IEM Jurutera Jul'22 | THE GOVERNMENT’S ROLE IN TRANSPORTATION PROJECT MANAGEMENT

Page 1

J U LY 2 0 2 2

The Government’s Role in Transportation Project Management



Introductory Rate for New Advertisers RM 3,200/page *

(NP RM4,900)

Full-Page, Full-Colour Advertisement •

This one-time-only special rate offer is for new advertisers.

Space availability is subject to booking on a first-come-first-served basis.

Clients will provide ready-to-print artwork in PDF format with 300dpi. Full page: 210mm x 285mm, 5mm extra bleed sizes for 4-sided with crop mark.

Advertising space must be utilised before 31 December 2022.

*Please note that the above rate will be subjected to 6% SST. For overseas advertisers, an additional 25% will be charged.

Rate shown above excludes 15% advertising agency commission.

Payment term: Full advance payment.

Artwork submission deadline is on (or before) the 1st week of the prior month of publication.

After the material deadline, no cancellation or alteration to the advertisement will be entertained.

Any cancellation after signing the advertising order will result in a 50% penalty charge.

The publisher reserves the right to edit, revise or reject any advertisement deemed unsuitable or inappropriate.

Circulation & Readership Profile JURUTERA has an estimated readership of 200,000 professionals. Our esteemed readership consists of certified engineers, decision making corporate leaders, CEOs, government officials, project directors, entrepreneurs, project consultants, engineering consulting firms and companies involved with engineering products and services.

Name of Company: Address: Tel:

Fax:

Contact Person (s):

Email Address: Publica�on month/s: Company’s Stamp & Authorised Signature

Date



Number 07, JULY 2022

IEM Registered on 1 May 1959

MAJLIS BAGI SESI 2022/2023 (IEM COUNCIL SESSION 2022/2023)

YANG DIPERTUA / PRESIDENT Ir. Prof. Dr Norlida bt Buniyamin TIMBALAN YANG DIPERTUA / DEPUTY PRESIDENT Ir. Prof. Dr Jeffrey Chiang Choong Luin NAIB YANG DIPERTUA / VICE PRESIDENTS Ir. Yau Chau Fong, Ir. Mohd Aman bin Hj. Idris, Y. Bhg. Dato’ Ir. Ahmad Murad bin Omar, Ir. Chen Harn Shean, Ir. Mohd Khir bin Muhammad, Ir. Prof. Dr Tan Chee Fai, Ir. Abdul Razak bin Yakob SETIAUSAHA KEHORMAT / HONORARY SECRETARY Ir. Prof. Dr Zuhaina binti Zakaria BENDAHARI KEHORMAT / HONORARY TREASURER Ir. Dr Lee Yun Fook BEKAS YANG DIPERTUA TERAKHIR / IMMEDIATE PAST PRESIDENT Ir. Ong Ching Loon BEKAS YANG DIPERTUA / PAST PRESIDENTS Y.Bhg. Dato’ Ir. Dr Gue See Sew, Y.Bhg. Dato’ Paduka Ir. Keizrul bin Abdullah, Y.Bhg. Academician Tan Sri Dato’ Ir. Prof. Dr Chuah Hean Teik, Y.Bhg. Dato’ Ir. Lim Chow Hock, Ir. Dr Tan Yean Chin, Ir. David Lai Kong Phooi WAKIL AWAM / CIVIL REPRESENTATIVE Ir. Yap Soon Hoe WAKIL MEKANIKAL / MECHANICAL REPRESENTATIVE Ir. Dr Aidil bin Chee Tahir WAKIL ELEKTRIK / ELECTRICAL REPRESENTATIVE Ir. Francis Xavier Jacob WAKIL STRUKTUR / STRUCTURAL REPRESENTATIVE Ir. Gunasagaran Kristnan WAKIL KIMIA / CHEMICAL REPRESENTATIVE Ir. Dr Chong Chien Hwa WAKIL LAIN-LAIN DISPLIN / REPRESENTATIVE TO OTHER DISCIPLINES Ir. Assoc. Prof. Dr Wong Yew Hoong WAKIL MULTIMEDIA DAN ICT / ICT AND MULTIMEDIA REPRESENTATIVE Ir. Jeewa Vengadasalam WAKIL JURUTERA WANITA / WOMEN ENGINEERS REPRESENTATIVE Ir. Noorfaizah bt Hamzah WAKIL BAHAGIAN JURUTERA SISWAZAH / YOUNG ENGINEERS SECTION REPRESENTATIVES Mr. Kuugan Thangarajoo, Mr. Lim Yiren, Mr. Muhammad Ashiq Marecan bin Hamid Marecan, Mr. Naveen Kumar a/l Apparao, Ms. Anis Akilah bt Ameer Ali AHLI MAJLIS / COUNCIL MEMBERS Ir. Dr Chan Swee Huat, Ir. Ellias bin Saidin, Ir. Mohd Radzi bin Salleh, Dato’ Ir. Hj Anuar bin Yahya, Ir. Dr Teo Fang Yenn, Ir. Sundraraj A. Krishnasamy, Ir. Dr Siti Hawa bt. Hamzah, Ir. Assoc. Prof. Lee Tin Sin, Ir. Mah Way Sheng, Ir. Sreedaran Raman, Ir. Lee Cheng Pay, Ir. Dr Kannan a/l M. Munisamy, Ir. Dr Siow Chun Lim, Ir. Wong Chee Fui, Ir. Dr Hum Yan Chai, Ir. Tiong Ngo Pu, Ir. Rusnida binti Talib, Ir. Prof. Dr Lau Hieng Ho, Ir. Muhammad Azmi bin Ayub, Ir. Fam Yew Hin, Ir. Razmahwata bin Mohd Razalli, Ir. Simon Yeong Chin Chow, Ir. Dr Chan Seong Phun, Ir. Yam Teong Sian, Ir. Kwok Yew Hoe, Ir. Dr Lee Choo Yong AHLI MAJLIS / COUNCIL MEMBERS BY INVITATION Ir. Lai Sze Ching, YBhg. Dato’ Prof. Ir. Dr Mohd Hamdi bin Abd Shukor, YBhg. Dato’ Ir. Nor Hisham bin Mohd Ghazali PENGERUSI CAWANGAN / BRANCH CHAIRMAN 1. Pulau Pinang: Ir. Bernard Lim Kee Weng 2. Selatan: Ir. Thayala Rajah s/o Selvaduray 3. Perak: Y.Bhg. Dato’ Sri Ir. Liew Mun Hon 4. Kedah-Perlis: Ir. Mohamad Shaiful Ashrul bin Ishak 5. Negeri Sembilan: Ir. Chong Chee Yen 6. Kelantan: Ir. Nik Ab. Hadi bin Hassan 7. Terengganu: YBhg. Dato’ Ir. Wan Nazari bin Wan Jusoh 8. Melaka: Ir. Ong Yee Pinn 9. Sarawak: Y.Bhg. Dato’ Ir. Janang Anak Bongsu 10. Sabah: Ir. Willie Chin Tet Fu 11. Miri: Ir. Chong Boon Hui 12. Pahang: Ir. Ab Rahman bin Hashim

AHLI JAWATANKUASA INFORMASI DAN PENERBITAN/ STANDING COMMITTEE ON INFORMATION AND PUBLICATIONS 2022/2023 Pengerusi/Chairman: Ir. Abdul Razak bin Yakob Naib Pengerusi/Vice Chairman: Ir. Wong Chee Fui Setiausaha/Secretary: Ir. Dr Hum Yan Chai Ketua Pengarang/Chief Editor: Ir. Abdul Razak bin Yakob Pengarang Prinsipal Buletin/ Principal Bulletin Editor: Ir. Dr Siow Chun Lim Pengarang Prinsipal Jurnal/Principal Journal Editor: Ir. Prof. Dr Abdul Aziz bin Abdul Samad Pengerusi Perpustakaan/Library Chairman: Ir. Dr Kannan a/l M.Munisamy Ahli-Ahli/Committee Members: Ir. Dr Teo Fang Yenn, Ir. Dr Bhuvendhraa Rudrusamy, Ir. Ong Guan Hock, Ir. Lau Tai Onn, Ir. Dr Oh Seong Por, Ir. Yee Thien Seng, Dr Sudharshan N. Raman, Ir. Dr Lai Khin Wee, Ir. Dr Lee Tin Sin, Ir. Yap Soon Hoe, Mr. Alex Looi Tink Huey, Dr Mohamad Shakri bin Mohmad Shariff, Ir. Mohd Razmi Ziqri bin Ahmad Shukri, Ir. Dr Siti Hawa Hamzah, Ir. Lee Chang Quan, Ms. Michelle Lau Chui Chui, Ir. Jeewa S/O Vengadasalam, Ir. Rusnida binti Talib, Ir. Dr Lee Choo Yong, Ir. Ts. Dr Tan Kim Seah, Mr. Muhd Ashiq Marecan bin Hamid Marecan LEMBAGA PENGARANG/EDITORIAL BOARD 2022/2023 Ketua Pengarang/Chief Editor: Ir. Abdul Razak bin Yakob Pengarang Prinsipal Buletin/ Principal Bulletin Editor: Ir. Dr Siow Chun Lim Pengarang Prinsipal Jurnal/Principal Journal Editor: Ir. Prof. Dr Abdul Aziz bin Abdul Samad Ahli-ahli/Committee Members: Ir. Lau Tai Onn, Ir. Ong Guan Hock, Ir. Yee Thien Seng, Ir. Dr Oh Seong Por, Dr Sudharshan N. Raman, Ir. Dr Lai Khin Wee, Ir. Dr Teo Fang Yenn Secretariat: Janet Lim, May Lee

THE INSTITUTION OF ENGINEERS, MALAYSIA

Bangunan Ingenieur, Lots 60 & 62, Jalan 52/4, P.O. Box 223, (Jalan Sultan), 46720 Petaling Jaya, Selangor Darul Ehsan. Tel: 603-7968 4001/4002 Fax: 603-7957 7678 E-mail: sec@iem.org.my Homepage: http://www.myiem.org.my

Contents Cover Note & Editor’s Note Cover Story

05 06 - 12

Government’s Role in Transportation Project Management

Features

16 - 26

Adopting Project Management Front-End Engineering in Development of PETRONAS Floating LNG (PFLNG) Ring-Fencing Transportation Projects from Covid-19 Insurgence Using Project Communications Management Practice

Forums

28 - 31

Project Management Conference 2022 PMTD: CSR Programme at Seri Semarak Urban Farm

News from Branch

37

Women Engineers Conference 2022: Building the Future, WE Lead

Engineer’s Adventure

39

Panmunjom: Bridge of No Return

Pink Page Blue Page

41 42 - 43


Authorised Publisher: The Institution of Engineers, Malaysia (IEM) - JURUTERA

Explore our full set of Professional and Integrated PUBLISHING MANAGEMENT SERVICES: » » » » »

Project Management Crea�ve Management Ad Space Management Mailing Management Print Management

• Annual Reports • Booklets • Brochures • Bun�ngs • Business Cards • CD / DVD Replica�ons • Calendars • Cards & Invita�ons • Cer�ficates • Custom Prin�ngs • Envelopes • Folders • NCR Bill Books • Notepads • Leaflets • Le�erheads • Paper Bags • Posters • S�ckers • Others

Dimension Publishing Sdn Bhd (449732-T)

Level 18-01-02, PJX-HM Shah Tower, No. 16A, Persiaran Barat, 46050 Petaling Jaya, Selangor Darul Ehsan, Malaysia. Tel: +603 7493 1049 Fax: +603 7493 1047 E-mail: info@dimensionpublishing.com Shirley Tham : +6016 283 3013 Joseph How : +6011 1234 8181


DIMENSION PUBLISHING SDN. BHD.

COVER NOTE

[ 199701034233 (449732-T) ]

Level 18-01-02, PJX-HM Shah Tower, No. 16A, Persiaran Barat, 46050 Petaling Jaya, Selangor Darul Ehsan, Malaysia. Tel: +(603) 7493 1049 Fax: +(603) 7493 1047 E-mail: info@dimensionpublishing.com Website: www.dimensionpublishing.com

Transportation Project Management

CHAIRMAN ROBERT MEBRUER CEO/PUBLISHER PATRICK LEUNG GENERAL MANAGER SHIRLEY THAM ● shirley@dimensionpublishing.com HEAD OF MARKETING & BUSINESS DEVELOPMENT JOSEPH HOW ● joseph@dimensionpublishing.com PRODUCTION EDITOR TAN BEE HONG ● bee@dimensionpublishing.com CONTRIBUTING WRITERS PUTRI ZANINA ● putri@dimensionpublishing.com HANNA SHEIKH MOKHTAR ● hanna@dimensionpublishing.com SENIOR GRAPHIC DESIGNER SOFIA HANIS ● sofia@dimensionpublishing.com GRAPHIC DESIGNER NICOLE THENG ● nicole@dimensionpublishing.com ADVERTISING CONSULTANTS THAM CHOON KIT ● ckit@dimensionpublishing.com ACCOUNTS CUM ADMIN EXECUTIVE YEN YIN ● yenyin@dimensionpublishing.com

For advertisement placements and subscriptions, please contact:

DIMENSION PUBLISHING SDN. BHD. [ 199701034233 (449732-T) ] Level 18-01-02, PJX-HM Shah Tower, No.16A, Persiaran Barat, 46050 Petaling Jaya, Selangor Darul Ehsan, Malaysia. Tel: +(603) 7493 1049 Fax: +(603) 7493 1047 E-mail: info@dimensionpublishing.com Subscription Department E-mail: info@dimensionpublishing.com

T

he COVID-19 pandemic has impacted all major industries, including the by Ir. Dr Nor Azhar transportation sector. During the bin Mohd Arif Movement Control Order (MCO), transportation Chairman, Project Management operators and businesses shifted their focus from Technical Division (PMTD) moving people to keeping a core transportation system operational with a skeleton workforce to ensure freight and key essential workers could continue to move. But many experienced an unexpected shortfall in finances due to the impact on their sources of revenue. Although plans had been made to ensure the transportation network was ready for normal operations when the MCO was lifted and borders reopened, the pre-pandemic volume and frequency of commuters and travellers had yet to be reached. This month, JURUTERA looks into the importance of project management by both the government and private entities in the transportation sector. The cover story features Transport Minister Y.B. Datuk Seri Ir. Dr Wee Ka Siong, who says good project management will plan for the on-time delivery of a project from the start of the project cycle and ensure a contingency plan is in place in case of any deviation or problem arising. The 2 other feature articles, Adopting Project Management Front-End Engineering in the Development of PETRONAS Floating LNG (PFLNG) and Ring-Fencing the Transportation Project from Covid-19 Insurgence Using Project Communications Management Practice Through Building Information Modelling, should also provide a good read to all.

JURUTERA is published and printed monthly by Dimension Publishing Sdn. Bhd.

JURUTERA MONTHLY CIRCULATION: OVER 50,000 MEMBERS

Submission or placement of articles in JURUTERA could be made to the:Chief Editor THE INSTITUTION OF ENGINEERS, MALAYSIA (IEM) Bangunan Ingenieur, Lots 60 & 62, Jalan 52/4, P.O. Box 223 (Jalan Sultan), 46720 Petaling Jaya, Selangor. Tel: +(603) 7968 4001/4002 Fax: +(603) 7957 7678 E-mail: pub@iem.org.my or sec@iem.org.my IEM Website: http://www.myiem.org.my © 2020, The Institution of Engineers, Malaysia (IEM) and Dimension Publishing Sdn. Bhd.

PUBLICATION DISCLAIMER The publication has been compiled by both IEM and Dimension with great care and they disclaim any duty to investigate any products, process, services, designs and the like which may be described in this publication. The appearance of any information in this publication does not necessarily constitute endorsement by IEM and Dimension. There is no guarantee that the information in this publication is free from errors. IEM and Dimension do not necessarily agree with the statement or the opinion expresssed in this publication.

COPYRIGHT JURUTERA Bulletin of IEM is the official magazine of The Institution of Engineers, Malaysia (IEM) and is published by Dimension Publishing Sdn. Bhd. The Institution and the Publisher retain the copyright over all materials published in the magazine. No part of this magazine may be reproduced and transmitted in any form or stored in any retrieval system of any nature without the prior written permission of IEM and the Publisher.

EDITOR’S NOTE Failing to Manage is Managing to Fail?

T

he phrase may not rhyme perfectly but I believe you get the point. Project management is an essential skill by Ir. Dr Siow Chun Lim that engineers need to have. Regardless of Principal Bulletin Editor the size of the project, the process of getting it done within a specific time and budget requires the application of such a skill, whether subconsciously or intently. In this July issue of JURUTERA, the Project Management Technical Division team has managed to touch base with the Minister of Transport, Datuk Seri Ir. Dr Wee Ka Siong, who has been a member of IEM since 1999, to gain greater insights into the role of the government in managing transportation projects. In addition, there are also a few other articles on project management lined up for your consumption. Happy reading!


6

JULY 2022

JURUTERA

COVER STORY

THE INSTITUTION OF ENGINEERS, MALAYSIA

Government’s Role in Transportation Project Management


THE INSTITUTION OF ENGINEERS, MALAYSIA

7

JULY 2022

JURUTERA

The IEM Project Management Technical Division (PMTD) team, led by its Chairman Ir. Dr Nor Azhar Mohd Arif, meets the Minister of Transport, Y.B. Datuk Seri Ir. Dr Wee Ka Siong, to find out more about the management of transportation projects by the Government.

T

he scope of national transportation projects covers land, aviation, maritime and logistics. The management of these projects falls under the ambit of the Ministry of Transport (MOT), which is guided by the principle of “moving people and goods safely, efficiently and sustainably across Malaysia to improve quality of life and support a competitive economy”. MOT governs the overall development of infrastructure for the four sectors, formulates and implements policies as well as addresses issues of safety and security through the relevant agencies. It also oversees the implementation of various interventions and initiatives, manages logistical resources throughout the supply chain and facilitates services by transport business entrepreneurs and operators, including matters concerning licences, taxes and permits. As the Ministry responsible for the management of the country’s transportation infrastructure projects, MOT is involved in various project management components, such as planning, designing, execution, monitoring, testing and project closure. Highly technical, all projects are linked to maintaining the continuing operation of the infrastructure, from directing

infrastructure projects to defining tasks and timelines, co-ordinating across various parties involved in the projects, managing national budgets for the government transportation projects and ensuring timely delivery.

Development Priorities

With so many factors involved in managing the government’s transportation projects, prioritisation becomes crucial. According to Datuk Seri Ir. Dr Wee, ensuring safety tops the government’s order of priorities for transportation projects.

"

COVER STORY

Safety is of utmost importance in terms of priority as no other element can override the safety criteria. Our priority will be projects that need rehabilitation or upgrading because these are due for maintenance and we will not allow them to reach a stage that’s beyond economic repair.

"


8

JULY 2022

JURUTERA

"

Next in the line of priorities is the cost factor. Datuk Seri Ir. Dr Wee says the Government needs to keep the budget feasible and not waste public funds.

We also need to look into the outcome of projects, such as whether they will bring mass benefits to the public. We will also consider the views of other stakeholders, such as State Governments, the Economic Planning Unit of the Prime Minister’s Department and the Treasury, to obtain their inputs on projects.

"

National Transport Policy

Sitting at the top echelon of project stakeholders, above project consultants, contractors and the public at large, MOT carries a heavy responsibility to ensure that the various parties involved in Government’s transportation projects can implement policies and directives of the Government. In this respect, Datuk Seri Ir. Dr Wee stresses that MOT is guided by the first National Transport Policy (NTP 2019-2030), which was launched in 2019. “NTP forms our guidelines and policies and MOT needs to adhere to it strictly to ensure that projects carried out are in line with strategies outlined in the NTP. Besides that, the Treasury issues circulars from time to time to remind each ministry to ensure that project implementation is done properly in terms of budget and work progress,” he says.

NTP serves as the overarching roadmap for developing an efficient, comprehensive, secure and sustainable transport sector aimed at enhancing Malaysia’s economic competitiveness and supporting the people’s well-being. Developed through close collaboration between the Government and the private sector, NTP 2019-2030 consists of five policy thrusts and 23 strategies, taking into consideration future trends that will affect the transport sector. The five policy thrusts aim to strengthen governance to create a conducive environment for the transport sector, to optimise, build and maintain transport infrastructure, services and networks for efficiency,

COVER STORY

THE INSTITUTION OF ENGINEERS, MALAYSIA

to enhance safety, integration, connectivity and accessibility for a seamless journey, to advance towards a green transport ecosystem and to expand global footprint and promote internationalisation of transport services. In addition, the formulation of NTP 2019-2030 addresses several key trends and issues, such as the growing and increasingly ageing population, increasing urbanisation, advances in real time information and digitalisation, expansion of e-commerce market, shifting towards environmentally sustainable transport, moving towards bigger vessels, consolidation and containerisation, increasing passenger travel and impact of



10

JULY 2022

JURUTERA

Datuk Seri Ir. Dr Wee Ka Siong talking to IEM-PMTD representatives about transportation project management

IEM-PMTD representatives (L-R): Ir. Wan Rizaluddin Abdullah Wan Ali (Committee Member), Ir. Dr Harris Abd Rahman Sabri (Deputy Chairman), Ir. Dr Nor Azhar Mohd Arif (Chairman), Ir. Assoc. Prof Dr Syuhaida Ismail (Secretary/Treasurer) and Mr. Chitdrakantan Subramaniam (Committee Member) at the presentation of a token of appreciation to Minister of Transport Datuk Seri Ir. Dr Wee Ka Siong

low-cost carriers as well as the proliferation of new technology. The framework of NTP will also be the guiding principle for future investments in the various transportation systems to ensure Malaysia remains a businessfriendly country in order to fulfill the needs of the industry. It will also focus on reviewing various acts and regulations to improve logistics connectivity in line with the e-commerce boom as well as on the continuous upgrading of ports

and expansion plans. The ultimate objective is to enhance productivity and increase competitiveness for the transportation sector in creating a robust regulatory framework that supports the future needs of the industry.

Effective Project Management

In ensuring the successful execution and completion of projects, Datuk Seri Ir. Dr Wee says MOT has a comprehensive set of monitoring

COVER STORY

THE INSTITUTION OF ENGINEERS, MALAYSIA

policies and procedures for each project. “For example, we hold progress review meetings monthly, make site visits and review budgets etc. so that we can monitor the progress of each project accordingly and take remedial actions swiftly should we note any untoward circumstances or variances. In fact, under the circular of Arahan No. 1 2022 – Mekanisme Penyelarasan Pelaksanaan Pembangunan Negara (National Development Implementation Coordination Mechanism), it is my responsibility as Minister, to chair the monthly Development Action Council meeting to ensure all projects are executed according to plan,” says Datuk Seri Ir. Dr Wee. He explains that effective project management is essential for the successful implementation of transportation projects. The elements of good project management are embedded in the earlier mentioned monitoring and review policies and procedures. Datuk Seri Ir. Dr Wee says: “Good project management will plan, right from the start, for the ontime delivery of the project and to ensure there is a contingency plan in place if there is any deviation or problem arising during the project implementation period. For MOT, the planning part is the most important phase since it provides the structure and foresight for the execution stage. The need to ensure project scope and specification is done meticulously. This is important to ensure the smooth execution of the project.” In managing the various transportation projects under NTP 2019-2030, MOT faces many critical challenges and Datuk Seri Ir. Dr Wee singles out public perception as MOT’s greatest challenge. “Public perception is our greatest challenge as major projects come under intense public scrutiny; we need to maintain greater transparency to safeguard public interest and uphold the people’s trust


COVER STORY

THE INSTITUTION OF ENGINEERS, MALAYSIA

in MOT,” he says, adding that another big challenge is the large capital expenditure involved in public transportation projects. Therefore, MOT needs to plan and identify priorities when it comes to new infrastructure projects,” he says.

Competency Certification

As for appointing project managers to handle government projects, the government has recently imposed a requirement for project managers to have the Certified Construction Project Manager (CCPM) certification issued by the Construction Industry Development Board (CIDB). However, Datuk Seri Ir. Dr Wee is of the view that this policy will not guarantee better quality project managers. He explains: “It all depends on how the management personnel are trained and the kind of exposure that they’ve had. Big organisations have the process in every step involved. If an engineer has gone through each process, he will have the necessary exposure. Whether you are certified or not will not guarantee better quality, but having gone through

JURUTERA

the process will definitely mean getting the needed exposure. Of course, the authorities want to come up with a competency certification to show that an engineer has gone through the training and process. In general, however, you must still provide a better and more conducive environment to train more people.” Although there is no guarantee that this measure will ensure projects are delivered on time and as per design, the certification is still a good step towards ensuring better deliverables. Ultimately, knowledge acquired by project managers largely depends on the depth and intensity of training they have been given.

Building Local Talents

Datuk Seri Ir. Dr Wee feels it is very important to train and build local talents. He says: “We have to build up local talents to manage and, of course, get external consultants to advise where needed. But eventually technology transfer and the transfer of know-how from the external consultants to local talents must happen. These consultants must

JULY 2022

11

impart the knowledge to Malaysians who must learn and pick up. That is very important.” He is of the opinion that Malaysia still lacks engineers and points at the failure to implement Science, Technology, Engineering & Mathematics (STEM) education. Instead of training students in one particular domain, STEM education should rightly combine all 4 domains in an inter-disciplinary and applied approach so as to better equip students for a career related to STEM. In addition, STEM education must consider real-world applications. “To be frank, STEM has not been successfully implemented. There are many graduates but they don’t have the STEM education that meets market demands. All construction sites, plants and manufacturing companies are facing the problem. They cannot find local workers and become too dependent on foreign workers whose productivity may not be as high as qualified locals. So more locals must be trained properly and their skills upgraded. The Human Resource Development Fund (HRDF)


12

JULY 2022

JURUTERA

COVER STORY

THE INSTITUTION OF ENGINEERS, MALAYSIA

for training must be utilised spot-on in the fields that the industry wants. Now there is no correlation between training given and the actual market demand,” he laments, adding that the government must study this aspect so that Malaysia will have more students taking up STEM and engineering courses. Datuk Seri Ir. Dr Wee says an engineering education is good and all engineers must have the basic training.

"

Engineers are taught to be very strict and to follow rules. They cannot bend the rules. For example, design criteria cannot compromise on safety. The engineers’ decision is crucial. Safety comes first. For instance, if an aeronautical engineer says a plane cannot fly, it means it just cannot take off even though grounding a faulty plane will cause delay. So what? Safety comes first.

"

There are challenges to managing big projects and MOT wants local talents and to build local capacity. Datuk Seri Ir. Dr Wee cites Petronas as an example. “Just look at how Petronas manages its business services. Initially, they may get guidance from someone else (external expertise) but eventually the local employees learn to do the job. It is like localisation

has taken place. Even the initial stage of the rail sector relied on the expertise of the Original Equipment Manufacturer or OEM. It is important that after the OEM has supplied the sets, we must think of ways to localise. For maintenance, repair and operations (MRO), we must start with very basic MRO, from level one to four and then gradually transfer the skills to a local company,” says Datuk Seri Ir. Dr Wee, adding that the rail sector has embarked on human capital development of local talents through the establishment of the National Rail Centre of Excellence (NRCOE). NRCOE, which comes under MOT, provides a centralised platform for the implementation of the Human Capital Development (HCD) Programme, Rail Industry Development Programme (RIDP), Testing and Certification (T&C) and Research and Technology (R&T). It also aims to become the facilitator for rail industry development in Malaysia, a hub for international and local industry players to interact and to provide professional advice on the rail industry. Datuk Seri Ir. Dr Wee says: “We must make sure we can produce

enough people and train more people for this sector.” One current concern is the airline industry which is picking up after the Covid-19 pandemic hit the world about two years ago. Datuk Seri Ir. Dr Wee says the government needs to revive the aviation industry and rebuild air connections. “This is very important because aviation will enable the movement of goods, investments and people. Without such movement, the economy cannot grow,” he says, stressing that helping to push economic growth remains one of the ultimate objectives of the government. He concludes by inviting representatives of IEM PMTD to join MOT in its study tours and technical visits, including visiting the Genting Tunnel which is currently under construction, the East Coast Rail Link (ECRL) project and port projects. He has also invited PMTD to attend the launch of Mass Rapid Transit 2 (MRT2), which is a part of the Putrajaya line. Such collaborations with MOT will expose IEM PMTD members to the state of current developments of projects under the management of MOT.


Advertise with us !

ju ru t era

THE MONTHLY BULLETIN OF THE INSTITUTION OF ENGINEERS, MALAYSIA

JUNE 2016

KDN PP 1050/12/2012 (030192) ISSN 0126-9909

ISSN 0126-9909

Fi re S afet y Manag ement

Driving

The Monthly Bulletin of The Institution of Engineers, Malaysia

KDN PP 1050/12/2012 (030192)

ISSN 0126-9909

STEM

Preparing ENGINEERs for

tomorrow’s

challenges

OCTOBER 2017

INNOVATIONS in

PALM OIL INDUSTRY

JANUARY 2020

T h e M o n t h ly B u l l e t i n o f T h e I n s t i t u t i o n o f E n g i n e e r s , M a l ay s i a

For advertisement placements and subscriptions, please contact:

Dimension Publishing Sdn. Bhd. [ 199701034233 (449732-T) ] +603-7493 1049

info@dimensionpublishing.com

Education

AUGUST 2018

Jurutera

KDN PP 1050/12/2012 (030192)


THE MONTHLY BULLETIN OF THE INSTITUTION OF ENGINEERS, MALAYSIA

JUNE 2016

J URUT

KDN PP 1050/12/2012 (030192) ISSN 0126-9909

17

R 20 CTOBE

O

TH

EM

ON

TH

LY

BU

LLET

IN

OF

TH

E IN

STIT

UT

ION

OF

ER A

EN

G

FEBINEERS, MAL N PP RU AY 1050 AR Y 20 SIA /12 /20 ISSN 12 (03 15

KD

IONS

0126 0192 -99 ) 09

VAT INNO in

OIL PALM RY T S INDU

juru Driving

STEM

(030

192)

ISSN

MR T 0126

-990

Fi re S Man afety age men t

18 ST 20

9

tera

a r e t Juru

/12/

2012

(030

192)

ISSN

0126

-990

9

AUGU

he CoTm Kla ing o f KDN Val ng PP 1 Education 050/ ley 12/2 012

KDN

050 PP 1

ing PrepEaErRs for

Mal

ays

ia

ENGIN row’s tomor

The

Mon

thly

Bull

he of T etin

Inst

itut

ion

ng of E

inee

rs,

ges challen

JANU

ARY

2020 The

Mon

t h ly

Bull

etin

of T he I nsti t

utio

n of Engi ne

ers,

For advertising enquiries, please contact:

Dimension Publishing Sdn. Bhd. [ 199701034233 (449732-T) ]

Level 18-01-02, PJX-HM Shah Tower, No. 16A, Persiaran Barat, 46050 Petaling Jaya, Selangor Darul Ehsan, Malaysia. Joseph How : +6011 1234 8181 Shirley Tham : +6016 283 3013

+603 7493 1049 +603 7493 1047 info@dimensionpublishing.com

Mala

ysia


JURUTER A T H E M O N T H LY BU L L E T I N O F T H E I N S T I T U T I O N O F E N G I N E E R S, M A L AYS I A

Circulation and Readership Profile

JURUTERA has an estimated readership of 200,000 professionals. Our esteemed readership consists of certified engineers, decision making corporate leaders, CEOs, government officials, project directors, entrepreneurs, project consultants, engineering consulting firms and companies involved with engineering products and services.

Advertising Benefits

Our business partners can be assured that their products and services will be given the circulation and exposure they deserve, thus maintaining a sustained advertising presence to our core readers of decision-making engineers and technical experts. Our website offers an even wider market reach, with added international presence, aided by our international affiliation with official engineering bodies all over the world. Our online and offline advertising features such as banner advertising, article sponsorship and direct e-mail announcements have proven to be successful marketing strategies that will set the businesses of our partners apart from their competition.

ADVERTISING RATES PRICES PER INSERTION IN RINGGIT MALAYSIA (RM) 1 INSERTION

3 INSERTIONS

6 INSERTIONS

9 INSERTIONS

12 INSERTIONS

Outside Back Cover (OBC)

7,800

7,050

6,750

6,450

6,150

Inside Front Cover (IFC)

7,250

6,650

6,350

6,050

5,750

Inside Back Cover (IBC)

6,750

6,250

5,950

5,650

5,350

Page 1

6,650

6,150

5,850

5,550

5,250

Facing Inside Back Cover (FIBC)

6,150

5,850

5,550

5,250

4,950

Facing Cover Note (FCN)

5,850

5,300

5,100

4,900

4,700

Facing Contents Page (FCP)

5,700

5,150

4,950

4,750

4,550

Centre Spread

11,200

9,500

9,000

8,500

8,000

ROP Full Page

4,900

4,500

4,300

4,100

3,900

ROP Half Page

2,900

2,650

2,550

2,450

2,350

ROP 1/3 Column

2,200

2,000

1,900

1,850

1,800

ROP 1/4 Page

1,950

1,750

1,650

1,600

1,550

SPECIFIED POSITION (Full Colour Ad)

Special Position: +15% Overseas Advertiser: +25% (Full Advance Payment Required) All prices shown above exclude Computer to Plate (CTP) charges

*Please note that the above prices will be subjected to SST *Advertising rates displayed do not include 15% advertising agency commission


16

JULY 2022

JURUTERA

FEATURE

THE INSTITUTION OF ENGINEERS, MALAYSIA

Adopting Project Management Front-End Engineering in Development of PETRONAS Floating LNG (PFLNG) Written and Prepared by: Ir. Ts. Wan Mohd Ikhwan bin Wan Yussoff A Staff Engineer in Front-End Engineering at PETRONAS MPM, Resource Development & Management (RDM) Division, with more than 18 years’ work experience in overall project management activities.

A

floating liquified natural gas (FLNG) facility is a floating production storage and offloading unit that conducts liquified natural gas (LNG) operations for developing offshore natural gas resources. Floating above an offshore natural gas field, the FLNG facility produces, liquefies, stores and transfers LNG at sea before it is shipped directly to markets. As part of Oil & Gas project management elements, Front-End Engineering (FEE) or Front-End Engineering Design (FEED) is defined as an early engineering design activity to realise a project via good planning prior to concluding the project Final Investment Decision (FID). It is also referred to as front-end loading (FEL), pre-project planning (PPP), feasibility study (FS) or early project planning. FEED is a basic engineering activity conducted right after conceptual design or project feasibility study. In other words, FEED is an engineering design approach executed prior to embarking on project Engineering, Procurement,

Ir. Wan Rizaluddin Abdullah bin Wan Ali A Staff Engineer in Planning & Scheduling at PETRONAS MPM, Resource Development & Management (RDM) Division, with more than 23 years’ work experience in project management.

Construction and Commissioning (EPCIC) phases. This is an important phase, designed to control the project execution plan and project related expenses prior to receiving bid submissions. On average, FEED takes up roughly 2% of the overall project cost. The benefit of a timely and solid executed FEED phase can potentially save up to 30% of overall project costs in the subsequent project phases. During project plan development, identification and analysis of project requirements via project framing exercise are conducted to establish the optimum business case – this activity is called Opportunity Project Framing (OPF). During this project stage, the PETRONAS FLNG concept was identified to monetise stranded gas resources in Malaysia. PETRONAS also explored the development of Floating Compressed Natural Gas (FCNG) and Floating Gas to Liquids (FGTL) as part of “Technology Challenge Initiatives”. In completing the elements in the overall LNG


FEATURE

THE INSTITUTION OF ENGINEERS, MALAYSIA

JURUTERA

value chain, a Floating Storage Regasification Unit (FSRU) was identified as a fast-track solution to make available LNG, especially to non-LNG producing countries. The above information is registered in a document called a Project Charter or the process of developing a document that authorises the existence of a project and provides the project manager with the mandate and formal authority to apply organisational resources to project activities. The contents of the Project Charter include project overview, project scope, project high level cost, project timeline, preliminary project economics, and project key deliverables.

JULY 2022

17

CHINT SUPERIOR SWITCHES

FLNG Project Scoping & Planning

As part of the Project Scoping and Planning, understanding the overall FLNG value chain is very important. For example, the traditional method of producing natural gas is by having an onshore facility. Normally, LNG is produced via an onshore LNG plant where the natural gas is piped from gas fields located in the ocean. Similarly for the onshore regasification plant to convert offshore LNG into natural gas before it is exported to end consumers via a gas grid. In terms of the conceptual design and size optimisation, these facilities must suit perfectly with certain feedstock or reserves in order to be economical. For example, a FLNG shall be designed to monetise gas fields with minimum reserves of between 1 trillion cubic feet (TCF) to 3 trillion cubic feet (TCF).

It is understood that gas fields of such capacities are available in reasonable quantities globally. This has led to the motivation for front-end studies to look for solutions in monetising them. Distance to shore is one of the elements in the evaluation between shore-based LNG plants vs onshore LNG plants. On another note, there are lots of stranded gas fields in deeper waters, where building a mobile/relocatable FLNG may be a more attractive and economically viable option. An important project management activity is Concept Identification (CID) and Concept Select (CS). This is the project stage where other potential facility concepts are also evaluated, in this case FCNG and FGTL.

FLNG Project Facilities Design

In Project Facilities Design, there are similarities in terms of the need for the production facility, storage, transfer systems and transportation. Floating facilities are believed to become a game changer in the future, overtaking the development of conventional wellhead platforms (WHP) and Central

ALPHA CHINT SWITCHES SDN. BHD. (952175-T)

+603-5569 3698 +603-5569 4099 www.alphasel.com alphamail@alphasel.com


18

JULY 2022

JURUTERA

FEATURE

THE INSTITUTION OF ENGINEERS, MALAYSIA

Processing platforms (CPP). Very often, conventional facilities are lacking in terms of product storage which requires the product to be sent to shore via pipelines. Floating facilities are constructed of many types, with the most common being ship-shaped or defined as Floating Production, Storage & Offloading (FPSO). FLNG is defined as water-based LNG operations employing technologies designed to convert natural gas into LNG, which enables the development of natural gas resources located in stranded or remote areas. As the first FLNG operator in the world, PETRONAS operated its first FLNG in 2016. The vessel was towed from a shipyard in South Korea to Kanowit Field in Sarawak waters. Floating nearby to an offshore natural gas field, the FLNG facility theoretically produces, liquefies, stores and transfers LNG at sea before it’s transported by ship directly to global markets.

Below are the main comparisons between onshore and offshore LNG plants:

FLNG Project Risk Assessment and HSSE

In addition, on HSE Planning, PMT must ensure compliance to stakeholders HSE and HSE regulations throughout all phases of the project. The plant located on a floating facility should be able to operate under a variety of process conditions and possess a high degree of inherent process robustness. In developing and constructing a floating plant, some key technical requirements must be considered. Major pieces of equipment such as compressors, gas expanders, gas turbine/generators, heat exchangers, columns and separators should be able to withstand offshore environment conditions. One key information required is the site-specific metocean data because when a facility is in operation, sea state conditions will introduce another major challenge especially during product transfer and storage capability. Specific to FLNG and FSRU, the LNG cargo containment systems should be designed to be capable of withstanding any potential damage that may occur due to the sloshing effect in partially-filled tanks. Therefore, data on wind, waves and currents in the open seas are critical inputs towards the design of the containment systems. In terms of design life, floating facilities are normally designed and constructed to operate for a minimum of 20 years without dry-docking. This means the structure and

Changing the LNG production from a conventional onshore to an offshore environment introduces a demanding set of challenges for the project team. In terms of the design and construction of the FLNG facility, every element of a conventional LNG facility needs to fit into a smaller area footprint while adhering to appropriate levels of safety and providing some flexibility in producing LNG. Every aspect, including the robustness of the processing equipment, is taken into consideration to suit the offshore marine environment. Most of the equipment used are normally well proven for an onshore environment but are later adapted to suit site-specific metaocean conditions. As part of Project Risk Identification & Control, development of risk management plan and the process by which risk identification and quantification will be evaluated. Therefore, it is understood that an offshore plant must be compact, lightweight and designed with a certain level of inherent process safety due to the limited deck space. Considering the dynamic motion of the vessel, another important requirement to be considered is that the units must have a stable and robust operation in a marine environment.

Criteria

Onshore

Offshore

CAPEX (excluding upstream development)

Extra cost for land, pipeline, jetties, infrastructure

One facility at source location and direct shipping to buyers

EIA and Permitting

Longer process and potential to have area limitations

Simpler and easier process expected for offshore locations

Installation and Abandonment

Permanent installation

Relocatable offshore floating units

Screening of Locations

Limitations on suitability of seafronts, water depth etc.

Can be located at gas source even if at remote area

Homeland Security

Close to the population

Lower risk, less exposure to public


FEATURE

THE INSTITUTION OF ENGINEERS, MALAYSIA

JULY 2022

JURUTERA

containment system of the vessel are designed for a service life of 20 years. A planned life-cycle of a minimum 20 years often provides a good economy of scale. As a result, for the Petronas FLNG development, solutions to reduce the effect of motion and weather were addressed very early in the design, allowing the floater to withstand and even reduce the impact of waves. This concern led to the decision to choose the right cargo containment system. A few rounds of model test and wind tunnel tests were carried out to simulate real FLNG operations. In this area, technological development had been mainly evolutionary rather than revolutionary, leveraging on and adapting technologies that were currently applied to offshore oil production or onshore liquefaction.

FLNG Technology Evaluation, Regulatory & Permitting Requirements

Multiple key technology evaluation was done with regards to the choice of transfer system. For example, traditional LNG loading arms were adopted to enable LNG transfers in the open water. The hose-based solutions for sideby-side transfers were also considered; however the technology maturity for the system was not available during the engineering phase. Today, the application of cryogenic hose may be the preferred way of transferring the LNG due to its flexibility and robustness. Throughout the development of Petronas FLNG, there were many critical regulatory approvals that had to be obtained from the local authorities and relevant bodies. Most of the requirements focused on the HSE aspects of the development and the new facilities to be developed which had to be environmentally friendly. For example, the Department of Occupational Safety & Health (DOSH) which resided under the Ministry of Human Resource, was responsible for providing Permit to Install (PTI) and Permit to Operate (PTO) of the Petronas FLNG flexible riser. Upon receiving the PTI, the project team provided the approved pressure test, witnessed by the DOSH officer. For the PTO, the Emergency Response Plan (ERP) had to be approved by DOSH. Another example would be the PFLNG1 helideck which had to be approved by the Department of Civil Aviation (DCA) after a physical inspection. Classification Society also played a significant role in the PFLNG1 regulatory approval processes. The Marine Department Malaysia was the body that ensured the facility followed relevant international maritime standards. PFLNG1 engaged Classification Society from the start of the project. PFLNG1 received an Approval in Principle (AiP) in 2012 from the classification body to confirm that the overall design was technically acceptable, without any showstoppers. Below are the key design criteria in designing a floating facility: Design criteria

Remarks

Inherent safety design

To meet the design margin

Production capacity and field development strategy

Built to capacity

Process robustness, efficiency and reliability

To withstand the site-specific conditions

Proven operational experience on onshore plant

Equipments marinisation to suit marine application

Research and development on marinisation

To gauge the limitation of applications

Sea state conditions (stability and structural integrity)

To design based on site specific data

19

Nehemiah Prestress 1140945-A

Nehemiah-OVM provides the following products and services: - Post-tensioning solution provider - Carpark Flat Slab - Transfer Plate - Beams, Box Girders - Alternative design solutions - Cable systems (stay cable, main cable, hanger)

- Bridge bearing and expansion joint - Construction solutions (heavy lifting, ILM, etc) - Monitoring, repairing and strengthening for structures

Nehemiah Prestress Sdn Bhd (1140945-A) No. 45-3, Jalan PJU 5/20 The Strand, Kota Damansara 47810 Petaling Jaya Selangor Darul Ehsan Tel Fax Email

Nehemiah : 603 6142 6638 A member of the Nehemiah Group : 603 6142 6693 : enquiry-pt@nehemiah-grp.com Certified by the European

Organization for Technical Approval


20

JULY 2022

The floating facilities shall be designed to support the production, provide storage for the inventory of the product and later to allow product transfer. For example, FLNG is equipped with mooring and offloading for export to LNG carriers and condensate tankers. Product offload will be side-by-side configuration for LNG off-take while in tandem configurations for condensate off-take. Cargo containment systems for FLNG and FSRU can be the same as long as the design has considered the capability to handle sloshing effects. For CNG, there are many types of tanks available to hold natural gas at pressures up to 3,600 PSI. However, specific requirements for FCNG such as minimum weight and compact design will be the key selection criteria for tank selection. For FGTL, a normal condensate tank is suitable as long as it is not mixed with the crude oil because GTL property is a lot cleaner than crude oil. The Acid Gas Removal Unit (AGRU) is designed to remove CO2 and H2S from the feed gas to meet required product specification. AGRU designs are available from many types and licensors. All the floating facilities, except FSRU, require AGRU as part of the system and to be installed at the topside, based on the condition of the feed gas.

All living quarters are usually located at the aft and the helicopter deck will be arranged above the living quarters. Living quarters are designed to house the minimum numbers of personnel required to operate both the marine system and process system located at the topside. Sometimes, it is also designed to provide more space, considering additional requirements during shutdown. Mooring systems are designed to fit the extreme condition based on the environmental data at site location. The turret or spread mooring system is designed to keep the facility anchored properly to the seabed at all

JURUTERA

FEATURE

THE INSTITUTION OF ENGINEERS, MALAYSIA

times during the operation phase. For example, a turret mooring system is designed to allow the floaters to freely weathervane around the mooring axis under the action of wind, waves and current as well as to accommodate roll, pitch and heave motions of the floater. The LNG offloading system is often selected based on the latest development and available technology, taking into account possible operations limitation due to environmental conditions. For example, the selection of the offloading system at the FLNG is very much determined by the LNG carrier (LNGC) offloading acceptance i.e. offloading design conditions.

Conclusion

Front-End Engineering remains one of the key elements in overall Project Management activities. It helps the project owner to appropriately chart the successful way forward and to identify necessary mitigation actions on risks associated with the early stage of the project design. FLNG is a great solution because all processing activities are done at the gas field and there is no need to lay long pipelines all the way to shore. This significantly reduces the environmental footprint and helps to preserve marine and coastal environments. FLNG is breakthrough technology, a game changer which requires bold decisions in becoming the pioneer in industry. PETRONAS has moved to another level of having huge aspirations in becoming a niche player in the FLNG arena. FLNG signifies technology advancement solution which adds value to marginal and stranded offshore gas resources which will otherwise not be economical to develop via onshore LNG method. The FLNG becomes dominant as it has the capacity for relocating to other gas fields. The mooring chain can be disconnected and the facility can be towed to a new location, minus the complicated abandonment works required for conventional fixed structures.


FEATURE

THE INSTITUTION OF ENGINEERS, MALAYSIA

JURUTERA

JULY 2022

21

Ring-Fencing Transportation Projects from Covid-19 Insurgence Using Project Communications Management Practice Written and Prepared by:

T

Chitdrakantan Subramaniam A committee member of the Project Management Technical Division (PMTD). He has been involved in project management and policy making related tasks in various ministries.

Nur Syafika Artika Rahim A sub-committee member of PMTD. She is a Project Manager at Property & Land Development, Damansara Holding Bhd. Malaysia.

Ir. Assoc. Prof. Dr Syuhaida Ismail Secretary/Teasurer of PMTD. She has published more than 300 articles on project and construction management.

Rahidah binti Mohd Deputy Undersecretary at the Ministry of Transport, is involved in the planning and monitoring of transportation projects for land, sea and air.

he COVID-19 pandemic has disrupted economic activities worldwide. On February 11, 2020, the World Health Organisation (WHO) declared the start of an unexplained black swan occurrence that was close to the post-World War II economic scene; it was formally referred to as COVID-19. The pandemic spread globally and it also affected the construction industry, including transportation projects (Nicola et al., 2020). Some operations were completely halted due to a near-zero level of human engagement. As the virus was highly infectious, all construction workers, categorically in transportation projects, were extremely vulnerable considering the nature of their work, which required teamwork and regular communication. As a result, the Ministry of Health (MOH) Malaysia and the National Security Council (NSC) issued an advisory warning to immediately shut down construction sites due to potential health concerns. The action had an adverse effect on the construction industry, especially transportation projects. Even after the Movement Control Order (MCO) was lifted, the construction industry, especially transportation projects, continued to encounter disruptions such as stringent Standard Operating Procedures (SOPs) and

shortage of manpower due to border shutdown. The transportation industry faced a lot of challenges as the country experienced an economic downturn postpandemic which affected the construction industry. These included communications management issues due to restricted working hours, social distancing requirements, communications breakdown and implementation of the “work from home” strategy. The construction industry, notably transportation projects, is always prone to project stakeholder miscommunication, often leading to disputes, causing cost overruns and project delays. Furthermore, poor communication may lead to delays in the flow of information and unclear project direction, resulting in confusion and wrong interpretation by project stakeholders. According to the Project Management Institute (PMI), most projects experience cost overrun due to ineffective communication and improper time management for project communication management plan (PMI, 2017). Transportation projects often involve multiple stakeholders such as the government, consultants, contractors, related authorities and land developers if the project involves Transit-Oriented Development (TOD).


22

JULY 2022

This shows the importance of an efficient and productive stakeholders’ communication plan to achieve successful project delivery. Ineffective communications is attributed to the lack of a shared language among team members, workplace tension, attitude of superiors and subordinates toward site workers, misinterpretation of orders and poor communication skills among employees. For this reason, to overcome the potential information flow breakdown during the pandemic, the Malaysian construction industry, especially transportation projects, will undoubtedly require a comprehensive project communications management approach. Moreover, better project communications management can result in innovations, superior technology methods, a positive impact on all partners and better decision-making. Hence, the utilisation of Building Information Modelling (BIM) in a project will certainly ring-fence the construction industry, particularly in transportation project, from the COVID-19 insurgence.

Project Communications Management

Due to the COVID-19 pandemic, communications has become a critical element for ensuring the successful completion of project activities in any sector. Project communications management is often described as the exchange of information in order to reach a shared understanding, which is defined as a system for transmitting information between individuals or organisations. According to the Project Management Institute (PMI), managing project communications is a process that guarantees information about a project is available and that the demands of stakeholders are addressed via the implementation of various activities (PMI, 2017). The PMI emphasises that project communications management is most critical during planning, execution, monitoring and controlling stages and serves as an important mechanism for evaluating project and stakeholder knowledge needs by implementing practices that will improve the efficacy of information exchange. It has been observed that construction companies which prioritise effective communications outperform those which do not. Companies that communicate effectively will complete more than 80% of their construction projects on time, within budget and with high standards of quality, as well as achieve other value systems for customers (Olanrewaju, Tan, & Kwan, 2017). Therefore, in order to ensure effective information exchange throughout the project, it is critical to do so right from the beginning by developing an effective communications plan prior to the commencement of a project. In the construction industry, communications can be defined as the exchange of project information and processes between sender and receiver to make the information and processes clear to both. A project manager needs to learn how to understand and share information in the best way possible. Additionally, the construction industry (and transportation projects) is a dynamic sector

JURUTERA

FEATURE

THE INSTITUTION OF ENGINEERS, MALAYSIA

with several stakeholders whose interactions require information analysis and transfer. Effective communication of project information contributes to performance in terms of cost, time, quality, sustainability and comfort. In principle, the complex nature of transportation projects involving several stakeholders increases the chance of jeopardising project communications management efficiency. Information transfer is critical since changes frequently occur over the course of completing a job in a project. Each project retains its own distinct set of critical aspects. A project may also involve a single unit or many units from the same organisation or multiple organisations. Recognising its importance, the Project Management Body of Knowledge (PMBOK) recommends two approaches for developing the project communications management action plan. First is to develop a strategy to ensure effective communications with all stakeholders and then to put that strategy into action (PMI, 2017). Three communications models form the foundation for the development of different communications frameworks: Linear, interactional and transactional. Each takes a different look at how communication works. The most common model is linear (See Figure 1. Shannon-Weaver’ Model of Communication), which shows how a sender sends a message to a receiver through different communication channels, with noise and barriers in the way (Shannon & Weaver, 1948).

Figure 1: Source: (Shannon & Weaver, 1948)

Furthermore, there are differing viewpoints on the effectiveness of communication channels, which vary according to the project milestone and direction. Although communications in a project is done formally through meetings, briefings, document distribution and other means, most instructions are given through informal communication. Generally, verbal communication (also known as face-to-face communication) is the best way for project managers to get the information across because there are no barriers. Two-way face-to-face communication with written documents or other printed information is a good way to avoid misunderstandings in a group with many/different people. In most cases, important decisions are made via upward communication to address issues with top management regarding costs, risks and design improvements. This mode


FEATURE

THE INSTITUTION OF ENGINEERS, MALAYSIA

JULY 2022

JURUTERA

of communication will spark ideas and suggestions which will help the organisation grow. Meetings, discussions, site visits, document reviews and even progress reports are commonly used to facilitate discussions. On the other hand, the downwards communication mode, which traditional organisations prefer, is intended to provide direction and obtain updates on recent site development.

The significance of a downward communication mode is that it allows for the collection of details on resource planning and feedback on-site conditions for future review and scheduling. While this is true, lateral communication occurs among project stakeholders. As a result, it facilitates the formation of partnerships among various stakeholders, resulting in the successful completion of the project. Understanding the role of project communications management in today’s scenario is vital to project management. For these reasons, it is critical to ensure that communications management practices on construction sites, particularly in transportation projects, adopt new technology that will benefit and further improve the quality of communications management in accordance with the most recent on-site requirements and improvements. Failure to address the changes can lead to project failure. Given the construction industry’s economic contribution, further delays in efforts to improve project performance may have an impact on the nation’s growth.

Digitalisation Transition in the Transportation Projects

Figure 2a: Front cover of the National Construction Policy 2030

23

In response to the National Construction Policy (NCP) 2030 (Figures 2a & 2b) by the Ministry of Works Malaysia as well as the COVID-19 pandemic situation globally, the construction industry and transportation projects should move towards digitalisation (MOW, 2021). The numerous projects outlined to support the National Transportation Plan 2019-2023 (Figures 3a & 3b) which aims to develop

Figure 2b: Main objectives of the National Construction Policy 2030



FEATURE

THE INSTITUTION OF ENGINEERS, MALAYSIA

Figure 3a: Front cover of the National Transport Policy 2019-2030

JULY 2022

JURUTERA

a sustainable transportation sector that accelerates economic growth, will certainly require a pragmatic approach to ensure the smooth execution of projects (MOT, 2019). One way to convert conventional methods to digitalisation is through BIM, a process that facilitates construction project stakeholders in terms of communicating project information throughout the project life-cycle by using suitable software. But although BIM can help minimise project miscommunication and improve project delivery, its implementation in Malaysia is still minimal.

25

BH GIRDER The BH Girder is an innovative and enhanced version of PSC Girder that utilizes the Bulb-T shape integrated with Half Slab which enables it to be applied over a span of longer than 60m. By adopting the latest cutting-edge technologies and innovation, the BH Girder has been designed to achieve the ultimate goals of “Cost Effectiveness”, “Rapid Construction”, “Aesthetics” and “Safety”. Half Slab ►Integrated slab girder for improving constructability

Enhancement of Aesthetics ► Stream lined shape Intermediate Tendon ► Maximization of prestressing efficiency

Bulb-T Shape ►Structural efficiency can be optimized

ADVANTAGES Straight Tendon ►Friction loss can be minimized

ADVANTAGES

● Maximization of prestressing efficiency ● Minimization of prestressing friction loss

Efficiency

● Reduction of substructure cost ● Reduction of slab cost by half slab girder

Economics

● Omission of deck slab formwork and shoring work by half slab girder ● Shorter construction period Constructability

PROFESSIONAL SERVICES (Free of charge)

● Design computations and analysis ● Construction drawings ● Material and construction specifications ● Cost estimates ● Technical advice and construction assistance BH Girders (60m long) launched on double decker portal piers at Setiawangsa Pantai Expressway

Figure 3b: The principles of Sustainable Transport

This is mostly due to the high cost of initial investment to acquire suitable software and for stakeholders involved in the BIM process (Eadie et al., 2013) to attend the necessary training. Moreover, there is no requirement to implement BIM in projects of less than RM10mil in value, especially government projects. This makes most construction project stakeholders reluctant to utilise BIM in their projects. During the COVID-19 insurgence, the lack of understanding among construction project stakeholders about BIM was also one of the major problems affecting its implementation in Malaysian transportation projects (Subramaniam et al., 2021). However, BIM had greatly helped transportation project stakeholders to overcome the COVID-19 insurgence which badly affected the industry. It has been shown that BIM is capable of improving project delivery by

NEHEMIAH TOWOONG BRIDGETECH SDN. BHD. No. 45-3, Jalan PJU 5/20, The Strand, Kota Damansara 47810 Petaling Jaya, Selangor Darul Ehsan. Tel Tel Fax

: 012 218 6693(Tan CC) : 603 6142 6638 : 603 6142 6693

Email Email

: tancc@nehemiah-grp.com : enquiry@nehemiah-grp.com

A partnership of


26

JULY 2022

implementing project communication management using BIM software (Deloitte, 2020). BIM software can be used efficiently in data transfer and real-time updates between stakeholders. Furthermore, it can help to ensure the continuity of project communication management between the stakeholders by initiating virtual meetings using related software. This practice can help prevent communication breakdown in transportation projects, especially with the implementation of the “work from home” strategy due to rising COVID-19 cases. Nowadays, people can opt for a hybrid mode where some may physically attend a meeting and others attend virtually. This will minimise contact and ensure the social distancing procedure is adhered to. In addition, BIM allows the project team to easily view, edit and update necessary project information such as design drawings, request for information (RFI) documents, project schedules, project costing and other documents in real-time speed because the information stored is accessible to every member of the team. This practice can ensure continuous communication among stakeholders and prevent delays in document transfer. Moreover, BIM also allows the practice of sustainable efforts such as paperless initiatives when attending site visits. Stakeholders can review drawings, undergo safety and quality inspections and solve on-site disputes by using online documents such as drawings and inspection forms that have been stored on cloud and are accessible by the project team. Other than that, BIM can also assist in the identification of clashing designs using software and this can be done virtually without the need for a physical meeting between stakeholders. It can shorten the time needed for discussions and decision-making, thus making the project delivery smooth. In normal practice, stakeholders must initiate a meeting to discuss the potential design clash on-site and they have to resolve it separately within their respective disciplines which is extremely time-consuming and highly prone to human error. With BIM, the changes can be updated concurrently and the stakeholders can get real-time update on possible changes. Managing a transportation project during the COVID-19 insurgence was challenging, especially in achieving effective cost management, on-time project delivery, efficient site planning and minimum disputes throughout the project life-cycle. Using BIM to maintain a good communications management plan for the project stakeholders will definitely help overcome the challenges. Besides, most construction project experts agree that industry players have to consider future problems, especially in transportation projects, if the conventional method is not digitalised and implemented. The implementation can be expedited by subsidising the initial investment cost, including software acquisition, which will help transportation industry players start implementing BIM in their projects. Apart from this,

JURUTERA

FEATURE

THE INSTITUTION OF ENGINEERS, MALAYSIA

providing sufficient training and seminars to equip transportation project stakeholders will also help them better understand the role and function of BIM. The integration of BIM in transportation projects, especially during COVID-19 endemic period, will reduce major problems in the construction project, such as design clash, cost overrun, project delays and disputes between stakeholders.

Conclusion

The Malaysian Government’s SOPs place pressure on the construction industry, notably transportation projects, by only permitting strict communications platforms, limiting face-to-face communication and restricting physical site document exchanges at construction sites. Communications is the most important instrument for integrating and maintaining close contact with all project operations. As a result, project communications management is critical to the success of a project, particularly in the transportation industry. As we are still under threat from COVID-19, the implementation of technology-based tools such as BIM is assuredly the best approach to ensure the sustainability of the construction industry, especially in the transportation projects. REFERENCES [1] Deloitte. (2020). 2021 Engineering and Construction Industry Outlook. Retrieved from https://www2.deloitte.com/us/en/pages/energy-andresources/articles/engineering-and-construction-industry-trends.html [2] MOT. (2019). National Transport Policy 2019-2030. In Ministry of Transport Malaysia. Retrieved from https://www.malaysia.gov.my/ portal/content/30900 [3] MOW. (2021). National Construction Policy 2030. In Ministry of Works Malaysia. Kuala Lumpur. [4] Nicola, M., Alsafi, Z., Sohrabi, C., Kerwan, A., Al-Jabir, A., Iosifidis, C., … Agha, R. (2020). The socio-economic implications of the coronavirus pandemic (COVID-19): A review. International Journal of Surgery, 78(April), 185–193. https://doi.org/10.1016/j. ijsu.2020.04.018 [5] Olanrewaju, A., Tan, S. Y., & Kwan, L. F. (2017). Roles of Communication on Performance of the Construction Sector. Procedia Engineering, 196(June), 763–770. https://doi.org/10.1016/j. proeng.2017.08.005 [6] PMI. (2017). A Guide to the Project Management Body of Knowledge (PMBOK Guide) - Sixth Edition (Sixth). Pennsylvania US: Project Management Institute. [7] Shannon, C. E., & Weaver, W. (1948). A Mathematical Theory of Communication. Bell System Technical Journal, 27(4), 623–656. https://doi.org/10.1002/j.1538-7305.1948.tb00917.x [8] Subramaniam, C., Ismail, S., Durdyev, S., Wan Mohd Rani, W. N. M., Bakar, N. F. S. A., & Banaitis, A. (2021). Overcoming the Project Communications Management Breakdown amongst Foreign Workers during the COVID-19 Pandemic in Biophilia Inveigled Construction Projects in Malaysia. Energies, 14(16), 4790. https://doi.org/10.3390/ en14164790 [9] Robert Eadie, Mike Browne, Henry Odeyinka, Clare Mckeown, & Sean McNiff (2013). BIM implementation throughout the UK construction project lifecycle: An analysis. Automation in construction, 36



28

JULY 2022

PROJECT MANAGEMENT TECHNICAL DIVISION FORUM JURUTERA • THE INSTITUTION OF ENGINEERS, MALAYSIA

Project Management Conference 2022 Written and Prepared by:

Ainarull Assikin Abdul Hadi

Ir. Prof Dr Syuhaida Ismail

T

he Project Management Conference (PROMAC) 2022, sponsored by Affin Bank Berhad and KLCC Projeks Sdn. Bhd., was held on 19 March 2022 from 9 a.m. to 5 p.m. at Kuala Lumpur Convention Centre, Malaysia. The inaugural event organised by the Project Management Technical Division (PMTD) was attended by close to 205 participants, both physically and online. PROMAC 2022 showcased 3 themes: Construction Mega Project in Malaysia (Infrastructure), ICT & Digital Project Management and Managing Projects in the Energy Sector. Held in conjunction with the 1st Malaysian Engineering Exhibition & Conference 2022 (ENGINEERTM), it brought together influential speakers from diverse backgrounds in project management to talk about current and emerging practices across different spectrums. Participants included project stakeholders from across the value chain of the industry, such as project owners, regulators/authorities, government agencies, consultants, contractors, investors, CAPEX financing institutions and academicians. PROMAC featured prominent speakers in project management and the aim was for all participants to discuss and share knowledge on current and emerging technologies and practices. The feedback from participants

Figure 1: Speech by PROMAC 2022 organising chairman, Ir. Dr Harris Abd Rahman

Figure 2: Y.Bhg. Datuk Ir. Hj. Mohamad Zulkefly Sulaiman giving his keynote speech

showed that this had been achieved. The national-level conference not only provided a great opportunity for creating business relationships but also in terms of exchanging ideas on the latest trends and techniques with respect to project management implementation as well as offering the views and opinions of technical expert on current mega projects in Malaysia and around the world.

Figure 3: IEM President, Ir. Ong Ching Loon presenting a token of appreciation to Y.Bhg. Datuk Ir. Hj. Mohamad Zulkefly Sulaiman


FORUM

PROJECT MANAGEMENT TECHNICAL DIVISION THE INSTITUTION OF ENGINEERS, MALAYSIA • JURUTERA

JULY 2022

29

PROMAC 2022 also showcased the latest developments leveraged on project management expertise in various industries. The event started with speeches by PROMAC 2022 organising chairman Ir. Dr Harris Abd Rahman (Figure 1), and IEM President Ir. Ong Ching Loon. This was followed by a keynote speech delivered by Y.Bhg. Datuk Ir. Hj. Mohamad Zulkefly Sulaiman, the Director General of Jabatan Kerja Raya (JKR) Malaysia (Figure 2 and Figure 3) and the Plenary speech by Ir. Norhasita Mohd Yusof, the General Manager, Centralised Organisation Programme Management Division, Telekom Malaysia Berhad (Figure 4).

Figure 5: Ir. Wan Rizaluddin Abdullah Wan Ali chaired the Theme 3 session on Managing Projects in the Energy Sector

chaired by Ir. Dr Nor Azhar Mohd Arif, Chairman of PMTD, the panellists were Dr Mohd Shahrul Azmi Mohamad Yusoff, Director of Centre of Innovation in Smart Manufacturing, SIRIM, Ir. Norhasita Mohd Yusof, General Manager Centralised Organisation Programme Management Division from Telekom Malaysia Berhad and Ms. Subathra Pancharam, Senior Project Manager from Malaysia Digital Economy Corporation (MDEC). Theme 3 on Managing Projects in the Energy Sector was chaired by Ir. Wan Rizaluddin Abdullah Wan Ali (Figure 5), committee member of PMTD and the panellists were Mr. Khaled Higgy, Project Director from Fluor Daniel International, Ir. Chow Pui Hee, Group Managing Director from Samaiden Group Berhad and Ir. Ts. Dr Wan Syakirah Wan Abdullah, Head of Business Assessment & Engineering from TNB Renewable Sdn Bhd. They spoke about various cutting-edge technologies, tools and methods of project management based on their interesting experiences and knowledge involved in the real case studies of the specific industries of each individual theme, all of which benefitted the participants of PROMAC 2022. It is hoped that this event will be continued in next coming years (Figure 6). Figure 4: Participants listening to the plenary speech by Ir. Norhasita Mohd Yusof, the General Manager, Centralised Organisation Programme Management Division, Telekom Malaysia Berhad

Theme 1 on Construction Mega Project in Malaysia (Infrastructure) was chaired by Y.Bhg. Dato’ Ir. Dr Ahmad Anuar Othman, with panellists Supt (R) Tharamadurai Ramanathan, Head of Department, Security, Safety, Health & Environment, Malaysian Resources Corporation Berhad (MRCB), Y.Bhg. Dato’ Ir. Ahmad Redza Ghulam Rasool, Deputy Director General (Infrastructure Sector) from JKR, Ms. Zaidatul Ahmad Zubel, General Manager, PJH Project Division from KLCC Projeks Sdn. Bhd. and Mr. Leo Leow Woon Hwoi, Country Director of Turner & Townsend Malaysia. For Theme 2 on ICT and Digital Project Management,

Figure 6: More than 80 participants from the Project Management fraternity attended PROMAC 2022



FORUM

PROJECT MANAGEMENT TECHNICAL DIVISION THE INSTITUTION OF ENGINEERS, MALAYSIA • JURUTERA

JULY 2022

31

PMTD: CSR Programme at Seri Semarak Urban Farm Written and Prepared by:

Mr. Chitdrakantan Subramaniam

O

Assoc. Prof. Ir. Dr Syuhaida Ismail

n 11 June 2022, the Project Management Technical Division (PMTD) organised a Corporate Social Responsibility (CSR) cum Outreach Programme at the Urban Farm owned by the B40 community in Projek Perumahan Rakyat (PPR) Seri Semarak, Air Panas, Kuala Lumpur. It was held in collaboration with Green Cities & Construction Research Group (GCCRG) of Universiti Teknologi Malaysia Kuala Lumpur (UTMKL). Taking part were 9 PMTD committee members, Welfare Department Malaysia (JKM) and the Resident Association of PPR Seri Semarak (Seri Semarak RA). It started with a welcome speech by Ts. Khairul Zahreen Mohd Arof, the Project Manager from GCCRG, who briefly explained the implementation of the urban farm, a brainchild of GCCRG and Seri Semarak RA. The farm is funded by the Institute of Electrical & Electronics Engineers (IEEE) to empower the residents through urban farming activities and engineering technovations such as the Internet of Things (IoT) which can potentially improve their livelihood, especially during the uncertain COVID-19 endemic phase. He further explained that the farming methods are based on the types of plants and available land area. The land is planted with vegetables including chilli, eggplant, water spinach

and lemongrass as well as MD2 pineapple and lemons. The farmers use the fertigation system which is planned for monitoring through IoT devices. However, due to the unforeseen circumstances, the potential funder for these IoT devices had halted the plan since last year. In his remarks, Ir. Dr Nor Azhar Mohd Arif, Chairman of PMTD, praised the GCCRG’s efforts to assist the B40 community at PPR Seri Semarak and the Seri Semarak RA to utilise available environment-friendly resources to improve their standards of living. He suggested that PMTD may extend its expertise and provide on-site talk on ways to manage the entire supply chain. Ir. Dr Azhar also suggested further streamlining the mechanisms in place to manage the farm better. Apart from that, the PMTD committee members and volunteers from JKM lent a hand during the regular gardening sessions. The programme also received attention from the Setiawangsa Member of Parliament, Y.B. Nik Nazmi Nik Ahmad, who was present and gave his support for enhancing the urban farming initiative. To conclude the programme, Ir. Dr Azhar handed over IoT devices for the plant monitoring system, valued at RM1,500, to Ts. Khairul who represented the B40 community of PPR Seri Semarak (see Figures 1 and 2: Group photo).

Figure 1: PMTD committee members and PPR Seri Semarak residents

Figure 2: PMTD committee members with Y.B. Nik Nazmi Nik Ahmad


Print Service

romotion Flyer / Leaflet Art Paper (Full Color)

A4

A5

FLYER MOCKUP Lorem Ipsum is a pseudo-Latin text used in web design, typography, typesetting, and printing instead of English to emphasize design elements over content.

105gsm 500pcs 1000pcs

130 RM160

128gsm 500pcs

RM

1000pcs

160 RM190

105gsm 500pcs

RM

1000pcs

100 RM130

128gsm 500pcs

RM

1000pcs

For other quantity and material, please contact: Joseph How Shirley Tham

RM

(+6) 011 1234 8181 (+6) 016 283 3013

130 RM160


Print Service

romotion Business Card - 54mm x 90mm Gloss / Matt Art Card (Full Color)

260gsm 200pcs 300pcs

40 RM 50 RM

310gsm 200pcs 300pcs

For other quantity and material, please contact: Joseph How Shirley Tham

(+6) 011 1234 8181 (+6) 016 283 3013

50 RM 60 RM



UTM KL LIBRARY CORPORATE MEMBERSHIP SERVICE

IEM LIBRARY NEW SERVICE

IEM is now a corporate member of UTM KL library and IEM members can now enjoy the following benefits • Two library membership cards available for use • Vast collec�on of academic research, technical papers, news, business forecast, interna�onal standards, & etc in the fields of science & technology as well as social science & humani�es • In campus access to library electronic resources • Loan eligibility for books • Informa�on consulta�on in informa�on searching

For more details kindly contact IEM librarian 03 79684012

lib@iem.org.my


BSL_PrintAd_BIM_IEM_210x285_OP.pdf 1 1/12/2022 10:50:19 AM

C

M

Y

CM

MY

CY

CMY

K

lysaght.malaysia@bluescope.com / lysaght.singapore@bluescope.com facebook.com/lysaghtMYBN / facebook.com/lysaghtsg


NEWS FROM BRANCH

THE INSTITUTION OF ENGINEERS, MALAYSIA

JURUTERA

JULY 2022

37

Women Engineers Conference 2022: Building the Future, WE Lead Written and Prepared by:

Ir. Heng Lee Sun

I

n conjunction with International Women’s Day celebrations in March 2022, the Women Engineers Section of The Institution of Engineers Malaysia (IEM), Penang branch, organised the first Women Engineers Conference 2022 on 4 March with the theme, Building the Future, WE Lead. Over 100 delegates attended the conference at Bayview Hotel Georgetown, Penang, which was officiated by Penang Deputy Chief Minister Y.B. Dato’ Ir. Hj. Ahmad Zakiyuddin bin Abdul Rahman, with Y.B. Chong Eng, Chairperson of Penang Women’s Development Corporation, as the special guest. Invited speakers included Y.Bhg. Professor Datuk Ir. Ts. Dr Siti Hamisah, Dato’ Ir. Dr Goh Teik Cheong, Ms. Ong Bee Leng, Professor. Ir. Dr Taksiah, Ts. Regine Choo Hooi Chin, Dr Thong Sze Yee and Ms. Angeline Goh Pei Leng. Conference Chairperson Ir. Heng Lee Sun (see Figure 1) said the event received huge support from all IEM Penang Women Engineers, while working crews of the Young Engineers Section volunteered their time. She was grateful the event went smoothly as there were many challenges,

especially during the pandemic. Indeed, they had planned for a whole year, with the various partners putting in lots of hard work and effort, connecting the dots from the draft to the completion of the conference. Generally, women play many roles in their daily lives. Being a woman means having a strong sense of multiple identities; they juggle their roles of career woman, wife, mother, daughter, sister, babysitter etc. Balancing the demands of all roles is important to ensure sustainable and continuing success as each role needs full responsibility and commitment. Women are gifted with the unique ability to perform multiple tasks and be as detailed as needed. The conference brought together the leadership and achievements shared by women engineers in different industries and highlighted the equality challenges that they faced. There were two panellist discussions during the conference with good interactive feedback from the audience. (See Figure 2 Group photo). We learn from the past, manage the present and plan for the future – Building the Future, WE Lead.

Figure 1: IEM Penang WE Conference Chairperson Ir. Heng Lee Sun

Figure 2: Group photo (right to left): Ir. Heng Lee Sun, Ms. Angeline Goh, Ir. Yau Ann Nian, Ir. Ong Ching Loon, Prof. Datuk Ir. Ts. Dr Siti Hamisah, Y.B. Chong Eng, Y.B. Dato’ Ir. Hj. Ahmad Zakiyuddin, Ir. Bernard Lim, Dato’ Ir. Dr Goh Teik Cheong, Ms. Ong Bee Leng and Ir. Catherine Sim


Subscribe to IEM’s Publications Now! Yes! I would like to be a subscriber of The Institution of Engineers, Malaysia’s publications Name: _________________________________________________________________________________________________________ Mailing Address: _________________________________________________________________________________________________ ______________________________________________________________________________ Country: ________________________ Company/Institution: ______________________________________________________________________________________________ Title: __________________________________________________________________________________________________________ Telephone No: _________________________ Fax: _________________________ Email: _____________________________________ New Subscriber

Renewal

Please commence my subscription from: _________________________(month/year)

Signature: _______________________________

To start your subscription of IEM’s publications, complete this form and mail it back to the address below. For faster processing, fax it to: +603 7493 1047. Thank you. What is your primary job title?

What are the main activities of your organisation? (Tick all that apply)

Corporate Management (including chairman, president, proprietor, partner, director, vice president, general manager, division manager, import/export manager, other corporate title)

Constructions of:

Manufacturer of:

Roads/bridges

Construction equipment

Dams/reservoirs/irrigation Cement

Management (including project/contract/equipment/service/transport district manager, clerk of works, other technical or operating manager)

Harbours/offshore structures

Other construction materials

Foundations/tunnels Distribution

Engineering/Design (including chief engineer, chief designer, civil/ highway/mechanical/planning engineer, other engineering/design title)

Pipelines/refineries

Construction equipment

Buying/Purchasing (including chief buyer, buyer, purchasing officer, other buying/purchasing title)

Structures/steel work

Construction materials

Building (commercial, industrial)

Hire/rental of construction equipment

Titles allied to the field (architect, consultant, surveyor, research and development professor, lecturer, supervisor, superintendent, inspector or other allied title)

Housing Design

Others (please specify) ____________________________

Construction management

Earth-moving/open cast mining

Deep mining

Aggregate production

Others (Please specify) _________________________________________

What type of organisation do you work in? (Tick one box only) Contractor

Rate (Please tick) RM360.00 - 12 issues of JURUTERA

Sub-contractor specialist

RM84.00 - 2 issues IEM Journal (Half-yearly)

Design and build contractor Consulting engineering/architectural/quantity surveying practice Mining/quarrying/aggregate production company Petroleum producer International/national authorities National/regional/local government Public utilities (electricity, gas, water, deck and harbour, other) Manufacturer

Terms and Conditions: 1) 2) 3) 4) 5) 6) 7) 8)

Distributor/importer/agent Construction department of large industrial/Commercial concern Association/education establishment/research

The subscription is to be prepaid. Please make cheque payable to Dimension Publishing Sdn. Bhd. Subscriptions are not refundable. Magazine/s will be sent to the mailing address given. Students are entitled for a 20% discount from the above subscription rate. Students must submit a photocopy of the student identification card together with the payment. The above rate is inclusive of delivery charges and applicable in Malaysia only. Additional delivery charges will apply to overseas subscribers.

For subscription enquiries, please contact +603-7493 1049 or email to info@dimensionpublishing.com.

Construction equipment hire/rental company Project/construction management consultancy Others (please specify) _______________________________

DIMENSION PUBLISHING SDN. BHD. (449732-T) Level 18-01-02, PJX-HM Shah Tower, No. 16A, Persiaran Barat, 46050 Petaling Jaya, Selangor Darul Ehsan, Malaysia Tel +603 7493 1049 Fax +603 7493 1047 Website www.dimensionpublishing.com

Updated May 2018


ENGINEER’S ADVENTURES THE INSTITUTION OF ENGINEERS, MALAYSIA

JULY 2022

JURUTERA

Panmunjom: Bridge of No Return

39

Written and Prepared by: Ir. Dr Oh Seong Por The Past Chairman of IEMNS and Director of Samsung SDI Energy (M). Sdn. Bhd.

Note: This is Part 2 of an article on Panmunjom by Ir. Dr Oh Seong Por. Part 1 was published in the June issue of JURUTERA.

S

tanding over the Sachon River which flows through the Joint Security Area (JSA) at the Panmunjom Demilitarised Zone in the Korean peninsula is the Bridge of No Return. At the end of the Korean War, prisoners of war were repatriated at this point. Once the bridge was crossed, there would be no return. Still intact today, the Bridge of No Return is under 24-hour surveillance by UN Command (UNC) and North Korea People’s Army (KPA) guards stationed at command posts at both ends of the bridge.

to KPA guards. Taking photographs of the KPA guards is also forbidden. Visitors are not allowed to cross the Military Demarcation Line (MDL) except within the Military Armistice Commission Building and under the supervision of UNC guards. Before being allowed to enter the JSA, every visitor is required to sign a disclaimer letter that fully absolves the UNC of any liability in the event of an attack by the enemy leading to bodily injury or death.

The Axe Murder

An incident dubbed the Axe Murder occurred near the bridge in August 1976 where two UNC officers, Major Arthur Bonifas and Lieutenant Mark Barrett, who led a team of workers to trim a poplar tree located near the bridge, were slain by 30 KPA soldiers. After the incident, the world watched to see how the United States would respond. The US launched Operation Paul Bunyan in which a team of highly trained commandos, with support from standby units comprising marine, navy and air force personnel, re-entered the area and chopped down the tree. The KPA soldiers remained at their posts and did nothing.

Bridge of No Return

Security Protocols

As the JSA is a hostile zone, all visitors have to abide by strict security protocols and observe specific prohibitions – such as talking unnecessarily or displaying hand gestures, especially

A meeting being held inside the MAC Building

Site Tour

After having attended the briefing and signed the disclaimer, we were asked to board the bus which brought us into the JSA and to the first stop which was Freedom House. Visitors were then asked to alight and were ushered into the Freedom House Pagoda. Built on higher elevation, the Pagoda offered a bird’s eye view of the blue Military Armistice Commission (MAC) Building and the North Korean Pan Mun Gak Building. KPA guards at Pak Mun Gak Building watched us closely by using binoculars and cameras fitted with zoom lenses. They were constantly observing us for any improper gesture or for noncompliance with rules, which could then be used by the KPA to file a complaint to the UNC. From here, visitors had to walk for a short distance to the MAC Building. Upon entering the building, one would immediately notice the long meeting table with the North and South Korean flags placed on opposite sides. The MDL runs across the centre of the table. Visitors are allowed to

cross the MDL and enter North Korean territory within the building under the watchful eyes of guards. I crossed the MDL to the North Korean side and took a photograph with a well-built UNC guard who was standing at full attention. We were aware that KPA guards were observing us closely through the windows, but this did not bother us as we had adhered to the rules. Our next stop was UNC Command Post 5 located up the oval road. This is an excellent observation point for visitors as it offers a good view of North Korea, including the Bridge of No Return and the site of the Axe Murder. Although the surroundings looked calm, this was, in reality, a highly hostile and volatile area where shootings or killings could happen at any time and under the slightest perceived provocation. Despite the truce that had been observed since 1953, the war had technically not ended. Till today the JSA had been able to prevent any major conflict through dialogue and regular meetings. Eventually, for permanent stability, North Korea and South Korea must be reunited through peaceful settlement. Until this is accomplished, the JSA at Panmunjom, which is the last operational demilitarised zone in the world, must continue to exist.

The MAC Building

After Command Post 5, the visitors were brought to another interesting site - the 3rd Infiltration Tunnel, located south of Panmunjom. The visit to the tunnel was another thrilling experience which I would be writing about in a forthcoming article.



TEMUDUGA PROFESSIONAL THE INSTITUTION OF ENGINEERS, MALAYSIA

JULY 2022

JURUTERA

Tarikh: 8 Jun 2022

41

89305

LUM YAN WEI

BE HONS (UTAR) (ELECTRICAL & ELECTRONIC, 2018)

114705

MOHD HAFIZI BIN YUSOF @ ABD TALIB

BE HONS (UiTM) (ELECTRICAL, 2009)

60535

MOHD. ABDUL RAUP BIN PARSAT

BE HONS (UiTM) (ELECTRICAL, 2016) ME (UTM) (ELECTRICAL POWER, 2022)

57571

MUHAMAD MUSHIDI BIN MUSTAPA

BE HONS (UiTM) (ELECTRICAL, 2007)

71203

BE HONS (UniMAP) (ELECTRICAL SYSTEMS, 2013)

Berikut adalah senarai calon yang layak untuk menduduki Temuduga Profesional bagi tahun 2022.

NORKHAIRIZAL BIN JAMALUDIN

58634

RIDWAN BIN MOKHTAR

BE HONS (UiTM) (ELECTRICAL, 2011)

95876

STEINOLD PAULI

BE HONS (UTHM) (ELECTRICAL (TELECOMMUNICATION), 2007)

Mengikut Undang-Undang Kecil IEM, Seksyen 3.8, nama-nama seperti tersenarai berikut diterbitkan sebagai calon-calon yang layak untuk menjadi Ahli Institusi, dengan syarat bahawa mereka lulus Temuduga Profesional tahun 2022.

87404

VIGNESWARAN A/L M RATNAM

BE HONS (UniMAP) (ELECTRICAL SYSTEMS, 2008)

Kepada Semua Ahli,

SENARAI CALON-CALON YANG LAYAK MENDUDUKI TEMUDUGA PROFESIONAL TAHUN 2022

Sekiranya terdapat Ahli Korporat yang mempunyai bantahan terhadap mana-mana calon yang didapati tidak sesuai untuk menduduki Temuduga Profesional, surat bantahan boleh dikemukakan kepada Setiausaha Kehormat, IEM. Surat bantahan hendaklah dikemukakan sebulan dari tarikh penerbitan dikeluarkan.

Ir. Prof. Dr Zuhaina binti Zakaria Setiausaha Kehormat, IEM Nama KEJURUTERAAN AWAM

Kelayakan

SOFIAH BINTI RAHMAT

BE HONS (UTM) (CIVIL - ENVIRONMENTAL, 2006) ME (UPM) (ENVIRONMENT) (2013)

KEJURUTERAAN ELEKTRIKAL ARMIZAN BIN MUHAMAD

BE HONS (UiTM) (ELECTRICAL, 2001)

MOHD AL HAFIZ BIN ISAHAR

BE HONS (UNITEN) (ELECTRICAL POWER, 2010)

MOHD FARID BIN MD KHALID

BE HONS (UTM) (ELECTRICAL, 2007)

MUHAMMAD ASYRAF BIN MOHAMAD

BE HONS (UiTM) (ELECTRICAL, 2017)

MUHD. HANIF BIN TARMIZI BIN ABDUL HAJIS

BE HONS (UiTM) (ELECTRICAL, 2012)

KEJURUTERAAN ELEKTRONIK 105501 AIRULL AZIZI BIN AWANG LAH

BE HONS (MMU) (ELECTRICAL, 2002) MSc (UTM) (SYSTEMS ENGINEERING, 2019)

99445

MOHD RIDHWAN BIN BAHAROM

BE (HIROSHIMA) (ELECTRICAL, COMPUTER AND SYSTEMS, 2010)

76080

PUTERI SARAH BINTI MOHAMAD SAAD

BE HONS (UiTM) (ELECTRICAL, 2003) MSc (UKM) (MICROELECTRONICS, 2006) PhD (UiTM) (ELECTRICAL, 2014)

55120

GOH WEI LOON

BE HONS (UTHM) (MECHANICAL, 2016)

80957

GOH ZHEN HWEE

BE HONS (LEEDS) (MECHANICAL, 2008) ME (UTM) (MECHANICAL, 2014)

64972

KAMSAH BIN OSMAN

BE HONS (UTHM) (MECHANICAL, 2014)

32415

MOHD HASRUL HISYAM BIN CHIK

BE HONS (UiTM) (MECHANICAL, 2010)

31425

MOHD ZAKARIA BIN MOHD SAHAR

BE HONS (UiTM) (MECHANICAL, 2011)

29758

SHAHRUL HAZIMI BIN MUHAMED YUSOF

BE HONS (UTM) (MECHANICAL, 2005)

49198

SIVA PERUMAL KONAR A/L JAGATHISEN

BE HONS (UNITEN) (MECHANICAL, 2013)

105604 WANG HUI LER

79575

CHUA HING LEONG

BE HONS (UTM) (CHEMICAL, 2001)

HENRY INSIONG

BE HONS (UTM) (CHEMICAL, 2008)

BE HONS (QUEENSLAND) (MECHANICAL, 2016)

BE HONS (IIUM) (COMMUNICATION, 2009)

KEJURUTERAAN MEKANIKAL DARENCE SENAWAT MATIUS

BE HONS (UKM) (MECHANICAL, 2011)

MOHD AZIZUL HAKIM BIN ZAINAL ABIDIN

BE HONS (UTP) (MECHANICAL, 2005)

PERMOHONAN BARU / PERPINDAHAN MENJADI AHLI KORPORAT

Nama KEJURUTERAAN AWAM

Kelayakan

LIM HOCK HOO, DAVID

ME HONS (LONDON) (CIVIL, 2007)

KEJURUTERAAN KIMIA CHONG CHIEN LOONG

87346

BE HONS (IIUM) (MANUFACTURING, 2002) ME (UTM) (MECHANICAL - ADVANCED MANUFACTURING TECHNOLOGY, 2006) PhD (UTM) (MECHANICAL, 2012)

WONG WEI RU

BE HONS (UM) (TELECOMMUNICATION, 2011) PhD (MALAYA) (2015)

PERMOHONAN BARU / PERPINDAHAN MENJADI AHLI KORPORAT

No. Nama Kelayakan Ahli KEJURUTERAAN AEROANGKASA 101936 LIEW CHEE LEONG

DCAM PART - 66 CATEGORY C HOLDER (2018)

KEJURUTERAAN AWAM 28316

MOHD AMIN BIN SHAFII

BE HONS (UTM) (CIVIL, 2008) ME (UTM) (CIVIL - TRANSPORTATION & HIGHWAY, 2010)

93858

SYAHMIZZI IFWAT BIN AZHARNIM

BE HONS (UiTM) (CIVIL, 2013) MSc (UiTM) (GEOTECHNICAL, 2015)

BE HONS (UKM) (CHEMICAL, 2012)

KEJURUTERAAN ELEKTRIKAL

KEJURUTERAAN MEKANIKAL HAZRY BIN DESA

NORHASHIMAH BINTI MOHD SHAFFIAR

KEJURUTERAAN TELEKOMUNIKASI

KEJURUTERAAN KOMUNIKASI JASMAN BIN AGNO

BE (TOKUSHIMA) (MECHANICAL, 1997) PhD (OITA) (2007)

PERPINDAHAN AHLI

20145

TONG YEAH CHUEN

AZRI BIN SAFLIE

BE HONS (UKM) (CIVIL & STRUCTURAL, 2002)

21189

CHAN YORK LIN

BE HONS (UTM) (CIVIL, 2003)

61932

CHUA CHIEN MING

BE HONS (KINGSTON) (CIVIL, 2011) MSc (SURREY) (STRUCTURAL, 2013)

17326

DANEIL ANAK PUNANG

BE HONS (UTM) (CIVIL, 1989)

99525

LAU HUI HIE

BE HONS (UTM) (CIVIL, 2012) ME (UTM) (CIVIL - STRUCTURE, 2013)

61914

LIM CHEE HOWE, LUCAS

BE HONS (UNIMAS) (CIVIL, 2009)

114770

LIM JIA YIN

BSc HONS (NATIONAL TAIWAN UNIVERSITY) (CIVIL, 2013)

53605

MUHAMMAD AKRAM BIN AMIRUDDIN

BE HONS (UKM) (CIVIL & STRUCTURAL, 2013)

35621

MUHAMMAD ALI FATHULLAH BIN ABDULLAH

BE HONS (UiTM) (CIVIL, 2005)

71389

NOOR AMANINA BINTI MUSA

BE HONS (UTHM) (CIVIL, 2015)

45294

TAM WAI SENG

BE HONS (KLiUC) (CIVIL, 2009)

116024

TAN JIA XIANG

BE HONS (CURTIN) (CIVIL & CONSTRUCTION, 2012)

52568

YEW PHAIK KHUAN, LINDA

BE HONS (UTM) (CIVIL, 2010)

KEJURUTERAAN ELEKTRIKAL BE HONS (USM) (ELECTRICAL, 2010) ME (MALAYA) (POWER SYSTEM, 2015)

BE HONS (MALAYA) (ELECTRICAL, 1999) ME (MALAYA) (2011)

KEJURUTERAAN MEKANIKAL 54261

VIMAL RAU A/L APAROW

Kelayakan

36869

AMIN SHAHARUDDIN BIN IBRAHIM

BE HONS (SUNDERLAND) (ELECTRONIC & ELECTRICAL, 2015) ME (UM) (POWER SYSTEM ENGINEERING, 2018)

YEO JUE CHUAN

KEJURUTERAAN PEMBUATAN

KEJURUTERAAN KIMIA

61141

BE HONS (UPM) (ELECTRICAL & ELECTRONICS, 2018)

81427

KEJURUTERAAN MEKANIKAL

PERMOHONAN BARU / PERPINDAHAN MENJADI AHLI KORPORAT

No. Nama Ahli KEJURUTERAAN AWAM

104869 VOON YONG JIAN

BE HONS (UTeM) (MECHANICAL (AUTOMOTIVE), 2011) MSc (UTeM) (MECHANICAL, 2013) PhD (UPNM) (MECHANICAL, 2018)

Pengumuman yang ke-164 SENARAI PENDERMA KEPADA WISMA DANA BANGUNAN IEM Institusi mengucapkan terima kasih kepada semua yang telah memberikan sumbangan kepada tabung Bangunan Wisma IEM. Ahli-ahli IEM dan pembaca yang ingin memberikan sumbangan boleh berbuat demikian dengan memuat turun borang di laman web IEM http://www.iem.org.my atau menghubungi secretariat di +603-7968 4001 / 5518 untuk maklumat lanjut. Senarai penyumbang untuk bulan Mei 2022 adalah seperti jadual di bawah: NO.

NO. AHLI

1

15123

Ir. ZAINOL ARIFEN BIN SAID

NAMA

2

72584

MR. LOH BOON CHUAN, ANDREW

3

70298

Ir. MD NASIR BIN MD ISA


42

JULY 2022

JURUTERA

CALL FOR NOMINATIONS

THE INSTITUTION OF ENGINEERS, MALAYSIA

IEM ENGINEERING HALL OF FAME AWARD 2023 The Sub-Committee of Engineering Hall of Fame under the auspices of the Standing Committee on Professional Practice is proud to invite nominations for the IEM Engineering Hall of Fame Award 2023.

will also serve as a beacon and as role models for young engineers as well as create greater interest in engineering in general and awareness of the contributions made by outstanding engineers in the country.

It is timely and expedient to induct and to record the accomplishments of engineers in the country who have or had demonstrated particularly outstanding professional achievements and provided excellent services to the Institution, the engineering industry and the Nation.

Nominations for the Award are open to Malaysian citizens who are or have been Corporate Members of the IEM.

The IEM Engineering Hall of Fame is established with the aim to confer recognition and to celebrate the accomplishments of members of the IEM:

Please submit nominations to:

Who have demonstrated outstanding professional achievements.

Who have made significant contributions to the engineering profession, the Institution of Engineers, Malaysia (IEM) and the Nation.

Who have rendered valuable service to the Community.

The closing date for receipt of nominations for IEM Engineering Hall of Fame Award is 31 October 2022.

Honorary Secretary The Institution of Engineers, Malaysia Bangunan Ingenieur, Lots 60&62 Jalan 52/4, 46720 Petaling Jaya, Selangor. The nomination form can be downloaded from the IEM website at www.myiem.org.my For further details, kindly contact IEM Secretariat at 03-7968 4001/2

The Engineering Hall of Fame will serve as the focal point or showcase of outstanding Malaysian engineers, past and present, who had or have made great contributions to the engineering profession and to the quality of life in Malaysia. Engineers honoured in the Engineering Hall of Fame

IEM AWARD FOR CONTRIBUTIONS TO THE ENGINEERING PROFESSION IN MALAYSIA 2023 To encourage an interest in engineering and to recognise important services or contributions to engineering in Malaysia, the IEM Award for Contribution to the Engineering Profession in Malaysia is to be presented to the person(s), who has: •

Contributed to the advancement of engineering in Malaysia, and/or

Designed and constructed an original engineering device or system of merit and applicability to industry.

This Award is open to all Malaysian citizens and permanent residents.

AWARD •

The Award is to be made by the Council upon recommendation by the Awards Committee.

The Award shall comprise a metal plaque, a scroll and a sum of RM1,000.

The closing date for nominations is 31 October 2022. Please submit nominations to:

NOMINATIONS •

Nominations will be invited annually. The closing date for receipt of nominations for each year is 30 September.

Nominations shall be made through a member of the Institution. Each member is restricted to one nomination per year.

Each nomination shall be accompanied by a brief write up of the services rendered or contributions made or system designed and/or constructed together with relevant photographs and other documents.

Honorary Secretary The Institution of Engineers, Malaysia Bangunan Ingenieur, Lots 60&62 Jalan 52/4, 46720 Petaling Jaya, Selangor. The nomination form can be downloaded from the IEM website at www.myiem.org.my For further details, kindly contact IEM Secretariat at 03-7968 4001/2

IEM OUTSTANDING ENGINEERING ACHIEVEMENT AWARD 2023 The IEM Outstanding Engineering Achievement Award is created to confer recognition to an organisation or body for outstanding engineering achievements within Malaysia. The award will be given to an organisation or body responsible for an outstanding engineering project in the country. The basis for the award shall be an engineering achievement that demonstrates outstanding engineering skills which has made a significant contribution to the profession and to the quality of life in Malaysia. In making the selection, the following criteria will be given special consideration:

Engineering achievements which include, interalia, the following can be submitted for consideration: •

Bridges, Tunnels, Waterways Structures, Roads

Telecommunications of national/international character, Power Transmission and Transportation

Dams and Power Stations

Ports and Harbours

Building and Structures

1) Contribution to the well-being of people and communities,

Airports

2) Resourcefulness in planning,

Water Supply, Waste Disposal Projects

3) Creativity in the solution of design problems,

Military projects such as bases, launching units, harbour facilities

4) Pioneering use of materials and methods,

Drainage, Irrigation and Flood Control Projects

5) Innovations in planning, design and construction,

Local design and manufacture of high technology products

6) Unusual aspects and aesthetic values.

Energy, Heat, Mass Transfer


CALL FOR NOMINATIONS

THE INSTITUTION OF ENGINEERS, MALAYSIA

JULY 2022

JURUTERA

permanent display.

Outstanding work in engineering research and development

Chemical processing of indigenous raw resources such as rubber, palm oil and various other local plants

Innovative use of local engineering materials

The closing date for nominations is 31 October 2022.

Outstanding contribution in engineering education

Please submit nominations to:

Original discovery of useful engineering theory

Nominations are invited from all members of the Institution. Each nomination submitted should contain a brief summary/write-up of the project in approximately 1,000 to 2,000 words together with full relevant reports on the project and three copies of supporting documentation including photographs. A project or component part thereof which has received an earlier award, from IEM does not qualify for nomination. •

43

The award shall be presented with due ceremony at an appropriate function of the IEM.

Honorary Secretary The Institution of Engineers, Malaysia Bangunan Ingenieur, Lots 60&62 Jalan 52/4, 46720 Petaling Jaya, Selangor. The nomination form can be downloaded from the IEM website at www.myiem.org.my For further details, kindly contact IEM Secretariat at 03-7968 4001/2

The award in the form of a metal plaque, naming the achievement shall be given to the organisation or body responsible for the project for

IEM YOUNG ENGINEER AWARD 2023 The objective of the Award is to encourage interest in engineering and to recognise potential among young engineers in Malaysia. The Award will be presented to the person who has shown outstanding ability and leadership qualities, either

nomination shall be supported by a brief recommendation from two Referees who are Corporate members of IEM. If the Proposer himself is a Corporate member of IEM (or higher), then he may also act as one of the two required Referees.

i)

in the design and/or construction of an engineering device or system of merit; or

The Award will comprise a cash prize of RM500.00, a scroll and plaque, to be presented with due ceremony to each recipient of the Award.

ii)

in the research and development or teaching of engineering.

The closing date for nominations is 31 October 2022.

In any one year, the Award may be made in either one or both of the categories mentioned above. If the Award is to be made in only one of the two category may be made in the year. The Award is open to candidate who are: i)

Registered member with the Board of Engineers, Malaysia and under 35 years of age

ii)

Malaysian citizens or permanent residents of Malaysia

ii)

Graduate or Corporate Members of IEM.

Please submit nominations to: Honorary Secretary The Institution of Engineers, Malaysia Bangunan Ingenieur, Lots 60&62 Jalan 52/4, 46720 Petaling Jaya, Selangor. The nomination form can be downloaded from the IEM website at www.myiem.org.my For further details, kindly contact IEM Secretariat at 03-7968 4001/2

The Proposer may or may not be a member of IEM. However, each

IEM WOMAN ENGINEER AWARD 2023 The primary objective of the Award is to recognise the contributions by women engineers. This Award may also incidentally encourage interest in engineering among women and encourage them to strive towards greater excellence. The Award will be presented to the woman engineer who has shown outstanding ability and leadership qualities, or has been a pioneer in any more of the following areas: •

In the design and/or construction of an engineering device or system, structural system, planned development, environmental improvements or,

In the research and development of engineering device, systems, processes and/or materials, publication of paper or,

In the teaching of engineering or,

In the management of engineering projects,

Entrepreneurship in the commercial sector.

In making the selection, the following criteria will be given special consideration: •

Contribution to the well-being of people and communities

Resourcefulness in planning and in the solution of design problems

Pioneering in use of materials and methods

Innovations in planning, design and construction

Unusual aspects and aesthetic values

The Award is opened to candidates who are: •

Registered members of the Board of Engineers, Malaysia,

Malaysian citizens or permanent residents of Malaysia,

Graduate or Corporate Members of The Institution of Engineers, Malaysia.

The Proposer may or not be a member of IEM or BEM, or an engineer. However, each nomination shall be supported by a brief recommendation from two Referees who are Graduate or Corporate member of IEM. If the Proposer is herself either a Corporate or Graduate member of IEM (or higher), then she may also act as one of the two required Referees. The Award shall comprise a cash prize of RM800.00, a scroll and plaque, to be presented with due ceremony to each recipient of the Award. The closing date for nominations is 31 October 2022. Please submit nominations to: Honorary Secretary The Institution of Engineers, Malaysia Bangunan Ingenieur, Lots 60&62 Jalan 52/4, 46720 Petaling Jaya, Selangor. The nomination form can be downloaded from the IEM website at www.myiem.org.my For further details, kindly contact IEM Secretariat at 03-7968 4001/2


Engineering

Engineering


For enquiry please contact: CRIB TECHNOLOGIES SDN BHD (564096-A), ARE WALL (M) SDN BHD

(542608-W)

No. 28-2, Jalan Setia Utama AS U13/AS, Setia Alam, Sek U13, 40170 Shah Alam, Selangor Tel: +603-3359 1227 (Hunting Line) Fax: +603-3358 7392 Email: groadesb@yahoo.com Website: http://www.ctsbare.com



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.