CONSTRUCTION - DETAILS
PORTFOLIO ELENA
ARDIGHIERI selection of TECHNICAL DRAWINGS _ february 2014
+45 26 55 07 27 elenardighieri@gmail.com
2
This portfolio represent a selection of technical drawings performed during my years of working experience in Denmark and in Italy. I have a bachelor degree in Architecture of Construction, this gave me the base for my technical background. I have instead a Master degree in Architecture and Design, which allowed me to encrease my creative approch towards the projects I have been involved till now. If you are interested in knowing more about my working method give a look to my entire architectural portfolio and CV clicking on this link: http://issuu.com/elena_ardighieri/docs/portfolio_2014_3rd_ print_opt?e=2139818/6761981
3
SSA
01
GENTOFTE SPEJDERHUS SCOUT HOUSE
commission project for Gentofte commune Gentofte (DK) | june-december 2013 collaboration as project leader | SSA TASKS: for this project I have been the only drawer and realizer of the idea from the first stages of the form finding and design to the final stage of the offered project for the commune and constructor. From the beginning I have been in contact with the clients, participating to all the meetings, and coordinate the meeting with the entrepreneur, for the materials choices. And finally I have been the reference point for the structural and VVS engineers. Despite my intermediate danish level I could be able and proud to handle a whole project for a danish client.
4
project leader architect - SSA
CONSTRUCTION The building construction is made of timber, except of the overhanging roof of the cafe, where the engineer suggested the use of a combination of steel columns and wooden beams. The inside finishing of the different houses is mainly plywood, while the exterior finishing is: wooden boards on the vertical partitions covered by the roof (which means all the walls facing the inner courtyard) and wooden shingles for the remaining walls (all the ones facing the forest and the main entrance area).
In this portfolio have been collected some few technical drawings. The whole project consisted of 23 details, 9 technical sections, 5 rooms drawings (kitchen, 2 toilets, petruljerum, acustic walls), 5 construction parts (concrete and wood terraces, windows, sliding door, seating and playing terrace/bench), 1 Revit Model.
5
The description and budget documentation has been written instead by my boss, who asked me an help also in this phase, teaching me the main steps involved, slightly different from the italian requests to which I was used.
My next task for the following months is going to be a 2 days/month participation to building site meetings, till the final realization of the project, this summer 2014.
6
project leader architect - SSA
7
SSA
02
MARIEHĂ˜J KULTURHUS FINAL PHASE
WINNING competition project Mariehøj (DK) | february-june 2013 collaboration as construction architect | SSA The project is a renovation of an existing culture house, which consists of several buildings aggregated over time. The building complex is heterogeneous, difficult to follow. The purpose of the competition was to create a clear connection between the various buildings and a new foyer, a focal point where the different activities and users converge.
8
construction architect - SSA
For this project I got the acknowledgment to be the person in charge of understanding and explaining the difficult geometry and connection between the flat and bended deck of the foyer building. Thanks to a structural 3D model I could better explain to both the engineers and constructor the particular geometry, which helped me in the drawing of the sections and the details.
9
OVERALL REALIZED DETAILS:
58
2
1
2
This detail is part of a series of 5 details realized in the area where the flat and bended deck are merging, passing from the highest point, where the deck 1 is the most overhanging to the lowest point where the deck 2 is the most overhanging. This particular detail has been taken in the kitchen and it is showing how to realize the opening, and finish the decks.
10
1
This detail has been taken nearly over the meeting point of the two decks. In this case the overhanging of the two decks is flipped.
construction architect - SSA
11
OVERALL REALIZED SECTIONS:
12
19
construction architect - SSA
13
SSA
03
GUDENÅ HOSPICE WINNING COMPETITION
WINNING competition project Brædstrup (DK) | august-september 2013 collaboration as project leader | SSA This winning solution has been developed by me as a project leader of Sophus Søbye Arkitekter, together with the technical suggestions and meetings of the architectural office Blaavand og Hansson. Other big participants of this competition were CF Moller and Creo.
14
project leader architect - SSA
15
SSA
02
ASKOV SPORTSHALL ASKOV-MALT SKOLE
commission project for Askov-Malt Skole Vejen (DK) | june-july 2013 consruction architect | SSA TASKS: for this project I have been the only construction architect involved in the project after the “projectforslag phase” and I had to deliver the “hovedproject drawins” in 4 weeks. Now the project is under construction.
16
construction architect - SSA
17
18
construction architect - SSA
19
20
construction architect - SSA
21
22
Elena Ardighieri