Office & Industrial Construction Projects - DFL

Page 1

O &

FFICE

industrial

Business Parks, Head Offices, Electrical Sub-Stations & Factories

WATERFORD BUSINESS PARK-ESB LODGEWOOD-PFPC PARAGON HOUSE-WEYERHAUSER-WATERFORD BUSIN REXAM-CARTEN CONTROLS-ESB KILMEADEN-BELLVI WATERFORD CRYSTAL-HICKEY FABRICATION-THE CO


Paragon House, DFL Headquarters

40

41


PFPC International Wexford

42

43


The Cove Centre

Dunmore Road, Waterford

44

45


Confederation House Waterford Business Park

46

47


5

5

5 5 5

4 6

3

7

8 9

48

10

1

49


Weyerhauser Europe “ A clean site is a safe site � David Flynn

David Flynn has always maintained that if a site is kept clean and tidy then it’s a very good indication that things are organised properly, hence DFL have always taken pride in their hoardings and site setup as well as ensuring that sites are always properly maintained from start to finish.

50

51


REXAM

Hickey Fabrication Hickey Fabrication

Rexam Rexam is a typical example of an existing manufacturing facitlity where DFL are involved on an ongoing basis in constructing and adapting a live production facility.

Hickey Fabrication Services The above production facility which was constructed on a green field site for Hickey Fabrication Services is a good example of the typical Industrial Units which DFL have constructed on various sites throughout the South East. This particular facility consists of a fabrication/welding area of 15,000 sq. feet and a lay down area of 62,000 sq. feet as well as all associated staff facilities, offices and meeting rooms.

Waterford Industrial Estate David Flynn Limited has proven it has the ability to provide a superior construction service within the industrial sector and has experience of working repeatedly with most of the facilities and clients at Waterford Industrial Estate. Our current client list includes Bausch & Lomb, Honeywell, Rexam, Waterford Business Park, Hasbro and House of O’Donoghue. Whatever the form of procurement, DFL believes in working with it’s clients and designers to form a team focused on the delivery of the facility to each client’s exacting standards whilst often working around and protecting the existing production lines which must operate on a 24/7 basis.

52

53


Waterford Tool Company

Carten Controls

Bellview Port

ESB Lodgewood 220Kv Station

IDA Industrial Estate, Waterford.

Bellview, Waterford.

54

IDA Industrial Estate, Waterford.

Delivery and offloading of the Transformer at the New 220KV Station which was constructed by DFL in Lodgewood, Co. Wexford.

55


ESB Lodgewood220Kv Station Lodgewood, Co. Wexford

56

57


ESB Cullinagh 220Kv Station Kilmeaden, Co. Waterford.

58

59


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.