NR
NR
NR
NR NR
Not included
Not included NR
Non e
NR
NR
NR NR
NR
NR
Now not 'likely', nor a predictio n
Q unclear $1.09 bn $691m/$39 9m $6.385 m
Info not yet availab le
$582,880 with caveat s As with A to 25
To be developed Precautionary app
Not relevant Risk assessment
Info not yet available NR Info nya NR
Risk assessment Non e Not relevant Info nya Info nya Info nya Risk assessment focu s
Q not clear
Non e
NR NR NR Not roads No Non e
A comment at the bottom of the reply states that "Dr Shand made it clear at the Council meeting of 1 November 2012 that the study is not probabalistic and therefore does not assign likelihood to any of the factors considered, not to the final scenarios developed."