Xiaoran Liu_Portfolio 2015-2018

Page 1

PORTFOLIO OF XIAORAN LIU

SELECTED WORKS 2015-2018


“ My passion for architecture is rooted in my belief that excellent architectural design is the reflection of technology, sociology, and art, which influences people’s behaviors and urban lives.”


ACADEMIC WORKS 01 Vertical City 02 432 Park Avenue Revitalization 03 Symbiosis City 04 Urban Connector

PROFESSIONAL WORKS 01 201 King of Prussia Rd Lobby Ronovation 02 426 Lancaster Ave Renovation 03 Garden Expo Museum for Art 05 Subaru NSTC Lobby Stair Detail Drawings 06 Junyuan Spanish Housing Design

OTHERWORKS



Academic Work



Vertical City An Ecological, Resilient Masterplan for Hainan Man-Made Eco-Island Date: 2016.9---2016.12 Location: Haikou, Hainan Island, China Type: Research Urban Design Studio Collaborator: Tai Feng, Shuo Wang Instructor: Thom Mayne& Ung-Joo Scott Lee(Morphosis Architects) Size:27,000,000sqft Responsibility: Case Research, Combinatory form study, 3D-Modeling, Partial Drawing, Diagrams Specification: It's an ecological, resilient masterplan for Man-made Eco-island in Hainan province in China. It will be a destination prototype for international, cruise-based eco-tourism. The island's eco-design incorporates local and regional consideration by addressing local demands for additional leisure and recreational landscapes, by facing the challenge of the extreme weather condition in Hainan island, and by creating multiple transportation methods, including air train, transit cruise, ferry, and inter-island light rail. This Man-made island could be a sustainable city both in good weather and bad weather. And we would like to create a city not only for people to have a leisure during good weather but also during the extreme weather condition.

Sea Level +4 0

Orginal Planning Strategy

Sea Level +4 0

High-rises & Reduced Land

Sea Level +4 0

Sky Connections

vertical city strategy


Site Conditions

Location

Hainan Island The Tropic of Cancer

Equator

The Tropic of Capricorn

Typhoon Trails in Past Ten Years 30

60

30

0

30

60

90

120

150

180

150

Man-made Island

2016

2015

Haikou

2013 2014

2011

2011

2014 2016 2011

2016 2013 2016

2011

2015

Storm Surge Height

+4

0

Land-use Strategy Constraction

Land Area Program FAR

sea level

+4 0 Existing Site

Modified Strategy

Dynamic Strategy

120


Combinatory Form Study The ideas of combinatory urbanism is to solve the urban problem with the support of combinatory form. It considers all urban systems as autonomous layers that organize themselves. When all the layers are added up together, new complex gesture of complex form and spontaneous coherence will come out to the urban space. The process of this method shows below.. ARCH-701-204—Fall 2016

+ PRIMITIVE Form Study

Urban Space 1

combinatory Form_Xiaoran

Constructed Paradise | Man-made island in Hainan

Urban Space II

Urban Space III

combinatory Form_Tai

combinatory Form_Shuo

Instructor: Ung-Joo Scott Lee

ARCH-701-204—Fall 2016

Midterm Review

Students: Shuo Wang, Tai Feng, Xiaoran Liu

Constructed Paradise | Man-made island in Hainan

Midterm Review

+ PRIMITIVE Form Study

combinatory Form_Xiaoran

combinatory Form_Tai

Combinatory Island

combinatory Form_Shuo


Zoning Strategy

Residential Zone

Central Zone Cultural Zone

Commercial& hotel zone

Transportation Methods

Airtrain System

Bus System

Road System


Site Plan

1. Bridge to Haikou City 2. Road 3. Cruise Terminal 4. Bus Station Convention Center Stadium 5. Towers& Connections 6. Music Center Art Center Museum 7. Towers& Connections 8. Cruise Ship Route


Dynamic Landscape Strategy

Without Typhoon

With Typhoon

Highrise

Landscape Scheme


Rendering Without Typhoon

RenderingWith Typhoon


Rendering of Horizontal Connection

Observation Housing Art& Restaurant

Housing,community center Housing landscape&park sports complex cultural facility commercial Adaptable Parking


Section of Vertial City Strategy


Vertical City Commercial Zone Axonometric View


r

nte

tio

e nC

n ve on

C

Sky

wa lk

fro

mC

rui

se

Ter m

l

ina

ina

l to

Co

mm

erc

Cr ial

Zon

e

uis

erm eT


Perspective View from Central Park


432 Park Avenue Revitalization Research New High-rise Typology for New York City Date: 2015.9-2015.12 Location: 432 Park Avenue, New York City Type: High-rise Design Instructor: Ali Rahim Collaborator: Jieming Jin, Yuchen Wen Specification: Designed to address the changing population demographics of new york city, this tower serves as a land-locked conceptual equivalent to the contemporary cruise ship, offering a hybird of housing and recreation to the city’s increasing number of people. Organized as a large scale mixed-use complex development in downtown Manhattan, the building is divided into a series of multi-functional parts with vastly different qualities that will create a comfortable life for elderly residents. The design thus creates opportunities for different types of programs to coexist. The program is different in each vertical section of the structure: residential units on top, entertainment and public areas at the bottom, coming together to form a hybirdized space in the middle. The tower would also provide medical clinics, recreation and fitness facilities, a shopping mall, a museum, theaters, and other amenities, including a hotel for people when family members visit..

CHAPTER 4

TITANIC VS OASIS OF THE SEAS

SEMINAL OCEAN LINERS/CRUISE SHIP

SEMINAL OCEAN LINERS/CRUISE SHIP

SEMINAL OCEAN LINERS/CRUISE SHIP

CHAPTER 4

CHAPTER 4

TITANIC VS OASIS OF THE SEAS

SEMINAL OCEAN LINERS/CRUISE SHIP

CHAPTER 4

Concept

182

183

Cruise Ship Cabins 184

185

Public Space


Formal Research

Accumulating

Bridging

Nesting

Seaming

Pinching

Texturing

Nesting Prototype Transformation

Programming Organization Strategy

observation

condos

Storage

loft

fitness facility

Atrium

apartment

restaurant

restaurant Hotel restaurant

recreation& lobby

Typical Clusters

shopping mall theather museum

Amenities

Public Space

Pattering


Elevation& Section

80F

EL 376m

74F

EL 376m

68F

EL 328m

62F

EL 280m

56F

EL 232m

50F

EL 184m

44F

EL 136m

38F

EL 88m

32F

EL 40m

0F

EL 0m


Entertainment

Shopping Mall

Museum


Facade Final Model

Chunk Model



SYMBIOSIS CITY The Adaptive Redevelopment Of Old Factory and Bus Station Date: 2012.3---2012.5 Location: Old Factory and Main Bus Station, Xiamen, China Type: Research Urban Design Studio Instructor: Shaofeng Wu Collaborator: Individual Specification: With the rapid development of the city, old factories are gradually deserted by modern city and people because they are usused with simple spatial quality and with functions unrelevant to surroundings. Based on the biological symbiotic theory symbiosis city develop it into an urban symbiotic strategy. It focus on the relationships between old and new buildings, built areas and outdoor space, the exterior and the interior, and functional sequence. Different from common urban strategy, our design aims to build up new buildings as new media with old factories and surroundings to create and enclosure new interesting outdoor space and road systems which we call symbiotic space. Due to that, the interface between old factories and surroundings could be Activated, and people will have the communication with it. Based on the systems of symbiotic space and different functiondemands and development pressure, the whole strategy are featured with sustability.

Urban Image

Urban Seperated and Unorganized Public Space Situation


Concept

Gather

Blend

Cell

New building Old building Square Old building New building

Transformation Strategy

Old Buildings Open Area


New Urban Public Space System

The project aims to reorganize the simple boring relationship of public space not only on the site but also around it by adding new buildings to enrich the original space.(image 1,2,3) Also, Under different purpose of development, the height, density, functionality of new buildings will be changed and the whole typology will be changed accordingly. Finally, New buildings and old buildings could connect with surroundings at different levels.

Public Space Distribution

Existing Site

FAR=2

FAR=3

FAR=4


As the FAR going up, urban spatial quality and function are developed in an organized way with the road, square and connection. Then They gather people at different level, and simulate the development of the old buildings in functional ways. We propose three senarios to evaluate it Commercial Central Park FAR=2

Hotel

Residential

Comercial

office

Apartment

Retail

Shopping Mall

Recreation

Retail

Exhibition

Shopping Mall

Shopping Mall

Commericial Complex FAR=3 Apartment

Retail

Office

Retail

Shopping Mall

Apartments

HOPSCA FAR=4 Apartment

Retail

Hotel

Retail

Office

Retail

Shopping Mall

Condos

Apartments


Vision of City As the FAR going up, urban spatial quality and function are developed in an organized way with the road, square and connection. Then They gather people at different level, and simulate the development of the old buildings in functional ways. We propose three senarios to evaluate it


Site Area: 30500 m2 Total Area: 120000 m2 Building Height: 213m Plot Ratio: 4.0 Density of Building: 32% Ratio of Green Space: 58% Ratio of Green Roofing: 100% Standard Floor Height: 4m


Urban Connector Research On New High-Rise Typology for Mixed-use Development Date: 2012.9-2012.11 Location: Jimei district, Xiamen, China Type: High-rise Design Instructor: Shaofeng Wu Collaborator: Nian Liu Specification: The site is located in the University City, where will be the busiest and most famous central area in the future. Also, it is the transfer zone for ground transportation, especially the bus and the elevated bus rapid transit. This project explores two questions. One is how to think about the relation between a commercial podium and outdoor ground area. Another is how to rethink the plan and space of the office tower. After researching on the economy, population, consumption, and comparison with many other cases in China, my proposal is to build up a transit-oriented, mixed-use, high-rise building that uplifts the commercial podium to return the ground to people. Also, the elevated podium serves as not only the part of the highrise, but also the connector that attracts and distributes people coming to this area. For the office tower, the tower space should not only be horizontal and is connected by the elevator, but also it could be vertical and is connected by stairs.

Concept

office

bus station

commercial

BRT

Massing Study

Create Urban Public Space

Rich Circulation, Increase Commercial Value

Vertical Office Public Space


Private Car Entrance & Exit

Bus Station Exit

Bus Station Entrance

Site Plan


Structure we use the large steel frame structure as the main structure of the whole podium because this design would make people see this huge bulk as a big island floating in the air.

Core Tube

core

core+elevators

Floor Slab

Concrete Frame Structure

Steel Sway Frame Structure with jointed Node

Steel Truss System

Structural Slab System


Vertical Office Public Space


Standard Floor Plan

Section A

Podium Plan

Section B



Professional Work


201 King of Prussia Rd Office Building Lobby Renovation Granum A/I Conceptual Drawing

Ceiling Elevation View

Ceiling Top View



426 Lancaster Ave Corporate Renovation Granum A/I

Leader: Patrick McGranaghan, Rob Hibbard Role: Revit Model, Conceptual Designs, Develop Design Studies, Prepare Presentation Materials Software: Sketch-Up, V-ray/Podium, Adobe Creative Suites, Revit Specification This proposal was to change the propotion of facade by adding a row of laminated aluminum panels, replace arch-shape curtain wall and renovate main lobby area.

Original Site Condition

Existing Building

Strengthen Visual Connection from the side of the main street

Emphasize the continuity of the main lobby and outdoor landscape



GARDEN EXPO MUSEUM for ART Zhejiang Tianren Jingjie Architecture & Associates Date: 2014.10-2014.11 Location: Xiamen Leader: Yuqi Ji Role: Generated conceptual design and production for design competition

Organize Exhibition Space

Specification: The site is located within Xiamen Garden Expo Area where it needs a sulptural building with geometric figure. To design a symbolic museum in this area, we need to take care of the key elements in surrounding atmosphere as well as creating beautiful sceneries for tourists. I propose to initially manipulate and organize exhibition spaces so that the shape of the museum will come out.

Exhibition


Section

Northernwest Elevation

First Floor Plan


Subaru NSTC

Leader: Chris Miller, Rob Hibbard Role: Construction Drawings in Revit

Lobby Stair Construction Drawings Granum A/I

M

T.O. PARAPET 32' - 0"

7

6

5

A-600

A-600

A-600

GRANUM A/I

ARCHITECT 100 MATSONFORD ROAD RADNOR CORPORATE CENTER 4, SUITE 110 RADNOR, PA 19087 215.525.2663

T.O. ROOF 31' - 0"

IN COLLABORATION WITH:

T&M ASSOCIATES

CIVIL ENGINEER AND LANDSCAPE ARCHITECT

5

6

7

A-600

A-600

A-600

5

6

A-600

A-600

11 TINDALL ROAD MIDDLETOWN, NJ 07748 484.530.1270

7 A-600

O'DONNELL & NACCARATO 6"

4' - 0"

4' - 0"

6.9

6"

2"

4' - 0"

1' - 0"

8"

DASHED LINES INDICATE JOINT PATTERN OF PRECAST TILES AT LANDING

111 S. INDEPENDENCE MALL EAST PHILADELPHIA, PA 19106 215.925.3788

4' - 0"

10

MEPFP ENGINEERS

200 AMERICAN METRO BOULEVARD SUITE 120 HAMILTON, NJ 08619 609.750.9590

A-602

MEZZANINE 18' - 0"

4

DRAGO ILLUMINATION LIGHTING DESIGN

A-600

11"

1'-0" RADIUS

AKF ENGINEERS

TYP

5 A-831

1' - 0"

7

4' - 0"

4' - 0"

2" RADIUS EXTENSION OF STEEL-PLATE BENCH ALIGN

STRUCTURAL ENGINEER

PICKETS AT 4" OC MAX

6.9

7

EQUALLY-SPACED

2"

3' - 6"

4' - 0"

138 CRICKET AVENUE ARDMORE, PA 19003 484.410.4580

8

7

6.9

6 A-831

62 7/8"

UPHOLSTERED CUSHION 4

4 A-600

3

12' - 10"

Project Name:

SUBARU OF AMERICA NATIONAL SERVICE TRAINING CENTER CAMDEN, NJ

A-600

PAINTED, STEEL CHANNEL STRINGER

ALIGN

STEEL-PLATE MODESTY PANEL

PAINTED, TUBE-STEEL SCREEN WALL FRAME WITH BARGRATING INFILL PANELS 2" RADIUS

1' - 8"

8 7 3/4"

8

9

PAINTED STEEL PLATE BENCH WITH UPHOLSTERED CUSHION

DN

UP

A-401

OPEN

1' - 0 1/4"

1' - 6"

1' - 0 1/4"

8"

1"

LEVEL 1 0"

PAINTED STEEL STIFFENER PLATE AT EACH SCREEN VERTICAL

1

A-600

TYP

A-602

(15) TREAD @ 11"

13' - 9"

11

PAINTED STEEL-PLATE GUARDRAIL INFILL

(15) TREAD @ 11"

TUBE-STEEL SCREEN WALL ASSEMBLY

12' - 10"

13' - 9"

(15) TREADS @ 11" EA

STEEL-PLATE BENCH

(14) TREADS @ 11" EA

A-600

ENLARGED PLAN AT STAIR 02 - FIRST FLOOR

2

3/8" = 1'-0"

A-600

ENLARGED PLAN AT STAIR 02 - MEZZANINE LEVEL

3

3/8" = 1'-0"

A-600

ELEVATION AT STAIR 02

4

3/8" = 1'-0"

A-600

CROSS SECTION AT STAIR 02 3/8" = 1'-0"

N

4 A-600

8

T.O. PARAPET 32' - 0" T.O. ROOF 31' - 0"

4

6.9

6.9

6"

1' - 1 1/4"

2"

3' - 0"

6.9

8

A-600

T.O. PARAPET 32' - 0" T.O. ROOF 31' - 0"

2"

2"

3' - 0"

3' - 0"

2"

3' - 0"

8

4 A-600

Professional Seals

6"

ANCHOR TUBE STEEL FRAME TO STRUCTURE ABOVE

PAINTED STEEL-PLATE GUARDRAIL FROM 1/4" PLATE WITH CONTINUOUS TOP CAP; EXTEND FROM TOP OF STRINGER TO FULL GUARDRAIL HEIGHT AT MEZZANINE 2"

PAINTED STEEL-PLATE GUARDRAIL; EXTEND TO FLUSH WITH FIRST FLOOR CEILING

2 A-602

EQUALLY-SPACED PICKETS AT 4" OC MAX

Patrick J. McGranaghan; NJ License # 21AI01596000 7 A-831

Issue Description

3' - 6"

3' - 6"

2"

PAINTED STEEL-PLATE GUARDRAIL; EXTEND TO FLUSH WITH FIRST FLOOR CEILING

10

TYP

MEZZANINE 18' - 0"

20' - 0"

MEZZANINE 18' - 0"

YYYY-MM-DD

DESIGN DEVELOPMENT BULLETIN 2 -CD ISSUE BULLETIN 3 - PERMIT ISSUE

A-602

MEZZANINE 18' - 0"

2017-05-17 2017-09-01 2017-09-22 2017-09-27

TYP

8' - 8 1/2"

1 1/2" DIAMETER STAINLESS STEEL HANDRAIL

4"

4" RADIUS

(15) RISERS @ 6.97" +/-

4 A-602

1' - 0"

8 A-602

20' - 0"

PAINTED 5/16" STEEL PLATE MODESTY PANEL

6 A-602

PAINTED, TUBE-STEEL SCREEN WALL FRAME WITH BAR-GRATING INFILL PANELS

Project No: BRT 1118G

1 1/2" DIAMETER STAINLESS STEEL HANDRAIL

7' - 0"

Sheet Title

2" RADIUS

STAIR 02 - ENLARGED PLANS, ELEVATIONS, AND SECTIONS

PAINTED STEEL CHANNEL STRINGER

0"

FULL WIDTH OF STRINGER

LEVEL 1 0"

4" OC MAX 3/8" = 1'-0" REFER TO STAIR SECTION SECTION AT STAIR 02

A-600

LEVEL 1 0" 8" MINIMUM CORE DRILL WITH EPOXY PAINTED STEEL-PLATE GUARDRAIL

SECTION AT STAIR 02

6

3

4" 6"

1' -

LEVEL 1 0"

5

A-600

3/8" = 1'-0"

3

Original drawing is 42 x 30

Do not scale contents of this drawing

A-600

Sheet Number

A-602

SECTON AT STAIR 02

7

A-600

PAINTED STEEL-PLATE GUARDRAIL

3/8" = 1'-0"

A-602 4

FULL WIDTH OF STEEL-PLATE HANDRAIL STRINGER BRACKET; PAINT TO MATCH GUARDRAIL

ALIGN

HANDRAIL BRACKET DETAIL AT GUARDRAIL 1 1/2" = 1'-0"

= 1'-0" HANDRAIL1 1/2" EXTENSION AND RISER / TREAD DEATIL - STAIR 022 A-602

A-602

1 1/2" = 1'-0" CLOSURE PLATE

1 1/2" = 1'-0"

2"

PAINTED RISERS

SURFACE

1 1/2" = 1'-0"

A-602

A-602

1 1/2" = 1'-0"

A-602

1 1/2" = 1'-0"

3/4"

3/4"

1 3/4"

1" 5 1/2"

1 1/2" DIAMETER BRUSHED SS HANDRAIL

6

8

HANDRAIL TERMINATION DETAIL 1 1/2" = 1'-0"

9

A-602

GUARDRAIL CONNECTION AT SLAB 1 1/2" = 1'-0"

1/2" GYP SHIM REINFO TO STRU

CONCR METAL D TO STRU

5/16" STEEL-PLATE BRACKET; PAINT TO MATCH TUBE-STEEL FRAME

HANDRAIL BRACKET ELEVATION AT SCREEN WALL

STEEL B TO STRU

PAINTED PLATE G

SCHEDU PARTITI

7

H

A-602 GUARDRAILCONNECTION CONNECTION AT DRYWALL 1 10 10 GUARDRAIL AT DRYWALL

A-602

A-602

1 1/2" = 1'-0"

1 1/2" = 1'-0"

REINFORCED POUR STOP; REFER TO STRUCTURAL

FLOOR FINISH AS SCHEDULED CONTINUOUS, PAINTED STEEL BENT PLATE 1/2" GYP BOARD REVEAL SHIM REINFORCED POUR STOP; REFER TO STRUCTURAL CONCRETE SLAB ON METAL DECK; REFER TO STRUCTURAL STEEL BEAM; REFER TO STRUCTURAL

PAIN PLAT

SHIM AS N

PAIN GUA BRAC COU ANC ALIGN

PAINTED STEELPLATE GUARDRAIL

10 GUARDRAIL CONNECTION AT DRYWALL

A-602

1 1/2" = 1'-0"

SCH AND

CON BOT

SCHEDULED PARTITION

A-602

FLOOR CONTIN STEEL B

METAL EDGE STRIP

1/2"

CONTINUOUS BOTTOM RAIL

OPENING BETWEEN GUARDRAIL PICKETS; PAINT TO MATCH GUARDRAIL

4"

PAINTED STEEL BLOCKING AT EACH SCREEN WALL VERTICAL 12 BENCH DETAIL

CONTINUOUS BOTTOM RAIL

1 1/2" = 1'-0"

STEEL-PLATE HANDRAIL

THIN-SET, PRECAST,

PAINTED STEEL STIFFENERCONCRETE TREADS PLATE AT EACH SCREEN WALL VERTICAL

STEEL BEAM; REFER TO STRUCTURAL 1 1/2"

CONTINUOUS BOTTOM RAIL

STEEL BEAM; REFER TO STRUCTURAL

PAINTED STEEL BLOCKING AT BRACKET FULL WIDTH OF EACH SCREEN WALL VERTICAL

1" RADIUS

TUBE-STEEL FRAME

PAINTED STEEL-PLATE GUARDRAIL SUPPORT BRACKET WITH COUNTERSUNK ANCHORS

CONCRETE SLAB ON METAL DECK; REFER TO STRUCTURAL ALIGN

METAL E

1/2"

1"

1 3/4" 1"

CONCRETE SLAB ON METAL REINFORCED POUR STOP; DECK; REFER TO STRUCTURAL REFER TO STRUCTURAL

PAINTED GUARDR WITH CO

ALIGNSTEEL BEAM; REFER REINFORCED POUR STOP; TO REFER TO STRUCTURAL STRUCTURAL

STEEL-PLATE HANDRAIL BRACKET FULL WIDTH OF WALL AS SCHEDULED OR TUBEOPENING BETWEEN FRAME; GUARDRAILSTEEL PICKETS; PAINT PROVIDE TO MATCH BLOCKING GUARDRAIL AS NECESSARY AT

FLOOR FINISH AS SCHEDULED

1" RADIUS

ALIGN

6

1 1/2" DIAMETER STAINLESS A-602STEEL HANDRAIL ALIGN CLOSURE PLATE 5/16" STEEL-PLATE BRACKET; WITH END OF HANDRAIL BRACKET PAINT TO MATCH ADJACENT

SHIM

UPHOLSTERED CUSHION PAINTED STEEL-PLATE

1 1/2" DIAMETER STAINLESS STEEL HANDRAIL ALIGN CLOSURE PLATE PAINTED STEEL STIFFENER WITH END OF HANDRAIL PLATE AT EACH SCREEN BRACKET WALL VERTICAL

PAINTED 5/16" STEEL-PLATE 1" RADIUS BENCH STEEL PAN WITH

PAINTED STEEL-PLATE A-602

6

A-

1/2"

5 1/2"

1" A-602

1 1/2" = 1'-0"

GUARDRAIL PAINTED 5/16" STEEL-PLATE BENCH

1"

PAINTED STEEL-PLATE 5 GUARDRAIL

SCHEDULED

HANDRAIL BRACKET DETAIL AT WALL OR SCREEN WALL

PAINTED STEEL-PLATE GUARDRAIL SUPPORT BRACKET

PAINTED TUBE STEEL SCREEN WALL

2" 1 1/2"

3/4" 2" 1 1/2"

5

PAINTED STEEL-PLATE GUARDRAIL

A-602

1' - 6"

A-602

1 1/2" = 1'-0"

A-602 8 HANDRAIL 9 GUARDRAIL CONNECTION ATA-602 SLAB1 1/2" = 1'-0" 1 1/2" = 1'-0" TERMINATION 9DETAIL HANDRAIL TERMINATION DETAIL GUARDRAIL CONNECTION AT SLAB

SCHEDULED FLOOR FINISH

PAINTED TUBE STEEL SCREEN WALL

TREAD DEATIL - STAIR 02

1 1/2" = 1'-0" 8

2"

1 1/2" DIAMETER BRUSHED SS

PAINTED STEEL-PLATE HANDRAIL GUARDRAIL

HANDRAIL BRACKET DETAIL AT WALL OR SCREEN WALL

WALL LOCATIONS

STEEL BAR BLOCKING

3

UPHOLSTERED CUSHION

HANDRAIL BRACKET ELEVATION

HANDRAIL EXTENSION AND RISER / TREAD DEATIL - STAIR 02

2"

CONC TREAD

4

A-602

OPENING BETWEEN GUARDRAIL PICKETS; PAINT TO MATCH GUARDRAIL

A-602

SHIM

1 3/4" 6 1/2"

A-602

3

STRINGERPANEL DETAIL AT STAIR 02A-602 MODESTY

THIN-SET, PRECAST, CONCRETE TREADS

1 3/4"

2

1' - 0 1/4"

PAINTED STEEL-CHANNEL

THIN-SET, PRECAST, CONCRETE TREADS

PAINTED STEEL-CHANNEL STAIR STRINGER

1"

ANDRAIL EXTENSION

1

0" 1' -

7"

STEEL PAN WITH

FULL WIDTH OF OPENING BETWEEN PAINTED RISERS HANDRAIL GUARDRAIL PICKETS; PAINTSTEEL-PLATE TO BRACKET FULL WIDTH OF MATCH GUARDRAIL

STEEL-PLATE HANDRAIL BRACKET; PAINT TO MATCH GUARDRAIL

5/16" STEEL-PLATE BRACKET; PAINT TO MATCH ADJACENT SURFACE

WALL AS SCHEDULED OR TUBESTEEL FRAME; PROVIDE BLOCKING AS NECESSARY AT WALL LOCATIONS

GUARDRAIL SUPPORT BRACKET CONCRETE SLAB ON METAL DECK; REFER TO SHIM EQ EQ STRUCTURAL FLOOR FINISH AS

4"

2" 1 1/2"

0" 1' -

STEEL-PLATE HANDRAIL BRACKET; PAINT TO MATCH GUARDRAIL

3

A-602 1 1/2" DIAMETER STAINLESS STEEL HANDRAIL ALIGN CLOSURE PLATE WITH END OF HANDRAIL BRACKET STEEL-PLATE HANDRAIL BRACKET

1 1/2" DIAMETER STAINLESS STEEL HANDRAIL

1 1/2" DIAMETER STEEL PAN WITH 11" PAINTED 1" RISERS STAINLESS STEEL HANDRAIL

ALIGN CLOSURE PLATE WITH STEEL PAN END OF HANDRAIL BRACKET

1 1/2" = 1'-0"

FLOOR FINISH AS SCHEDULED

PAINTED STEEL-PLATE GUARDRAIL

4"

2"

THIN-SET CONCRETE STAIR

1 1/2" DIAMETER STAINLESSTREAD STEEL HANDRAIL

EEL-CHANNEL STAIR

PAINTED STEEL-PLATE GUARDRAIL

4

1/4" RAKED CAULK JOINT

4

A-602

SCHEDULED FLOOR FINISH

2"

PAINTED STEEL-PLATE GUARDRAIL

STEEL BAR BLOCKING

A-602

A-602

4"

NCRETE STAIR

3

3 A-602

1 3/4"

1/2" x 6" STEE BLOCKING; ALIGN 1" HANDRAIL BRACKETS ABOVE; WITH PAINT TO MATCH STRINGER

11"

3/4"

CAULK JOINT

1 1/2" = 1'-0"

1"

2"

A-602

PAINTED STEEL-PLATE GUARDRAIL

HANDRAIL BRACKET DETAIL AT GUARDRAIL

PAINTED STEEL-PLATE GUARDRAIL SUPPORT BRACKET5 HANDRAIL BRACKET ELEVATION

CLOSURE PLATE

CONC TREAD

FULL WIDTH OF STRINGER

A-602

6

A-602

HANDRAIL BRACKET DETAIL AT WALL OR SCREEN WALL

4"

1' - 0 1/4"

COUNTER-SUNK ANCHORS; PAINT TO MATCH ADJACENT SURFACE

3

PAINTED STEEL-CHANNEL STRINGER

7"

HANDRAIL EXTENSION

5

PAINTED STEEL-PLATE GUARDRAIL 1 3/4"

SCHEDULED FLOOR 1' - 0" FINISH

WALL AS SCHEDULED OR TUBESTEEL FRAME; PROVIDE 1 1/2" DIAMETER BRUSHED SS HANDRAILAS NECESSARY AT BLOCKING WALL LOCATIONS

2"

STEEL-PLATE HANDRAIL BRACKET FULL WIDTH OF A-602 OPENING BETWEEN 1 1/2" GUARDRAIL PICKETS; PAINT TO = 1'-0" MATCH GUARDRAIL

1 1/2" = 1'-0"

5 1/2"

3/4" OUTSIDE RADIUS

STEEL-PLATE HANDRAIL BRACKET; PAINT TO MATCH GUARDRAIL

HANDRAIL BRACKET ELEVATION

BRACKET; PAINT TO MATCH GUARDRAIL

ALIGN CLOSURE PLATE WITH END OF HANDRAIL BRACKET

STEEL BAR BLOCKING

2"

E BLOCKING; ALIGN AIL BRACKETS ABOVE; TCH STRINGER 3

4

STEEL-PLATE HANDRAIL A-602

ALIGN

CONC TREAD

CONTINUOUS, 5/16", STEELPLATE, MODESTY PANEL

1 1/2" = 1'-0"

1 1/2" DIAMETER STAINLESS STEEL HANDRAIL

1 1/2" DIAMETER STAINLESS STEEL HANDRAIL

1/2" DIAMETER STAINLESS HANDRAIL 1STEEL BRACKET DETAIL AT GUARDRAIL HANDRAIL

CLOSURE PLATE

COUNTER-SUNK ANCHORS; PAINT TO MATCH ADJACENT SURFACE

UNK ANCHORS; PAINT DJACENT SURFACE

A-602

5/16" STEEL-PLATE BRACKET; PAINT TO MATCH ADJACENT SURFACE

4

3/4"

1/4"

- 0 1/4" 5/16", PAINTED, 1' STEEL-PLATE, HANDRAIL BRACKET

E RADIUS

3

PAINTED STEEL-CHANNEL STRINGER

7"

HANDRAIL EXTENSION

6 A-602

PAINTED STEEL-PLATE GUARDRAIL

A-602

2"

PAINTED STEEL-PLATE GUARDRAIL

2" 1 1/2"

1 1/2" 3/4" 2"

1' - 0"

7 A-602

2"

2"

S, 5/16", STEELESTY PANEL

ALIGN

STEEL-PLATE HANDRAIL BRACKET; PAINT TO MATCH GUARDRAIL

1 1/2" DIAMETER STAINLESS STEEL HANDRAIL

UNK ANCHORS; PAINT DJACENT SURFACE

STEEL-PLATE HANDRAIL BRACKET FULL WIDTH OF OPENING BETWEEN 3 GUARDRAIL PICKETS; PAINT TO A-602 MATCH GUARDRAIL

PAINTED STEEL-PLATE GUARDRAIL

1 1/2" DIAMETER BRUSHED SS HANDRAIL

2"

2" 1 1/2"

3/4"

1 1/2" DIAMETER STAINLESS STEEL HANDRAIL

4" OC MAX CLOSURE PLATE WITH ALIGN 3 REFER TO END OF HANDRAIL BRACKET A-602 STAIR SECTION

ED, STEEL-PLATE, RACKET

1' - 0"

1 1/2" DIAMETER STAINLESS STEEL HANDRAIL

1 1/2" DIAMETER STAINLESS STEEL HANDRAIL

A-602

2"

PAINTED STEEL-PLATE GUARDRAIL

2" 1 1/2"

TER STAINLESS STEEL

1 3/4"

9' - 3 1/2"

NOTE: REFER TO 6/A-600 FOR ADDITIONAL INFORMATION

1'-0" RADIUS

0"

(16) RISERS @ 6.97" +/-

5' -

TYP

3' - 0"

A-602

2"

TYP 1

11 GUARDRAIL CONNECTION

A-602

1 1/2" = 1'-0"


&6. ,

'UDZLQJ 1XPEHU

*5$180 $ ,

660 $6 6&+('8/(' 29(5 3/<:22' 68%675$7(

3URMHFW 1XPEHU

$5&+,7(&7 [ ),1,6+(' 5(9($/ $// (;326(' ('*(' ),1,6+(' 72 0$7&+ :22' 3/$1. 0$7621)25' 52$' $6 6&+('8/(' 5$'125 &25325$7( &(17(5 68,7( 5$'125 3$

&0 660 29(5 3/<:22' 68%675$7( 3529,'( '5,3 ('*( 7<3,&$/

,

%57 $ $6 12('

3/<:22' :,7+ /$0,1$7( ),1,6+ $6 6&+('8/(' &251(56 72 %( 0,7(5(' 12 (;326(' ('*(6

6FDOH

Cafe Bar Redesign and Millwork Construction Drawings Granum A/I

Leader: Chris Miller, Rob Hibbarb, Jennifer Hemphill Role: Construction Drawings in Revit

,VVXHG 'DWH

Subaru Global Headquarters

0,//:25. 6758&785( $6 5(48,5('

6($/$17 72 0$7&+ &2817(5

; ),1,6+(' 5(9($/

'5$*2 ,//80,1$7,21 $7 &2817(5 &/($5

/,*+7,1* '(6,*1 &2168/7$17

6XEDUX RI $PHULFD +HDGTXDUWHUV

&5,&.(7 $9(18( $5'025( 3$

&0 660 29(5 3/<:22' 68%675$7( 3529,'( '5,3 ('*( 7<3,&$/

,17(5,25 (/(9$7,21

5()(5(1&( /,1(

6 ,1'(3(1'(1&( 0$// ($67 3+,/$'(/3+,$ 3$

:22' 3/$1. $6 6&+('8/(' %/,1' 1$,/(' 2172 3/<:22' 68%675$7( 5()(5 72 ),1,6+ 6&+('8/( )25 025( ,1)250$7,21

$1&+25 %$6( &+$11(/ 72 )/225 6/$% &217,18286 6,/,&21( %($' &2/25 72 0$7&+ 67$,1/(66 67((/ 72( .,&. 7+,&. &217,18286 %586+(' 67$,1/(66 67((/ 023 *8$5' ),1,6+ )/225 $6 6&+('8/('

7+,16(7 $6 6&+('8/('

$/,*1

*:% 3$57,7,21 $6 6&+('8/('

7+,16(7 $6 6&+('8/('

$/,*1

6.,

325&(/$,1 7,/( $6 6&+('8/('

%57 $

325&(/$,1 7,/( $6 6&+('8/(' 6&+/87(5 -2//< $6 6&+('8/('

7($5 $:$< %($'6 $6 6&+('8/(' 5(9($/ *5287 $6 63(&,),('

6.,

$/,*1

'UDZLQJ 1XPEHU

$/(;$1'(5 3$5. 68,7( 35,1&(721 1-

6FDOH

0(3) (1*,1((56

&21&($/(' 0,//:25. 6758&785( 6(( )6( '2&80(176 )25 $'',7,21$/ ,1)250$7,21

,VVXHG 'DWH

'UDZLQJ 7LWOH

$.) (1*,1((56 6(&7,21 '(7$,/ $7 &$)( &$6+,(5 &2817(5

ƒ

$33/,(' &217,18286 %586+(' 67$,1/(66 67((/ 72( .,&. $'+(5( 72 67$,1/(66 67((/ %$6( &+$11(/

6758&785$/ (1*,1((5

2QH 6XEDUX 'ULYH &DPGHQ 1-

2 '211(// 1$&&$5$72

660 $6 6&+('8/(' 29(5 3/<:22' 68%675$7(

3URMHFW 1XPEHU

:22' 3/$1. $6 6&+('8/(' %/,1' 1$,/(' 2172 3/<:22' 68%675$7( 5()(5 72 ),1,6+ 6&+('8/( )25 025( ,1)2

,1 &2//$%25$7,21 :,7+

6($/$17 72 0$7&+ &2817(5

*:% 3$57,7,21 $6 6&+('8/('

7+,&. &217,18286 %586+(' 67$,1/(66 67((/ 023 *8$5'

'(7$,/ $7 7,/( 7,/( ),1,6+ 75$16,7,21

),1,6+ )/225 $6 6&+('8/('

7$3( 63$&./( $1' )($7+(5 $7 75,0

3/<:22' %/2&.,1* $6 5(48,5('

3$57,7,21 $6 6&+('8/('

6(&7,21 '(7$,/ $7 &$)( 75$16$&7,21 &2817(5

'(7$,/ $7 *:% &(,/,1* ),1,6+ 75$16,7,21

'(7$,/ $7 &2817(5 &251(5

$UFKLWHFWXUH ,QWHULRUV

$/,*1

:22' 3/$1. $6 6&+('8/(' &251(56 72 %( 0,7(5(' 12 (;326(' ('*(6

2QH 6XEDUX 'ULYH &DPGHQ 1-

; 5(9($/ 75,0 6(( 5&3 )25 /2&$7,216 *(1(5$/ 3$,17 ),1,6+ 72 :5$3 5(9($/ ('*( 72 ,16,'( &251(5

&217,18286 6,/,&21( %($' &2/25 72 0$7&+ 67$,1/(66 67((/ 72( .,&.

),567 )/225 5()/(&7(' &(,/,1* 3/$1 1257+

'(7$,/ $7 *:% 7,/( ),1,6+ 75$16,7,21

$33/,(' &217,18286 67$,1/(66 67((/ 72( .,&. $'+(5( 72 67$,1/(66 67((/ %$6( &+$11(/

$UFKLWHFWXUH ,QWHULRUV

'UDZLQJ 7LWOH

& 678' 6(&7,21

6XEDUX RI $PHULFD +HDGTXDUWHUV

5(9($/ *5287 $6 63(&,),('

& 678' 6(&7,21


Junyuan Spanish Housing Design Zhejiang Tianren Jingjie Architecture & Associates

Leader: Yafeng Song, Hui Liu Role: Construction Document Software: Sketch Up, AutoCAD, V-ray, Adobe Creative Suites



South Jersey Industries Pre-Planning

GRANUM A/I ARCHITECT 100 MATSONFORD ROAD RADNOR CORPORATE CENTER 4, SUITE 110 RADNOR, PA 19087 215.525.2663

IN COLLABORATION WITH:

ALDERSON ENGINEERING MEP, FP

407 LAKESIDE DR SOUTHAMPTON, PA 18966 215.364.5635

Granum A/I

Key Plan

Project Name:

SJI: FOLSOM RENOVATION HAMMONTON, NJ 08087

Professional Seals

No.

Issue Description

Project No:

SJI 1156A

Sheet Title

{3D - xliu}

1

A-711

YYYY-MM-DD

Unnamed

Original drawing is 48 x 36 Do not scale contents of this drawing

NOT FOR CONSTRUCTION

A-711

Sheet Number

GRANUM A/I ARCHITECT 100 MATSONFORD ROAD RADNOR CORPORATE CENTER 4, SUITE 110 RADNOR, PA 19087 215.525.2663

IN COLLABORATION WITH:

ALDERSON ENGINEERING MEP, FP

407 LAKESIDE DR SOUTHAMPTON, PA 18966 215.364.5635

B'

C'

C'

D'

E'

F'

G.3'

G.2'

G.1'

G'

H'

J'

L'

K'

O

6

N

5

4

3

2

1

B'

PENTHOUSE FLR 113' - 1 1/2"

SECOND FLOOR 99' - 6"

FIRST FLOOR 84' - 6"

9

A-700

A-EE NORTH HIDDEN 1984

2

1/8" = 1'-0"

13'

A-700

A-EE SOUTH 1/8" = 1'-0"

1

14'

2

3

4

5

N

6

O

L'

K'

J'

G'

G.1'

G.2'

G.3'

F'

E'

D'

C'

B'

Key Plan

PENTHOUSE FLR 113' - 1 1/2"

SECOND FLOOR 99' - 6"

Project Name:

FIRST FLOOR 84' - 6"

8

A-700

A-EE EAST HIDDEN 1984

3

1/8" = 1'-0"

14'

A-700

13'

SJI: FOLSOM RENOVATION HAMMONTON, NJ 08087

A-EE NORTH 1/8" = 1'-0"

11'

9'

6'

3'

2'

A

1'

B

C

D

E

F

G

H

J

Professional Seals

PENTHOUSE FLR 113' - 1 1/2"

SECOND FLOOR 99' - 6"

No.

Issue Description

FIRST FLOOR 84' - 6" 6

A-700

A-EE WEST

4

1/8" = 1'-0"

A-700

J

H

G

A-EE WEST HIDDEN 1969 NORTH

5

1/8" = 1'-0"

A-700

F

E

A-EE WEST HIDDEN 1969 SOUTH 1/8" = 1'-0"

D

C

B

A

PENTHOUSE FLR 113' - 1 1/2"

SECOND FLOOR 99' - 6" Project No:

SJI 1156A

Sheet Title

FIRST FLOOR 84' - 6"

7

A-700

A-EE SOUTHEAST 1984 1/8" = 1'-0"

1

A-700

A-EE EAST 1/8" = 1'-0"

MECHANICAL 77' - 6"

NOT FOR CONSTRUCTION

EXTERIOR ELEVATIONS

Original drawing is 48 x 36 Do not scale contents of this drawing

Sheet Number

A-700

YYYY-MM-DD


GRANUM A/I

8

7

6

5

4

3

2

ARCHITECT 100 MATSONFORD ROAD RADNOR CORPORATE CENTER 4, SUITE 110 RADNOR, PA 19087 215.525.2663

1

IN COLLABORATION WITH:

A B

ALDERSON ENGINEERING MEP, FP

407 LAKESIDE DR SOUTHAMPTON, PA 18966 215.364.5635

6' - 0 1/2"

C

1' - 6"

20' - 0"

D

4' - 7 3/16" B'

C'

D'

F'

G'

J'

M.5'

N.5'

12' - 0"

19' - 8"

12' - 7" 6' - 5"

14'

L'

1' - 0"

3 7/8"

12' - 0 3/16"

14' - 10"

O

N

4' - 11 3/8"

13'

12'

5' - 2"

5' - 4 5/8"

E

Key Plan

DN

3' - 6"

4' - 4" 9' - 0 5/8"

10'

16' - 8"

11'

6' - 0"

5' - 1"

12'

DN

9'

8'

6.5'

20' - 8"

8' 7' 6.5' 6'

DN

Project Name:

5' - 9 3/8"

6' - 8"

DN

SJI: FOLSOM RENOVATION F

4'

HAMMONTON, NJ 08087

5' - 8"

6' - 3 5/8"

1' - 4"

5' 4'

L'

J'

16' - 0"

Professional Seals

3'

H' G

H

No.

Issue Description

YYYY-MM-DD

J

2' DN

1'

Project No:

B'

C'

D'

F'

E'

M'

N'

N.1'

SJI 1156A

Sheet Title

Unnamed W-XL 02 EXG PLAN 1/8" = 1'-0"

Original drawing is 48 x 36 Do not scale contents of this drawing

NOT FOR CONSTRUCTION

A-712

Sheet Number

GRANUM A/I ARCHITECT 100 MATSONFORD ROAD RADNOR CORPORATE CENTER 4, SUITE 110 RADNOR, PA 19087 215.525.2663

8

7

6

5

4

3

2

IN COLLABORATION WITH:

1

ALDERSON ENGINEERING MEP, FP

3' - 6"

7' - 6"

40' - 0"

40' - 0"

40' - 0"

7' - 6"

407 LAKESIDE DR SOUTHAMPTON, PA 18966 215.364.5635

3' - 6"

A B

11"11"

38' - 2"

11" 2' - 8"

C

9' - 6"

3' - 8"

11" 2' - 8"

1' - 0"

1' - 0"

11"11" 1' - 4"

11" 2' - 8"

2' - 8" 11"

7' - 6"

2' - 0"

5' - 9"

N.5'

12' - 6"

14'

11"11"

3"

11' - 3"

11'

10'

10'

4' - 0"

8' - 10"

- 7"

40' - 0"

16' - 4"

3' - 0"

E

3' - 0"

5' - 2"

27' - 1"

1' - 2" 3' - 0"

Key Plan

12'

6'

3' - 0"

26' - 1"

11' - 3"

2' - 1"

5' - 1"

6' - 0 17/32"

41' - 4 1/2"

1"

8' - 7"

5' - 1 3/4"

14' - 10" 11'

DN

N13'

O

5" 4' - 11"

2' - 9 1/2"

13' - 11"

11"11"

12' - 11 3/4"

5' - 7 1/2"

5' - 0"

8' - 0"

2' - 8"

1' - 0"

1' - 4 1/2"

2' - 8"

13'

M.5'

3' - 9"

6' - 10"

2' - 8"

14'

L'

43' - 0 1/2"

40' - 0"

J'

6' - 0"

G'

40' - 0"

D

4' - 10"

20' - 10"

F'

40' - 0"

6' - 3"

7' - 6 7/16"

D'

11"11"

4' - 2"

11' - 6"

C'

3' - 4"

2' - 8"

11"11"

1' - 3"2' - 4" 2' - 4"

B'

6' - 0"

9' - 2"

5' - 0"

4' - 5"

4' - 0"

1' - 0"

9' - 0"

3' - 4 1/2"

40' - 0"

9"

6' - 0"

9'

9'

2"

Project Name:

4'

6' - 1 1/4"

4'

3' - 0"

F

3' - 0"

DN

DN

Professional Seals

7'

- 2"

7'

40' - 0"

- 2"

7'

- 2"

40' - 0"

5'

- 2"

3'

- 4"

L'

J'

DN

11"11"

5' - 9 3/16"

1' - 5 29/32"

5'

1' - 1"

5'

5' - 9"

4' - 8"

HAMMONTON, NJ 08087

5" 2' - 1"

°

5' 4'

SJI: FOLSOM RENOVATION

4' - 4 1/2" 6' - 6 3/16"

5' - 9 3/8"

8' - 11"

45.00

- 11 "

8' 8' 7' 6.5' 6.5'

10' - 1"

11"11"

6'

11"11"

7'

- 2"

1' - 0"

No.

- 2"

Issue Description

7' - 6"

1' - 4"

G

H J

- 2"

7'

- 2"

7'

E'

11" 2' - 8"

3' - 6"

31' - 1"

7'

- 2"

1' - 0"

7'

- 2"

H'

2' - 8" 11"

4' - 0"

7'

- 2"

3'

7' -2

11' - 2"

5'

3' - 8" 1' - 0"

10' - 1"

3' - 8"

1/8"

11"

1' - 1"

2' - 8" 2'

1' - 0"

3' - 10 3/16" 1'

1' - 0"

1

A-712

1' - 0"

18' - 10"

11' - 0"

7' - 10"

7' - 2"

1' - 1"

19' - 11"

31' - 1"

40' - 0"

45' - 4 1/2"

Project No:

1' - 5" 1' - 8"2' - 6"

SJI 1156A

Sheet Title

C'

1

A-713

D'

E'

F'

Unnamed M'

N'

N.1'

W-XL 01 EXG PLAN

Original drawing is 48 x 36 Do not scale contents of this drawing

1/8" = 1'-0"

NOT FOR CONSTRUCTION

Sheet Number

A-713

YYYY-MM-DD


“ Home” Pen Drawing, 2013, Shanxi,China


“ the Ancient Villages” Photograph, 2014, Hongcun, China

“ Urban Village in China” Pen Drawing,2013,Xiamen,China

“Sunset Path” Watercolor Painting, 2011, Xiamen, China



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.