/Toegang2

Page 1

Appendix 3bis A): Designation and/or change of duration of designation of the Access Responsible Party charged with off-take of the load and designation of the corresponding energy supplier (see Articles 8, 11 and 20) This document forms an integral part of the Access Contract with the reference: []

1. Designation /Change of duration of designation of the Access Responsible Party charged with off-take of the load:

[]

Name of Access Point + address of site

[]

Last month of designation of ARP

Access Point (EAN Code)

First month of designation of ARP

Table of Access Points

(month/year)

(month/year)

[]

[]

With regard to signing Appendices 9, 10 or 11, it is important to understand the term “Offtake Energy” in these Appendices as being energy taken off by the load. The Access Responsible Party specified in more detail below is designated by the Access Holder as the Access Responsible Party charged with off-take of the load for: each Access Point that is included in the Access Contract with the reference: [] each Access Point with the characteristics indicated in the table above:

and this Access Responsible Party accepts this designation. (indicate above whichever applies) The Access Holder designates himself as Access Responsible Party charged with offtake of the load (he must be listed in the register of Access Responsible Parties kept up to date by Elia). To this end, the Access Holder designates the following Access Responsible Party charged with off-take of the load (this Access Responsible Party must be listed in the register of Access Responsible Parties kept up to date by Elia). (indicate above whichever applies)

Access Contract

Date

[●]/[●] V1/2012 !! For information purposes only !!

[●] [●]


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.