Facility Program

Next Article
Facility Use

Facility Use

[The 1996 Nueva School Master Plan Page 22-28]

The 2012 Master Plan Update accommodates new Middle School classrooms and specialized educational facilities including a new Environmental Center, a covered sports court, a multi-purpose building, affordable housing, and a theater. When fully implemented, the Update utilizes the remaining entitled building area of 20,785 SF from the 1996 Master Plan and proposes an additional area of approximately 23,000 SF to meet current and projected needs over the next 15 years. The proposed Theater (16,000 SF) comprises a significant proportion of that area.

Advertisement

Included in this section are general descriptions of existing and proposed facilities and their uses. Each facility description includes a review of current and projected impacts. The building areas and structural coverage areas proposed are estimates. Total campus structural coverage through 2027 will not exceed the Town of Hillsborough Development Standards as allowed by the total site acreage.

This article is from: