DIMA ALMOBARAK 2016 | Selected Work
dima.almobarak@gmail.com | (415)-632-7706 | 175 Clifford Terrace, San Francisco, CA 94117
1
01
Fulton Street Residential over commerical project (VA-IIA), San Francisco; EE Submittal
02
Soilab A Research Facility in Treasure Island, San Francisco
03
Cool School. Nested Brick A Design Competition, Khovd, Mongolia
04
Sheltering Humanity. Transit Station A Design Competition, Greece
05
Master Bathroom’s Detail Private Residense in Khobar, Saudi Arabia
2
DIMA ALMOBARAK_
01 Fulton Street
Residential over commerical project (VA-IIA), San Francisco; EE Submittal T he proj e c t is l o c ate d i n t he Pan hand l e dist r i c t i n San Francis co. It cont ains 9 u n it s ab ove a re st aurant. The us e of t he si mpl e l i ne s and t he mater i as in t he f a c a de g ive s it its mo de r n app e arance. The st r uc ture is a concre te p o d ium w it h wo o d f rame ab ove.
OWNER
SHEETNOTES 1 GARAGE DOOR
Trite
4 RESIDENTIAL UNITS ENTRY
2 CAR RAMP
5 RESTAURANT ENTRY
3 RESTAURANT EXHAUST
6 GARAGE EXHAUST
Bu PROJECT
1751San Fra 1 A14.0
1 A12.0
6 PL
11
10
4"
9
8
7
4
6
5
4
3
2
1
PL
SCALE
4"
112'-1 1/2"
PL
MAILBOXES
11
12
13
14
15
16
17
19
18
16
15
14
13
9
11
12
SP
A
SHEET NO. ELEV.
10
UP 20 x 6 1/2" = 11'
UP
9
8
7
6
5
4
3
2
1
1
2
3
4
5
6
7
4'
SHEET DESC
3'-5"
8
DRAWING TI
GM
CORRIDOR-2 16 x 7 1/2" = 10'
4'
10
4"
24'-8 1/2"
DATE
BAR
HALL-1 CORRIDOR-1
B
ISSUE 1 A9.0
PPA
1 A10.0
DINING
1 A13.0
1 A13.0
WAITING STATION
C
56'-11"
DINING PATIO AREA
DISHWASHING WOMEN`S RESTROOM
PREP AREA
DW D
RG
DRY STORAGE
6"
CORRIDOR-3
3'-10"
COLD STORAGE
4'-4"
RG
MEN`S RESTROOM
6
1
2
3
4
5
6
7
8
7
18 x 6 3/4" = 10'
10'
RAMP TO GARAGE BELOW
UP
17
16
15
14
13
12
11
10
9
8
19 x 7" = 11'
18
17
16
15
14
13
12
11
10
9
SP
4"
E
PL 1 A14.0
1 A11.0
3
1
FIRST FLOOR PLAN SCALE: 3/32" = 1'-0"
2
5
1
Ian Birc
251 S. San
4
DIMA ALMOBARAK_
OWNER
SHEETNOTES 1 BAY WINDOW ABOVE
4 OPEN TO DINING PATIO BELOW
2 GUARDRAIL @ 42" A.F.F
5 LIGHT WELL
3 RETAIL SIGN
6 GARAGE EXHAUST
Triterr
P Burlin PROJECT
1751- 1 San Fran 1 A14.0
1 A12.0
6 PL
11
10
9
8
7
5
6
5
34'-3 1/2"
AP
2
4
3
2
1
PL
SCALE
102'-6 1/2"
4'-7 3/4"
OPEN TO ABOVE
11
15
14
13
12
19
18
17
SP
16
4"
PL
STORAGE
ELEV.
8"
SHEET NO.
10
SHEET DESCRIP 9
12
13
14
15
8
9
11
10
4
5
6
1
7
B
16 x 7" = 9'-6"
UP
CORRIDOR 2-1
2
DATE
3
5
6
7
8
1
2
3
4
UNIT #303 LOWER
DW
UNIT #201 RG
ISSUE 1 A9.0
58'-11"
PPA-
F
1 A10.0
0"
20 x 6 1/2" = 11'
UP
OPEN TO REAR YARD BELOW
DRAWING TITLE
A
56'-11"
13'-3"
1 A13.0
21'-1 3/4"
COURT
9'-6 1/4"
1 A13.0
C
12
13
14
15
8
9
11
10
4
5
6
7
2
1 UP
3
OPEN TO BELOW
16 x 7" = 9'-6"
D
UNIT #304 LOWER
CORRIDOR 2-2
3
2
1
7
6
5
4
8
CD
17 x 6 3/4" = 9'-6"
UP
4'-9 3/4"
15
16
17
11
12
13
14
10
9
OPEN TO ABOVE
SP
4"
E
PL
13'-10 1/4" 1 A11.0
4
1
2
1
1 A14.0
5
3
1
SECOND FLOOR PLAN SCALE: 3/32" = 1'-0"
Ian Birch
251 S. Va San Fra 4
5
OWNER
SHEETNOTES 1 BAY WINDOW
T
4 MECHANICAL ENCLOSURE
2 GUARDRAIL @ 42" A.F.F 3 DINING PATIO @ REAR YARD
PROJECT
175 San
SCALE 10
9
8
7
6
5
4
3
2
1
+50'-6" 6 PH Roof
DRAWING
SHEET NO
SHEET DE DATE
4
CUOS
+39'-6" 5 Roof
BEDROOM
BATHROOM
BATHROOM
COURT
UNIT #402
KITCHEN
CORRIDOR 4-1
DINING
UNIT #403
LIVING
ISSUE
P +30' 4 P4
BEDROOM
+20'-6" 3 P3
BATHROOM
BATHROOM
COURT
UNIT #304
CORRIDOR 3-1
KITCHEN
DINING
UNIT #303- UPPER
LIVING
1 UNIT #201 LIVING
DINING
COURT
2 +11' 2 P2
3 DINING PATIO AREA
RESTAURANT DINING AREA
±0" 1 P1
GARAGE- CAR PARKING
-10' -1 B1
1
LONGITUDINAL SECTION SCALE: 3/32" = 1'-0"
Ian B
251 S
6
DIMA ALMOBARAK_
7
SHEET LIST
02 Soilab
A Research Facility in Treasure Island, San Francisco Tre asure Isl and has t he p ote nt i a l to b e come one of t he c it y’s mo st b e aut i f u l and pro duc t ive ne i g hb orho o ds. Cre at i ng p arks and op e n sp ace s w i l l add v a lue to t he l and. The purp o s e of t he re s e arch ce nte r is to de vel op a v ar i e t y of met h o ds to re me di ate t he cont am i nate d s oi l on t he isl and. The re me di at i on f i el ds w i l l i l lust rate a range of opt i ons t hat cou ld t ransf rom t he l and i nto re cre at i ona l p arks for t he com munit y. The conce pts e x pl ore how s oi l re me di at i on c an prov id e opp or tunit i e s for a he a lt hy l iv i ng sp ace, as wel l as address e nv i ronme nt a l conce r ns. The re s e arch ce nte r is a proj e c t t hat i nte g rate s t he s ci e nce s, e conom i cs and urb an pl anni ng w it h e duc at i on and an advo c ac y to supp or t t he publ i c age nd a.
Concept Statement_ SOIL A B has an op en e nvel op e w it h wo o de n ve r t i c a l l ou vers pl a ce d in a 2 5 ’ g r i d. Whe n t he y are op e n , t he us e r has t he fe eling of b eing outdo ors . T he op e n l ouve rs a l l ow for enclosu re w it hout in hibit i ng ve nt i l at i on . E ach f l o or s er ves as a op en sp a ce w it h pro g r ams e mb e d d e d w it h i n . There are t racks and sli d i ng wa l ls to e ncl o s e and c re ate more sp a ces w hen ne e d e d The Wi ld C ards - T he i r re g u l ar c u r ve d shap e s t hat c an b e found in t he res e arch c e nte r, g a l l e r y, hous i ng and e nv i ronment a l l ibr ar y and t hat are me ant to e nc ou r age i nte rac t i on. Test Fi eld - T he outd o or te st f i el ds su r rou ndi ng t he re s e arch center are me ant for s e ve r a l t y p e s of re c re at i on f rom h i k i ng , bi k ing , and pl ay ing outdo or sp or t s . The pi er a dj a cent to t he s ite l e nds it s el f to promote re st and rel ax at ion by us ing t he s ame i r re g u l ar p o cke t s of sp ace to br ing us ers toget her and to a l l ow i nte r a c t i on . T he i de a is to br ing as mu ch of t he publ i c to t he s e sp a c e s to p ar t i cip ate i n cle aning up t he toxic s oi l.
10
DIMA ALMOBARAK_
UE N AVE N
M UE EN AV E
NU
E AV IA
RN IFO
L
CA
E AV EI
NU
NU
E AV EG
CONCEPT KEY BUIDINGS ALL THE GATHERING SPACES PATHWAYS WITHIN THE PATHWAYS WITHIN THE TEST FIELD 3 PERSON LAB
Site Pl an
0
BB
2
25’
50’
1 2 3 4
100’
Outdoor Reading Wildcard Storage Outdoor Wildcard
4
1 3 S e c ti on throug h the site
11 0
25’
50’ 38’
1
1 2 3 4 5 6 7 8 9 10 11 12 13 14
3 2
1
B
A
UP
Living Quarters Environmental Library Open Gallery Outdoor Wildcard Dry Lab Dry Lab Soil Test Room Reception Wildcard Wildcard Solar Room Outdoor Reading Area Outdoor Gallery Test Field
UP
3
5 8
6
7
12
2
UP
9
C
D 10
UP
4
14
13
DN
11 A B C D
Scientists’ entrance Secondary entrance Guest’s entrance Loading/ Egress
Ground F l o or Pl an 0
12
DIMA ALMOBARAK_
14’ 25’
50’
Sustainable Strategies_ T he s h a d i n g d e v ic e c ove r i n g t he bu i ld i n g re duc e s t he d i re c t s u n l i g ht c om i n g t o t he bu i ld i n g w h ic h c o ol s it d ow n ; he nc e , it s ave s on e ne r g y u s e . It
SUMMER
SOLAR GRILL
e x p a nd s t o c ove r p a r t of t he pl a z a a nd t he t e s t f i e ld WINTER
for t he r m a l c om for t . T he s u r f a c e of t h at d e v ic e i s d i v id e d i nt o s ol a r p a ne l s , g r i l l s a nd lou ve r s t o
PYTHOR EMEDIATION
a l low s ome c ont r ol . S t or a ge t a n k for g re y w at e r t re at me nt i s lo c at e d u nd e r t he t e s t t e s t f i e ld t he re a re p ore s i n t he s oi l t o c ol le c t r a i n w at e r a nd for t he s it e u s e i n t he p o ol a nd for i r r i g at ion . T he pl a nt s i n t he s it e a re
PV PA N E L S SHADING SCREEN FLYASH CONCRETE
VERTICAL LOUVERS
a l l n at i ve c a l i for n i a n u s e d t o re me d i at e t he s oi l
MUSHROOM FIELD
a nd t o i mpr ove t he a i r q u a l it y.
G R E Y WAT E R COLLECTOR
ELEVATION 1
13
14
DIMA ALMOBARAK_
03
Cool School. Nested Brick A Design competition in Khovd, Mongolia
Th is prop o s a l di re c t ly re sp onds to t he s e ve re
cl i mate condit i ons of t he site t h roug h p assive he at i ng st rate g i e s, w h i l e prov i di ng a pl ace for ch i l dre n t hat promote s c ur i o sit y and j oy t h roug h ac t iv at i ng sp ace s. C l assro oms and re st ro oms are dist i nc t volume s t hat are pl ace d i nsi de a l arge r sp ace i n a way t hat org ani z e s t hat l arge r volume i nto t wo f l e x ibl e are as: A l ounge / re adi ng are a and a g y m / ha l l for bi g ge r g t he r i ng s. The opt i m ism i n t h is prop o s a l is t hat it of fe rs an e nv i ronme nt ro ote d i n t he ne e ds of t he ch i l dre n and t he i r e duc at i on. It not on ly of fe rs b asi c cl assro oms but sp ace s t hat c an b e ac t iv ate d by t he ch i l dre n b as e d on t he i r de si re d ac t iv it i e s w h i l e of fe r i ng t he m an e nvel op e t hat ke e ps t he te mp e rature st abl e and t he d ay l i g ht pl e nt i f u l.
Floor Plans, Sections and Elevations_
T he cl ass ro oms are dist i nc t volu me s i ns i de t he l arge r sp ace. The ce i l i ng he i g ht for t he t wo cl assro oms shou ld b e lower t han t hat of t he main g y m/ha l l in ord er to ret ain he at w it h in e a ch cl ass ro om, s i nc e hot ai r natura l ly r is e s to t he ve r y top of a sp ace. Shou l d t he budget a l low for it, t he inclusion of a clerestor y ab ove t he
B
cl ass ro om c an a l l ow a ddit i ona l l i g ht to e nte r t he g y m / ha l l.
1
A ls o, shou ld t he bu d ge t a l l ow, t he upp e r p or t i on of e ach cl assro om volume c an cont ai n acr y l i c p anels t hat a l low d ay lig ht enter ing into t he cl assro oms to con-
4
t inue into t he rest of t he sp a c e s . Whe re p o ss ibl e, op e rabl e w i ndows t hat c an prov i de natura l ve nt i l at i on t h roug hout t he cl assro oms and main g y m/ha l l shou ld b e us e d.
B
daylight
A
2
4
1
4
classroom A classroom B gym/hall study 1m
0
4m
. smaller volumes retain heat
adobe walls
. exterior & interi or walls of thick adobe retain heat
Section BB
3
A (7)
Elevation West West Elevation
Section AA
(optional) (optional) clerestory clerestory
2m
A 16
(7)
1 classroom A 2 classroom B 3 gym/hall 5 4 study
A
(7)
(optional) clerestory
North Elevation
2
5
heat retention
B
5
3
2
Section AA
1
B
B
1 2 3 4
3
West Elevation
A
. (optional) acrylica panels allow light to travel through the classroom to the rest of the interior
DIMA ALMOBARAK_
1 2
1m
0 classroom A
4m 2m
Elevation NorthNorth Elevation
Section BB
For mater i a ls , lo c a l ly - s ou rc e d a dob e is us e d ge ne rously. E x ag ge rat i ng t he t h i ck ne ss of t he adob e wa l ls, b ot h inter ior and exter ior ones, ensures t hat, in a harsh climate su ch as t hat of t his p ar t i c u l ar s ite, he at f rom t he sun and f rom t he ac t iv it i e s ge ne rate d by t he students t hroug hout a l l prog ram are as is ac tu a l ly ret aine d. T he unexp e c te d a d d it i ona l t hi ck ne ss of t he a dob e wa l ls a l ong t he i nte r i or c an b e us e d for storage, by f ram ing out shelv ing systems w it hin t he ad ob e w a l l its elf. C over i ng t hes e stor age are as w it h l arge wo o de n do ors or c ur t ai ns c an help rel i e ve t he clutte r, but e ve n ke e ping t he storage are as op en is enoug h to s ep arate cl ass ro om and g y m - rel ate d ite ms f rom t he stu de nts’ ac t ive z one s.
Window Placed Above Brick Facade
Standing Seam Metal Roof
Steel Frame / Wood Slat Bi-fold Door
Metal Deck Lightweight Ceiling
Section Perspective
04
S h e l t e r i n g H u m a n i t y. Tr a n s i t S t a t i o n A Design competition in Greece
The Sy r i an re f uge e situ at i on is a cr isis of num-
b e rs: ove r 4 .8 m i l l i on re f uge e s m i g rat i ng out of Sy r i a,t hous ands cont i nue to ar r ive d ai ly on Gre ek shore s, and t he humanit ar i an assist ance suppl i e d is w hol ly i nade qu ate to hand l e t he i r b asi c ne e ds. B e c aus e of t he i mpl i cit assumpt i on t hat t he rel i e f e f for ts must b e ce nt ra l i z e d, t he re are to o fe w to help to o many. Inste ad, we b el i e ve t hat t he burde n of rel i e f must b e dist r ibute d. Th is prop o s a l pre s e nts a dist r ibut ive st rate g y t hat ai ms to prov i de for b asi c ne e ds. The el e me nts are i nte nde d to b e mo du l ar, i nte rchange abl e, and f l e x ibl e.
There are t wo asp e c ts to t his prop os a l: t he st at ionar y and t he t ransitor y. The st at ionar y ele ment (t he ‘t ransit st at ion’ ) is compr is e d of cour t yard housing w hich c an b e re- appropr i ate d by t he tour ist e conomy - as Sy r i an mig rants re ach t heir Nor t her n Europ e an d est inat ions, t he cour t yard blo cks, situ ate d a long t he co asts of isl ands, c an hous e tour ists. The t ransitor y element is compr is e d of lig ht weig ht s olut ions toshelter, mobi lit y, and b asic ne e ds as Sy r i ans mig rate f rom one stop to t he next t hroug hout t heir j our ne y.
S ample Tent C onf igurat ion
C ou r t y ard Pl an
Tent Pl an and S e c t ion
C ou r t y ard S e c t ion and E l e v at i on
S ample Tent E le vat ion
C our tyard Al l e y Vi e w : Sy r i an refu g e e s i n Tr an siti on
C our tyard A l l e y Vi e w : Abs orb e d by tourist e c onomy
Sy r i an women and ch i l d ren : Sp a c e appropr i ate d for re f uge e s ac t iv it i e s; cour t yard
Tour ist and Gre ek ve nd ors: Sp ace appropr i ate d, p ost ref uge esmig rat ion, for lo c a l
and t heir adj oin ing “a l l e y s” prov i de sp at i a l l aye rs for a c t iv it i e s sp e ci f i c to a c u l-
m i cro - e conom i e s. C our t yard and t heir adj oining “a l le ys” prov id e sp at i a l l ayers-
tu r a l g roup, gend er or climate to t a ke pl a c e
for ac t iv it i e s sp e ci f i c to a c u ltura l g roup, gend er or climate to t a ke pl ace
T h e Tr ansitor y : The bi c yc l e an d t h e b a c kb a c k
05
Bathrooms’ Details At a Private Villa in Saudi Arabia Fl o or i ng and ce i l i ng pl ans Wa l l f i nish E l e v at i ons Fi x ture pl ans and el e v at i ons
Master Bathroom’s Flooring and walls finishes_
22
DIMA ALMOBARAK_
23
DIMA ALMOBARAK 2016| Selected Work 24
DIMA ALMOBARAK_