Shadow Angkor Hotel Construction Drawings

Page 1

SHADOW OF ANGKOR HOTEL SIEMREAP CONSTRUCTION DRAWING PACKAGE

DESIGNER: DUC DINH LECTURER: CHUONG CHANFIBORA DATE: AUGUST 14, 2013


GENERAL NOTES

LIST OF DRAWING DWG NO.

DRAWING

ISSUE

REMARK

COVER SHEET

July 14, 2013

For Construction

G-001

LIST OF DRAWING

July 14, 2013

For Construction

G-002

ARCHITECTURAL SYMBOL

July 14, 2013

For Construction

A-101

GROUND FLOOR PLAN

July 14, 2013

For Construction

A-102

FIRST FLOOR PLAN

July 14, 2013

For Construction

A-103

SECOND FLOOR PLAN

July 14, 2013

For Construction

A-104

GROUND FLOOR FINISH PLAN

July 14, 2013

For Construction

A-105

FIRST FLOOR FINISH PLAN

July 14, 2013

For Construction

A-106

SECOND FLOOR FINISH PLAN

July 14, 2013

For Construction

A-107

GROUND FLOOR CEILING PLAN

July 14, 2013

For Construction

A-108

FIRST FLOOR CEILING PLAN

July 14, 2013

For Construction

A-109

SECOND FLOOR CEILING PLAN

July 14, 2013

For Construction

A-201

EXTERIOR ELEVATION

July 14, 2013

For Construction

A-301

SECTION A

July 14, 2013

For Construction

A-302

SECTION B

July 14, 2013

For Construction

A-401

BAR COUNTER DETAIL

July 14, 2013

For Construction

A-402

SUITE ROOM DETAIL

July 14, 2013

For Construction

A-403

BANQUET DETAIL

July 14, 2013

For Construction

A-404

CEILING DETAILS

July 14, 2013

For Construction

The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

LIST OF DRAWINGS

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:1

SHEET:

G-001


GENERAL NOTES

ARCHITECTURAL SYMBOL ABBREVIATIONS @ cL

MATERIAL HATCH SYMBOL

MATERIAL SECTION SYMBOL

WALL SYMBOL FOR PLAN

AT CENTER LINE

CERAMIC TILE

WOOD PLANKS

PLYWOOD

EXISTING WALL (EX)

BRICK WALL

DIAMETER OR ROUND m2

METER SQUARE

A/C

AIR CONDITIONING

ALUM.

ALUMINIUM

ARCH.

ARCHITECTURE

BD.

BOARD

CEM.

CEMENT

CER.

CERAMIC

CH.

CEILING HIGHT

CL.

CEILING

CONC.

CONCRETE

COL.

COLUMN

DEPT.

DEPARTMENT

DET.

DETAIL

DIA.

DIAMETER

DIM.

DIMENSION

DN.

DOWN

DWG.

DRAWING

ELEC.

BRICK WALL (BW) WOOD LAMINATE

ELEVATION

EQ.

EQUAL

EXST.

EXISTING

EXT.

EXTERIOR

F.D.

FLOOR DRAIN

FIN.

FINISH

FL.

FLOOR

GYP.

GYPSUM

HDWD.

HARDWOOD

JAN.

JANITOR

MAX.

MAXIMUM

MIN.

MINIMUM

N.I.C.

NOT IN CONTRACT

N.T.S.

NOT TO SCALE

PTL.

PLASTIC LAMINATE

PLYWD.

PLYWOOD

R.A.G.

RETURN AIR GRILL

REF.

REFRIGERATOR

RM.

ROOM

S.A.G.

SUPPLY AIR GRILL

SPEC.

SPECIFICATION

THK.

THICK

TYP.

TYPICAL

W/

WITH

WD.

WOOD

WP.

WALL PAPER

GLASS

FABRIC

CONCRETE

GROUT

SPECIFIC NOTES :

Room number IDENTITY SHOWS ELEVATION/SECTION IN-XX

Room name

TOTAL PAGE OR PAGE NUMBER Height of Ceilling Level of floor IDENTITY SHOWS ELEVATION/SECTION

ELECTRICAL

ELEV.

CEMENT TILE

The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

Floor Symbol

TOTAL PAGE OR PAGE NUMBER

Ceilling Symbol WX

INTERIOR ELEVATION VIEW DERECTION

WALL SYMBOL

FLOOR SYMBOL

FF-XX

DOOR NUMBER

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

DOOR SYMBOL

ROOM NUMBER

SECTION SYMBOL FINISHING CODE

1 CF-1

A

FINISHING CODE

COLUMN GRID LINE NO.

CL-XX

ASSIGNMENT TITLE:

CEILING SYMBOL

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

ARCHITECTURAL SYMBOL

SEE DETAIL NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:1

SHEET:

G-002


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

GROUND FLOOR PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:75

SHEET:

A-101


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

FIRST FLOOR PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:75

SHEET:

A-102


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

SECOND FLOOR PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:75

SHEET:

A-103


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

GROUND FLOOR FINISH PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:75

SHEET:

A-104


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

FIRST FLOOR FINISH PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:75

SHEET:

A-105


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

SECOND FLOOR FINISH PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:75

SHEET:

A-106


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

GROUND FLOOR CEILING PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:75

SHEET:

A-107


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

FIRST FLOOR CEILING PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:75

SHEET:

A-108


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

SECOND FLOOR CEILING PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:75

SHEET:

A-109


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

EXTERIOR ELEVATION

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:75

SHEET:

A-201


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

SECTION A

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:75

SHEET:

A-301


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

SECTION B

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:75

SHEET:

A-302


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

BAR COUNTER DETAIL

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:25; 1:10

SHEET:

A-401


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

SUITE ROOM DETAIL

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:40, 1:5

SHEET:

A-402


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

BANQUET DETAIL

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:10

SHEET:

A-403


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

COMMERCIAL PACKAGE DRAWING

DRAWING TITLE:

CEILING DETAILS

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 2

Raffles International College DATE: 14-08-2012 SCALE: 1:10

SHEET:

A-404