Engineering Department 2023 Quarterly Report
Organizational Chart City Engineer (Marcus Thompson Jr)
Senior Project Manager (James Gordon)
Executive Assistant (Kelly Vereen)
Project Manager (Alesha Mann)
Engineering Technician (Robert McNeil)
Project Updates
Jessie Davis Park Improvements
Initial Budget
$21,910,988 Contract Amount Current Budget
$22,002,446 Contract Amount
Project Status • Crushing/hammering blasted rock into smaller pieces to haul off-site. • Began the installation of CMU walls at the proposed pool facility. • Started the in-wall rough-in for plumbing at the pool facility. • Completed the installation of the CMU walls for the proposed restroom facility. • Received all metal trusses and joists for the proposed gym facility. • Received transformers. • Obtained water meter permits.
Downtown Amphitheater/Greenspace
Initial Budget
$12,143,991 Contract Amount Current Budget
$14,132,405 Contract Amount
Project Status • RA-LIN is addressing minor items listed on TSW’s punch list. • The illuminated rail system will be installed at the end of October. • The metalwork panels for the event space bridge will be installed the week after the last concert • The metalwork panels for the stage area will be installed by the end of October. • Additional landscape features at the Fire Department Administration building. • Additional electrical infrastructure for the Amphitheater (power for hoist speakers, including electrical circuitry).
West Pines Maintenance Facility
Initial Budget
$250,000 Contract Amount Current Budget
$355,056 Contract Amount
Project Status • The contractor has completed the installation of the PEMB structure. • The electrical work is currently in place, in addition to the installation of the heater and fan systems. • Staff is coordinating with various utility companies to make connections (GA Power, Comcast, etc.) • The contractor is finalizing the installation of a security system for the facility. • After all utilities are in place, and gravel work is completed, staff will move forward with selecting a contractor for the proposed asphalt and concrete work around the building.
Hunter Park Improvements
Initial Budget
$300,500 Contract Amount Current Budget
$300,500 Contract Amount
Project Status • F.S. Scarborough has recently begun construction. There are two crews working simultaneously on opposite sides of the proposed walking trail. • Sink hole remediation.
Additional Projects • Old SR 92/Dallas Highway Improvements • Fairburn Road Corridor Improvements • Wayfinding/Signage Strategy Phase 2 • ADA Transition Plan Phase 2 • Stewart Mill Road at Heritage Dr. Intersection Improvement • Downtown Golf Cart Routes Implementation • Douglasville Sidewalk Construction RFP • SR 5 Improvements • Chapel Hill Road Improvements
Plan Review
Land Disturbance Permits Number of permits issued this year to date: 22 Pending: • 1551 North River Road Warehouse • Riverside West Site 7 Warehouse • 3300 Shoals School Road - Residential • Silverman Phase 5 Warehouse • 7125 W Strickland Street Townhomes • Youngtown Subdivision • 8258 Malone Rd – Residential • 9415 Hwy 5 Convenience Store • Astoria at Crystal Lake Senior Living • Dorris Road Kidney Spa • Durelee Lane Senior Living Facility • Heron Mill Apartments • Homewood Suites
Development Plan Applications Number of applications this year to date: 12 • • • • • • • • • • • •
Astoria at Crystal Lake Heron Mills Apartments A Better Plan Veterans Memorial at Whitley Dr. Townhomes Vick’s Tire Shop 1516 Municipal Parkway Self-Storage StorQuest Self-Storage 6568 Malone Rd Self-Storage Dorris Road Kidney Spa 7125 W Strickland Street BT Storage Odessa Street Warehouse
Plat Reviews Pending: • • • • •
Golf Ridge Boulevard/Chapel Hill Road Prestley Mill Rd at Timber Ridge Drive Ultimate Liquor Store Tributary C2A Kensington 2B