South Makes

by Egidijus Kasakaitis


Research reflection

The initial research helped to identify problems within the district of the site as well as showed their impact in a scale of a city of Chicago. However, in order to have those assumptions, the analysis were divided into three stages. Firstly, an extensive research was initiated including the collection of hard data and the use of media helped to form the perception about Chicago and particularly South Chicago, the location of the project. Secondly, the validity of the collected knowledge was tested during the field trip, which revealed false public perception through media about South Chicago and by meeting and interviewing various people became evident that architectural intervention couldn’t help in the existing political context. And thirdly, the collected knowledge and experience was translated into an urban strategy by criticising current legitimate base and general developments policy within the range of Chicago to address the most outstanding issues with proposed development alternative in the district of South Chicago. Therefore, design proposal had intended to focus not on solving issues such as high unemployment, low education and high crime rate within the district, but rather identifying a major problem causing these problems to occur, which turned out to be that people stuck in a loop of problems, where problems enhancing each other. To break that loop the long term system is being proposed, which would reduce the magnitude of the problems by engaging community in the overall design development. In order to achieve that goal, the gradual approach was chosen, where project with diverse program is taking place as a catalyst, the first step in community’s engagement. Due to that, by referring to the proposed urban strategy for the entire area, it was necessary to create a flexible framework, which would be able to adapt through time. As a result, based on successful scenario the social and economic impact on the community of South Chicago would grow gradually in parallel with the development of the project by expanding the proximity to the whole city of Chicago.

2/ South Makes

In relation to the theme of the studio (Complex Projects) the reason for choosing the location is well defined by exposing the complexity of interrelating issues within the area. Therefore, in order to grasp the scale of the problems the extensive research as mentioned, is a part of studio’s approach. Additionally, the research also consisted of multiple case studies analysis, to understand how it is dealt with similar problems worldwide. By using the same methodology multiple case studies both building and public spaces were analysed to define the size and composite of the program for chosen design goal.


3/ South Makes

Content

Urban Strategy Research Conclusions Spatial Strategy Program Design Proposal


4/ South Makes

Urban Strategy


Chicago LOOP

16km

5/ South Makes

SOUTH WORKS


South-Works Site “At its peak, the steel mill employed some 20,000 people, which spurred the development of a new community centered around the mill�



South-Works Site

8/ South Makes

“On 10 April 1992, the plant permanently shut down with fewer than 700 people employed at the time of its closing.�


9/ South Makes

2.4km2


10/ South Makes

Field Trip


11/ South Makes


12/ South Makes


Research Conclusions Major problems in south chicago

AFFORDABILITY IS A BIG GROWING ISSUE HERE

SOM architect

IMAGINE

NASUTSA MABWA McCaffery project manager

INDUSTRIAL ANCHOR

WAYNE STEGER politics teacher

High crime rate

No free time activities Weak community / no pride Single parent families

Low education Connectivity / infrastructure Gang zones

High unemployment

13/ South Makes

Catalyst needs


Critique To Masterplans

14/ South Makes

To attract external ivestors


Old Model Rigid phasing

“The client faces a battle. The housing market collapses and the presumed market for the site is gone. So now they have to rethink what the site is going to be.� - SOM Spokesperson

1 3

Rigid phasing

4

2

5

1 3

2

4 5

New Model

Envolving partnership Involvement of multiple interests Decentralized authority Individual cluster managers

15/ South Makes

Cluster testing


South-Works As Inspiration

16/ South Makes

Inherent growth according to it’s own logic


Evolutionary Species

Darwins tree of life (1837)

Adaptable to market ONE ANCHOR

CLUSTER PRINCIPLE

Initial Investment

Crisis

Crisis

17/ South Makes

Initial investments


18/ South Makes

SOUTH

WORKS


19/ South Makes


20/ South Makes

Research Conclusions


Routine Regular day in the neighbourhood

“Its lack of diversity in education systems. It’s all left brain learning, it’s very rigid learning, their creative and athletic side is not touched. They are not getting people who are believing in them, there are no opportunities to get jobs, and if there are no jobs why wouldn’t you hustle drugs on streets.”

21/ South Makes

From Interview (2013 10 15) with SARAH WARD Happy Art Center


Problems People stuck in the loop

No freetime activities There is lack of amenities preventing kids from attending gangs and reducing employment possibilities, while gang zones is the reason of the lacking

High unemployment Gone industrial anchor left crippled community with degrading education and increasing violence instead

Low education

22/ South Makes

Reduced quality of gained knowledge is limiting future employment prospects and pulling the faith in community away from people


23/ South Makes

“People no longer know how to live on their own�


Goal Solution turns into a cycle

MAKERS HUB

Make a split

MAKERS HUB

Use existing potential

24/ South Makes

IMAGE

MAKERS HUB

Alternate the loop


Intention

MAKERS HUB

DIVERSE AGE GROUPS

LIFE SKILLS TRAINING

PRODUCTION

ECONOMIC BENEFIT

SOUTH CHICAGO

CHICAGO

25/ South Makes

FREETIME ACTIVITIES


26/ South Makes

Spatial Strategy


27/ South Makes


Cluster Location

28/ South Makes

Lakeshore Drive


Cluster Growth Creating public flow collisions

RO

MA

AD

No 2 adjacent blocks >15m

BL

AD

Max block length: 50m

FR

Continuous facade front

IN

Min block height: 4F

MA

IN

MI

Max intersecting roads: 3

MI

M2

SE

BL

BL

PL

Max block height: 5F

M2

TR

No height limit

PL

Freely placed plots

RO

Initial road

SE

Initial seed

FR

TR

Freely placed trees

29/ South Makes

Infrastructure growth


Program Legend

INDUSTRY OFFICE RETAIL CULTURE RESIDENTIAL

30/ South Makes

Spatial growth of the cluster


Site Location Close to urban traffic node

New light rail MAKERS HUB LOCATION

Ore walls Existing roads


32/ South Makes

Program


Program Guidelines

Living Short excursions Individual studios

Learning + making After school activities in age of 7 - 16 Public access to educational facilities Skills application for production in south chicago and chicago Makers faire is place to show your creations Startup kit and facilities Hybrid making

Showing

33/ South Makes

Common space as meeting, brainstorming and exhibition places Gallery is to show and sell production Public square is the market of exchange


Functions And Manufacture Clasification

CLASSROOMS

FAB LABS WORKSHOPS METAL WOOD FABRICS CRAFTS

CO WORKING STUDIOS EXHIBITION

34/ South Makes

COMMON SPACE

EDUCATION HOUSE FIXTURES PROTOTYPING INDUSTRIAL DESIGN ENGINEERING IT PROGRAMMING FURNITURE FASHION


South Chicago Makers & Public Overlap of activities

CUSTOMERS INTERNSHIP MAKERS FAIRE

PUBLIC CONSUMERS

SCHOOL EXCURSIONS + STAYING EMPLOYED MAKERS

LOCAL MAKERS

USING STUDIOS + CO WORKING FACILITIES APPLICATION FOR STARTUP GRANT ENTREPRENEURSHIP COURSES LEARNING 3D PRINTING KNOWLEDGE APPLICATION IN WORKSHOPS CLASSES ABOUT TECHNOLOGY + CRAFTS

KIDS

12

TEENS

18

ADULTS

30

35/ South Makes

6


36/ South Makes

UPDATE


37/ South Makes


Case Studies w

1% Reception desk 101 m2

7% Garage 5% Storage

13% Circulation 714 m2 Ramps / staircases

21% Workshops 400 m2

10% Service

5% Common space 67 m2 4% Meeting place 57 m2

Loading area 25% Workshops / exhibition 480 m2

5% Rest room

9% Common space

e areas

15% Services

5% Workspaces

18% Access / Crit / Gallery 10% Workshops 126 m2

5% Exhibition

9% Photo 105 m2

7% Utilities 110 m2

43% Studios 2808 m2

100% Total 6460 m2

TU Delft BK City Delft

26% Residence 500 m2

15% Students facilities 12% Conference rooms / Radio

10% Workshop

Main entrances

8% Bookshop

5% Workspaces

4% Research collection

7% Auditorium

18% Modeling spaces 1203 m2

21% Shared space 420 m2

3% Entrance

2% Pritzker club

6% Office 79 m2

5% Reception

25% Workshops 1634 m2

2% Welcome center

7% Utilities 218 m2

7% Multipurpose hall

10% Restaurant / Food court / Cafe / Bookshop

14% Shared space 18% Studios 216 m2

14% Library / Ancient book collection

19% Auditorium

29% Cafe

100% Total 1910 m2

100% Total 2300 m2

Nida Art Colony Nida

Google Jump Studio London

28% Main studio 335 m2

100% Total 1203 m2

55% Studios

100% Total 4370 m2

Antony Gormley Studio Milstein Hall London Cornell University New York

42% Services / Logistics / Kitchens 100% Total 10690 m2

IIT Mccormick Tribune Campus Center Chicago

20% Offices 100% Total 14375 m2

Rolex Learning Center Lausanne

Rest room / Control room / Prints treatment space 100% Manufacture / Logistics 100% Total 6950 m2

Stratasys 3D Printers Factory Eden Prairie

38/ South Makes

RDM campus


Building Program Total - GFA 11927 sqm

Roof deck 2761 sqm

Outdoor common space 3213 sqm

27% 27%

Outdoor common space 3213 sqm

Outdoor common space 3213 sqm

Roof deck 2761 sqm

Outdoor common space 3213 sqm

Terraces 452 sqm

Terraces 452 sqm First floor 1910 sqm

Indoor common space 3687 sqm First floor 1910 sqm

Indoor common space 3687 sqm Utilities 166 sqm

32% 32% 1%

4%

Logistics 463 sqm Administration 275 sqm Media Lab 244 sqm

Utilities 166 sqm Residential 563 sqm Logistics 463 sqm 3D Printing 300 sqm Administration 275 sqm Media Lab 244 sqm FAB LAB 900 sqm Residential 563 sqm Co-working 300 sqm 3D Printing 300 sqm Workshops 600 sqm FAB LAB 900 sqm Event space 300 sqm Food court 225 sqm Co-working 300 sqm Reception 138 sqm

WorkshopsRetail 600 sqm543 sqm Event space 300 sqm Food court 225 sqm Reception 138 sqm Retail 543 sqm

2% 2%

4%5% 1%

2.5%

2%

7.5% 5% 2%

2.5%2.5%

5% 7.5% 2.5%

2.5% 2% 1%

4% 5% 2.5% 2% 1%

4%

Indoor common space 3687 sqm

Utilities 166 sqm Logistics 463 sqm Administration 275 sqm Utilities 166 sqm Media Lab 244 sqm

Logistics 463 sqm Residential 563 sqm Administration 275 sqm Media 244 sqm300 sqm 3DLab Printing Residential 563 sqm FAB LAB 900 sqm 3D Printing 300 sqm Co-working 300 sqm FAB LAB 900 sqm Workshops 600 sqm

Ground floor 1777 sqm

Storage 18 sqm Toilets 148 sqm Ground floor 1777 sqm Logistics 463 sqm

Lounge / offices 104 sqm Conference room 50 sqm 6x Offices 121 sqm Storage 18 sqm Computer workplace 19 sqm Toilets 148 sqm 2x Classrooms 225 sqm Lounge Logistics 463 sqm 141 sqm 2x Toilets 20 sqm Storage 11 sqm 4x Studios 128 sqm Lounge 139 sqm Lounge / offices 104 sqm Conference2x room 50 sqm Toilets 21 sqm Loundry 7 sqm 3x Rooms 6x Offices 121 sqm 96 sqm Prints treatment Computer workplace 19 sqmroom 44 sqm

2x Classrooms 225 sqmhall 256 sqm 3D Printing Lounge 141 sqm 11 sqm Education FAB LAB 300 sqm 2x Toilets 20 sqm Storage 4x Studios 128 sqm Lounge 139 sqm 2x Toilets 21 sqm Loundry 7 sqm 2x sqm Production FAB LABS 600 sqm 3x Rooms 96 Prints treatment room 44 sqm 3D Printing hall 256 sqm Rest room 50 sqm Workshop 90 sqm Kitchen 60 sqm Lounge 100 sqm Education FAB LAB 300 sqm Crafts / Carpentry workshop 225 sqm

2x Production FAB LABS 600 sqm Furniture workshop 225 sqm 2x Sewing workshops 150 sqm

Event space Co-working 300 sqm300 sqm Food court 225 sqm Workshops 600 sqm138 sqm Reception

Storage Rest room 50 sqm 19 sqm Workshop 90 sqm Kitchen 60 Event sqm space 281 sqm Lounge 100 sqm Kitchen 75 sqm Canteenworkshop 150 sqm 225 sqm Crafts / Carpentry Staff room 38 sqm Furniture workshop sqm Entrance 225 & Reception 100 sqm

2x Sewing workshops 150 sqm Kitchen 59 sqm

Event spaceRetail 300 sqm543 sqm Food court 225 sqm Reception 138 sqm Retail 543 sqm

Storage 19 Cafe sqm 140 sqm

Event space 281 sqm Gallery 344 sqm Kitchen 75 sqm Canteen 150 sqm Staff room 38 sqm Entrance & Reception 100 sqm Kitchen 59 sqm Cafe 140 sqm Gallery 344 sqm

39/ South Makes

Indoor common space 3687 sqm


Conceptual Schemes

40/ South Makes

Development principles

Grid

Fluid

Regular

Flexible + expandible

Non-regular

Limited

Consequential

Public indoor - outdoor

2D & 3d mixing

Horizontal


Linear

Consequential

Inverted

Conventional stacking

Cross connection

Accidental arrangement

41/ South Makes

Public flow


42/ South Makes

Design Proposal


Building Concept Incremental building method

Adapting through time

43/ South Makes

Generic element binds diverse program


Generic element as a seed

Sunlight impact

N


Public flow collisions

Plugging in the program


Designating logistics zones

Blending in the surroundings


Program distribution

Common space Retail Food court Event space Workshops Fab labs 3D printing Co - working Residential Media lab Administration Logistics

Program zoning

PUBLICLY ACCESSIBLE ZONE RESIDENTIAL ZONES

PRODUCTION ZONE


Public landscape

Workshop yard space

132 meters

48/ South Makes

Car traffic


Site Plan Concept Functional zoning

Representative outdoor space me

ter

s

Main square / market hall

Car parking

49/ South Makes

67


Public landscape Workshop yard / test site / exhibition

Clean

132 meters

Vegetation as natural buffer

Bicycle par

50/ South Makes

Dirty logistics

In


Site Plan Key moments

n logistics

Shared space / open air terrace 67

me

ter

s

Main square / market hall

nteractive zone / open air cinema Parking lot

51/ South Makes

rking lot


Public landscape

Multifunctional outdoor space

52/ South Makes

Parking lot


South Chicago

53/ South Makes

Main square


Building Components Ground floor

Workshop yard Production zone

Publicly accessible zone

Transition zone

Circulation Utilities Retail Workshops 3D printing Residential Logistics Outdoor common space

Representative zone


First floor

Indoor common space

Circulation Outdoor common space Retail Food court Event space Workshops Fab labs

Residential Media lab Administration

55/ South Makes

Co - working


56/ South Makes


57/ South Makes


Indoor Common Space Extending program into a common space Computer workplaces Exhibition / Crits

Meeting place / Exhibition Meeting place Meeting place

Chillout area

Chillout area

Workshop extention

Workshop extention Presentations space

Meeting place Exhibition

Tools to create atmosphere Room acoustics

Multifunctional space

Light diffused surfaces Entertainment corners

58/ South Makes

Diverse floor finishings

Social corners

Public workplaces Indoors workshops


59/ South Makes


60/ South Makes

Ground Floor


61/ South Makes


62/ South Makes

First Floor


63/ South Makes


Building Section Section a

Multifunctional common space Meeting place / Exhibition

64/ South Makes

Studios

Workers rooms


Multifunctional event space Meeting place

65/ South Makes

Sound absorbing elemnts


Alternative Building Scenario Adapting to changing conditions

Potential of the building

66/ South Makes

Reduced capacity of the building


67/ South Makes


Structural Concept Using methods from the context

Permanent - robust concrete ore walls are found in the site

68/ South Makes

Temporary - add ons for houses from timber is a common typology in Chicago


69/ South Makes


Flexible Connection Detail Regular connecetion joint

Reinforced concrete floor slab with CCA technology

Regular reinforced concrete portal CCA heating connection

Cast in steel plate with heating connection

Custom profile for beam connection and suspension cable

70/ South Makes

Load bearing glue laminated timber beam 150 / 700 mm


Flexible Connection Detail Cantilievering construction joint

Special reinforced concrete portal

Cast in steel plate

Custom profile for rigid timber portal connection and suspension cable

71/ South Makes

Glue laminated timber beam 150 / 700 mm


Building Sustainability Concept

Economic independency

72/ South Makes

Social welfare

Local materials

Strategies incorporating within the building


73/ South Makes


Building Facade Concept Materialization principles articulating the building

Exposing construction - using curtain facade system

Controlling daylight intake - local timber vertical louvres

74/ South Makes

Translucency versus trasparency - while in day time provides difused light in night time it becomes transparent


75/ South Makes


76/ South Makes


77/ South Makes


Building Facade Concept Exposing construction behind

Double Height Facade Fragment Permanent structure facade Rough sawn softwood boarding

Vertical wooden shading elements

Curtain wall facade

Ventilation “Breathing window” units + rainwater drainage

Plugins Front Facade Fragment Temporary structure facade

Rough sawn softwood boarding Curtain wall facade

78/ South Makes

Vertical wooden shading elements

Ventilation “Breathing window” units + rainwater drainage


Translucency versus transparency

Plugins Side Facade Fragment Temporary structure facade Rough sawn softwood boarding

U shape glass facade

Main Entrance Side Facade Fragment Using same material to emphasize

Rough sawn softwood boarding

U shape glass facade

79/ South Makes

U shape glass facade mounting frame


80/ South Makes


81/ South Makes


82/ South Makes


83/ South Makes


South Makes by Egidijus Kasakaitis


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.