DRAFT Douglasville Comprehensive Transportation Plan

Page 1

COMPREHENSIVE TRANSPORTATION PLAN

Draft Recommendations


STEERING COMMITTEE • • • • • • • • • • • • • •

George Boulineau, Douglasville Bicycle and Pedestrian Committee J.R. Davidson, City of Douglasville Police Department Councilwoman Lashun Burr-Danley, City of Douglasville Councilman Terry Miller, City of Douglasville Corey Jackson, City of Douglasville Marcus Thompson, City of Douglasville Ron Roberts, Douglas County Miguel Valentin, Douglas County Karla Poshedly, Douglas County April McKown, City of Douglasville Patrice Williams, City of Douglasville Michelle Wright , City of Douglasville Reggie James, Atlanta Regional Commission Megan Weiss, Georgia Department of Transportation


PLANNING PROCESS Community Engagement An integral part of the planning process is reaching out to the community to get input and feedback. The Douglasville CTP update used multiple methods to engage the community including a steering committee, an online survey tool, attending community events, and a public meeting. Inventory and Assessment The inventory and assessment phase establishes baseline conditions of the transportation network and projects future conditions. Problems and opportunities are identified through analytical methodologies. Recommendations The recommendations phase looks at capital projects that will address the issues and opportunities found in the previous planning phases. The projects are broken down into short, mid, and long-range implementation phases.


PROJECT RECOMMENDATIONS


RECOMMENDATIONS The following project recommendations address issues identified through data analysis, staff input, stakeholder outreach, and community engagement. The projects are broken down into four types: • Vehicular Safety & Operations – This project type includes improvements along a corridor such as signal upgrades, turning lanes, medians, and fiber signal communications. • Intersection Improvements – This project type is similar to safety and operations but are limited to a single intersection. They can also include upgraded pedestrian accommodations. • Roadway Widenings – This project type adds capacity to roadways by adding additional travel lanes. This is the most expensive project type in this plan. • Active Transportation – This project type includes accommodations for people such as sidewalks, multiuse trails, bike lanes, and crosswalks.


VEHICULAR SAFETY & OPERATIONS Crash data covering the most recent three-year period was pulled from the GDOT GEARS database for this analysis. Crash density was analyzed to identify corridors and intersections with vehicular safety concerns. In addition, stakeholder and public input was used to verify the results. Safety concerns include: • • • • • • • • • • •

Chapel Hill Road from the interchange with I-20 south past Stewart Mill Rd Douglas Boulevard near SR 5 as well as Chapel Hill Rd SR 6 from near Blairs Bridge Rd to Maxham Rd Chicago Ave from Strickland Rd to Cave Springs Rd SR 92 From the I-20 interchange to the new SR 92 bypass project SR 92 from US 78 north to Upshaw Mill Rd SR 5 near the intersection with US 78 Intersection of Chapel Hill Rd and Douglas Blvd Intersection of Chapel Hill Rd and Stewart Mill Rd Intersection of Blairs Bridge Rd and SR 6 Intersection of US 78 and SR 5

Safety concerns were cross referenced with planned and recently completed projects to guard against duplicating efforts. Recommendations from the Dallas Highway LCI study were also considered and included in these recommendations.


VEHICULAR SAFETY & OPERATIONS


VEHICULAR SAFETY & OPERATIONS Project ID

*DTP-09

DTP-12

Road

Chapel Hill Rd

Chicago Ave

From

Nightingale Ln

Strickland St

To

Hospital Dr

Operational and traffic flow improvements access management features, turn lanes, signal operational upgrades, and ITS connectivity.

Cave Springs Rd.

Safety upgrade - signal timing, turn lanes, or access management. Shoulder upgrades for safety.

DTP-25 Ellis Ave

SR 92 Relocation

Description

Huey St

Convert to urban section with curb and gutter and sidewalk.

* Possible partnership with Douglas County DOT


INTERSECTION IMPROVEMENTS


INTERSECTION IMPROVEMENTS Project ID

Road

From

To

DTP-03

Chapel Hill Rd

at Douglas Blvd

-

Prestley Mill Rd

at High St

DTP-04

SR 5

at Concourse Pkwy

-

DTP-21

Bright Star Rd

at Wood Rd

-

*DTP-16

Prestley Mill Rd

at Frank Ln

-

DTP-17

Prestley Mill Rd

at Saddlebrook Way

-

DTP-11

-

Description Additional Right and Left Turn lanes, signal upgrade, streetlights. Gateway Feature Traffic study to assess how well intersection has improved as result of GDOT project #0012618. Traffic Study Roundabout

Roundabout DTP-10

Douglas Blvd

At SR5

-

Add a second eastbound and westbound left turn lane. Add a dedicated westbound right turn land. Add a dedicated southbound right turn lane.

* Possible partnership with Douglas County DOT


CONGESTION The Atlanta Regional Commission’s (ARC) Regional Travel Demand Model (TDM) was utilized to assess congestion on Douglasville roadways going out to the year 2040. Stakeholder and public input was used to verify results of the congestion analysis. In general, congestion on non-interstate routes in Douglasville is relatively minor. Much of the existing and projected future congestion was centered near downtown Douglasville along SR 92 (Fairburn Rd and Dallas Hwy) and US 78 (Veterans Memorial). The SR 92 bypass project that is currently under construction is expected to alleviate much of the congestion downtown. In additions, there is some overlap with corridors with safety concerns. Congested Corridors Include: • • • •

US 78 (Veterans Memorial Highway) in downtown Douglasville and near SR 5 Riverside Parkway from SR 92 to King Dr Chapel Hill Rd near Interstate 20 Blairs Bridge Rd from Mt. Vernon Rd to SR 6

The congestion analysis was cross referenced with planned and recently completed projects to guard against duplicating efforts.


WIDENING


WIDENING Project ID

Road

From

To

*DTP-07

Chapel Hill Rd

Stewart Mill Rd

Central Church Rd

DTP-26

John West Rd Relocation

Mobley Creek

Description Widening from 2 to 4 lanes

Bright Star Rd

Relocate John West Road to the north to tie in with Bright Star Connector. Close Cherry Lane and limit the existing John West Road to right in/right out. Split diamond interchange. At I-20 at SR 5 and I-20 at Bright Star Road with frontage roads between Bright Star Road and SR 5 and two new signalized intersections at new ramp termini with Bright Star Road.

*DTP-08

I-20

SR 5 (Bill Arp Rd)

Bright Star Road

*DTP-14

Blairs Bridge Rd.

Mt. Vernon Rd

SR 6 (Thornton Rd)

Widening from 2 to 4 lanes

* Possible partnership with Douglas County DOT


ACTIVE TRANSPORTATION

During the planning process for this CTP update two other plans were under development: the Dallas Highway LCI plan and a Pedestrian and Bicycle Connectivity Plan. Both plans have project recommendations for active transportation (walking, biking, etc.). Because of these two other efforts the CTP did not develop specific project recommendations. A high-level analysis was conducted to identify priority pedestrian corridors based on land use, transit routes, proximity to schools, and proximity to parks. Those priority routes are shown in the image on the left. The Dallas Highway LCI study is complete. Its recommendations are included. The recommendations from the ongoing Pedestrian and Bicycle Connectivity Plan will be included.


ACTIVE TRANSPORTATION


ACTIVE TRANSPORTATION Project ID *DTP-15

Road

From

Riverside Parkway SR 92 (Fairburn Rd)

To King Dr

DTP-01

Church St

Rose Ave

Fairburn Rd

DTP-18

Club Dr

Selman Ave

Church St

DTP-13

Campbellton St

Wood Valley Rd

Church St

DTP-19

Veterans Memorial McCarley St. RR Xing

Fairburn Road

DTP-06

Spring St

Club Dr

-

*DTP-22

Prestley Mill Rd

Hospital Dr

Saddlebrook Way

*DTP-23

Prestley Mill Rd

Hospital Dr

Slater Mill Rd

DTP-02

Dallas HWY

Strickland St.

Description Complete Street including separated shared use path. Redesign the Church Street streetscape to include narrower travel lanes, a cycle track, landscape strips, wider sidewalks (minimum 8’ width) and on-street parking, space permitting. Redesign the Club Drive streetscape to include narrower travel lanes, a multi-use trail, landscape strips, and on-street parking, space permitting . Redesign the Campbellton Street streetscape to include narrower travel lanes, a multi-use trail, landscape strips, and sidewalks. Create an alternative streetscape design for Veterans Memorial HWY to replace GDOT's plan. Construct new 6' sidewalk to connect to the conference center. Add sidewalk on south side of road

Add multi use path on north side of road Implement recommendations from Dallas New State Route 92 Highway LCI.

* Possible partnership with Douglas County DOT


ACTIVE TRANSPORTATION Project ID

Road

From

To

DTP-05

Fairburn Rd

Hospital Dr

Veterans Memorial

DTP-20

Veterans Memorial

Fairburn Rd

SR 92 Relocation

*DTP-24

Dorris Rd

Duralee Ln

Fairburn Rd

*DTP-28

Citywide Study

-

-

Description

Implement complete street conversion. The preferred typical section would reduce the amount of vehicular travel lanes from 5 to 2 (one in each direction). It would include street parking on both sides of the road. The new typical section would accommodate non-vehicular modes by adding a landscaped median outside of the street parking and then a one-way cycle track. Outside of the cycle track would be a 5' furniture zone followed by a 10' sidewalk. Complete street conversion would include upgrade pedestrian crossings at Estelle St, Spring St, Church St, and Veterans Memorial.

Construct a 10' shared use path Construct a 10' shared use path ITS Implementation study

* Possible partnership with Douglas County DOT


ALL PROJECT RECOMMENDATIONS


FUNDING


FUNDING SPLOST The main source of funding for transportation projects used by the City of Douglasville is the Special Purpose Local Option Sales Tax (SPLOST). A SPLOST is a 1% sales tax that can be used for capital improvements in the city. The current SPLOST was approved in 2016. It began collection in April 2017 and will run through April 2023. It will generate an estimated $37,504,000 for the city. The SPLOST was approved with a specific project list and dedicates about 45% to transportation projects. For the purposes of this study it was assumed that the SPLOST will be renewed in 2023. With a 3% annual growth rate the new SPLOST could generate up to $41,644,000. With a similar percentage allocated to transportation (45% – 55%) the City of Douglasville could invest between $18.7 million and $22.9 million in transportation improvements. In order to implement the recommended projects multiple SPLOST renewals will be required.


FUNDING SPLOST Estimated new SPLOST funding is broken down here by implementation time periods: Short Term, Mid Term, Long Term. Estimate uses 3% growth rate and a 50% allocation to transportation. • • • •

Short Term – 2020-2025: $6,500,000 estimated additional funding Mid Term – 2026 – 2030: $18,000,000 estimated additional funding Long Term – 2031 – 2041: $50,500,000 estimated additional funding Total Plan 2020 – 2041: $75,000,000 estimated additional funding

These funds can be used directly to implement transportation projects. In addition they can be used as match for federal or state funds to leverage total funding.


FUNDING Federal Funding In addition to local funding for transportation, federal funds can be secured to help implement projects. Federal funding comes with more administrative requirements which typically increases implementation time. However, federal funds can be used for up to 80% of project costs which would make the increased oversite worthwhile for larger, more expensive projects. The City of Douglasville could allocate a portion of its SPLOST funds to use as a match for federal funds. For example, if the city allocated $10 million as a 20% match it could leverage an additional $40 million in federal funds to implement a $50 million project. Strategic use of federal funds for large projects is recommended. Smaller projects can be implemented faster with less red tape by utilizing only local funds.


FUNDING

State Funding State funds can also be utilized to implement projects on state routes. The Georgia Department of Transportation (GDOT) allocates these funds. Often local governments can partner with GDOT to fund projects. A common partnership would include the city funding the preliminary engineering phase of the project while GDOT would fund right of way and construction costs. All project agreements are different, but this type of arrangement could help implement projects on state routes.


PROJECT LIST


PROJECT LIST – PAGE 1 Project ID Project Type DTP-01

From

To

Description

Short Range

Church St

Rose Ave

Fairburn Rd

Redesign the Church Street streetscape to include narrower travel lanes, a cycle track, landscape strips, wider sidewalks (minimum 8’ width) and on-street parking, space permitting

Dallas Highway

Strickland St

New State Route 92

Implement recommendations from Dallas Highway LCI.

Chapel Hill Rd

at Douglas Blvd

SR 5

at Concourse Pkwy

Active Transportation

DTP-02

Complete Street

DTP-03

Intersection

DTP-04

Intersection

DTP-05

Road

Implementation Phase

Complete Street

Fairburn Rd

Hospital Dr

DTP-06

Active Transportation

Spring St

Club Dr

*DTP-07

Roadway Capacity

Chapel Hill Rd

Stewart Mill Rd

Veterans Memorial

Central Church Rd

Cost

Prioritization Score

$ 5,200,000.00

10

$

7,200,000

Additional Right and Left Turn lanes, signal upgrade, streetlights

Short Range

$

1,582,000

8.75

Traffic study to assess how well intersection has improved as result of GDOT project #0012618

Short Range

$

50,000

8.75

Implement complete steet conversion. The prefered typical section would reduce the amount of vehicular travel lanes from 5 to 2 (one in each direction). It would include street parking on both sides of the road. The new typical section would accomdate non-vehicular modes by adding a landscaped median outside of the street parking and a one-way cycle track pair.. Outside of the cycle track would be a 5' landscape flex zone followed by a 10' sidewalk. Complete street conversion would include upgrade pedestrian crossings at Estelle St, Spring st, Church St, and Veterans Memorial.

Mid Range

$

12,400,000

8.75

Construct new 6' sidewalk to connect to the conference center

Mid Range

$

200,000.00

8.75

Widening from 2 to 4 lanes

Long Range

$

15,800,000

8.75

* Possible partnership with Douglas County DOT These project costs are based on planning level studies and experience on prior projects and are approximate only. All costs are subject to change due to fluctuations in the construction market as well as further detailed design associated with each project provided.


PROJECT LIST – PAGE 2 Project ID Project Type

Road

From

To

Description

Long Range

Mid Range

*DTP-08

Interchange Capacity

I-20

SR 5 (Bill Arp Rd)

Bright Star Road

Split diamond interchange. At I-20 at SR 5 and I-20 at Bright Star Road with frontage roads between Bright Star Road and SR 5 and two new signalized intersections at new ramp termini with Bright Star Road.

*DTP-09

Safety & Operational

Chapel Hill Rd

Nightingale Ln

Hospital Dr

Operational and traffic flow improvements access management features, turn lanes, signal operational upgrades, and ITS connectivity

DTP-10

Intersection

Douglas Blvd

DTP-11

Intersection

Prestley Mill Rd

DTP-12

Safety & Operational

Chicago Ave

DTP-13

Active Transportation

Campbellton St

at SR 5

Conference Center

at High St

Strickland St

Cave Springs Rd

Wood Valley Rd

Church St

Roadway Capacity

*DTP-15

Complete Street

Blairs Bridge Rd

Mt Vernon Rd

SR 6 (Thornton Rd)

Riverside Pkwy

SR 92 (Fairburn Rd)

King Dr

Cost

Prioritization Score

$

32,000,000

7.75

$

2,000,000

7.5

Add a second eastbound and westbound left turn lan. Add a dedicated westbound right turn land. Add a dedicated southbound right turn lane.

Mid Range

$

3,025,000

7.5

Gateway Feature

Short Range

$

50,000

6.25

Safety upgrade - signal timing, turn lanes, or access management, and shoulder upgrades.

Mid Range $

2,550,000

6.25

Mid Range

$

2,300,000

6.25

Long Range

$

36,081,000

6.25

Redesign the Campbellton Street streetscape to include narrower travel lanes, a multi-use trail, landscape strips, and sidewalks *DTP-14

Implementation Phase

Widening from 2 to 4 lanes Complete Street including separated shared use path. (approximately 5.5 miles)

Long Range

$15,000,000

6.25

* Possible partnership with Douglas County DOT These project costs are based on planning level studies and experience on prior projects and are approximate only. All costs are subject to change due to fluctuations in the construction market as well as further detailed design associated with each project provided.


PROJECT LIST – PAGE 3 Project ID Project Type *DTP-16

Intersection

DTP-17

Intersection

DTP-18

DTP-19

Active Transportation

Active Transportation

DTP-20

Active Transportation

DTP-21

Intersection

*DTP-22 *DTP-23

Description

Implementation Phase

at Frank Ln

Roundabout

Long Range

$

2,000,000

6.25

Prestley Mill Rd

at Saddlebrook Way

Roundabout

Long Range

$

2,000,000

6.25

Club Dr

Selman Ave

Redesign the Club Drive streetscape to include narrower travel lanes, a multi-use trail, landscape strips, and on-street parking, space permitting

Short Range

$

3,000,000

5.25

Create an alternative streetscape design for W. Broad Street to replace GDOT's plan

Short Range

Construct a 10' shared use path

Mid Range

$

1,850,418

Traffic Study

Short Range

$

50,000

5

Add sidewalk on south side of road

Long Range

$

5,000,000

5

Add multi use path on north side of road

Long Range

$

8,000,000

5

Road

From

Prestley Mill Rd

Veterans Memorial Hwy

McCarley St RR Xing

To

Cost

Prioritization Score

Church St

Fairburn Rd

Veterans Memorial Hwy

Fairburn Rd

SR 92 Relocation

Bright Star Rd

at Wood Rd

Active Transportation

Prestley Mill Rd

Hospital Dr

Saddlebrook Way

Active Transportation

Prestley Mill Rd

Hospital Dr

Slater Mill Rd

$5,000,000

5.25 5.25

* Possible partnership with Douglas County DOT These project costs are based on planning level studies and experience on prior projects and are approximate only. All costs are subject to change due to fluctuations in the construction market as well as further detailed design associated with each project provided.


PROJECT LIST – PAGE 4 Project Project Type ID *DTP-24

DTP-25

Active Transportation

Road

From

To

Dorris Rd

Duralee Ln

Fairburn Rd

*DTP-28

Construct a 10' shared use path

Long Range

$

3,500,000

5

Convert to urban section with curb and gutter and sidewalk.

Long Range

$

1,300,000

4.25

Relocate John West Road to the north to tie in with Bright Star Connector. Close Cherry Lane and limit the existing John West Road to right in/right out.

Long Range

$

10,000,000

3

ITS implementaton study

Short Range

$

150,000

Cost

Prioritization Score

Safety & Operational

Ellis Ave

DTP-26

Description

Implementation Phase

Roadway Capacity John West Rd Relocation

SR 92 Relocation

Huey St

Mobley Creek

Bright Star Rd

Study Citywide

* Possible partnership with Douglas County DOT These project costs are based on planning level studies and experience on prior projects and are approximate only. All costs are subject to change due to fluctuations in the construction market as well as further detailed design associated with each project provided.


PLANS

• • • • • • • • • •

North Side Trail Plan Dallas Highway LCI Study Pedestrian and Bicycle Connectivity Plan Fairburn Road LCI Plan North Side Redevelopment Plan I-20 @ SR5/Bright Star Road Transportation Study Prestley Mill Road Corridor Study Downtown Master Plan and 10-Year Strategic Plan Downtown Douglasville Public Arts Master Plan Wayfinding and Gateway Signage Plan


CONTACT

City of Douglasville Community Development Department williamsp@douglasvillega.gov | 678.449.3042


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.