INVESTMENT OPPORTUNITY
ACEH INDONESIA in
Aceh Investment Coordinating Board 2013
1
PREFACE Zaini Abdullah Governor of Aceh
“We welcome you to invest in amazing Aceh�
2
All praises and gratitude are due to God the Almighty for giving us ability to provide you information about investment opportunity in Aceh. Peace may be bestowed upon His messenger, Prophet Muhammad PBUH who gave us example how to be tolerant and kind to others. Aceh is your investment destination. As a special province in Indonesia, Aceh gains several opportunities a head among others: friendly investment laws, geographical position, abundant natural resources, and human capital. Friendly investment laws started from Bill No. 11 on Government of Aceh, in 2006. It gives Aceh opportunities to be more innovative and accommodate Aceh's needs, including business plans and action plans. In fact, this law enhances the Free Trade Zone and Free Port of Sabang' Bill No. 37 of 2002 which made
Aceh as Western Business Gate of Indonesia. Those freedom on economics activities also supported by President Regulations No. 11 of 2010 to give Aceh permission to achieve more regional and international business ventures directly. Another thing that makes Aceh as one of the best place to invest is its location proximity. If we put Aceh as a center, then East Africa, Middle East, South Asia, Southeast Asia, East Asia, along with Australia and New Zealand are growing potential markets. This geographical position is a beneficial networking for long term investment activities. Aceh also has abundant natural resources. Coffee, cocoa, rubber, and palm oil are just a short list of them. Not to mention mineral resources located inland and offshore of Aceh. Potential investors can gain beneficial of all of these commodities using productive and hardworking human resources of Aceh. The Government of Aceh provides 20% of its annual budget for human capital so they can be your partners in these opportunities. A brand-new Aceh is just right for your investment in the future. We welcome you to invest in amazing Aceh.
CONTENTS I
III
INTRODUCTION
1.1 Vision and Mission on Investment 1.2 Investment Policy 1.3 Geography 1.4 Aceh Development Indicator 1.5 Aceh Spatial Planning
INVESTMENT OPPORTUNITY
3.1 AGRO INDUSTRIES 3.1.1 Coffee 3.1.2 Cocoa 3.1.3 Rubber 3.1.4 Palm Oil 3.1.5 Patchouli 3.1.6 Corn 3.1.7 Organic Horticulture 3.1.8 Fishery 3.1.9 Dairy and Livestock Farm
II
WHY INVEST IN ACEH 2.1 Regulations 2.2 Incentives 2.3 Infrastructure Support
AND IV INDUSTRIAL TRADING ESTATES
4.1 ACEH INDUSTRIAL AREA 4.2 SABANG FREE TRADE & FREEPORT ZONE
3.2 TOURISM 3.3 ENERGY & INFRASTRUCTURE 3.4 MINING
3
I INTRODUCTION
VISION & MISSION ON INVESTMENT
VISION ACEH BECOMES ONE OF THE LEADING INVESTMENT DESTINATIONS IN 2017
MISSION • Improve human resources on investment. • Implement integrated planning and control on investment among central government, local governments and private sectors. • Promote Aceh’s new branding image as one of the leading investment destinations. 5
INVESTMENT POLICY
1. Investment climate improvement. 2. Investment distribution across Aceh. 3. Focusing on agro-industry development, infrastructure and energy, manufacturing industry and tourism, and science-based economy. 4. The environmental base of investment. 5. Improving the quality of local labor. 6. Empowering cooperatives and micro, Small and Medium Enterprises (MSMEs). 7. Facilities provision, convenience and investment incentives. 8. Investment promotion.
6
GEOGRAPHY
ACEH, THE WEST GATE OF INDONESIA
ACEH
7
GEOGRAPHY
7,478,801.95 Ha
56,770.81 Km2
Total area of the territorial sea whose breadth extends to two hundred Straits of Malaca nautical miles measured from the baselines.
18
district
Total area according to Basemap of Indonesia.
5
cities
284
subdistrict
48 %
of the population work in the agriculture sector.
Inhabited by
4,726,001 people (2012)
Indian Ocean
Topographically hilly with mountains, valleys, rivers, waterfalls, and narrow floodplain
2,001,259 Labors Force
Source: www.bps.go.id
8
755
mukim
6.450
gampong
ACEH DEVELOPMENT INDICATOR 40 ACHIEVEMENT & TARGET (%)
35 30 25 20 15 10 5 0
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 YEARS 1,22
7,23
1,88
3,97
5,32
5,89
6,0
6,5
6,7
6,8
7,2
8,0
%
Level of Poverty 28,69
28,28
26,65
23,53
21,8
20.98
19,57
19,0
17,5
15,5
13,5
11,5
9,5
%
Unemployment 14,00
12,08
9,84
9,56
8,71
8,37
7,43
7,30
7,22
7,10
7,00
6,80
6,50
%
9,98
9,41
11,92
3,72
5,86
5,78
3,4
4,2
4,4
4,9
5,1
5,0
%
Economic Growth
1,76
Inflation 34,88
TARGET Source: www.bps.go.id
9
ACEH SPATIAL PLANNING
Cultivated Area Protected Area Conservation Area
2,934,602 Ha Cultivated Area Those areas for production forest, community forest; agriculture; fisheries; mining; industry; tourism; housing and other functions.
10
2,708,550 Ha
Protected Area and Conservation Area Those areas ruled for the protection for following areas Local protected area; preserve region and areas and cultural heritage; national disasterprone; geology protection; and other preservation areas.
II
WHY INVEST IN ACEH
REGULATIONS Law No 11 of 2006 on Aceh Governance. The law gives the Government of Aceh privileges to governm the province including in economic development to improve health, safety, and public welfare.
Aceh’s Governor Office
Law No. 37 of 2000 on Sabang Free Port and Free Trade. Sabang has a special authority in economical aspect which made this island free from entry and exit tax. BPKS Sabang is a government’s agency who helps potential investors to start the business. President Regulation No. 11 of 2010 on Cooperation between the Government of Aceh and Foreign Institutions. The regulation allows a wide authority for the Government of Aceh to establish cooperation with foreign institutions, especially in economic development.
12
INCENTIVES FISCAL • Tax Allowance: income tax deduction for certain investments and/or region. • Facilities import duty: tax exemption for imports of machinery and materials standard for business activity with some requirements. • Tax Holiday: tax exemption. • Incentives from local governments. NON FISCAL • Land acquisition for the development of public infrastructure. • Investment Licensing through National Single Window for Investment (NSWI) (http://nswi.bkpm.go.id) • Providing industrial area
Aceh’s Finance Office
13
INFRASTRUCTURE SUPPORT
ROAD
Banda Aceh-Calang Highway National Road
14
National Road 1.803,36 Km
Source: Aceh Transportation dan Communication Agency, 2013.
Provincial Road 1.813,33 Km
Regencial Road 13.841,07 Km
INFRASTRUCTURE SUPPORT
SEA PORT
A
A
B C
Balohan Sea Port, Sabang
D
B
Malahayati Sea Port, Great Aceh C
Krueng Geukueh Sea Port, South Aceh D
Kuala Langsa Sea Port, Langsa
Willem Torrens Lighthouse at Pulo Aceh (Aceh Island Subdistrict) Erected in 1877 by Dutch Source: Aceh Transportation dan Communication Agency, 2013.
15
INFRASTRUCTURE SUPPORT
AIRPORT
SULTAN ISKANDAR MUDA INTERNATIONAL AIRPORT AIRBUSS
Runway 3.000m x 45m
A
CUT NYAK DHIEN AIRPORT Nagan Raya District CESSNA & CASSA
C
B
MAIMUN SALEH AIRPORT Sabang District
A D
CESSNA & CASSA
B
Runway 1.850m X 30m
C
MALIKUSSALEH AIRPORT North Aceh District CESSNA & CASSA
16
Runway 1.800m X 30m
Runway 2000m x 30m
D
Sultan Iskandar Muda International Air Port
Source: Aceh Transportation dan Communication Agency, 2013.
INFRASTRUCTURE SUPPORT
ENERGY 343 MW
2x110 MW
Source: PT. PLN (Persero)
ACEH-NORTH SUMATRA INTERCONNECTION NAGAN RAYA STEAM POWER PLANT
Steam Power Plant Nagan Raya District
17
III
INVESTMENT OPPORTUNITY
INVESTMENT OPPORTUNITY
Coffee
PROCESSING INDUSTRIES Bener Meriah Robusta: 1,250 Ha / 660 Tons Arabica: 48,101 Ha /22,414 Tons Central Aceh Robusta: 2,315 Ha / 874 Tons Arabica: 48,000 Ha/ 24,328 Tons
Total potency in Aceh Planted Area = 121,094 Ha Production = 53,950 Tons
Gayo Lues 4,588 Ha 1,036 Tons
PROJECT PURPOSES
• Establishing coffee processing industries. • Establishing packaging industry.
INVESTMENT ESTIMATION Instant coffee processing invesment for 5,000 tons
Cost 30,864,300 USD Source: www.bps.go.id : 2012
19
INVESTMENT OPPORTUNITY
Cocoa
PROCESSING INDUSTRIES Pidie Jaya 10,513 Ha 3,073 Tons
TOTAL POTENCY IN ACEH
Aceh Tamiang 2,675 Ha 1,127 Tons
Planted Area = 89,512 Ha Production = 37,594 Tons
PROJECT PURPOSES
• Establishing cocoa processing industries (paste, butter, powderander). • Establishing packaging industry.
Southwest Aceh 4,356 Ha 2,746 Tons
INVESTMENT ESTIMATION
Cost 97,095,995 USD Net Present Value : 5,730,808.44 USD Internal Rate Return : 22,4% Benefit Cost Ratio : 1,69 Pay Back Periode : 6,9 year
20
Bireuen 5,436 Ha 4,039 Tons
Source: www.bps.go.id : 2012
Southeast Aceh 11,970 Ha 7,622 Tons
INVESTMENT OPPORTUNITY
RUBBER
PROCESSING INDUSTRIES West Aceh 27,381 Ha 13,321 Tons
TOTAL POTENCY IN ACEH Planted Area = 144,292 Ha Production = 72,874 Tons
East Aceh 35,277 Ha 16,351 Tons Aceh Tamiang 22,238 Ha 12,652 Tons
Project Purpose
Establishing rubber processing industries.
INVESTMENT ESTIMATION Capacity 24.000 tons/annually
Cost 21,161,739 USD Net Present Value : 234,618,007 USD Internal Rate Return : 53,81 % Benefit Cost Ratio : 1,26 Net Benefit Cost Ratio : 3,739
EXISTING COMPANY
PT. Aceh Rubber Industry (Aceh Tamiang) Source: www.bps.go.id : 2012
21
INVESTMENT OPPORTUNITY
PT. Aceh Rubber Industry The Pioneer for Processing Industry in Aceh Tamiang
22
INVESTMENT OPPORTUNITY
Palm Oil
PROCESSING INDUSTRIES
TOTAL POTENCY IN ACEH
Aceh Tamiang 50,755 Ha 121,916 Tons
Planted Area = 365,997 Ha Productions = 572,953 Tons
PROJECT PURPOSE
Establishing palm oil processing industries (Biodiesel, Fatty Alcohol, Edible Oil, Shortening, SBE, Soap Noodles Plant, Dove Plant, Fatty Acid Plant, NPK Fetilizer Plant, Refinery Plant, Biomass Pellet Production Plant).
Nagan Raya 76,439 Ha 90,241 Tons Singkil 47,111 Ha 110,004 Tons
INVESTMENT ESTIMATION Development Factory Plan of CPO Product Capacity 30 TBS/ton
Cost 26,449,321 USD Net Present Value : 8,411,663.48 USD Internal Rate Return : 23,1% Payback Periode : 6 years, 8 months
Source: www.bps.go.id : 2012
23
INVESTMENT OPPORTUNITY
Patchouli
PROCESSING INDUSTRIES Aceh Jaya 107 Ha 20 Tons
TOTAL POTENCY IN ACEH Planted Area = 3,859 Ha Production = 253 Tons
PROJECT PURPOSES
• Establishing parfume industry and cosmetics. • Increasing production volume and quality of patchouli.
World’s Finest Patchouli
West Aceh 114 Ha 6 Tons
Contains a substaince (yield) 2.5% to 3.3% (the average yield of patchouli in the world is 2.5%).
INVESTMENT ESTIMATION
Cost 1,025,960 USD
24
Source: www.bps.go.id : 2012
South Aceh 334 Ha 21 Tons
Gayo Lues 149 Ha 33 Tons
CORN INVESTMENT OPPORTUNITY
TOTAL POTENCY IN ACEH Planted Area = 41,853 Ha
PROJECT PURPOSES
POULTRY FEED PROJECT
Southeast Aceh 31,262 Ha South Aceh 1,423 Ha
Establishing poultry feed factory (maize bran, maize germ, cattle feed, corn grits) which has drying machine (capacity 40 tons/hour) and warehouse (capacity 9000 tons)
INVESTMENT ESTIMATION
Cost 12,367,320 USD Source: www.bps.go.id : 2012
25
INVESTMENT OPPORTUNITY
ORGANIC HORTICULTURE PROJECT Cost : 1,025,850 USD
POTENCY (tons) AVOCADO 74,624 MANGGO 270,544 RAMBUTAN 280,994 ORANGE 85,522 JACK FRUIT 81,154 DURIAN 270,449 PAPAYA 148,298 BANANA 689,892 WATERMELON 165,397
STRING BEAN 170,188 CHILI 300,188 CAYENNE PEPPER 195,052 TOMATO 173,573 EGG PLANT 147,778 CUCUMBER 198,629 RED UNION 26,004 GARLIC 772 POTATO 86,154
PROJECT PURPOSES
• Establishing organic farm base on a production system that sustains the health of soils, ecosystems and people. • Selling the products in international markets.
Bener Meriah Linung Beuleun 25,300 Ha
26
Source: www.bps.go.id : 2013
INVESTMENT OPPORTUNITY
LIVESTOCK
DAIRY AND LIVESTOCK FARM
Great Aceh 1,263,654 Kg
Bener Meriah Uber-uber & Blang Paku 4,166 Ha 46,116 Kg
TOTAL POTENCY IN ACEH Production = 9,462,222 Kg
PROJECT PURPOSES
The project involves rearing of both beef and dairy cattle. The main activities of the project would be procurement of irrigation and hay making equipment, construction of back-up livestock farm infrastructure, construction of an animal feeds plant, and processing of the dairy and beef products.
INVESTMENT ESTIMATION
Cost 1,025,850 USD
Source: www.bps.go.id : 2012
27
INVESTMENT OPPORTUNITY
Aceh International Fishing Port Cost 200,000,000 USD
PROJECT PURPOSE Establishing fishery industries (taking, culturing, processing, preserving, storing, transporting, marketing or selling fish or fish products).
2009
7,819,222
2011
2010
6,083,925
2006
5,446,289
2012
6,827,531 6,823,158
2007
4,634,037
2008
4,928,027
LAMPULO FISHING PORT PRODUCTION 2006 - 2012 (Kg)
Banda Aceh Lampulo Fishing Port 51,8 Ha
28
Source: Aceh Fishery Agency, 2012
V
INVESTMENT OPPORTUNITY INVESTMENT OPPORTUNITY
Idi Fishing Port NO 1
2
INVESTMENT OPPORTUNITY
Block Ice Factory Modern fishery processing industry Industry
CAPACITY
80 ton/day
EXPLAIN
50 ton
Pelagic
3
Shipyard (Wood & fiber)
4 unit
4
Ship Services Transportation fish (domestic and foreign)
Repairs & Shipyard
2 unit
East Aceh Idi Fishing Port 62,5 Ha
TOTAL POTENCY IN ACEH Productions = 696,117 Tons
PROJECT PURPOSE
Establishing fishery industries (taking, culturing, processing, preserving, storing, transporting, marketing or selling fish or fish products).
INVESTMENT ESTIMATION
Cost 10,000,000 USD
Potency in idi
• Total catch of fishermen reached 48.67 tons daily • The number of fishermen as much as 8246 people (Year 2012) • Total fleet of 447 fishing fleets units (Year 2012) • Various Fishing gear reaching 571pieces (Year 2012). Source: Aceh Fishery Agency, 2012
Photo: Idi Fishing Port
29
INVESTMENT OPPORTUNITY INVESTMENT OPPORTUNITY
Tourism
POTENCY
•
Photo: Iboih, Sabang
•
• •
•
30
Spiritual Tourism Potential tourists are from Malaysia, Middle East, and other Muslim’s countries.
Ecotourism, Adventure, Beach and Sport Potential tourists are from Europe and Asia. Tsunami, Heritage dan Education Potential researchers are from Japan and Europe.
Nostalgia Potential tourists are Ex-workers and volunteers from reconstruction-phase post tsunami. Culinary and Handicraft Industry
2011
2008
2009
2012 1.055.793
2010
2007 609.381
Foreign and Domestic Tourists (2007-2012)
INVESTMENT OPPORTUNITY
KRUENG ACEH RIVER WALK PROJECT
FACILITIES • • • •
Food Court Restaurant Playground Jogging Track
• • • •
Mini Port Amphitheater Park Fishing Spot
Banda Aceh
Investment Cost 10,000,000 USD Source: Banda Aceh Tourism Agency, 2013 | www.bandaacehtourism.com
31
INVESTMENT OPPORTUNITY
ULEE LHEUE BEACH PROJECT
FACILITIES • • • •
32
Food Court Restaurant Playground Jogging Track
• Mini Port • Park • Fishing Spot
Investment Cost : 5,000,000 USD Source: Banda Aceh Tourism Agency, 2013 | www.bandaacehtourism.com
Banda Aceh
INVESTMENT OPPORTUNITY
HYDRO POWER PLANT Project 2013-2026
1 10
7
No.
District/City
1
North Aceh
2
Gayo Lues
4
Aceh Tamiang
3
5
East Aceh
South Aceh
6
Nagan Raya
7
West Aceh
8
Central Aceh
9
Southeast Aceh
10
Aceh Jaya
Project Name
Location
Jambuaye-3
Wh Jambu Air
Bidin/Jambuaye
Kr. Jambuaye
Jambuaye-5
Capacity (MW) 37.2
Invesment Estimation (Million USD)
181.8
Ramasan-1
Kr. Ramasan
171.6
514.8
Tampur
W. Tampur
428
1284
Peureulak
Jambo Papeun-2
Kr. Peureulak
34.8
Sibubung-2
Kr. Sibubung
121.1
363.3
Teripa-4
Kr. Teripa
306.4
919.2
Teripa-3
Meureubo-1
Woyla-2 Pameu
Peusangan Dolok-1
Teunom-2 Total
Kr. Teripa
Kr. Meulaboh Kr. Woyla
172.6 82.1 274
423
517.8
246.3
822
Kr. Pameu
160.6
481.8
Kr. Dolok
32.2
96.6
Kr. Peusangan
Kr. Teunom
90
288.2
2862.8
9
104.4 285.6
141
5
738
95.2
Kr. Kluet
2
545.4
Kr. Jambo Papeun
Kluet
4
6
111.6
Kr. Jambuaye
246
3
8
270
864.6
8,588.40
Source: Aceh Mining & Energy Agency, 2013
33
INVESTMENT OPPORTUNITY
JAMBO AYE MULTIPURPOSE RESERVOIR PROJECT
North Aceh Jambo Aye
PROJECT PURPOSES
Cost 539,280,000 USD Source: Aceh Mining & Energy Agency, 2013
34
Photo: Illustrations
Establishing Irrigation 19.50 HA and Hydropower Plant 160 MW/580 MWH
INVESTMENT OPPORTUNITY
geothermal POWER PLANT Project 2013-2026 1 2 3 5
No
District/City
1
Sabang
2
Great Aceh
3 4
Objects
Hypothesis
Unexpected
25
-
-
-
73
50
-
185
165
Alue Lhong – Beungga
100
-
-
Rimba Raya
100
Lho’ Pria Lot
Jaboi – Keuneukai
‘Ie Seum – Krueng Raya Seulawah Agam
Alur Canang
Bener Meriah
5
Central Aceh
6
East Aceh
Energy Reserves(Mwe)
Speculative Iboih
Pidie
Energy Potential (Mwe)
Tangse
Simpang Balik
Gunong Geureudong
50 -
25
25
100
-
63 -
-
-
-
92
625
533
7
Aceh Tamiang
Beurawang Buaya
8
Gayo Luwes
G. Kembar
Kafi
Dolok Perkirapan
Total Potency
25 25
25
-
-
25
Meranti
-
120
100
-
-
-
8
-
-
Silih Nara
7
-
-
6
4
-
-
-
215
Source: Aceh Mining & Energy Agency, 2013
35
INVESTMENT OPPORTUNITY
BENER MERIAH GEOTHERMAL POWER PLANT PROJECT
The power requirement for the district of Bener Meriah supplied from 150 kV transmission Aceh - Sumatra interconnection system sourced from North Sumatra. The power supply is only able to serve 207 villages (89.22%) of the total 232 villages. A total of 25 village have not been served yet. Source: BKPM, 2013 | www.bkpm.go.id
36
Investment estimation The investment needed to build a geothermal power plant in Burni Telong are = 2,770 [USD / kW] x 104,000 [kWe] =
288,080,000 USD
Charges for operation and maintenance = 0.022 [USD / kWh] x 104,000 [kWe] = 2.288 [USD/hour]
Photo: Ilustrations
Investment Feasibility
INVESTMENT OPPORTUNITY
Roll-on/Roll-off Cargo Ferry Service PROJECT PURPOSES
Establishing Ro-Ro Freight Ferry Shipping
INVESTMENT ESTIMATION
North Aceh Krueng Geukuh Sea Port Langsa Kuala Langsa Sea Port
Cost 1,025,960 USD EXISTING COMPANY
Langsa: Kenangan Passanger Ferry
37
INVESTMENT OPPORTUNITY
METAL NO
INDICATION
1
Gold
LOCATION SILIH NARA, Central Aceh
0,25 - 0,45 Gr/Ton
TAPAKTUAN, SOUTH ACEH
0,01 - 6,81 ppm
BLANG KEJEREN, GAYO LUES SEUNAGAN, NAGAN RAYA LHOONG, GREAT ACEH
2
Copper
POTENCY 0,19 - 0,28 Gr/Ton 0,3 - 0,5
2,9 - 22,5 ppm
PULO ACEH, GREAT ACEH
0,14 - 0,23 ppm
SILIHNARA, Central Aceh
Cu : 356 – 568 Ppm
SERBAJADI, EAST ACEH
Cu : 0,23 – 2 %
RIKIT GAIB, SOUTHEAST ACEH
Cu : 10 – 470 Ppm
TAPAKTUAN, SOUTH ACEH 3
4 5
38
Molibdenum Iron Sand Iron Ore
Gr/m3
LHOONG, GREAT ACEH
Cu :
1 – 1730 Ppm
Cu : 150-1520 Ppm
SILIH NARA, Central Aceh
170 – 291 Ppm
-, BIREUEN
-
-, GREAT ACEH
LHOONG, GREAT ACEH
BABAH ROT, WESTEAST ACEH
-
-
INVESTMENT OPPORTUNITY
NON METAL NO
MINERAL
1
Andesit
2
Limestone
3
Bentonite
4
Dolomite
5
Kaolin
6
Kuarsit
7
Granite
Granite Stone
LOCATION Great Aceh West Aceh South Aceh Seouteast Aceh North Aceh Central Aceh
East Aceh Central Aceh Great Aceh West Aceh Southeast Aceh South Aceh Pidie East Aceh Central Aceh East Aceh
Southeast Aceh Sabang South Aceh Southeast Aceh East Aceh South Aceh Central Aceh
POTENCY/ TON
3.019.450.000 2.081.945.000 2.584.342.000 38.053.159.000 38.892.000 11.603.849.000
426.970.000 12.182.992.000 8.900.320.000 35.138.651.000 46.508.534.000 7.495.749.000 986.957.000 8.730.000 170.000.000
1.192.272.000
12.383.000 300.000
64.955.000 1.753.588.000
804.532.500 6.616.845.000 23.280.915.000
coal
POTENCY (Million Ton)
NO
LOCATION
1
Meulaboh (MET)
137.65
2
Meulaboh (MLB)
1612.00
3
West Aceh (BPM)
42.69
4
West Aceh (ARM)
28.15
39
INVESTMENT OPPORTUNITY
Laweung cement plant Project
Pidie Laweung
Capacity: 750,000 tons/year
Cost 370,828,800 USD Existing Company
PT Lafarge Cement Indonesia, Plant HR Dept Jl. Banda Aceh - Meulaboh KM 17 Lhoknga PO BOX 30 - Banda Aceh Email: semen.andalas@id.lafarge.com
40
Photo: PT. Lafarge Cement Indonesia’s cement-plant, Lhoknga, Great Aceh.
IV industrial and trading estates
industrial and trading estates
ACEH INDUSTRIAL AREA PLAN
Location:
Ladong, District of Great Aceh (about 18 Km to Banda Aceh and 9 Km to Port of Malahayati).
Great Aceh 556.663 sq m (55 Ha)
Consisted of: 42
• • •
19 lots for small scale industries (0.10 Ha – 0.30 Ha). 23 lots for medium scale industries (0.30 Ha – 0,50 Ha). 10 lots for large scale industries (0.50 Ha – 1 Ha).
industrial and trading estates
sabang
FREE TRADE & FREE PORT ZONE
Facilities: Freeport
Has 1.400m length, 800m wide, approximately 53m depth, and 177 Ha pool harbor.
Potency:
• Trade and Industry; • Tourism; • Fisheries.
Free Trade Zone
The location is worth geographically and transportation reachable and strategic for international trading.
Free Tax
Has advantage of free duty under Indonesian law.
43
We welcome you to invest in amazing Aceh
Aceh Investment Coordinating Board
44
Jl. Ahmad Yani, No. 39, Banda Aceh, 23122. Telp. 0651 23170, Fax 0651 23171. investasi@acehprov.go.id investasi.acehprov.go.id acehinvestment.com