Detail Plan 2016, Aceh Investment Coordinating Board

Page 1

ACEH INVESTMENT PROFILE



ACEH INVESTMENT PROFILE

ACEH INVESTMENT COORDINATING BOARD 2016


FOREWORD BY GOVERNOR OF ACEH

Aceh is your investment destination. There are four key strengths that make Aceh very promising: (1) friendly investment laws, (2) strategic geographical location, (3) abundant natural resources, and (4) human capital.

dr. Zaini Abdullah GOVERNOR OF ACEH

2 } Aceh Investment Coordinating Board

Friendly investment laws are related to our status as a special province with autonomy in Indonesia. We have a wider authority to govern ourselves than other provinces in Indonesia. We also have privileges


that allow us to make direct agreements with foreign institutions. We consider investment as one of the key instruments to enhance the economic development in Aceh with the focus on three potential sectors: (1) agro industry, (2) energy and infrastructure and (3) tourism. We already have excellent foundations in these strategic sectors. Coffee, patchouli, cocoa, palm oil, coconut are just a short list. Moreover, fisheries also have potential for investment opportunities in Aceh.

To accelerate investment in the region as well as to improve the investment climate, we are working on some important issues to resolve, such as deregulation at licensing acceleration, security and better infrastructure. Hence, the new Aceh will be perfect for your future investment. Last but not least, we welcome you to visit us and invest in amazing Aceh.

Aceh Investment Profile

{ 3


Content FOREWORD BY GOVERNOR OF ACEH 1. INTRODUCTION ~ 6

1.1 VISION AND MISSION ~ 8 1.2 ACEH AT A GLANCE ~ 10 1.2.1 AREA ~ 14 1.2.2 ADMINISTRATIVE REGIONS ~ 16 1.2.3 POPULATION ~ 18 1.2.4 MAN POWER/LABOR FORCE ~ 20

2. SPATIAL PLANNING ~ 22 3. INFRASTRUCTURE SUPPORT ~ 26 3.1 ROADS ~ 28 3.2 SEA PORTS ~ 30 3.3 AIRPORTS ~ 32 3.4 ENERGY ~ 34 3.5 WATER ~ 36

4. ECONOMIC PERFORMANCE ~ 38 5. EASES OF DOING BUSINESS IN ACEH ~ 44 6. DETAILED PLANS FOR AGRO INDUSTRIES ~ 50

6.1 DETAILED PLANS FOR AGROINDUSTRY 6.1.1 DETAILED PLANS FOR FOOD CROPS ~ 54 6.1.2 DETAILED PLANS FOR HORTICULTURE ~ 64 6.2. DETAILED PLANS FOR PLANTATION ~ 70 6.2.1. PALM OIL ~ 72 6.2.2. RUBBER ~ 84 6.2.3. CACAO ~ 86 6.2.4. COFFEE ~ 88 6.2.5. COCONUT ~ 92 6.3 DETAILED PLANS FOR ESSENTIAL OIL PRODUCTION ~ 94 6.3.1. PATCHOULI ~ 96 6.3.2. NUTMEG ~ 102 6.3.3. CITRONELLA ~ 104 6.4. DETAILED PLANS FOR ACEH BEEF INDUSTRY DEVELOPMENT PROJECT ~ 106 6.4.1. ACEH BESAR BEEF INDUSTRY DEVELOPMENT PROJECT ~ 108 6.4.2. PIDIE BEEF INDUSTRY DEVELOPMENT PROJECT ~ 110 6.4.3. BENER MERIAH BEEF INDUSTRY DEVELOPMENT PROJECT ~ 112 6.3.4. ACEH TENGAH BEEF INDUSTRY DEVELOPMENT PROJECT ~ 114 6.3.5. NAGAN RAYA BEEF INDUSTRY DEVELOPMENT PROJECT ~ 116


6.5. DETAILED PLANS FOR FISHERIES ~ 118 6.5.1. LAMPULO INTERNATIONAL FISHING PORT ~ 120 6.5.2. IDI FISHING PORT ~ 122 6.5.3. SAWANG BA’U FISHING PORT ~ 124 6.5.4. PEUDADA FISHING PORT IN BIREUEN ~ 126 6.5.5. SIMEULUE AQUACULTURE PROJECT ~ 128 6.5.6. Simeulue Fishing Port ~ 130 6.5.7 SIMEULUE SEAWEED CULTURE PROJECT ~ 132

7. DETAILED PLANS FOR INFRASTRUCTURE AND ENERGY ~ 134 7.1 DETAILED PLANS FOR INSFRASTRUCTURE ~ 136 7.1.1. BANDA ACEH URBAN RAILWAY ~ 138 7.1.2. KRUENG GEUKUEH SEAPORT PROJECT ~ 140 7.1.3. KUALA LANGSA SEAPORT PROJECT ~ 142 7.2 DETAILED PLANS FOR ENERGY ~ 144 7.2.1 ELECTRICITY IN ACEH ~ 146 7.2.2 GEOTHERMAL PROJECTS ~ 152 7.2.3 HYDRO POWER PROJECTS ~ 154

8. DETAILED PLANS FOR TOURISM DEVELOPMENT ~ 158 8.1 BANDA ACEH TOURISM DEVELOPMENT PROJECT ~ 160 8.1.1 KRUENG ACEH RIVER WALK ~ 162 8.1.2 ULEE LHEUE BEACH ~ 164 8.1.3 BANDA ACEH MADANI EDUCATION CENTER ~ 166 8.2 SIMEULUE MARINE AND TOURISM DEVELOPMENT ~ 168 8.2.1 DIVING CENTERS ~ 170 8.2.2 SURFING CENTERS ~ 172

9. SABANG FREE PORT AND FREE TRADE ZONE ~ 174 9.1 SABANG INTERNATIONAL WATER FRONT ~ 176 9.2 PASSENGER CRUISE TERMINAL ~ 178 9.3 YACHT MARINA & SUPPORTING FACILITIES ~ 180 9.4 DIVING CENTRES ~ 182 9.5 SEAPORT 184 9.6 INDUSTRIAL AND TRADING SECTOR ~ 186 9.7 BALOHAN INDUSTRIAL PARK ~ 188 9.8 FISHERIES SECTOR ~ 190

10 DETAILED PLANS FOR INDUSTRIAL ESTATES ~ 192

10.1 ACEH INDUSTRIAL ESTATE AT LADONG, ACEH BESAR ~ 194 10.2 LHOKSEUMAWE INDUSTRIAL ESTATE ~ 196


1

Introduction

6 } Aceh Investment Coordinating Board


The Aceh Investment Coordinating Board is the primary coordination body for the promotion and facilitation of investments in Aceh, Indonesia. It is responsible for providing a full range of support and services to investors wanting to establish or expand businesses, including preparing macro investment planning, identifying and promoting local potential, providing full assistance with permits and licensing, assisting and monitoring the existing investments, as well as assisting coordination and partnerships with all related agencies and with all districts/cities across the province to provide the best possible service for all investors.

Aceh Investment Profile

{ 7


Aceh becomes the leading investment destination in Indonesia

1.1

Vision and Mission 8 } Aceh Investment Coordinating Board


In line with the vision, the followings are missions to be accomplished.

ʠʠ Improving human resources in investment. ʠʠ Implementing integrated planning and control of investment amongst central government, provincial government, local governments and private sectors. ʠʠ Promoting Aceh’s new brand image as a leading investment destination. ʠʠ Providing support and services to investors wanting to establish or expand business.

The Board’s main objective is to increase the number and value of Investments in Aceh Province. While the specific targets are: ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤

Provision of efficient, effective, transparent, and accountable services toward businesses and the wider community. Providing a wide range of data and information for investors. Assistance in providing licensing and permits for both domestic and foreign investors. Conducting effective promotional activities to attract both domestic and foreign investors. Establishing investment partnerships either with domestic or foreign investors. Promoting partnerships between small-scale businesses and cooperatives and large-scale businesses. Continuous liaison with investors in their operations with an ultimate aim of improving the investment environment and the ease of doing business.

Photo: Sultan Iskandar Muda International Airport

Aceh Investment Profile

{ 9


Phuket

Andaman Sea

Ma lac ca

Banda Aceh

Aceh Province is located between 01 58’37, 2” - 06004’33, 6” North Latitude and 94057’57, 6” - 98017’13, 2” East Longitude with average altitude of 125 meters a.s l with an extensive highland area above 1,000 m a.s.l. 0

Str ait

ean Oc ian Ind

aceh

North Sumatera Province

119 islands 35 mountains N

1.2

(several volcanoes)

Aceh at a Glance 100km

10 } Aceh Investment Coordinating Board


Thailand

Malaysia

Kuala Lumpur

Singapore

73 rivers

1

large crater lake

Aceh Investment Profile

{ 11


Aceh, The west Gate of indonesia

12 } Aceh Investment Coordinating Board


ACEH

Aceh Investment Profile

{ 13


The total area of the territorial sea which extends to two hundred nautical miles measured from the coastline.

Topographically hilly with mountains, valleys, rivers, waterfalls, and narrow floodplain.

2.21%

125,439 ha Settlements

Area of the Aceh Province is 5,677,081 ha; with over 2,270,080 ha of forests and around 800,401 ha of plantations while the industrial area is 3,928 ha.

3.49%

7.00% 397,512 ha Rice fields

198,000 ha Mining

0.07% 3,928 ha Industry

1.2.1

Area 14 } Aceh Investment Coordinating Board

Dry land farming 139,049 ha

2.45%

Horticulture 305,624 ha

5.38%


5,677,081 ha Total Area

2,270,080 ha Forest

3,928 ha Industrial Area

800,401 ha Plantation

39.99% 17.63% 1,001,081 ha Plantations

2,270,080 ha Forests

4.09% 232,023 ha Pasture

3.64%

206,741 ha Inland water

Land Use Cleared Land 8,433 ha

0.15%

i Others 789,171 ha

13.90%

Source: Aceh Development Profile, Aceh Central Bureau of Statistic (BPS) 2014

Aceh Investment Profile

{ 15


Bener Meriah 232

11

10

172

21

322

32

Nagan Raya 10

30 222

Simeulue 10

29

138

Aceh Tengah 14

18

295

1.2.2

Administrative Region 16 } Aceh Investment Coordinating Board

136

16

51

385

Southwest Aceh

West Aceh 12

25

Southeast Aceh

Aceh Jaya 9

Gayo Lues 11

9

20

132

South Aceh 18

43 260

Aceh Singkil 11

16

116

Bireuen 17

75

609


Sabang 2

North Aceh

18

7

27

4

90

17

23

24

68 604

Pidie 94

32

68

53

511

Aceh Tamiang 12

727

27

213

Langsa

Pidie Jaya 8

9

East Aceh

Aceh Besar 23

852

Lhokseumawe

Banda Aceh 9

67

5

222

6

66

Subdistrict

Subulussalam

Mukim

5

Village

289 sub-districts

18

districts

5 cities

Source : Aceh Development Profile, Aceh Central Bureau of Statistic (BPS) 2014

761

8

74

6,464 vilages

mukim

Aceh Investment Profile

{ 17


population numbers by sex, 2012-2014 District/City

Male

Female

Total

Simeulue

45,056

42,871

87,927

Aceh Singkil

64,922

63,224

128,146

South Aceh

113,854

113,404

227,258

Southeast Aceh

109,919

109,386

219,305

East Aceh

211,386

207,355

418,741

Aceh Tengah

104,720

101,010

205,730

West Aceh

95,060

91,633

186,693

Aceh Besar

193,920

187,044

380,964

Pidie

216,620

218,587

435,207

Bireuen

211,742

216,905

428,647

North Aceh

283,575

285,446

569,021

Southwest Aceh

74,327

72,668

146,995

Gayo Lues

46,977

46,942

93,919

143,203

139,514

282,717

Nagan Raya

83,730

81,861

165,591

Aceh Jaya

42,822

40,937

83,759

Bener Meriah

77,469

74,931

152,400

Pidie Jaya

76,976

78,017

154,993

Banda Aceh

121,101

114,666

235,767

Sabang

19,452

18,725

38,177

Langsa

91,062

88,943

180,005

Lhokseumawe

94,249

94,322

188,571

Subulussalam

40,425

39,457

79,882

2014

2,562,567

2,527,848

5,090,415

2013

2,397,200

2,394,700

4,791,900

2012

2,347,000

2,346,900

4,693,900

Aceh Tamiang

Source: Aceh in Figures, Aceh Central Bureau of Statistic (BPS) 2015

1.2.3

Population 18 } Aceh Investment Coordinating Board


2,562,567 Males

2,527,848 Females

5,090,415 people

The population of Aceh in 2014 was estimated to be 5,437,120 people, consisting of 2,745,085 males and 2,692,035 females. Aceh Investment Profile

{ 19


Labor Force by DISTRICT/City, 2012-2014 District/City

Labor Force

Job Seekers

Simeulue

30,655

2,566

Aceh Singkil

45,208

5,258

South Aceh

98,112

1,936

Southeast Aceh

90,549

1,562

East Aceh

175,182

15,059

Aceh Tengah

93,547

3,880

West Aceh

83,349

8,770

Aceh Besar

159,789

10,952

Pidie

187,924

10,909

Bireuen

191,091

2,684

North Aceh

217,174

38,011

Southwest Aceh

53,620

6,744

Gayo Lues

43,662

5,229

Aceh Tamiang

113,924

4,377

Nagan Raya

68,505

3,660

Aceh Jaya

39,492

1,570

Bener Meriah

70,958

1,087

Pidie Jaya

63,592

710

112,067

10,639

Sabang

14,753

54

Langsa

64,983

1,319

Lhokseumawe

75,914

85

Subulussalam

29,262

592

2014

2,123,312

137,653

2013

1,926,173

141,067

2012

1,978,491

130,383

Banda Aceh

Source: Aceh in Figures, Aceh Central Bureau of Statistic (BPS) 2015

1.2.4

Man Power/Labor Force 20 } Aceh Investment Coordinating Board


137,653 Job seekers

2,123,312 Labor force

The government of Aceh provides 20% of its annual budget for human capital, so they can be your partnerts in business

Aceh Investment Profile

{ 21


2

Spatial Planning

22 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 23


2,934,602 Ha

Cultivated and Living Area

Those areas include production forests, community forests, agricultural lands, lands for fisheries, mining, industry, tourism, housing and other living functions.

2,708,550 Ha

Protected Areas and Conservation Areas Those areas include the following local protected areas, reserved and cultural heritage areas, national disaster-prone areas, areas for geology protection, and other provincial preservation areas.

Spatial Planning 24 } Aceh Investment Coordinating Board


Cultivated Area Protected Area Conservation Area

Strategic Areas: 1. The Center of National Strategic Activities (PKSN) : Sabang, free port and free trade area. 2. National Activity Center : Lhokseumawe and greater area (PKN) 3. Provincial Capital City, Banda Aceh Aceh Investment Profile

{ 25


3

Infrastructure Support

26 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 27


Andaman Sea

Banda Aceh

ean Oc ian Ind 3.1

Road 28 } Aceh Investment Coordinating Board

Ma lac ca

Str ait


National Road

1,803,35 Km Provincial Road

1,580,42 Km

Regencial Road

16,466.84 Km Aceh Investment Profile

{ 29


Ma lac ca

Andaman Sea Balohan-Sabang Malahayati - Aceh Besar

Str ait

Krueng Geukuh - North Aceh

Banda Aceh

Kuala Langsa

Calang Meulaboh

North Sumatera Province

Susoh Sinabang

ean Oc ian Ind 3.2

Sea Ports 30 } Aceh Investment Coordinating Board

South Aceh Singkil


Aceh Investment Profile

{ 31


Andaman Sea

Ma lac ca

Maimun Saleh Sabang International Airport Sultan Iskandar Muda

Banda Aceh

Str ait

Malikussaleh North Aceh Kuala Langsa

Cut Nyak Dhien Nagan Raya Kuala Batee Southwest Aceh

ean Oc ian Ind

Lasikin Sinabang

3.3

Air Ports 32 } Aceh Investment Coordinating Board

T. Cut Ali South Aceh Hamzah Fanshuri Singkil

North Sumatera Province


Aceh Investment Profile

{ 33


Ma lac ca

Andaman Sea

Aceh North Sumatra Interconnection

Banda Aceh

Str ait

PLTG Arun Lhokseumawe Peusangan Hydro Power

Nagan Raya Steam Power

ean Oc ian Ind 3.4

Energy 34 } Aceh Investment Coordinating Board

North Sumatera Province


343 MW

Aceh-North Sumatra Interconnection

2x110 MW

Nagan Raya Steam Power Plant

200 MW

PLTG Arun Lhokseumawe

88 MW

Peusangan Hydro Power Plant

Capacity

Tariff/KWH IDR

USD

1,300 VA

1,409.16

0.12

2,200 VA

1,409.16

0.12

3,500 VA - 5,500 VA

1,409.16

0.12

6,600 VA above

1,409.16

0.12

6,600 VA - 200 KVA

1,409.16

0.12

More than 200 KVA

1,083.92

0.09

30,000 KVA above

970.35

0.08

6,600 VA - 200 KVA

1,409.16

0.12

Kurs $ 1 = Rp. 12,000 Source : PT. PLN (Persero) Region Aceh

More than 200 KVA

1,083.92

0.09

Aceh Investment Profile

{ 35


Andaman Sea

Ma lac ca

Str ait

Banda Aceh

ean Oc ian Ind

North Sumatera Province

3.5

Water 36 } Aceh Investment Coordinating Board


DISTRICT/CITY

WATER SUPPLY COMPANY

Simeulue

PDAM Tirta Fulawan

Aceh Singkil

PDAM Tirta Singkil

South Aceh

PDAM Tirta Naga Tapaktuan

Southeast Aceh

PDAM Tirta Agara Kutacane

East Aceh

PDAM Tirta Peusada

Aceh Tengah

PDAM Tirta Tawar

West Aceh

PDAM Tirta Meulaboh

Aceh Besar

PDAM Tirta Mon Tala

Pidie

PDAM Tirta Mon Krueng Baro

Bireuen

PDAM Tirta Krueng Peusangan

North Aceh

PDAM Tirta Mon Pase

Southwest Aceh

PDAM Tirta

Gayo Lues

PDAM Tirta Sejuk

Aceh Tamiang

PDAM Tirta Tamiang

Aceh Jaya

BLUD SPAM Tirta Mon Mata

Bener Meriah

PDAM Tirta Beungi

Pidie Jaya

PDAM Tirta Krueng Meureudu

Banda Aceh

PDAM Tirta Daroy

Sabang

PDAM Tirta Aneuk Laot

Langsa

PDAM Tirta Keumeuneng

Lhokseumawe

PDAM Ie Sare Beurata

Source: Aceh in Figures, Aceh Central Bureau of Statistic (BPS) 2015

Aceh Investment Profile

{ 37


4

Economic Performance

38 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 39


2011

Economic Growth

2015

3.43 %

6.24%

3.18 % 5.14% 4.84%

4.82%

Inflation

4.44%

4.18%

8.09 %

2014 2011

2012 2013

2012

7.31 %

2013

2014 2015

Total Investment Realization

Minimum Wage

54,347,998 141,022,634

$ 177

458,240,249

$ 146 $ 117

$ 129

547,432,347

593,033,434

$ 113 2011

2012

2013

2014

2015

Kurs $ 1 = Rp 12,000

2,149,740.41 tons 1,288,051.43 tons 132,024.22 tons 477,554.01 tons 1,145,957.48 tons

2011 2012 2013

2014 2015

40 } Aceh Investment Coordinating Board

EXPORT VOLUME

2011 2012 2013 2014 2015


Big 5 Foreign Direct Investment (Countries of Origin, 2015 ) France 24,188,544.94

Malaysia 16,274,440.00

South Korea 11,334,531.00

2

1

United Kingdom 2,663,478.50

3

4

Singapore 674,576.57

5

Foreign Direct Investment and Domestic Investment 382,330,821

561,491,578 402,410,303

13,564,772

40,783,226

2011

165,101,527

114,889,419

31,541,856

26,133,215

2012

2013

55,829,946

2014

2015

1,352,613 tons

IMPORT VOLUME

1,508,000 tons 1,603,125.44 tons 5,028,813 tons 88,994.8 tons

2011 2012 2013

2014 2015

Aceh Investment Profile

{ 41


The Big 5 Foreign Direct Investment by Sectors, 2015

i Other Services 988,647.87 US$

Other Industries 10,000,000 US$

Trading & Reparation Electricity, Gas & Water Food Crops & Plantations 25,885,288.81 13,717,016.18 4,263,698.21 US$ US$ US$

The Big 5 Domestic Investment by Sectors, 2015

i Other Services 9,188,826 US$

Electricity, Gas & Water 121,543,851 US$

42 } Aceh Investment Coordinating Board

Food Industry 38,354,947 US$

Mining 101,161,522 US$

Food Crops & Plantations 124,322,789 US$


The Big 5 Foreign Direct Investment Districts/Cities, 2015

#1

#2

#3

#4

#5

Aceh Besar 24,520,822

Nagan Raya 13,721,602

Lhokseumawe 11,300,000

Aceh Tamiang 2,663,479

North Aceh 1,859,405

#1

#2

#3

#4

#5

Lhokseumawe 106,962,931

West Aceh 93,735,425

Aceh Tamiang 39,585,096

Bireuen 30,242,443

Nagan Raya 28,707,132

The Big 5 Domestic Investment Districts/Cities, 2015

Aceh Investment Profile

{ 43


5

Eases of Doing Business in Aceh

44 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 45


REGULATIONS Law No 11 of 2006 for Aceh Governance. This law gives the Government of Aceh privileges to govern the province including control at economic development, health, education, safety, and public welfare.

46 } Aceh Investment Coordinating Board

Law No. 37 of 2000 for Sabang Free Port and Free Trade Zone. Includes a wide range of facilities for doing business in Sabang, such as import duty and tax exemptions. The Sabang Management and Development Agency (BPKS) operates the zone and has authory to issue all licenses for investment in this area.

Presidential Regulation No. 11 of 2010 for Cooperation between the Government of Aceh and Foreign Institutions. This regulation gives the Government of Aceh authority to establish cooperation with foreign institutions, especially for economic development.


POTENTIAL INVESTORS INVESTMENT ACCELERATION TASK FORCE TEAM

INFORMATION, FACILITATION AND ASSISTANCE

> Security, convenience and law certainty > Land availability, labor, wages & incentive > Licensing administration > Policy, Regulation > Field Visit, etc

LICENSING

One Stop Service for Local Licenses

PRINCIPLE LICENSE: BKPM/BPKS WORKING LICENCE: BKPM/BPKS LOC AL LICENCE: BP2T

CONSTRUCTION

INVESTMENT EVALUATION AND CONTROLLING TASK FORCE TEAM FACILITATION AND ASSISTANCE

OPERATION AND BUSINESS EXPANSION

> Security, convenience and low certainty > Land dispute, labor dispute, etc > Regulation and licensing for business

NOTE: BKPM > Indonesian Investment Coordinating Board BPKS > Sabang Free Port and Free Trade Management Board BP2T > One Stop Service Office

INCENTIVES Providing incentives to investors in the form of: a. Reduction of sectoral levy for permits; Shall not exceed 50% (fifty percent) of the (levy) payable amount.

b. Stimulus funding, for selected sectors; Stimulus funds awarded in the form of interest subsidy shall not exceed 2 % (two percent) of the rate of interest paid for the purchase of machinery or equipment.

c.

Capital relief; in the form of equity and assets in accordance with the ability of the Government of Aceh .

Aceh Investment Profile

{ 47


ONE STOP SERVICE FOR PERMITS AND LICENSES

Incomplete Submit Application Complete Application Received

Check for Completeness

Computerization

Technical Examination/ Field Observations

Technical Team Meeting for Validation/Consideration for Qualified License

Output: 1. Reject 2. Pending 3. Accept

Issue of Permit/License Application/Document Payment of Permit Fees into Bank

1. Time Given to Complete Application

Record by Administration

2. Complete the requirement

Permit signed on behalf of Government

48 } Aceh Investment Coordinating Board

Print Permits Documents

3. Resubmit and Proceed Again


FOR INVESTMENT ONLY

BUSINESS LICENSING PROCEDURE (Based on Perka BKPM No. 5/2013)

INVESTOR APPLIES

PRINCIPLE LICENSE

BUSINESS LICENSE ISSUED

»» Operational Permit from Related Ministry »» Regional License

*) Business License is issued by the One Stop Service Office according to the authorization given. If there is NO authorization/ delegation, then the permit/license is issued by the relevant ministry

Proceed with Production

MECHANISM FOR COMPLAINTS FROM BUSINESSMEN IN ONE STOP SERVICE OFFICE (BP2T) TECHNICAL STAFF

COMPLAINING CUSTOMER

CUSTOMER SERVICE

Complaint cannot be solved by Customer Service

Complaint cannot be solved by Technical Staff Head of Information Service & Complaints

TECHNICAL TEAM

COMPLAINING CUSTOMER

HEAD OF ONE STOP SERVICE OFFICE OF ACEH PROVINCE

Aceh Investment Profile

{ 49


6

Detailed Plans for Agro Industries

50 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 51


6.1

Detailed Plans for Agro Industries

52 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 53


paddy Rice, the major food crop is particularly important for food security. The overall demand for rice in Indonesia currently reaches 39 million tons (http://www.statista. com), while Aceh domestic consumption was about 985.28 tons (2013). Aceh is a rice surplus province and with rice demand growing there is huge potential to expand paddy rice farming and processing to meet the domestic market demands. o The annual production of paddy rice was about 1,820,060 tons in 2014 o Produced by about 359,478 farmers throughout Aceh.

Bireuen North Aceh East Aceh

Aceh Besar Pidie

6.1.1

Detailed Plans for Food Crops 54 } Aceh Investment Coordinating Board


Area and production of paddy By District/City, 2014 District

Planted Area (Ha)

Production (Ton/year)

Simeulue

5,193

19,440

Aceh Singkil

1,199

4,119

South Aceh

15,470

66,351

Southeast Aceh

23,921

104,358

East Aceh

42,856

155,821

Central Aceh

4,425

33,198

West Aceh

25,151

73,829

Aceh Besar

40,204

176,330

Pidie

50,076

218,621

Bireuen

44,426

179,410

North Aceh

63,177

360,119

Southwest Aceh

19,165

51,148

Gayo Lues

11,597

39,785

Aceh Tamiang

24,275

95,968

Nagan Raya

32,317

104,984

Aceh Jaya

13,090

41,888

Bener Meriah

2,089

12,855

Pidie Jaya

15,417

62,638

118

76

Sabang

-

-

Langsa

2,409

9,668

Lhokseumawe

1,924

5,245

Subulussalam

998

4,209

2014

439,497

1,820,060

2013

397,887

1,956,938

2012

438,855

1,788,738

Banda Aceh

Source: Aceh in Figures, Aceh Central Bureau of Statistic (BPS) 2015

Paddy rice is a key crop in Aceh, with plantings in 439,497 Ha Aceh Investment Profile

{ 55


Pidie District is one of the leading rice producers in Aceh; its production has increased significantly. The main rice varieties planted are Ciherang and Inpari. Milling is a crucial post-harvest activity in the production of rice (http:// www.ifc.org) and surplus rice production in Pidie is a key element to establish a rice milling industry. An existing rice milling plant was built in 2014 in Pidie to produce high quality rice as well as to create a competitive price in local and national market.

4 Ha

Land Area

Pidie Rice Milling Industry Project 56 } Aceh Investment Coordinating Board

Location:

Jeumpa Village, Glumpang Minyeuk, Glumpang Tiga Sub District


Malahayati Seaport

Jeumpa Village

pidie

Spring Water

Sultan Iskandar Muda International Air port

INFRASTRUCTURE SUPPORT Sultan Iskandar Muda Malahayati River, Spring

Project Purpose

Supported

Establishing the modern rice milling plant, capacity 8 ton/hour.

by condition: Good by surface: Asphalt

Investment Estimate

Land Status:

Pidie District Government Land

USD 8,000,000

Assets:

»» »»

Building (Aceh Provincial Government Owned) Equipment/Machine (Aceh Provincial Government Owned) Aceh Investment Profile

{ 57


“There is a reason why corn [Zea mays] is the most-produced grain worldwide; it is involved in just about every aspect of our lives. Corn provides about 21 percent of human nutrition across the globe. Corn is a major animal feed. There are many other nonculinary uses for the grain as well; it is a key ingredient in ethanol, cosmetics, ink, glue, laundry starch, medicines and fabrics, just to name a few. It also can be the raw material for baskets and toys. In short, corn is an essential ingredient in our diets and also in our world� (source: en.wikipedia. org/wiki/ Maize). As a major producers of corn, we offer opportunities for potential investors to set up a feed industry in Aceh.

south aceh

southeast aceh

Corn

Photo : Illustration

... it is a key ingredient in ethanol, cosmetics, ink, glue, laundry starch, medicines and fabrics, just to name a few.

58 } Aceh Investment Coordinating Board


Maize harvested area pursuant to intensification by district/city (ha), 2014 District

Planted Area (Ha)

Harvested Area (Ha)

Simeulue

-

-

160

81

South Aceh

12,066

10,572

Southeast Aceh

29,256

28,634

1,081

946

Aceh Tengah

86

42

West Aceh

178

107

Aceh Besar

1,099

662

285

337

Bireuen

1,778

839

North Aceh

1,119

426

Southwest Aceh

408

535

Gayo Lues

1,536

1,119

Aceh Tamiang

1,617

1,898

Nagan Raya

245

146

Aceh Jaya

354

342

Bener Meriah

298

393

Pidie Jaya

335

134

-

-

Sabang

32

2

Langsa

3

1

Lhokseumawe

31

1

Subulussalam

359

140

2014

52,326

47,357

2013

47,160

44,099

Aceh Singkil

East Aceh

Pidie

Banda Aceh

2012 51,788 Source: Aceh in Figures, Aceh Central Bureau of Statistic (BPS) 2015

43,675

Project Purpose

Establishing poultry feed factory (maize bran, maize germ, cattle feed, corn grits), which has drying machine (capacity 40 tons/hour) and warehouse (capacity 9000 tons)

Investment EstimatE

USD 12 Million

Aceh Investment Profile

{ 59


Corn is one of the main commodities in South Aceh. Its production has increased over years; in 2013, the planted area was 11,856 ha and it increased by 12, 331 ha in 2014, which resulted in an increase in the harvest volume. Total dry land in 2015 was Âą 86,479.36 ha, spread over 18 sub districts in South Aceh and around Âą13,000 ha was used for corn plantation with target of production is 72,730 tons. Thus it is feasible to establish a cornprocessing industry in South Aceh

Corn dry-milling industry capacity 60 tons and warehouse 2 units

Poultry feed factory capacity 10 tons

Investment Estimate

Investment EstimatE

USD 100,000

USD 83,333 5 Ha

Land Area

South Aceh Corn Industry Project

Location:

Seuneubok Village, Pasie Raja Sub District 60 } Aceh Investment Coordinating Board


south aceh Photo : Illustration

Working Capital of both projects is

USD 166,666

TOTAL INVESTMENT

USD 350,000 Ownership:

Regional Owned-Enterprises Fajar Selatan

PROJECT PURPOSE:

Establishing corn dry-milling industry capacity 60 tons and poultry feed factory (maize bran, maize germ, cattle feed, corn grits) capacity 10 ton. Aceh Investment Profile

{ 61


Pidie Jaya Bireuen North Aceh East Aceh Aceh Tamiang

Soybean is a major source for vegetable protein and vegetable oil in the world. Nationwide, soybean production in 2013 was 847,160.00 tons on 554,132 ha of land. In Aceh, soybean was planted on approximately 50,765 ha in 2014 with production of 42,784 tons.

soybean 62 } Aceh Investment Coordinating Board

50,765 Ha. 42,784 tons.


Area and production of soybean by district/city, 2014 District

Planted Area (Ha)

Harvested Area (Ha)

Simeulue

-

-

Aceh Singkil

1

-

South Aceh

61

64

-

-

15,121

7,675

Aceh Tengah

41

114

West Aceh

73

69

Aceh Besar

365

698

Pidie

3,024

2,228

Bireuen

12,365

17,125

North Aceh

8,950

5,251

37

44

4

4

5,867

4,914

Nagan Raya

112

105

Aceh Jaya

293

282

23

338

4,391

3,852

Banda Aceh

-

-

Sabang

8

-

Langsa

-

-

Lhokseumawe

13

2

Subulussalam

16

19

2014

50,765

42,784

2013

41,276

30,579

2012

44,638

35,599

Southeast Aceh East Aceh

Southwest Aceh Gayo Lues Aceh Tamiang

Bener Meriah Pidie Jaya

Source: Aceh in Figures, Aceh Central Bureau of Statistic (BPS) 2015

Project Purpose Establishing poultry feed factory (cattle feed), which has drying machine (capacity 40 tons/hour) and warehouse (capacity 9000 tons)

Investment EstimatE

USD 12,000,000

Aceh Investment Profile

{ 63


Bener Meriah Horticultures Project

Bener Meriah

6.1.2

Detailed Plan of Horticulture 64 } Aceh Investment Coordinating Board


POTENTIALS (tons) Horticulture

Areas Planted (Ha)

Production (Ton/Annum)

Vegetable Cabbage

354

55,789

-

-

Red Onion

198

1,729

Tomato

372

20,289

Chilie Pappers

598

15,227

Carrot

242

2,999

Carrots

166

22,063

Pineapple

8,138

4

Avocado

41,367

621

Orange

65,711

290

Passion Fuit

6,110

962

Garlic

Fruit

Source : Statistic of Bener Meriah (BPS) 2014

A horticultural area is a geographic area that has similar ecosystems and united by common infrastructure facilities, thus forming a region filled with various business activities including the provision of facilities for horticultural production, cultivation, postharvest handling and processing, marketing,

and support activities (Indonesia Directorate General of Horticulture). Its main purpose is to develop the well-being of society through the utilization of resources in a sustainable manner by integrating communal relations, the economy, and the environment in harmony.

Aceh Investment Profile

{ 65


The Government of Bener Meriah District has selected Linueng Buleun Sub District as a horticultural development area. It is very potential for horticultural farms, as it is close to the new hydro power plant and has direct access to seaports on the east coast. The target is to supply organic fruits and vegetables for international markets. The very supportive and welcome local community ensures that investment in this area is very promising.

Lineung Buleun Horticulture Project 66 } Aceh Investment Coordinating Board

Project Purpose 造造 Establishing organic farm base on a production system that sustains the health of soils, ecosystem and people 造造 Selling the products in international markets


Bener Meriah

INFRASTRUCTURE SUPPORT : Malikussaleh Krueng Geukuh

Malikussaleh Air Port

Krueng Geukuh Sea Port Lineung Buleun

River, Spring Supported by condition: Moderate by surface: Gravel and Asphalth

Investment EstimatE

USD 1,025,850

Aceh Investment Profile

{ 67


Photo: Harvesting Potatos in Lineung Buleun, Bener Meriah

Potato (Solanum tuberosum) is one of the world’s favorite foods and it is the fourth main food crop after paddy, wheat and corn. Today Indonesia is the biggest potato producer in Southeast Asia. The total area used for potatoes in Indonesia was 70.187 ha in 2013 with total production of 823.856 tons. One of the target areas for potato production is located in Bener Meriah District in Aceh Province.

Bener Meriah Potato Development Project 68 } Aceh Investment Coordinating Board

The Governments of Aceh and Bener Meriah District have made serious efforts to accelerate potato growing in Bener Meriah. To meet the demand for potatoes both from domestic and from overseas markets, we invite investors to invest in this potential sector through collaboration with local farmers using contract farming system.


Bener Kelipah

Pintu Rime Gayo

Permata Mesidah

Gajah Putih Timang Gajah Wih Pesam

Bukit

Bandar

Syiah Utama

AREAS Planted and production of potato in Bener Meriah District Sub district

Planted Area (Ha)

Timang Gajah

5

63

17

446

704

18,317

70

1,928

478

7,581

Permata

2,175

43,825

Mesidah

40

213

3,489

72,373

Wih Pesam Bukit Bandar Bener Kelipah

TOTAL

Production (Ton)

Estimates for potato development project (costs per hectare): Land rental per harvest (1 ha) = USD 333,33 Operational production costs = USD 3,120.42 Labor cost = USD 853,32 Total investment = USD 4,037.08 Profit = USD 3,526.25 B/C = 1.73

Aceh Investment Profile

{ 69


6.2

Detailed Plans for Plantations

70 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 71


Palm oil constitutes the largest plantation crop in Aceh by volume and by area and economic value. The palm oil industry has significant growth potential as a major source of supply for food and bio fuel products. The Government of Aceh has made several strategic plans for palm oil. 1. Create operational and policy support for sustainable palm oil among governments, private sector, NGOs, and smallholders. 2. Support palm oil public-private investment partnerships 3. Reduce threats to high conservation value forests and peat swamp ecosystems. 4. Create a provincial seed certification and distribution program 5. Improve supply chains and pricing transparency for palm oil production and processing.

6.2.1

Palm Oil 72 } Aceh Investment Coordinating Board

In 2013 production by small holder was 355,366 tons and estate enterprises was 1,633,312 tons.


Palm oil planted areaS and production by district / city in 2013 District Simeulue

Planted Area (Ha)

Production (Tons/Annum)

3,387

1,826

Aceh Singkil

55,441

397,134

South Aceh

10,209

34,910

7,454

20,551

60,592

278,550

-

-

West Aceh

26,144

206,240

Aceh Besar

1,282

407

77

16

5,181

22,197

North Aceh

24,953

115,477

Southwest Aceh

20,767

14,215

-

-

Aceh Tamiang

54,442

496,986

Nagan Raya

82,252

329,321

Aceh Jaya

16,714

19,348

Bener Meriah

1,300

117

767

1,090

Banda Aceh

-

-

Sabang

-

-

Langsa

399

825

Lhokseumawe

208

243

Subulussalam

21,701

49,225

2013

393,270

1,988,678

2012

368,650

5,070,555

2011

365,996

572,953

Southeast Aceh East Aceh Aceh Tengah

Pidie Bireuen

Gayo Lues

Pidie Jaya

Source: Aceh in Figures, Aceh Central Bureau of Statistic (BPS) 2015

Crude Palm Oil (CPO) is the main product of the palm oil industry. Aceh Tamiang, Aceh Singkil, Nagan Raya, and West Aceh have the highest CPO production that makes those areas suitable for processing industry. Aceh Investment Profile

{ 73


Bireun 1. PT. Blang Ketumba 2. PT. Syaukath Sejahtera North Aceh 3. PT. Perkebunan Nusantara I East Aceh 4. PT. Padang Palma Permai 5. PT. Ensem Sawita 6. Koperasi Prima Jasa 7. PT. Anugerah Fajar Rezeki Aceh Jaya 8. PT. Boswa Megapolis West Aceh 9. PT. Karya Tanah Subur 10. PT. Mopoli Raya

LIST OF CRUDE PALM OIL INDUSTRIES IN ACEH 74 } Aceh Investment Coordinating Board

Aceh Tamiang 11. PT. Perkebunan Nusantara I 12. PT. Perkebunan Nusantara I 13. PT. Mapoli Raya 14. PT. Parasawita 15. PT. Dwikencana Lestari 16. PT. Padang Palma Permai 17. PT. Sisirau 18. PT. P.P. Pati Sari 19. PT.Bahari Dwikencana Lestari 20. PT. Socfin Indonesia 21. PT. Tri Agro Palma Tamiang Subulussalam 22. PT. Lestari Tunggal Pratama 23. PT. Bangun Sempurna Lestari 24. PT. Samudera Sawit Nabati


Nagan Raya 25. PT. Fajar Baizury 26. PT. Kalista Alam 27. PT. Sawit Nagan Raya Makmur 28. PT. Beurata Subur Persada 29. PT. Ujong Neubok Dalam 30. PT. Surya Panen Subur II 31. PT. Surya Panen Subur I 32. PT. Kharisma Iskandar Muda 33. PT. Ensem Lestari 34. PT. Socfin Indonesia (Seunagan) 35. PT. Socfin Indonesia (Seumanyam)

south Aceh 41. PD. Fajar Selatan Simeulue 42. PDKS Simeulue

Aceh Singkil 36. PT. Perkebunan Lembah Bhakti 37. PT. Delima Makmur 38. PT. Nafasindo 39. PT. Ensem Lestari 40. PT. Socfin Indonesia

Aceh Investment Profile

{ 75


Aceh Tamiang is one of the major producers of palm oil in Aceh and has high potential for establishment of a CPO processing industry. Raw materials is fresh fruit bunches come from 51,677.22 ha of estates and 20,347 ha of smallholders spread over 11 sub districts in Aceh Tamiang. Based on market analysis, a CPO factory can store about 2,160 tons of fresh bunches and produce 530 tons/day of palm oil.

6Ha

Land Area

Aceh Tamiang CPO Processing Industry 76 } Aceh Investment Coordinating Board

Location: Seruway


Aceh Tamiang

Existing CPO processing plants:

Kuala Langsa Sea Port

Seruway

Tanjung Seumantoh, Pulau Tiga PTPN I, PT. Socfindo, PT. Padang Palma Permai, PT. Parasawita, PT. Mapoli Raya, PT. Sisirau, PT. Bahari Dwikencana Lestari, PT. Pati Sari, PT. Tri Agro Palma Tamiang, and CV Selaksa Windu) with production capacity 5 – 45 ton/hour.

Investment Estimate

USD 2,000,000 o NPV: 15,790,000 USD o IRR: 30,19% o B/C: 1,88 o PAYBACK PERIOD: 5 YEARS ( Estimates December 2014 )

Ownership:

Goverment Land

PROJECT PURPOSE:

Establishing 2 units of CPO milling plant capacity 30 tons/hour

Aceh Investment Profile

{ 77


The total production of oil palm fruit in North Aceh in 2013 was 115,477; produced by smallholders (39,156 tons) and estates (76,321 tons). Government estates (PTPN-I) had 7,506 ha of oil palm plantations and own their CPO factory in Cok Girek with capacity 60 tons/hour or 168,000 tons/year. Smallholders supplied around 18,000 tons of fresh bunches/year.

25 Ha

Land Area

North Aceh CPO Processing Industry 78 } Aceh Investment Coordinating Board

Location: Lhoksukon


North Aceh

Malikussaleh Air Port

Krueng Geukuh Sea Port Lhoksukon

Investment Estimate

USD 2,000,000 o NPV: 15,790,000 USD o IRR: 30,19% o B/C: 1,88 o PAYBACK PERIOD: 5 YEARS ( Estimates December 2014 )

Ownership:

Goverment Land

PROJECT PURPOSE:

Establishing 2 units of CPO milling plant capacity 30 tons/hour

Aceh Investment Profile

{ 79


The demand for cooking oil has been rising for many years. West Aceh produced 206,240 tons of crude palm oil (CPO) in 2013 and production is continuing to increase. CPO is the raw material for cooking oil, hence this large volume of CPO is a big reason to establish a palm oil cooking oil processing factory in West Aceh since the cooking oil is a value added product.

West Aceh Cooking Oil Processing Industry

80 } Aceh Investment Coordinating Board

50 Ha

Land Area

Location:

Beuregang Industrial Area


West Aceh

Beuragang INFRASTRUCTURE SUPPORT : Cut Nyak Dhien Meulaboh River, Spring Nagan Raya Steam Power Plant by condition: Moderate by surface: Gravel and Alsphat

Ownership:

Goverment Land

Investment Estimate

USD 13,000,000 o NPV: USD 8,4 million o Return on Investment: 225 % o PAYBACK PERIOD: 7 YEARS

PROJECT PURPOSE:

Establishing Cooking Oil Processing Industry

Aceh Investment Profile

{ 81


Photo: Illustration

Aceh Tamiang as the center of palm plantation in Aceh has 51,677,22 ha of estate plantations and about 20,347 ha of smallholders plantings with total production of 2,690,68 ton/day. Eleven palm oil mills are located in Karang Baru, Seuruway, Kejuruan Muda, and Rantau Sub Districts produce CPO with the capacity of 255/hour.

The supply of CPO has been sufficient; therefore it is very feasible to establish cooking oil Industry with the capacity 200 500 ton/CPO per day. The factory will be built on the area of 4-6 Ha, designed to include supported buildings, housing, Waste Water Treatment Plant (WWTP) and green belt.

4-6 Ha Land Area

Aceh Tamiang Cooking Oil Processing Industry 82 } Aceh Investment Coordinating Board


Kuala Langsa Sea Port

Aceh Tamiang

Seruway Development plan of Cooking Oil Industry (CPO Processing), with capacity 200 – 500 ton/day is divided into three as follows: PreConstruction Phase

»» »» »»

Detailed Design

»» »» »» »» »» »»

PostConstruction »» »» Phase

Location:

Green Industrial Park Aceh Tamiang Sereuway/Bendahara District

Public Relations informing communities pre design of complex Obtaining Permit Appoint construction contractor (Tender Process) Build road access Build Cooking Oil Factory Build Oil Storage Tanks Build Waste Water Treatment/Recycling Plant Mobilize equipment for factory Build offices, housing and other support facilities. Appoint factory director and engage staff Start operation of factory & WWT/RP

Ownership:

Private Ownership Aceh Investment Profile

{ 83


Natural rubber consists of suitable polymers of the organic compound isoprene with minor impurities of other organic compounds plus water. The rubber trees can grow to 15-25 meters in height with a large trunk and high branching. Currently, rubber is harvested mainly in the form of latex from rubber trees (Hevea Brasiliiensis), which was tapped from the cut bark of the plant. This used to produce other forms of rubber, such as crumb rubber and plank rubber. Natural rubber is used extensively in many applications and products, either alone or in combination with other materials such as wood on charcoal, wood or lumber for household appliances, furnitures, door and

6.2.2

Rubber 84 } Aceh Investment Coordinating Board

window profiles, hoses, belts, matting, flooring and dampeners (antivibration mounts) for the automotive industry, in the aircraft industry, textiles, gloves (medical, household and industrial) and toys. There are 3 (three) districts in Aceh with high rubber production that are suitable for processing industry, West Aceh, East Aceh, and Aceh Tamiang. The following table shows total production for each district.

Project Purpose

Establishing rubber-processing industries


Rubber Planted Area and Production of Smallholder & Estate Enterprises by District/ City 2011-2013 District / City

Planted Area (Ha)

Simeulue

1,833

106

Aceh Singkil

3,660

2,332

South Aceh

1,219

271

Southeast Aceh

12,141

4,973

East Aceh

31,607

40,801

-

-

West Aceh

29,050

23,555

Aceh Besar

413

1

Pidie

140

-

3,363

1,383

12,454

6,890

1,027

136

190

18

Aceh Tamiang

22,640

896,361

Nagan Raya

12,358

3,356

Aceh Jaya

13,576

5,406

-

-

543

1

Banda Aceh

-

-

Sabang

-

-

Langsa

1,779

1,302

Lhokseumawe

18

16

Subulussalam

4,471

2,293

2013

152,481

989,201

2012

149,678

961,627

2011

144,291

87,407

Aceh Tengah

Bireuen North Aceh Southwest Aceh Gayo Lues

Bener Meriah Pidie Jaya

Existing Company: PT. Aceh Rubber Industry (Aceh Tamiang)

Production (Ton)

Source: Aceh in Figures, Aceh Central Bureau of Statistic (BPS) 2015

Investment Estimate

USD 21,161,739

o Net Present Value: 234,618,007 USD o Internal Rate on Return: 53,81% o Benefit Cost ratio: 1,26 o Net Benefit Cost ratio: 3,739 o PAYBACK PERIOD: 6 YEARS AND 8 MONTHS Aceh Investment Profile

{ 85


Indonesia is the third largest producer of cacao in the world after the Ivory Coast and Ghana. Aceh, one of the largest producers of cacao in Indonesia, have plantations spread almost in all districts, from Pidie in the eastern part of Aceh, to Simeulue Island in the outer edge of Aceh Province. Aceh cacao has been exported to many countries in the world. The statistics show that in 2010, Aceh exported 420,978.40 kg of cacao beans worth USD 1,166,080.30 (Aceh Industry and Trade Agency, 2012).

6.2.3

Cacao 86 } Aceh Investment Coordinating Board

The development strategy is to create a sustainable cacao industry. The upstream industry will be with the focus on boosting value added in the downstream sector. There are four districts in Aceh that are major cacao producers suitable for a cacao processing industry, Pidie Jaya, North Aceh, East Aceh and Southeast Aceh.

Project Purpose

o Establishing cacao processing industries (paste, butter, chocolate powder) o Establishing packaging industry.


Cacao Areas and Production by District/City 2011-2013 District/City Simeulue

Planted Area (Ha)

Production (ton)

1,598

119

Aceh Singkil

640

168

South Aceh

1,332

169

Southeast Aceh

19,994

8,843

East Aceh

12,484

6,684

2,322

786

West Aceh

809

317

Aceh Besar

3,302

426

10,160

2,674

Bireuen

6,671

2,559

North Aceh

9,662

3,288

Southwest Aceh

4,300

567

Gayo Lues

4,493

902

Aceh Tamiang

2,096

665

Nagan Raya

5,405

1,327

Aceh Jaya

1,292

159

Bener Meriah

1,053

332

13,484

4,375

-

-

Sabang

737

193

Langsa

301

126

Lhokseumawe

135

65

Subulussalam

826

143

2013

103,096

34,887

2012

100,490

37,120

2011

89,512

37,594

Aceh Tengah

Pidie

Pidie Jaya Banda Aceh

Source: Aceh in Figures, Aceh Central Bureau of Statistic (BPS) 2015

Investment Estimate

USD 97,000,000

o Net Present Value: 5,730,808.44 USD o Internal Rate of Return: 22,4% o Benefit Cost ratio: 1,69 o PAYBACK PERIOD: 6 YEARS AND 9 MONTHS Aceh Investment Profile

{ 87


Gayo coffee is a typical coffee from the Gayo highlands, an area that covers Bener Meriah, Central Aceh and Gayo Lues Districts Gayo is the name of the highland people who live in this region. The majority of people in this area are coffee growers. Coffee planting started in 1908 and mainly is Arabica coffee. In fact, Arabica coffee production from the Gayo region is the largest on Asia.

Zealand, Australia, Norway, British, Germany, Ireland). 8,798 tons valued at USD 52 million were exported. (Aceh Industry and Trade Agency, 2014). Gayo coffee has gained some international certifications recognition for its excellent quality especially its organic coffee which is fair trade certified with Geographical Indication (GI). In particular, Gayo Arabica coffee got the highest score in the Indonesian Specialty Coffee Auction 2010 in Bali, which guarantees that it is the best coffee in the world.

Gayo coffee has been exported to many countries in the world. The statistics indicate that in 2012, Aceh exported coffee beans to 19 countries (South Korea, China, Japan, Taiwan, Hong Kong, Malaysia, Singapore, United State, Canada, New

Coffee Planted Area and Production of Smallholder by District/City 2013 Robusta

Total Robusta & Arabika (Ton)

Arabika

Sub District

Farmers

Planted Area (Ha)

Production (Ton)

Planted Area (Ha)

Production (Tons)

Planted Area (Ha)

Production (Tons)

Aceh Tengah

2,315

763

48,300

27,079

50,615

27,842

33,000

Bener Meriah

1,795

808

49,496

15,000

51,291

15,808

29,000

-

-

4,770

1,145

4,770

1,145

40,000

9,572

1,569

-

-

9,572

1,569

11,846

2013

13,682

3,140

102,566

43,224

116,248

46,364

113,846

2012

11,367

2,377

54,266

16,145

65,633

18,522

113,846

2011

23,254

4,709

107,336

44,369

130,590

49,078

101,735

Gayo Lues Pidie

Source : Aceh Development Profile, Aceh Central Bureau of Statistic (BPS) 2015

6.2.4

Coffee 88 } Aceh Investment Coordinating Board

8,641,332 kg

Aceh export volumes of coffee beans to 20 countries


LIST OF COFFEE EXPORTER No

EKSPORTIR

List of Coffee Exported Destination No.

1 PT. Ihtiyeri Ketiara

COUNTRY ASIA :

2 PT. Sumatera Arabika Gayo

1 SINGAPORE

3 Kop. Gayo Linge Organik Coffee (GLOC)

2 HONG KONG

4 CV. Cahaya Commodity Nusantara

3 KOREA

5 CV. Degayo Agri

4 JAPAN

6 CV. Aridalta Mandiri

5 TAIWAN

7 KBQ. Baburrayyan

6 CHINA

8 Kop. Serba Usaha (KSU) Bies Utama

7 TURKISH

9 Kop. Pedagang Kopi (Kopepi) Ketiara 10 PT. Ketiara

AMERICA 9 UNITED STATES

11 CV. Oro Kopi Gayo

10 CANADA

12 CV. Putra Darma

11 MEXICO

13 CV. Donya Drop Darugt

EUROPE

14 PT. Poju Grincum

12 GERRMAN

15 CV. Gayo Mandiri Coffee

13 RUSSIA

16 PT. Fajar Jeumpa

14 ENGLAND

17 KSU. Permata Gayo

15 DUTCH

18 CV. Gayo Mountain Coffee

16 BELGIUM

19 PT. Cahaya Mas Global Kopi

17 IRELANDIA 18 NEW ZEALAND 19 AUSTRALIA AFRICA 20 SOUTH AFRICA

Three major producers of coffee in Aceh are Bener Meriah, Aceh Tengah and Gayo Lues. These areas are suitable for a big coffee processing industry.

Aceh Investment Profile

{ 89


The demand for Gayo Coffee both in domestic and overseas market are very high. It is currently sold as green beans. As the government encourages to increase value added of the Aceh coffee, it is a big opportunity to build a modern

coffee processing industry. The popular culture of coffee consumption in Aceh is also a good prospect to establish Gayo instant coffee processing industry.

4 Ha

Land Area

Aceh Tengah Coffee Processing Industry 90 } Aceh Investment Coordinating Board


PROJECT PURPOSE: ESTABLISHING INSTANT COFFEEE PROCESSING INDUSTRY Based on market observation, at present, at least 10 brands of instant coffee are sold in the market, which shows the growing of instant coffee consumption; hence the prospect is very promising. Investment estimation for establishing instant coffee processing industry with the capacity 30,000.000 sachets is: sale price at producer/industry level per sachet US $ 0.10 and premium quality US$ 0,04 per sachet.

The short supply chain within Aceh region offers an adventage for investment since the production cost is less than the average cost (assuming green bean price US$ 4,58/Kg). The price is more competitive and accordingly is able to create market segment both on market share and market space. Moreover, it is able to compete with other large scale national products.

Krueng Geukuh Seaport Aceh tengah

Investment Estimate

Mulie Jadi

USD 6,258,377

o Establishing plant and Working Capital : US$ 3,333,333 o Operational Cost : US$ 2,925,043 *(US$ 1 = IDR 12,000)

Location:

Mulie Jadi Village, Silih Nara Sub District

Ownership:

Private Ownership

o NPV = US$ 1,844,999 o IRR = 23% o BC = 1,6 o PAYBACK PERIOD: 6 YEARS Aceh Investment Profile

{ 91


Coconut industry can be developed by either farmer group level or larger scaled industry, for domestic and international market, such as young coconut products, coconut cocktail, coconut jam, baby food supplements, soft drinks, nata de coco, coconut water sauce, coconut flour,

6.2.5

Coconut 92 } Aceh Investment Coordinating Board

virgin coconut oil, coconut shell charcoal, briquette charcoal, liquid smoke of coconut shell, coconut wood, and organic fertilizer. While the exporting goods are such as copra, white copra, raw coconut oil, coconut cake, desiccated coconut, and active charcoal.


Coconut Planted Area and Production of Smallholder by District/City 2013 District/City

Planted Area (Ha)

Production (Ton)

Simeulue

7,472

2,319

Aceh Singkil

5,230

2,232

South Aceh

6,523

2,961

760

369

6,797

6,012

103

13

West Aceh

2,832

1,459

Aceh Besar

14,351

8,025

Pidie

8,633

5,216

Bireuen

14,341

10,132

North Aceh

16,695

9,586

Southwest Aceh

2,605

900

Gayo Lues

450

81

Aceh Tamiang

586

242

Nagan Raya

1,351

658

Aceh Jaya

6,358

1,379

-

-

3,401

1,224

-

-

Sabang

2,645

1,718

Langsa

473

283

Lhokseumawe

631

355

Subulussalam

839

270

2013

103,076

55,434

2012

107,395

59,766

2011

106,542

62,926

Southeast Aceh East Aceh Central Aceh

Bener Meriah Pidie Jaya Banda Aceh

Aceh Investment Profile

{ 93


4 Ha

Land Area

Aceh Besar Virgin Coconut Oil Processing Industries 94 } Aceh Investment Coordinating Board


Ladong Industrial Park Malahayati Seaport

Aceh Besar

Investment Estimate

USD 87,286 Project Purpose

Establishing Virgin Coconut Oil Processing Industry

Ownership:

o Net Present Value: 15.5% o Internal Rate of Return: 57.39% o Benefit Cost ratio: 2.19

Government Ownership

Location:

Ladong Industrial Park

Aceh Investment Profile

{ 95


6.3

Detailed Plans for Essential Oil Production

96 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 97


Patchouli (pogostemoncablinbenth) is a tropical evergreen shrub of the mint family. A valuable essential oil is distilled from its dried leaves. The oil is used in cosmetics and is particularly valuable in the global perfume industry and modern scented industrial products such as paper towels, laundry detergents, and air fresheners where the demand for it is still growing. Patchouli also can be used in antiseptic, pesticide, and as a fixative to bind other essential oils. Currently Indonesia is the world largest supplier of patchouli, supplying more than 80% of the world market. Patchouli is extensively cultivated in Aceh, Indonesia. Due to its high alcohol content and flavor, it is the Aceh variety of this tropical plant that is one of the most sought after (svet.charita.cz)

2.5% to 3.3%, which makes it the best patchouli in the world (patchouli-aceh. com, 03/18/2012). As one of the major producers of patchouli, Aceh offers opportunities for potential investors to set up patchouli processing industries in the region.

The Geographical Indication Expert of the Indonesian Ministry of Agriculture, Dr. Riyaldi, affirmed that Aceh is very potential for the development of largescale patchouli businesses, because of its supporting condition of land and its quality. According to a research, Aceh patchouli oil contains patchouli alcohol (yield)

6.3.1

Patchouli 98 } Aceh Investment Coordinating Board

According to a research, Aceh patchouli oil contains patchouli alcohol (yield) 2.5% to 3.3%, which makes it the best patchouli in the world


Patchouli Area and Production of Smallholder By District/City, 2013 District/City

Planted Area (Ha)

Production (Ton)

-

-

Aceh Singkil

40

70

South Aceh

202

240

Southeast Aceh

634

950

-

-

Aceh Tengah

23

100

West Aceh

20

276

Aceh Besar

118

70

8

42

36

48

North Aceh

132

170

Southwest Aceh

42

450

863

1,250

Aceh Tamiang

3

8

Nagan Raya

7

86

500

572

Bener Meriah

-

-

Pidie Jaya

3

8

Banda Aceh

-

-

Sabang

-

-

Langsa

-

-

Lhokseumawe

-

-

Subulussalam

19

28

2013

2,650

4,368

2012

5,300

8,736

2011

10,560

17,402

Simeulue

East Aceh

Pidie Bireuen

Gayo Lues

Aceh Jaya

Source : Aceh Development Profile, Aceh Central Bureau of Statistic (BPS) 2014

Aceh produces the best patchouli in the world. The main production areas are Aceh Jaya, South Aceh, Southwest Aceh and Gayo Lues Districts, which are suitable for largescale processing industries. The following table shows the total production for each district. Aceh Investment Profile

{ 99


Aceh Jaya as one of the main patchouli producers in Aceh has 501 ha of patchouli plantations with total production 36,39 tons/day. The Government of Aceh Jaya District has encouraged the increased high quality patchouli production volume to support the establishment of patchouli processing industry. The centre of patchouli planted areas in Aceh Jaya is Panga (65 ha), Jaya (24 ha), Indra Jaya (20 ha), Sampoiniet (35 ha), Darul Hikmah (45 ha), Setia Bakti (66 ha), Krueng Sabee (105 ha), Pasie Raya (and Teunom Sub Districts. There is a potential to develop another 315 ha of land in this area.

38 Ha

Land Area

Aceh Jaya Patchouli Processing Industry 100 } Aceh Investment Coordinating Board


Aceh Jaya

Calang Sea Port

Panga o NPV = US$ 3,131.246 o IRR = 64.22 % o PAYBACK PERIOD: 2 YEARS

Investment Estimate

USD 1,103,333

Ownership:

Location:

Panga Sub District

Private Ownership

Project Purpose

Establishing patchouli processing industries Aceh Investment Profile

{ 101


Nutmeg tree is native to Indonesia, which is the world’s largest producer, contributing about 75% of the world’s supply. This spice is popular for its health benefit as it contains antioxidant and disease-preventing phytochemicals. Its distinctive and aromatic flavor is also used for culinary. The district of South Aceh is one of the nation’s main producers of nutmeg. The cultivation of nutmeg continues to be important in the district. Today, nine of the 16 sub districts in South Aceh grow nutmeg, producing several different products including sugared candies and syrup. (source: http://www.tradeforum.org)

6.3.2

Nutmeg 102 } Aceh Investment Coordinating Board


Nutmeg Area and Production of Smallholder By District/City District/City Simeulue

Planted Area (Ha)

Production (ton)

1,431

62

124

13

15,230

5,906

43

8

East Aceh

1

-

Aceh Tengah

3

1

West Aceh

64

13

Aceh Besar

328

45

Pidie

109

38

Bireuen

147

28

North Aceh

148

28

3,119

245

Gayo Lues

-

-

Aceh Tamiang

-

-

Nagan Raya

121

33

Aceh Jaya

173

18

Bener Meriah

12

3

Pidie Jaya

17

3

-

-

Sabang

34

7

Langsa

-

-

Lhokseumawe

-

-

Subulussalam

-

Aceh Singkil South Aceh Southeast Aceh

Southwest Aceh

Banda Aceh

2013

21,104

6,451

2012

21,031

5,790

2011

21,522

5,261

Source: Aceh in Figures, Aceh Central Bureau of Statistic (BPS) 2015

Aceh Investment Profile

{ 103


Citronella (Cymbopogon nardus L) is a type of grass with narrow, long leaves and grows to 200 – 1000 m. It produces natural essential oil, namely citronella oil. The main components of citronella oil are citronellal and geraniol, which respectively have unique fragrance. This aromatic oil is mostly used in soaps, cosmetics, perfume, flavoring and pharmacy industries (http://thakshana.nsf. ac.lk/slstic/NA-238/NA_238.pdf). Gayo Lues Regency is one of the main producers of citronella oil in Aceh, centered in seven sub districts; Blang Jerango, Kutepanyang, Dabun Gelang, Blang Kejeren, Pantan Cuaca. Trangun and Tripa Jaya. More than 8500 ha of land are used for citronella and the overall of land production was 400 kg/ha in 2014 (insetgalus.com).

6.3.3

Citronella 104 } Aceh Investment Coordinating Board


Project Purpose: Gayo Lues Citronella Processing Industry

Area (Ha)

Production (ton)

Kuta Panjang

2,122

271,448

Blangjerango

3,712

477

Blangkejeren

1,950

248

Putri Betung

-

-

Dabun Gelang

2,364

302,376

Blang Pegayon

1,254

159,186

Pining

1,046

132,354

Rikit Gaib

2,069

265,611

Pantan Cuaca

1,454

185,631

Teragun

980

124,485

Tripe Jaya

262

31,218

17,213.00

1,473,034

SUB DISTRICT

TOTAL

Photo: Illustration

Aceh Investment Profile

{ 105


The area suitable for livestock grazing in Aceh is 1,5 ha. This very large area is suitable for grazing, integrated with crops and plantations. The project involves both breeding and fattening. The main activities in this project are building irrigation and buying hay equipment, construction of infrastructure, construction of animal feedlots, breeding and fattening cattle. Strategy for Aceh beef Development project includes: develop a nucleus-plasma structure for the developing a beef herd in Aceh, establish system for management of mature breeding cows (grazing or feedlot), establish a beef finishing unit (feedlot) in each district with halal beef processing and meat distribution. Targeted for initial development: Aceh Besar, Pidie, Bener Meriah, Central Aceh and Nagan Raya Districts.

6.4

Detailed Plan of Aceh Beef Industry Development Project

106 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 107


Photo: Tradisional Fattening in Krueng Aceh, Aceh Besar

6,434 Ha Land Area

6.4.1

Aceh Besar Beef Industry Development Project 108 } Aceh Investment Coordinating Board


Investment Estimate

USD 33,147,500 ¤¤ ¤¤

Breeding Fattening

: 5,500 cows : 15,000 cows

¤¤ ¤¤

ROI : 29.64 % B/C : 1.23

Payback Period : 3 years and 5 months

Aceh Besar SUITABLE FOR: ¤¤ Kuta Malaka - Major Feedlot for Nucleus Herd ¤¤ Krueng Aceh- Traditional Fattening ¤¤ Cot Sirebee, Jantho- Bull Depot ¤¤ Blang Ubo-Ubo- Large Scale Breeding for Nucleus Herd

Krueng Aceh Kuta Malaka Blang Ubo-ubo

Scheme ¤¤ Nucleus : 605 Ha ¤¤ Plasma : 5,829 Ha

ACEH BESAR

Cot Sirebee

Ownership:

Location:

Krueng Aceh, Kuta Malaka, Blang Ubo-Ubo

Government Land Aceh Investment Profile

{ 109


500 Ha Land Area

6.4.

Pidie Beef Industry Development Project 110 } Aceh Investment Coordinating Board


Investment Estimate

USD 21,325,600 ¤¤ ¤¤

Breeding : 3,080 cows Fattening : 10,000 cows

Payback Period : 3 years and 5 months

¤¤ ¤¤

ROI : 32 % B/C : 1.23

SUITABLE FOR: ¤¤ Breeding Scheme ¤¤ Plasma System

Pidie

Biheu Village

PIDIE

Ownership: Location:

Biheu Village, Muara Tiga District

Private Land

Aceh Investment Profile

{ 111


4,155 Ha Land Area

6.4.3

Bener Meriah Beef Industry Development Project 112 } Aceh Investment Coordinating Board


Investment Estimate

USD 21,628,500 ¤¤ ¤¤

Breeding : 3,080 cows Fattening : 10,000 cows

Payback Period : 3 years and 2 months

¤¤ ¤¤

ROI : 32 % B/C : 1.23

SUITABLE FOR: ¤¤ Breeding ¤¤ Central Feedlot

Bener meriah

BENER MERIAH Perumpakan Benjadi

Ownership:

Government Land

Location:

Perumpakan Benjadi

Aceh Investment Profile

{ 113


2,280 Ha Land Area

6.4.4

Aceh Tengah Beef Industry Development Project 114 } Aceh Investment Coordinating Board


Investment Estimate

USD 21,628,500 ¤¤ ¤¤

Breeding : 3,080 cows Fattening : 10,000 cows

Payback Period : 3 years and 2 months

¤¤ ¤¤

ROI : 32 % B/C : 1.23

Scheme ¤¤ Nucleus : 780 Ha ¤¤ Plasma : 1,500 Ha

Aceh tengah

Karang Ampar

Jagong Jeget

aceh tengah

Ownership:

Location:

Private and Government Land

Jagong Jeget, Karang Ampar Aceh Investment Profile

{ 115


5,000 Ha Land Area

6.4.5

Nagan Raya Beef Industry Development Project 116 } Aceh Investment Coordinating Board


NAGAN RAYA Blang Baroe Rambong

Nagan Raya

Investment Estimate

USD 21,628,500 ¤¤ ¤¤

Breeding : 3,080 cows Fattening : 10,000 cows

¤¤ ¤¤

ROI : 32 % B/C : 1.23

Payback Period : 3 years and 2 months

SUITABLE FOR: ¤¤ Research Station ¤¤ Feedlot ¤¤ Breeding Scheme ¤¤ Nucleus dan Plasma System

Ownership:

Location:

Aneuk Nanggroe Cooperatives

Blang Baroe Rambong Aceh Investment Profile

{ 117


6.5

Detailed Plans for Fisheries

118 } Aceh Investment Coordinating Board


Number of Fisherman and Production of Sea Fishing By Regency/City 2012-2014 DISTRICT/CITY

Fisherman

Production (Ton)

Simeulue

3,387

4,288

Aceh Singkil

3,034

6,568

South Aceh

7,623

12,875

242

38.2

13,747

16,019

260

137

West Aceh

3,467

13,266

Aceh Besar

1,500

7,901

Pidie

3,018

11,536

Bireuen

8,686

9,512

North Aceh

5,222

11,526

Southwest Aceh

5,192

10,649

383

113.2

Aceh Tamiang

3,642

4,512

Nagan Raya

1,032

5,505

Aceh Jaya

3,408

4,626

178

36

2,303

6,968

Banda Aceh

842

6,621

Sabang

763

7,346

Langsa

4,388

11,902

Lhokseumawe

2,044

7,405

Subulussalam

358

139

2014

74,719

159,487

2013

73,731

155,270

2012

64,466

145,834.00

Southeast Aceh East Aceh Aceh Tengah

Gayo Lues

Bener Meriah Pidie Jaya

Source: Aceh in Figures, Aceh Central Bureau of Statistic (BPS) 2015

Aceh Investment Profile

{ 119


The Aceh Government invites investors to open businesses in Lampulo Port in the following sectors: 1. Fishing vessels with capacity 60 GT for long line fishing to operate in ZEE area of Aceh, with local labor 70% and foreign labor 30%. 2. Block ice factory capacity 6-80 ton/day 3. Frozen fish 4. Fish Canning factory 5. Fish processing factory (nuggets, sausages, and others). 6. Seaweed processing factory 7. Modern iodine-salt factory 8. Docking 9. Fiber industry

70,771

Of fishermen in Aceh (2013) 6.5.1

Lampulo International Fishing Port 120 } Aceh Investment Coordinating Board


Lampulo International Fishing Port is strategically located facing the fishing grounds of Malacca Strait, has an area of 50 Ha and is classified as a Type A (Ocean Fisheries Port). The development of this area emphasizes improving of the fishery community welfare. The area is designed to have integrated fishery activities such as quality control, marketing services and industrial processing area.

produced

148,765

tons of fish from fisheries in Aceh (2014)

Aceh Investment Profile

{ 121


To support the development of a minapolitan (fishery city), the Aceh Timur government focuses on increasing the production of aquaculture and wild fishery. The products are primarily sold in domestic and international market. The production of wild fish catches from Idi Port is around 21,473.51 tons/annum and production from aquaculture is 10,485 tons/annum, including tilapia, catfish, milkfish, black tiger shrimp, white shrimp, fire shrimp and crabs.

Photo: Kuala Idi Fishing Port

6.5.2

Idi Fishing Port 122 } Aceh Investment Coordinating Board


east aceh Idi Fishing Port

East Aceh

Operational area of Idi fishing port is around 62,5 ha, supported by the facilities & infrastructure as follows: Facilities & Infrastructures Jetty

Capacity 1,600 M2

Break water

800 M3

Port pool

300 Ha

West-side discharge and load jetty

160 M2

East-side fish market

600 M2

West-side fish market

800 M2

Fish packing building

150 M2

Port management office

452 M2

Generator set housing

48 M2

Water tower

1 Unit

Port office

1 unit

West-side warehouse

8 unit

Warehouse forklift

1 unit

Workshop

1 unit

Culinary stall

In response to the increase of production from both wild fish catches and aquaculture in Idi Port, the following are potential investments: 1. Block ice factory 2,000 blocks/day 2. Fish Canning factory 3. Promotion & research center for fisheries 4. Docking facilities 5. Central fish marketing and distribution centre

22 unit

West-side mushalla (prayer room)

1 unit

Mess facilities

9 unit

Port car park

1 unit

Fuel station for fishing boats

2 unit

Aceh Investment Profile

{ 123


Sawang Ba’u Fishing Port is located in Sawang Ba’u Village. It is the fish production center for South Aceh, with a total of 1.604 fishermen and 132 fishing boats. There are 60 boats 10 GT, and 78 non-motorized boats. The fishing gear used is purse saine and the main catches are skip jack and tuna. The facilities in Sawang Ba’u port are as follows: FACILITIES

CAPACITY

Port Area

1.5 ha

Quay

-

Jetty

-

Breakwater

400 m

Pool Port

1.2 ha

Revetment

150 m

Groin Fish market (TPI)

6x6m

The fish potential in Sawang Ba’u is very promising; the local government is expected to provide necessary facilities, to encorage the private sector to invest in a fish processing factory there. The following have potential for investment to develop Sawang Ba’u Fishing Port: 1. Block ice factory capacity 10 ton/day 2. Fuel station for fishing boats 3. Cold storage 4. Docking facilities

6.5.3

Sawang Ba’U Fishing Port 124 } Aceh Investment Coordinating Board


south Aceh

Aceh Investment Profile

{ 125


Photo: Peudada Fishing Port Blue Print

6.5.4

Peudada Fishing Port in Bireuen 126 } Aceh Investment Coordinating Board


bireuen

Peudada Fishing Port

Bireuen District which located on the coast at the Malacca Strait is a strategic location for fisheries development. Besides abundant resources for aquaculture and wild fish catches, Bireuen district has the potentials for maritime development with a coastline 15 ±68 km long and a sea area around 1.511 km3. The potential for fisheries is about 34.600 ton/year, whilst the present exploitation is only ±18.000 ton/ year or only about 47%. Maximum Sustainable Yield (MSY) used is around 25.600 ton/year. Peudada Fish Landing Port (PPI) is the centre for fisheries development in Bireuen District. Geographically, it is located at 5.204078 North Latitude and 96.583872 East Longitude.

The investment potentials for the development of national Peudada Fish Landing Port (PPI) and Outer Ring Fishing Port Development (ORFoD) are as follows: »» »» »» »» »» »» »»

Fish Processing/Fish Canning Factory. Logistic supplies for Tuna Long-Line fishing boats Docking Facilities. Fuel station for fishermen. Cold Storage Facilities. Block Ice Factory. Warehouse for fish.

Aceh Investment Profile

{ 127


GROUPER, SNAPPER AND LOBSTER Teluk Dalam and Sefelak Island are the focus areas for sustainable aquaculture development on Simeulue Island. The highest potential fish species for cultivation/growing on are grouper, snapper and lobster. The fish hatchery (Balai Benih Pantai Simeuleu) can supply seedling fish particularly grouper casino, barramundi and clownfish. As for lobsters, most are taken from the sea. Most fish production has been sold to Medan, North Sumatera via Susi Air, which then exported to Malaysia, Singapore, and other countries with net sales of lobster at USD 41.67/kg. In 2014, around 70 tons of fresh lobster was exported via Belawan Port, North Sumatera and 300 ton/year of grown-on grouper was exported to Hong Kong.

6.5.5

Simeulue Aquaculture Project 128 } Aceh Investment Coordinating Board


simeulue

Investment Estimate

USD 80,000,000

Project Purpose Establishment 6,000 units of six holes high-density polyethylene (HDPE) floating fish cage

Aceh Investment Profile

{ 129


Apart from the huge fish catching area, in the Indian Ocean, Simeulue District also has high potential for marine culture, with about 58,000 ha of suitable sea areas including two large bays, Teluk Dalam and Sibigo Bay. The most common fish species found in Simeulue District are skip jack, mackerel, yellow fin tuna, tiger grouper, sunu grouper, lobster, crab, teripang, and seaweeds.

6.5.6

Simeulue Fishing Port 130 } Aceh Investment Coordinating Board


Facilities & Infrastructures at Sinabang Bay, fish landing port (PPI) »» Wholesale market »» Jetty for ship to 80 GT »» Docking for ship repairs and other docking facilities for ship to 80 GT equiped with marine repairing small ship repair workshops. »» Cold storage (capacity 80 tons) »» State Electricity Company (PLN) 165 kW & backup generator capacity 186 kW »» Fresh water facilities »» Block Ice factory

simeulue

Potential investment: 1. Block ice factory 2. Fish processing industries Aceh Investment Profile

{ 131


Indonesia has a vision to be the biggest seaweed producer in 2015. The target is to produced 10 million tons of seaweed in the next ten years. According to Seaweed Commission of Indonesia, there are several key stregthent to develop seaweed in Indonesia as follow; »» The large coastline of Indonesia is very feasible for seaweed culture; »» Easy to develop in a short time (45 days); »» Labor intensive, high market demand; »» High value-added as it is raw material for food industry, pharmacy, cosmetics and others. Indonesian seaweed has contributed to around 500 end products around the world. (http://mitrabisnissyariah.blogspot. com/2012/05/melirik-potensi-rumput-laut-aceh-budi.html) Simeulue has been identified as a potential area for seaweed culture and processing. The investment opportunity is to develop seaweed culture system and post harvest management to produce high quality seaweed as raw material for industrial purpose.

6.5.7

Simeulue Seaweed Culture Project 132 } Aceh Investment Coordinating Board


simeulue

PROJECT PURPOSE To develop seaweed culture in Simeulue

INVESTMENT ESTIMATE

USD 3,073,083 R/C: 3.5 BEP: 3,411

Aceh Investment Profile

{ 133


7

Detailed Plans for Infrastructure and Energy

134 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 135


7.1

Detailed Plans for Insfrastructure (Railways & Seaports)

136 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 137


Aceh railway construction started in 1874 from Ulee Lheue and finished in 1917 at Pangkalan Susu (now in North Sumatera). The Aceh Railway was originally built for the benefit of the mobilization of military equipment with a track width of 750 mm and a length of 486 km. The construction costs reached 23 million Guiden. In 1974, the Aceh Railway stopped operating because of the high competition with other land transport and lack of spare parts.

Post tsunami disaster in Aceh, the French Government granted Pre-Feasibility Study for Aceh railway conducted by SNCF (Société Nationale des Chemins de fer Français) in 2015. The result of the PreFS study includes application of normal gauge (1435 mm) for intercity tracks, development of Banda Aceh urban railway lines and development of commuter line Lhokseumawe - Bireun. According to Aceh Regional and Spatial Planning Article 18, railway development is to be focused on revitalization of the eastern coast and northern coastal railway

7.1.1

Banda Aceh Urban Railway 138 } Aceh Investment Coordinating Board

line and on an urban railway for Banda Aceh. The growth of population in Aceh has been increasing significantly and reached 5,437,120 in 2014, including Banda Aceh as the capital of Aceh Province and the central of governmental as well as economics and education activities. Therefore, it leads to the increasing numbers of passengers and goods from Medan and districts/cities in Aceh to Banda Aceh. In response to this, it is very necessary to initiate the development of Banda Aceh urban railway as a way to provide better service to people.


Proposed Rail Route Potential sectors for investment: 1. Study of Banda Aceh Urban Railway Development »» Feasibility Study (FS) »» Detailed Engineering Design (DED) »» Environmental Impact Assessment (EIA) 2. Provision of Technical Assistance for Railway Development in Aceh Province 3. Human Resources Development for Railway Construction, Operation and Maintenance »» Short courses »» Internship »» Bachelor/Master degrees

Aceh Investment Profile

{ 139


Krueng Geukueh Port is managed by PT Pelabuhan Indonesia I (Persero) and located at Tambon Baroh in Dewantara Sub District, North Aceh. Geographically, the port is at 05° 100 North Latitude and 97. 02.00 East Longitude. The Working Area of this Regional Port (DLKR) is ¹ 38 ha of land and around 10.941 Ha of water. The Region of Interest at this Ports Environment (DLKP) covers about 9.035 ha of water.

7.1.2

Krueng Geukueh Seaport Project 140 } Aceh Investment Coordinating Board


Krueng Geukueh Port has the total water area approximately 900,000 m2 with a depth of 10 m. LWS. It has potential to serve large ships that enter the port PT. Arun LNG, PT. ASEAN Fertilizer,PT. Pupuk Iskandar Muda and PT. KKA. Commodities that have been exported through this port since 1994 include LNG, condensate, fertilizer, ammonia, paper and betel nuts. The major exports were oil and gas (LNG) exported by PT Arun.

Aceh Investment Profile

{ 141


Kuala Langsa Port is a key for economic development in the eastern regions of Aceh (Langsa City, Aceh Tamiang District and East Aceh District, along with the central region of Aceh, Gayo Lues). As the gateway for exports and imports for the surrounding area, the Kuala Langsa port could cooperate with the much larger port, Belawan Port in North Sumatra, to be an alternative port for when Belawan Port is overloaded.

with natural resources such as fisheries, plantations and farming (sea food, palm oil, rubber, cacao, areca, essential oils and coffee) plus energy & minerals (petroleum, natural gas, coal, lead, limestone and marble).

The hinterland that support the Kuala Langsa covers an area of 14,805.24 km2, and is very rich

Export of crops from the east of Aceh via Belawan Port in North Sumatera requires extra

transport costs. To reduce these extra costs, it will be better to optimaze use of Kuala Langsa Port. Furthermore, the government has provided 225 ha of land around the port which is feasible as a centre for processing industries for major commodities such as Crude Palm Oil (CPO).

7.1.3

Kuala Langsa Seaport Project 142 } Aceh Investment Coordinating Board

EXISTING COMPANY - Langsa: Kenangan Passanger Ferry - PT. Pelayaran Alkan Abadi


FACILITIES BERTH Public Berth

TYPE OF SERVICE

UNIT

Pilot Boat

Available

Tug Boat

Not Available

150 M

Freshwater

Available 12-15 Ton/Hour

600 M

Traffic Loading and Unloading TKBM

Available

Port Operator

PT. Pelabuhan Indonesia I (Persero)

3000 M2

Liquid Bulk Terminal ROAD Port Road OPEN STORAGE Open Storage A

6000 M2

Open Storage B

4000 M2

OFFICE BUILDING Port Building

200 M2

Pos Komite Pemantau Penyelenggara Pemerintahan

REMARK

40 M2

Public Service EMKL

2

Freight Forwarder

2

Port State Control (PSC)

4

WAREHOUSE Warehouse 01

500 M2

Warehouse 02

300 M2

EQUIPMENT Forklift (Patria)

2 Unit

Project Purpose

Establishing Ro-Ro Freight Ferry Shipping

Investment Estimate

USD 1,025,960

Frequent Route of PT. Pelayaran Alkan Abadi Loading Port

Destination Port

Ship Name

Tg. Priok, Jakarta

Malahayati, Aceh

Hirondex V.9

Malahayati, Aceh

Tg. Priok, Jakarta

Hirondex V.10

Aceh Investment Profile

{ 143


7.2

Detailed Plans for Energy

144 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 145


7.2.1

Electricity Supply System In Aceh Supply Conditions

Isolated 20 kV 106 MW (28%)

Supply

Rp 2,988/kWh Customers

Grid 150 KV 269 MW (72%)

Prod. Cost

1,127,469 Average Selling Price in Aceh Rp 732/kWh

Tariffs

Electricity subsidy

Indonesia (2013) : Prod. Cost = Rp 1,347 / kWh | Av. Selling price = Rp 818 / kWh

CUSTOMER GROWTH

646 546

361

2013

391

2014

427

2015

146 } Aceh Investment Coordinating Board

463

2016

593

503

2017

2018

2019

2020


GEOTHERMAL 589.42 MWe

POTENTIAL ENERGY IN ACEH

Sabang/Jaboi 74,14 MWe SeulawahAgam 250,00 MWe Gayo Lesten 15,28 MWe

HYDROPOWER 1,482.50 MW Meureudu (RES) 17,0 m3/sec: 62,60 MW Teunom (RES) 41,6 m3/sec: 41,10 MW Jambo Aye (RES) 72.12 m3/sec: 192,00 MW Peusangan (RES) 13.57 m3/sec: 88,90 MW Remasan (RES) 10,30 m3/sec: 101,80 MW Peureulak (RES) 38,80 m3/sec: 20,80 MW Tampur-Tamiang (RES) 99,35 m3/sec: 427,00 MW Bidin (RES) 31,30 m3/sec: 98,60 MW Tawar/Bidin (RES) 7,40 m3/sec: 73,30 MW Tawar/Jambo Aye (RES) 3,20 m3/sec: 41,90 MW PantanDedalu (ROR) 3,20 m3/sec: 7,90 MW Lawe Alas (RES) 50,00 m3/sec: 268,10 MW Lawe Mamas (ROR) 10,80 m3/sec: 65,80 MW

COAL RESERVES Meureubo & Kaway XVI District Estimation: 571 Million Ton (‚ 3,500 Calorie) Reserves available: 1.82 Billion Ton

PEAK LOAD TREND ESTIMATES (MW)

1,127,469 1,196,438

2013

2014

2015

1,412,113

1,345,792

1,276,674

2016

2017

2018

2019

2020

Aceh Investment Profile

{ 147


Transmission Line Development Planning up to 2020 Ulee Kareng – Krueng Raya 2017 Jantho – Icomer 2014 PLTP Seulawah- Incomer 2021

Banda Aceh – Ulee Kareng 2017 Banda Aceh Lampisang 2019

Samalanga – Incomer 2017 Bireuen – Takengon 2016

Krueng Raya

Cot Trueng – Incomer 2015 Panton Labu – Incomer 2014

Sigli

Banda Aceh Lampisang

Bireuen Samalanga

Jantho

P Seulawah

Cot Trueng Lhokseumawe Panton Labu Idie Rayeuk

Lampisang – Calang 2019

PLTA Peusangan 2 – Takengon 2016

Calang

A

Calang – Meulaboh 2018 Sigli – Steam Powerplant 2012

Krueng Cut

PLTA Peusangan 1 – Peusangan 2 - 2016

Meulaboh

Meulaboh – Steam Power plant 2015

Langsa

Takengon

A

Nagan Raya Steam Powerplant

Blang Kejeren Blangpidie

Steam Powerplant – Blang Pidie 2015 Takengon – Blang Keujeuren 2017

Kuta Cane

Blang Pidie – Tapak Tuan 2017 Tapaktuan

Kutacane – Blang Keujeuren – 2018 Tapak Tuan – Subulussalam 2018 Subulussalam

Subulussalam – Singkil 2018 Existing 150 KV Planning 150 KV Planning 275 KV

Planning

P

Geothermal

Planning 275 KV

A

Hydropower

Existing

148 } Aceh Investment Coordinating Board

Singkil

Sidikalang – Subulussalam 2015


IPP in Progress Until 2014

Excess Power Mini Hydro (PLTMH) Kr. Kala Capacity : 0,045 MW Status: Operate

Excess Power Steam power plant (PLTU) EAS Capacity : 10 MW Status: Operate IPP Hydro Power Plant (PLTM) Kr. Isep Capacity : 10 MW Status: Construct COD : 2016

Excess Power Steam power plant (PLTU) PT. LCI/SAI Capacity : 5 MW Status: Approaching has been started since 2011, MoU up to 16 Nov 2014 Contract Agreement Process Excess Power Steam power (PLTU) Sinergi BUMN Capacity : 24 MW Status: Operate 10 MW in May 2014, Full operation in November 2014 Excess Power Mini hydro (PLTMH) Marpunge Capacity: 0,4 MW Status: Operate in April 2014 Excess Power PLTMH Wih Selah Capacity: 0,15 MW Status: Operate Excess Power Mini hydro (PLTMH) Rerebe Capacity : 0,175 MW Status: Operate

IPP PLTM Cuko II Capacity: 5,4 MW COD (Estimate): 2018 IPP PLTP Jaboi Capacity: 10-50 MW COD (Estimate): 2017

IPP PLTM Cuko I Capacity: 4,6 MW COD (Estimate): 2018 IPP PLTBiomas Capacity: 9,8 MW Status: PPA 4 Sept. 2013 COD (Estimate): 2016

IPP PLTMH Teunom Capacity: 10 MW COD (Estimate): 2007

IPP PLTGBS Alur Manis Capacity: 3,3 MW COD (Estimate): 2017

IPP PLTM Ketol Capacity: 9.9 MW COD (Estimate): 2019

IPP PLTM Lawe Mamas Capacity: 9,6 MW COD (Estimate): 2017

IPP PLTM Kerpap Capacity: 2.2 MW COD (Estimate): 2017

IPP PLTM Lawe Sikap Capacity: 6.9 MW COD (Estimate): 2017

IPP PLTM Bidin II Capacity: 3.1 MW COD (Estimate): 2018

IPP PLTM Lawe Gurah Capacity: 4.5 MW COD (Estimate): 2017

IPP PLTM Bidin I Capacity: 6.6 MW COD (Estimate): 2018 IPP PLTM Subulussalam Capacity: 9 MW COD (Estimate): 2018 Aceh Investment Profile

{ 149


Power Plant Development up to 2020 PLTGU Kr. Raya (2 x 50 MW)

PLTP Jaboi (10 MW) 2018-2019 PLTP Seulawah (55 MW) 2016 P

PLTM Teunom (2 x 5 MW) 2016

G

PLTA Teunom 1,2,3 (24 MW-2023) (288,2 MW – 2026) (102 MW – 2024)

A A

PLTA Woyla 2 (274MW) 2024

A

A A

PLTA Woyla 3 (43 MW) & Woyla 4 (9 MW) 2016

A A A U

PLTM Ketol (2 x 5 MW) 2018

PLTGKKA (18 MW) 2014 & Arun (80 MW) 2015

PLTA Peusangan 4 (2 x 42) 2018

A A

PLTG Arun (184 MW) 2015

PLTM Ilthabi (6.6 MW) PLTA Jambo Aye (160 MW)

PLTG Sumbagut 1 (250 MW) 2016

PLTM Lumut (10 MW) 2016 PLTM Kerpap (1,5 MW) 2015

G G

PLTA Ramasan 1 (171.6 MW) 2024

A

PLTA Tampur (428 MW) 2025

A

PLTBimass Tjg Semantoh (10 MW) 2015

A

A

A

PLTM Lawe Mamas (9,6 MW) 2017 Gedung Biara (1 MW) & PLTGBS Alur Manis (3 MW) 2016

A

A

PLTA Meulaboh 5 (43 MW) 2019 PLTA Meureubo 1 & 2 (82,1 MW) (2 x 30 MW) 2017

A

PLTA Seunagan 3 (31 MW) 2021

A

PLTM Lawe Sikap (6,99 MW) & PLMT Lawe Gurah (4,5 MW) 2017

A

A

PLTA Jambo Papeuen (95.2 MW) 2019

A

PLTU Meulaboh (2 x 110 MW) 2013 (1 x 200 MW) 2016 (1 x 200 MW) 2016

A

PLTA Sibubung (121.1 MW) 2021

PLTM Kr. Isep (2 x 5 MW) 2016

PLTA Kluet (141 MW) 2019

PLTA Tripa 3 & 4 (172,6 MW) (306,4 MW) 2024

PLTM Kombih (17.8 MW) 2016

PLTA Peusangan 1 & 2 (2 x 22.1 MW) (2 x 21,1 MW) 2016

ENERGY MIX IN 2014-2023 2014

150 } Aceh Investment Coordinating Board

2017


Demand & Supply Condition 150 kV Sumut-Aceh Power System Peak Load: 269 MW (71.6%) IPP: (179 MW) Self Generation (48 MW) SABANG Peak Load: 4.7 MW IPP: 4 MW Self Generation = 1.9 MW

TAKENGON Peak Load: 15.5 MW IPP: 9 MW Self Generation = 8.5 MW

CALANG PeakLoad: 4.85 MW IPP: 5 MW Self Generation = 1.8 MW

BLANGKEUJEUREN Peak Load: 3.4 MW IPP: 3 MW Self Generation = 4.3 MW

MEULABOH Peak Load: 31.6 MW IPP: 24 MW Self Generation = 18.6 MW

KUTACANE Peak Load: 10.4 MW IPP: 8 MW Self Generation = 5.6 MW

BLANGPIDIE Peak Load: 10.6 MW IPP: 4 MW Self Generation = 10.9 MW

SUBULUSSALAM Peak Load: 10.9 MW IPP: 10 MW Self Generation = 3.1 MW

TAPAKTUAN Peak Load: 4.5 MW IPP: 2 MW Self Generation = 3.7 MW KUTA FAJAR Peak Load: 4.5 MW IPP: 4 MW Self Generation = 1.4 MW SINABANG Peak Load: 4.2 MW IPP: 5 MW Self Generation = 4.1 MW

2020

Substation TL 150 kV

2023

Aceh Investment Profile

{ 151


The demand for global energy is expected to increase approximately around 50 percent by 2030. Fossil fuel as the main resource will last eventually for several decades and the change of market dynamics and the increase of energy cost have accelerated the development of renewable energy, which then enhances its status as one of the core energy. Geothermal and Power Operation (2008), Chevron, Jakarta. According to Energy and Mineral Resource Department, the potential of geothermal in Indonesia is proximately 27,000 megawatt, while Aceh has arround 1,115 megawatt. Geothermal potentials in Aceh spread in eight districts/cities with total 17 spots. Five spots of geothermal have been managed in various

stages: pre survey, evaluation for survey request, designated working area, establishment of joint venture, and exploration. The central government has assigned the National Power Company (PLN) to build 5,000 Mw of energy in Aceh to fulfill the projected national demand of 35,000 Mw. Hance the potential for investment in energy sector is widely open.

Photo: Illustration

Investment Feasibility

7.2.2

Geothermal Projects 152 } Aceh Investment Coordinating Board

The Power for the district of Bener Meriah is supplied from the 150 KV transmission systems from North Sumatera interconnection system from North Sumatera. The power supply is only able to serve 207 villages (89,22%) of the total 232 villages. A total of 25 villages have not been served yet.


Energy Potential (Mwe) N o

Objects

Regency/City

Coordinate

Resource (Mwe) Spec

Reserve (Mwe)

Hipo

Expec

1

Iboih

Sabang

LU 04°37' ; BT 96°45'

25

-

-

2

Lho Pria Laot

Sabang

LU 03°47' ; BT 97°41'

50

-

-

3

Jaboi Keuneukai

Sabang

LU 05°53' ; BT 95°14

-

-

4

Ie Seum-Krueng Raya

Aceh Besar

LU 05°29' ; BT 95°39'

-

63

5

Seulawah Agam

Aceh Besar

LU 05°50' ; BT 95°18

6

Alur Canang

Pidie

7

Alue Long-Bangga

Pidie

Remark

Phase Exploration by 50 PT. Sabang Geothermal Energy Praparation to Establish Joint Venture Between 165 PT. Pertamina with Local Company

-

-

LU 05°01' ; BT 95°55

25

-

-

LU 04°48' ; BT 96°48'

100

-

-

8

Tangse

Pidie

LU 04°56' ; BT 96°44'

25

-

Phase Evaluation of aplicationPreliminari - Survey PT. HitayBumi Energy by Directorat General EBTKE, KESDM

9

Rimba Raya

Bener Meriah

LU 03°28' ; BT 97°51'

100

-

-

10

Simpang Balik

Bener Meriah

LU 04°19' ; BT 97°53

100 Phase Work Area Designation PT. - JasaDaya Chevron by Directorat General EBTKE, KESDM

11

G. Geureudong

Aceh Tengah

LU 05°48' ; BT 95°19'

-

120

12

Silih Nara

Aceh Tengah

LU 04°37' ; BT 97°42'

100

-

-

13

Meranti

East Aceh

LU 05°05' ; BT 95°54'

25

-

-

14

Brawang Buaya

Aceh Tamiang

LU 05°08' ; BT 96°18'

15

Kafi

Gayo Luwes

16

Gunung Kembar

Gayo Luwes

LU 05°33' ; BT 95°33'

17

Dolok Perkirapan

Gayo Luwes

LU 04°42' BT 96°49'

TOTAL POTENTIALS = 1.115 Mwe

25

-

-

25

-

-

-

92

Phase Evaluation of aplicationPreliminari - Survey PT. HitayBumi Energy by DirectoratJ enderal EBTKE, KESDM

25

-

-

625

275

215

Investment Estimate

USD288,080,00

Aceh Investment Profile

{ 153


The Ministry of Energy and Mineral Resources has identified Aceh province as one with renewable energy sources especially the hydropower geology, weather hydrology, and catchment areas consisting of mountains and rivers of small, medium and large scale with relatively static water levels and these have potential for hydropower.

The Energy and Mineral Resources Office and PT.PLN has conducted surveys and identified rivers with a potential for hydropower (PLTA) and Mini Hydro (PLTMH) spread in 9 districts which can produced around 3,898 MW.

HYDROPOWER PLANT PROJECT IN ACEH NO 1

District/City North Aceh

Capacity (MW)

Jambuaye-3

WhJambu Air

37

112

Jambuaye-5

Kr. Jambuaye

160

545

Bidin/Jambuaye

Kr. Jambuaye

246

738

172

515

2

Gayo Lues

Ramasan-1

Kr. Ramasan

3

East Aceh

Peureulak

Kr. Peureulak

4

Aceh Tamiang

Tampur

W.Tampur

4

South Aceh

Jambo Papeun-2

5 6

7

Nagan Raya West Aceh

Aceh Tengah

Investment Estimation (Million USD)

Location

Project Name

35

104

428

128

Kr. Jambo Papeun

95

286

Kluet

Kr. Kluet

141

423

Sibubung 2

Kr. Sibubung

121

363

Tripa-3

Kr. Tripa

173

518

Ptripa-4

Kr. Tripa

306

919

Meureubo-1

Kr. Meulaboh

821

246

Meureubo-2

Kr. Meureubo

60

NA

Woyla-2

Kr. Woyla

274

822

Woyla-3

Kr. Woyla

43

NA

Woyla-4

Kr. Woyla

9

NA

Pameu

Kr. Pameu

161

482

Peusangan-1

Kr. Peusangan

44

270

Peusangan-2

Kr. Peusangan

42

NA

Peusangan-4

Kr. Peusangan

84

NA

8

Southeast Aceh

Dolok-1

Kr. Dolok

32

97

9

Aceh Jaya

Teunom-1

Kr. Teunom

24

865

Teunom-2

Kr. Teunom

288

NA

Teunom-3

Kr. Teunom

102

NA

3,898

7,433

Total

7.2.3

Hydro Power Plant 154 } Aceh Investment Coordinating Board


Existing Company: • PT. Velcan Ilthubi Hydropower (Bener Meriah) • PT. Aceh Hydropower (West Aceh) • PT. PLN Persero; Peusangan 1 & 2 (Aceh Tengah) • PT. Kamirzu (Gayo Lues, Aceh Tamiang, East Aceh)

Investment Feasibility Establishing Irrigation for 19.50 Ha and Hydropower Plant 160 MW/580 MWH Aceh Investment Profile

{ 155


Irrigation 19,50 Ha, Hydropower Plant 160 Mw/580 Mwh

Jambo Aye Multi Purpose Reservoir Project 156 } Aceh Investment Coordinating Board


Jambo Aye Reservoir a. Plan of Reservoir - Catchment Area

= 3,920 Km2

- Maximum Height of Reservoir Wall

= 90 m’

- Total Volume

= 4,170 X 106 m3

b. Function of Reservoir - Irrigation Supply

= 41,200 Ha, 16 m3/second

- Flood Control (Q1000ch), El. + 85 m

= 3,850 m3/second

- Hydropower

= 160 MW / 580 MWH

- River Regulation

= 2 m3/second

c. Impact oN Environment - Area inundated

= 11,500 Ha

- Vegetation inundated

= Forest

- Residences Submerged

= 220 Households

- Land inundated

= Refer detailed list

d. Total Cost

= US $ 539, 28 million

- Sub Total for hydropower plant project

= US $ 344,40 million

- Cost per KW installed

= US 2,150,00/KW

No

Land Use List

Hectares (Ha)

1

Reserved Forest

220 Ha

2

Forest Concession Areas PT. Rimba Penyangga Utama

3

Forest Concession Areas PT. Tualang Raya

4

Concession Lands of EXXON MOBIL OIL

6,970 Ha

5

Residences (220 Houses) & Garden

800 Ha

2,495 Ha 778 Ha

Aceh Investment Profile

{ 157


8

Detailed Plans for Tourism Development Projects

158 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 159


8.1

Banda Aceh Tourism Development Project

160 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 161


8.1.1

Krueng Aceh River Walk 162 } Aceh Investment Coordinating Board


FACILITIES • Food Court • Restaurant • Playground • Jogging track • Mini Port • Amphitheater • Park

INVESTMENT ESTIMATE

USD 5,000,000 Aceh Investment Profile

{ 163


8.1.2

Ulee Lheue Beach 164 } Aceh Investment Coordinating Board

facilities ¤¤ ¤¤ ¤¤ ¤¤

Food Court Restaurant Playground Jogging Track

¤¤ ¤¤ ¤¤ ¤¤

Mini Port Amphitheater Park Fishing Spot


Investment EstimatE

USD 10,000,000 Aceh Investment Profile

{ 165


8.1.3

Banda Aceh Madani Education Center 166 } Aceh Investment Coordinating Board

Infrastructure Development: 1. Islamic School 2. Male Dormitory 3. Female Dormitory 4. Administration Office 5. Convention Hall and Exhibition Hall


Incentives from Banda Aceh Government: »» Facilitated Environmental Impact Analysis (AMDAL) »» Permit Arrangement »» Land Acquisition

INVESTMENT ESTIMATE:

USD 250,500,000 Aceh Investment Profile

{ 167


8.2

Simeulue Marine Tourism Development

168 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 169


8.2.1

Diving Center Location

170 } Aceh Investment Coordinating Board

Siumat Island, Ganting, Sibau, Simanaha Island and Harapan Island, Simeulue


simeulue simeulue

Diving Spot

Investment Estimate

USD 3,100,000 IRR: 18% Payback Period : 5 Years

Investment Potentials

Land Status

Private and Goverment Land

1. Diving/Snorkeling Equipment 2. Cottages 3. Human Resources 4. Camp 5. Monitoring (Government Sustainable Purpose) Aceh Investment Profile

{ 171


8.2.2

Surfing Center Location

172 } Aceh Investment Coordinating Board

Harapan Island, Maudil, Matanurung, AlusAlus and Batu Berlayar Island, Simeulue


simeulue

Surfing Spot

Investment Estimate

USD 2,100,000 IRR : 18% Payback Periode: 3 Years

Investment Potentials

Land Status Private own

1. Surfing Equipment 2. Cottages 3. Human Resources 4. Camps 5. Monitoring (Government Sustainable Purpose) Aceh Investment Profile

{ 173


9

Sabang Free Port and Free Trade Zone Project

174 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 175


9.1

Sabang International Water Front 176 } Aceh Investment Coordinating Board


Sabang

Land Area Location Land Status Supporting Land

: : : :

0.5 Ha Paradiso Beach Goverment Land 1 Ha Sabang Fair Area

Road Condition Road Surface Water Electicity

: : : :

Good Asphalt Lake and Spring Supported

Infrastructure Support Airport : Maimun Saleh Seaport : Balohan (passanger port) and Sabang International Hubport

investment estimate

USD 35,000,000 Payback : 8 Years B/C Ratio : 1.21

Aceh Investment Profile

{ 177


Land Area Location Land Status Depth CT 1 Length CT 3 Length

: : : : : :

117 Ha Sabang Bay Goverment Ownership 22 m 180 m2 x 25 m2 423 m2 x 50 m2

9.2

Cruise Passenger Terminal 178 } Aceh Investment Coordinating Board

Road Condition Road Surface Water Electricity

: : : :

Very good Asphalt Treated Water Supply Supported


Infrastructure Support Airport : Maimun Saleh Seaports : Balohan (ferry port) and Sabang International Hubport (shipping)

investment estimation

USD 120,000,000 Payback : 8 Years B/C Ratio : 1.23

Aceh Investment Profile

{ 179


Batchmetri Area Land Area Location Land Status

: : : :

26.5 Ha 13 Ha Lhok Wieng Goverment Land

Road by Condition Road by Surface Water Electicity

: : : :

Good Asphalt Lake and Spring Supported

Infrastructure Support Airport : Maimun Saleh Seaport : Balohan (ferry port) and Sabang International Hubport (shipping)

9.3

Yacht Marina & Supporting Facilities 180 } Aceh Investment Coordinating Board


investment estimatE

USD 6,000,000 Payback : 5 Years B/C Ratio : 1.3

Aceh Investment Profile

{ 181


9.4

Diving Center 182 } Aceh Investment Coordinating Board


Location Land Status

: Gapang and Iboih Beach : Goverment Land

Road Condition Road Surface Water Electicity

: : : :

Good Asphalt Lake and Spring Supported

Infrastructure Support Airport : Maimun Saleh Seaport : Balohan (ferry port) and Sabang International Hubport

investment estimatE

USD 1,100,000 Payback : 4 Years B/C Ratio : 1.3

Aceh Investment Profile

{ 183


9.5

Seaport 184 } Aceh Investment Coordinating Board


investment opportunities ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤

Commerce, Export-Import Transhipment port Cruise line Docking yard Fuel Bunkering Service Storage Water Supply Other Aceh Investment Profile

{ 185


business opportunities ¤¤ ¤¤ ¤¤ ¤¤ ¤¤

Service of export or import Fuel Bunker, Transit & Supply Down Stream for Agro Industry (CPO, Cacao, Rubber, etc) Shipping Industry/ Ship Docking Fish Processing Industry

9.6

Industrial and Trading Sector 186 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 187


We will offer the greatest advantages in today’s challenging manufacturing environtment. We will offer the most advanced Industrial Free Zone in Indonesia-minutes from the Container Seaport. We will offer competitive labor rates, on-site property management and 24-hours security. We will layout the Parks to best utilize the land area and provide for only High Tech Industries that create jobs beneficial to the people of Weh Island and Indonesia.

9.7

Balohan Industrial Park 188 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 189


¤¤ It is surrounded by the Indian Ocean and the Malacca Strait. ¤¤ Sabang Zone has a big potential for marine fish processing industries ¤¤ Part of Sub Regional Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)/ Andaman Cluster ¤¤ Some location along the coast of Weh Island nearby Pulo Aceh Island have high potential for marine fish and seaweed culture.

busineess opportunities ¤¤ ¤¤ ¤¤ ¤¤ ¤¤

Export Processing Zone (EPZ) Fresh Fish Export Terminal (sea and Air cargo) Marine Culture, such as seaweed, lobsters. Cold Storage Docking Yard

9.8

Fishery Sector 190 } Aceh Investment Coordinating Board


INCENTIVES: BPKS has the authority to provide incentives for business in the Sabang Zone: ¤¤

¤¤ ¤¤

Sabang Zone has free: »» Custom Clearance »» Custom (Export-Import) duties »» Luxury goods tax »» Value Added Tax (VAT) Free Trade and Free Port determined for 70 years. Management Board of Free Trade and Free Port Sabang (BPKS) has the authority to grant business licenses and other license, hence, the procedures are faster and easier

Aceh Investment Profile

{ 191


10

Detailed Plans for Industrial and Trading Estates

192 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 193


Reserved Land Area : 552.663 sqm

10.1

Aceh Industrial Area Plant at Ladong 194 } Aceh Investment Coordinating Board

Location: Ladong, Aceh Besar (about 18 km west to Banda Aceh, 30 km to Sultan Iskandar Muda Airport, and 9 km east to Malahayati Port ).


Ladong 556,663 sqm (55 Ha)

beef processing focused investment area

Malahayati seaport

coconut focused investment areas

aceh besar

pidie

Consist of: • 19 lots for small scale industries (0.10 Ha – 0.30 Ha). • 23 lots for low medium scale industries (0.30 Ha – 0,50 Ha). • 10 lots for higher medium scale industries (0.50 Ha – 1 Ha). Aceh Investment Profile

{ 195


10.2

Lhokseumawe Industrial Area 196 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 197


Created by: Promotion Division of Aceh Investment Coordinating Board Team Design and Layout aSOKA communications Copyrigth 2016 | Aceh Investment Coordinating Board

198 } Aceh Investment Coordinating Board


Aceh Investment Profile

{ 199


ACEH INVESTMENT COORDINATING BOARD 2016


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.