FORWARD JUSTICE CENTER FOR EQUALITY

BRITTANY LAWING

RALEIGH, N.C.


SITE

HISTORIC OAKWOOD

CAMERON PARK

1/ 2 M IL E

RAD

COTTON PLACE

IUS

(1 0

NU

MI

TE WA

Raleigh, North Carolina

LK)

227 S. Person Street 35°N 78°W

S. Person Street

MARTIN STREET

E. Martin Street

BOYLAN HEIGHTS

PATTERSON GREEN

PERSON STREET 0’

500’

1000’


SITE

Downtown Black Main Street

Martin St.

Gr e e n w a

East St.

S. Person St.

Q

Blount St.

S re oo

Bus Station

y

Raleigh Rescue Mission

M

Bloodworth St.

Wilmington St.

Hargett St.

Train Station 6 blocks west

Residential

United States District Court

Street Parking

Wake County Justice Center Three blocks west

0’

125’

250’


VIEW FROM SOUTH WEST


MARBLES KIDS MUSEUM

HARGETT STREET

OAK CITY OUTREACH CENTER

FIRE EXIT

FIRE EXIT

320 ’

MOORE SQUARE

BLOODWORTH STREET

PERSON STREET

RALEIGH RESCUE MISSION

BLOUNT STREET

TATION

SITE PLAN

330’

ENTRY

310’

MARTIN STREET 0

MARKET HALL

MOORE SQUARE MAGNET MIDDLE SCHOOL

32

64

128 FT


SOUTH ELEVATION

0 4

8

16

32 FT

WEST ELEVATION

0 4

8

16

32 FT


LEVEL 00 BASEMENT

VENT WITH GRATE COOLING OPEN TO ABOVE

MECHANICAL

WATER COOLED CHILLER

AIR HANDLING UNIT

STORAGE

SECTION ONE

SECTION TWO

TOWER

0 4

8

16

32 FT


LEVEL 01 ENTRY

’ 318 ’ 317

CAFE SUPPORT

’ 316

ACTIVITY ROOM

CAFE

SECTION TWO

SECTION ONE

313’

314’

315’

LOBBY

0 4

8

16

32 FT


LEVEL 02 RESOURCE

MEETING ROOM MEETING ROOM MEETING ROOM

LIBRARY

EXHIBIT

SECTION ONE

SECTION TWO

0 4

8

16

32 FT


LEVEL 03 FLEX

CATERING KITCHEN

STORAGE

OPEN TO BELOW

LIBRARY

SECTION TWO

SECTION ONE

EVENT SPACE

0 4

8

16

32 FT


LEVEL 04

FORWARD JUSTICE

OPEN OFFICE

CONFERENCE ROOM

CONFERENCE ROOM

COPY/BREAK

SECTION TWO DIRECTORS OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

SECTION ONE

PATIO

OFFICE

RECEPTION

OFFICE

0 4

8

16

32 FT


ENTRY COURTYARD


LOBBY

EXHIBIT SEE DETAIL

0 4

8

16

32 FT

MARTIN STREET

SECTION ONE


DETAIL - ROOF + LEVEL 03 6” STUD 1/2” GYPSUM ALUMINUM PANELS

FLASHING

4” METAL STUD 1/2” GYPSUM

3 1/2” COMPOSITE METAL DECK RIGID INSULATION WATERPROOF MEMBRANE METAL COPING 6” METAL STUD 5” METAL STUD ALUMINUM CHANNEL FOR LOUVERS POUR STOP

W-FLANGE BEAM 2” RIGID INSULATION AT SPANDREL GLASS CURTAIN WALL MULLION SUSPENDED CEILING COLUMN BEYOND

3 1/2” COMPOSITE METAL DECK ALUMINUM CHANNEL FOR LOUVERS POUR STOP 4” METAL STUD 1/2” GYPSUM W-FLANGE BEAM 2” RIGID INSULATION AT SPANDREL GLASS CURTAIN WALL MULLION SUSPENDED CEILING COLUMN BEYOND


DETAIL - LEVEL 02 + GROUND COLUMN BEYOND 3 1/2” COMPOSITE METAL DECK POUR STOP COLUMN BEYOND

CURTAIN WALL MULLION

HANDRAIL BEYOND

ALUMINUM CHANNEL SUPPORT FOR LOUVERS

1/2” GYPSUM 4” METAL STUD

W-FLANGE BEAM 2” RIGID INSULATION BEHIND SPANDREL GLASS

CURTAIN WALL MULLION SUSPENDED CEILING

COLUMN BEYOND

COLUMN BEYOND COLUMN BEYOND

CURTAIN WALL MULLION METAL COPING 4” CONCRETE TURN DOWN SLAB 2” RIGID INSULATION WATERPROOF MEMBRANE FOUNDATION KEY FOOTING BEYOND AT COLUMN DRAINABLE FILL


CHUNK MODEL


SECTION TWO

0 4

LIBRARY

8

16

32 FT

PERSON STREET

SEE DETAIL


DETAIL - ROOF AND BALCONY METAL COPING RIGID INSULATION 3 1/2” COMPOSITE METAL DECK POUR STOP W-FLANGE BEAM 6” METAL STUD 3/4” SHEATHING WATERPROOF MEMBRANE 2” RIGID INSULATION 2” AIR GAP THIN BRICK METAL COPING STEEL ANGLE SUSPENDED CEILING

STONE PAVERS ADJUSTABLE PEDESTAL SLOPED RIGID INSULATION 3 1/2” COMPOSITE METAL DECK METAL COPING W-FLANGE BEAM 6” METAL STUD 3/4” SHEATHING WATERPROOF MEMBRANE 2” RIGID INSULATION 2” AIR GAP THIN BRICK METAL COPING STEEL ANGLE CURTAIN WALL MULLION SUSPENDED CEILING


DETAIL- LIBRARY PLATFORM

COLUMN BEYOND COLUMN BEYOND

CURTAIN WALL MULLION FLASHING METAL COPING 3 1/2” METAL COMPOSITE DECK POUR STOP 6” METAL STUD THIN BRICK 2” AIR GAP 2” RIGID INSULATION WATERPROOF MEMBRANE 3/4” SHEATHING 6” METAL STUD W-FLANGE BEAM

2” RIGID INSULATION AT SPANDREL GLASS SUSPENDED CEILING CURTAIN WALL MULLION

METAL COPING FLASHING STEEL ANGLE 6” METAL STUD WITH 3/4” SHEATHING 2” RIGID INSULATION ALUMINUM PANEL SOFFIT


DETAIL - GROUND + FOUNDATION

COLUMN BEYOND 3 1/2” COMPOSITE METAL DECK POUR STOP CURTAIN WALL MULLION DRAINAGE GARDEN W-FLANGE BEAM 6” METAL STUD 2” RIGID INSULATION WATERPROOF MEMBRANE 1/4” DRAINAGE BOARD 12” CONCRETE FOUNDATION WALL 1/2” GYPSUM SUSPENDED CEILING

1/2” GYPSUM 6” METAL STUD 4” CONCRETE TURN DOWN SLAB 12” CONCRETE FOUNDATION WALL DRAINABLE FILL 2” RIGID INSULATION WATERPROOF MEMBRANE 4” FOUNDATION DRAIN DRAINABLE FILL 1/4” DRAINAGE BOARD CONCRETE FOOTING


CHANGE THE SOUTH CHANGE THE NATION Forward justice is a nonpartisan law, policy, and strategy center dedicated to advancing racial, social, and economic justice in the U.S. South.

OPEN OFFICE


VIEW FROM SOUTH EAST


ENTRY RESOURCE FLEX WORK

FORWARD JUSTICE

’ 318

’ 317

CAFE SUPPORT

’ 316

ACTIVITY ROOM

CAFE

SECTION TWO

CENTER FOR EQUALITY

313’

SECTION ONE

314’

315’

LOBBY

0 4

8

16

32 FT

0 4

8

16

32 FT

0 4

8

16

32 FT

MEETING ROOM MEETING ROOM MEETING ROOM

SECTION TWO

LIBRARY

SECTION ONE

EXHIBIT

STORAGE

CATERING KITCHEN

OPEN TO BELOW

LIBRARY

SECTION TWO

SECTION ONE

EVENT SPACE

OPEN OFFICE

CONFERENCE ROOM

CONFERENCE ROOM

COPY/BREAK

SECTION TWO

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

RECEPTION

OFFICE

0 4

8

16

32 FT

0 4

8

16

32 FT

MARTIN STREET

DIRECTORS OFFICE

SECTION ONE

PATIO


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.