RE-INDUSTRIALIZING A N U R B A N WA S T E L A N D JOHNATHAN MANZA | JOANNE AITKEN (ADVISOR)


RESEARCH

T H E S I S S TAT E M E N T

GOALS

Re-establishing a portion of Philadelphia’s industrial heritage through the cultivation of modern, high-tech, and “green” industrial practices, focused on personalized production proccesses over mass-production. This new industrial environment will foster a blending of the community, the making process, and institutional research to create more

joneslanglasalle.cu/manufacturing

knowledgable and less wasteful end users.

Traditional Manufacturing Supply Chain 2

3D Printing Supply Chain


PRECEDENTS Reprap Prusa i3 Build

Production Hall Hettingen

Herman Miller Greenhouse Factory

3


S I T E A N A LY S I S 4

S I T E L O C AT I O N The 381 acre study area is largely comprised of vacant land owned by Philadelphia Energy Solutions and a PGW gasification plant. The Schuylkill River, Interstate-76, and Passyunk Avenue strongly define the west, east, and southern boundaries, respectively. The northern limit of the site is Moore Street and it is currently connected to the city via Maiden Lane.


Site Photos

Institutional Access

Rail Connections

Hydrology

Topography

Mass Transit

Major Roads

Industrial Paths

Mapping the River

5


FA L L R E V I E W

Second Floor Plan Ground Floor Plan

6

Third Floor Plan


PROCESS

CULT

URAL

PHYSICAL SUP PORT

SUPP

ORT

CULTURAL SU PPORT

PHYSICAL SUP PORT

Sizing the Program

Introduce Daylight

Taking the Edge

Break the Grid

Accentuate the Corner

Site Integration

Parti Diagram

7


8

TECHNICAL REVIEW


SYSTEM DIAGRAMS INTERIOR

EXTERIOR

WHITE PERFORATED MTL PANEL ROOF ON STILTS (WALKABLE)

T.O. Making Roof 22' - 0" WATERPROOFING REMOVABLE FLASHING @ PLANK MODULE EDGE

INSULATED INFILL BOX

TPO ROOFING, SLOPED TO DRAIN

FUTURE TENANT FLOORING

T.O. Roof Stl 18' - 0" 8" PRECAST CONC PLANK

30" CELLULAR STL BEAM

INTERIOR

W10 STL COLUMN BEYOND

STL CROSS BRACING BEYOND

PRINTED INSULATED GRP PANEL (R13) 1" AIR SPACE EXTERIOR SHEATHING

PRINTED CARBON FIBER STRUCTURAL FRAME INFILLED W/ R19 INSULATION

GWB SHEATHING

RAISED FLOORING

GRATING

1 - Ground 0' - 0"

18" SLAB ON GRADE FOR ADAPTABLE CONSTRUCTION

SYSTEMS PIPING, PAINTED FOR WAYFINDING

UTILITY TRENCH

T.O. Footing -6' - 0"

WATERPROOFING

0

1’

2’

FOOTING BEYOND

Making Wall Section

9


10

FINAL MASTER PLAN


SITE DIAGRAMS

Existing Conditions

Cut and Fill

Improving Access

Service Connections

Stormwater Control

Programming

Industrial Re-Use

11


STREET SECTIONS

Section at S 34th St

12

Section along CSX Trestle


13

LOWER SCHUYLKILL M A K I N G FA C I LT Y


P L A N S & E L E VA VAT I O N S West Elevation

14

Ground Floor Plan


Second Floor Plan

Third Floor Plan

North Elevation

15


Section Perspectve Through Making Space

16


17

U S E R C U S T O M I Z AT I O N


18

MASTER PLAN MODEL


19


20


Turn static files into dynamic content formats.