Construcciones 5
SEMANA 11.2
ANÁLSIS DINÁMICO - Rafael , Denia , Jennifer y Valeria PLAN DE VENTAS E INGRESOS PROYECTADOS
PRESUPUESTO
ESCENARIO FAVORABLE
$15,445,728.00
ESCENARIO PESIMISTA
$15,445,728.00
T0
T1
T2 $2,316,859.20
T3
T4
$2,316,859.20
T5
T6
T7
$9,267,436.80
$1,544,572.80 $4,633,718.40
$10,812,009.60
TOTAL VENTAS PROYECTO
ESTRUCTURA Y PLANIFICACIÓN DE COSTOS
PRESUPUESTO
TERRENO
$1,787,700.00
T0
PRELIMINARES
T1
T2
T3
T4
T5
T6
T7
$113,694.36
ESTRUCTURA
$3,410,830.80
ALBAÑILERIA
$1,136,943.60
PIEZAS SANITARIAS
$568,471.80
GYPSUM
$795,860.52
REVESTIMIENTO DE PAREDES
$454,777.44
PISOS
$795,860.52
ALUMINIO Y VIDRIO
$1,591,721.04
EQUIPAMIENTO
$113,694.36
PUERTAS Y MUEBLES FIJOS
$227,388.72
OBRAS EXTERIORES
$113,694.36
AMBIENTALES Y SEGURIDAD OBRA CIVIL ELECTRICA
$22,738.87 $454,777.44
$11,369,436.00
CANALIZACION ELECTRICA CIVIL
$113,694.36
INGENIERIA ELECTRICA
$568,471.80
MEDIO VOLTAJE
$56,847.18
BAJO VOLTAJE
$56,847.18
FUERZA
$56,847.18
ILUMINACION
$113,694.36
GENERADOR TRIFASICO
$22,738.87
CANALETAS
$5,684.72
PARARRAYO EXTERNO CON CEBADO ELECTRONICO
$2,273.89
SISTEMA DE AGUA POTABLE
$341,083.08
SISTEMA DE AGUA RESIDUALES
$113,694.36
SISTEMA CONTRA INCENDIOS
$5,684.72
TOTAL COSTOS CONSTRUCCIÓN
$13,157,136.00
TOTAL COSTOS CONSTRUCCIÓN
$11,258,015.53
$113,694.36
T0 GASTOS GENERALES
11/9/2020
$3,410,830.80
T1 $323,731.85
$170,541.54
T2 $323,731.85
$3,297,136.44
T3 $323,731.85
$795,860.52
T4 $323,731.85
$1,256,322.68
T5 $323,731.85
$1,736,112.88
T6 $323,731.85
$477,516.31
T7 $323,731.85
$323,731.85
1