECTION COLUMN CUSTOM-FRAMEDDOUBL-GLAZEDWINDOW BRICKWALLATTACHEDTOSTEELFRAMINGVIA BRICKTIESAT200MMVERTICALCENTERS R5.0BATTINSULATION COMPACTEDRUBBLE DAMPPROOFMEMBRANE CONCRETEFOOTINGBASETO ENGINEER'SSPECIFICATIONS 300MMCONCRETESLAB SUSPENSIONRODBRACKET (FIXEDTOSIDE-FACEOFTIMBER TRUSSBOLTEDTOTHEPRIMARY STEELSTRUCTUREVIAHEXHEAD BOLTSONSTEELBRACKET) R6.0BATTINSULATION SUPENDEDREINFORECED STEEL-COILRODS TIMBERTRUSSBOTTOM SUSPENSIONCLIPTRIPLE2MMBOLTEDFORTENSION 50MMPARTICALBOARDBOLTEDWITH PLASTERBOARDCEILINGON SUSPENDEDCEILINGSYSTEM RONOP50SHADOWLINE CEILINGMOUNTINGTRACK 160CONCRETESLABWITH50MM STEELDECKINGSUPPORT 10MMLAMINATEDTIMBER FLOORING WEATHERSHEATINGBOARDFIXEDTOSTEEL STUDAND250MM250MMSHSVIASCREWS FALL1° 10MMTIMBERCLADDING WATER-PROOFVANISH TIMBERWINDOWFRAMING WINDOWMOUNTINGDEVICE WEATHERSHEATINGBOARDFIXEDTOSTEELSTUD AND250MMx250MMSHSVIASCREWS BRICKWALLATTACHEDTOSTEELFRAMINGVIA BRICKTIESAT200MMVERTICALCENTERS R5.0BATTINSULATION 10MMPLASTERBOARDWALLLINING 10MMPARTICLEBOARDCONNECTEDTO PLASTERBOARDVIA5MMFLATHEADNAILS 50MMCORRUGATEDIRON0.60BMT(BASEMETAL
TIMBERSTUDFRAMING 80MM203MMGALVASPAN STEEL-PURLIN CONNECTEDTOTIMBERSTUDVIA50MM BOLTSCREWS 80MM180MMGALVASPANSTEELCPURLINCONNECTEDTOUNIVERSAL BEAMANDOTHER-PURINSVIABOLT CONNECTIONSWITHPURLIN BRACKET FURTHERDETAILSREFERTOTHE ENGINEER'SSPECIFICATIONS PURLINBRACKET 50x150MMCURTAINWALL 50MMX120MMTIMBERFRAMING EXTERNALBUILDINGFACADE R5.0BATTINSULATION 10MMPARTICLEBOARD 10MMPLASTERBOARDATTACHEDTO PARTICLEBOARDVIANAILS 250MM250MM(9MMBMT)STEEL SQUAREHOLLOWEDSECTION (SHS) WEATHERSHEATINGBOARDFIXED TOTIMBERFRAMING AND250MM250MMSHSVIA SCREWS PROJECT TITLE STUDENT NO. DRAWING TITLE DATE: SCALE: DRAWING NUMBER 20 10 10 20 30 40 50 60 70 80 90 100mm CONSTRUCTION III 2021 2022/6/9 7:37:24 As indicated C:\AUSTRALIA\UNI OF ADELAIDE\Construction\CONSTRUCTION 3\CONSTRUCTION 3\CONS ASSIGNMENT 3B\12_07am KATE FINAL SERVICES.rvt ASSIGNMENT 3B VITURAL MODELING & DETAILING A1760370 DANNING ZHU SECTION DETAILS A03 1:20 SECTIONDETAIL01 D1 1:20 SECTIONDETAIL02 D2 1:5 SECTIONDETAIL04 D4 PAVINGTOENGINEER'SDETAIL 250MM50MM70MMSTEELSTUDBASETRACK WEATHERSHEATINGBOARDFIXEDTOSTEELSTUD AND250MM250MMSHSVIASCREWS BRICKWALLATTACHEDTOSTEELFRAMINGVIA BRICKTIESAT200MMVERTICALCENTERS R5.0BATTINSULATION 10MMPLASTERBOARDWALLLINING 10MMPARTICLEBOARDCONNECTEDTO PLASTERBOARDVIA5MMFLATHEADNAILS
DETAILS
THICKNESS) CONNECTEDTOTIMBERPURLINFRAMINGVIA GALVANISEDTWISTEDROOFINGNAILS COMPACTEDRUBBLE DAMP-PROOFMEMBRANE CONCRETEFOOTINGTOENGINEER'S SPECIFICATION 170MMCONCRETESLAB 15MMPARTICALBOARD 15MMLAMINATEDTIMBERCLADDING TEXTURE 250MM250MM(9MMBMT)STEELSQUARE HOLLOWEDSECTION(SHS) STEELSTRUCTURALBRACINGTO 305MMX165X40MMUNIVERSALBEAMSTOP ROOFFRAMING R6.0BATTROOFINSULATION 35MMPARTICLEGYPSYBOARDSCONNECTED TOTIMBERSTRUCTUREVIASCREWS TIMBERROOFPURLIN205MM75MMSTRUCTURE
CONNECTEDTOCORRUGATEDROOFING STEELBRACKETWITH3-BOLT2INCHSCREWS FLASHING 1:5
D3
THICKNESS) CONNECTEDTOTIMBERPURLINFRAMINGVIA GALVANISEDTWISTEDROOFINGNAILS R6.0BATTROOFINSULATION 35MMPARTICLEGYPSYBOARDSCONNECTED TOTIMBERSTRUCTUREVIASCREWS TIMBERROOFPURLIN205MM75MMSTRUCTURE 10MMMOISTURERESISTANTPARTICLEBOARD CONNECTEDTOCORRUGATEDROOFING
250MM30MMSTEELFASCIATOMANUFACTURER'S
50MMCORRUGATEDIRON0.60BMT(BASEMETAL
10MMMOISTURERESISTANTPARTICLEBOARD
WALLPLANDETAIL03
TIMBERSTUDFRAMING
12346789 10 11 12 13 A B C D E F G H J K VRNAHSRCURPSS CRCAOLWSCOCOLMNHX 0MSUREHOOWSECNTUCTURA OUMN FOOYTMRMNUVERAEMSA91 ROFSRUTRRUSPNESSEM MMX0MCOCEERETNGOONS 10X2XMMSTUCUAOUDATONA 0MM6XMMNESBAMORANG 01XMMUNESLBAMROORMNG 25952222505856816600 67167575730033005274651645367556 25952222505856816600 671675757300330052746516453611010 3857 3900 3514 2555 PROJECT TITLE STUDENT NO. DRAWING TITLE DATE: SCALE: DRAWING NUMBER 20 10 10 20 30 40 50 60 70 80 90 100mm CONSTRUCTION III 2021 2022/6/9 7:55:56 C:\AUSTRALIA\UNI OF ADELAIDE\Construction\CONSTRUCTION 3\CONSTRUCTION 3\CONS ASSIGNMENT 3B\A1760370_DANNING ZHU_Virtual.rvt ASSIGNMENT 3B VITURAL MODELING & DETAILING A1760370 DANNING ZHU STRUCTURE & ILLUSTRATIONS A04 STRUCTURALFRAMING3D 1 STRUCTURALFRAMINGPLAN 2 3DILLUSTRATION1 3 3DILLUSTRATION2 6 3DILLUSTRATION3 5 3DAXONOMETRIC1 4
UNDERGROUNDFIRE WATERMAINSUPPLY AIRCONDENSINGUNIT(ACU) OSGATEVALVE AHUCONDENSATIONDRAINTUBE ACULARGEAIRHANDLINGUNIT(AHU) TOAHUCONNECTION FRESHAIRVENT WETPIPEFIRESPRINKLERSYSTEM FRESHAIRDUCT 300300MMSUPPLYAIRDUCT 300300MMRETURNAIRDUCT FLEXIBLEDUCTWORK STACKDRAINPIPE CONNECTINGGROUND FLOORTOFIRSTFLOOR SINKDRAINPIPEWITHPTRAP HANDWASHBASINSINK COLDWATERLINE HOTWATERLINE BOILER WATERMAIN UNDERGROUND MUNICIPALWASTEWATER CONNECTION WATERCLOSET 100MMPVCWASTEDRAIN PIPE BRANCHINGSUPPLYPIPETOFIRST BUILDING BRANCHINGSUPPLYPIPETOSECONDBUILDING COMBINEDSERVICESPLAN DISPLAYINGCONSIDERATIONFOR INDIVIDUALSERVICEPLACEMENTTO AVOIDCLASHES PROJECT TITLE STUDENT NO. DRAWING TITLE DATE: SCALE: DRAWING NUMBER 20 10 10 20 30 40 50 60 70 80 90 100mm CONSTRUCTION III 2021 2022/6/9 7:37:54 200 C:\AUSTRALIA\UNI OF ADELAIDE\Construction\CONSTRUCTION 3\CONSTRUCTION 3\CONS ASSIGNMENT 3B\12_07am KATE FINAL SERVICES.rvt ASSIGNMENT 3B VITURAL MODELING & DETAILING A1760370 DANNING ZHU MEP SERVICES A05 1200 GROUNDFLOORELECTRICAL 4 GFLHVAC+WETPIPEFIRESPRINKLERSYSTEM3DDIAGRAM 3 PLUMBING3DDIAGRAM 1 1:200 GROUNDFLOORCOMBINEDSERVICESPLAN 2 CLOSEUPDETAIL DISPLAYING SPACING BETWEENSUPPLY AIRDUCTAND RETURNAIRDUCT ALLOWING SERVICEAREA FORWETPIPE FIRESPRINKLER SYSTEM PLACEMENT SUPPLYAIRDUCTSYSTEM RETURNAIRDUCTSYSTEM WETPIPEFIRESPRINKLERSYSTEM FRESHAIRDUCTSYSTEM MECHANICALEQUIPMENT DRAINTUBE ACUTOAHUCONNECTION G E N WATERSUPPLYLINE(COLD) WASTELINE HOTWATERLINE L E G N D 100MMDOWNLIGHTFIXTURE ELECTRICALWIRING SINGLELIGHTSWITCH EMERGENCYLIGHTING G E N SUPPLYAIRDUCTSYSTEM RETURNAIRDUCTSYSTEM WETPIPEFIRESPRINKLERSYSTEM FRESHAIRDUCTSYSTEM MECHANICALEQUIPMENT WASTEDRAINAGELINE WATERSUPPLYLINE HOTWATERLINE LIGHTINGFIXTURE G E N