CAPITAL IMPROVEMENT PROGRAM
FISCAL YEAR 2021-2022
California
CITY OF DOWNEY FISCAL YEAR 2021-2022 CAPITAL IMPROVEMENT PROGRAM | 1
Mayor and City Council City Officials Claudia M. Frometa District 4 MAYOR Gilbert A. Livas City Manager
Blanca Pacheco District 1 MAYOR PRO TEM
Capital Improvement Project Team
Mission Sean Ashton District 2 COUNCIL MEMBER
Proudly committed to continuously improving the quality of life for the Downey community by providing excellent service in a professional, ethical and responsible manner.
Values Integrity | Commitment | Respect | Catherine Alvarez District 3 COUNCIL MEMBER
Teamwork | Engagement | Passion | Excellence
City Council Priorities
Mario Trujillo District 5 COUNCIL MEMBER
Fiscal Responsibility Economic Vibrancy Efficiency and Adaptability Quality of Life, Safety and Infrastructure Public Engagement
Delfino Consunji Director of Public Works/ City Engineer Edwin J. Norris Deputy Director of Public Works Engineering/ Traffic Daniel Mueller Deputy Director of Public Works Utilities Desi Gutierrez Principal Engineer Ahmed Husain GIS Program Manager
California
CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2021-2022 CAPITAL IMPROVEMENT PROGRAM 5
Overview of Capital Improvement
7 Capital Improvement Projects Five Year Projections 8 Capital Improvement Projects by Fund 9
Streets - Overview Streets - Five Year Projections Street Improvement Projects
TRAFFIC & SAFETY 91 Traffic & Safety - Overview 92 Traffic & Safety - Five Year Projections 94 Traffic & Safety Improvement Projects
PUBLIC FACILITIES 141 Public Facilities - Overview 142 Public Facilities - Five Year Projections 144
233 234 236
Water Utility - Overview Water Utility - Five Year Projections Water Utility Improvement Projects
Measure S - Public Facilities
STREETS 14 16 18
WATER UTILITY
Public Facilities Improvement Projects
SEWER & STORM DRAIN 275 276
Sewer & Storm Drain - Overview Sewer & Storm Drain - Five Year Projections
278
Sewer & Storm Drain Improvement Projects
CAPITAL IMPROVEMENT PROGRAM
Overview on Capital Improvement Capital projects are long-term improvement and maintenance programs designed to preserve the City’s infrastructure, buildings and facilities. The programs are broad, and include land and building acquisitions; development of off-street parking; street and sidewalk improvement and rehabilitation; intersection capacity enhancements; traffic signal upgrades; potable water, recycled water and sewer improvements; stormwater treatment and infiltration; public lighting projects; and park acquisition and renovations. Both capital improvement and maintenance projects are included in this document. Capital improvements enhance economic development by attracting new businesses and new customers, bringing increased vitality to the City. These projects are easy to identify, usually specific to a particular location, and are often the most visible municipal activities. On the other hand, capital maintenance is a City service commonly taken for granted. Most users do not recognize the deterioration of a facility or roadway until significant damage has been done. This makes capital maintenance easy to postpone when budgets are tight and demand for more visible City programs and services is high. Delays in maintenance, however, create greater costs in future years, because expensive reconstruction or replacement of assets must supplant more inexpensive preservation efforts. The vast majority of Downey’s Capital Improvement Program (CIP) consists of capital maintenance.
Project Funding Capital projects may be funded from several sources, including operating capital, grants, joint agency endeavors, public/private partnerships, special district projects, and debt financing. Operating capital is appropriated from the unreserved balances and annual revenues of various funds; joint agency projects are those funded by the City and another government. Tax increases and special districts have historically been used to fund capital projects; however, legislation now places substantial restrictions on cities’ abilities to raise revenues in these ways. Special taxes must be approved by a two-thirds vote of the electorate; general taxes must be approved by a majority vote of the electorate. Staff, therefore, remains diligent in searching for grants and other financing partnerships. The City has channeled federal and local funds to purchase replacement buses for the DowneyLink; planted hundreds of street trees; installed various traffic mitigation and control measures; implemented accessibility features for disabled constituents on sidewalks, parks, and in public buildings; and invested heavily in maintenance of current buildings, streets and sidewalks.
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 2
CAPITAL IMPROVEMENT PROGRAM Projects Types and Priority Levels There are several broad types of City projects: Streets, Traffic Safety, Public Facilities, Water Utilities and Sewer & Storm Water. Funds are used for acquisition, construction, engineering, maintenance and rehabilitation projects. The Department of Public Works administers the building projects for most City facilities. The department also coordinates the street tree planting and vehicle replacement programs. Potable and recycled water and sewer system projects are the responsibility of the Deputy Director of Public Works - Utilities. The Deputy Director of Public Works – Engineering is responsible for various street and roadway improvements as well as traffic safety-related projects and tasks. All projects are rated according to the following priority levels: •
Priority 1: The project is urgent and/or mandated, and must be completed quickly. Failure to address the project will impact the health, safety, or welfare of the community, or have a significant impact on the financial well-being of the City. The project must be initiated or financial/opportunity losses will result.
•
Priority 2: The project is important and addressing it is necessary. The project impacts safety, law enforcement, health, welfare, economic base, and/or the quality of life in the community.
•
Priority 3: The project would enhance the quality of life and would provide a benefit to the community. Completion of the project would improve the community providing cultural, recreational, and/or aesthetic effects.
•
Priority 4: The project would be an improvement to the community, but need not be completed within a five-year capital improvement program.
General Fund Operational Impacts The vast majority of projects in the City’s five-year CIP are capital maintenance projects with no future net impact on the general fund operating budget. In a few cases, there may be some minor savings due to increased energy efficiency or a reduction of water use. Where there will be operational impacts (i.e., landscaping services required after the installation of a new landscaped median) those costs have been noted in the chart depicting CIP project cost projections over the next five years.
CAPITAL IMPROVEMENT PROGRAM Five Year Projections Project Type
Streets Traffic and Safety
Adopted FY 2021-22
Projection FY 2022-2023
Projection FY 2023-24
Projection FY 2024-2025
Projection FY 2025-26
38,981,301
4,796,000
2,970,000
350,000
350,000
8,902,421
1,200,000
250,000
200,000
250,000
Public Facilities
16,309,765
75,000
75,000
75,000
75,000
Water
18,700,000
16,600,000
3,400,000
3,400,000
3,100,000
Sewer & Storm Drain
3,200,000
2,800,000
2,250,000
6,800,000
6,800,000
$86,093,487
$25,471,000
$8,945,000
$10,825,000
$10,575,000
Grand Total
FY 2021-2022 Total Capital Improvement Projects
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 4
CAPITAL IMPROVEMENT PROGRAM FY 2021-2022 Total Capital Improvement Projects by Fund Funds
Public Facilities
Sewer & Storm Drain
Streets
Traffic and Safety
Water
Grand Total
22-AQMD Fund
-
-
180,000
-
-
180,000
23- L&L District Fund
-
-
-
-
-
-
25-TDA III Fund
-
-
-
161,500
-
161,500
10,831,355
-
23,489,089
4,982,995
8,625,000
47,928,439
30-Gas Tax Fund
-
-
-
-
-
-
32-SB1 Local Return Fund
-
-
3,520,000
656,000
-
4,176,000
33-Measure S Bond Fund
4,862,118
-
-
-
-
4,862,118
36-Relinquishment Fund
-
-
737,500
-
-
737,500
38-Vehicle Imapct Fee Fund
-
-
4,255,000
-
-
4,255,000
40-Capital Project Fund
231,292
-
-
-
-
231,292
40-Art in Public Places Fund
335,000
-
-
-
-
335,000
-
2,000,000
-
-
-
2,000,000
50,000
-
-
-
10,075,000
10,125,000
54-Prop "C" Local Return Fund
-
-
2,595,000
386,706
-
2,981,706
56-Measure R Local Return Fund
-
-
1,277,912
2,054,061
-
3,331,973
57-Measure M Local Return Fund
-
-
2,926,800
661,159
-
3,587,959
72-Sewer Fund
-
1,200,000
-
-
-
1,200,000
$16,309,765
$3,200,000
$38,981,301
$8,902,421
$18,700,000
$86,093,487
26-Grant Fund
50-Storm Water Fund 51-Water Fund
Grand Total
CAPITAL IMPROVEMENT PROGRAM Measure S – Public Facilities Measure S, a 1/2 percent to the transactions and use tax, was approved by 63% of Downey voters in November 2016 and went into effect April 1, 2017. In fall 2017, the City’s public financing authority approved the issuance of $50 million in lease revenue bonds, to be repaid over the course of 20 years with revenues derived from the approval of Measure S. In accordance with the City’s responsible fiscal policies, the lease revenue bond comprised of 50 percent of Measure S revenues is a long term debt that is programmed for significant infrastructure improvements. The bond funds will not be used for current operations. The other 50 percent of Measure S revenues are programmed for public safety enhancements and primarily safety personnel. Measure S is expected to generate $10,200,000 this fiscal year with monies being allocated for public safety personnel and related safety and community programs, and the debt service of the $50 million lease revenue bond, which is funding the various improvements. The City was able to successfully complete the Measure S project in FY 2020-2021. Below is a listing of the major capital improvement projects planned through Measure S: Four Fire Station Improvement Projects $23M - Station modernization through completion of improvement to the interior spaces of the station, and reconstruction of pavement. Two of the fire stations were completed in FY 201920. The Remaining two fire stations were completed in FY 2020-21.
Fire Station No. 1
Fire Station No. 2
Fire Station No. 3
Fire Station No. 4
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 6
CAPITAL IMPROVEMENT PROGRAM Measure S – Public Facilities (continued)
Apollo Park
Dennis the Menace Park
Apollo Park $4.6M - Irrigation system replacement, turf renovation, synthetic field conversion, playground resurfacing, parking lot upgrades, ball field lighting, restroom renovation, and ADA improvements. Apollo Park was completed in FY 2019-20. Dennis the Menace Park $2.3M - Soil stabilization and grading, irrigation replacement, turf renovation, parking lot upgrades, and ADA improvements. Dennis the Menace Park was completed in FY 2019-20.
CAPITAL IMPROVEMENT P
Library Renovation $7.5M - Interior spaces reconfiguration, interior finishes replacement, books and data storage furniture, installation of energy efficient lighting, completion of ADA improvements, new doors and signage, as well as exterior painting of the building. Further, reconfiguration and enhancement of the area adjacent to the northwest of the Library through an attractive shade structure with a multi-color cover will provide added comfort for the patrons and create a more dramatic backdrop. The Downey Library was completed in FY 2020-21.
Downey City Library
Children’s Area - Downey City Library
CAPITAL IMPROVEMENT PROGRAM Measure S – Public Facilities (continued) Golden Park $3M - Community building improvements, ADA Accessible path of travel to new amenities, five (5) new picnic shelters include two (2) 48’ HXE, one (1) 16’x24’ and two (2) 24x34, rubberized surfacing at play area, one (1) 12x20 storage shed and a site built trash enclosure, ADA improvements in the parking lot, basketball court improvements include new basketball court surfacing, new basketball backboards/nets, 8’ high chain link fence around basketball courts, baseball Field Improvements include 4’ chain link homerun fence, two (2) new bleachers at baseball fields, and a decomposed granite trail. Golden Park was completed in FY 19-20. Independence Park $1.6M - One (1) new detached restroom structure, four (4) restrooms (west of the northeast restroom building adjacent to the northern parking lot), removal of existing playground fall zone material and replace with rubberized surfacing, resurface eight (8) tennis courts, site built trash enclosure, and site furnishings (picnic tables, BBQs, benches, trash receptacles and drinking fountain). Independence Park was completed in FY 2019-20.
PROGRAM
Golden Park
Independence Park
Discovery Sports Complex Park Discovery Sports Complex Park $2.6M– Synthetic field conversion and ball field lighting installation. Discovery Sports Complex was completed in FY 2019-20.
Wilderness Park
Wilderness Park Ponds
Wilderness Park $3M - A community building with restroom improvements, a new restroom building, ADA Improvements in the parking lot and accessible path of travel to new amenities, three (3) new picnic shelters include (1) 48’ Hexagon (HXE), (2) 24’x34, rubberized surfacing at the play area, site built trash enclosure, and site furnishing (picnic tables, BBQs, benches, trash receptacles, and drinking fountain). Wilderness Park improvements were completed in FY 19-20, however, the City is currently renovating the ponds at Wilderness Park through the use of Rivers and Mountains Conservancy grant funds. Wilderness Park was completed in FY 20-21. FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 8
CAPITAL IMPROVEMENT PROGRAM Measure S – Public Facilities (continued) Furman Park $5.2M - Irrigation system replacement, turf renovation, parking lot upgrades, ball field lighting, bleachers/back stops, play fields, new picnic shelters, a tennis court upgrade, and community buildings upgrades. Furman Park was completed in FY 19-20. Downey Theatre Plaza and Courtyard $2.8M– Installation of a circular fountain displaying a prominent sculpture, an information kiosk, seating/conversation areas, art displays as well as an exterior elevator accessing the Theatre’s second floor. Theatre Plaza will be completed in FY 2020-21.
Furman Park
Other Improvements $8M - In addition to the projects listed above, Measure S was used to fund the Police Station Modernization and Rio Hondo Event Center Improvements. These improvements were completed in FY 19-20. Additionally, monies will be used to improve the Public Works Yard and Downtown Parking Structure. These were completed in FY 20-21. of Measure S is dependent on a holistic approach, as all department staff members in the organization are collaboratively working to promote public awareness, support careful planning, accurate accounting, transparent reporting, and the execution of relocation of temporary worksites and personnel redeployment as the City strives to provide continuity of public services during this active time of construction. Rio Hondo Golf Course
Downey Police Department
Downey Theatre Plaza and Courtyard
STREETS
CAPITAL IMPROVEMENT PROGRAM Streets The Streets section of the CIP contains various capital projects related to the improvement, rehabilitation and preservation of the City’s streets, sidewalks and bridges. Projects within this category specifically include street and intersection widening projects to increase capacity; pavement rehabilitation projects involving asphalt reconstruction, overlay or slurry seal; new sidewalk construction or replacement; reconstruction of curb access ramps to comply with the latest Americans with Disabilities Act (ADA) standards; bridge replacement or rehabilitation; and corridor beautification. Nearly $39 million is programmed in the CIP for streets-related projects funded through various sources including Gas Tax, County Proposition C, Measure M and R Local Return; Senate Bill (SB) 1 and grant funds commissioned by the Los Angeles County Metropolitan Transportation Authority (Metro). Because the City’s street maintenance and rehabilitation needs far exceed available funding, streets within the City are prioritized through the City’s Pavement Management System.
Old River School Road Pavement Rehabilitation
Firestone Blvd Median Landscape
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 12
CAPITAL IMPROVEMENT PROGRAM Streets Five Year Projections
CAPITAL IMPROVEMENT PROGRAM Streets Five Year Projections
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 14
ANNUAL MISCELLANEOUS BRIDGE REPAIRS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2020-2021 through FY 2024-2025
Street Improvements
Project Title: Annual Miscellaneous Bridge Repairs Capital Improvement Project No.: N/A Account No.: 16624 Total Project Amount: $200,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2017 6/30/2022 $170,453 $0
This project includes maintenance and repair of the City's bridges as recommended by the Los Angeles County Department of Public Works biennial bridge inspection program.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$ $
180,000 20,000
$ $
180,000 20,000
$ $
180,000 20,000
$ $
180,000 20,000
$ $
180,000 20,000
$ $ $ $
$
200,000
$
200,000
$
200,000
$
200,000
$
200,000
$ 1,000,000
Fund 57 (Measure M)
Budgeted FY 2021-22 $ 200,000
Proposed FY 2022-23 $ 200,000
Proposed FY 2023-24 $ 200,000
Proposed FY 2024-25 $ 200,000
Proposed FY 2025-26 $ 200,000
Total
$
$
$
$
$
Funding Source
Total
200,000
200,000
200,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 16
200,000
200,000
900,000 100,000 -
Total $ 1,000,000 $ $ $ 1,000,000
CIP 14-07 FLORENCE AVENUE BRIDGE REHABILITATION AND WIDENING AT SAN GABRIEL RIVER DACOSTA ST
TA PICO VIS
OTTO ST
RD
Ê
Overview Map
FLORENC E AV
LA KE
RD
STUDEBAKER RD
GAYB ROOK AV
LESTERFORD AV
NEWVILLE AV
P RAM FWY
PROJECT LOCATION MAP
Y I-605 FW
Project Limits
LI TT LE
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Florence Avenue Bridge Rehabilitation and Widening at San Gabriel River Capital Improvement Project No.: 14-07 Account No.: 16710 Total Project Amount: $10,037,422
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2016 6/30/2024 $129,296 $0
This project includes replacement of existing Florence Avenue bridge at San Gabriel River to provide a new six-lane bridge (environmental and preliminary engineering phase).
Design Right-of-Way Acquisition Construction Construction Engineering and Administration
Estimated Expenditures FY 2020-21 $ 2,170
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
$ $ $ $
331,912 500,000 100,000 12,000
$ 4,200,000 $ 300,000
$ 4,200,000 $ 500,000
$
943,912
$ 4,500,000
$ 4,700,000
$
Proposed FY 2022-23 $ 4,000,000 $ 500,000
Proposed FY 2023-24 $ 4,200,000 $ 500,000
Proposed FY 2024-25
Fund 26 (Caltrans HBP) Fund 26 (Metro Call for Projects - CMAQ Funds) Fund 56 (Measure R)
Budgeted FY 2021-22 $ 412,000 $ 500,000 $ 31,912
Total
$
$ 4,500,000
$ 4,700,000
$
Total
$
Funding Source
2,170
943,912
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 18
Proposed FY 2025-26
Total $ $ $ $
-
$
-
$ 10,143,912
Proposed FY 2025-26
Total $ $ $
-
$
-
331,912 500,000 8,500,000 812,000
8,612,000 1,500,000 31,912
$ 10,143,912
OTTO ST
DINSDALE ST
Overview Map
SUSAN AV
Ê
TECUM RD
GU AT EM AL A
AV
CIP 14-08 FLORENCE AVENUE BRIDGE REHABILITATION AT RIO HONDO RIVER
OLD RIVER SCHOOL RD
FLORENCE AV
Project Limits
SH ER RY AV
IRWINGROVE DR
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Florence Avenue Bridge Rehabilitation at Rio Hondo River Capital Improvement Project No.: 14-08 Account No.: 16693 Total Project Amount: $2,073,063
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2016 6/30/2023 $238,030 $0
This project includes rehabilitation of existing bridge to partially replace/repair the structure (environmental and preliminary engineering phase).
Design Construction Construction Engineering and Administration
Estimated Expenditures FY 2020-21 $ 10,334
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
$ 150,000 $ 1,600,000 $ 84,000
$ $
100,000 10,000
$ 1,834,000
$
110,000
Proposed FY 2022-23 $ 110,000
Proposed FY 2023-24
Fund 26 (Caltrans Federal Highway Bridge Program) Fund 57 (Measure M)
Budgeted FY 2021-22 $ 1,780,000 $ 54,000
Total
$ 1,834,000
$
$
Total
$
10,334
Funding Source
110,000
Proposed FY 2024-25
Proposed FY 2025-26
Total $ 150,000 $ 1,700,000 $ 94,000 $ -
$
-
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 1,944,000
Total $ 1,890,000 $ 54,000 $ -
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 20
-
$
-
$
-
$ 1,944,000
MARBEL AV
CIP 14-09 FIRESTONE BOULEVARD AT LAKEWOOD BOULEVARD INTERSECTION IMPROVEMENTS
BL WOOD LAKE
Ê
Overview Map
NASH AV
FIRESTONE BL
MCCAHILL ST
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Firestone Boulevard at Lakewood Boulevard Intersection Improvements Capital Improvement Project No.: 14-09 Account No.: 16692 Total Project Amount: $2,700,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2018 6/30/2023 $164,874 $0
This project includes widening and reconstruction of Firestone Boulevard at Lakewood Boulevard intersection. Improvements will include new concrete pavement and decorative concrete crosswalks; additional left-turn lanes on Lakewood Boulevard; and modification of existing traffic signal. Total estimated project cost is $2.7 million. The Los Angeles County Metropolitan Transportation Agency has approved $1.3 million in funding. Once design is completed, the City will apply for an additional estimated $1.4 million in funding to implement the project.
Design Construction Construction Engineering and Administration
Estimated Expenditures FY 2020-21 $ 46,790
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
$ 75,000 $ 2,179,100 $ 250,000
$ $
21,000 10,000
$ 2,504,100
$
31,000
Proposed FY 2022-23 $ 31,000
Proposed FY 2023-24
Fund 26 (Metro Meas. R I-605 Congestion Hot Spots) Fund 26 (Other)
Budgeted FY 2021-22 $ 2,145,000 $ 359,100
Total
$ 2,504,100
$
$
Total
$
46,790
Funding Source
31,000
Proposed FY 2024-25
Proposed FY 2025-26
Total $ 75,000 $ 2,200,100 $ 260,000 $ -
$
-
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 2,535,100
Total $ 2,176,000 $ 359,100 $ -
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 22
-
$
-
$
-
$ 2,535,100
CIP 14-14 WOODRUFF AVENUE PAVEMENT REHABILITATION
VULTEE AV
RD &
LAKEWOOD BL
Project Limits
Y FW
ST
AV
S ME JA
WY LH IA R E
ST ST N LE SON A D OR B
R DA ED CH ST
MP RA
E OR AD
LL GE AN
E
ST
0 I-1
5
D OO W L CA E UR LN B RF LA M AX O SC AV ST AN ST A R B ILL C FA IS US PR T AV
Y FW
ST
ST
BELLMAN AV
DONOVAN ST
S DI AR
BIRCHDALE AV
SPRINGER ST
T ES ER T V E S
AV
MORY ST
LN
SS NE IR A F
ON TS BE IB
P IM
WY IA AV MB LU SE CO RO
TT DGE BLO V A
ORANGE ST
Overview Map
AV
MELVA ST BOYSON ST
Ê
CA AA SE ST
AV CT DI NE BE
TR
AV
TW US TR
SS NE HI T OR
T
IN OB NR DU
ALAMEDA ST
S RY SP
BL
AV
ALBIA ST
ER
CAVEL ST
E YN BO T S
BEL MAR
BYERS ST
FF RU OD WO
MCCALLUM ST
RN BU SH A W
V AA TT IZE
OW FL LL BE
NADA ST
DR TA
RD
V AA UT AV RN K CO OO BR ST EA
M EL
VIS
AV RN BO NG PA
NG MI DE AV FONTANA ST
AN IG RR CO AV
BUCKLES ST
BE LC HE R
PATTON RD
AV
CLETA ST
COLE ST
EW
MO EN AD
MAN ATEE ST
LUXOR ST
DOWNEY RD NORWALK
V KA OO BR LD AV CO OR
IOWA ST
ST EW AR T
RD LL HA
MARGARET ST
GR AY
NANCE AV
VI NT GE RE
NASH AV
FIRESTONE BL
PROJECT LOCATION MAP
ER ST FO
RD
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Woodruff Avenue Pavement Rehabilitation Capital Improvement Project No.: 14-14 Account No.: 16711 Total Project Amount: $2,102,494
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2014 6/30/2023 $52,494 $0
This project includes rehabilitation of existing asphalt pavement on Woodruff Avenue from Foster Road to Firestone Boulevard. The work includes miscellaneous repairs of existing concrete sidewalks, curb and gutter, driveway approaches, ADA compliant curb access ramps and incidental replacement of striping and pavement markings. Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Fund 56 (Measure R) Fund 38 (Vehicle Impact Fees) Total
$
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
50,000
-
$
50,000
$ 2,000,000
$
Budgeted FY 2021-22 $ 50,000
Proposed FY 2022-23
Proposed FY 2023-24
-
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
50,000
$ 2,000,000
$ 2,050,000
Total $ 50,000 $ 2,000,000 $ -
$ 2,000,000 $
Total $ 50,000 $ 1,800,000 $ 200,000 $ -
$ 1,800,000 $ 200,000 $
Funding Source
Budgeted FY 2021-22
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 24
-
$
-
$
-
$ 2,050,000
CIP 15-12 BELLFLOWER BOULEVARD PAVEMENT REHABILITATION M EL
VIS
DR TA
STEWART
S WA
& GRAY RD
COLE ST
MARBEL AV
PATTON RD
Y FW
LAKEWOOD BL
E OR AD MP RA
PROJECT LOCATION MAP
E
LN
CA RF AX
ST
B OM SC ST N A A ILL BR C IS FA PR US T AV
ST
LL GE AN
V YA AH LE
AV
AV
RE IE EM PR AV R LE FID AV
Y LE
RD
BARLIN AV
BIRCHDALE AV
5
D OO LW E UR LA
AV
0 I-1
Y FW
ST
LL BE CA
BELLDER DR
Overview Map
AV
PLANETT AV
FF RU OD WO
ST
AV AN IG RR AV CO GE ID BR AN V ST SA ER TG RU
AV
WY W CO
E IR SH EN GL
Project Limits
LYNDORA ST
ST
ON RS BO
S DI AR
MEADOW RD
WY LH IA R E
N LE DA
IA MB LU CO
MEADOW RD < PVT.>
S ME JA ST
AV
EVEREST ST
P IM
SE RO
EUCALYPTUS ST
DONOVAN ST
Ê
ON TS BE IB
SPRINGER ST
V KA OO BR AV LD OR CO
MORY ST
LN
ST
R DA ED CH
MO EN AD
ORANGE ST
TR
EV
T ES ER
AV CT DI NE BE
BOYSON ST
MELVA ST
BLODGETT AV
ALAMEDA ST
S ES IN TH R O
AV
TW US TR
SS NE IR A F
ST RY SP
IN OB NR DU
ALBIA ST
BL
BROOKSHIRE AV
BYERS ST
ER
CAVEL ST ST NE O B Y
MCCALLUM ST
OW FL LL BE
BYERS AV
V AA TT IZE
NADA ST
RD
V AA UT RN AV K CO OO BR ST EA
FONTANA ST
N UR HB
ST
AV
ST
G M IN DE V A
BE LC HE R
TRISTAN DR
VULTEE AV
BUCKLES ST
BELLMAN AV
LUXOR ST
ER ST FO
RD
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Bellflower Boulevard Pavement Rehabilitation Capital Improvement Project No.: 15-12 Account No.: 16712 Total Project Amount: $2,135,276
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2016 6/30/2024 $121,870 $0
This project includes rehabilitation of existing pavement on Bellflower Boulevard from Foster Road to Dalen Street and 900 feet north of Imperial Highway to Stewart and Gray Road. The work includes miscellaneous repair of existing concrete surfaces and incidental replacement of striping and pavement markings. Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Fund 54 (Proposition C) Fund 38 (Vehicle Impact Fees) Total
$
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
30,000
-
$
30,000
Budgeted FY 2021-22 $ 30,000
$
-
Proposed FY 2022-23
$ 2,000,000
$
-
Proposed FY 2023-24
Proposed FY 2024-25
$
-
Proposed FY 2025-26
30,000
$
-
$ 2,000,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 26
$ 2,030,000
Total $ 30,000 $ 2,000,000 $ -
$ 2,000,000 $
Total $ 30,000 $ 1,800,000 $ 200,000 $ -
$ 1,800,000 $ 200,000 $
Funding Source
Budgeted FY 2021-22
$
-
$
-
$ 2,030,000
CIP 16-05 TELEGRAPH ROAD TRAFFIC THROUGHPUT & SAFETY ENHANCEMENTS, PHASE 2
PICO VISTA RD
TRUE AV
SHERIDELL AV
RD
BLANDWOOD RD
DOWNEY SANFORD BRIDGE RD
SERAPIS AV
LINDE LL AV
BIRCHDALE AV
ME LDA RA V MA N ZA NA RA BR OO V KSH IR E AV
STOA KES A V
ARRINGTON AV
BIR CH BA AV RK
DOWNEY AV
BR OC KA V
LA REINA AV
STA MP SA BIR V CH LEA FA V
NT AV ELMO
PAR AM OU NT BL
PARROT AV
SAMOLINE AV
ORIZAB A AV
KRISTIN DR
GAYMONT AV
TWEEDY LN
GU AT EM AL A
HORLE Y AV
DALE KLINE AV AV CASANES
AV
JULIUS AV
METRO ST
DR
BR OO KP AR K
DALEWOOD AV
FEST SONG DR
AV HASTY
W SIDEVIE
E EGLIS
PROJECT LOCATION MAP
RD
AV CORD
APPLEBY ST
RAVILLER DR
N BUHMA AV
Project Limits
PASSONS BL
CIRO ST
GALLATIN RD
VISTA D EL RIO AV
AV HALEDON
NOREN ST
SEVERY ST
LE IT T WH CR < T.> PV
P
CEDAR TREE
H GARNIS DR AN LEMOR AV Y CHANE AV
SUVA ST
D
RA M
V YA
CALMCREST DR
FW Y
I-5 FWY
CE AN CL
GLENCLIFF DR
RD
ST
BLAND WOOD RD
PAGE ANT S T GE SANT RTR A UD ES R
CLEARGROVE DR
GR AP H
BL
FINEVA LE DR
DEL ROS A
OOD LAKEW
COOLGROVE DR SHADYOAK DR
ST
ALLENGROVE ST
VIST A
TEL E
Y AV LINDSE
BAIRNSDALE ST
E NV DA
AV
BOTANY ST
RD
RS
SMALLWOOD AV
B BR A N OO G LE KP R AR D K S D DO S R O I R
Overview Map
BIR CH CR RD EST
CR ID AV ER LO WM AN AV
RI V AV ES
Ê
SUVA ST
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Telegraph Road Traffic Throughput & Safety Enhancements, Phase 2 Capital Improvement Project No.: 16-05 Account No.: 17806 Total Project Amount: $9,300,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2016 6/30/2022 $512,074 $3,000
This project includes construction of new median islands, traffic safety improvements and rehabilitation of asphalt pavement on Telegraph Road from West City Limit to Lakewood Boulevard and Passons Boulevard to East City Limit. Work includes replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.
Design Construction Construction Engineering and Administration Total
Estimated Expenditures FY 2020-21 $ $ 89,265
$
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
Total $ $ 8,286,539 $ 500,000 $ -
$ 8,286,539 $ 500,000 $ 8,786,539
$
Proposed FY 2022-23
Fund 26 (Caltrans Federal STPL) Fund 26 (City of Pico Rivera) Fund 32 (SB1) Fund 54 (Proposition C) Fund 57 (Measure M)
Budgeted FY 2021-22 $ 2,778,739 $ 3,400,000 $ 1,000,000 $ 1,160,000 $ 447,800
Total
$ 8,786,539
Funding Source
89,265
Budgeted FY 2021-22
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
$ 8,786,539
Proposed FY 2025-26
Total $ $ $ $ $
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 28
-
$
-
$
-
2,778,739 3,400,000 1,000,000 1,160,000 447,800
$ 8,786,539
CIP 16-20 OLD RIVER SCHOOL ROAD PAVEMENT REHABILITATION DOLAN AV
BROOKSHIRE AV
MAN ATEE ST
CLETA ST
PROJECT LOCATION MAP
LYNDORA ST DALEN ST
ALBIA ST
BOYSON ST
PLANETT AV
GLYNN AV
ALAMEDA ST
EVEREST ST
MEADOW RD < PVT.>
BELLDER DR
DOLAN AV < PVT.>
LANKIN ST
EUCALYPTUS ST
µ
VERDURA AV
AMIGOS AV < PVT.>
CAVEL ST
DOLAN AV
ERICKSON AV < PVT.>
R OLD RIVE SCHOOL RD < PVT.>
IMPERIAL HWY
CALADRE AV
ANDER BERG AV LEEDS ST
BYERS AV
BOYNE ST
DOWNEY AV
EMILY LN
COLE ST
DONOVAN ST
QUOIT ST
PARROT AV
QUILL DR
CONRAD ST
GNEISS AV
HONDO ST
ORIZABA AV < PVT.>
SPRINGER ST
ORANGE ST
ORIZAB A AV
KINGBEE ST
Overview Map
DUESLER ST
LA REINA AV
SAMOLINE LN
MELVA ST
PARAMOUNT BL
HORLEY AV
RICHEON AV
RUNDELL ST
BERGMAN LN
SAMOLINE AV
COREY ST
RIVES AV
SARA B ETH ST YANKEY ST
NADA ST
MORNING AV
BRUNACHE ST
SMALLWOOD AV
NADA ST < PVT.>
JULIUS AV
NORLAIN AV
OLD RIVER SCHOOL RD
QUILL DR < PVT.>
Ê
FONTANA ST
PATTON RD
FONTANA ST < PVT.> STEWART & GRAY RD
LAURA ST
LOS PADRINOS DR < PVT.>
GALT DR
DE PALMA ST
CHAVERS AV
NADA ST
DAVIS ST
LUXOR ST
POMERING RD
COLE ST
TEXAS ST
GURLEY AV
BROOKMILL RD < PVT.>
HARO AV
STEWART & GRAY RD
Project Limits
MAC GOVERN AV
BROOKMILL RD
BROCK AV
LUXOR ST
RYERSON HER ITAG AV CIR E SALFORD SUSAN AV AV SUSAN AV < PVT.>
BENARES ST
PERNELL AV
MITLA AV
ADWEN ST
ADCO AV
NEO ST
IOWA ST
PHLOX ST
AV PRUESS
FI
ARNETT ST
L EB TON RES
BURNS AV
HORTON AV
PIVOT ST
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Old River School Road Pavement Rehabilitation Capital Improvement Project No.: 16-20 Account No.: 16628 Total Project Amount: $3,200,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2016 6/30/2022 $3,010,000 $0
This project includes rehabilitation of existing asphalt pavement and overlay of existing concrete pavement on Old River School Road from Imperial Highway to Arnett Street. The work includes miscellaneous repairs of existing concrete sidewalks, curb and gutter, driveway approaches, ADA compliant curb access ramps and incidental replacement of striping and pavement markings. Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration
$ $
2,655,090 150,000
$ $
130,000 60,000
Total
$
2,805,090
$
190,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 26 (Caltrans Federal STPL) Fund 26 (Metro 2016 Federal Earmark Exchange) Fund 56 (Measure R) Fund 57 (Measure M)
Budgeted FY 2021-22 $ 70,000 $ 50,000 $ 10,000 $ 60,000
Total
$
$
Funding Source
190,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 30
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
130,000 60,000 -
$
190,000
Proposed FY 2025-26
$
-
Total $ $ $ $
70,000 50,000 10,000 60,000
$
190,000
CIP 19-05 SUVA STREET AT RIO HONDO RIVER BRIDGE REPAIR
E RIV
DO SR IOS
RD
FINEVALE DR
CLEARGROVE DR
OVE RGR DR ER ST FO
GLENCLIFF DR
GE ID BR BL
Ê
Overview Map
BL UF FR D
CALMCREST DR
SUVA ST
M CU TE RD
Project Limits
NORLA IN AV
PROJECT LOCATION MAP
HORLEY AV
WILEY BURKE AV
RICHEON AV
IVO ST
JULIUS AV
CIRO ST
POMERING RD
GU AT EM AL A
AV
NOREN ST
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Suva Street at Rio Hondo River Bridge Repair Capital Improvement Project No.: 19-05 Account No.: 16744 Total Project Amount: $26,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2022 $0 $0
This project includes the repair of Suva Street bridge at the Rio Hondo River. Los Angeles County Department of Public Works is the lead agency and the City's shared cost is $26,000.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
$
26,000
$
26,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 26,000
Total
$
$
Funding Source
26,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 32
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
26,000 -
$
26,000
Proposed FY 2025-26
$
-
Total $ $ $
26,000 -
$
26,000
CIP 19-06 PARAMOUNT BOULEVARD AT IMPERIAL HIGHWAY INTERSECTION IMPROVEMENTS
LEEDS ST
Ê
Overview Map CIT I
CT
DALEN ST
PROJECT LOCATION MAP
LA REINA AV
ORIZABA AV
BROCK AV
Project Limits
PARROT AV
LYNDORA ST
SAMOLINE AV
SMALLWOOD AV
PARAMOUNT BL
IMPERIAL HWY
ZE NS HIP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Paramount Boulevard at Imperial Highway Intersection Improvements Capital Improvement Project No.: 19-06 Account No.: 16745 Total Project Amount: $3,185,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2023 $256,088 $0
This project includes widening and reconstruction of Paramount Boulevard at Imperial Highway intersection. Improvements include reconstruction of intersection with concrete pavement and decorative concrete crosswalks; widening along the east and west sides of Paramount Boulevard; double left-turn lanes in the southbound, westbound and northbound directions; construction of ADA-compliant curb access ramps, drive approaches and sidewalks; new bus shelters; modification of traffic signal; and incidental striping and signing modifications.
Design Right-of-Way Acquisition Construction Construction Engineering and Administration
Estimated Expenditures FY 2020-21 $ 53,495
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
$ 48,892 $ 750,000 $ 1,900,000 $ 201,108
$ $
50,000 10,000
$ 2,900,000
$
60,000
Proposed FY 2022-23 $ 60,000
Proposed FY 2023-24
Fund 26 (Metro Measure R I-710 Early Action)
Budgeted FY 2021-22 $ 2,900,000
Total
$ 2,900,000
$
$
Total
$
Funding Source
53,495
60,000
Proposed FY 2024-25
Proposed FY 2025-26
Total $ 48,892 $ 750,000 $ 1,950,000 $ 211,108
$
-
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 2,960,000
Total $ 2,960,000 $ $ -
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 34
-
$
-
$
-
$ 2,960,000
CIP 19-07 LAKEWOOD BOULEVARD AT FLORENCE AVENUE INTERSECTION IMPROVEMENTS
OTTO ST
ARRINGTON AV
TRISTAN DR
BELLDER DR
OTTO ST
Overview Map
BL
BIRCHDALE AV
OOD LAKEW
Ê
FLORENCE AV
BAYSINGER ST
CLANCEY AV
TENTH ST
VULTEE AV
BELL MAN AV
ELEVENTH ST
BAYSINGER ST
Project Limits
IRWINGROVE DR
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Lakewood Boulevard at Florence Avenue Intersection Improvements Capital Improvement Project No.: 19-07 Account No.: 16746 Total Project Amount: $4,925,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2023 $417,325 $0
This project includes widening and reconstruction of Lakewood Boulevard at Florence Avenue intersection. Improvements include reconstruction of intersection with concrete pavement and decorative concrete crosswalks; widening along the east and west sides of Lakewood Boulevard to provide double left-turn lanes in the southbound and northbound directions; construction of ADA-compliant curb access ramps, drive approaches and sidewalks; modification of existing traffic signal, street and pedestrian lighting; and striping and signing modifications.
Design Right-of-Way Acquisition Construction Construction Engineering and Administration Total
Estimated Expenditures FY 2020-21 $ 116,989
$
116,989
Funding Source Fund 26 (Metro Measure R I-605 Congestion Hot Spots) Fund 56 (Measure R) Total
Budgeted FY 2021-22
Proposed FY 2022-23
$ 200,000 $ 500,000 $ 3,500,000 $ 350,000
$ $
90,000 10,000
$ 4,550,000
$
100,000
Budgeted FY 2021-22 $ 4,550,000
Proposed FY 2022-23
$ 4,550,000
$
100,000
$
100,000
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
Total $ 200,000 $ 500,000 $ 3,590,000 $ 360,000
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 4,650,000
Total $ 4,550,000 $ 100,000 $ -
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 36
-
$
-
$
-
$ 4,650,000
CIP 19-08 LAKEWOOD BOULEVARD AT IMPERIAL HIGHWAY INTERSECTION IMPROVEMENTS
SE RO AV IA MB LU CO
MEADOW RD
LAKEWOOD BL
WY
P IM
Ê
Overview Map
WY LH IA R E
A OR ND LY
ST
W CO Y LE
E IR SH EN GL
AV
BARLIN AV
RD
LYNDORA ST
D OO AV
Project Limits
ST
W IT E WH
ON RS BO
DALEN ST
PROJECT LOCATION MAP
µ
E OR AD ST
E
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Lakewood Boulevard at Imperial Highway Intersection Improvements Capital Improvement Project No.: 19-08 Account No.: 16747 Total Project Amount: $4,060,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2023 $190,762 $0
This project includes reconstruction of Lakewood Boulevard at Imperial Highway intersection. Improvements include widening on north and south sides of Imperial Highway to provide double left-turn lanes in the eastbound and westbound directions; widening on east side of Lakewood Boulevard for a northbound right-turn lane; construction of sidewalks, drive approaches and ADA-compliant curb access ramps; modifications of traffic signal, street and pedestrian lighting; striping and signing modifications; and right-of-way acquisitions as necessary.
Design Right-of-Way Acquisition Construction Construction Engineering and Administration
Estimated Expenditures FY 2020-21 $ 172,851
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
$ 160,000 $ 500,000 $ 2,900,000 $ 300,000
$
10,000
$ 3,860,000
$
10,000
Proposed FY 2022-23 $ 10,000
Proposed FY 2023-24
Fund 26 (Metro Measure R I-605 Congestion Hot Spots)
Budgeted FY 2021-22 $ 3,860,000
Total
$ 3,860,000
$
$
Total
$
172,851
Funding Source
10,000
Proposed FY 2024-25
Proposed FY 2025-26
Total $ 160,000 $ 500,000 $ 2,900,000 $ 310,000
$
-
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 3,870,000
Total $ 3,870,000 $ $ -
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 38
-
$
-
$
-
$ 3,870,000
NASH AV BARLIN AV
VERDURA AV
LAKEWOOD BL
V YA AH E L
ST
PATTON RD
BELLMAN AV TRISTAN DR
BIRCHDALE AV
GLYNN AV
PLANETT AV
BELLDER DR
Y FW
BE LC HE R
BROOKSHIRE AV
DOLAN AV
GNEISS AV
DOLAN AV < PVT.>
DOWNEY AV
HORTON AV
MAC GOVERN AV
GURLEY AV CALADRE AV
SAMOLINE AV
ORIZABA AV < PVT.>
ORIZAB A AV
LA REINA AV
PARROT AV BROCK AV
DOLAN AV
SAMOLINE LN
MORNING AV
SMALLWOOD AV
RIVES AV
HORLEY AV
PARAMOUNT BL
05
LL BE CA AV
GROVETREE AV
I-1
CA RF AX A AV LL I C IS PR ST
AV
ST
R ST DA E ED RE O CH AD ST P L M EL RA G Y AN FW
LN
ST U
CHAVERS AV
D OO LW E UR LA
FA
RICHEON AV
Overview Map
LN
ON TS BE IB AV
JULIUS AV
SS NE IR FA
CT DI NE BE AV
PROJECT LOCATION MAP
RS BO
N LE DA T S ON
AV RE IE EM V PR RA LE FID
ERICKSON AV < PVT.>
AV
IMPERIAL HWY
S ME JA ST
AV AN E IG G RR RID B CO V AN AV ST SA ER TG RU
MEADOW RD
ADOREE ST
AV
EVEREST ST
Ê
ST
T
IN OB NR DU
DONOVAN ST
CA AA SE
FF RU OD WO
V AA UT AV RN K CO OO BR ST EA
V AA TT IZE
BORSON ST
S RY SP SS NE
MORY ST
AV
DALEN ST
Project Limits
EUCALYPTUS ST
RD
ST
WY V IA YA MB LE W LU CO CO DR E AV AY IR SH IPW EN D K GL R
LYNDORA ST
BOYSON ST
SE RO
LANKIN ST
LEEDS ST
AMIGOS AV < PVT.>
ALBIA ST
ALAMEDA ST
QUOIT ST
I TH OR W T TR US TR
S DI AR
QUILL DR
CONRAD ST
BOYNE ST
BL
SPRINGER ST
HONDO ST
ORANGE ST
ER
MELVA ST KINGBEE ST
CAVEL ST
BERGMAN LN DUESLER ST
ETT AV BLODG
ST RUNDELL
MCCALLUM ST
BYERS AV
VI
N UR HB S WA
R AD ST
AV
YANKEY ST
COREY ST
NADA ST
M EL
EL MAR B
BRUNACHE ST LAURA ST
FONTANA ST FONTANA ST < PVT.> & GRAY RD STEWART COLE ST
BUCKLES ST NG MI DE AV
OW FL LL BE
NADA ST < PVT.>
LUXOR ST
CLETA ST
VULTEE AV
DE PALMA ST
MAN ATEE ST
RN BO NG V PA A
BROOKMILL RD
BROOKMILL RD < PVT.>
TEXAS ST GALT DR
RD LL HA
AV
ADWEN ST
MARGARET ST
IOWA ST DAVIS ST
EW
PHLOX ST
V KA OO BR AV LD OR CO MO EN AD
ARNETT ST
FIRESTONE BL
NANCE AV
VI NT GE RE
BURNS AV
AV PRUESS
POMERING RD
PIVOT ST
MYRTLE ST
CIP 20-04 LAKEWOOD BOULEVARD PARKWAY IMPROVEMENTS
ER ST FO
RD
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Lakewood Boulevard Parkway Improvements Capital Improvement Project No.: 20-04 Account No.: 16782 Total Project Amount: $600,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2024 $40,000 $0
This project includes repair of concrete surfaces in the Lakewood Boulevard parkways between Imperial Highway and Bellflower Boulevard. Repair work consists of tree removal and replacement; repair of damaged concrete curbs, gutters and sidewalks, reconstruction of ADA-compliant curb access ramps; and miscellaneous asphalt repairs.
Design Construction Construction Engineering and Administration
Estimated Expenditures FY 2020-21 $ 40,000 $ $ -
$ $
200,000 20,000
$ $
200,000 20,000
$ $
100,000 20,000
Total
$
$
220,000
$
220,000
$
120,000
40,000
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
$
-
Proposed FY 2022-23 $ 220,000
Proposed FY 2023-24 $ 120,000
Proposed FY 2024-25
Fund 57 (Measure M)
Budgeted FY 2021-22 $ 220,000
Total
$
$
$
$
Funding Source
220,000
220,000
120,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 40
-
Proposed FY 2025-26
$
-
Total $ $ $ $
500,000 60,000 -
$
560,000
Proposed FY 2025-26
$
-
Total $ $ $
560,000 -
$
560,000
LUBEC ST
LUBEC ST < PVT.>
STAMPS AV
BROCK AV
SAMOLINE AV
CIP 20-05 FLORENCE AVENUE PAVEMENT REHABILITATION
Ê
FLORENCE AV
PARAMOUNT BL
DINSDALE ST
ORIZABA AV
DINSDALE ST
E AV FLORENC
ELEVENTH ST LEXINGTON RD
TENTH ST
DOWNEY AV
PROJECT LOCATION MAP
PVT RD
BIGBY AV
MANZANAR AV
STAMPS RD
Project Limits
FARM ST
VIA AMORITA
STAMPS AV
SAMOLINE AV
MORNING AV
RIVES AV
LA REINA AV
VIA AMORITA
WESTERN AV
BAYSINGER ST
IRWINGROVE DR
Overview Map
BIRCHDALE AV
OTTO ST
BELLDER DR
BROOKSHIRE AV
TWEEDY LN
SMALLWOOD AV
OTTO ST
DACOSTA ST
PAR ROT AV
DACOSTA ST
DOLAN AV
GAINFORD ST
GAINFORD ST
BIGBY ST
µ
FARM ST
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Florence Avenue Pavement Rehabilitation Capital Improvement Project No.: 20-05 Account No.: 16783 Total Project Amount: $1,950,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2022 $61,414 $0
This project includes rehabilitation of asphalt pavement on Florence Avenue from Tweedy Lane to Brookshire Avenue. The work includes replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.
Design Construction Construction Engineering and Administration Total
Estimated Expenditures FY 2020-21 $ 25,000
$
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$ $ 1,700,000 $ 200,000
Total $ $ 1,700,000 $ 200,000 $ -
$ 1,900,000
$
Proposed FY 2022-23
Fund 54 (Proposition C) Fund 57 (Measure M)
Budgeted FY 2021-22 $ 1,405,000 $ 495,000
Total
$ 1,900,000
$
Funding Source
25,000
Budgeted FY 2021-22
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 1,900,000
Total $ 1,405,000 $ 495,000 $ -
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 42
-
$
-
$
-
$ 1,900,000
CIP 20-09 ENTRY MONUMENT SIGNS (VARIOUS LOCATIONS)
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Entry Monument Signs (Various Locations) Capital Improvement Project No.: 20-09 Account No.: 16787 Total Project Amount: $120,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2022 $50,669 $1,000
This project includes fabrication and installation of new Entry Monument Signs on arterial streets at City entrances.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22 $ $ $
50,000 10,000
$
60,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 60,000
Total
$
$
Funding Source
60,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 44
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
50,000 10,000 -
$
60,000
Proposed FY 2025-26
$
-
Total $ $ $
60,000 -
$
60,000
CIP 20-30 FOSTER BRIDGE BOULEVARD, RIVERGROVE DRIVE & GLENCLIFF DRIVE PAVEMENT REHABILITATION FIN E
CL EA RG RO
VE
VA LE DR
DR
E RIV S DO
DR
OS RI RD
ER ST FO
Overview Map
AV GU AT EM AL A
OVE RGR
Ê
GLENCLIFF DR
GE ID BR BL
BL UF FR D
CALMCREST DR
NOREN ST
Project Limits
PROJECT LOCATION MAP
JULIUS AV
SUVA ST
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Foster Bridge Boulevard, Rivergrove Drive and Glencliff Drive Pavement Rehabilitation Capital Improvement Project No.: 20-30 Account No.: 16778 Total Project Amount: $350,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $50,000 $0
This project includes rehabilitation of pavement on various streets including Foster Bridge Boulevard (Bluff Road to Rivergrove Drive), Rivergrove Drive (Foster Bridge Boulevard to Glencliff Drive) and Glencliff Drive (Rivergrove Drive to Bluff Road), replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.
Design Construction Construction Engineering and Administration Total
Estimated Expenditures FY 2020-21 $ 5,000
$
5,000
Budgeted FY 2021-22 $ $ $
250,000 50,000
$
300,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 38 (Vehicle Impact Fee)
Budgeted FY 2021-22 $ 300,000
Total
$
$
Funding Source
300,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 46
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
250,000 50,000 -
$
300,000
Proposed FY 2025-26
$
-
Total $ $ $
300,000 -
$
300,000
I-1
05
AIRPOINT AV
CIP 20-36 LAKEWOOD BOULEVARD STREET IMPROVEMENTS Y FW
GARDENDALE ST
MI DE AV NG
BLODGETT AV
Ê D OO W KE LA
LAURELDALE AV
BL
GOLDEN ST
REYDON ST
GUNDERSON AV
CASTANA AV
BARLIN AV
VERDURA AV
EARNSHAW AV
DEMPSTER AV
PRICHARD ST
W DO
DORION ST
Y NE AV CENTURY BL
Overview Map
PAR KCLIFF ST
NS RA EC S RO
AV
CENTURY BL
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Lakewood Boulevard Street Improvements Capital Improvement Project No.: 20-36 Account No.: 16773 Total Project Amount: $1,037,500
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $0 $0
This project includes street and traffic signal improvements and related to the relinquishment of Lakewood Boulevard from Century Boulevard to Gardendale Street.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Budgeted FY 2021-22 $ $ $
$
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
87,500 800,000 150,000
Total $ $ $
$ 1,037,500
$
Proposed FY 2022-23
Fund 36 (Relinquishment) Fund 57 (Measure M)
Budgeted FY 2021-22 $ 737,500 $ 300,000
Total
$ 1,037,500
$
Funding Source
-
Proposed FY 2022-23
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
$ 1,037,500
Proposed FY 2025-26
Total $ $ $
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 48
-
$
-
$
-
87,500 800,000 150,000
737,500 300,000 -
$ 1,037,500
CIP 20-37 LAKEWOOD BOULEVARD STREET IMPROVEMENTS (PHASE 3) CED AR TRE E
RD
TELEGR APH RD
FW Y
Ê
P
AV OR IZA BA
LA RE INA AV
VISTA D EL RIO AV
SUNSHINE PL < PVT.>
JOSHUA WY < PVT.>
EA V
MA N ZA NA RA V
ME LDA R
STO AK ES AV
AV DO WN EY
BR OO KSH IR
PROJECT LOCATION MAP
IELD SHELLEYF RD
GALLATIN RD
APPLEBY ST
H DR GARNIS
T.>
BROOK PARK R D
AN AV LEMOR
AV
Y AV CHANE
ON HALED
PV
EY AV CLANC
N AV ARRINGTO
Project Limits
R<
ELL AV SHERID
AV
BL
IT WH
EC TL
BL
I-5 FWY
VISTA D EL RIO AV
OOD LAKEW
SAN TA GE RTR UD ES RD
Overview Map
Y AV LINDSE
RA M
CEDARTREE RD
NS PASSO
BROOK PARK R D
SERAPIS AV
RD
ELS TO N
BLAND WOOD
BIR CH LEA FA V
EN RD
AV
BROOK GRE
LIN DE LL
AV
ST
STA MP SA V
ELMO
BIRCH CREST RD
BIRCHB ARK AV
DEL ROS A
NT AV
VIST A
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Lakewood Boulevard Street Improvements (Phase 3E) Capital Improvement Project No.: 20-37 Account No.: 17802 Total Project Amount: $489,206
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $4,956 $0
This project includes street improvements and striping work on Lakewood Boulevard from Gallatin Road to Telegraph Road.
Design Construction Construction Engineering and Administration Total
Estimated Expenditures FY 2020-21 $ 4,956
$
4,956
Budgeted FY 2021-22 $ $ $
54,250 400,000 30,000
$
484,250
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 26 (Grant Fund)
Budgeted FY 2021-22 $ 484,250
Total
$
$
Funding Source
484,250
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 50
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $
54,250 400,000 30,000
$
484,250
Proposed FY 2025-26
$
-
Total $ $ $
484,250 -
$
484,250
CIP 21-02 FY 20/21 SLURRY SEAL PROJECT (AREA 9)
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
District 1
LD IE RF GA AV
Area 9
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: FY 20/21 Slurry Seal Project Capital Improvement Project No.: 21-02 Account No.: 16775 Total Project Amount: $300,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $16,426 $0
This project includes slurry seal of deteriorated asphalt concrete pavement on residential streets in Council District 1, Area 9. The application of slurry seal on deteriorated pavement is an effective means of preserving asphalt pavement surfaces and extending its life an average of 5 to 7 years.
Design Construction Construction Engineering and Administration Total
Estimated Expenditures FY 2020-21 $ 16,426
$
16,426
Budgeted FY 2021-22 $ $ $
15,000 250,000 20,000
$
285,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 32 (Senate Bill 1)
Budgeted FY 2021-22 $ 285,000
Total
$
$
Funding Source
285,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 52
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
15,000 250,000 20,000 -
$
285,000
Proposed FY 2025-26
$
-
Total $ $ $
285,000 -
$
285,000
CIP 21-03 FY 20/21 RESIDENTIAL STREETS PAVEMENT REHABILITATION (AREA 9)
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
District 1
LD IE RF GA AV
Area 9
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: FY 20/21 Residential Streets Pavement Rehabilitation Capital Improvement Project No.: 21-03 Account No.: 16776 Total Project Amount: $2,280,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $115,000 $0
This project includes rehabilitation of pavement on various residential streets in Council District 1, Area 9, replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.
Design Construction Construction Engineering and Administration Total
Estimated Expenditures FY 2020-21 $ 115,000
$
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$ $ 2,000,000 $ 165,000
Total $ $ 2,000,000 $ 165,000 $ -
$ 2,165,000
$
Proposed FY 2022-23
Fund 32 (Senate Bill 1) Fund 38 (Vehicle Impact Fees)
Budgeted FY 2021-22 $ 135,000 $ 2,030,000
Total
$ 2,165,000
$
Funding Source
115,000
Budgeted FY 2021-22
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 2,165,000
Total $ 135,000 $ 2,030,000 $ -
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 54
-
$
-
$
-
$ 2,165,000
CIP 21-04 CENTURY BOULEVARD PAVEMENT REHABILITATION PRICHARD ST
DORION ST
Ê
PAR KCLIFF ST
BLODGETT AV
BARLIN AV
AV
EARNSHAW AV
Y NE
DEMPSTER AV
W DO
BIXLER AV
KLONDIKE AV
VERDURA AV
LAURELDALE AV
PRICHARD ST
Overview Map
CENTURY BL
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Century Boulevard Pavement Rehabilitation Capital Improvement Project No.: 21-04 Account No.: 16777 Total Project Amount: $200,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $0 $0
This project includes rehabilitation of asphalt pavement on Century Boulevard from Klondike Avenue to Downey Avenue and Downey Avenue to Elburg Street. The work includes replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements. Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
$ $
180,000 20,000
$
200,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 38 (Vehicle Impact Fee)
Budgeted FY 2021-22 $ 200,000
Total
$
$
Funding Source
200,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 56
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
180,000 20,000 -
$
200,000
Proposed FY 2025-26
$
-
Total $ $ $
200,000 -
$
200,000
CIP 21-05 3RD STREET PAVEMENT REHABILITATION FOURTH ST
FOSTORIA ST
SMALLWOOD AV
PARAMOUNT BL
FOURTH PL
Ê
Overview Map
RIVES AV
THIRD ST THIRD ST
SECOND ST
SECOND ST
Project Limits
FIRESTONE BL
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: 3rd Street Pavement Rehabilitation Capital Improvement Project No.: 21-05 Account No.: 16835 Total Project Amount: $330,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $30,000 $0
This project includes rehabilitation of asphalt pavement on 3rd Street from Rives Avenue to Paramount Boulevard. The work includes replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.
Design Construction Construction Engineering and Administration Total
Estimated Expenditures FY 2020-21 $ 30,000
$
30,000
Budgeted FY 2021-22 $ $ $
275,000 25,000
$
300,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 57 (Measure M)
Budgeted FY 2021-22 $ 300,000
Total
$
$
Funding Source
300,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 58
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
275,000 25,000 -
$
300,000
Proposed FY 2025-26
$
-
Total $ $ $
300,000 -
$
300,000
CIP 21-06 FIFTH STREET PAVEMENT REHABILITATION
TRISTAN DR
MULLER ST
Overview Map
LAKEWOOD BL
AV
Ê MAR B EL
FIFTH ST
BEL LMA AV N
BROOKSHIRE AV
DOLAN AV
BIRCHDALE AV
SIXTH ST
MULLER ST
SHELLEYFIELD RD
PLANETT AV
ARRINGTON AV
SEVENTH ST
CECILIA ST
STONEWOOD ST
LA VILLA ST
RESPONSIBILITY RW
THIRD THIRD ST < PVT.> ST
THIRD ST
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Fifth Street Pavement Rehabilitation Capital Improvement Project No.: 21-06 Account No.: 16830 Total Project Amount: $550,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $50,000 $0
This project includes rehabilitation of asphalt pavement on Fifth Street from Brookshire Avenue to Lakewood Boulevard. The work includes replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.
Design Construction Construction Engineering and Administration Total
Estimated Expenditures FY 2020-21 $ 50,000
$
50,000
Budgeted FY 2021-22 $ $ $
450,000 50,000
$
500,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 500,000
Total
$
$
Funding Source
500,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 60
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
450,000 50,000 -
$
500,000
Proposed FY 2025-26
$
-
Total $ $ $
500,000 -
$
500,000
CIP 22-01 FY 21/22 MISCELLANEOUS CONCRETE REPAIRS AND ADA IMPROVEMENTS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
City Boundary
LD IE RF GA AV
District 3
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: FY 21/22 Miscellaneous Concrete Repairs and ADA Improvements Capital Improvement Project No.: 22-01 Account No.: 16820 Total Project Amount: $500,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2022 $0 $0
This project includes the miscellaneous concrete construction and repairs of concrete surfaces and construction of ADAcompliant curb access ramps, drive approaches and sidewalks Citywide.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22 $ $ $
50,000 375,000 75,000
$
500,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 25 (TDA Article III) Fund 26 (Downey Unified School District) Fund 32 (Senate Bill 1)
Budgeted FY 2021-22 $ $ 200,000 $ 300,000
Total
$
$
Funding Source
500,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 62
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
50,000 375,000 75,000 -
$
500,000
Proposed FY 2025-26
$
-
Total $ $ $
200,000 300,000
$
500,000
CIP 22-02 FY 21/22 RESIDENTIAL STREETS PAVEMENT REHABILITATION (AREA 10)
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
District 1 District 2
LD IE RF GA AV
Area 10
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: FY 21/22 Residential Streets Pavement Rehabilitation Capital Improvement Project No.: 22-02 Account No.: 16821 Total Project Amount: $4,225,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2022 $0 $0
This project includes rehabilitation of pavement on various residential streets in Council District 2, Area 10, replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2024-25
Proposed FY 2025-26
$ 225,000 $ 3,675,000 $ 350,000 $
-
Total $ 225,000 $ 3,675,000 $ 350,000 $ -
$ 4,250,000
$
Proposed FY 2022-23
Fund 32 (Senate Bill 1) Fund 38 (Vehicle Impact Fees) Fund 56 (Measure R) Fund 57 (Measure M)
Budgeted FY 2021-22 $ 1,800,000 $ 1,725,000 $ 125,000 $ 600,000
Total
$ 4,250,000
$
Funding Source
Proposed FY 2023-24
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 4,250,000
Total $ 1,800,000 $ 1,725,000 $ 125,000 $ 600,000
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 64
-
$
-
$
-
$ 4,250,000
CIP 22-03 FY 2021/22 ALLEY BEAUTIFICATION PROGRAM
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: FY 21/22 Alley Beautification Program Capital Improvement Project No.: 22-03 Account No.: 16822 Total Project Amount: $300,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2022 $0 $0
This project includes the beautification of various residential alleys citywide. The improvements include lighting improvements, signage, pavement rehabilitation and replacement of damaged cross gutters and concrete improvements.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22 $ $ $
30,000 240,000 30,000
$
300,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 300,000
Total
$
$
Funding Source
300,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 66
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
30,000 240,000 30,000 -
$
300,000
Proposed FY 2025-26
$
-
Total $ $ $
300,000 -
$
300,000
FIFTH ST
AN AV
BIRCHDALE AV
FERN LN < PVT.>
LA VILLA ST
FOURTH ST
LA REINA AV
SMALLWOOD AV
PARAMOUNT BL
CECILIA ST
BUELL ST
SIXTH ST
FOURTH PL
Ê THIRD ST < PVT.>
DOWNEY AV
THIRD ST
Overview Map
BROOKSHIR E AV
JACARANDA LN < PVT.>
OLIVE LN < PVT.>
NEW ST
SIXTH ST
BEL LM
PRIVET LN < PVT.>
WESTERN AV
PARROT AV
CIP 22-04 3RD STREET PAVEMENT REHABILITATION
SECOND ST < PVT.>
MYRTLE ST
SECOND ST
Project Limits
SAMOLINE AV
PRUESS AV
BURNS AV
PHLOX ST
PIVOT ST
PROJECT LOCATION MAP
PATTON RD
NANCE AV
DOLAN AV
FIRESTONE BL
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: 3rd Street Pavement Rehabilitation Capital Improvement Project No.: 22-04 Account No.: 16823 Total Project Amount: $500,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2023 $0 $0
This project includes rehabilitation of asphalt pavement on 3rd Street from Paramount Boulevard to Civic Center Drive. The work includes replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements. Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Budgeted FY 2021-22 $
$
-
$
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2025-26
25,000
25,000
$ $
425,000 50,000
$
475,000
$
-
Proposed FY 2022-23 $ 475,000
Proposed FY 2023-24
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 25,000
Total
$
$
$
Funding Source
Proposed FY 2024-25
25,000
475,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 68
-
$
-
Proposed FY 2024-25
$
-
$
-
Total $ $ $ $
25,000 425,000 50,000 -
$
500,000
Proposed FY 2025-26
$
-
Total $ $ $
500,000 -
$
500,000
CIP 22-05 IMPERIAL HIGHWAY PAVEMENT REHABILITATION RD
V AA UT RN CO
SS NE IR A F
K OO BR ST EA
RN BU SH A W
LN
AV
V AA TT IZE T ES ER EV
ST RY SP
Ê
AV
AV ON TS BE IB AV
OW FL LL BE
P IM
Y HW AL I ER
ER BL R DA ED CH
K OO BR LD CO
AV ST
Y FW
MP RA
I-1
ST
LL GE AN
05
Y FW
ST
V AA UT RN CO
OR ON RS BO
ST
EE OR AD
AV
MO EN AD
Project Limits
Overview Map
FF RU OD WO
AV CT DI NE BE
TR
IN OB NR DU
TW US TR
S ES IN TH R O
ST
PROJECT LOCATION MAP
E UR LA
D OO LW
LN
B OM SC N A BR
FA
US T
I PR
AV
CA RF AX
ST
A ILL SC
AV
ST
R HE LC E B
ST
ER ST FO
RD
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Imperial Highway Pavement Rehabilitation Capital Improvement Project No.: 22-05 Account No.: 16824 Total Project Amount: $1,500,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2023 $0 $0
This project includes rehabilitation of asphalt pavement on Imperial Highway from Adenmoor Avenue to East City Limit. The work includes replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements. Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
$ $
150,000 -
$
150,000
$ 1,350,000
$
Proposed FY 2022-23 $ 1,350,000
Proposed FY 2023-24
Fund 57 (Measure M)
Budgeted FY 2021-22 $ 150,000
Total
$
$ 1,350,000
$
Total
$
Funding Source
-
150,000
Proposed FY 2024-25
Proposed FY 2025-26
Total $ 150,000 $ 1,200,000 $ 150,000 $ -
$ 1,200,000 $ 150,000 -
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 1,500,000
Total $ 1,500,000 $ $ -
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 70
-
$
-
$
-
$ 1,500,000
CIP 22-06 ELECTRIC VEHICLE CHARGING STATIONS, PHASE 3
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Electric Vehicle Charging Stations, Phase 3 Capital Improvement Project No.: 22-06 Account No.: 16825 Total Project Amount: $180,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2022 $0 $0
This project includes installation of three dual-port Electric Vehicle Charging Stations (EVCS) at Dennis the Menace Park, Golden Park and the Downey Library. The work includes procurement of the EVCS and related electrical work and equipment.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22 $ $
30,000 150,000
$
180,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 22 (AQMD)
Budgeted FY 2021-22 $ 180,000
Total
$
$
Funding Source
180,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 72
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
30,000 150,000 -
$
180,000
Proposed FY 2025-26
$
-
Total $ $ $
180,000 -
$
180,000
CIP 22-07 TELEGRAPH ROAD BRIDGE REPLACEMENT AT SAN GABRIEL RIVER
Ê TELEGRAP
Overview Map
H RD
PICO VISTA
RD
TRUE AV
DALE KLINE
DALEWOOD AV
CEDAR TR EE RD
AV
Project Limits
ALIWIN ST
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Telegraph Road Bridge Rehabilitation and Widening at San Gabriel River Capital Improvement Project No.: 22-07 Account No.: 16826 Total Project Amount: $800,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2024 $0 $0
This project includes replacement of existing Telegraph Road bridge at San Gabriel River to provide a new six-lane bridge. City of Pico Rivera is the Lead Agency.
Estimated Expenditures FY 2020-21 Design Right-of-Way Acquisition Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
Proposed FY 2022-23
$
$ $
$
100,000
100,000
$
Proposed FY 2023-24
Proposed FY 2024-25
100,000 100,000
200,000
$
500,000
$
500,000
$
-
Proposed FY 2022-23 $ 200,000
Proposed FY 2023-24 $ 500,000
Proposed FY 2024-25
Fund 57 (Measure M)
Budgeted FY 2021-22 $ 100,000
Total
$
$
$
$
Funding Source
100,000
Proposed FY 2025-26
200,000
500,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 74
-
$
-
Total $ $ $ $
200,000 100,000 500,000 -
$
800,000
Proposed FY 2025-26
$
-
Total $ $ $
800,000 -
$
800,000
CIP 22-08 CONCRETE IMPROVEMENTS - CITYWIDE
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Concrete Improvements - Citywide Capital Improvement Project No.: 22-08 Account No.: 16842 Total Project Amount: $500,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2022 $0 $0
This project includes the miscellaneous repairs of concrete surfaces such as sidewalks, drive approaches curbs, gutters and curb access ramps Citywide.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$
100,000
$
100,000
$
100,000
$
100,000
$
100,000
$
100,000
$
100,000
$
100,000
$
100,000
$
100,000
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 100,000
Proposed FY 2022-23 $ 100,000
Proposed FY 2023-24 $ 100,000
Proposed FY 2024-25 $ 100,000
Proposed FY 2025-26 $ 100,000
Total
$
$
$
$
$
Funding Source
100,000
100,000
100,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 76
100,000
100,000
Total $ $ $ $
500,000 -
$
500,000
Total $ $ $
500,000 -
$
500,000
CIP 22-09 CITYWIDE MEDIAN ISLAND LANDSCAPE ENHANCEMENTS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Citywide Median Island Landscape Enhancements Capital Improvement Project No.: 22-09 Account No.: 16843 Total Project Amount: $250,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2022 $0 $0
This project includes the miscellaneous repair and enhancement of existing landscaped median islands Citywide.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$
50,000
$
50,000
$
50,000
$
50,000
$
50,000
$
50,000
$
50,000
$
50,000
$
50,000
$
50,000
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 50,000
Proposed FY 2022-23 $ 50,000
Proposed FY 2023-24 $ 50,000
Proposed FY 2024-25 $ 50,000
Proposed FY 2025-26 $ 50,000
Total
$
$
$
$
$
Funding Source
50,000
50,000
50,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 78
50,000
50,000
Total $ $ $ $
250,000 -
$
250,000
Total $ $ $
250,000 -
$
250,000
CIP 23-XX ANNUAL MISCELLANEOUS CONCRETE REPAIRS AND ADA IMPROVEMENTS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Annual Miscellaneous Concrete Repairs and ADA Improvements Capital Improvement Project No.: 23-xx Account No.: NEW Total Project Amount: $450,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the miscellaneous concrete construction and repairs of concrete surfaces and construction of ADAcompliant curb access ramps, drive approaches and sidewalks Citywide.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$ $ $
40,000 360,000 50,000
$ $ $
40,000 360,000 50,000
$ $ $
40,000 360,000 50,000
$ $ $
40,000 360,000 50,000
$ 160,000 $ 1,440,000 $ 200,000 $ -
$
450,000
$
450,000
$
450,000
$
450,000
$ 1,800,000
Total
Fund 25 (TDA Article III) Fund 26 (Downey Unified School District) Fund 32 (Senate Bill 1)
Budgeted FY 2021-22 $ $ $ -
Proposed FY 2022-23 $ 77,000 $ 200,000 $ 173,000
Proposed FY 2023-24 $ 77,000 $ 200,000 $ 173,000
Proposed FY 2024-25 $ 77,000 $ 200,000 $ 173,000
Proposed FY 2025-26 $ 77,000 $ 200,000 $ 173,000
$ $ $
Total
$
$
$
$
$
$ 1,800,000
Funding Source
-
450,000
450,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 80
450,000
450,000
Total 308,000 800,000 692,000
CIP 23-XX ANNUAL RESIDENTIAL STREETS PAVEMENT REHABILITATION
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Annual Residential Streets Pavement Rehabilitation Capital Improvement Project No.: 23-xx Account No.: NEW Total Project Amount: $2,400,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes rehabilitation of pavement on various residential streets, replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$ 150,000 $ 2,100,000 $ 150,000
$ 150,000 $ 2,100,000 $ 150,000
$ 150,000 $ 2,100,000 $ 150,000
$ 150,000 $ 2,100,000 $ 150,000
$ 600,000 $ 8,400,000 $ 600,000 $ -
$ 2,400,000
$ 2,400,000
$ 2,400,000
$ 2,400,000
$ 9,600,000
Fund 32 (Senate Bill 1) Fund 38 (Vehicle Impact Fees)
Budgeted FY 2021-22 $ $ -
Proposed FY 2022-23 $ 900,000 $ 1,500,000
Proposed FY 2023-24 $ 900,000 $ 1,500,000
Proposed FY 2024-25 $ 900,000 $ 1,500,000
Proposed FY 2025-26 $ 900,000 $ 1,500,000
Total
$
$ 2,400,000
$ 2,400,000
$ 2,400,000
$ 2,400,000
Design Construction Construction Engineering and Administration Total
$
Funding Source
-
$
-
-
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 82
Total
Total $ 3,600,000 $ 6,000,000 $ $ 9,600,000
CIP 23-XX ANNUAL ALLEY BEAUTIFICATION PROGRAM
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Street Improvements Project Title: Annual Alley Beautification Program Capital Improvement Project No.: 23-xx Account No.: NEW Total Project Amount: $300,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the beautification of various residential alleys citywide. The improvements include lighting improvements, signage, pavement rehabilitation and replacement of damaged cross gutters and concrete improvements.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$ $
30,000 270,000
$ $
30,000 270,000
$ $
30,000 270,000
$ $
30,000 270,000
$ 120,000 $ 1,080,000 $ $ -
$
300,000
$
300,000
$
300,000
$
300,000
$ 1,200,000
Fund 56 (Measure R)
Budgeted FY 2021-22 $ -
Proposed FY 2022-23 $ 300,000
Proposed FY 2023-24 $ 300,000
Proposed FY 2024-25 $ 300,000
Proposed FY 2025-26 $ 300,000
Total
$
$
$
$
$
Funding Source
-
300,000
300,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 84
300,000
300,000
Total
Total $ 1,200,000 $ $ $ 1,200,000
TRAFFIC SAFETY
CAPITAL IMPROVEMENT PROGRAM Traffic Safety The Traffic Safety section of the CIP contains various capital projects related to enhancing traffic safety, capacity and operational efficiencies of the City’s transportation circulation system as well as preserving the integrity of the City’s neighborhoods. Projects in this category include the upgrading and expansion of the City’s traffic signal communications system; new traffic signal and flashing warning beacon installations; and construction of new raised landscaped median islands. New active transportation projects include elements that promote the safety of pedestrians and cyclists including vehicle speed feedback signs and other traffic calming devices. Other projects will refresh roadway striping, crosswalks and other pavement markings as well as upgrade signage, including replacement of additional street name signs. $8.9 million is programmed in the CIP for traffic safety projects
Stewart and Gray Road Signalization and Safety Enhancements
Paramount Median Landscape
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 88
CAPITAL IMPROVEMENT PROGRAM Traffic Safety Five Year Projections
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 90
TRAFFIC SAFETY IMPROVEMENT PROGRAM
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Traffic Safety Improvement Program Capital Improvement Project No.: N/A Account No.: 16454 Total Project Amount: $1,800,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2017 6/30/2022 $658,270 $0
This project includes various miscellaneous improvements citywide related to traffic safety enhancements.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
Design Construction Construction Engineering and Administration
$
142,853
$
200,000
$
200,000
$
200,000
$
200,000
$
200,000
Total
$
142,853
$
200,000
$
200,000
$
200,000
$
200,000
$
200,000
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 200,000
Proposed FY 2022-23 $ 200,000
Proposed FY 2023-24 $ 200,000
Proposed FY 2024-25 $ 200,000
Proposed FY 2025-26 $ 200,000
Total
$
$
$
$
$
Funding Source
200,000
200,000
200,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 92
200,000
200,000
Total $ $ 1,000,000 $ $ $ 1,000,000
Total $ 1,000,000 $ $ $ 1,000,000
FLORENCE AVENUE REGIONAL COMPLETE STREETS STUDY
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
Citywide
LD IE RF GA AV
Location
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Florence Avenue Regional Complete Streets Study Capital Improvement Project No.: N/A Account No.: 17829 Total Project Amount: $25,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2022 $529 $0
This study by the Gateway Cities Council of Government (GCCOG) is for a complete streets study of the Florence Avenue corridor from City of Santa Fe Springs to City of Huntington Park. Funds are for the City's share of cost for the preparation of study. Estimated Expenditures FY 2020-21 $ 188
Study
Total
$
188
Budgeted FY 2021-22 $
$
Proposed FY 2022-23
Proposed FY 2024-25
Proposed FY 2025-26
25,000
25,000
$
-
Proposed FY 2022-23
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 25,000
Total
$
$
Funding Source
Proposed FY 2023-24
25,000
-
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 94
-
$
-
Proposed FY 2024-25
$
-
$
-
Total $ $
25,000 -
$
-
$
25,000
Proposed FY 2025-26
$
-
Total $ $ $
25,000 -
$
25,000
I-5 CONSORTIUM
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: I-5 Consortium Capital Improvement Project No.: N/A Account No.: 16005 Total Project Amount: $60,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $30,000 $0
The I-5 Freeway Consortium is compromised of member cities along the I-5 Freeway corridor from the 710 Freeway to the 91 Freeway and collectively advocate for the best interests of its communities to enhance capacity and improve the safety and efficiency of the freeway and related transportation systems in the corridor. Funds are for the City's membership dues for the Consortium. Estimated Expenditures FY 2020-21 $ 30,000
Membership Dues
Total
$
30,000
Budgeted FY 2021-22 $
$
Proposed FY 2022-23
Proposed FY 2024-25
Proposed FY 2025-26
30,000
30,000
$
-
Proposed FY 2022-23
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 30,000
Total
$
$
Funding Source
Proposed FY 2023-24
30,000
-
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 96
-
$
-
Proposed FY 2024-25
$
-
$
-
Total $
30,000
$
-
$
30,000
Proposed FY 2025-26
$
-
Total $ $ $
30,000 -
$
30,000
I-710 CONSORTIUM
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: I-710 Consortium Capital Improvement Project No.: N/A Account No.: 16484 Total Project Amount: $50,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $25,000 $0
The I-710 Freeway Consortium is compromised of member cities along I-710 Freeway corridor from the I-5 Freeway to the 91 Freeway and collectively advocate for the best interests of its communities to enhance capacity and improve the safety and efficiency of the freeway and related transportation systems in the corridor. Funds are for the City's membership dues for the Consortium.
Membership Dues
Estimated Expenditures FY 2020-21 $ 25,000
$
25,000
Total
$
$
25,000
25,000
Budgeted FY 2021-22
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 25,000
Total
$
$
Funding Source
25,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 98
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
25,000 -
$
25,000
Proposed FY 2025-26
$
-
Total $ $ $
25,000 -
$
25,000
91/605 MAJOR CORRIDOR STUDY
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: 91/605 Major Corridor Study Capital Improvement Project No.: N/A Account No.: 16572 Total Project Amount: $40,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $20,000 $0
This study by the Gateway Cities Council of Government (GCCOG) and County of Los Angeles (County) is for a transportation study of the 91 Freeway and 605 Freeway corridors serving as a major transportation connection between the County and the Ports of Long Beach and Los Angeles. Funds are for the City's share of cost for the preparation of study.
Study
Estimated Expenditures FY 2020-21 $ 20,000
$
20,000
Total
$
$
20,000
20,000
Budgeted FY 2021-22
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 20,000
Total
$
$
Funding Source
20,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 100
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
20,000 -
$
20,000
Proposed FY 2025-26
$
-
Total $ $ $
20,000 -
$
20,000
LOCAL ROAD SAFETY PLAN
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Local Road Safety Plan Capital Improvement Project No.: 21-20 Account No.: 16836 Total Project Amount: $80,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $0 $0
The Local Road Safety Plan (LRSP) is a program to help local agencies evaluate their roadway networks to address safety issues and identify safety projects to submit for Highway Safety Improvement Program (HSIP) grant funding consideration. Funds are for the City's share of cost of the program. Estimated Expenditures FY 2020-21 Study
Total
$
-
Budgeted FY 2021-22 $
66,000
$
66,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 26 (Caltrans Grant) Fund 56 (Measure R)
Budgeted FY 2021-22 $ 59,400 $ 6,600
Total
$
$
Funding Source
66,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 102
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
66,000 -
$
66,000
Proposed FY 2025-26
$
-
Total $ $ $
59,400 6,600 -
$
66,000
IMPERIAL HIGHWAY COMPLETE STREETS STUDY
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
Citywide
LD IE RF GA AV
Location
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Imperial Highway Complete Streets Study Capital Improvement Project No.: N/A Account No.: 16827 Total Project Amount: $25,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2022 $0 $0
This study by the Gateway Cities Council of Government (GCCOG) is for a complete streets study of the Imperial Highway corridor from City of Lynwood to La Mirada. Funds are for the City's share of cost for the preparation of study.
Estimated Expenditures FY 2020-21 Study
Budgeted FY 2021-22 $
Total
$
-
$
Proposed FY 2022-23
Proposed FY 2024-25
Proposed FY 2025-26
25,000
25,000
$
-
Proposed FY 2022-23
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 25,000
Total
$
$
Funding Source
Proposed FY 2023-24
25,000
-
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 104
-
$
-
Proposed FY 2024-25
$
-
$
-
Total $ $
25,000 -
$
-
$
25,000
Proposed FY 2025-26
$
-
Total $ $ $
25,000 -
$
25,000
CIP 16-15 BIKE SHARE AND SAFETY EDUCATION PROGRAM
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Bike Share and Safety Education Program Capital Improvement Project No.: 16-15 Account No.: 17827 Total Project Amount: $224,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2016 6/30/2022 $180,103 $0
This project includes purchase and installation of 35 bicycles and related bicycle racks, equipment and signage to be made available to the public at different locations in the City.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
$ $
36,000 8,000
$
44,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 26 (Caltrans ATP) Fund 56 (Measure R - Local Match)
Budgeted FY 2021-22 $ 20,000 $ 24,000
Total
$
$
Funding Source
44,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 106
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
36,000 8,000 -
$
44,000
Proposed FY 2025-26
$
-
Total $ $ $
20,000 24,000 -
$
44,000
CIP 17-07 CITYWIDE TRANSIT PRIORITY SYSTEM
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
Northeast Route
IMPERIAL HWY
Northwest Route Southwest Route Project Limits
LD IE RF GA AV
Southeast Route
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Citywide Transit Priority System Capital Improvement Project No.: 17-07 Account No.: 17826 Total Project Amount: $1,804,200
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2022 $7,000 $0
This project includes equipping the LINK bus fleet with GPS-based transit priority emitter/processer devices to enable the buses to request priority at an approaching signalized intersection. Project includes retrofitting signalized intersections along six major transit routes within the City with transit priority receivers and retiming the traffic signals along the major transit routes to enhance overall mobility along said corridors. The six major transit routes are Lakewood Boulevard, Paramount Boulevard, Firestone Boulevard, Telegraph Road, Florence Avenue and Imperial Highway.
Design Construction Construction Engineering and Administration Total
Estimated Expenditures FY 2020-21 $ 1,021
$
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$ 159,200 $ 1,550,000 $ 88,000
Total $ 159,200 $ 1,550,000 $ 88,000 $ -
$ 1,797,200
$
Proposed FY 2022-23
Fund 26 (Metro Call for Projects) Fund 56 (Measure R - Local Match)
Budgeted FY 2021-22 $ 1,285,000 $ 512,200
Total
$ 1,797,200
$
Funding Source
1,021
Budgeted FY 2021-22
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 1,797,200
Total $ 1,285,000 $ 512,200 $ -
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 108
-
$
-
$
-
$ 1,797,200
CIP 17-09 PARAMOUNT BOULEVARD SIGNALIZATION & SAFETY ENHANCEMENTS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
Citywide
LD IE RF GA AV
Location
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Paramount Boulevard Signalization & Safety Enhancements Capital Improvement Project No.: 17-09 Account No.: 17830 Total Project Amount: $1,850,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2017 6/30/2022 $1,650,000 $2,000
This project includes various traffic signal upgrades and safety enhancements along Paramount Boulevard from Gardendale Street to Telegraph Road. Project includes installation of fiber optic cable, new controllers, signal hardware, equipment, safety lighting and intersection pedestrian countdown signal heads to improve safety for pedestrians and bicyclists.
Design Construction Construction Engineering and Administration Total
Estimated Expenditures FY 2020-21 $ 1,454,395
$
1,454,395
Budgeted FY 2021-22
$ $
175,000 25,000
$
200,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 26 (Caltrans Federal HSIP)
Budgeted FY 2021-22 $ 200,000
Total
$
$
Funding Source
200,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 110
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
175,000 25,000 -
$
200,000
Proposed FY 2025-26
$
-
Total $ $ $
200,000 -
$
200,000
CIP 17-10 STEWART & GRAY ROAD SIGNALIZATION & SAFETY ENHANCEMENTS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
Citywide
LD IE RF GA AV
Location
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Stewart & Gray Road Signalization & Safety Enhancements Capital Improvement Project No.: 17-10 Account No.: 17831 Total Project Amount: $3,089,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2017 6/30/2022 $2,202,294 $2,000
This project includes various traffic signal upgrades and safety enhancements along Stewart & Gray Road from Old River School Road to Firestone Boulevard. Project includes installation of traffic signal communications, traffic signal upgrades, striping and signage, reconstruction of curb access ramps, traffic signal timing and miscellaneous safety improvements. Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration
$
2,037,388
$ $
800,000 86,706
Total
$
2,037,388
$
886,706
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 26 (Caltrans Federal HSIP) Fund 54 (Proposition C) Fund 56 (Measure R) Fund 57 (Measure M)
Budgeted FY 2021-22 $ 563,063 $ 86,706 $ 46,261 $ 190,676
Total
$
$
Funding Source
886,706
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 112
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
800,000 86,706 -
$
886,706
Proposed FY 2025-26
$
-
Total $ $ $ $
563,063 86,706 46,261 190,676
$
886,706
CIP 17-11 SOUTH DOWNEY SAFE ROUTES TO SCHOOL PROJECT PATTON RD
ALBIA ST
MELVA ST
Ê E DG BLO
MARBEL AV
MORY ST
AV TT
ORANGE ST
Overview Map
LAKEWOOD BL
BOYSON ST
BIRCHDALE AV
BROOKSHIR E AV
ALAMEDA ST
SPRINGER ST
IA MB LU CO WY
DONOVAN ST
SE RO AV
Project Limits
EUCALYPTUS ST
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: South Downey Safe Routes to School Project Capital Improvement Project No.: 17-11 Account No.: 17832 Total Project Amount: $1,700,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2018 6/30/2022 $253,356 $0
This project includes upgrading of curb access ramps; installation of signage; replacement of striping and pavement markings; installation of vehicle speed feedback signs along various school routes in the south part of the City. The project includes development and implementation of a public outreach/education component.
Design Construction Construction Engineering and Administration Total
Estimated Expenditures FY 2020-21 $ 86,594
$
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$ 83,330 $ 1,240,000 $ 100,000
Total $ 83,330 $ 1,240,000 $ 100,000 $ -
$ 1,423,330
$
Proposed FY 2022-23
Fund 25 (TDA Article III) Fund 26 (Caltrans ATP) Fund 32 (Senate Bill 1) Fund 56 (Measure R)
Budgeted FY 2021-22 $ 161,500 $ 205,830 $ 656,000 $ 400,000
Total
$ 1,423,330
$
Funding Source
86,594
Budgeted FY 2021-22
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
$ 1,423,330
Proposed FY 2025-26
Total $ $ $ $
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 114
-
$
-
$
-
161,500 205,830 656,000 400,000
$ 1,423,330
CIP 17-12 CITYWIDE PEDESTRIAN PLAN
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Citywide Pedestrian Plan Capital Improvement Project No.: 17-12 Account No.: 17833 Total Project Amount: $300,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2018 6/30/2022 $265,231 $0
This project will develop a Citywide Pedestrian Plan. The Plan will recommend a list of priority pedestrian projects that will address specific community concerns and gaps identified through a community/public outreach process.
Estimated Expenditures FY 2020-21 $ 20,138
Study
Total
$
20,138
Budgeted FY 2021-22 $
$
Proposed FY 2022-23
Proposed FY 2024-25
Proposed FY 2025-26
34,769
34,769
$
-
Proposed FY 2022-23
Fund 26 (Caltrans ATP)
Budgeted FY 2021-22 $ 34,769
Total
$
$
Funding Source
Proposed FY 2023-24
34,769
-
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 116
-
$
-
Proposed FY 2024-25
$
-
$
-
Total $ $
34,769 -
$
-
$
34,769
Proposed FY 2025-26
$
-
Total $ $ $
34,769 -
$
34,769
CIP 18-07 IMPERIAL HIGHWAY SIGNALIZATION AND SAFETY ENHANCEMENTS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
Citywide
LD IE RF GA AV
Location
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Imperial Highway Signalization & Safety Enhancements Capital Improvement Project No.: 18-07 Account No.: 16722 Total Project Amount: $1,410,944
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2018 6/30/2022 $660,944 $2,000
This project includes upgrading of traffic control infrastructure at several signalized intersections and related safety measures along Imperial Highway from Old River School Road to Woodruff Avenue.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration
$
415,851
$ $
700,000 50,000
Total
$
415,851
$
750,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 26 (Caltrans Federal HSIP)
Budgeted FY 2021-22 $ 750,000
Total
$
$
Funding Source
750,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 118
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
700,000 50,000 -
$
750,000
Proposed FY 2025-26
$
-
Total $ $ $
750,000 -
$
750,000
CIP 19-14 DOWNEY BIKE MASTER PLAN IMPLEMENTATION PHASE 1 DOWNTOWN/TRANSIT
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Downey Bike Master Plan Implementation Phase 1 Downtown/Transit Capital Improvement Project No.: 19-14 Account No.: 16765 Total Project Amount: $2,847,416
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2018 6/30/2022 $612,000 $0
This project includes installation of Class II bicycle facilities on nine roadway segments, bicycle parking facilities, and way finding signs. Construction of these facilities includes application of slurry seal on roadway pavement; new roadway striping pavement markings and signage; and traffic signal modifications to detect bicycles at several intersections.
Design Construction Construction Engineering and Administration Total
Estimated Expenditures FY 2020-21 $ 120,895
$
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$ 25,416 $ 2,000,000 $ 210,000
Total $ 25,416 $ 2,000,000 $ 210,000 $ -
$ 2,235,416
$
Proposed FY 2022-23
Fund 26 (Metro Call for Projects) Fund 57 (Measure M)
Budgeted FY 2021-22 $ 1,764,933 $ 470,483
Total
$ 2,235,416
$
Funding Source
120,895
Budgeted FY 2021-22
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 2,235,416
Total $ 1,764,933 $ 470,483 $ -
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 120
-
$
-
$
-
$ 2,235,416
CIP 20-11 FLORENCE AVENUE TRAFFIC SIGNAL UPGRADES
Ê
ORIZABA AV
DINSDALE ST
BIRCHDALE AV
OTTO ST
BELLDER DR
BROOKSHIRE AV
PAR ROT AV
DOLAN AV
DACOSTA ST
TRISTAN DR
GAINFORD ST
Overview Map
FLORENCE AV
FLORENC E AV
ELEVENTH ST
BAYSINGER ST
BELL MAN AV
TENTH ST
DOWNEY AV
LA REINA AV
WESTERN AV
LEXINGTON RD
BIGBY AV
PVT RD
Project Limits
STAMPS AV
VIA AMORITA
PROJECT LOCATION MAP
BIGBY ST
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Florence Avenue Traffic Signal Upgrades Capital Improvement Project No.: 20-11 Account No.: 16789 Total Project Amount: $450,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $20 $1,000
This project includes upgrading of existing traffic signal and curb access ramps at the Florence Avenue at Downey Avenue and Florence Avenue at Brookshire Avenue intersections.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22 $ $ $
30,000 375,000 45,000
$
450,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 54 (Proposition C) Fund 56 (Measure R)
Budgeted FY 2021-22 $ 300,000 $ 150,000
Total
$
$
Funding Source
450,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 122
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
30,000 375,000 45,000 -
$
450,000
Proposed FY 2025-26
$
-
Total $ $ $
300,000 150,000 -
$
450,000
CIP 20-12 FIRESTONE BOULEVARD TRAFFIC SIGNAL UPGRADES LA VILLA ST
FOURTH ST
NEW ST LA REINA AV
SMALLWOOD AV
FOURTH PL
PARAMOUNT BL
FOSTORIA ST
THIRD ST
SECOND ST < PVT.>
RIVES AV
Ê
SECOND ST
Overview Map
DOWNEY AV
MYRTLE ST
SECOND ST
FIRESTONE BL
THIRD ST < PVT.>
THIRD ST
NANCE AV BURNS AV
DOLAN AV ARNETT ST
GURLEY AV
PRUESS AV
PROJECT LOCATION MAP
IOWA ST
MAC GOVERN AV
HORLEY AV
Project Limits
PHLOX ST
AV
RICHEON AV
ARNETT ST
PIVOT ST
E SAMOLIN
HORTON AV
PHLOX ST
KOOPMAN AV
PIVOT ST
DAVIS ST
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Firestone Boulevard Traffic Signal Upgrades Capital Improvement Project No.: 20-12 Account No.: 16790 Total Project Amount: $540,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2023 $1,318 $0
This project includes upgrading of existing traffic signal and curb access ramps at the Firestone Boulevard at Rives Avenue and Firestone Boulevard at Downey Avenue intersections.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Budgeted FY 2021-22 $
$
-
$
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2025-26
40,000
40,000
$ $
450,000 50,000
$
500,000
$
-
Proposed FY 2022-23 $ 500,000
Proposed FY 2023-24
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 40,000
Total
$
$
$
Funding Source
Proposed FY 2024-25
40,000
500,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 124
-
$
-
Proposed FY 2024-25
$
-
$
-
Total $ $ $ $
40,000 450,000 50,000 -
$
540,000
Proposed FY 2025-26
$
-
Total $ $ $
540,000 -
$
540,000
PANGBORN AV
CASANES AV
CHANEY AV
CLANCEY AV
HALEDON AV
D ST STO NEW OO NASH AV
PATTON RD BELLMAN AV
PLANETT AV
GURLEY AV
BIRCHDALE AV
GLYNN AV
EE OR AD
µ
ST
0 I-1
Y W 5F
LL GE AN ST
T US FA AV
R DA ED T H S C
AV
ANDER BERG GNEISS AV AV CALADRE AV
BROOKSHIRE AV
DOLAN AV
MAC GOVERN AV
HORLEY AV
PARAMOUNT BL
ORIZABA AV
SAMOLINE LN SAMOLINE AV
P IM
WY LH IA R E
ON TS BE IB
MORNING AV
AV
PROJECT LOCATION MAP
LN
T ES ER T V E S
T
AV
BOYSON ST
SS NE IR FA
ST
AV CT DI NE BE
ALAMEDA ST
TW US TR
TR
CA AA SE
FF RU OD WO
ALBIA ST
SS NE HI T OR
S RY SP
IN OB NR DU
BOYNE ST
N UR HB S WA
V AA UT AV RN K CO OO BR ST EA
CAVEL ST
DR TA
RD
V AA TT IZE
BYERS ST
BL
MCCALLUM ST
BYERS AV
VIS
ER
NADA ST
M EL
OW FL LL BE
ORANGE ST
COLE ST
AV NG MI E D
MAR BEL AV
Project MELVA ST Limits
DUESLER ST
FONTANA ST & GRAY RD STEWART
BUCKLES ST
BLODGETT AV
ELL RUND ST
LUXOR ST
FONTANA ST < PVT.>
BERGMAN LN
T
AN IG RR CO AV
DE PALMA ST
MAN ATEE ST
S CLETA
Overview Map
AV
BROOKMILL RD
TEXAS ST GALT DR
Ê
RD LL HA
EW
ADWEN ST
DAVIS ST
MARGARET ST
V KA OO BR AV LD OR CO
ARNETT ST
IOWA ST
NANCE AV
MO EN AD
S AV PRUES
PHLOX ST
ARDINE ST
VI NT GE RE
AV DOWNEY
PIVOT ST
YANKE Y ST
TRISTAN DR
FIRESTONE BL
VULTEE AV
MYRTLE ST
RIVES AV
SECOND ST < PVT.>
FOSTORIA ST
PELLET ST
NANCE AV
BURNS AV
BRUNACHE ST
THIRD ST < PVT.>
LAKEWOOD BL
THIRD ST
NEW ST
FOURTH PL
LA VILLA ST
CECILIA ST
NEWVILLE AV
LA REINA AV
FOURTH ST
SECOND ST
BIRCHDALE AV
WESTERN AV
SMALLWOOD AV
FIFTH ST
MULLER ST
BUELL ST
PICO VISTA RD
SIXTH ST
HASTY AV
FOSTORIA ST
OLIVE LN < PVT.>
CORD AV
CECILIA ST
PARROT AV
CIP 20-13 LAKEWOOD BOULEVARD TRAFFIC SIGNAL UPGRADES
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Lakewood Boulevard Traffic Signal Upgrades Capital Improvement Project No.: 20-13 Account No.: 16791 Total Project Amount: $440,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2023 $0 $0
This project includes upgrading of existing traffic signal and curb access ramps at the Lakewood Boulevard at 5th Street-Cecilia Street and Lakewood Boulevard at Alameda Street intersections.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Budgeted FY 2021-22 $
$
-
$
Proposed FY 2022-23
Proposed FY 2024-25
Proposed FY 2025-26
40,000
40,000
Budgeted FY 2021-22
$ $
350,000 50,000
$
400,000
Fund 54 (Proposition C) Fund 56 (Measure R)
$
40,000
Proposed FY 2022-23 $ 200,000 $ 200,000
Total
$
40,000
$
Funding Source
Proposed FY 2023-24
400,000
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 126
-
$
-
Proposed FY 2024-25
$
-
$
-
Total $ $ $ $
40,000 350,000 50,000 -
$
440,000
Proposed FY 2025-26
$
-
Total $ $ $
200,000 240,000 -
$
440,000
CIP 21-07 INTERSECTION ROUNDABOUTS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Citywide
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Intersection Roundabouts Capital Improvement Project No.: 21-07 Account No.: 16831 Total Project Amount: $440,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $0 $0
This project includes the investigation, study and possible implementation of intersection roundabouts at various locations citywide.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22 $ $ $
40,000 350,000 50,000
$
440,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 440,000
Total
$
$
Funding Source
440,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 128
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
40,000 350,000 50,000 -
$
440,000
Proposed FY 2025-26
$
-
Total $ $ $
440,000 -
$
440,000
CIP 21-08 FY 20/21 ANNUAL CITYWIDE TRAFFIC STRIPING OF ROADWAYS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: FY 20/21 Annual Citywide Traffic Striping of Roadways Capital Improvement Project No.: 21-08 Account No.: 16832 Total Project Amount: $50,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2026 $0 $0
This project includes repainting of existing pavement traffic striping and markings at various locations throughout the City.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
$
50,000
$
50,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 50,000
Total
$
$
Funding Source
50,000
-
Proposed FY 2023-24
$
50,000
$
50,000
Proposed FY 2024-25
$
-
Proposed FY 2023-24 $ 50,000
Proposed FY 2024-25
$
$
50,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 130
-
Proposed FY 2025-26
$
50,000
$
50,000
Proposed FY 2025-26 $ 50,000
$
50,000
Total $ $ $ $
150,000 -
$
150,000
Total $ $ $
150,000 -
$
150,000
WHITTLE CR < PVT.>
SUNSHINE PL < PVT.>
JOSHUA WY < PVT.>
CIP 21-09 GALLATIN ROAD STREET LIGHTING UPGRADES
Ê OOD LAKEW
ARRINGTON AV
GALLATIN RD
Overview Map
BL
RAVILLER DR
ALE AV BIRCHD
Project Limits
RAVILLER DR
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Gallatin Road Street Lighting Upgrades Capital Improvement Project No.: 21-09 Account No.: 16833 Total Project Amount: $100,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $0 $0
This project includes installation of new street lighting upgrades on the south side of Gallatin Road from approximately 400 feet west of and east of Lakewood Boulevard.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
$ $
90,000 10,000
$
100,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 26 (Other)
Budgeted FY 2021-22 $ 100,000
Total
$
$
Funding Source
100,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 132
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
90,000 10,000 -
$
100,000
Proposed FY 2025-26
$
-
Total $ $ $
100,000 -
$
100,000
THIRD ST < PVT.>
THIRD ST
GURLEY AV
DOLAN AV
MAN ATEE ST AS CLET
T
PROJECT LOCATION MAP
CASANES AV
CORD AV HASTY AV
CHANEY AV
WOODRUFF AV
GARNISH DR
BRIERBUSH AV
LEMORAN AV
HALEDON AV CLANCEY AV
ARRINGTON AV
SHELLEYFIELD RD
TRISTAN DR
BELLMAN AV
NASH AV
RD LL HA
S LE CK BU ST
V KA OO BR LD AV CO OR
MAC GOVERN AV
MYRTLE ST KOOPMAN AV
RIVES AV
NANCE AV
MO EN AD
HORTON AV
BUELL ST
PELLET ST
BL
OLD RIVER SCHOOL RD
IOWA ST
GALT DR
Overview Map
FOSTORIA ST
ER
BROOKMILL RD
Ê
MARGARET ST
DAVIS ST
TEXAS ST
GOTHAM ST
CECILIA ST
OW FL LL BE
RD < PVT.>
PHLOX ST
FARM ST
THIRD ST
FIRESTONE BL NANCE AV
DOWNEY AV
Project BROOKMILL Limits
AV SAMOLINE
ADWEN ST
S AV PRUES
ARNETT ST
NEO ST
SECOND ST < PVT.>
SECOND ST
BIGBY ST
MULLER ST
LAKEWOOD BL STO NEW OOD ST
LA VILLA ST
VIA AMORITA
MARBEL AV
FOURTH ST
BURNS AV PIVOT ST
BIRCHDALE AV
FIFTH ST
FOURTH PL
FIRESTONE PL
BELLDER DR
MANZANAR PVT RD AV
STAMPS RD
NEDRA AV
SEVENTH ST
PATTON RD
FERN LN < PVT.>
QUINN ST
BROOKSHIRE AV
CECILIA ST
IRWINGROVE DR
SIXTH ST
NEW ST
FOSTORIA ST
PRIVET LN < PVT.>
PARROT AV
SMALLWOOD AV
HORLEY AV
MULLER ST
RICHEON AV
WILEY BURKE AV
NORLAIN AV
BUELL ST
PEAR LN < PVT.>
HARPER AV
BIGBY AV
CHEROKEE DR
LA REINA AV
EIGHTH ST
QUINN ST
STAMPS AV
WESTERN AV
PARAMOUNT BL
JULIUS AV
POMERING RD
FARM ST
BAYSINGER ST
TENTH ST
VULTEE AV
VIA RIO NIDO
VIA AMORITA
MORNING AV
BAYSINGER ST
IRWINGROVE DR
ELEVENTH ST
LEXINGTON RD
PLANETT AV
HOPELAND AV
E AV FLORENC
EGLISE AV
CIP 22-10 PEDESTRIAN CROSSING SAFETY ENHANCEMENTS
ST
RD AY GR
µ
T& AR EW
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Traffic Improvements Project Title: Pedestrian Crossing Safety Enhancements Capital Improvement Project No.: 22-10 Account No.: 16828 Total Project Amount: $120,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2022 $0 $0
This project includes new pedestrian crossing signalization upgrades on Downey Avenue at Our Lady of Perpetual Help School and on Patton Road at PIH Hospital.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Budgeted FY 2021-22 $
$
-
$
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2025-26
20,000
20,000
$ $
90,000 10,000
$
100,000
$
-
Proposed FY 2022-23 $ 100,000
Proposed FY 2023-24
Fund 56 (Measure R)
Budgeted FY 2021-22 $ 20,000
Total
$
$
$
Funding Source
Proposed FY 2024-25
20,000
100,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 134
-
$
-
Proposed FY 2024-25
$
-
$
-
Total $ $ $ $
20,000 90,000 10,000 -
$
120,000
Proposed FY 2025-26
$
-
Total $ $ $
120,000 -
$
120,000
PUBLIC FACILITIES
CAPITAL IMPROVEMENT PROGRAM Public Facilities Each year, the Public Works Department develops a specific CIP to address future facility needs. The CIP assesses requirements for new facilities, renewal of existing facilities, infrastructure management and other facility-related needs. Following the City's required public bidding/contract processes, these public facility improvements will be completed within FY 2021-2021. These projects have been identified as priorities due to the need to address safety and/or compliance conditions as well as replace deteriorating/aging infrastructure. Engineering and Maintenance staff are tasked with the responsibility of carrying out these projects to completion. $16.3 million is programmed in the CIP for public facilities projects.
Installation of Veteran’s Memorial signage at Civic Center
Wilderness Park Irrigation Project
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 138
CAPITAL IMPROVEMENT PROGRAM Public Facilities Five Year Projections
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 140
CIP 15-26 CITYWIDE PLAYGROUND STRUCTURE SAFETY REPAIRS AND REPLACEMENT
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Citywide Playground Structure Safety Repairs and Replacement Capital Improvement Project No.: 15-26 Account No.: 17665 Total Project Amount: $450,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $10,356 $0
This project includes repair or replacement of identified play structure components needed to maintain safety condition for users.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$
75,000
$
75,000
$
75,000
$
75,000
$
75,000
$
75,000
$
75,000
$
75,000
$
75,000
$
75,000
Budgeted FY 2021-22 Fund 26 (LA County Maintenance & Servicing Excess Funds Pr $ 50,000 Fund 40 (Capital Project Fund) $ 25,000
Proposed FY 2022-23 $ 50,000 $ 25,000
Proposed FY 2023-24 $ 50,000 $ 25,000
Proposed FY 2024-25 $ 50,000 $ 25,000
Proposed FY 2025-26 $ 50,000 $ 25,000
Total
$
$
$
$
Funding Source
$
75,000
75,000
75,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 142
75,000
75,000
Total $ $ $ $
375,000 -
$
375,000
Total $ $ $
250,000 125,000 -
$
375,000
CIP 15-21 WILDERNESS PARK LAKE IMPROVEMENT PROJECT I-5
FLORENC E AV
GAYB ROOK AV
AKE RD
STUDEBAKER RD
LITTL EL
ST
L EL BU
ST
AV OD
LESTERFORD AV
PICO VISTA RD
NEWVILLE AV
AV AV FT RO MC EL
MATTOCK AV
AV
ER LL MU
Overview Map
O LW DA
QUINN ST
ST
AV
GOTHAM ST
LI CI CE
A
ST
AV
IB LE
S OS FL LE
AV RT OU LC HA
FARM ST
AV LE DA
D IEL NF BE
PANGBORN AV
TH OR N IN QU
RD FO IR FA
Ê S OS CR
CASANES AV
W NG LO
DR
LN
N ISO LL DO
EY FL OF
P RAM FWY
WY I-605 F
VIA AMORITA
FW Y
R HE AC AV
M DU NT O AV
Project Limits
MULLER ST
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Wilderness Park Lake Improvement Project Capital Improvement Project No.: 15-21 Account No.: 17706 Total Project Amount: $5,500,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2018 6/30/2022 $5,303,062 $2,000
This project improvements include the wildlife relocation, removal of the pond water and sludge, replace pond liner, new stream recirculation, dry stream bed, electrical service upgrade, new filtration and piping, enhanced trails, pedestrian bridges, fountains, new irrigation system, turf renovation and native planting. Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration
$
2,953,402
$
873,489
Total
$
2,953,402
$
873,489
Proposed FY 2022-23
$
-
Budgeted FY 2021-22 Fund 26 (Rivers and Mountain Conservancy Proposition 1) $ 623,272 Fund 26 (CA Dept. of Parks and Rec. Habitat Conserv. Wetland $ 150,000 Fund 40 (Capital Project Fund) $ 100,217
Proposed FY 2022-23
Total
$
Funding Source
$
873,489
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 144
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
873,489 -
$
873,489
Proposed FY 2025-26
$
-
Total $ $ $
623,272 150,000 100,217
$
873,489
CIP 19-37-02 FIRE STATION NO. 2 MODERNIZATION AND EXPANSION PROJECT
IN OB NR DU AV
P IM
Ê
WY LH IA R E
Overview Map
V AA TT IZE
K OO BR LD CO AV
ER
OR
BL
MO EN AD
OW FL LL BE
AV
Project Limits
R DA ED CH
ST
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Fire Station No. 2 Modernization and Expansion Project Capital Improvement Project No.: 19-37-02 Account No.: 13312 Total Project Amount: $3,451,066
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2022 $2,642,742 $1,000
This project consists of the modernization and expansion of Fire Station No. 2. Modernization includes an enlarged apparatus bay; dorm rooms, restrooms, locker rooms, exercise room, dayroom, kitchen and dining area; refreshed exterior palette of metal panels, aluminum frame windows, stucco and updated building graphics. (Existing Station Area: 3,681 sq.ft. to New Station Area: 6,791 sq.ft.) Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Proposed FY 2022-23
Design Construction Construction Engineering and Administration
$
1,770,757
$ 1,600,000 $ 162,279
Total
$
1,770,757
$ 1,762,279
$
Proposed FY 2022-23
Fund 33 (Measure S Bond)
Budgeted FY 2021-22 $ 1,762,279
Total
$ 1,762,279
$
Funding Source
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
Total $ $ 1,600,000 $ 162,279 $ -
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 1,762,279
Total $ 1,762,279 $ $ -
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 146
-
$
-
$
-
$ 1,762,279
CIP 19-37-04 FIRE STATION NO. 4 MODERNIZATION AND EXPANSION PROJECT GARNISH DR
DACOSTA ST
CASANES AV
DINSDA LE ST
SIDEVIEW DR
DOWNEY SANFORD BRIDGE RD
CHANEY AV
OTTO ST
Ê
Overview Map
PANGBORN AV
CORD AV
EGLISE AV
WOODRUFF AV
FLORENCE AV
HASTY AV
BAYSINGER ST
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Fire Station No. 4 Modernization and Expansion Project Capital Improvement Project No.: 19-37-04 Account No.: 13314 Total Project Amount: $4,730,343
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2022 $2,401,462 $1,000
This project consists of the modernization and expansion of Fire Station No. 4 including an enlarged apparatus bay, dorm rooms, restrooms, locker rooms, exercise room, dayroom, kitchen and dining area, refreshed exterior palette of metal panels, aluminum frame windows, stucco and updated building graphics. (Existing Station Area: 3,793 sq.ft. to New Station Area: 7,693 sq.ft.) Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Proposed FY 2022-23
Design Construction Construction Engineering and Administration
$
1,505,853
$ 2,328,881
Total
$
1,505,853
$ 2,328,881
$
Proposed FY 2022-23
Fund 33 (Measure S Bond)
Budgeted FY 2021-22 $ 2,328,881
Total
$ 2,328,881
$
Funding Source
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
Total $ $ 2,328,881 $ $ -
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 2,328,881
Total $ 2,328,881 $ $ -
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 148
-
$
-
$
-
$ 2,328,881
NEDRA AV
CIP 19-21 CITY HALL IMPROVEMENT PROJECT
SHELLEYFIELD RD
TRISTAN DR
AN AV
FIFTH ST
BIRCHDALE AV
SIXTH ST
BEL LM
PARROT AV
BUELL ST
WESTERN AV
PRIVET LN < PVT.>
MULLER ST
CECILIA ST
Ê
DOWNEY AV
MARBEL AV
STONEWOOD ST
THIRD ST
SECOND ST < PVT.>
MYRTLE ST
LAKEWOOD BL
BROOKSHIRE AV
THIRD ST < PVT.>
THIRD ST
SECOND ST
Overview Map
FOURTH ST
NEW ST
LA REINA AV
LA VILLA ST
Project Limits
PROJECT LOCATION MAP
MCCAHILL ST
NASH AV
PATTON RD
NANCE AV
DOLAN AV
FIRESTONE BL
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: City Hall Improvement Project Capital Improvement Project No.: 19-21 Account No.: 13304 Total Project Amount: $1,200,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2022 $323,717 $1,000
This project includes elevator, mechanical and interior renovations and upgrades and conference room lighting improvements.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration
$
3,496
$
596,317
Total
$
3,496
$
596,317
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 33 (Measure S Bond)
Budgeted FY 2021-22 $ 596,317
Total
$
$
Funding Source
596,317
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 150
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
596,317 -
$
596,317
Proposed FY 2025-26
$
-
Total $ $ $
596,317 -
$
596,317
CIP 19-25 DOWNTOWN PARKING STRUCTURE IMPROVEMENTS
NEW ST
FOURTH ST
THIRD ST
THIRD ST
THIRD ST < PVT.>
DOWNEY AV
LA REINA AV
Ê
Overview Map
SECOND ST
SECOND ST
MYRTLE ST
SECOND ST < PVT.>
FIRESTONE BL
µ DOLAN AV
Project Limits
PROJECT LOCATION MAP
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Downtown Parking Structure Improvements Capital Improvement Project No.: 19-25 Account No.: 13309 Total Project Amount: $400,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2022 $15,174 $1,000
This project includes wayfinding signage and parking structure count displays.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
$
85,008
$
85,008
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 33 (Measure S Bond)
Budgeted FY 2021-22 $ 85,008
Total
$
$
Funding Source
85,008
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 152
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
85,008 -
$
85,008
Proposed FY 2025-26
$
-
Total $ $ $
85,008 -
$
85,008
CIP 19-36 TREASURE ISLAND PARK IMPROVEMENT PROJECT ALDERDALE ST
I-5
FW
Y
RD FF BLU
SMALLWOOD AV
BOTANY ST
DANVERS ST
BAIRNSDALE ST
Ê
RD
TWEEDY LN
RIVES AV
CLEARGROVE DR
E ROV ERG RIV DR GE ID BR BL
BL UF FR D
GLENCLIFF DR
ER ST FO
Project Limits
HO RL EY
FINEVALE DR
GAYMONT AV
AV
COOLGROVE DR
AV
AK DR
ST
GU AT EM AL A
DO SR IOS
SH AD YO
HA NN ON
Overview Map
ALLENGROVE ST
RAVILLER DR
CALMCREST DR
PROJECT LOCATION MAP
SUVA ST
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Treasure Island Park Improvement Project Capital Improvement Project No.: 19-36 Account No.: 13395 Total Project Amount: $200,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2022 $10,481 $0
This project primarily focuses on improving the existing parking lot.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
$
89,633
$
89,633
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 33 (Measure S Bond)
Budgeted FY 2021-22 $ 89,633
Total
$
$
Funding Source
89,633
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 154
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
89,633 -
$
89,633
Proposed FY 2025-26
$
-
Total $ $ $
89,633 -
$
89,633
CIP 20-15 DOWNEY CIVIC THEATRE OUTDOOR PLAZA ART SCULPTURE THIRD ST
THIRD ST < PVT.>
Ê BROOKSH IRE AV
SECOND ST
Overview Map
Project Limits
DOLAN AV
FIRESTONE BL
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Downey Civic Theatre Outdoor Plaza Art Sculpture Capital Improvement Project No.: 20-15 Account No.: 16793 Total Project Amount: $525,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2022 $441,637 $1,000
This project includes new art sculpture in the Outdoor Plaza at the Downey Civic Theatre.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
$
80,000
$
80,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 47 (Art in Public Places)
Budgeted FY 2021-22 $ 80,000
Total
$
$
Funding Source
80,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 156
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
80,000 -
$
80,000
Proposed FY 2025-26
$
-
Total $ $ $
80,000 -
$
80,000
CIP 20-20 ENERGY EFFICIENCY IMPROVEMENTS AT CITY FACILITIES
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Energy Efficiency Improvements at City Facilities Capital Improvement Project No.: 20-20 Account No.: 16798 Total Project Amount: $1,100,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $69,483 $4,000
This project includes the implementation of various energy efficiency improvements at various City Facilities.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Proposed FY 2022-23
Design Construction Construction Engineering and Administration
$
44,902
$ $
Total
$
44,902
$ 1,000,000
$
Proposed FY 2022-23
Fund 26 (Other)
Budgeted FY 2021-22 $ 1,000,000
Total
$ 1,000,000
$
Funding Source
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
Total $ $ $ $
900,000 100,000 -
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
900,000 100,000 -
$ 1,000,000
Total $ 1,000,000 $ $ -
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 158
-
$
-
$
-
$ 1,000,000
Overview Map
MORNING AV
ADOREE ST
PARAMOUNT BL
BORSON ST
ORILLA AV
DALEN ST
COMOLETTE ST
SAMOLINE AV
ERICKSON AV < PVT.>
LYNDORA ST
Ê
12826
FLORES ST < PVT.>
SMALLWOOD AV
OLD RIVER RD SCHOOL < PVT.> AMIGOS AV < PVT.>
GROVETREE AV
IVER OLD R L RD O SCHO
V NA SO ER RY
IMPERIAL HWY
RIVES AV
CIP 20-25 RANCHO SOUTH CAMPUS SPECIFIC PLAN
DEVENIR AV
CONKLIN ST
7601
PURITAN ST CONSUELO ST < PVT.>
I RF GA D EL AV
7501
GARDENDALE ST
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Rancho South Campus Specific Plan Capital Improvement Project No.: 20-25 Account No.: 17885 Total Project Amount: $450,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2018 6/30/2022 $350,345 $0
This study includes the developmment of the Rancho Los Amigos South Campus Specific Plan.
Study
Estimated Expenditures FY 2020-21 $ 7,962
$
104,656
Total
$
$
104,656
7,962
Budgeted FY 2021-22
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 26 (Other)
Budgeted FY 2021-22 $ 104,656
Total
$
$
Funding Source
104,656
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 160
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
104,656 -
$
104,656
Proposed FY 2025-26
$
-
Total $ $ $
104,656 -
$
104,656
ERICKSON AV < PVT.>
CIP 20-26 RANCHO SPORTS COMPLEX
CONKLIN ST
PARAMOUNT BL
SAMOLINE AV
MORNING AV
SMALLWOOD AV
COMOLETTE ST
12826
FLORES ST < PVT.>
DEVENIR AV
7601
PURITAN ST CONSUELO ST < PVT.>
Ê
CHEYENNE Overview Map AV
PRISCILLA ST
I RF GA D EL AV
7501
GARDENDALE ST
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Rancho Los Amigos South Campus Sports Center Capital Improvement Project No.: 20-26 Account No.: 17886 Total Project Amount: $3,000,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $0 $0
This project, with the County of Los Angeles (County), includes the design and construction of a Sports Complex at the southerly end of the County's Rancho Los Amigos South Campus.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2024-25
Proposed FY 2025-26
-
Total $ $ 3,000,000 $ $ -
$ 3,000,000
$
$ 3,000,000
$
Proposed FY 2022-23
Fund 26 (Other)
Budgeted FY 2021-22 $ 3,000,000
Total
$ 3,000,000
$
Funding Source
Proposed FY 2023-24
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 3,000,000
Total $ 3,000,000 $ $ -
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 162
-
$
-
$
-
$ 3,000,000
SB-2 PLANNING GRANT
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: SB-2 Planning Grant Capital Improvement Project No.: N/A Account No.: 17887 Total Project Amount: $380,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $78,878 $0
The SB-2 Planning Grant program is to provide funding and technical assistance to local governments to help prepare, adopt, and implement plans and process improvements that streamline housing approvals and accelerate housing production.
Estimated Expenditures FY 2020-21 Planning Grant
Total
$
-
Budgeted FY 2021-22 $
299,927
$
299,927
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 26 (Other)
Budgeted FY 2021-22 $ 299,927
Total
$
$
Funding Source
299,927
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 164
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
299,927 -
$
299,927
Proposed FY 2025-26
$
-
Total $ $ $
299,927 -
$
299,927
CIP 21-17 PARAMOUNT BOULEVARD AT FIRESTONE BOULEVARD IMPROVEMENTS
Ê
Overview Map
PARAMOUNT BL
FIRESTONE BL
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Paramount Boulevard at Firestone Boulevard Improvements Capital Improvement Project No.: 21-17 Account No.: 16731 Total Project Amount: $280,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $160,424 $0
This project includes the installation of landscape and irrigation improvements at the southwest corner of Paramount Boulevard at Firestone Boulevard. Landscape improvements will include decorative screen panels.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
$
119,575
$
119,575
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 26 (Other) Fund 36 (Relinquishment) Fund 47 (Art in Public Places)
Budgeted FY 2021-22 $ 3,500 $ 6,075 $ 110,000
Total
$
$
Funding Source
119,575
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 166
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
119,575 -
$
119,575
Proposed FY 2025-26
$
-
Total $ $ $
3,500 6,075 110,000
$
119,575
CIP 21-18 INSPIRATION SPACE SHUTTLE EXHIBIT AND EDUCATION BUILDING
BOYSON ST ST
Overview Map
IA MB LU CO WY
DONOVAN ST
Ê LAKEWOOD BL
AV ETT DG BLO
SPRINGER ST
MARBEL AV
RY MO
SS
V SA DI AR
SE RO AV
ME JA
T
IM
Project Limits
PROJECT LOCATION MAP
HW AL RI PE
Y
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Inspiration Space Shuttle Exhibit & Education Building Capital Improvement Project No.: 21-18 Account No.: 16829 Total Project Amount: $5,000,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2023 $0 $0
This project includes the construction of a new Space Shuttle Exhibit and Education Building as part of the expansion of the Columbia Memorial Space Center Campus.
Design Construction Construction Engineering and Administration
Estimated Expenditures FY 2020-21 $ $ $ -
$ 750,000 $ 4,000,000 $ 250,000
Total
$
$ 5,000,000
$
Proposed FY 2022-23
Fund 26 (Other)
Budgeted FY 2021-22 $ 5,000,000
Total
$ 5,000,000
$
Funding Source
-
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
Total $ 750,000 $ 4,000,000 $ 250,000 $ -
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 5,000,000
Total $ 5,000,000 $ $ -
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 168
-
$
-
$
-
$ 5,000,000
FIFTH ST
AN AV
BIRCHDALE AV
FERN LN < PVT.>
BEL LM
BUELL ST
PARROT AV
LA VILLA ST
Ê
NEW ST
LA REINA AV
FOURTH PL
THIRD ST < PVT.>
THIRD ST
SECOND ST < PVT.>
MYRTLE ST
DOWNEY AV
SECOND ST
Overview Map
BROOKSHIRE AV
JACARANDA LN < PVT.>
SIXTH ST
PARAMOUNT BL
FOURTH ST
FIRESTONE BL
Project Limits
DOLAN AV
KOOPMAN AV
SAMOLINE AV
BURNS AV
PIVOT ST
PHLOX ST
PROJECT LOCATION MAP
PATTON RD
NANCE AV
PRUESS AV
SMALLWOOD AV
CECILIA ST
OLIVE LN < PVT.>
WESTERN AV
SIXTH ST
TRISTAN DR
CIP 21-21 DOWNTOWN MURAL
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Downtown Mural Capital Improvement Project No.: 21-21 Account No.: 16839 Total Project Amount: $0
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $0 $0
This project includes the installation of a mural in downtown Downey.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
$
35,000
$
35,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 47 (Art in Public Places)
Budgeted FY 2021-22 $ 35,000
Total
$
$
Funding Source
35,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 170
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
35,000 -
$
35,000
Proposed FY 2025-26
$
-
Total $ $ $
35,000 -
$
35,000
CIP 21-22 CIVIC THEATRE HARDSCAPE AND LANDSCAPE IMPROVEMENTS THIRD ST
THIRD ST < PVT.>
Ê BROOKSH IRE AV
SECOND ST
Overview Map
Project Limits
DOLAN AV
FIRESTONE BL
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Civic Theatre Hardscape and Landscape Improvements Capital Improvement Project No.: 21-22 Account No.: 16840 Total Project Amount: $120,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $9,263 $0
This project includes the installation of hardscape and landcape improvements in the Outdoor Plaza at the Downey Civic Theatre.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration
$
9,263
$
110,000
Total
$
9,263
$
110,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 47 (Art in Public Places)
Budgeted FY 2021-22 $ 110,000
Total
$
$
Funding Source
110,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 172
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
110,000 -
$
110,000
Proposed FY 2025-26
$
-
Total $ $ $
110,000 -
$
110,000
CIP 21-29 COLUMBIA MEMORIAL SPACE CENTER IMPROVEMENTS
BOYSON ST ST
Overview Map
IA MB LU CO WY
DONOVAN ST
Ê LAKEWOOD BL
AV ETT DG BLO
SPRINGER ST
MARBEL AV
RY MO
SS
V SA DI AR
SE RO AV
ME JA
T
IM
Project Limits
PROJECT LOCATION MAP
HW AL RI PE
Y
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Columbia Memorial Space Center Improvements Capital Improvement Project No.: 21-29 Account No.: 16834 Total Project Amount: $600,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2022 $0 $0
This project includes various building improvements and modifications at the Columbia Memorial Space Center.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22 $ $ $
50,000 500,000 50,000
$
600,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 26 (Other)
Budgeted FY 2021-22 $ 600,000
Total
$
$
Funding Source
600,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 174
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
50,000 500,000 50,000 -
$
600,000
Proposed FY 2025-26
$
-
Total $ $ $
600,000 -
$
600,000
ARRINGTON AV
AN AV
FIFTH ST
BEL LM
FERN LN < PVT.>
BIRCHDALE AV
SIXTH ST
SHELLEYFIELD RD
MULLER ST
TRISTAN DR
DOLAN AV
SEVENTH ST
PLANETT AV
PARROT AV
LILY LN < PVT.> PRIVET LN < PVT.> OLIVE LN < PVT.> BUELL ST
WESTERN AV
STAMPS RD
SEVENTH ST
NEDRA AV
CIP 22-11 POLICE DEPARTMENT CARPET FLOORING REPLACEMENT
Ê
Overview Map
CECILIA ST
THIRD ST
THIRD ST < PVT.>
DOWNEY AV
THIRD ST
MYRTLE ST
MARBEL AV
SECOND ST < PVT.>
SECOND ST
STONEWOOD ST
LAKEWOOD BL
BROOKSHIRE AV
FOURTH ST
NEW ST
LA REINA AV
LA VILLA ST
PROJECT LOCATION MAP
MCCAHILL ST
NASH AV
PATTON RD
Project Limits
NANCE AV
DOLAN AV
FIRESTONE BL
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Police Department Carpet Flooring Replacement Capital Improvement Project No.: 22-11 Account No.: 16844 Total Project Amount: $100,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2022 $0 $0
This project includes the removal and replacement of the carpet flooring in the Police Department building.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
$
100,000
$
100,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ 100,000
Total
$
$
Funding Source
100,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 176
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
100,000 -
$
100,000
Proposed FY 2025-26
$
-
Total $ $ $
100,000 -
$
100,000
CIP 22-12 UTILITIES YARD HVAC DUCT REPLACEMENT MARGARET ST
IOWA ST
K OO BR LD CO
Ê
AV
AV
CLETA ST T
OW FL LL BE
SS LE CK U B
VULTEE AV
BL
S RT BE E RA
T
M EL
VIS
TA
DR
RN BU SH A W
RD
V AA UT RN CO
OO BR ST EA V KA
AV
PROJECT LOCATION MAP
IN OB NR DU
V AA TT IZE
MARBEL AV
&
AV
Project Limits
T AR EW T S
RD AY GR
N GA
NADA ST
ER
I RR CO
AV ING DEM
Overview Map
AV FF RU OD WO
OR MO EN AD
LAKEWOOD BL
RD LL HA
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Utility Yard HVAC Duct Replacement Capital Improvement Project No.: 22-12 Account No.: 16841 Total Project Amount: $50,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2022 $0 $0
This project includes the removal and replacement of the existing HVAC ducts at the Utility Yard.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
$
50,000
$
50,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 51 (Water)
Budgeted FY 2021-22 $ 50,000
Total
$
$
Funding Source
50,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 178
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
50,000 -
$
50,000
Proposed FY 2025-26
$
-
Total $ $ $
50,000 -
$
50,000
SUSAN AV
VIA RIO NIDO
RYERSON AV
PERNELL AV
Project Limits
RIO HON DO D R
RIO FLORA PL
PELLET ST
PROJECT LOCATION MAP
Overview Map
BUELL ST
CECILIA ST
WILEY BURKE AV
RIO HONDO PL
QUINN ST
MULLER ST
NORLAIN AV
COUNTRY CLUB DR
OLD RIVER SCHOOL RD
Ê
JULIUS AV
CHEROKEE DR
POMERING RD
SH ER RY AV
CIP 23-xx NETTING REPLACEMENT AND INSTALLATION HOLE #11
FOSTORIA ST
FOURTH PL
THIRD ST
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Netting Replacement & Installation Hole #11 Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $102,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the netting replacement and installation of new netting at Hole #11 of the Rio Hondo Golf Course.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$
102,000
$
102,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 102,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
102,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 180
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
102,000 -
$
102,000
Proposed FY 2025-26
$
-
Total $ $ $
102,000 -
$
102,000
SUSAN AV
VIA RIO NIDO
RYERSON AV
PERNELL AV
Project Limits
RIO HON DO D R
RIO FLORA PL
PELLET ST
PROJECT LOCATION MAP
Overview Map
BUELL ST
CECILIA ST
WILEY BURKE AV
RIO HONDO PL
QUINN ST
MULLER ST
NORLAIN AV
COUNTRY CLUB DR
OLD RIVER SCHOOL RD
Ê
JULIUS AV
CHEROKEE DR
POMERING RD
SH ER RY AV
CIP 23-XX RIO HONDO GOLF COURSE BARRIER TREE TRIMMING
FOSTORIA ST
FOURTH PL
THIRD ST
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Rio Hondo Golf Course Barrier Tree Trimming Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $30,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the trimming of barrier trees at the Rio Hondo Golf Course adjacent to Via Rio Nido and Old River School Road.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$
30,000
$
30,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 30,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
30,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 182
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
30,000 -
$
30,000
Proposed FY 2025-26
$
-
Total $ $ $
30,000 -
$
30,000
HONDO ST
ORIZABA AV < PVT.>
MONTGOMERY ST
SPRINGER ST
SAMOLINE AV
HORLEY AV
RICHEON AV
CHAVERS AV
JULIUS AV
POMERING RD
NORLAIN AV
KINGBEE ST
GNEISS AV
CIP 23-XX APOLLO PARK TURF PERIMETER FENCING
CONRAD ST
HONDO ST QUILL DR
CI TI ZE NS HI P
PROJECT LOCATION MAP
BROCK AV
PARROT AV
DALEN ST
ORILLA AV
SMALLWOOD AV
GROVETREE AV
ERICKSON AV < PVT.>
OLD RIVER SCHOOL RD < PVT.>
LYNDORA ST
CT
LA REINA AV
N SO ER RY AV
Project Limits
LANKIN ST
LEEDS ST
IMPERIAL HWY
AMIGOS AV < PVT.>
Overview Map
GNEISS AV
N
QUOIT ST
ORIZABA AV
PARAMOUNT BL
RIVES AV
D OOL R R SCH
MORNING AV
IVE OLD R L EMILY
Ê
µ
BORSON ST
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Apollo Park Turf Perimeter Fencing Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $40,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the installation of new field turf perimeter fencing at Apollo Park.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$ $
35,000 5,000
$
40,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 40,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
40,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 184
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
35,000 5,000 -
$
40,000
Proposed FY 2025-26
$
-
Total $ $ $
40,000 -
$
40,000
SUSAN AV
VIA RIO NIDO
RYERSON AV
PERNELL AV
Project Limits
RIO HON DO D R
RIO FLORA PL
PELLET ST
PROJECT LOCATION MAP
Overview Map
BUELL ST
CECILIA ST
WILEY BURKE AV
RIO HONDO PL
QUINN ST
MULLER ST
NORLAIN AV
COUNTRY CLUB DR
OLD RIVER SCHOOL RD
Ê
JULIUS AV
CHEROKEE DR
POMERING RD
SH ER RY AV
CIP 20-19 RIO HONDO GOLF COURSE GOLF CART PATH REPAIRS
FOSTORIA ST
FOURTH PL
THIRD ST
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Rio Hondo Golf Course Golf Cart Path Repairs Capital Improvement Project No.: 20-19 Account No.: 16797 Total Project Amount: $90,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the concrete repairs of the existing golf cart paths at the Rio Hondo Golf Course.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$ $
85,000 5,000
$
90,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 90,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
90,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 186
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
85,000 5,000 -
$
90,000
Proposed FY 2025-26
$
-
Total $ $ $
90,000 -
$
90,000
ORIZABA AV
CIP 23-XX FIRE STATION NO. 1 ASPHALT IMPROVEMENTS
ALAMEDA ST
MO SA
MELVA ST
Overview Map
V EA LIN
PARAMOUNT BL
Ê
MONTGOMERY ST
ORANGE ST
KINGBEE ST
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Fire Station No. 1 Asphalt Improvements Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $50,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the removal of existing asphalt and construction of new asphalt pavement at Fire Station No. 1.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$
50,000
$
50,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 50,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
50,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 188
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
50,000 -
$
50,000
Proposed FY 2025-26
$
-
Total $ $ $
50,000 -
$
50,000
ORIZABA AV
CIP 23-XX FIRE STATION NO. 1 CABINETS AND COUNTER TOPS
ALAMEDA ST
MO SA
MELVA ST
Overview Map
V EA LIN
PARAMOUNT BL
Ê
MONTGOMERY ST
ORANGE ST
KINGBEE ST
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Fire Station No. 1 Cabinets and Counter Tops Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $40,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the installation of new cabinets and counter tops at Fire Station No. 1.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$ $
35,000 5,000
$
40,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 40,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
40,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 190
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
35,000 5,000 -
$
40,000
Proposed FY 2025-26
$
-
Total $ $ $
40,000 -
$
40,000
CIP 23-XX TRAINING TOWER BATHROOM MODIFICATIONS SS NE IR A F
RD
V AA UT RN CO
K OO BR ST EA
S WA
N UR HB
AV T
Ê
Overview Map
AV
AV CT DI NE BE
IN OB NR DU
OW FL LL BE ER BL
TR
WY LH IA R E
AV
P IM
ON TS BE IB
TW US TR
ST
AV
T ES ER EV
FF RU OD WO
V AA TT IZE
S RY SP
SS NE HI T OR
LN
AV
PROJECT LOCATION MAP
V AA UT RN CO
K OO BR ST EA
A TT IZE AV
Project Limits
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Training Tower Bathroom Modifications Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $75,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes modifying the existing bathroom at the Fire Department Training Tower area located at the easterly end of Independence Park.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$ $
65,000 10,000
$
75,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 75,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
75,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 192
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
65,000 10,000 -
$
75,000
Proposed FY 2025-26
$
-
Total $ $ $
75,000 -
$
75,000
CIP 23-XX FIRE STATION SECURITY CAMERAS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
Project Limits
LD IE RF GA AV
Location
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Fire Station Security Cameras Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $100,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the installation of security cameras at the four Fire Stations.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$ $
90,000 10,000
$
100,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 100,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
100,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 194
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
90,000 10,000 -
$
100,000
Proposed FY 2025-26
$
-
Total $ $ $
100,000 -
$
100,000
ORIZABA AV
BROCK AV
SAMOLINE AV
CIP 23-XX FIRE STATION NO. 3 FUEL TANK/DISPENSER RELOCATION
LUBEC ST
GAINFORD ST
TWEEDY LN
SMALLWOOD AV
PAR ROT AV
DACOSTA ST
PARAMOUNT BL
Ê
Overview Map
DACOSTA ST
OTTO ST
LA REINA AV
OTTO ST
DINSDALE ST
ORIZABA AV
DINSDALE ST
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Fire Station No. 3 Fuel Tank/Dispenser Relocation Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $150,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the relocation of the existing fuel tank/dispenser at Fire Station No. 3.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$ $
135,000 15,000
$
150,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 150,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
150,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 196
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
135,000 15,000 -
$
150,000
Proposed FY 2025-26
$
-
Total $ $ $
150,000 -
$
150,000
ORIZABA AV
CIP 23-XX FIRE STATION NO. 1 SHOP ACCESS DOOR
ALAMEDA ST
MO SA
MELVA ST
Overview Map
V EA LIN
PARAMOUNT BL
Ê
MONTGOMERY ST
ORANGE ST
KINGBEE ST
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Fire Station No. 1 Shop Access Door Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $6,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the installation of a new shop access door at Fire Station No. 1.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$
6,000
$
6,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 6,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
6,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 198
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
6,000 -
$
6,000
Proposed FY 2025-26
$
-
Total $ $ $
6,000 -
$
6,000
ORIZABA AV
CIP 23-XX FIRE STATION NO. 1 ANNEX BUILDING PAINTING IMPROVEMENTS
ALAMEDA ST
MO SA
MELVA ST
Overview Map
V EA LIN
PARAMOUNT BL
Ê
MONTGOMERY ST
ORANGE ST
KINGBEE ST
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Fire Station No. 1 Annex Building Painting Improvements Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $40,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the painting of the Fire Station No. 1 Annex Building.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$
40,000
$
40,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 40,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
40,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 200
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
40,000 -
$
40,000
Proposed FY 2025-26
$
-
Total $ $ $
40,000 -
$
40,000
CIP 23-XX FIRE STATION DECONTAMINATION SINKS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
Project Limits
LD IE RF GA AV
Location
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Fire Station Decontamination Sinks Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $80,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the installation of decontamination sinks at the four Fire Stations.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$
80,000
$
80,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 80,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
80,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 202
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
80,000 -
$
80,000
Proposed FY 2025-26
$
-
Total $ $ $
80,000 -
$
80,000
CIP 20-18 TRAINING TOWER ASPHALT REPLACEMENT SS NE IR A F
RD
V AA UT RN CO
K OO BR ST EA
S WA
N UR HB
AV T
Ê
Overview Map
AV
AV CT DI NE BE
IN OB NR DU
OW FL LL BE ER BL
TR
WY LH IA R E
AV
P IM
ON TS BE IB
TW US TR
ST
AV
T ES ER EV
FF RU OD WO
V AA TT IZE
S RY SP
SS NE HI T OR
LN
AV
PROJECT LOCATION MAP
V AA UT RN CO
K OO BR ST EA
A TT IZE AV
Project Limits
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Training Tower Asphalt Replacement Capital Improvement Project No.: 20-18 Account No.: 16796 Total Project Amount: $190,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes replacement of existing asphalt pavement at the Fire Department Training Tower area located at the easterly end of Independence Park.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$ $
175,000 15,000
$
190,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 190,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
190,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 204
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
175,000 15,000 -
$
190,000
Proposed FY 2025-26
$
-
Total $ $ $
190,000 -
$
190,000
TRISTAN DR
BEL LMA AV N
FIFTH ST
BIRCHDALE AV
DOLAN AV
CIP 23-XX CITY HALL AND POLICE DEPARTMENT PAINTING IMPROVEMENTS
FIFTH ST
LA VILLA ST
Overview Map
BROOKSHIRE AV
Ê
DOWNEY AV
NEW ST
FOURTH ST
SECOND ST < PVT.>
THIRD ST
THIRD ST < PVT.>
SECOND ST
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: City Hall and Police Department Painting Improvements Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $95,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes painting improvements at the City Hall and Police Station buildings.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$
95,000
$
95,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 95,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
95,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 206
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
95,000 -
$
95,000
Proposed FY 2025-26
$
-
Total $ $ $
95,000 -
$
95,000
CIP 23-XX DOWNTOWN PARKING STRUCTURE PAINTING IMPROVEMENTS
NEW ST
FOURTH ST
THIRD ST
THIRD ST
THIRD ST < PVT.>
DOWNEY AV
LA REINA AV
Ê
Overview Map
SECOND ST
SECOND ST
MYRTLE ST
SECOND ST < PVT.>
FIRESTONE BL
µ DOLAN AV
Project Limits
PROJECT LOCATION MAP
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Downtown Parking Structure Painting Improvements Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $40,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the painting improvements at the Downtown Parking Structure.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$
40,000
$
40,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 40,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
40,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 208
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
40,000 -
$
40,000
Proposed FY 2025-26
$
-
Total $ $ $
40,000 -
$
40,000
CECILIA ST
SHELLEYFIELD RD
TRISTAN DR
FIFTH ST
BIRCHDALE AV
PARROT AV
WESTERN AV
CIP 23-XX DOWNEY CIVIC THEATRE INTERIOR UPGRADES
LA VILLA ST
MARBEL AV
BROOKSH IRE AV
DOWNEY AV
PATTON RD
DOLAN AV
KOOPMAN AV
IOWA ST
NASH AV
MARGARET ST
OW FL LL BE
µ
IOWA ST
ER
ARNETT ST
BL
Project Limits
L OD B
MCCAHILL ST
PHLOX ST
Overview Map
FIRESTONE BL
NANCE AV
PIVOT ST
THIRD ST
WO LAKE
MYRTLE ST
Ê
THIRD ST < PVT.>
THIRD ST
SECOND ST < PVT.>
SECOND ST
STONEWOOD ST
NEW ST
LA REINA AV
FOURTH ST
PROJECT LOCATION MAP
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Downey Civic Theatre Interior Upgrades Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $80,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes interior upgrades to the Downey Civic Theatre's Green Room, Offices and Hallways.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$
80,000
$
80,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 80,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
80,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 210
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
80,000 -
$
80,000
Proposed FY 2025-26
$
-
Total $ $ $
80,000 -
$
80,000
HONDO ST
ORIZABA AV < PVT.>
MONTGOMERY ST
SPRINGER ST
SAMOLINE AV
HORLEY AV
RICHEON AV
CHAVERS AV
JULIUS AV
POMERING RD
NORLAIN AV
KINGBEE ST
GNEISS AV
CIP 23-XX APOLLO PARK HISTORICAL SOCIETY BUILDING HVAC INSTALLATION
CONRAD ST
HONDO ST QUILL DR
CI TI ZE NS HI P
PROJECT LOCATION MAP
BROCK AV
PARROT AV
DALEN ST
ORILLA AV
SMALLWOOD AV
GROVETREE AV
ERICKSON AV < PVT.>
OLD RIVER SCHOOL RD < PVT.>
LYNDORA ST
CT
LA REINA AV
N SO ER RY AV
Project Limits
LANKIN ST
LEEDS ST
IMPERIAL HWY
AMIGOS AV < PVT.>
Overview Map
GNEISS AV
N
QUOIT ST
ORIZABA AV
PARAMOUNT BL
RIVES AV
D OOL R R SCH
MORNING AV
IVE OLD R L EMILY
Ê
µ
BORSON ST
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Apollo Park Historical Society Building HVAC Installation Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $70,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the installation of a new Heating, Ventilation and Air Conditioning (HVAC) sytem at the Apollo Park Historical Society building.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$
70,000
$
70,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 70,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
70,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 212
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
70,000 -
$
70,000
Proposed FY 2025-26
$
-
Total $ $ $
70,000 -
$
70,000
CIP 23-xx STREET DIVISION BUILDING FRONT ENTRANCE IMPROVEMENTS RD OO BR ST EA
N UR HB S WA
K AV
V AA TT IZE
T
Ê
Overview Map
AV CT DI NE BE
BL
AV
ER
IN OB NR DU
OW FL LL BE
Y
AV
R DA ED H C
ON TS BE IB
K OO BR LD CO AV
OR MO EN AD AV
PROJECT LOCATION MAP
W LH IA ER
V AA UT RN CO
P IM
Project Limits
TS
AV FF RU OD WO
RY SP
ES ER EV
ST
ST ST E RE Y O FW AD 05 I-1 Y FW MP RA
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Street Division Building Front Entrance Improvements Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $85,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the the removal and reconstruction of the Public Works Street Division's building front entrance.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$
85,000
$
85,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 85,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
85,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 214
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
85,000 -
$
85,000
Proposed FY 2025-26
$
-
Total $ $ $
85,000 -
$
85,000
CIP 23-XX MAINTENANCE YARD BAY DOOR REPLACEMENT RD OO BR ST EA
N UR HB S WA
K AV
V AA TT IZE
T
Ê
Overview Map
AV CT DI NE BE
BL
AV
ER
IN OB NR DU
OW FL LL BE
Y
AV
R DA ED H C
ON TS BE IB
K OO BR LD CO AV
OR MO EN AD AV
PROJECT LOCATION MAP
W LH IA ER
V AA UT RN CO
P IM
Project Limits
TS
AV FF RU OD WO
RY SP
ES ER EV
ST
ST ST E RE Y O FW AD 05 I-1 Y FW MP RA
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Maintenance Yard Bay Door Replacement Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $100,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the replacement of two bay doors at the Public Works Maintenance Yard.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
Funding Source Fund 40 (Capital Project) Fund ## (insert fund name) Total
-
$
-
Proposed FY 2022-23
$
100,000
$
100,000
Proposed FY 2023-24
$
-
Budgeted FY 2021-22 $ -
Proposed FY 2022-23 $ 100,000
Proposed FY 2023-24
$
$
$
-
100,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 216
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
100,000 -
$
100,000
Proposed FY 2025-26
$
-
Total $ $ $
100,000 -
$
100,000
CIP 23-XX MAINTENANCE YARD PARKING LOT RESURFACING RD OO BR ST EA
N UR HB S WA
K AV
V AA TT IZE
T
Ê
Overview Map
AV CT DI NE BE
BL
AV
ER
IN OB NR DU
OW FL LL BE
Y
AV
R DA ED H C
ON TS BE IB
K OO BR LD CO AV
OR MO EN AD AV
PROJECT LOCATION MAP
W LH IA ER
V AA UT RN CO
P IM
Project Limits
TS
AV FF RU OD WO
RY SP
ES ER EV
ST
ST ST E RE Y O FW AD 05 I-1 Y FW MP RA
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Maintenance Yard Parking Lot Resurfacing Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $200,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the resurfacing of the existing asphalt pavement parking lot at the Public Works Maintenance Yard.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$
200,000
$
200,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 200,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
200,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 218
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
200,000 -
$
200,000
Proposed FY 2025-26
$
-
Total $ $ $
200,000 -
$
200,000
CIP 23-XX MAINTENANCE MANAGEMENT SOFTWARE RD OO BR ST EA
N UR HB S WA
K AV
V AA TT IZE
T
Ê
Overview Map
AV CT DI NE BE
BL
AV
ER
IN OB NR DU
OW FL LL BE
Y
AV
R DA ED H C
ON TS BE IB
K OO BR LD CO AV
OR MO EN AD AV
PROJECT LOCATION MAP
W LH IA ER
V AA UT RN CO
P IM
Project Limits
TS
AV FF RU OD WO
RY SP
ES ER EV
ST
ST ST E RE Y O FW AD 05 I-1 Y FW MP RA
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Maintenance Management Software Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $63,750
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the acquisition of new maintenance management software for the Public Works Maintenance Division.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$
63,750
$
63,750
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 63,750
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
63,750
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 220
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
63,750 -
$
63,750
Proposed FY 2025-26
$
-
Total $ $ $
63,750 -
$
63,750
CIP 18-08 MAINTENANCE YARD FUEL DISPENSER CANOPY PROJECT FF RU OD WO AV
V AA UT RN CO
RD
K OO BR ST EA
N UR HB S WA
AV
V AA TT IZE
S RY SP
T ES ER EV
T
Ê
AV CT DI NE BE
BL
µ AV
V AA TT IZE
K OO BR LD AV CO
PROJECT LOCATION MAP
WY LH IA R E
K OO BR ST EA
P IM
Project Limits
Overview Map
AV
ER
TR
IN OB NR DU
OW FL LL BE TW US TR
S ES IN TH R O
ST
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Maintenance Yard Fuel Dispenser Canopy Project Capital Improvement Project No.: 18-08 Account No.: 16723 Total Project Amount: $200,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $21,725 $0
This project includes installation of a new Fuel Dispenser Canopy at the Maintenance Yard.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23 $ $
25,000 150,000
$
175,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 175,000
Proposed FY 2023-24
Fund 40 (Capital Project Fund)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
175,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 222
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
25,000 150,000 -
$
175,000
Proposed FY 2025-26
$
-
Total $ $ $
175,000 -
$
175,000
CIP 23-XX THEATRE STAGE ELECTRICAL PANELS AND UPGRADES THIRD ST
THIRD ST < PVT.>
Ê
Overview Map
BROOKSH IRE AV
SECOND ST
Project Limits
DOLAN AV
FIRESTONE BL
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Theatre Stage Electrical Panels and Upgrades Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $75,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes the upgrade of the existing and installation of new electrial panels for the Civic Theatre stage.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23
$ $
70,000 5,000
$
75,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 75,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
75,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 224
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
70,000 5,000 -
$
75,000
Proposed FY 2025-26
$
-
Total $ $ $
75,000 -
$
75,000
FIFTH ST
TRISTAN DR
FIFTH ST
BIRCHDALE AV
DOLAN AV
CIP 23-XX CIVIC CENTER PARKING LOT IMPROVEMENTS
LA VILLA ST
Project Limits
Overview Map
SECOND ST
FIRESTONE BL
PROJECT LOCATION MAP
PATTON RD
SECOND ST < PVT.>
THIRD ST < PVT.>
DOLAN AV
THIRD ST
Ê
BROOKSH IRE AV
RESPONSIBILITY RW
DOWNEY AV
LA REINA AV
NEW ST
FOURTH ST
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Public Facility Improvements Project Title: Civic Center Parking Lot Improvements Capital Improvement Project No.: 23-XX Account No.: NEW Total Project Amount: $125,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2022 6/30/2023 $0 $0
This project includes pavement repairs of the Civic Center parking lots. Repair work consists of tree replacements; repair of concrete curbs, gutters, and sidewalks; miscellaneous asphalt repairs; slurry seal of the pavement and new striping.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration Total
$
-
$
-
Proposed FY 2022-23 $ $ $
15,000 95,000 15,000
$
125,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 125,000
Proposed FY 2023-24
Fund 40 (Capital Project)
Budgeted FY 2021-22 $ -
Total
$
$
$
Funding Source
-
125,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 226
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
15,000 95,000 15,000 -
$
125,000
Proposed FY 2025-26
$
-
Total $ $ $
125,000 -
$
125,000
WATER UTILITY
CAPITAL IMPROVEMENT PROGRAM Water Utility Each year, the City’s aging water infrastructure is reassessed against current policies and programs in order to prioritize and develop a list of water rehabilitation and replacement projects necessary to continue providing high quality, reliable water service and fire protection. The following Water Utility CIP represents the FY 2021-2022 through FY 2025-26 funding necessary for the planning, design, construction, and administration of potable and recycled water distribution and supply system improvement projects necessary to continue meeting the demands of the City’s water customers into the future. The scope of the proposed water improvements includes, but is not limited to: installation of new water mains, valves and associated fittings; replacement of existing and installation of new fire hydrants; installation of new copper water service lines; replacement of old water meters with new remote-read advanced water meters; abandoning of redundant, undersized water mains, remediation of contaminated soil and groundwater; construction of new groundwater wells; rehabilitation of existing groundwater wells; and control system upgrades. $18.7 million is programmed in the CIP for water projects.
Groundwater Well Rehabilitation
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 230
Water Piping
CAPITAL IMPROVEMENT PROGRAM Water Utility Five Year Projections
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 232
WATER WELL REFURBISHMENT PROGRAM
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Citywide
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: Water Well Refurbishment Program Capital Improvement Project No.: N/A Account No.: 18642 Total Project Amount: $2,750,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2017 6/30/2026 $507,134 $0
This project includes refurbishment of groundwater wells such as rehabilitation of pumps, motors, replacement of aging parts, water quality testing and installation of new equipment/materials.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
Design Construction Construction Engineering and Administration
$
129,513
$ $ $
50,000 400,000 50,000
$ $ $
50,000 400,000 50,000
$ $ $
50,000 400,000 50,000
$ $ $
50,000 400,000 50,000
$ $ $
50,000 400,000 50,000
$ 250,000 $ 2,000,000 $ 250,000 $ -
Total
$
129,513
$
500,000
$
500,000
$
500,000
$
500,000
$
500,000
$ 2,500,000
Fund 51 (Water)
Budgeted FY 2021-22 $ 500,000
Proposed FY 2022-23 $ 500,000
Proposed FY 2023-24 $ 500,000
Proposed FY 2024-25 $ 500,000
Proposed FY 2025-26 $ 500,000
Total
$
$
$
$
$
Funding Source
500,000
500,000
500,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 234
500,000
500,000
Total
Total $ 2,500,000 $ $ $ 2,500,000
TELEMETRY SYSTEM MODIFICATIONS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
Citywide
LD IE RF GA AV
Location
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: Telemetry System Modifications Capital Improvement Project No.: N/A Account No.: 18647 Total Project Amount: $600,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $0 $0
This project includes development, furnishing, installation and integration of a new Supervisory Control and Data Acquisition (SCADA) system for the City's potable water system.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22 $ $ $
50,000 500,000 50,000
$
600,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 51 (Water)
Budgeted FY 2021-22 $ 600,000
Total
$
$
Funding Source
600,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 236
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
50,000 500,000 50,000 -
$
600,000
Proposed FY 2025-26
$
-
Total $ $ $
600,000 -
$
600,000
CC 686B/C NEW WATER WELLS NO.27 AND NO.28 NASH AV
BROOKSHIRE AV
TRISTAN DR
PATTON RD
BELLMAN AV
BIRCHDALE AV
BARLIN AV
PLANETT AV
GLYNN AV
DOLAN AV < PVT.>
DOWNEY AV
VULTEE AV
DOLAN AV
LAKEWOOD BL
GURLEY AV CALADRE AV
ANDER BERG AV ORIZABA AV < PVT.>
BROCK AV
T
MP RA
A LL V CI YA IS T H R S P A LE
AV AN IG GE ID RR BR CO AN AV S ST ER TG RU AV
PROJECT LOCATION MAP
0 I-1
WY 5F
Y FW
S LL GE AN
ST
LL BE CA AV
MEADOW RD
AV
ORIZAB A AV
PARROT AV
ST ST N N LE SO DA OR B
RE IE EM PR AVER L FID AV
GNEISS AV
SAMOLINE LN
MORNING AV
PARAMOUNT BL
HORLEY AV
RICHEON AV
JULIUS AV
CHAVERS AV
SMALLWOOD AV
RIVES AV
POMERING RD
NORLAIN AV
SAMOLINE AV
S ME JA ST
S DI AR
LYNDORA ST
EE OR AD
WY V IA YA MB LE LU W CO CO
IMPERIAL HWY
DONOVAN ST
E IR SH EN D GL R
Project Limits
MEADOW RD < PVT.>
T
R DA ED T H S C
AV
LEEDS ST
LANKIN ST
EVEREST ST
MORY ST
SS NE HI T OR TW TR US R T
SE RO
N SO ER V RY A
EMILY LN
QUOIT ST
EUCALYPTUS ST
BELLDER DR VERDURA AV
MYRTLE ST
HORTON AV
MAC GOVERN AV
ADCO AV
HARO AV OLD RIVER SCHOOL RD
CONRAD ST
BOYSON ST
S RY SP
SS NE IR FA LN T ES ER T V E S
AV CT DI NE BE
QUILL DR
ALBIA ST
ALAMEDA ST
Overview Map
AV
HONDO ST
ORANGE ST
BOYNE ST
Ê
RD
IN OB NR DU
SPRINGER ST
CAVEL ST
DUESLER ST
S WA
V AA TT IZE
KINGBEE ST
BYERS ST
BL
MELVA ST
MCCALLUM ST
BYERS AV
VI
N UR HB
ETT AV BLODG
RUNDELL ST
BERGMAN LN
NADA ST
AV
COREY ST
COLE ST
M EL
R AD ST
ER
BRUNACHE ST
SARA B ETH ST YANKEY ST
& GRAY RD STEWART
M DE
EL MAR B
LAURA ST
NADA ST < PVT.>
FONTANA ST
AV ING
OW FL LL BE
NADA ST
FONTANA ST < PVT.>
BUCKLES ST
V AA UT AV K RN CO OO BR ST EA
DE PALMA ST
CLETA ST
AV
LUXOR ST
MAN ATEE ST
AV
BROOKMILL RD < PVT.>
BENAR ES ST
GALT DR
FF RU OD WO
BROOKMILL RD
DAVIS ST
TEXAS ST
RD LL HA
EW
ADWEN ST
MARGARET ST
IOWA ST
V KA OO BR AV LD OR CO MO EN AD
NEO ST
AV PRUESS
ARNETT ST
PHLOX ST
NANCE AV
VI NT GE RE
BURNS AV
PIVOT ST
FIRESTONE BL NANCE AV
µ
ER ST FO
RD
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: New Water Wells No. 27 and No. 28 Capital Improvement Project No.: CC686B/C Account No.: 18665 Total Project Amount: $8,000,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2017 6/30/2023 $90,316 $0
Phase 1 includes design and construction/drilling of Wells 27 (7926 Springer Street) and 28 (Utilities Yard located at 9252 Stewart & Gray Road). Phase 2 includes design and construction/equipping of Wells 27 and 28 .
Design Construction Construction Engineering and Administration
Estimated Expenditures FY 2020-21 $ 3,680
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
$ 100,000 $ 3,750,000 $ 150,000
$ 3,750,000 $ 250,000
$ 4,000,000
$ 4,000,000
$
Proposed FY 2022-23 $ 4,000,000
Proposed FY 2023-24
Fund 51 (Water)
Budgeted FY 2021-22 $ 4,000,000
Total
$ 4,000,000
$ 4,000,000
$
Total
$
Funding Source
3,680
Proposed FY 2024-25
Proposed FY 2025-26
Total $ 100,000 $ 7,500,000 $ 400,000 $ -
-
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 8,000,000
Total $ 8,000,000 $ $ -
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 238
-
$
-
$
-
$ 8,000,000
WELL/YARD SITE SECURITY
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
Citywide
LD IE RF GA AV
Location
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: Well/Yard Site Security Capital Improvement Project No.: N/A Account No.: 18666 Total Project Amount: $475,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2017 6/30/2026 $21,318 $0
This project includes replacement of basic security measures such as gates and perimeter fencing at the Utilities Yard and ground water well sites.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$ $ $
2,000 45,000 3,000
$ $ $
5,000 90,000 5,000
$ $ $
5,000 90,000 5,000
$ $ $
5,000 90,000 5,000
$ $ $
5,000 90,000 5,000
$ $ $ $
22,000 405,000 23,000 -
$
50,000
$
100,000
$
100,000
$
100,000
$
100,000
$
450,000
Fund 51 (Water)
Budgeted FY 2021-22 $ 50,000
Proposed FY 2022-23 $ 100,000
Proposed FY 2023-24 $ 100,000
Proposed FY 2024-25 $ 100,000
Proposed FY 2025-26 $ 100,000
Total
$
$
$
$
$
Funding Source
50,000
100,000
100,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 240
100,000
100,000
Total
Total $ $ $
450,000 -
$
450,000
WATER SYSTEM IMPROVEMENT PROGRAM
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Citywide
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: Water System Improvement Program Capital Improvement Project No.: N/A Account No.: 18674 Total Project Amount: $11,000,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2017 6/30/2026 $377,327 $0
This project includes the removal, replacement and rehabilitation of existing and installation of new water service lines, meters, boxes, mains, hydrants and other water system facilties.
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
Design Construction Construction Engineering and Administration
Estimated Expenditures FY 2020-21 $ 5,000 $ 104,277 $ 5,000
$ $ $
40,000 400,000 60,000
$ 250,000 $ 2,000,000 $ 250,000
$ 250,000 $ 2,000,000 $ 250,000
$ 250,000 $ 2,000,000 $ 250,000
$ 250,000 $ 2,000,000 $ 250,000
$ $ $ $
Total
$
$
500,000
$ 2,500,000
$ 2,500,000
$ 2,500,000
$ 2,500,000
$ 10,500,000
Fund 51 (Water)
Budgeted FY 2021-22 $ 500,000
Proposed FY 2022-23 $ 2,500,000
Proposed FY 2023-24 $ 2,500,000
Proposed FY 2024-25 $ 2,500,000
Proposed FY 2025-26 $ 2,500,000
Total
$
$ 2,500,000
$ 2,500,000
$ 2,500,000
$ 2,500,000
Funding Source
114,277
500,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 242
Total 1,040,000 8,400,000 1,060,000 -
Total $ 10,500,000 $ $ $ 10,500,000
CIP 17-01 SITE ENVIRONMENTAL REMEDIATION/GROUNDWATER PROTECTION AT 9255 IMPERIAL HIGHWAY
Ê
P IM
Overview Map
Y HW AL I ER
S DI AR AV
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: Site Environmental Remediation/Groundwater Protection at 9255 Imperial Highway Capital Improvement Project No.: 17-01 Account No.: 16583 Total Project Amount: $1,650,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2017 6/30/2025 $311,178 $0
This project includes remediation of contaminated soil and groundwater at 9255 Imperial Highway to protect groundwater sources from the spread of contamination as required by the California Regional Water Quality Control Board.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Design Construction Construction Engineering and Administration
$
146,833
$ $
325,000 25,000
$ $
275,000 25,000
$ $
275,000 25,000
$ $
275,000 25,000
Total
$
146,833
$
350,000
$
300,000
$
300,000
$
300,000
Proposed FY 2025-26
$ $ 1,150,000 $ 100,000 $ $
-
Proposed FY 2022-23 $ 300,000
Proposed FY 2023-24 $ 300,000
Proposed FY 2024-25 $ 300,000
Proposed FY 2025-26
Fund 51 (Water)
Budgeted FY 2021-22 $ 350,000
Total
$
$
$
$
$
Funding Source
350,000
300,000
300,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 244
300,000
Total
$ 1,250,000
Total $ 1,250,000 $ $ -
-
$ 1,250,000
CIP 18-10 BELLFLOWER BOULEVARD WATER SYSTEM IMPROVEMENTS
LAKEWOOD BL
PROJECT LOCATION MAP
BARLIN AV
LL GE N A
ST
ST
VULTEE AV
TRISTAN DR
BELLMAN AV
PATTON RD
BROOKSHIRE AV
BIRCHDALE AV
GLYNN AV
PLANETT AV
BELLDER DR
VERDURA AV
RE IE EM PR AV R LE FID AV
DOLAN AV
V YA AH LE
ST
ER ST FO
RD
AV
DOLAN AV < PVT.>
CALADRE AV
ANDER BERG AV ORIZABA AV < PVT.>
DOWNEY AV
Y W 5F
AV AN IG V A RR GE CO ID BR V AN SA ST ER TG RU
AV
GNEISS AV
0 I-1
MP RA
EE OR AD
LL BE CA
ORIZABA AV
ST ST N N LE SO A R D O B
Overview Map
LN C D AR OO W F EL B AX R M AV U O A C L S ST AN ST A L BR L CI FA IS U PR ST AV
AV
P IM
Y HW AL I ER
S DI AR
MEADOW RD
ON TS BE IB
S ME JA ST
AY E IR PW KI DR SH EN D GL R
LYNDORA ST
Y FW
WY IA V D MB YA OO LU W LE CO W IT E CO WH AV
MEADOW RD < PVT.>
DONOVAN ST
Ê
AV
SPRINGER ST
EVEREST ST
Project Limits
AV
T MORY S
EUCALYPTUS ST
LEEDS ST
R DA ED T H S C
AV
LANKIN ST
MELVA ST
SE RO
QUOIT ST
BOYSON ST
BLODGETT AV
ALAMEDA ST
TW US TR
TR
T ES ER EV ST
ST
IN OB NR DU
ALBIA ST
SS NE HI T OR
RY SP
LN
SS NE IR A F
AV CT DI NE BE
BL
MAR BEL AV
BOYNE ST
DO HON ST
ER
BYERS ST
RD
N UR HB S WA
FF RU OD WO
MCCALLUM ST
CAVEL ST
DUESLER ST
DR TA
V AA TT IZE
NADA ST
BYERS AV
BRUNACHE ST
M EL
VIS
OW FL LL BE
COLE ST
M DE
AV ING
CA AA SE ST
BE LC HE R
DOLAN AV
MAC GOVERN AV
GURLEY AV
FONTANA ST & GRAY RD STEWART
FONTANA ST < PVT.>
BUCKLES ST
V AA UT AV RN K CO OO BR ST EA
DE PALMA ST
LA REINA AV
CLETA ST
AV RN BO NG PA
MAN ATEE ST
LUXOR ST
V KA OO BR LD AV CO OR
GALT DR
MO EN AD
TEXAS ST
ORANGE ST
RD LL HA
DAVIS ST
W V IE NT GE AV RE
IOWA ST
ARNETT ST
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: Bellflower Boulevard Water System Improvements Capital Improvement Project No.: 18-10 Account No.: 18680 Total Project Amount: $1,050,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2023 $0 $0
This project includes removal, replacement and rehabilitation of existing and installation of new water service lines, meters, boxes, mains, hydrants and other water system facilities on Bellflower Boulevard from Foster Road to Hall Road.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Budgeted FY 2021-22 $
Proposed FY 2022-23
$
Proposed FY 2025-26
900,000 100,000
$ 1,000,000
$
Proposed FY 2022-23 $ 1,000,000
Proposed FY 2023-24
Fund 51 (Water)
Budgeted FY 2021-22 $ 50,000
Total
$
$ 1,000,000
$
50,000
Total $ $ $ $
50,000
Funding Source
-
Proposed FY 2024-25
50,000 $ $
$
Proposed FY 2023-24
-
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
50,000 900,000 100,000 -
$ 1,050,000
Total $ 1,050,000 $ $ -
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 246
-
$
-
$
-
$ 1,050,000
CIP 19-03 PELLET STREET AND RYERSON AVENUE WATER SYSTEM IMPROVEMENTS
FOURTH PL
RIO FLORA PL
RYERSON AV
PELLET ST
THIRD
ST Overview Map
OLD RIVER SCHOOL RD
PERNELL AV
Ê
FIRESTONE PL
DINWIDDIE ST
Project Limits
PROJECT LOCATION MAP
µ
E ON ST E R FI
BL
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: Pellet Street and Ryerson Avenue Water System Improvements Capital Improvement Project No.: 19-03 Account No.: 18684 Total Project Amount: $950,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2022 $0 $0
This project includes removal, replacement and rehabilitation of existing and installation of new water service lines, meters, boxes, mains, hydrants and other water system facilities on Pellet Street from Ryerson Avenue to Old River School Road and Ryerson Avenue from Dinwiddie Street to Rio Flora Place. Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22 $ $ $
50,000 800,000 100,000
$
950,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 51 (Water)
Budgeted FY 2021-22 $ 950,000
Total
$
$
Funding Source
950,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 248
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
50,000 800,000 100,000 -
$
950,000
Proposed FY 2025-26
$
-
Total $ $ $
950,000 -
$
950,000
CIP 20-31 DESTRUCTION OF WATER WELLS NOS. 1, 3, 20 & 27A
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Citywide
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: Destruction of Water Wells Nos. 1, 3, 20 and 27A Capital Improvement Project No.: 20-31 Account No.: 18689 Total Project Amount: $200,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2022 $0 $0
This project includes the destruction of abandoned Water Wells Nos. 1, 3, 20 and 27A in accordance to regulatory requirements.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22 $ $ $
20,000 160,000 20,000
$
200,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 51 (Water)
Budgeted FY 2021-22 $ 200,000
Total
$
$
Funding Source
200,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 250
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
20,000 160,000 20,000 -
$
200,000
Proposed FY 2025-26
$
-
Total $ $ $
200,000 -
$
200,000
CIP 21-12 3RD STREET WATER SYSTEM IMPROVEMENTS FOURTH ST
FOSTORIA ST
SMALLWOOD AV
PARAMOUNT BL
FOURTH PL
Ê
Overview Map
RIVES AV
THIRD ST THIRD ST
SECOND ST
SECOND ST
Project Limits
FIRESTONE BL
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: 3rd Street Water System Improvements Capital Improvement Project No.: 21-12 Account No.: 18630 Total Project Amount: $1,000,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $0 $0
This project includes removal, replacement and rehabilitation of existing and installation of new water service lines, meters, boxes, mains, hydrants and other water system facilities on 3rd Street from Rives Avenue to Paramount Boulevard.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Budgeted FY 2021-22 $ $ $
$
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
100,000 750,000 150,000
Total $ $ $ $
$ 1,000,000
$
Proposed FY 2022-23
Fund 51 (Water)
Budgeted FY 2021-22 $ 1,000,000
Total
$ 1,000,000
$
Funding Source
-
Proposed FY 2022-23
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
100,000 750,000 150,000 -
$ 1,000,000
Total $ 1,000,000 $ $ -
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 252
-
$
-
$
-
$ 1,000,000
DINSDALE ST
FLORENCE AV
PARAMOUNT BL
DINSDA LE ST
HOPELAND AV
Ê AV FLORENCE
ELEVENTH ST LEXINGTON RD
DOWNEY AV
VIA AMORITA
PROJECT LOCATION MAP
BIGBY ST
PVT RD
MANZANAR AV
DOLAN AV
BIGBY AV
STAMPS RD
WESTERN AV
SAMOLINE AV
MORNING AV
RIVES AV
Project Limits
FARM ST
LA REINA AV
VIA AMORITA
BAYSINGER ST
TENTH ST
BAYSINGER ST
IRWINGROVE DR
Overview Map
TRISTAN DR
OTTO ST
FARM ST
CHEROKEE DR
BELLMAN AV
TWEEDY LN
AV SMALLWOOD
OTTO ST
DACOSTA ST
PAR ROT AV
DACOSTA ST
BROOKSHIRE AV
GAINFORD ST
GAINFORD ST
LUBEC ST
BIRCHDALE AV
LUBEC ST
LUBEC ST < PVT.>
BELLDER DR
STAMPS AV
BROCK AV
ORIZABA AV
CHARLOMA DR
MAN ZA NAR AV
CIP 20-34 FLORENCE AVENUE WATER SYSTEM IMPROVEMENTS
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: Florence Avenue Water System Improvements Capital Improvement Project No.: 20-34 Account No.: 18631 Total Project Amount: $2,100,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $2,025,000 $0
This project includes removal, replacement and rehabilitation of existing and installation of new water service lines, meters, boxes, mains, hydrants and other water system facilities on Florence Avenue from Tweedy Lane to Brookshire Avenue.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Design Construction Construction Engineering and Administration
$
2,025,000
$ $
65,000 10,000
Total
$
2,025,000
$
75,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 51 (Water)
Budgeted FY 2021-22 $ 75,000
Total
$
$
Funding Source
75,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 254
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
65,000 10,000 -
$
75,000
Proposed FY 2025-26
$
-
Total $ $ $
75,000 -
$
75,000
CIP 21-14 COLE STREET WATER SYSTEM IMPROVEMENTS STEWART
& GRAY RD
NADA ST
BROOKSHIRE AV
Ê
Overview Map
PATTON RD
COLE ST
BYERS AV
Project Limits
PROJECT LOCATION MAP
BYERS ST
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: Cole Street Water System Improvement Capital Improvement Project No.: 21-14 Account No.: 18633 Total Project Amount: $500,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $0 $0
This project includes removal, replacement and rehabilitation of existing and installation of new water service lines, meters, boxes, mains, hydrants and other water system facilities on Cole Street from Brookshire Avenue to Patton Road.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22 $ $ $
25,000 450,000 25,000
$
500,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 51 (Water)
Budgeted FY 2021-22 $ 500,000
Total
$
$
Funding Source
500,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 256
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
25,000 450,000 25,000 -
$
500,000
Proposed FY 2025-26
$
-
Total $ $ $
500,000 -
$
500,000
LAKEWOOD BL
BROOKSHIRE AV
FIFTH ST
HALEDON AV
CLANCEY AV
Ê
SHELLEYFIELD RD
TRISTAN DR
MULLER ST
SIXTH ST
LA REINA AV
GOTHAM ST
ARRINGTON AV
BELLMAN AV
BIRCHDALE AV
QUINN ST
PLANETT AV
DOLAN AV
SEVENTH ST
NEDRA AV
WESTERN AV
DOWNEY AV
STAMPS RD
CHEROKEE DR
VULTEE AV
CIP 21-15 FIFTH STREET WATER SYSTEM IMPROVEMENTS
Overview Map
CECILIA ST
NEW ST
FOURTH ST
THIRD ST
SECOND ST < PVT.>
MARBEL AV
SECOND ST
THIRD ST
THIRD ST < PVT.>
Project Limits
PROJECT LOCATION MAP
STONEWOOD ST
LA VILLA ST
µ
FIRESTONE BL
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: 5th Street Water System Improvements Capital Improvement Project No.: 21-15 Account No.: 18634 Total Project Amount: $1,200,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $0 $0
This project includes removal, replacement and rehabilitation of existing and installation of new water service lines, meters, boxes, mains, hydrants and other water system facilities on 5th Street from Downey Avenue to Lakewood Boulevard.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2024-25
Proposed FY 2025-26
$ 100,000 $ 1,000,000 $ 100,000 $
-
Total $ 100,000 $ 1,000,000 $ 100,000 $ -
$ 1,200,000
$
Proposed FY 2022-23
Fund 51 (Water)
Budgeted FY 2021-22 $ 1,200,000
Total
$ 1,200,000
$
Funding Source
Proposed FY 2023-24
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 1,200,000
Total $ 1,200,000 $ $ -
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 258
-
$
-
$
-
$ 1,200,000
CIP 21-25 WELL NO. 4 TREATMENT IMPROVEMENTS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: Well No. 4 Treatment Improvements Capital Improvement Project No.: 21-25 Account No.: 18691 Total Project Amount: $4,000,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $0 $0
This project includes the design and constuction of a PFAS wellhead treatment system and associated site improvements.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2024-25
Proposed FY 2025-26
$ 281,000 $ 3,400,000 $ 319,000 $
-
Total $ 281,000 $ 3,400,000 $ 319,000 $ -
$ 4,000,000
$
Proposed FY 2022-23
Fund 26 (American Rescue Plan)
Budgeted FY 2021-22 $ 4,000,000
Total
$ 4,000,000
$
Funding Source
Proposed FY 2023-24
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 4,000,000
Total $ 4,000,000 $ $ -
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 260
-
$
-
$
-
$ 4,000,000
CIP 21-26 WELL NO. 11 TREATMENT IMPROVEMENTS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: Well No. 11 Treatment Improvements Capital Improvement Project No.: 21-26 Account No.: 18692 Total Project Amount: $4,000,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $0 $0
This project includes the design and constuction of a PFAS wellhead treatment system and associated site improvements.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2024-25
Proposed FY 2025-26
$ 293,000 $ 3,400,000 $ 307,000 $
-
Total $ 293,000 $ 3,400,000 $ 307,000 $ -
$ 4,000,000
$
Proposed FY 2022-23
Fund 26 (American Rescue Plan)
Budgeted FY 2021-22 $ 4,000,000
Total
$ 4,000,000
$
Funding Source
Proposed FY 2023-24
-
$
-
Proposed FY 2023-24
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 4,000,000
Total $ 4,000,000 $ $ -
-
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 262
-
$
-
$
-
$ 4,000,000
CIP 21-27 WELL NO. 2 TREATMENT IMPROVEMENTS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: Well No. 2 Treatment Improvements Capital Improvement Project No.: 21-27 Account No.: 18677 Total Project Amount: $3,812,500
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2023 $0 $0
This project includes the design and constuction of a PFAS wellhead treatment system and associated site improvements.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Budgeted FY 2021-22 $
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2025-26
312,500
-
$
312,500
$ 3,500,000
$
Proposed FY 2022-23 $ 3,500,000
Proposed FY 2023-24
Fund 26 (American Rescue Plan)
Budgeted FY 2021-22 $ 312,500
Total
$
$ 3,500,000
$
312,500
Total $ 312,500 $ 3,300,000 $ 200,000 $ -
$ 3,300,000 $ 200,000 $
Funding Source
Proposed FY 2024-25
-
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 3,812,500
Total $ 3,812,500 $ $ -
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 264
-
$
-
$
-
$ 3,812,500
CIP 21-28 WELL NO. 10 TREATMENT IMPROVEMENTS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Project Limits
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: Well No. 10 Treatment Improvements Capital Improvement Project No.: 21-28 Account No.: 18678 Total Project Amount: $3,812,500
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2023 $0 $0
This project includes the design and constuction of a PFAS wellhead treatment system and associated site improvements.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
Budgeted FY 2021-22 $
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2025-26
312,500
-
$
312,500
$ 3,500,000
$
Proposed FY 2022-23 $ 3,500,000
Proposed FY 2023-24
Fund 26 (American Rescue Plan)
Budgeted FY 2021-22 $ 312,500
Total
$
$ 3,500,000
$
312,500
Total $ 312,500 $ 3,300,000 $ 200,000 $ -
$ 3,300,000 $ 200,000 $
Funding Source
Proposed FY 2024-25
-
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 3,812,500
Total $ 3,812,500 $ $ -
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 266
-
$
-
$
-
$ 3,812,500
FIFTH ST
AN AV
BIRCHDALE AV
FERN LN < PVT.>
LA VILLA ST
FOURTH ST
LA REINA AV
SMALLWOOD AV
PARAMOUNT BL
CECILIA ST
BUELL ST
SIXTH ST
FOURTH PL
Ê THIRD ST < PVT.>
DOWNEY AV
THIRD ST
Overview Map
BROOKSHIR E AV
JACARANDA LN < PVT.>
OLIVE LN < PVT.>
NEW ST
SIXTH ST
BEL LM
PRIVET LN < PVT.>
WESTERN AV
PARROT AV
CIP 22-13 3RD STREET WATER SYSTEM IMPROVEMENTS
SECOND ST < PVT.>
MYRTLE ST
SECOND ST
Project Limits
SAMOLINE AV
PRUESS AV
BURNS AV
PHLOX ST
PIVOT ST
PROJECT LOCATION MAP
PATTON RD
NANCE AV
DOLAN AV
FIRESTONE BL
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Water Improvements Project Title: 3rd Street Water System Improvements Capital Improvement Project No.: 22-13 Account No.: 18676 Total Project Amount: $1,300,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2023 $0 $0
This project includes removal, replacement and rehabilitation of existing and installation of new water service lines, meters, boxes, mains, hydrants and other water system facilities on 3rd Street from Paramount Boulevard to Civic Center Drive.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Proposed FY 2022-23
$
100,000
$ 20,000 $ 1,100,000 $ 80,000
$
100,000
$ 1,200,000
$
Proposed FY 2022-23 $ 1,200,000
Proposed FY 2023-24
Fund 51 (Water)
Budgeted FY 2021-22 $ 100,000
Total
$
$ 1,200,000
$
Design Construction Construction Engineering and Administration Total
$
Funding Source
-
100,000
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
Total $ 120,000 $ 1,100,000 $ 80,000 $ -
-
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$ 1,300,000
Total $ 1,300,000 $ $ -
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 268
-
$
-
$
-
$ 1,300,000
SEWER AND STORM DRAIN
CAPITAL IMPROVEMENT PROGRAM Sewer and Storm Drain Each year, the City’s aging water infrastructure is reassessed against current policies and programs in order to prioritize and develop a list of water rehabilitation and replacement projects necessary to continue providing high quality, reliable water service and fire protection. The following Water Utility CIP represents the FY 2021-2022 through FY 2025-26 funding necessary for the planning, design, construction, and administration of potable and recycled water distribution and supply system improvement projects necessary to continue meeting the demands of the City’s water customers into the future. The scope of the proposed water improvements includes, but is not limited to: installation of new water mains, valves and associated fittings; replacement of existing and installation of new fire hydrants; installation of new copper water service lines; replacement of old water meters with new remote-read advanced water meters; abandoning of redundant, undersized water mains, remediation of contaminated soil and groundwater; construction of new groundwater wells; rehabilitation of existing groundwater wells; and control system upgrades. $18.7 million is programmed in the CIP for water projects.
Sewer Manhole
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 272
Sewer Lining
CAPITAL IMPROVEMENT PROGRAM Sewer and Storm Drain Five Year Projections
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 274
SEWER MAIN REHABILITATION & REPAIR PROGRAM
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Citywide
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Sewer Improvements Project Title: Sewer Main Rehabilitation & Repair Program Capital Improvement Project No.: N/A Account No.: 13999 Total Project Amount: $5,350,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2015 6/30/2026 $742,865 $0
This project includes rehabilitation and/or repair of sewer mains and associated facilities.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
Design Construction Construction Engineering and Administration
$
149,868
$
900,000
$
850,000
$
850,000
$ 1,000,000
$ 1,000,000
Total
$
149,868
$
900,000
$
850,000
$
850,000
$ 1,000,000
$ 1,000,000
Fund 72 (Sewer)
Budgeted FY 2021-22 $ 900,000
Proposed FY 2022-23 $ 850,000
Proposed FY 2023-24 $ 850,000
Proposed FY 2024-25 $ 1,000,000
Proposed FY 2025-26 $ 1,000,000
Total
$
$
$
$ 1,000,000
$ 1,000,000
Funding Source
900,000
850,000
850,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 276
Total $ $ 4,600,000 $ $ $ 4,600,000
Total $ 4,600,000 $ $ $ 4,600,000
SEWER CCTV INSPECTION PROGRAM
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
Citywide
LD IE RF GA AV
Location
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Sewer Improvements Project Title: Sewer CCTV Inspection Program Capital Improvement Project No.: N/A Account No.: 14010 Total Project Amount: $900,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2026 $14,026 $0
This project includes the closed circuit television (CCTV) inspection and assessment of sewer mains and associated facilities in Council District 4.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Design Construction Construction Engineering and Administration
$
14,026
$
300,000
$
300,000
$
300,000
Total
$
14,026
$
300,000
$
300,000
$
300,000
Proposed FY 2024-25
$
-
Proposed FY 2022-23 $ 300,000
Proposed FY 2023-24 $ 300,000
Proposed FY 2024-25
Fund 72 (Sewer)
Budgeted FY 2021-22 $ 300,000
Total
$
$
$
$
Funding Source
300,000
300,000
300,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 278
-
Proposed FY 2025-26
$
-
Total $ $ $ $
900,000 -
$
900,000
Proposed FY 2025-26
$
-
Total $ $ $
900,000 -
$
900,000
NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT COMPLIANCE
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Citywide
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Storm Water Improvements Project Title: National Pollution Discharge Elimination System (NPDES) Permit Compliance Capital Improvement Project No.: N/A Account No.: 13983 Total Project Amount: $1,500,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2016 6/30/2026 $201,640 $0
This project includes compliance efforts, planning, design and construction costs associated with the California Regional Water Quality Control Board's latest NPDES permit.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$
100,000
$
300,000
$
300,000
$
300,000
$
300,000
$
100,000
$
300,000
$
300,000
$
300,000
$
300,000
Fund 50 (Storm Water)
Budgeted FY 2021-22 $ 100,000
Proposed FY 2022-23 $ 300,000
Proposed FY 2023-24 $ 300,000
Proposed FY 2024-25 $ 300,000
Proposed FY 2025-26 $ 300,000
Total
$
$
$
$
$
Funding Source
100,000
300,000
300,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 280
300,000
300,000
Total $ $ 1,300,000 $ $ $ 1,300,000
Total $ 1,300,000 $ $ $ 1,300,000
CIP 20-33 CATCH BASIN INSERTS
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
Citywide
LD IE RF GA AV
Location
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Storm Water Improvements Project Title: Catch Basin Inserts Capital Improvement Project No.: 20-33 Account No.: 14012 Total Project Amount: $320,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2023 $70,383 $0
This project includes installation of catch basin full capture trash devices at various locations in the City as required by the NPDES permit.
Estimated Expenditures FY 2020-21
Budgeted FY 2021-22
Proposed FY 2022-23
Design Construction Construction Engineering and Administration
$
50,000
$
150,000
$
100,000
Total
$
50,000
$
150,000
$
100,000
Proposed FY 2023-24
$
-
Proposed FY 2022-23 $ 100,000
Proposed FY 2023-24
Fund 50 (Storm Water)
Budgeted FY 2021-22 $ 150,000
Total
$
$
$
Funding Source
150,000
100,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 282
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
250,000 -
$
250,000
Proposed FY 2025-26
$
-
Total $ $ $
250,000 -
$
250,000
CIP 20-35 FIRESTONE BOULEVARD DRY WELL IMPROVEMENTS
MITLA AV
ONE EST FIR
Project Limits
PROJECT LOCATION MAP
BL
Ê
Overview Map
ADWEN ST
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Storm Water Improvements Project Title: Firestone Boulevard Dry Well Improvements Capital Improvement Project No.: 20-35 Account No.: 14015 Total Project Amount: $650,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2020 6/30/2022 $152,884 $0
This project includes the installation of dry well improvements on Firestone Boulevard at the west city limits.
Design Construction Construction Engineering and Administration Total
Estimated Expenditures FY 2020-21 $ 152,884
$
152,884
Budgeted FY 2021-22
$ $
450,000 50,000
$
500,000
Proposed FY 2022-23
$
-
Proposed FY 2022-23
Fund 50 (Storm Water)
Budgeted FY 2021-22 $ 500,000
Total
$
$
Funding Source
500,000
-
Proposed FY 2023-24
$
-
Proposed FY 2023-24
$
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 284
-
Proposed FY 2024-25
$
-
Proposed FY 2024-25
$
-
Proposed FY 2025-26
$
-
Total $ $ $ $
450,000 50,000 -
$
500,000
Proposed FY 2025-26
$
-
Total $ $ $
500,000 -
$
500,000
BAYSINGER ST
HOPELAND AV
HORLEY AV
CIP 22-14 FURMAN PARK STORMWATER CAPTURE AND INFILTRATION
SAMOLINE AV
Overview Map
RIVES AV
FARM ST
EIGHTH ST
CHEROKEE DR
SMALLWOOD AV
WILEY BURKE AV
JULIUS AV POMERING RD
VIA RIO NIDO
Ê
VIA AMORITA
VIA AMORITA
MORNING AV
IRWINGROVE DR
HARPER AV QUINN ST
Project Limits
PROJECT LOCATION MAP
µ
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Storm Water Improvements Project Title: Furman Park Stormwater Capture and Infiltration Capital Improvement Project No.: 22-14 Account No.: 14016 Total Project Amount: $14,300,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2021 6/30/2026 $0 $0
This project includes installation of an underground Stormwater Capture and Infiltration System at Furman Park.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
Funding Source Fund 50 (Storm Water) Fund 26 (Measure W Grant) Total
-
Budgeted FY 2021-22
Proposed FY 2022-23
$ 200,000 $ 1,000,000 $ 50,000
$ 100,000 $ 1,100,000 $ 50,000
$ $
750,000 50,000
$ 1,250,000
$ 1,250,000
$
Budgeted FY 2021-22 $ 1,250,000
Proposed FY 2022-23 $ 800,000 $ 450,000
$
800,000
$ 1,250,000
$
800,000
$ 1,250,000
Proposed FY 2023-24
Proposed FY 2025-26
Total
$ 5,250,000 $ 250,000
$ 5,250,000 $ 250,000
$ 300,000 $ 13,350,000 $ 650,000 $ -
800,000
$ 5,500,000
$ 5,500,000
$ 14,300,000
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
Total
$ 5,500,000
$ 5,500,000
$ 2,050,000 $ 12,250,000 $ -
$ 5,500,000
$ 5,500,000
$ 14,300,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 286
Proposed FY 2024-25
STORM DRAIN REPAIR PROGRAM
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
LD IE RF GA AV
Citywide
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Storm Water Improvements Project Title: Storm Drain Repair Program Capital Improvement Project No.: N/A Account No.: 13944 Total Project Amount: $400,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2019 6/30/2026 $0 $0
This project includes rehabilitation and/or replacement of aging storm drains and associated structures.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$
-
$
100,000
$
100,000
$
100,000
$
100,000
$
-
$
100,000
$
100,000
$
100,000
$
100,000
Fund 50 (Storm Water)
Budgeted FY 2021-22 $ -
Proposed FY 2022-23 $ 100,000
Proposed FY 2023-24 $ 100,000
Proposed FY 2024-25 $ 100,000
Proposed FY 2025-26 $ 100,000
Total
$
$
$
$
$
Funding Source
-
100,000
100,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 288
100,000
100,000
Total $ $ $ $
400,000 -
$
400,000
Total $ $ $
400,000 -
$
400,000
STORM DRAIN LIFT STATION REFURBISHMENT PROGRAM
PARAMOUNT BL
TELEGR APH RD
FLORENCE AV
Ê
Overview Map
LAKEWOOD BL
FIRESTONE BL
IMPERIAL HWY
Citywide
LD IE RF GA AV
Location
NS RA EC S RO
AV
PROJECT LOCATION MAP
0
µ
0.5
1 Miles
Five-Year Capital Improvement Program FY 2021-2022 through FY 2025-2026
Storm Water Improvements Project Title: Storm Drain Lift Station Refurbishment Program Capital Improvement Project No.: N/A Account No.: 14011 Total Project Amount: $125,000
Estimated Start Date: Estimated End Date: Total Expended to Date: General Fund Impact:
7/1/2017 6/30/2026 $12,008 $0
This project includes the annual refurbishment of storm lift station(s) such as: rehabilitation of pumps, motors, replacement of aging parts, installation of new equipment/materials.
Estimated Expenditures FY 2020-21 Design Construction Construction Engineering and Administration Total
$
-
Budgeted FY 2021-22
Proposed FY 2022-23
Proposed FY 2023-24
Proposed FY 2024-25
Proposed FY 2025-26
$
-
$
25,000
$
25,000
$
25,000
$
25,000
$
-
$
25,000
$
25,000
$
25,000
$
25,000
Fund 50 (Storm Water)
Budgeted FY 2021-22 $ -
Proposed FY 2022-23 $ 25,000
Proposed FY 2023-24 $ 25,000
Proposed FY 2024-25 $ 25,000
Proposed FY 2025-26 $ 25,000
Total
$
$
$
$
$
Funding Source
-
25,000
25,000
FY 2021-22 CITY OF DOWNEY CAPITAL IMPROVEMENT PROGRAM | 290
25,000
25,000
Total $ $ $ $
100,000 -
$
100,000
Total $ $ $
100,000 -
$
100,000
11111 Brookshire Avenue Downey, CA 90241 562.869.7331 www.downeyca.org