Análisis dinámico de costos del proyecto Fullness

Page 1

Construcciones 5

SEMANA 11.2

ANÁLSIS DINÁMICO - Rafael , Denia , Jennifer y Valeria PLAN DE VENTAS E INGRESOS PROYECTADOS

PRESUPUESTO

ESCENARIO FAVORABLE

$15,445,728.00

ESCENARIO PESIMISTA

$15,445,728.00

T0

T1

T2 $2,316,859.20

T3

T4

$2,316,859.20

T5

T6

T7

$9,267,436.80

$1,544,572.80 $4,633,718.40

$10,812,009.60

TOTAL VENTAS PROYECTO

ESTRUCTURA Y PLANIFICACIÓN DE COSTOS

PRESUPUESTO

TERRENO

$1,787,700.00

T0

PRELIMINARES

T1

T2

T3

T4

T5

T6

T7

$113,694.36

ESTRUCTURA

$3,410,830.80

ALBAÑILERIA

$1,136,943.60

PIEZAS SANITARIAS

$568,471.80

GYPSUM

$795,860.52

REVESTIMIENTO DE PAREDES

$454,777.44

PISOS

$795,860.52

ALUMINIO Y VIDRIO

$1,591,721.04

EQUIPAMIENTO

$113,694.36

PUERTAS Y MUEBLES FIJOS

$227,388.72

OBRAS EXTERIORES

$113,694.36

AMBIENTALES Y SEGURIDAD OBRA CIVIL ELECTRICA

$22,738.87 $454,777.44

$11,369,436.00

CANALIZACION ELECTRICA CIVIL

$113,694.36

INGENIERIA ELECTRICA

$568,471.80

MEDIO VOLTAJE

$56,847.18

BAJO VOLTAJE

$56,847.18

FUERZA

$56,847.18

ILUMINACION

$113,694.36

GENERADOR TRIFASICO

$22,738.87

CANALETAS

$5,684.72

PARARRAYO EXTERNO CON CEBADO ELECTRONICO

$2,273.89

SISTEMA DE AGUA POTABLE

$341,083.08

SISTEMA DE AGUA RESIDUALES

$113,694.36

SISTEMA CONTRA INCENDIOS

$5,684.72

TOTAL COSTOS CONSTRUCCIÓN

$13,157,136.00

TOTAL COSTOS CONSTRUCCIÓN

$11,258,015.53

$113,694.36

T0 GASTOS GENERALES

11/9/2020

$3,410,830.80

T1 $323,731.85

$170,541.54

T2 $323,731.85

$3,297,136.44

T3 $323,731.85

$795,860.52

T4 $323,731.85

$1,256,322.68

T5 $323,731.85

$1,736,112.88

T6 $323,731.85

$477,516.31

T7 $323,731.85

$323,731.85