Ops Talk Magazine Spring 2014

Page 42

When educators help guide facility renewal and modernization investments, enormous financial and educational value can be created By Lance Roberts, Ph.D., Professor, Department of Sociology, University of Manitoba, and Wayne C. Cole, Learning Environment Specialist, Johnson Controls Canada

As soon as school facilities are construct-

ment approaches are utilized to assess

establish some measure of facility con-

ed, they begin the unavoidable process

and track the physical deterioration of

dition index is appropriate to fulfill the

of physical deterioration. The stewards

building components, and to determine

purposes for which they were developed

of these building assets have a clear

the level of investment needed to re-

– to measure how degraded the physical

duty to manage the impact of this physi-

store these components to their original

components of a school facility are.

cal deterioration to optimize the useful

condition. With these common assess-

While property management and

lifespan of these assets, and to ensure

ment methodologies, an effort is made

engineering assessments may be use-

that building deterioration does not in-

to prioritize the timetable for making

ful for managing physical deterioration,

terfere with the educational mission for

such investments. There is no doubt that

research evidence about school facilities

which these buildings exist.

schools are physical structures and sys-

makes it clear that any assumption that

Across the nation, various property

tems and, like others, they deteriorate.

this assessment provides meaningful in-

management and engineering assess-

Therefore using such methodologies to

formation about the quality of the teach-

Martha Currie Elementary School

Rogers Elementary School

courtesy of Schubert Plumbing

Z82300-3M

Kelowna Parkinson Sunnyside Elementary Activity School Centre

Lynn Fripps Elementary

courtesy of of Grant Meiklejohn Architects courtesy + Sinclair Architects

JL Crowe Secondary School

Norkam Secondary Renovations courtesy of MQN Architects

ZS880

mechanical consulting engineers

Congratulations, EFMA, on celebrating fifty years of success!

Contact us today at one of our seven BC locations to learn more about how we can provide you with intelligent building engineering solutions for your school facilities or other buildings VANCOUVER

LANGLEY

VICTORIA

NANAIMO

#302 - 2425 Quebec Street Vancouver, BC V5T 4L6 Phone: 604-559-8809

#208 - 20171 92A Avenue Langley, BC V1M 3A5 Phone: 604-888-7779

#312 - 1095 McKenzie Avenue Victoria, BC V8P 2L5 Phone: 250-704-4427

#102 - 3721 Shenton Road Nanaimo, BC V9T 2H1 Phone: 250-585-0222

KELOWNA

KAMLOOPS

NELSON

#201 - 1420 St. Paul Street Kelowna, BC V1Y 2E6 Phone: 250-763-3759

#202 - 1339 McGill Road Kamloops, BC V2C 6K7 Phone: 778-471-6472

2nd Floor - 607 Front Street Nelson, BC V1L 4B6 Phone: 250-352-7933

For more information visit our website at www.rpeng.ca

42

Ops Talk • Spring 2014

Z6930-XL

One Choice. One Zurn. Z5758

Innovative solutions for new construction and retrofit applications. “The Retrofit Pint” Urinal is a low consumption urinal system designed for optimal performance between the Zurn fixture and a Zurn flush valve to save water while exceeding industry performance standards.

zurn.com

9 05.405.8272

OpsTalk_Zurn_Mar2014.indd 1

3/14/14 9:40 AM


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.