ARCHITECTURE PORTFOLIO ZHENG LI
Graduate Architect Master of Architecture
Zheng Li
Graduate Architect
Master of Architecture, The University of Melbourne, Australia Bachelor of Industrial Design, Zhengzhou University, China Tel: 0424 038108 Email: johnzhengli@outlook.com
CONTENT
CONTENT
Architecture Portfolio
DESIGN & VISUALISATION Silver Fctory Store Front, Newyork_2016 Maggie Cancer Center, Melbourne_2016 Victoria Parliament Extension, Melbourne_2017 78 Bealiba Rd, Caulfield Melbourne_2017 43 Martin St, Caulfield Melbourne_2017 25 Prospect St, Malvern East_2018
2 4 8 12 16 20
CONSTRUCTION & MODELLING CAZ Tower Construction Model_2016
20
CONSTRUCTION DOCUMENTATION CAD & REVIT Documentation_2014 - 2018
22
1
PINK POROSITY
Storefront of Silver Factory (Andy Warhol) The idea of this store front is to encourage everyone engage with the design of the storefront and each factory person will have their own private and independent gallery to exhibit their works this is inspired by andy warhole’s 15minutes The architectural composition is to put the solid pink box in the center surrounded by extruded glass boxes which can be extruded to form the facade of the storefront according to designers needs. Factory people design the facade through the extruded glass boxes which are independent small gallery too. People will enter the semi-public long ,dark narrow, corridor to watch andy’s films, finally they will arrive the private pink solid box in the center which is the theaterett the free access entrances, semi-public corridor and the private pink theaterette forms the porosity of pink in terms of visiting sequence during that process visitors will experiencing from bright glass galleries to dark quiet film corridor, then gather at the center-theaterette. This is a storefront which connects the public to the factory, it will give people different visiting experiences both hironzontally and vertically as well as let people use their sensories to feel the design of this storefront.
Studio Leader Rennie Liffen Virginia Mannering
Š 2016
2
DESIGN & VISUALISATION
DESIGN & VISUALISATION
3
4
DESIGN & VISUALISATION
DESIGN & VISUALISATION
5
MAGGIE CANCER CENTER Melbourne
According to cancer patient’s emotional statues, the concept is to design a place of non place. Try to give cancer patient different feeling when they recieve chemo therapy and radio therapy. A large garden is designed in the center to generate a cosy micro nature environment.Every functional blcoks are shifted to form the “lady rooms” where has the fabulous views towards outside. Meanwhile the mini gardens surrounding the lady room to keep it private.
Studio Leader Dr Dominic Hozler
6
DESIGN & VISUALISATION
DESIGN & VISUALISATION
7
DESIGN THESIS Victoria Parliament Extension Australian Politic Research
There are different types of discussions in this building, formal informal private, they all visually connected, from long section people in the auditorium can see the open offices as well as the roof top gathering spaces, people on the ramp can see all these activities. These are the glass boxes people looking into the assembly, the short section is to show the auditorium, two discussion rooms and some cafe and other activities happening in the building also how the trees are planted on the roof. To summarise, the new media centre introducing different types of discussions, exposing politicians negotiation process as well as using glass boxes punch into parliament to create the new communication between media centre and parliament. that is it, thank you.
Studio Leader Christina Bowzan
Studio 2017 Melbourne School of Design The University of Melbourne Faculty of Architecture Building and Planning
Š 2015 Bower Studio
8
DESIGN & VISUALISATION
DESIGN & VISUALISATION
9
10
DESIGN & VISUALISATION
DESIGN & VISUALISATION
11
78 Bealiba Road High-end Housing In Caulfield
A heady mix of old and new, Caulfield North is one of Melbourne’s most liveable suburbs for access and amenity. Filtered light spills generously into the interiors through glazed skylights throughout, illuminating the interiors with soft warm light throughout the seasons. Spaciously proportioned interiors seamlessly blend inside and outside via full-width bi-fold doors, leading out to onto a covered alfresco area with built-in BBQ. Perfect for summer evenings, or entertaining with guests amidst the vast pamorama of a lush lanscaped garden and decking.
Design Team Craig Mullin Hugo Cunha Zheng Li Project 2017 Knight Building Group
Š 2017 Residential Project
12
DESIGN & VISUALISATION
DESIGN & VISUALISATION
13
14
DESIGN & VISUALISATION
DESIGN & VISUALISATION
15
43 Martin St
High-end Housing In Caulfield A heady mix of old and new, Caulfield North is one of Melbourne’s most liveable suburbs for access and amenity. Filtered light spills generously into the interiors through glazed skylights throughout, illuminating the interiors with soft warm light throughout the seasons. Spaciously proportioned interiors seamlessly blend inside and outside via full-width bi-fold doors, leading out to onto a covered alfresco area with built-in BBQ. Perfect for summer evenings, or entertaining with guests amidst the vast pamorama of a lush lanscaped garden and decking.
Design Team Craig Mullin Hugo Cunha Sebastian Ospina Muñoz Zheng Li Project 2017 Knight Building Group
© 2017 Residential Project
16
DESIGN & VISUALISATION
DESIGN & VISUALISATION BASEMENT FLOOR PLAN
GROUND FLOOR PLAN
BED 2
WIR ENSUITE
ENSUITE MASTER BED 1 ENSUITE
LAUNDRY PDR LIBRARY
LIVING
THEATRE LIFT
STORE
BUTLERS PANTRY
KITCHEN
GARAGE
LIFT
DINING
WINE CELLAR
PDR
POOL
ALFRESCO
N
0
1
2
N
3
4
5
0
1
2
3
4
5
The plans presented are for illustrative purposes only. For accurate drawings of each apartment, refer to construction drawings.
The plans presented are for illustrative purposes only. For accurate drawings of each apartment, refer to construction drawings.
FLOOR PLANS
13 FOOTE ST, BRIGHTON
17
18
DESIGN & VISUALISATION
DESIGN & VISUALISATION
19
25 PROSPECT St
High-end Housing In Malvern East Australian Politic Research
A heady mix of old and new, Caulfield North is one of Melbourne’s most liveable suburbs for access and amenity. Filtered light spills generously into the interiors through glazed skylights throughout, illuminating the interiors with soft warm light throughout the seasons. Spaciously proportioned interiors seamlessly blend inside and outside via full-width bi-fold doors, leading out to onto a covered alfresco area with built-in BBQ. Perfect for summer evenings, or entertaining with guests amidst the vast pamorama of a lush lanscaped garden and decking.
Design Team Zheng Li Luciano
Project 2018 2BSCENE DESIGN Š 2017 Residential Project
20
DESIGN & VISUALISATION
NOT FOR CONSTRUCTION
Issue WD1
Date AUG 2018
6215
7900 120
120
260
WT6
1 : 100
1500 WIR
115
90 3460
6220
6005 GARAGE
690
1200 90 BUTLERS
1600 P'TRY
2235 1015
100 1005 5495 FAMILY
3830
5000
4910 11285
90
190 770 500 500 500 500
2250 STAIRCASE
1850
1890 PUJA
90
1895 ENTRY
1
115
1090 90
4555
745 90
90 1000
ENS 820 WIR
240
90
2100
700
ng
CT
2550
Ceilin
BOUNDARY LINE
DWELLING 1
05
90 900 90
1800 PUJA
90
10 940 90 SHR 10145 WALL ON BOUNDARY
06
21 90
110
10 8 19 90
240
8 90
105
8
2510 350
12070
720 90
2270 90
10 90 10
WIR
4320
4320
BED 1 4300
995
90 780
600 90 1000 90
2490
PORCH
110 120
90 600
10MM PLASTERBOARD 90MM THK STUD FRAME 10MM PLASTERBOARD
1550 PORCH
NOT FOR CONSTRUCTION
RE
500
DWELLING 2
03
03
05
06
500
DW1 FIRST CL
110426
104706
07
05
W214 01
DW2 FIRST
106970
04
PROPOSED 1.8m HIGH FENCE
PROPOSED 1.2m HIGH FENCE
02
01
DW2 GROUND 01
01
103950
PROPOSED DW2 DRIVEWAY
01
POLYSTYRENE LIGHTWEIGHT WALL ABOVE TO BE PACKED TO MATCH BRICK VENEER WIDTH UNDER.
03
DWELLING 1
ALUMINIUM SCREENING DEVICE by Bayside Privacy Screens or similar (<20% visibility) up to 1.7m to prevent overlooking in accordance with standard B22 of clause 55
03
03
RE
500
DW1 FIRST CL
110426
05
07
03
05
client
Chandramohan & Pabari SECTIONS 1
project no. date scale
PRO25 JULY2016 1 : 50
W206
2700 106970
H WA LL ON
1700
400
2700
3200
2700 320 820
D102
DECKING AREA
WD - West Elevation 1 : 100
01
04
01
01
EXISTING 1.8m HIGH PALING FENCE
107406
DW1 GROUND
104706
103950
02
PROPOSED 1.8 HIGH INTERNAL PAILING FENCE
6
WD - Internal West Elevation 1 : 100
client
107726
DW1 GROUND CL
01
DW2 GROUND
5
DW1 FIRST
01
N
this drawing is COPYRIGHT drawings shall remain the property of 2bscene design
project
01
01
DWELLING 1 GARAGE
106650
01
PROPOSED DW2 DRIVEWAY
DW1 FIRST CL
03
03
DW2 GROUND CL
W205
BOUN DARY
1000mm high Axiom NEO semi frameless glass balustrade with rectangular outer top rail powdercoated monument or similar
320
MAX 3.2m HIG
DW2 FIRST
1700
obs
1500
W212
ob s
W113
03
109670
01 05
2700
W213
obs
1000
1500 04
03
110426
DW2 FIRST CL
01
@ A1
05
01
400
Dwg No:
WD07
title
1000mm high Axiom NEO semi frameless glass balustrade with rectangular outer top rail powdercoated monument or similar
proposed dwelling development @ 25 Prospect St Mount Waverley
DWELLING 1
06
BOUNDARY LINE
03
500
TB SC OD E SE
03 05
2845
103950
BOUNDARY LINE
DWELLING 2
AC K
BOUNDARY LINE
320
1000
DW2 GROUND
N
this drawing is COPYRIGHT drawings shall remain the property of 2bscene design
ALUMINIUM SCREENING DEVICE by Bayside Privacy Screens or similar (<20% visibility) up to 1.7m to prevent overlooking in accordance with standard B22 of clause 55
1 : 100
06
2700
240mm brick veneer construction. Refer to energy rating report for insulation requirements
PROPOSED 2.4m HIGH INTERNAL PALING FENCE
EXISTING 1.6m HIGH PALING FENCE + PROPOSED 500mm TRALLICE ABOVE EXISTING
WD - South Elevation
01
° 96.00
2500
3910
104706
01
K AC
2670
107406 01
DW1 GROUND
K AC
2700
107726
04
TB
DW2 GROUND
D103
D202
500
4
project
103950
BOUNDA RY
01
° 84.00
BED 1
3605
320
01
106650
DINING
3550
WALL ON
01
DW2 FIRST
106970
ENTRY
1700
2700
1700 HIGH
3200
3.2m
103950
RE
BOUNDARY
D205
TB
320
MAX 01
DW1 FIRST
DW1 GROUND CL
MAX 3.2m BOUNDA HIGH WAL L ON RY
W104
106970
DW2 GROUND CL
03
04
109670
DW2 GROUND CL
W216
01
E SE OD SC
1 WD10
01
RE
DW2 GROUND CL
106650
01
E SE OD SC
106970
W111
W112
05
W210
05
2700
SC OD E SE
ALUMINIUM SCREENING DEVICE by Bayside Privacy Screens or similar (<20% visibility) up to 1.7m to prevent overlooking in accordance with standard B22 of clause 55
320
TB
AC K
BOUNDARY LINE
DWELLING 2 05
DW2 FIRST
COLORBOND parapet capping. Colour 'Monument' throughout. 2°
2700
106650
04
DW2 GROUND
COLORBOND Flat Roof, Lysaght Klip-Lok 406 throughout
1:100 Fall
400
DW2 GROUND CL W201
D201
1 : 100
DW2 FIRST CL
Bayside Privacy Baton Style Window screen powdercoat 'Monument' to prevent overlooking in accordance with Standard B22 of Clause 55.
ADJOINING SINGLE STOREY RENDERED DWELLING
DW2 FIRST CL
500 D207
04
W202
350
WD - North Elevation
2700
290
500
BED 2
820
1000
2700
FAMILY
2° Fall
(05) FUTUREWOOD - ENVIROSLAT CLADDING - WALNUT (HORIZONTAL)
BOUNDARY LINE
07 07 07
PROPOSED DW1 DRIVEWAY
02
RE
DW2 FIRST
(04) MATRIX CLADDING PAINT FINISH - DULUX "NOMAD"
D206
01
106650
COLORBOND parapet capping. Colour 'Monument' throughout.
2700
500
° 96.00
BOUNDARY
Zincalume Box Gutter,100mm deep supported on 19mm marine grade plywood 1:200 Fall to gutter minimum
6° Fall
Post & Panel balustrade system to incorporate 40 X 40 stainless steel frame powdercoated "Monument". 12mm toughened glass to be fixed onto via glass clamps.
05
(03) MATRIX CLADDING PAINT FINISH - DULUX "TIMELESS GREY"
obs Obscured Windows
03
01
W211
° 96.00
290 X 90 treated pine dressed timber post as per engineer's specs 1000mm high Axiom NEO semi frameless glass balustrade with rectangular outer top rail powdercoated monument or similar
2700
2700 03
06
DW2 FIRST CL
1 : 50
05
W207
W208
DWELLING 1 GARAGE
109670
COLORBOND Flat Roof, Lysaght Klip-Lok 406 throughout
109670
(02) RENDER PAINT FINISH - DULUX "NOMAD"
(06) PFC FEATURE PAINT FINISH "GLOSS BLACK"
01
1 : 50
DW2 FIRST CL
(01) RENDER PAINT FINISH - DULUX "TIMELESS GREY"
103950
2700
01
104706
Section 1 DWELLING 2
Note
TENDER ISSUE
109670
W203 01
3
Section 2
320
6820 06
D105
DW1 GROUND
Date AUG 2018
MATERIAL SCHEDULE
106650
1 : 100
W215
03
01
W105
Issue WD1
320
2700
03
01
FFL 103.80
2
DWELLING 2
05
D106
04
DW1 FIRST
107726
05
D107
date scale
PRO25 JULY2016 As indicated @ A1
(07) MATRIX CLADDING PAINT FINISH - DULUX "MONUMENT" 1000mm high Axiom NEO semi frameless glass balustrade with rectangular outer top rail powdercoated monument or similar
05
W116
W115 W114
DWELLING 1 PLANS
project no.
2700
3020
2700
2500
W109
DW1 GROUND CL
DW1 GROUND
FSL 104.56
05
107406
Concrete footings as per engineer's specs.
FFL 104.66
03
2700
2700
Commercial frame window installed as per manufacturer's specs. Refer to window and door schedule for further details.
LIVING
Existing soil to be graded away from building
380 PFC feature installed as per engineer's details. Paint over finish with Dulux "Gloss Black"
106970
1:20
WD - Internal East Elevation
1000mm high Axiom NEO semi frameless glass balustrade with rectangular outer top rail powdercoated monument or similar
2700
2400
W105
05
DW1 FIRST CL
2700
320 2700
DINING
D105
06
500
110426
POLYSTYRENE LIGHTWEIGHT WALL ABOVE TO BE PACKED TO MATCH BRICK VENEER WIDTH UNDER.
01
1
02
DW2 GROUND CL
DW2 GROUND
K AC
KITCHEN
BUTLERS
05
5530
W117
380 PFC feature installed as per engineer's details. Paint over finish with Dulux "Gloss Black"
DW2 GROUND
W216
D203
01
TB
DW2 GROUND CL
500
DWELLING 1
DW1 FIRST
106650
103950
DWELLING 1 GARAGE W204
500
2°
106970
STORAGE
01
104706
2 05
107406
110
PROPOSED MAX 1.8m HIGH FENCE
01
1 : 100
Zincalume Shaped Box Gutter,100mm deep supported on 19mm marine grade plywood 1:200 Fall to gutter minimum 107726
DWELLING 1 GARAGE
01
740
FAMILY
D107
DW1 GROUND CL
LIVING
01
Chandramohan & Pabari
109670
DW2 FIRST
01
W115
DW2 FIRST
DWELLING 2 GARAGE
PROPOSED MAX 1.2m HIGH FRONT FENCE
500
STUDY
D207
01
proposed dwelling development @ 25 Prospect St Mount Waverley
500
FAMILY
STUDY
1
500
W214
D106
01
500
BED 3
W114
FIRST FLOOR: 19mm THK yellow tongue particle board flooring installed to floor. Floor joists to manufacturer's specifications, designed & installed to AS1684.1. Builder to provide computations & specifications to designer & building surveyor before installation. Insulation to energy rating requirements.Flooring finish as per internal details.
04
WD - East Elevation
1000
Insulation as per energy rating report.
110426
320
06
05
PROPOSED 2.4m HIGH PALING FENCE
E SE OD SC
2700
FUTUREWOOD Enviroslat Cladding - Walnut to be installed as per manufacturer's specs
04
107406
W107
RE
BOUNDARY
109670
DW1 FIRST CL
380 PFC feature installed as per engineer's details. Paint over finish with Dulux "Gloss Black"
DP
DW2 FIRST CL
01
400
RHW
W106
2700
SCYON Matrix cladding installed as per manufacturer's specs.
2° Fall
W101
D101
06
DW1 GROUND PROPOSED MAX PROPOSED MAX 1.2m 1.8m HIGH FENCE HIGH FRONT FENCE
2700
2° Fall
W102
W103
N
this drawing is COPYRIGHT drawings shall remain the property of 2bscene design
DW2 FIRST CL 05
W209
2° Fall
2° Fall
1000 Timber balustrade
2° Fall
107726
01
DW1 GROUND CL
DWELLING 1
COLORBOND parapet capping. Colour 'Monument' throughout. Flashing over as required.
COLORBOND parapet capping. Colour 'Monument' throughout.
DW1 FIRST
01
400
DWELLING 2
Zincalume Box Gutter,100mm deep supported on 19mm marine grade plywood 1:200 Fall to gutter minimum
320
COLORBOND Flat Roof, Lysaght Klip-Lok 406 throughout
01
06
01
Zincalume Box Gutter,100mm deep supported on 19mm marine grade plywood 1:200 Fall to gutter minimum
05
400 1000
04
WT7
client
03
COLORBOND Flat Roof, Lysaght Klip-Lok 406 throughout
Internal stair treads and landings are required to achieve a slip resistance rating of not less than P3 and external deck steps a rating of not less than P4.
240
K AC
500
SC OD E SE
4910
120
4775 BED 1
W108
W110
Sub floor ventilation to be provided at a rate of 6000mm²/m, wherein the sub floor clearance between ground level and underside of bearers to be a minimum of 150mm. Subfloor vents are required at 1200mm centre and maximum of 600mm from corners.
1895 ENTRY
01 03
Bearers- provide 2/90x45 MGP10 H3 treated pine support on stump minimum 400 clearance from surface level single span max. 1400mm as required in a termite area. Floor joist- 90x45 MGP10 H3 treated pine at 450 max. ctrs single span max. 1600mm Decking- 19x70 MGP10 H3 treated pine decking stained finish with "Cabot Merbau) Framing to be built in accordance with residential timber framed construction AS1684 Provide ant caps between concrete stump and bearer as per AS3660.1
title
90 4775
TB
TB
AC K
06
1770 PWD 2020
E SE OD SC
03
7.5MM THK HARDIETEX - ACRYLIC RENDER OVER WITH PAINT FINISH AS PER MATERIAL SCHEDULE 90MM THK STUD FRAME AT 600 CTRS. MAX. 7.5mm THK HARDIETEX - ACRYLIC RENDER OVER WITH PAINT FINISH AS PER MATERIAL SCHEDULE
WD09
1600 90 1250 90 PTY 90 1000 90 600 1000 90 CL 240 1600 90 2160 L'DRY ENS
19680
ADJOINING SINGLE STOREY BRICK DWELLING
DECK FRAMING NOTE Stumps- 100x100 reinforced concrete supported on 350 dia. x 200 deep mass concrete pad min. founding depth 600 from nsl refer to soil report
BOUNDARY LINE
1890
Protective coatings for exposed steelwork. All external exposed steelwork such as window or door lintels shall be hot dipped galvanize 300g/m2 min.
project
AC K
3435 DECKING
6095
Balustrading to be 1000 mm min. in height at landings and 865mm min. height at stairway. Balusters shall be installed, such that the spacing between balusters does not exceed 125mm. Stairway shall be 850mm min. width clear of all obstructions.
2
1 WD09
1200 90
1 : 100
4670
10 DP
WT2
5590
6090 350
WT2
DP
1800 BUTLERS
PFC Canopy above
g
Stairway to comply with current NCC. Steps to be 250mm min. treads 'non slip' and 190mm max. risers. if owner chooses to install open tread staiway, open risers are to have a maximum opening of 125mm.
1795
Ceili
1 WD08
2400
2550
canopy above
680 90
ENS
ng
Ceili
ht
240
590 875
wall above
WT6 W103
120 500 500 500 500 480
BUTLERS
DP
265
floor above
skylig
2550
CLOTHESLINE
2.4m HIGH PALING FENCE
D102
90 600
100
WD - Dwelling 1 Ground
Note
TENDER ISSUE CONDITION 1 AMENDMENTS
TM
RE
Date FEB 2018 09/2014
BED 1
CT
W104
WT2
240
4450
Issue WD1 1
L'DRY
560
PORCH
FFL 104.66 ET MB
WT2
WIR TM
FSL 103.80
6005 GARAGE 5855
240
1 : 100
NOT FOR CONSTRUCTION
820
2035
P'TRY CL L'DRY
WD - Setout Plan 1
CL 720
TM DP
D101
W102
820
1160
6m3 STORAGE
FFL 104.61
W101
TM
S
720
W
50090 2535
1880
500
2120
240
BUTLERS 90 1005 90 600 90500
3200
1000
90 1000 90 230 2880
DECKING
4225
DINING
KITCHEN 5090
5090 6110
GARAGE
6570 190500
DECKING
WT2
CT
WT5
Solid membrane damp proof courses and flashing shall be incorporated to external walls. Weepholes at 1000mm max. centres. In accordance with Standard Domestic General Specification Clause 3-11.
8MM SCYON MATRIX CLADDING - VERTICAL 2390 X 590 - PAINT FINISH AS PER MATERIAL SCHEDULE 19MM SCYON CAVITY TRIM WT6 90MM THK CSR BRADFORD R2.0 'GOLD' WALL BATTS BETWEEN 90MM THK STUD FRAME AT 600 CTRS. MAX. 10MM PLASTERBOARD PAINT FINISH DULUX "WHITE ON WHITE"
W118
500 ENTRY
TM
PWD
TB
5825
@ A1
TM
WD07
SC OD E SE
1550
1 WD08
1.2m high timber balustrade, paint finish Dulux "White on White"
UP
P'TRY
700
WT2
TM
DWELLING 1
820 D103 DP
1
W107
875
LIVING
FFL 104.72
RE
10145 WALL ON BOUNDARY
CN
TM
TM
6005 WT1
DINING
KITCHEN
BOUNDARY LINE
1890
PRO25 JULY2016 1 : 100
FFL 104.66
WT4
21MM THK FUTUREWOOD ENVIROSLAT WEATHERPROOF CLADDING "HORIZONTAL-WALNUT" FUTUREWOOD ENVIROSLAT JOINING PLATE HARDIEWRAP WEATHER BARRIER TYVEK® HOMEWRAP 90MM THK CSR BRADFORD R2.0 'GOLD' WALL BATTS BETWEEN 90MM THK STUD FRAME 10MM PLASTERBOARD
Install where indicated 250mm diameter exhaust fan, ceiling mounted, min. capacity 350ms/hr. Where fan is provided to sanitary compartments, maintain 15mm min. door clearance to FFL. Fan to extract to open air.
240
1665
scale
DW1 GARAGE
BOUNDARY LINE
10030
WT1
WT2
310
7780 WALL ON BOUNDARY
project no. date
SETOUT PLAN
WT2
BINS
200
735
Chandramohan & Pabari
DP
240
title
proposed dwelling development @ 25 Prospect St Mount Waverley
75
Dwg No:
WD03
13980
2510 350 4300
w
client
2530
N
this drawing is COPYRIGHT drawings shall remain the property of 2bscene design
project
G
FP
W105
D105
WT3
PFC Canopy above
PUJA
1910
ALFRESCO
240
500
4910
PROPOSED 1.2m HIGH RENDERED FENCE
4460
PROPOSED 1.2m HIGH RENDERED FENCE
FFL 104.61
2270 DW1 MAILBOX
MB
CLOTHESLINE
PROPOSED 2.4m HIGH PALING FENCE
2400 2610
5000
FFL 103.90
FSL 103.80
140
10MM HI-FIBRE RENDER IN SELECTED PAINT FINISH 100MM THK UNITEX 'UNI-IB' CLADDING BOARD TYVEK® HOMEWRAP 50MM PACKING TO SUIT 90MM THK CSR BRADFORD R2.0 'GOLD' WALL BATTS BETWEEN 90MM THK STUD FRAME AT 600 CTRS. MAX.
WT2 DP
DP
1
190
SWIN GGAT E
FFL 104.66
CLOTHESLINE
1830
WT2
FFL 104.66
WT2
10MM HI-FIBRE RENDER IN PAINT FINISH - DULUX "TIMELESS GREY" 75MM THK UNITEX 'UNI-IB' CLADDING BOARD TYVEK® HOMEWRAP 90MM THK CSR BRADFORD R2.0 'GOLD' WALL BATTS BETWEEN 90MM THK STUD FRAME AT 600 CTRS. MAX.
500
2 WD09
ALFRESCO
WT2
WD07
190
FFL 104.72 DWELLING 1
1190
e abov
6550 WALL ON BOUNDARY
FFL 104.66
230 500
6910
BINS
REF
FFL 103.95
PROPOSED DRIVEWAY
void
17070
FSL 104.56
1
ACRYLIC RENDER - PAINT FINISH AS PER MATERIAL SCHEDULE SELECTED CLAY BRICK TYVEK® HOMEWRAP 90MM THK CSR BRADFORD R2.0 'GOLD' WALL BATTS BETWEEN 90MM THK STUD FRAME 10MM THK PLASTERBOARD PAINT FINISH "WHITE ON WHITE"
240
WD09
FP
FFL 103.80
WT1
Dwg No:
6225 ALFRESCO
1550 PORCH
FFL 104.66
DWELLING 2
Install where indicated direct wired interconnected smoke detectors with battery back up in accordance with A.S.3786. SM
WALL TYPE
ACRYLIC RENDER OVER BRICK - DULUX "TIMELESS GREY" SELECTED CLAY BRICK (DOUBLE LEAF)
110
190
6005
360
G
110
Timber construction shall comply with Residential Timber Framing Construction Code A.S.1684-2010.
floor waste to specifications
WD04
5500
MB
PROPOSED 1.2m RENDERED FENCE
3420
3000
2040 2510
255 HIGH E 1.2m NC ED FE OS ED OP ER PR REND
FFL 103.90
1670
11675 350
PROPOSED 1.2m HIGH RENDERED FENCE
FSL 104.56
All glazing shall be in accordance with Australian Standard A.S.1288-2006.
smoke detector exhaust fan
CONSTRUCTION
90 270 125
8215
5855
5940
PROPOSED 1.8m HIGH RENDERED FENCE
SM
dishwasher washing machine laundry trough cavity sliding door external sliding door articulation joint overflow pipe
19695
10615
PROPOSED 1.2m RENDERED FENCE
w
960
190
All materials and method of construction, testing etc. shall comply with relevant Australian Standards and current Building Code of Australia dw wm tr cs sld aj ov
WD06
2090
3575
Drawings shall be read in conjunction with relevant engineers and other consultant's design, drawing and specifications.
selected timber look tiles
shower base to specifications bath tub to owner's selection vanity basin wall basin semi-recessed vanity basin toilet specifications bench fridge underbench oven hot plate stainless steel sink pantry
WALL TYPE LEGEND
110
3000
3420 BED 2
selected ceramic tiles selected carpet finish
320
DW2 MAILBOX
190 1115
3420
40
5480
90
1300 90 WIR 7730
CT CPT
Dwg No:
PROPOSED 1.2m RENDERED FENCE
ALL LANDSCAPING TO REFER TO LANDSCAPE PLAN BY F&G DESIGN DATED 14/5/17
1480
2010 90
240
190 1200 190
90
2710 ENS
5000
4685
PROPOSED 1.8m FENCE
3000
PROPOSED 2.1m HIGH RENDERED FENCE
565
2000
90
240
EXISTING CROSSOVER TO BE REMOVED AND REINSTATED TO COUNCIL'S SATISFACTION
PROPOSED DOUBLE CROSSOVER
90 1900 ENS
110
3490
WD - Dwelling 1 First
2
3510
230
1550
90
360
75 10
11675
175
5855
90
2390
100
4990
2 WD09
selected timber flooring
6 STAR ENERGY RATING SUMMARY: Ceiling insulation R6.0 plus foil excluding Garage. Wall insulation R2.5 plus foil to all external walls and Garage internal walls excluding Garage external walls. Seal gaps, cracks and exhaust fans. Weather-strip windows and entry doors. Seal to garage door is not required. Window frames to be single glazed low-e type or approved equivalent excluding fixed windows in Living & Family. Fixed windows in Living & Family to be double glazed U-4.1 SHGC-0.52 type or approved equivalent.
50
1965
1 WD09
VOID
7180
115 RHW DP
1 : 100
90
120 DP
3000
RHW DP
WD - Setout Plan First Floor
2740
WT6
10
940
2120
1:200 Min. Fall
WT6
DP
WD08
630
TM
1
timber decking
TLT
2245
WT6
120
WIR
720
W111
CANOPY ABOVE
WT5
2° Fall
RHW DP
2195
CT
W112
2°
W110
TD TM
shr bh vb wb rb pn bc ref ubo hp ss pty
120 235
1:200 Min. Fall
TM
515 500 500 500 500 480
2°
RHW DP
BED 2
Drawings shall not be scaled. contractors shall verify all dimensions on site before commencing any works or preparing any shop drawings, which must be approved by the designer before manufacture.
FLOOR FINISHES SCHEDULE
PLAN LEGEND
150 1160
ENS
CT
WT5
DP
WT5
over
ENS 720
WT5 W109
1300
DN TM
2° Fall
820
720
WIR
VOID
1m High Timber Balustrade
D
flashing
2° Fall
CANOPY ABOVE
TM
W113
W108
600
FFL 107.73
1:200 Min. Fall
WD08
DWELLING 1
820
RHW DP
1
CANOPY ABOVE
820
RAISE LED G ANG CEILIN
BED 3
WD07
1m High Timber Balustrade
1:200 Min. Fall
TM
265
2° Fall
FAMILY
TM
GENERAL NOTES
BALCONY 1410
115 855 120 1155 105 BALCONY 2235
DP
W114 W115
3655
WT5
150
D107
BED 2 4150 W110 5030
1:100 Fall 1:100 Fall
1:200 Min. Fall
DP
145
100
2245
2990
FAMILY
5000 RHW DP
1:200 Min. Fall
1:200 Min. Fall
90 1000
90 115
1:200 Min. Fall
505
RHW DP
115 2095
2275
2775
2° Fall
2240
RHW DP
DP
SCREENING DEVICE
ENS
1:200 Min. Fall DP
DP
8965 3700
14200
WIR
Overflow as required
WT7
1:200 Min. Fall
STUDY CANOPY ABOVE
2540
ENS
630
2°
RHW DP
350
21
Note
TENDER ISSUE
105
WT6
ET
FFL 107.68
600
RHW DP
over
ENS
4605
BALCONY
D106
WT6
2° Fall
BED 2 flashing
7620
WIR
WD07
1090 90
DN
DP
1180
Date AUG 2018
660 90 100
1
90
1:200 Min. Fall
2° Fall
2° Fall
DP
2°
1:200 Min. Fall RHW DP
DP
6010
Issue WD1
WT7
100 RHW DP
2820 5010
115
1
1m High Timber Balustrade
BED 3
1:200 Min. Fall RHW DP
2760
2 WD09
1:200 Min. Fall
FFL 107.73
DP
110
NOT FOR CONSTRUCTION
1830
3400
1
500 500 500 500
WT6 WT6
ENS
DP
RHW DP
2
90
100
2° Fall
115 855 120 1155 105
1:200 Min. Fall
VOID
2° Fall
DWELLING 1
DP
RHW DP
2010
2435 VOID
WD09
WT6
DP
2° Fall
2° Fall
2° Fall
1m High Timber Balustrade
DP
FFL 106.97
2000
1210
4340
90
600
1:200 Min. Fall
DP
FAMILY
2195
1:100 Fall
120 1070
1:200 Min. Fall
FFL 107.68
STUDY
600
BALCONY
2°
RHW DP
1:200 Min. Fall DP
120
1:100 Fall
RHW DP
FFL 106.92
2090
DN
90
120 1270 115
260
4100 FAMILY 90
5150
RHW DP
DP
DP
4360 120
5530 BALCONY 90
3490 STUDY 3490 BED 3
RHW DP
DESIGN & VISUALISATION
Note
TENDER ISSUE
title
proposed dwelling development @ 25 Prospect St Mount Waverley
Chandramohan & Pabari ELEVATIONS
project no. date scale
PRO25 JULY2016 1 : 100
@ A1
TOWER MODEL 1:500 APPLIED CONSTRUCTION
OUTRIGGER
Supervisor Giorgio Marfella Jamie Mccutcheon
Applied construction University of Melbourne School of Design
© 2016
22
CONSTRUCTION & MODELLING
BELT TRUSS
CONCRETE BAND BEAM
CONCRETE COLUMN
LATERAL LOADS RESISTING SYSTEM
CONCRETE EDGE BEAM
CONCRETE BAND BEAM
CONCRETE COLUMN
CONCRETE EDGE BEAM
STEEL COLUMN
CONCRETE CO
CONSTRUCTION & MODELLING
TRUSS ROOF
LIGHT WEIGHT BRACING FOR ROOFTOP STRUCTURE
OLUMN
CONCRETE EDGE BEAM
23
BMU COX E5000 E-TYPE 3
CONSTRUCTION DOCUMENTATION CAD Drawings
1 A5.3
Supervisor Giorgio Marfella
The University of Melbourne Faculty of Architecture Building and Planning Melbourne School of Design
© 2015
1 A4.4
ELEVATION 1:50 @ A2 2 ROOF BMU SECTION A4-5 SCALE 1:50
24
CONSTRUCTION & MODELLING
CONSTRUCTION & MODELLING A5.3 Parapet: Details
6MM ALUCOBOND ALUMINUM COMPOSITE PANEL WHITE
6MM ALUCOBOND ALUMINUM COMPOSITE PANEL WHITE
STEEL TUBE 250X150X6MM
2 A5.3
02 A5.3
SILICON SEALANT
SILICON SEALANT BRACKET 120X40X5MM
01 A5.3
Decorative Facade Section Detail 1:5
50mm
200mm
02 A5.3
50mm
Decorative Facade Section Detail 1:1
ALUMINIUM COMPOSITE PANEL CAPPING 3MM WHITE FINISH TIMBER PACKING SILICON SEALANT
SILICON SEALANT
ALUMINIUM COMPOSITE PANEL 4MM WHITE
1 DETAIL A5-3 SCALE 1:20
04 A5.3
ALUMINIUM COMPOSITE SPANDREL PANEL 4MM WHITE
Spider Section Detail 1:5
ORIGINAL TENSION TRUSS GRID
TOP HAT TCN NODE, 12MM OFFSET HOLE Ø32MM COMPRESSION SPAR
MIG GLAZING FIXING LIQUD WATERPROOFING MEMBRANE
6MM
MIG THREADED ROD TRE TIE ROD PORK, MIG, M25 ROD Ø25MM
03 A5.3
ORIGINAL TENSION TRUSS GRID
Retaining wall Section Detail 1:5
40MM BLUESTONE 2MM MORTAR WEARING SLAB LIQUID WATERPROOFING MEMBRANE
600X600 RAISED ACCESS FLOOR
TIE ROD Ø25mm
CONCRETE FLOOR SLAB TRE TIE ROD FORK M25
THERMAL INSULATION 50MM CONCRETE FINISH
T BRACKETS 200x100x10MM M16 AGA NUT
RIGID GRID PEDESTAL
2 DETAIL A5-3 SCALE 1:2
MECHANICAL FLOOR 05 A5.3
Crown Floor Section Detail 1:5
25
CONSTRUCTION DOCUMENTATION CAD Drawings
Supervisor Giorgio Marfella Christina Bozan Lina Xu
The University of Melbourne Faculty of Architecture Building and Planning Melbourne School of Design
© 2014
26
CONSTRUCTION & MODELLING
CONSTRUCTION & MODELLING
27
CONSTRUCTION DOCUMENTATION CAD Drawings
Design Team Craig Mullin Hugo Cunha Sebastian Ospina Muñoz Zheng Li Project 2017 Knight Building Group
© 2017 Residential Project
28
CONSTRUCTION DOCUMENTATION
CONSTRUCTION DOCUMENTATION
29
DWELLING 1
CONSTRUCTION DOCUMENTATION
COLORBOND Flat Roof, Lysaght Klip-Lok 406 throughout 6° Fall
Zincalume Box Gutter,100mm deep supported on 19mm marine grade plywood 1:200 Fall to gutter minimum
REVIT Drawings
00° 96.
DW1 FIRST CL
110426
2700
03
Design Team Craig Mullin 1:100 Fall Hugo Cunha Sebastian Ospina Muñoz Zheng Li
all
Project 2018 Knight Building Group
COLORBOND Flat Roof, Lysaght Klip-Lok 406 throughout COLORBOND parapet capping. Colour 'Monument' throughout.
DW1 FIRST
107726
DW1 GROUND CL
107406
DINING
PWD
WIR
ENS
240mm brick veneer construction. Refer to energy rating report for insulation requirements
2500
ONY
ENS
1000 TIMBER BALUSTRADE
FAMILY
FIRST FLOOR: 19mm THK yellow tongue particle board flooring installed to floor. Floor joists to manufacturer's specifications, designed & installed to AS1684.1. Builder to provide computations & specifications to designer & building surveyor before installation. Insulation to energy rating requirements.Flooring finish as per internal details.
DW1 GROUND
104706
© 2017 Residential Project
30
CONSTRUCTION DOCUMENTATION
CONSTRUCTION DOCUMENTATION NOT FOR CONSTRUCTION
12mm thick clear toughened glass to builder's selection
Floor finish as per client's selection
Non grout mechanical fix glazing channel powdercoated "Monument" with cover cap or similar
19mm thick yellow tongue particle flooring. Floor trusses to engineer's specs. Colorbond flashing to be shaped prior to sliding door installation Commercial frame aluminium sliding door as per door and window schedule. Glazing details refer to energy rating report Waterproof membrane to be installed with a min. 50mm upturn. 22mm Scyon Secura Exterior Flooring installed to manufacturer's specifications Waterproof membrane as required.
Zincalume Shaped Box Gutter,100mm deep supported on 19mm marine grade plywood 1:200 Fall to gutter minimum COLORBOND Flat Roof, Lysaght Klip-Lok 406 throughout 8mm thick Matrix Panel as per manufacturer's specifications. Colour as per material schedule.
19mm SCYON Cavity Trim
COLORBOND parapet capping, Monument colour throughout 01
Date AUG 2018
31
Note
TENDER ISSUE
Tiling profile over membrane turnup Tile grouting as required Selected tile adhesive Tile movement joint
Mortarbed with reinforcement graded to discharge point Non-slip ceramic floor tiles installed over mortarbed.
Canopy beam and roof trusses as per engineer's specs
Issue WD1
Liquid membrane as required
Tiles as per Domestic Specifications. COLORBOND parapet capping, Monument colour throughout 100mm stainless steel floor grate
Reinforcement band or special treatment to liquid membrane over sheet jointing
100 X 45 strip drain to be installed to builder's specifications. 2° Fall
DW2 FIRST
106970
1:100 Fall
DW2 GROUND CL
106650
20
Balcony floor joists as per engineer's specs. Insulation as per energy rating requirements
6mm Villaboard installed as per manufacturer's requirements 20mm drip overhang as required 10mm toughened glass feature to be supported on 32 X 32 Capral glazing channel or similar approved. 960
1
DW1 FIRST CL
110426
Lintel as per engineer's specs. Polystyrene lightweight wall above to be packed to match width of brick veneer wall.
Reinforcement bandage
HARDIPANEL compressed waterproof flexible sheet with sealed joints
NOTE: HARDIPANEL compressed joints must occur over joists and trimmers
HARDIPANEL compressed movement joint
Floor beam as per engineer's specs 10mm plasterboard paint finish Dulux "White on White" Capral 425 Narrowline aluminium framing system or similar approved. Glazing as per energy report.
Typical Balcony Waterproofing Detail
Dwelling 2 Balcony and Canopy Detail 1 : 10
COLORBOND parapet capping, Monument colour throughout Floor finish as per client's selection
Capral 425 Narrowline aluminium framing system or similar approved. Glazing as per energy report. Colorbond flashing to be shaped prior to sliding door installation COLORBOND Flat Roof, Lysaght Klip-Lok 406 throughout
19mm thick yellow tongue particle flooring. Floor trusses to engineer's specs. Colorbond flashing to be shaped prior to sliding door installation Commercial frame aluminium sliding door as per door and window schedule. Glazing details refer to energy rating report Waterproof membrane to be installed with a min. 50mm upturn. 22mm Scyon Secura Exterior Flooring installed to manufacturer's specifications Waterproof membrane as required.
Zincalume Shaped Box Gutter,100mm deep supported on 19mm marine grade plywood 1:200 Fall to gutter minimum 2° Fall
DW1 FIRST
107726
1:100 Fall
DW1 FIRST
107726
DW1 GROUND CL
107406
6mm villaboard installed as per manufacturer's specs Balcony floor joists as per engineer's specs Brick veneer to be constructed above sliding door lintel. Render over as per material schedule. Balcony beam as per engineer's specs
2
Dwelling 1 Balcony Detail 1 : 10
10mm plasterboard Lintel as per engineer's specs. Insulation as per energy rating report Capral 425 Narrowline aluminium framing system or similar approved. Glazing as per energy report.
6mm villaboard installed as per manufacturer's specs. Caulking as required. Cleat plate CFW welded to back of PFC at 450 ctrs to correspond with posi-joists. Posi-joists refer to engineer's details. BUILDER WARNING : No penetration through web or flanges of PFC.
240mm brick veneer construction. Render over colour as per material schedule Beam as per engineer's specs. Insulation as per energy rating requirements
Hot dip galvanized 380 X 100 PFC to structural engineer's specs. PFC to be coated in Dulux Professional All Metal Primer. Paint finish over with Dulux "Gloss Black".
3
Dwelling 1 Canopy Feature Detail 1 : 10
Dwg No:
1:100 Fall
WD10
10mm plasterboard
100 X 45 strip drain to be installed to builder's specifications.
50
100 TILE UPTURN
1000
Mortarbed with reinforcement graded to discharge point Non-slip ceramic floor tiles installed over mortarbed. Tiles as per Domestic Specifications. 7.5mm Hardietex installed over 90mm timber stud. Acrylic render over, paint finish as per material schedule 100mm stainless steel floor grate
N
this drawing is COPYRIGHT drawings shall remain the property of 2bscene design
project
client
title
proposed dwelling development @ 25 Prospect St Mount Waverley
Chandramohan & Pabari DETAILS
project no. date scale
PRO25 JULY2016 1 : 10
@ A1