Appendix 3ter:Designation and/or change of duration of designation of the Access Responsible Parties charged with off-take or injection and designation of the corresponding energy supplier (see Articles 8, 11 and 20) This document forms an integral part of the Access Contract with the reference: []
1. Designation /Change of duration of designation of the Access Responsible Party charged with monitoring of the Injected Energy:
[]
[]
Last month of designation of ARP
Name of Access Point + address of site
Access Point (EAN Code)
First month of designation of ARP
Table of Access Points
(month/year)
(month/year)
[]
[]
With regard to signing Appendices 9, 10 or 11, it is important to understand the term “Offtake Energy / Injected Energy” in these Appendices as being energy taken off and energy injected. 1. Company details of Access Responsible Party charged with injection: Company:
[]
EIC-Code:
[]
Head office:
[]
Company reg. no.:
[]
VAT no.:
[]
Represented by:
[]
This Access Responsible Party is designated by the Access Holder as the Access Responsible Party charged with injection for: each Access Point that is included in the Access Contract with the reference: [] each Access Point with the characteristics indicated in the table above: and this Access Responsible Party accepts this designation. (indicate above whichever applies)
Access Contract
Date
[●]/[●] V1/2012 !! For information purposes only !!
[●] [●]