GAYOEN YOU PERKINS & WILL - BOSTON (2017 - PRESENT) UNIVERSITY OF WISCONSIN - MADISON INTERIOR ARCHITECTURE (2012 - 2016) SOUTHERN CALIFORNIA INSTITUTE OF ARCHITECTURE (2016)
TABLE OF CONTENTS
01 GOOGLE 8CC Workplace Perkins&Will
You_G_3
05 THE PLACE Restaurant UW-Madison
02 BLUEROCK Workplace & Lab Perkins&Will
06 LINE | GRID | MANIPULATION Making + Meaning Sci-Arc
03 FRB BOSTON Seminar Room Perkins&Will
07 SURFACE | TEXTURE | SHADE Making + Meaning Sci-Arc
04 FRB BOSTON Fitness Center Perkins&Will
01 GOOGLE 8CC (2019 - 2021) TYPE
WORKPLACE RENOVATION
SIZE
152,000 SF
SITE
CAMBRIDGE, MA
PHASE
Pre-Design ~ CA
NOTES
LEED GOLD; 9 floors with 9 distinctive designs
8CC-1 RECEPTION LOBBY [Photography]
MOVEMENT A JOURNEY TO 9 DIFFERENT SPACES
8CC is inspired by the movement of people and culture in Cambridge. It’s not your typical touristy Cambridge but instead, what is thriving below the surface of Cambridge. Each floor represents a different neighborhood and sub culture. We adventure out into the neighborhoods to discover hidden gems and unexpected destinations.
TWO TYPICAL FLOOR PLANS // FLOW & DISPERSE There are two different types of floor plans to reflect characteristics of each floor’s subculture theme
DISPERSE plan is the reminiscence of the crowd’s movement towards a commercial area and disperse back home afterward.
FLOW plan reminds the pull of the current and the natural movements of the water. The organic shape guides users through a pathway of discovery.
THE JOURNEY THROUGH CAMBRIDGE Starting from the Charles River. Each floor represent (9) popular neighborhoods in Cambridge.
LEVEL 9 - FLOW - STRAWBERRY HILL (WELLNESS) LEVEL 8 - FLOW - NORTH CAMBRIDGE (HOME) LEVEL 7 - DISPERSE - AGASSIZ (PERFORMANCE ART) LEVEL 6 - DISPERSE - MID CAMBRIDGE (HISTORY) LEVEL 5 - DISPERSE - CAMBRIDGEPORT (HUB) LEVEL 4 - DISPERSE - THE PORT (SCIENCE & TECH) LEVEL 3 - FLOW - EAST CAMBRIDGE (LIFESTYLE) LEVEL 1 - FLOW - CHARLES RIVER (LIFESTYLE)
8CC-1 CHARLES RIVER // LIFESTYLE The 1st floor is inspired by the curves and movement of the Charles River. It is the starting point of our journey North through Cambridge and is planned with the “Flow” space planning concept. The curves help guide the users and visitors into the space and up the stairs or to the elevators to begin their journey.
8CC-1 LOBBY [Photography]
IMPACT RESISTANT GWB CLADDING LEVEL 5 FINISH
3'-6"
IMPACT RESISTANT GWB CLADDING LEVEL 5 FINISH
EXISTING STEEL SUPPORT
3'-0"
EXISTING STEEL SUPPORT STRUCTURE TO REMAIN
REMOVE EXISTING CAULK, POWER CLEAN TREAD AND INSTALL NEW CAULK AT DISSIMILAR MATERIAL JOINTS
GAYOEN YOU
REMOVE EXISTING CAULK, INSTALL NEW CAULK AT DIS
METAL TRIM ANGLE
METAL TRIM ANGLE
EXISTING TREAD AND RISER, POWER CLEAN
EXISTING TREAD AND RISER
INSTALL BLACK FINISH SHEET METAL AT BACKSIDE OF EXISTING RISER TO SEAL WD CAP, PTD PT1A SOLID HOLES PRIOR TO GWB CEILING INSTALL, TYP ALL RISERS
1/4"
REVEAL
INSTALL BLACK FINISH SHE HOLES PRIOR TO GWB CEIL
REVEAL EXISTING STRINGER, PTD PT1B
EXISTING STRINGER, PTD P
1/4"
1"
1"
SOLID WD CAP, PTD PT1A
BLOCKING AS REQUIRED
BLOCKING AS REQUIRED
GOOGLE 8CC
0' - 1 1/2" TYP.
1 1/2" SOLID WHITE OAK WD HANDRAIL
1 1/2" SOLID WHITE OAK WD HANDRAIL PTD STL HAND RAIL SUPPORT
PTD STL HAND RAIL SUPPORT NEW BLOCKING FROM STRINGER TO STRINGER
PLYWOOD SUBSTRATE THICKNESS: AS REQUIRED
PLYWOOD SUBSTRATE THICKNESS: AS REQUIRED GWB FINISH AT UNDERSIDE
IMPACT RESISTANT GWB CLADDING LEVEL 5 FINISH
IMPACT RESISTANT GWB CLADDING LEVEL 5 FINISH
NEW BLOCKING FROM CARY GWB FINISH TO STRINGER TO STRINGER CAFE LEVEL, REFER TO LEVE 2 DWGS
LEVEL 02 15' - 0"
GWB FINISH AT UNDERSIDE
3'-6"
REFER TO STRUCTURAL DWGS FOR SLAB EDGE CONDITION
EXISTING STEEL SUPPORT STRUCTURE TO REMAIN
3'-0"
EXISTING STEEL SUPPORT STRUCTURE TO REMAIN
REMOVE EXISTING CAULK, POWER CLEAN TREAD AND INSTALL NEW CAULK AT DISSIMILAR MATERIAL JOINTS
REMOVE EXISTING CAULK, POWER CLEAN TREAD AND INSTALL NEW CAULK AT DISSIMILAR MATERIAL JOINTS
METAL TRIM ANGLE
METAL TRIM ANGLE
EXISTING TREAD AND RISER, POWER CLEAN
4'-0"
LOBBY STAIR SECTION
5
1 1/2" = 1'-0"
EXISTING TREAD AND RISER, POWER CLEAN
K FINISH SHEET METAL AT BACKSIDE OF EXISTING RISER TO SEAL HOLES PRIOR TO GWB CEILING INSTALL, TYP ALL RISERS
INSTALL BLACK FINISH SHEET METAL AT BACKSIDE OF EXISTING RISER TO SEAL HOLES PRIOR TO GWB CEILING INSTALL, TYP ALL RISERS 5/8" GWB
EXISTING STRINGER, PTD PT1B
EXISTING STRINGER, PTD PT1B
BLOCKING AS REQUIRED
BLOCKING AS REQUIRED
NEW BLOCKING FROM STRINGER TO STRINGER
NEW BLOCKING FROM STRINGER TO STRINGER
MTL C STUDS
HANGER ROD
BLOCKING, AS REQUIRED
ACT-3
GWB FINISH AT UNDERSIDE
MIN. 18"H
GWB FINISH AT UNDERSIDE
CLEAR ANODIZED ALUMINUM TOP CHANNEL, BURRIED IN DRYWALL HEADER
REVEAL TRIM
1/2" THK. TEMPERED GLASS DR
5/8" GWB
8CC-1 LOBBY [Rendering]
LOBBY STAIR SECTION
CEILING DETAIL AT LOBBY AT OPEN S
4
1 1/2" = 1'-0"
1 1/2" = 1'-0"
FLOOR OPENING, GWB FASCIA WALL PTD CEILING WHITE
COORDINATE WITH ARCHITECT PRIOR TO INSTALL
0' -
SEE RCP FOR LIGHTING DESIGN IN GWB CEILING
LT39
9"
9"
GLASS DRAFT STOPS
2' -
5
0' - 2 3/8"
WHITE OAK WOOD HANDRAILS GWB OUTSIDE, PT1A FINISH
1' - 2"
0' - 4"
8' -
GWB INTERIOR, PT1B FINISH
LT39
0"
3
1/4" = 1'-0"
9" 1' - 0 "
6" 4' -
6" 1' -
0"
LT77
EQ
TY P.
LEVEL 01 STAIR LT77 ELEVATIONLEVEL 01 STAIR ELEVATION - WEST WEST
2
1/4" = 1'-0"
LT77
1' - 3 "
2' 7"
LT77
3' - 5" LT81
LT39
11 "
EQ
4' -
10 " EQ
ETR EXTERIOR CURTAINWALL
LT77
8'
EX METAL SUPPORT PTD PT1A
4' -
4' -
ROCK GARDEN, 12" H METAL GARDEN BED, CONTAINING ROCKS AND POTTED PLANTS
LT77
3'
-8 "
EQ LT39
EQ
2' -
10 "
not to scale NOTES: 1. CENTER STARS ALONG STAIR RUN 2. LT7A (18) TO BE RANDOMLY PLACED WITHIN THE REFERENCE AREA
6"
LT77
2' -
THE HIDDEN GEM UNDER THE STAIR // LIBRA Lights are placed under the stair to LEVEL 01 - DIMENSIONED RCP STAIR STAR LIGHTS Google’s birth constellation. 2represent 3/4" = 1'-0"
3 2
LEVEL 01 - DIMENSIONED RCP @ LOBBY 1/4" = 1'-0"
2.18
3
3' - 9
3.9
LT
LT77
0"
4' -
+/-
5' -
LT81
+/1
0"
GWB ENCLOSURE, PTD PT1A
LT72A (18)
LT81
3' -
BEYOND, SOLID WHITE OAK WD HANDRAIL, LT77TO METAL TURNDOWN FLOOR AT BOTH LEVEL ENDS OF RAILING
LT81
0"
0"
LT77
LT77 TURNSTILE
EQ
1' -
C B.95
LT39 LT81
LT81
2' 1' -
MAX GAP 6"
FIRST RISER TO MATCH EXISTING PERF METAL W/ BLACK METAL BACKPLATE
LEVEL 01 STAIR ELEVATION - NORTH
6"
LT77
6"
3' 15
4' -
"
6" 1' -
CANE DETECTION
9"
3' 6"
1 1/2 1' - 1
5' -
71 /2"
1/2"
" 1' - 2
LT81
LT39
WHITE OAK WOOD 1' - 6" HANDRAILS
LT72 (7)
6' -
1/2" GLASS DRAFT STOP
LT39
TURNSTILE
2' -
6"
LT39
LT39
GWB INTERIOR, PT1B FINISH
HANDRAILS
HANGING ARTWORK
LT81
3' -
1' - 8
1' - 11"
LT39
LT39
1/4" = 1'-0"
not to scale
GLASS DRAFT STOPS
GWB OUTSIDE, PT1A FINISH
7' 6"
3
LT39
3' -
LEVEL 01 STAIR ELEVATION - NORTH LEVEL 01 STAIR ELEVATION - NORTH
FLOOR OPENING, GWB FASCIA WALL PTD CEILING WHITE
SEE RCP FOR LIGHTING DESIGN IN GWB CEILING
CANE DETECTION
6"
1/2"
7/22/2020 11:11:29 PM
TURNSTILE
FIRST RISER TO MATCH EXISTING PERF METAL W/ BLACK METAL BACKPLATE
81 /2"
1' - 6
0' - 10"
HANDRAILS
0' -
1/2"
1' - 7"
BIM 360://Google - CAM 8CC/ARCH_Google CAM_ 8CC.rvt
0' - 8
0' - 5"
LT39
4
8CC-5 CAMBRIDGEPORT // HUB The 5th floor represents the Cambridgeport neighborhood, home of Central Square and Cambridge city hall. Perfectly positioned in the center of the building, 8CC-5 offers a space for everyone. Its colorful inclusive spirit makes everyone feel welcome and energized. This is a community floor designed with bold colors and a lot of heart. The micro kitchen is designed like a small Cambridge record shop. Explore this floor for a massage room, a community room and a public book share.
GAYOEN YOU GOOGLE 8CC
8CC-5 MICRO-KITCHEN [Photography]
8CC-5 ELEVATOR LOBBY [Photography]
2" 1"
PT6E
1/2"
LOBBY CUSTOM DESIGNED CEILING
0
GHD
An acrylic ceiling feature that was inspired by the famous central square graffiti wall
YAH MAP
TBD
E6-2A
RECESSED EVACUATION CHAIR, PAINT TO MATCH WALL
6TH FLOOR ELEV LOBBY DISPLAYS
14
1/4" = 1'-0"
GHD
4.18
5
4.18
5
GHD YAH MAP GHDF
GHDF 627
RECESSED EVACUATION CHAIR, PAINT TO MATCH WALL
DOORS AND FRAMES PT6
B.95
Y DISPLAYS
6TH FLOOR ELEVATOR LOBBY - WEST
EQ
LT33
1/4" = 1'-0"
12
5'-7"
13
5'-2"
B.95
EQ
6TH FLOOR ELEVATOR LOB 1/4" = 1'-0"
PT6A GHD
DEC38A
ELEVATOR LOBBY EQ
600 LT33
GHDF
GHDF
GHDF GF1
627
GHDF 600
GF1
LOBBY - WEST
5'-2"
12
4'-0"
5'-2"
4'-0"
EQ
DEC38B
DOORS AND FRAMES PT6
EXP1 DOORS AND FRAMES PT6 12' - 10"AFF LT33
3'-7"
6TH FLOOR ELEVATOR LOBBY - SOUTH
6TH FLOOR ELEVATOR LOBBY - EAST
11
1/4" = 1'-0"
10
1/4" = 1'-0"
6TH FLOOR ELEVATOR 1/4" = 1'-0"
7'-3"
DEC38C
HD
LT33 LT45s
EQ
B 2' - 10" GHDF
7' - 0"
EQ
7' - 0"
6' - 6"
GHDF
EQ
PT5A
600
LT33
LT33
LT33
LT33
EQ
LT33
GHDF
GHDF 500B
DOORS AND FRAMES PT6
LOBBY - EAST
10
6TH FLOOR ELEVATOR LOBBY - NORTH
9
1/4" = 1'-0"
7
LEVEL 06 -ELEVATOR LOBBY ENLARGED RCP
8
1/4" = 1'-0"
LEVEL 06 - ENLARGE 1/4" = 1'-0"
5TH FLOOR ELEV LOBBY - SOUTH 1/4" = 1'-0"
4.18
5 GHD
4.18
PT5A TYP A4 A62-50
GHDF
GHD 500A
B.95
ACRYLIC CEILING AXON
LEVEL 05 - ENLARGED RCP @ ELEVATOR LOBBY
not to scale
not to scale
B.95 8
ELEVATOR LOBBY EQ
500
8' - 0"
EQ
DOORS1' AND - 9" FRAMES PT2
6
OUTH
1' - 9" AC1: STEEL ASYMMETRIC "PITCHED ROOF" FRAME SUSPENDED FROM DECK, WITH 1/4" = 1'-0" ACRYLIC PANELS BY ACRYLITE OR EQUAL FRAME IS WELDED ANGLE STEEL, RAW FINISH
5TH FLOOR ELEV. LOBBY - EAST
5
1/4" = 1'-0"
5TH FLR ELEV. LOBBY -
GHDF
GHDF
DOORS AND FRAMES PT2
AST
5
5THFLOOR FLR ELEV. LOBBY - NORTH 5TH ELEVATOR LOBBY - NORTH 1/4" = 1'-0"
not to scale
2/25/2020 4:47:59 PM
500A
LIGHTS ARE ABOVE "ROOF" CEILING. IDEA IS THAT LIGHT SHINES THROUGH COLORED ACRYLIC PANELS AND CASTS COLORFUL SHADOWS ON THE CONCRETE BELOW.
GHD
LOCAL PRECEDENT TO REFERENCE: GRAFFITI ALLEY, CAMBRIDGE
AC1 9' - 6"AFF LT45
LT45
26'-10"
GHD
C:\Temp\Google Cam_ 8CC_Level 2-9_R19_farrells.rvt
LT45s
E5-2A
7'-11"
LINEAR DIFFUSERS AND RETURNS TO BE PLACED ON SIDES
DOWN
DOORS AND FRAMES PT2
4
5TH FLOOR ELEV. LOBBY - WEST 5TH FLOOR ELEVATOR LOBBY - WEST
3
1/4" = 1'-0"
ELEVATION @ ELEVAT 1/4" = 1'-0"
not to scale
2' - 3"
B EXP-2 CUSTOM ACRYLIC CEILING DETAIL [CD] EQ
GHD
1' - 6"
0' - 5"
3' - 0"
GHD
2' - 6"
TYP
LT37
LT35
J LT38
EQ
J
LT35
YAH MAP E5-2A
6' - 6"
LT38
LT38
LT38
LT38
LT38
LT35
LT37
2' - 0"
8CC-9 STRAWBERRY HILL // WELLNESS The 9th floor is inspired by the Strawberry Hill neighborhood near Alewife and Fresh Pond. This landscape inspired floor feels healthy and fresh with a palette of wood, greens and natural materials. Full of biophilia, 8CC-9 really connects the user with nature and provides an exciting bright destination at the top of the building. Explore this floor for the game room, makerspace and a living room off the MK.
GAYOEN YOU GOOGLE 8CC
8CC-9 MICRO-KITCHEN [Photography]
8CC-9 FOCUS ROOM [Photography]
BUILT-IN PLANTERS
Biophilia is an important element of design in Google 8CC for Googler’s wellbeing. Not only movable planters but also builtin planters are placed throughout the spaces. Planters in Flow floors are built with gypsum wallboard when Disperse floors have millwork with wood appearance plastic laminates.
PROJECT
PROJECT
GOOGLE 8CC
PLANTER - TYPE D
not to scale
not to scale
GYP PLANTER
ISSUED FOR CONSTRUCTION
OCTOBER 25, 2019
not to scale
ISSUE CHART
ISSUED FOR CONSTRUCTION
KEYPLAN
KEYPLAN
BUILT-IN PLANTER DETAILS [CD] NO
ISSUE
ISSUE
Checker Approver
Approved NO
DATE
156154.000
Job Number Checked
DATE
TITLE
ARCHITECTURAL 156154.000 Checker Checked WOODWORK & Approver Approved DETAIL TITLE MILLWORK ARCHITECTURAL PLANTER WOODWORK & SHEET NUMBER DETAIL MILLWORK PLANTER Job Number
ISSUE CHART
PROJECT
GOOGLE CAM 8CC - F0ZF, FLOORS 1,3-9
OCTOBER 25, 2019
p\Google Cam_ 8CC_Level 2-9_R19_farrells.rvt
8CC_Level 2-9_R19_farrells.rvt
2019 12:23:53 PM
not to scale
not to scale
WOOD PLANTER
TABLE WITH BUILT-IN PLANTER
SHEET NUMBER
not to scale
M
TITLE
GOOGLE 8CC
GOOGLE 8CC
Checker Approver
ARCHITECTURAL WOODWORK & DETAIL MILLWORK PLANTER
MILLWORK SECTION @ MK BUILT-IN PLANTER
DATE
156154.000
A50-07 MILLWORK SECTION @ MILLWORK SECTION @
MILLWORK SECTION @ BAR
ISSUE
Checked Approved
NO
Job Number
PROJECT
GOOGLE CAM 8CC - F0ZF, FLOORS PROJECT 1,3-9 GOOGLE CAM 8CC - F0ZF, FLOORS 1,3-9
ISSUED FOR CONSTRUCTION
OCTOBER 25, 2019 ISSUE CHART
A50-06
A50-06
KEYPLAN
PLANTER - TYPE A
not to scale
A50-06
SHEET NUMBER
not to scale
SHEET NUMBER TITLE
SHEET NUMBER
GOOGLE 8CC
TITLE
TITLE SHEET NUMBER
A50-06
PLANTER - TYPE B
Checker Approver
ARCHIECTURAL 12/20/2019 DATE WOODWORK & 156154.000 DETAIL - GYP Checker Approver PLANTER
ARCHIECTURAL ARCHIECTURAL WOODWORK & WOODWORK & DETAIL - GYP DETAIL - GYP PLANTER PLANTER
12/20/2019 DATE
156154.000
12/20/2019 3 BULLETIN #02 ARCHIECTURAL DATENO ISSUE WOODWORK & 156154.000 Job Number DETAIL Checker Checked - GYP Approver Approved PLANTER
Checked Approved
Job Number
TITLE
3 BULLETIN #02 NO ISSUE
PLANTER - TYPE C
Job Number
GOOGLE CAM 8CC - F0ZF, FLOORS 1,3-9
3 BULLETIN #02 3 BULLETIN #02 12/20/2019 NO ISSUE NO ISSUE DATE Job Number 156154.000 Checked Checker Checked Approved Approver Approved
PROJECT
C:\Temp\Google Cam_ 8CC_Level 2-9_R19_davisj.rvt
12/20/2019 7:26:22 PM
C:\Temp\Google Cam_ 8CC_Level 2-9_R19_davisj.rvt
12/20/2019 7:26:22 PM
C:\Temp\Google Cam_ 8CC_Level 2-9_R19_davisj.rvt
12/20/2019 7:26:22 PM
ISSUE CHART
C:\Temp\Google Cam_ 8CC_Level 2-9_R19_davisj.rvt
12/20/2019 7:26:22 PM
ISSUE CHART
OCTOBER 25TH, 2019
ISSUE CHART
OCTOBER 25TH, 2019
OCTOBER 25TH, 2019
ISSUED FOR ISSUED FOR CONSTRUCTION CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUE CHART
OCTOBER 25TH, 2019
KEYPLAN
KEYPLAN
GOOGLE 8CC
KEYPLAN
not to scale
KEYPLAN
PLANTER - TYPE E
GOOGLE 8CC
GOOGLE 8CC
PROJECT
GOOGLE CAM 8CC GOOGLE CAM 8CC - F0ZF, FLOORS - F0ZF, FLOORS 1,3-9 1,3-9
PROJECT
GOOGLE CAM 8CC GOOGLE CAM 8CC - F0ZF, FLOORS - F0ZF, FLOORS 1,3-9 1,3-9
A50-07
SHEET NUMBER
GOOGLE 8CC
KEYPLAN
02 BLUEROCK - CORPORATE HEADQUARTER (2020 - 2022) TYPE
WORKPLACE & LABORATORY RENOVATION
SIZE
74,000 SF (20,000 SF WORKPLACE & 54,000 SF LAB)
SITE
CAMBRIDGE, MA
PHASE
Pre-Design ~ CD
NOTES
LEED GOLD
BRIDGE CONNECTOR TO LAB [In-House Rendering]
TRANSFORM CREATIVE COLLISIONS
BlueRock believes in making the impossible possible. The company is innovative and the science is cutting edge. The future of cell+gene science is who BlueRock is. “Transformation” takes the space we have and transforms it into a vibrant, smart, inspirational workplace. The materials are sleek, contemporary and yet, warm. Honoring BlueRock culture, brand and forward thinking approach and creating a space for science and innovation.
0
1/2"
1"
2"
OFFICE TOWER
AV
CP U
2"
2"
LAB TOWER
225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 www.perkinswill.com
CONSULTANTS
CONSULTANTS
2"
1/2" 0
1"
1/2" 0
1"
TRUE NO
225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 www.perkinswill.com
MEPFP
MEPFP
5802 Research Park Blvd. Madison, WI 53719 t 608.238.2616
5802 Research Park Blvd. Madison, WI 53719 t 608.238.2616
CODE CONSULTANTS
CODE CONSULTANTS
0
BIM 360://BlueRock Therapeutics - 238 Main Street/ARCH_238 MAIN_BLUEROCK.rvt
AEI
JENSEN HUGHES
JENSEN HUGHES
1661 Worcester Road, Suite 501 Framingham, MA 01701 t 508.620.8900
1661 Worcester Road, Suite 501 Framingham, MA 01701 t 508.620.8900
ACOUSTIC ENGINEERS
ACOUSTIC ENGINEERS
30 Moulton Street Cambridge, MA 02138 t 617.499.8000
30 Moulton Street Cambridge, MA 02138 t 617.499.8000
STRUCTURAL ENGINEERS
STRUCTURAL ENGINEERS
ACENTECH
90
90
.0 0°
.0 0°
1' - 6"
1' - 6"
AWP2, DIRECT GLUE 09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
AWP2, DIRECT GLUE 09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
?09 30 13.E2
?09 30 13.E2
08 71 00 00.XX DOOR HARDWARE
11
11
5.0
5.0
ACENTECH
McNAMARA SALVIA
McNAMARA SALVIA
101 Federal Street, Suite 1100 Boston, MA 021110 t 6177370040
101 Federal Street, Suite 1100 Boston, MA 021110 t 6177370040
LIGHTING
08 71 00 00.XX DOOR HARDWARE
08 0880 8000 00.C CLEAR GLAZING
08 0880 8000 00.C CLEAR GLAZING
0880 8000 00.F 08 GLAZING SEALANT, SILICONE
0880 8000 00.F 08 GLAZING SEALANT, SILICONE
LIGHTING
LAM PARTNERS
LAM PARTNERS
84 Sherman Street Cambridge, MA 02140 t 617-352-4502
84 Sherman Street Cambridge, MA 02140 t 617-352-4502
0°
0°
2/24/2021 9:51:51 AM
1/2"
1"
AEI
AUDIO VISUALS
AUDIO VISUALS
77 Accord Park Unit B10 Norwell, MA 02061 t 781-741-5959
77 Accord Park Unit B10 Norwell, MA 02061 t 781-741-5959
CONSULTANT ENGINEERS
CONSULTANT ENGINEERS
ACT
AWP2, DIRECT GLUE 09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
AWP2, DIRECT GLUE 09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
2' - 8"
2' - 8"
?09 30 13.E2
?09 30 13.E2
FULL BUILDING PLAN [Presentation Plan] 1' - 7
90 .0 0°. 08 08 81 81 13 13.A3 DECORATIVE GLAZING
08 08 81 81 13 13.A3 DECORATIVE GLAZING
SOFFIT ABOVE
SOFFIT ABOVE
1' - 7
3/4"
13
0.0
0°
3/4"
13
0.0
0°
?09 30 13.E2
90.0 0°.
90.0 0°.
?09 30 13.E2
AWP2, DIRECT GLUEWALL PANEL 09 72 72 20 20.A1 09 ACOUSTIC
07 0792 9200 00.A JOINT SEALANT
AWP2, DIRECT GLUEWALL PANEL 09 72 72 20 20.A1 09 ACOUSTIC
PROJECT
2"
07 0792 9200 00.A JOINT SEALANT
4"
4"
PROJECT90.0
BLUEROCK KENDALL SQ PROJECT PHASE I/II
PLAN DTL @ MEETING ROOM 3151 PLAN DTL @ MEETING ROOM 3151 ENTRY ENTRY B1 B1 1 1/2" = 1'-0" 1 1/2" = 1'-0"
BLUEROCK KENDALL SQ PROJECT PHASE I/II
0°.
08 08 81 81 13 13.A3 DECORATIVE GLAZING SOFFIT ABOVE
1/2"
1"
AHA ENGINEERS 700 Technology Square, Suite 402 Cambridge, MA 02139 t 781.402.6000
AWP2, DIRECT GLUE 09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
?09 30 13.E2
PLAN DTL @ MEETING ROOM 3151 PLAN DTL @ MEETING ROOM 3151 B2 B2 1 1/2" = 1'-0" 1 1/2" = 1'-0"
AHA ENGINEERS 700 Technology Square, Suite 402 Cambridge, MA 02139 t 781.402.6000
1' - 6"
.0 0°.
1' - 6"
90
ACT
0
07 0792 9200 00.A JOINT SEALANT
4"
B2
09 0929 2900 00.A INTERIOR GYPSUM BOARD PT2 FROM TOP OF SLAT TO BOTTOM OF DECK
09 0929 2900 00.A INTERIOR GYPSUM BOARD ON ALL SURFACES
09 0929 2900 00.A INTERIOR GYPSUM BOARD ON ALL SURFACES
PAINTED ALUM SHEET 4"X1/8"
PAINTED ALUM SHEET 4"X1/8"
MOUNT FIXTURE TO THE OUTER FACE OF LIP
MOUNT FIXTURE TO THE OUTER FACE OF LIP 10' - 0"
4"
4 1/2"
POCKET SCREW
09 72 72 20 20.A3 09 ECOUSTIC EDGING PROFILE 0.47"
09 72 72 20 20.A3 09 ECOUSTIC EDGING PROFILE 0.47"
09 0965 6513 13.A RESILIENT BASE AS SCHEDULED
09 0965 6513 13.A RESILIENT BASE AS SCHEDULED
9 1/2"
MIN
MIN
080880800000.J GLAZING CHANNEL
08 08 81 81 13 13.A3 DECORATIVE GLAZING
08 08 81 81 13 13.A3 DECORATIVE GLAZING
09 09 29 29 00 00.D1 PLASTIC CORNER BEAD 09 0929 2900 00.A INTERIOR GYPSUM BOARD
08 08 81 81 13 13.A3 DECORATIVE GLAZING
08 08 81 81 13 13.A3 DECORATIVE GLAZING
09 68 13 13.XX TILE CARPETING
08 0880 8000 00.H GLAZING SHOE
08 0880 8000 00.H GLAZING SHOE
POCKET SCREW
DISPLAY
.10 PAINTED 14 23.A1ACRYLIC LOGO (TO FOLLOW CLIENT BRAND AND SIGNAGE GUIDELINE), BY OTHERS
.10 PAINTED 14 23.A1ACRYLIC LOGO (TO FOLLOW CLIENT BRAND AND SIGNAGE GUIDELINE), BY OTHERS
05 05 50 50 00 00.A1 ALUMINUM ANGLE
POCKET SCREW
SECTION @ THE EGG SLATS
CONCRETE FLOOR
A2
ISSUE CHART
MOUNT FIXTURE TO THE OUTER FACE OF LIP
AWP2, DIRECT GLUE 09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
DISPLAY
POWDER COATED WHITE
1/2" 7 71/2"
1/2"
SEC. DTL MEETING RM 3151 GLASS SEC. DTL MEETING RM 3151 GLASS WALL TYP. WALL TYP. A2 1 1/2" = 1'-0" 1 1/2" = 1'-0"
POWDER COATED WHITE
A1
4"
.0 0°.
09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
4"
B1
SHEET NUMBER PLAN DTL @ MEETING ROOM 3151 09 68 13 13.XX TILE CARPETING ENTRY 1 1/2" = 1'-0" 08 0880 8000 00.H GLAZING SHOE
A44-02
POCKET SCREW
09 72 72 20 20.A3 09 ECOUSTIC EDGING PROFILE 0.47"
Checker
CONCRETE DECK
09 09 22 22 16 16.B1 STUD
CONCRETE COLUMN BEYOND
12 12 22 22 00 00.A2 RECESSED DRAPERY TRACK
9'-0"
6" 080880800000.J GLAZING CHANNEL
9'-6"
0°
Approver
TITLE
SHEET NUMBER
A44-02
CONCRETE FLOOR
SEC. DTL MEETING RM 3151 VIEW SLATS A3 1 1/2" = 1'-0"
MOUNT FIXTURE TO THE OUTER FACE OF LIP
09 54 13.A11 13 PERFORATED METAL CEILING EDGE TRIM, SAS TCA 0879
9 1/2" 13 MIN0.0
SEC. DTL MEETING RM 3151 GLASS WALL TYP. A2 1 1/2" = 1'-0"
ISLAND DETAILS [CD]
10' - 0"
3/4"
7 1/2"
09 0965 6513 13.A RESILIENT BASE AS SCHEDULED
not to scale
DATE
09 0929 2900 00.A INTERIOR GYPSUM BOARD ENLARGE ENLARGE 08 08 81 81 13 13.A3 DECORATIVE GLAZING DETAILS MEETING DETAILS MEETING ROOM 3151 ROOM 3151
09 0992 29 2900 00 00.A INTERIOR GYPSUM BOARD 07 07 92 00.A JOINT SEALANT
PAINTED ALUM SHEET 4"X1/8"
4 1/2"
Checked
Approver Approved POCKET SCREW 09 09 29 29 00 00.D1 PLASTIC CORNER BEAD
SEC. DTL@ FABRIC WRAPPED PANELS MEETING ROOM 3151 A4 3" = 1'-0"
ISSUE
Job Number
Checker
Checked Approved
09 0929 2900 00.A INTERIOR GYPSUM BOARD ON ALL SURFACES
4"
NO
TITLE
09 0929 2900 00.A INTERIOR GYPSUM BOARD PT2 FROM TOP OF SLAT TO BOTTOM OF DECK
1/2"
DATE
Job Number
08 08 81 81 13 13.A3 DECORATIVE GLAZING
09 22 22 16 16.B1 09 STUD
09 09 72 72 20 20.A3 ECOUSTIC EDGING PROFILE 0.47"
1' - 7
09 54 13.A10 13 PERFORATED METAL CEILING ISSUE
PLAN DETAIL @ THE EGG
not to scale
9'-6"
4 1/2"
NO
PLAN DTL @ MEETING ROOM 3151 AXON VIEW @ 238 MAIN LEVEL 03 AXON VIEW @ 238 MAIN B2 LEVEL 03 SOUTHEAST RECEPTION SOUTHEAST RECEPTION 1 1/2" = 1'-0" A1
SECTION @ TYP GLASS WALL
6"
09 54 13.A11 13 PERFORATED METAL CEILING EDGE TRIM, SAS TCA 0879
?0909 093072 7213.E2 20 20.A3 ECOUSTIC EDGING PROFILE 0.47"
05 05 50 50 00 00.A1 ALUMINUM ANGLE
7 1/2"
2' - 8"
10' - 0"
SOFFIT ABOVE
7 1/2" CONCRETE FLOOR
CONSTRUCTION DOCUMENTS
2021.03.12 09 0929 2900 00.A INTERIOR GYPSUM BOARD ON ALL SURFACES PAINTED ALUM SHEET 4"X1/8"
90
09 68 13 13.XX TILE CARPETING
TRUE NORTH 09 0929 2900 00.A INTERIOR GYPSUM BOARD PT2 FROM TOP OF SLAT TO BOTTOM OF DECK
2021.03.12
POCKET SCREW
09 09 29 29 00 00.D1 PLASTIC CORNER BEAD
09 22 22 16 16.B1 09 STUD
ISSUE CHART
9 1/2"
09 0929 2900 00.A INTERIOR GYPSUM BOARD
SEC. DTL MEETING RM 3151 VIEW SEC. DTL MEETING RM 3151 VIEW SEC. DTL@ FABRIC WRAPPED PANELS SEC. DTL@ FABRIC WRAPPED PANELS SLATS SLATS MEETING ROOM 3151 MEETING ROOM 3151 A4 A3 A3 3" = 1'-0" 3" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"
not to scale
080880800000.J GLAZING CHANNEL
BIM 360://BlueRock Therapeutics - 238 Main Street/ARCH_238 MAIN_BLUEROCK.rvt
09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
9'-6"
3/12/2021 1:46:40 PM
09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
.0 0°
CONSTRUCTION DOCUMENTS
4"
09 0929 2900 00.A INTERIOR GYPSUM BOARD
90
09 54 13.A10 13 PERFORATED METAL CEILING
4" 4"
09 0929 2900 00.A INTERIOR GYPSUM BOARD
9'-0"
6"
1/2" REVEAL
9'-6" 1/2"
09 54 13.A10 13 PERFORATED METAL CEILING
9'-0"
6" 09 54 13.A11 13 PERFORATED METAL CEILING EDGE TRIM, SAS TCA 0879
1/2" REVEAL
1/2" REVEAL
4 1/2"
12 12 22 22 00 00.A2 RECESSED DRAPERY TRACK
KEYPLAN
TRUE NORTH
4"
BIM 360://BlueRock Therapeutics - 238 Main Street/ARCH_238 MAIN_BLUEROCK.rvt
3/12/2021 1:46:40 PM
BIM 360://BlueRock Therapeutics - 238 Main Street/ARCH_238 MAIN_BLUEROCK.rvt
A4
4"
12 12 22 22 00 00.A2 RECESSED DRAPERY TRACK
KEYPLAN
1' - 6"
3/12/2021 1:46:40 PM
1/2" REVEAL
1/2"
CONCRETE COLUMN BEYOND
0°
09 09 72 72 20 20.A3 ECOUSTIC EDGING PROFILE 0.47"
09 09 22 22 16 16.B1 STUD
CONCRETE COLUMN BEYOND
238 Main Street Cambridge, MA 02142
5.0
09 09 72 72 20 20.A3 ECOUSTIC EDGING PROFILE 0.47"
09 09 22 22 16 16.B1 STUD
238 Main Street Cambridge, MA 02142
11
10' - 0" 09 54 13.A11 13 PERFORATED METAL CEILING EDGE TRIM, SAS TCA 0879
CONCRETE DECK
90.0 0°.
09 0929 2900 00.A INTERIOR GYPSUM BOARD PT2 FROM TOP OF SLAT TO BOTTOM OF DECK
CONCRETE DECK
4"
09 22 22 16 16.B1 09 STUD
BlueRock
1' - 6"
09 22 22 16 16.B1 09 STUD
PLAN DTL @ MEETING ROOM 3151 1 1/2" = 1'-0"
BlueRock
08 08 81 81 13 13.A3 DECORATIVE GLAZING
09 54 13.A10 13 PERFORATED METAL CEILING
9 1/2" MIN DISPLAY
AV
AV
AV AV
AV
CP U
CAFE LAYOUT [Presentation Plan]
CP U
ALL HANDS LAYOUT [Presentation Plan]
FLEXIBILITY The central Cafe located behind the reception desk is not only the central gathering space but also a large meeting area which can accommodate 92 people. Dropdown AV and stackable lightweight furniture enables the maximum flexibility.
F
“Creative Collisions”
PORTAL CONCEPT SKETCH
BLUEROCK
With the unexpectedly unique design, the arrival promotes creative collisions and an immersive experience for visitors. It also celebrates transparency and views into space with strong brand visibility from the first floor courtyard.
GAYOEN YOU
ARRIVAL // THE PORTAL
OFFICE TOWER RECEPTION [In-House Rendering]
BLUE CEILING The deck above the white metal ceiling is painted in BlueRock’s branding blue to provoke a continuous immersive experience from the arrival portal. With the white metal ceiling and lights placed above, the brand experience becomes less intensive to increase comfort within the space.
GAYOEN YOU BLUEROCK
OFFICE TOWER CAFE [In-House Rendering]
OFFICE TOWER PORTAL [In-House Rendering]
Reception
LAB TOWER PORTAL [In-House Rendering]
n
Elevators PORTAL RCP [Presentation RCP]
OFFICE TOWER [In-House Rendering]
OFFICE TOWER [In-House Rendering]
OFFICE TOWER MEETING ROOM SECTION [In-House Rendering]
LABORATORY [In-House Rendering]
LABORATORY CORRIDOR [In-House Rendering]
GAYOEN YOU BLUEROCK
LAB COLORED PORTALS Color-coded portals strengthen not only BlueRock’s branding and connection to the workspace but also wayfinding throughout the lab space.
03 FEDERAL RESERVE BANK OF BOSTON - SEMINAR ROOM (2021-2022) TYPE
AMENITY
SIZE
3,000 SF
SITE
BOSTON, MA
PHASES
Pre-Design ~ CD
VIEW FROM ENTRY [In-House Rendering]
CHIC CLASSIC MODERN TWIST
The Federal Reserve Bank of Boston is looking for a new seminar room for the research group, which will be the new face of the group. They are looking for a timeless classic appearance that can relate to the board room in Washington D.C. Materials were carefully selected to represent the classical look yet relates to the anodized aluminum exterior building. Classical elements were added with a modern twist, such as dentil molding with simplified motif and picture frame molding with a velvet panel insert.
36/2
36/2
P.
OPEN WORK AREA 831
AV CLOSET 34
ACT1 9' - 8" AFF
Q M
LT4 ETR. GYP 9' - 4" AFF
36/2
CORRIDOR OPEN WORK AREA
LT4
801
SEMINAR ROOM
824
829
10
14
16.
R ETR. GYP 9' - 4" AFF
823
830
ETR. ACT 9' - 0" AFF
831
ETR. ACT 9' - 0" AFF
BREAKROOM 835 ETR. ACT 9' - 0" AFF
ETR. ACT 9' - 0" AFF
36/2
ETR. ACT 9' - 0" AFF
9' - 0" AFF
36/2
36/5 36/2ETR. ACT
9' - 0" AFF
36/2
36/2
36/5 ETR. ACT36/5
36"BC 36"BC
36"BC 36"BC
T 36/2
36/2
36/2
CORRIDOR 803
832
834
833
SCOPE OF WORK
U
SEMINAR ROOM PLAN 806
805
FLOOR PLAN [Presentation Plan]
ACT1 9' - 2" AFF
36/2
859
ETR. ACT OFFICE 8' - 6" AFF
OFFICE
807
CONF. ROOM 804
RCP17
RCP17
RCP17
36/4
BLE DIAGRAM - OPTION A LAN, RCP AND ELEVATIONS DENTIL MOLDING LOCATION
OPEN WORK AREA
V
831
10/12/2021 04/06/21
GYP
GYP 8' - 8" AFF
8' - 8" AFF
858
36/2
Room
36/2
36/2
36/4
36/4
808
36/4
36/4
Room
ACT1 8' - 4" AFF
LT4 ETR. GYP 9' - 4" AFF
CEILING SLOPE 4 DEGREES
36/2
ACT1 9' - 8" AFF
SEMINAR ROOM
36/2
OPEN WOR
82
LT4
829
856 ETR. GYP 9' - 4" AFF
36/2
36/2 AGC 9' - 2" AFF
855
36/2
36/2 36/5
36/5
36/5 36/2
GYP 9' - 2" AFF
36/5
36/5 36/2
ACT1 8' - 6" AFF
806
REFLECTED CEILING PLAN [Presentation Plan]
36/4
Room 808
SEM
Roo
80
36/4
36/4
806
36/4
6CC
F/S
F/S
F/S
H3 2 BUBBLE DIAGRAM - OPT OPTION - PLAN, RCP AND 36/4
811
36/4
36/4
SEMINAR ROOM RCP
36/4
36/4
809
36/4
36/5
GAYOEN YOU
14
10
FRB - SEMINAR
10
16.
14
10
10
16.
831
RCP17
RCP17
34
36/2
36/2
831
GYP 8' - 8" AFF
GYP 8' - 8" AFF
8' - 4" AFF
858
36/2
829
ROOM EAST
P.
SLOPE 4 DEGREES
SEMINAR ROOM
not to scale
ACT1 9' - 8" AFF
ACT1 9' - 8" AFF LT4 ETR. GYP 9' - 4" AFF
36/2
36/2
OPEN WORK AREA 824
LT4
829
OPEN WORK AREA 824
LT4 LT4 ETR. GYP 9' - 4" AFF
SEMINAR ROOM CEILING
856
85636/2
GYP 8' - 8" AFF
CEILING SLOPE 4 DEGREES
ACT1 8' - 4" AFF
36/2SEMINAR
34
AV CLOSET OPEN WORK AREA
GYP
N. ACT1
AV CLOSET
831
8' - 8" AFF
858
36/2
RCP17
36/2
36"BC 36"BC
36/2
36/2
RCP17
OPEN WORK AREA
DENTIL MOLDING LOCATION
36/2
ETR. ACT 8' - 6" AFF
ACT1 9' - 2" AFF
DENTIL MOLDING LOCATION
36/2
ETR. ACT 8' - 6" AFF
36/2
RCP17
36"BC 36"BC
36/2
36/2
not to scale L.
16.
835
ETR. ACT 9' - 0" AFF
834
833
ACT1 9' - 2" AFF
RCP17
834
BREAKROOM
36/2
833
832
CURVED BACK WALL
859
ETR. ACT 9' - 0" AFF
SCOPE OF WORK
SCOPE OF WORK
859
36/2
ETR. ACT 9' - 0" AFF
832
835 ETR. ACT 9' - 0" AFF
36/2
830
14
ETR. ACT 9' - 0" AFF
BREAKROOM ETR. ACT 9' - 0" AFF
36/2
823
831
36/2
830
17.1
36/2
823
10
ETR. ACT 9' - 0" AFF
ETR. ACT 9' - 0" AFF
36/2
36/2 36/2
ETR. ACT 9' - 0" AFF
ETR. ACT 9' - 0" AFF
36"BC 36"BC
ETR. ACT 9' - 0" AFF
ETR. ACT 9' - 0" AFF
36"BC 36"BC
ETR. ACT 9' - 0" AFF
36"BC 36"BC
ETR. ACT 9' - 0" AFF
36"BC 36"BC
not to scale
36/2
LCD SCREEN WALL ELEVATION
ETR. GYP 9' - 4" AFF
OPEN WORK AREA 831
36/2
AV CLOSET
ETR. GYP 9' - 4" AFF
AGC 9' - 2" AFF
34
36/2
36/2 AGC 9' - 2" AFF
855
36/2 855 36/5
36/5
36/5 36/2
17.1 M
36/5
14
GYP 9' - 2" AFF
36/2
36/5 36/2
CORRIDOR
GYP SEMINAR ROOM 9' - 2" AFF 829
A
36/5
16. 801
36/5
36/5 36/2 36/2
ACT1 8' - 6" AFF
36/5
36/5
36/5 36/2
ACT1 8' - 6" AFF
SEMINAR ROOM WEST
808
803
U OFFICE
SEMINAR R
36/4
36/4
36/2
Room 807
Room 807
H3 2 BUBBLE DIAGRAM - OPTION OPTION - PLAN, RCP AND ELE H3 2 BUBBLE DIAGRAM - OPTION OPTION - PLAN, RCP AND ELE 36/4
36/2
F/S CORRIDOR
SEMINAR
RENDERED ELEVATIONS [Revit]
F/S
T
Room
36/4
806
36/4 36/4 36/4 36/4 36/4
808
F/S
806
6CC
Room
F/S
36/4 36/4
36/4 36/4 36/4 36/4 36/4 36/4
811
F/S
36/4
806
SEMINAR ROOM RCP
N.
OFFICE
806
36"BC 36"BC
36/4
6CC
36"BC 36"BC
809
L. R811
SEMINAR ROOM RCP
36/4
not to scale 809
F/S
36/5
36/2
Q
36/2
10
VIEW FROM ENTRY PORTAL [In-House Rendering]
VIEW FROM BACK ENTRY [In-House Rendering]
GAYOEN YOU FRB - SEMINAR
VIEW FROM REAR [In-House Rendering]
VIEW FROM REAR CENTER [In-House Rendering]
04 FEDERAL RESERVE BANK OF BOSTON - FITNESS CENTER (2017-2019) TYPE
AMENITY
SIZE
18,000 SF
SITE
BOSTON, MA
PHASES
Pre-Design ~ CD
RECEPTION [Photography]
DYNAMIC EXPLORATION
Federal Reserve Bank of Boston’s Fitness Center has been designed to enhance employee well-being as the organization highly respects wellness. Supergraphics in the entrance boosts user’s energy as soon as they walk in and make them excited. Space is designed around the curved perforated metal ceiling, which adds dynamics to the workout space and encourages users to explore other spaces
AXON [Revit]
5
4
28
3
29
30
31
32
2
33
1
5
4
3
PARTITION PLAN29LEGEND 28
26
24
30
31
32
NEW PARTITION
J
DOOR NUMBER, REFER TO DOOR AND HARDWARE SCHEDULE ON SHEET A62-01 FOR FURTHER INFORMATION
J
CONSULTANTS MEPFP ENGINEERS
VANDERWEIL ENGINEERS
FIRE EXTINGUISHER / CABINET
FEC
D
274 Summer St Boston, MA 02110 t (617) 423-7423
PARTITION TYPE
B11 1 A43-04 D
D
P18
STRUCTURAL ENGINEERS
D11
A41
THORNTON TOMASETTI WEIDLINGER PROTECTIVE DESIGN PRACTICE
MILLWORK HATCH PATTERN
P15
D32
K
P31
3' - 0"
P19 E26
P15
CORR BE100
C
SOFFIT ABOVE
Q.7
Q.7 CORRIDOR CARD READER
STAIR
P16 B102
ELEC
OFFICE
E12
4 5
B116A
6
E22 UNDER COUNTER
B114 E23
B110
ENTRY
E24
A45-01
B102
P16
8 P22
E25
P24
P16
E08
P11
P19
B107
P32
WOMEN'S LOCKER
E04
D42
E08 P17
B106
E04
P13
11
B109B
BE103
BE107
BE106
BE105
B112
E04
Y
WATER METER
BE111
TEL
P01
P06
P02
P07
P03
P08
P04
P09
P05
BE113
EXHAUST
BE113
MECH
BE113
BE111
BE115 A
Z BE114
BE116
BE114
LEVEL B1 FITNESS CENTER PARTITION PLAN
PARTITION PLAN [CD]
12/19/2017 10:19:25 AM
12/19/2017 10:19:20 AM
1
EXHAUST
1/8" = 1'-0"
5
4
3
5
4
3
26
24
28
1/2"
D22
BE103
D22
D22
D22
D42
D22
A81
BUILD D11 WALL AS TIGHTISSUE TO CHART COLUMN AS POSSIBLE
D22
STRETCHING B112 18' - 0"
FAN
HOUSEKEEPING
HOUSEKEEPING
LINEN ROOM
CORR
6' - 9 3/4"
BE107
BE106
BE105
B123
BE104
Y
D11
A81
ALIGN
29
30
D41
WATER METER BE112
TYPICAL IN SCOPE OF WORK
BE104
BE108
D82
D22
BE112
E08
CORR
B113
D41
CORR
P34
D41
CARDIO
D22
ELEC
D22
B
A81
D11
26
31
32
BREAK ROOM
CORR
CORR
BE108
BE104
MARK
P36 SHAFT
EXHAUST
BE113
MECH
BE115
BE113
BE111
156009.034
Drawn
A
1. EQUIPMENT SCHEDULE IS LOCTAED ON SHEET A00-02. ALL ITEMS TAGS THAT BEGIN WITH "E" CAN BE FOUND ON A00-02.
Z
DATE
Job Number
PARTITION PLAN GENERAL NOTES
A
Z
ISSUE
100% TEL Construction Documents BE113 ISSUED: 11/28/17 Author
Checked
Checker
Approved
Approver
TITLE
LEVEL B1 FITNESS CENTER PARTITION PLAN SHEET NUMBER
LEVEL B2 - PART PLAN
2
1
1/8" = 1'-0"
PARTITION DIMENSION PLAN A11-01 [CD] LEVEL B1 FITNESS CENTER PARTITION PLAN 1/8" = 1'-0"
Copyright © 2016 Perkins+Will
33
2
5
1
4
3
2
5
1
4
3
REFLECTED CEILING PLAN LEGEND 28 29 30
26
24
31
32
DRYWALL CEILING / SOFFIT
CONSULTANTS
ACCESS PANEL
J
MEPFP ENGINEERS
J 2 A43-04
LP7
K
VANDERWEIL ENGINEERS
RETURN DIFFUSER
274 Summer St Boston, MA 02110 t (617) 423-7423
STRUCTURAL ENGINEERS
SLOT DIFFUSER
LP4
IN CEILING PROJECTOR SCREEN. REFER TO AV DWGS.
LR5
S
PG WN
K
THORNTON TOMASETTI WEIDLINGER PROTECTIVE DESIGN PRACTICE
GL-1 CEILING MOUNTED SPEAKER (A/V, PAGING, WHITE NOISE)
CEILING MOUNTED CAMERA
27 Wormwood St, Suite 200 Boston, MA 02210 (617) 250 4100
GWB1
LP2
$
RECESSED WALLWASH (ROUND, SQUARE)
LR9
LC5 ACT-4
LC5
10' - 0"AFF
A51-01 LP8 LR3
LR6
LR6
LC5
10' - 0"AFF
10' - 0"AFF
LR9
LR4 LR4
LR11
$
LR11 ETR
ACT-1
LR11
LC5
LR5 LR11
1
EQ
E17 LP1
A51-01
LC5
LR11 RCP16 LR11
Y
LR11
LR11
LR11
LR11
LR11
LR11 LR11
ACT-1 9' - 6"AFF
TYPICAL IN SCOPE OF WORK LR11
LR11
LR11 A
LR11
LR11
LR11
LR11
LR11
RCP1 RCP2
RCP7 RCP8
ACT-1
ACT-1
RCP3
RCP9
10' - 0"AFF LR11
10' - 0"AFF
RCP4
RCP10
RCP5
RCP11
LR11
LR11
LR11
LR11
LR11
RCP6
RCP16
Z
REFLECTED CEILING PLAN [CD]
2
LEVEL B1 FITNESS CENTER REFLECTED CEILING PLAN 1/8" = 1'-0"
5
4
3
c:\temp\156009_034_FRB FITNESS_V16_JW_gayoen.you@perkinswill.com.rvt
LR11
ETR
12/19/2017 10:19:34 AM
Y
LR11
FT-1
RCP15 ETR
WOMEN'S LOCKER RCP1 B106 PT-1 GL-1 RCP2 FT-1 (base) FT-1 RCP3 FN11 FN13 RCP4 GL-1
X
9' - 0"AFF
RCP PLAN NOTES CPT-1
5
CPT-1
WD-1 RB-6
CPT-1
RF-1
B1 FITNESS CENTER RENOVATION
FN17
Type
KEYPLAN 8 A50-01 FN16
B
8
FN16
A50-01
ISSUE CHART STRETCHING B112
floor finish 5
FN14
PT-2
ISSUE
DATE
TYPICAL IN SCOPE OF WORK
FN1 100% Construction Documents ISSUED: 11/28/17 FN2 FN3
Job Number A
FN18
Z
PT-1/GL-1 RB-1B
600 Atlantic Ave Boston, MA 02110 CARDIO B113 PT-1, UNO RB-1B RF-1
MECH BE111 PT-1 RB-1A PT-7
A
Drawn
FN6
FN11
FN7
FN12
FN8
FN13
156009.034 FN4
FN9
Author FN5
FN10
Checked
Checker
Approved
Approver
TITLE
LEVEL B1 FITNESS CENTER REFLECTED CEILING PLAN SHEET NUMBER
FINISH PLAN [CD] LEVEL B1 FITNESS CENTER FINISH PLAN
A12-01
1
4
3
Item Code
Description
Manufacturer
CARPET
CPT-1
CARPET TILE
J+J KINETEX
STRATA (1826)
CEILING CEILING CEILING CEILING CEILING CEILING CEILING
ACT-1 ACT-2 ACT-3 ACT-4 ACT-5 SP-1 SP-2
ACOUSTICAL CEILING PANEL ACOUSTICAL CEILING PANEL ACOUSTICAL CEILING PANEL 24X24 PERFORATED CEILING PANEL 24X24 PERFORATED CEILING PANEL SPRAY-ON ACOUSTICAL INSULATION SPRAY-ON ACOUSTICAL INSULATION
USG
USG MILLENNIA C
USG MARS, FLB EDGE ARMSTRONG METAL WORKS, TO ARMSTRONG METAL WORKS, TO INT'L CELLULOSE CO K-13 INT'L CELLULOSE CO K-13
ENGINEERED STONE ENGINEERED STONE
ES-1 ES-2
DUPONT ZODIAQ CAESARSTONE
N/A N/A
CLOUD WHITE 4003 SLEEK CONC
ETR
ETR
EXISTING TO REMAIN
FABRIC FABRIC
FB-1 PB-2
CURTAIN FABRIC SHOWER FABRIC
KNOLL TBD
CROSSROADS/KT NYLON
FILM FILM
WF-1 WF-2
FROSTED FILM DICHROIC FILM
3M SCOTCHCAL FROSTED CRYSTA 3M DICHROIC GLASS DF-PA BLAZE
GLASS GLASS GLASS
GL-1 GL-2 GL-3
MIRROR DICHROMATIC GLASS CLEAR
SCHOTT
COPPER FREE MIR NARIMA
PAINT PAINT PAINT PAINT PAINT PAINT PAINT
PT-1 PT-2 PT-3 PT-4 PT-5 PT-6 PT-7
LATEX PAINT LATEX PAINT LATEX PAINT LATEX PAINT LATEX PAINT LATEX PAINT LATEX PAINT
BENJAMIN MOORE BENJAMIN MOORE BENJAMIN MOORE BENJAMIN MOORE BENJAMIN MOORE SCUFFMASTER DECK PAINT
EGGSHELL FINISH EGGSHELL FINISH EGGSHELL FINISH EGGSHELL FINISH EGGSHELL FINISH EGGSHELL FINISH SEMI GLOSS
PLASTIC LAMINATE PLASTIC LAMINATE PLASTIC LAMINATE
PL-1 PL-2 PL-3
HIGH LINE 797OKCOLOR CORE 2 COLOR CORE 2
LAMINATE LAMINATE LAMINATE
WILSONART FORMICA FORMICA
RESILIENT FLOORING BBT-1
BIO BASED FLOOR TILE
ARMSTRONG
TBD
SPORTS FLOORING SPORTS FLOORING SPORTS FLOORING
RF-1 RF-2 RF-3
SPORTS FLOORING SPORTS FLOORING SYNTHETIC TURF
PLAE PLAE PLAE
ACHIEVE, 13MM EXCEED, 12MM ATTACK, 14.2MM
STONE
ST-1
MARBLE SLAB
CASTELLUCCI
CALACATTA MARB
TILE FLOORING TILE FLOORING
FT-1 FT-2
PORCELAIN TILE PORCELAIN TILE
IMOLA CERAMICA IMOLA CERAMICA
KOSHI 36G KOSHI 36G
WALL WALL
MT-1 WC-1
METAL PANEL WALL COVERING
MOZ TROVE
GRADIENT COLLE ESTUARY
WALL BASE WALL BASE WALL BASE WALL BASE WALL BASE WALL BASE WALL BASE WALL BASE
RB-1A RB-1B RB-2A RB-2B RB-3 RB-4 RB-5 RB-6
RUBBER BASE RUBBER BASE RUBBER BASE RUBBER BASE RUBBER BASE RUBBER BASE WOOD BASE WOOD BASE
ALLSTATE ALLSTATE ROPPE ROPPE JOHNSONITE JOHNSONITE STILE STILE
STRAIGHT BASE 6" HIGH BASE STRAIGHT BASE 6" HIGH BASE STRAIGHT BASE STRAIGHT BASE 4" HIGH BASE 4" HIGH BASE
WALL TILE
1/8" = 1'-0"
Copyright © 2016 Perkins+Will 5
1
5 A50-01
MARK
2
L
GL-3
PT-1 RB-1B
FN15 REFER TO ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION AND SPECIFICATIONS. GC SHALL REPORT GL-1ANY DISCREPENCIES TO THE ARCHITECT. GC SHALL PROVIDE EXIT SIGNS. EXACT LOCATION SHALL BE VERIFIED IN FIELD AND APPROVED PRIOR TO INSTALLATION. REFER TO ENGINEERING DRAWINGS FOR CEILINGCPT-1 MOUNTED LIGHTS ANDCLOSET MOTION SENSORS. MAINT. FT-1 WT-2 WT-2 INSTALLATION. LOCATIONS SHALL BE VERIFIED IN FIELD AND APPROVED PRIOR TOB109 UNO ALL LIGHT FIXTURES AND CEILING DEVICES INCLUDING SPEAKERS PT-1 , ARE TO BE PROVIDED AND INSTALLED BY GC RB-1 RCP5 GC SHALL FIELD VERIFY THE PREMISES AND VERIFY ALL CLEARANCES BBT-1AS REQUIRED FOR LIGHTING FIXTURES BEFORE PROCEEDING WITH ANY INSTALLATION. GC SHALL ELEC. REPORT ANY DISCREPANCIES TO THE ARCHITECT. B111 CPT-1 ARE FOR RCP6 ANY DIFFUSERS, SPRINKLERS AND SPEAKERS SHOWN ON ARCHITECTURAL PLANS PT-1 COORDINATION PURPOSES ONLY. GC TO REFER TO ENGINEERING DRAWINGS AND REPORT RB-1A CPT-1 ANY DISCREPENCIES TO THE ARCHITECT. Existing BBT-1 RCP7 GC TO PROVIDE CONTROL JOINTS AS NEEDED IN GWB CEILINGS. JOINTS SHALL RETURN ABOVE CEILING. PAINT WHITE OR MATCH CEILING COLOR. RCP8 UNO IN ACT CEILING: ALL LIGHT FIXTURES AND SPRINKLERS SHALL BE CENTERED IN TILES. RCP9 UNO IN GWB CEILING: SPRINKLERS SHALL BE CENTERED IN BETWEEN LIGHT FIXTURES. ETR RF-1 RCP10 UNO ALL ACT SHALL BE INSTALLED WITH EQUAL TILES ON BOTH ENDS. PT-2 RCP11 PROVIDE MOISTURE RESISTANT GYP. BOARD CEILINGS IN SHOWER AREAS. LINEN ROOM HOUSEKEEPING RCP12 REVIEW LIGHTING LAYOUT IN THIS CORRIDOR INB123 FIELD WITH ARCHITECT PRIOR TO BE105 INSTALLATION. PT-1 PT-1 PT-1CEILING CURVED EDGE. RCP13 SPRAY K13 IN THIS AREA. OVERSPRAY TO 10'-0" BEYOND THE METAL RB-1A RB-1 ETR REFER TO FINISH PLAN FOR FURTHER INFORAMATION BBT-1 BBT-1 SPRAY K13 IN THIS AREA. REFER TO FINISH PLAN FOR FURTHER INFORAMATION RCP14 RCP15 EXISTING CEILING TO REMAIN IN THIS AREA RCP16 NEW CEILING IN THIS AREA TO MATCH EXISTING. CEILING IS TO BE REMOVED FOR THE INSTALLATION OF NEW DUCTWORK. INTENT IS FOR EXISTING LIGHTING AND SPRINKLERS TO REMAIN. USE ACT-1
BE113 BE113 PT-1 ETR ETR
1
2
A50-01
GL-3 ENTRY B102 PT-1 RB-5 CPT-1
CORRIDOR B102A PT-1 RB-1A CPT-1
FN11 FN13
WT-2 LC5
9' - 0"AFF ACT1
LR11
RCP15 ACT-1 9' - 6"AFF RCP12
SHOWERS B108 PT-1, FT-1 FT-1 (base) FT-1, FT-2
LC5 UPLIGHTING ABOVE TV'S
ACT-1 9' - 0"AFF
LP2
LW4
ETR
E17
1 A51-01
9' - 0"AFF
LR5
ETR
TOILETS B107 PT-1 FT-1 (base) FT-1
OFFICE B116 PT-1 RB-1A CPT-1
GL-2
SPEAKERCPT-1
WT-2
STRENGTH B114 PT-1 RB-1B RF-1
PT-3
PT-1
Z PT-1 GL-1 RB-1B
PROJECT
A50-01
Sim
B
8' - 0"AFF
LR5
ACT-1
LW5
X
LP2
WT-2
DECORATIVE PENDANT
5
PT-1
LW4
LR3
GWB1
LR5
LC5 LC5
W
RCP13
$ LR3
LW1
LR3
GL1
INDIRECTGL1 / DIRECT PENDANT3FIXTURE
WT-2
SP-1
LR9 SLOT
LR3 ACT-4 10' - 0"AFF
LR6
LR6
LR9
GWB2 9' - 0"AFF
LR3
1 A13-02
RECESSED COVE FIXTURE
GL1
PT-2
LR6
LR3
LC5
V
WD-1 RB-6
TRACK LIGHTING
GL1 MEN'S LOCKER B103 PT-1 FT-1 (base) FT-1
S
EQ
GWB2
LR4 LR4
LR3 LR6
LC5
LR9
LR4
LR5 9' - 0"
LR6
LP2
S
S
LW1
LR6
LR3
LR3
A50-01
CPT-1
WT-2
LR6
LW4 LR5
LR3
LR3 ACT-4
LR9
B
LR3 ACT-5 10' - 0"AFF LR3
6 A51-01
$
LR6
LC6 MOUNTED ON TOP OF METAL CEILING
LR3
CPT-1 FT-1
TOILETS B105 PT-1 FT-1 (base) FT-1
LC6
EQ
1' - 6"
LR6
LR3
LR9 SLOT
FT-1
U
PT-5
ACT-4 10' - 0"AFF
LR3 LC5
LW2
LW4 ACT-4 10' - 0"AFF
9' - 0"
LR3
LC5
LW2 LC5
LR3
E17
LR3
5
LC5 LR3
LR6
9' - 1"AFF
S
GWB2 10' - 0"AFF
9' - 1"AFF
WT-1
LW2
LP2
LR3
LR3 LR1
10' - 0"AFF
GL-3
A50-01
A50-01
CPT-1
LW2
LW2
LW4
LR9 SLOT
ACT-1
LR9 SLOT
LR3
GWB2 10' - 0"AFF
LW4
LW4
LR9 SLOT LR3 LR3
LR5
LW4
LW4
LR4
LR9
ACT-4 10' - 0"AFF
LR3
LW4 LW4
GWB2 LR4 9' - 0"AFF
LR9 GWB2 10' - 0"AFF
LR9
4
CONSULT B117 PT-1 RB-1A CPT-1
RECESSED LINEAR SLOT 3 CPT-1
FT-1
LR3
LC5
9' - 0"AFF
LR4 LR4 LR4
SHOWERS B104 PT-1, FT-1 FT-1 (base) FT-1, FT-2
FT-1
LR6
FEC
RECESSED STRIP FIXTURE
T
WT-2
LR6
LR6
LR3
LR3
FEC
LC5 GWB2
LW4
LR6
LR6
NOTE: EXPOSED CEILING IN OPEN FITNESS AREA TO BE PAINTED SP-1
A51-01
10' - 0"AFF
FN17
PT-1
GL-2
STRIP FIXTURE
S
5
LR1 ACT-1
CPT-1
PT-1
FUNCTIONAL TRAINING B115 PT-1, UNO varies RF-3
PT -1 PT-1
UP UP
VARIERS
LR3
LR3 ETR
CORRIDOR
RECTANGULAR B101 PENDANT WALLWASH FN14 FN14 VARIESRECESSED WALLWASH RECTANGULAR
R1
3' - 6 71/128"
GWB2 9' - 1"AFF
LR6
W
GWB2 9' - 1"AFF
LC5 PC16 LC5 SURFACE MOUNTED TO TOP OF LOCKERS LC5 ACT-4 10' - 0"AFF
RECESSED ADJUSTABLE ACCENT (ROUND, SQUARE) PT-2
LP2
PT-3
GL-1/PT-1
Q.7
SP-1
RF-1
STORAGE B118 PT-1 RB-1A C BBT-1
PT-2
RCP13 A51-01 LR3
CPT-1
LR5
LR5 LW4 9' - 0"
9' - 1"AFF
WT-1 9' - 1"AFF
8' - 0"AFF LR3 TYP. 8 A51-01
EQ
LC5
S
9' - 0"
2 A43-01
GWB1
LR4
3' - 9 247/256"
LR6 LC5
LW4
ACT-4
LR4 LR4 LR4
ETR
RF-2
C
E17
3' - 0"
LR6
9' - 1"AFF
ACT-4
8' - 0"AFF
9 A51-01 $
LR6
2 A43-02 WT-1
U
GWB1
LR2
LR2
PT-2
PT-1
LR3
GL-2
PT-1
B120 PT-1(ROUND, SQUARE) PENDANT DOWNLIGHT
WC-1
WT-1 9' - 1"AFF
LR2
ACT-1 10' - 0"AFF
$
S
LR12
RCP12 LR2
LR2
PT-1
PT-1
RECESSED DOWNLIGHT (ROUND, SQUARE) STRETCHING
PT-2
LR2
GL2
2X2 TROFFER FIXTURE
Q.1
E18 8'-0"
RB-1 RF-1
LR3
LR4
LR11
FN14
PT-2
8' - 0"AFF
LR11
LR3
4 LR2 ETR
c:\temp\156009_034_FRB FITNESS_V16_JW_gayoen.you@perkinswill.com.rvt
LP2
TYP. 8 A51-01
GWB1
Q.7
12/19/2017 10:19:28 AM
LR3
ACT-1 $ 10' - 0"AFF
EQ
LR5
LR3
$
C
8' - 0"AFF
LR5
LR3 LR9 CURVED SLOT
A50-01
P
E17 LP1 AND LP2 MOUNTED AT 12'-6" AFF TO BOTTOM OF FIXTURE
LR3
LR9 SLOT
7
PT-1
TYP. 8 A51-01
LR3
LR3 LR3
LR3
Y
PT-2
CEILING HEIGHT
LP2 MOUNTED AT 11'-0" AFF TO BOTTOM OF FIXTURE GWB1
SPIN STUDIO B119 PT-4 RB-4 RF-1
FN14
CPT-1
LR5
STORAGE B122 PT-1 RB-1B RF-2
FT-1
$
GWB1 8' - 0"AFF
LR5
LR5
E17
LP7
LR3
O LP1
LP6
CPT-1
EQ
10' - 0"AFF
LP7
E18
LP3 WALL MOUNTED FAN LR5
GWB1
RAISED PLATFORM SEE DETAIL
PT-6/PT-1
1t 1' - 0"AFF
FT-1
GWB1 10' - 0"AFF
SP-2
O
LIN E
0"
ACT-3 11' - 0"AFF
3' -
ETR
E18
LR5
295 Huntington Ave, Suite 305 Boston, MA 02210 (617) 267 9500 GL1
GL-1
MULTIPURPOSE STUDIO B121 PT-1 RB-1B CEILING MATERIAL RF-2
EQ
8' - 0"
LR8
LP4
OF WO RK
EMERGENCY STROBE
ES
M LIM IT
LR1 (24')
LR8
E17
LP4
EXIT SIGN
LP7 LIGHTING BELOW SPIN INSTRUCTORS PLATFORM
S LR5
10' - 1"AFF
CUSTOM METAL SCREEN, SEE ELEVATIONS
MT-1
LR5
LR8 ACT-1
LP4
EQ
8' - 0"
LR8
RCP14
LIM IT LIGHTING DESIGNERS FW SLADEN FEINSTEIN O INTEGRATED OR K LI INC. LIGHTING, NE
CEILING MOUNTED PROJECTOR
CEILING MOUNTED PROJECTOR, REFER TO AV DWGS. COORDINATE LOCATION IN FIELD WITH ARCHITECT
E18
1' - 2"
8' - 0"
2 A43-03
LP4
LP4 NOTE: EXPOSED CEILING IN MULTIPURPOSE STUDIO AREA TO BE PAINTED SP-2
WALL MOUNTED CAMERA
L
LR5
S
E17 LP4
WALL MOUNTED PROJECTOR SCREEN. REFER TO AV DWGS.
M
10' - 0"AFF
9' - 0"
EQ
CEILING MOUNTED PROJECTOR, REFER TO AV DWGS. COORDINATE LOCATION IN FIELD WITH ARCHITECT
J
D
GL-1
E17
LP4
EQ
SUPPLY DIFFUSER
LINEAR DIFFUSER
D
LP7
33
225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 www.perkinswill.com
2'X2' ACOUSTICAL CEILING GRID AND TILE
D
D41
ALIGN 100
A41
A43
B123B B104
WATER
D22
5/8" GWB ON 7/8" HAT CHANNEL
D22 A81
D42
X
BE112 BE104
E02
BE100B
A82
P15
E08
CORR
B123
D42
MAINT. CLOSET B109 A42
A82
E04
LINEN ROOM
Y
c:\temp\156009_034_FRB FITNESS_V16_JW_gayoen.you@perkinswill.com.rvt
LOC ATI AFT ON OF ELE ER FINAL CTR EQU ICAL IN IPM ENT FLOOR LAY OUT RACEW IS ISS AY TBD UED
A45-01
STRETCHING 10
P19 E05/E06
B114 E04
E02
HOUSEKEEPING HOUSEKEEPING
D42
A82 D22
A82
A82
E09 E08
FAN
D22
A82
D42
FEC
P10
B123A
2' - 0"
A82
B106 A42
B111
X E02
WOMEN'S LOCKER
A42
TBD
B111
D11
A81 D42
B108
B113
A45-01
ELEC.
ELEC
A82
SHOWERSD42
D22
CARDIO
B108 P24
A82
3 A43-03
E08
B109
SHOWERS
B
E08
E11
MAINT. CLOSET
P27
P28
P29 TYP.
D42
30 "R
Sim
1 A43-01
P25
E21
P29 TYP.
B114
B1 FITNESS CENTER RENOVATION
600 Atlantic Ave Boston, MA 02110
N41
E08
P20
TOILETS
B
BUILD WALL AS TIGHT TO COLUMN AS POSSIBLE
W
P32
B107A
B107C
N41
E08 P21
B107B
E08
P24
W
V
E08
P23
P19
STRENGTH
PT1
P24
U STRENGTH
RECEPTION P30
6 A43-03
B116 7
A45-01
D11
GL1
E08
B105A
V
B116B
P11
P32
E04
B103
B105
A45-01
2' - 6"
P27
MEN'S LOCKER
T
A45-01
B116
TOILETS
S
P19
9 11
AV CLOSET
E04
U B105B
E07
BE102
P24
ALIGN
B104
3' - 0"
SHOWERS
P29 TYP.
P20
B117
5 1/2"
Sim
E08
E08
B117
c:\temp\156009_034_FRB FITNESS_V16_JW_gayoen.you@perkinswill.com.rvt
P28
1 A43-02
CONSULT
BE102 E22 UNDER COUNTER
R1 E09
P35
P24
T
E08
E08
BE101
1
+- 2' - 6"
B101
2
A45-01
P29 TYP.
B115
9' - 10 1/2"
P21
P15
S
1' - 2"
P15
BE101A
R1
UP UP
FUNCTIONAL TRAINING
- 4 1/4"
3
1' - 6"
E08
E01
+4' - 11"
E01
00"
24'
B115
HOLD
BE101B
90° 00'
D11
25' - 4"
B120
D11
FEC
FEC
P18
Q.1
P31
FUNCTIONAL TRAINING E08
E04
3' - 0" MIN
B119
B118
STORAGE B118
BE100
C
3 E19
5
H61
B119
- 0"
P35 P27
A45-02 E21
P14
B120
A45-02
E08
E29
A45-02
P13 E10
STRETCHING 6 E08
CORR
P
1 2
4
Q.1
SPIN STUDIO
1'
E08
B121A
10' - 9"
SOFFIT ABOVE
P35
C81
GC IS RESPONSIBLE FOR PROVIDING BLOCKING AS REQUIRED FOR WALL MOUNTED BUILD WALL AS TIGHT D22ACCESSORIES, TVS, WALLBOARDS AND HOOKS (ITEMS MAY BE IN EITHER GC OR MILLWORK, D42 TO COLUMN AS POSSIBLE OWNER SCOPE. GC TO OWN BLOCKING INSTALLATION) REFER TO PLAN AND ELEVATIONS FOR LOCATIONS D22 D42 P07 PROVIDE 3M SCOTCHCAL FROSTED CRYSTAL CUSTOM DESIGNED DECORATIVE FILM SOLID D12 BAND AND MOTIF AT INTERIOR GLASS FRONTS WHERE NOTED. ALL WINDOW FILM TO BE A81 ROB FISHER 781-233-3647. GC TO PROVIDE D11 PROVIDED BY SONNYS GLASS TINTING, CONTACT A41 D22 D42 PROPOSE LAYOUT FOR APPROVED BY BANK AND ARCHITECT. 7' - 6" P08 ALL POWER/TEL/COMM NEW DEVICES SHALL BE PROVIDED AND INSTALLED BY GC. MATCH D42 BUILGING STANDARDS FOR DESIGN/MATERIALS. RENEW LOCATION IN FIELD ARCHITECT A81 RADIUS OF WALL TO BEWITH LAYED MORE FOR APPROVAL BEFORE RUNNING WIRING. REFER TO ENGINEERS DRAWINGSINFOR OUT WITH ARCHITECT FIELD D42 INFORMATION. A81 6' D41 0" A81 NEW WALL P09 GC IS RESPONSIBLE FOR RELOCATINGSTRETCHING EXISTING OR PROVIDING D82 AND INSTALLING D42 SWITCHES/TERMOSTATS OR OTHER DEVICESB120 IN ORDER TOACCOMODATE NEW D82 D82 LAYOUT. +4' - 6" 6' - 2" PATCH AND REPAIR WALLS AS NEEDED. GC IS RESPONSIBLE FOR VERIFYING EXISTING STORAGE D41 6' - 8" D82 A82 CONDITIONS AND QUANTITIES IN FIELD. D82 B118 D21 D42 P10 PROVIDE FR PLYWOODBACKER PANEL, FULL HEIGHT AT ELECTRICAL CLOSET WALLS. D21 D22 D22 A81 2' - 5" SEE DETAILS. P11 LCD BY GC, SEE AV SCOPE. GC TO PROVIDE BLOCKING AND METAL SURROUND. A41 A81 D22 CD22 ALIGN P13 PROVIDE NEW PLUMBED BOTTLE FILLER. SEE PLUMBING A81 DRAWINGS. 5' - 6" P14 VENDING MACHINE BY OWNER D81 D12 P15 FURRED OUT WALL ON CMU EXISTING WALL UP D22 UP D22 A81 DOORS P16 CMU INFILL ATD12 DEMOLISHED D82 ALIGN CORRIDOR A81ONE SIDED WALL CONSTRUCTION P17 BUILT UP TO HOLD LCD SCREEN. APPLIED CUSTOM METAL D22 STAIR B101 PANEL AND INSET LED TAPE LIGHT. SEE MILLWORK DETAILS. D22 BE101 D22 2' - 2" D22 D22 P18 CUSTOM METAL BARRE,N41 SEE SPECIFICATIONS P19 WRAP EXISTING COLUMN WITH FULL HEIGHT SINGLE SIDED GWB AND HIGH HAT CHANNEL D81 P20 WRAP COLUMN FACE WITH MIRROR. D22 D22 A31 D42 P21 PROVIDE LEVEL 5 FINISH AND PREP FOR CUSTOM WALL GRAPHICS. SEE FINISH PLAN AND 6' - 0" D22 D82 ELEVATIONSD22 FOR CUSTOM GRAPHICS. GRAPHICS IN SCOPE OF GC. D42 D22 D42 A82 A42 P22 CUSTOM MILLWORK RECEPTION DESK -SEE DETAILSD22 PROJECT ELEC D22 P23 OPTICAL TURNSTILE, FURNISH AND INSTALL IN GC SCOPE. SEE SPECIFICATIONS. CONSULT BE102 A42 P24 LOCKERS FURNISH AND INSTALL BY GC, SEE SPECIFICATIONS A42 B117 A81 SHOWERS D42 LOCKERS FURNISH AND INSTALL BY GC, SEE SPECIFICATIONS. THIS AREA HAS A MILLWORK P25 D22 D22 D22 B104 A42 ENCLOSURE AT THE LOCKERS. SEE ELEVATIONS. D42 14' - 1" D22 D22 WITH CUSTOM METAL PROTECTION P26 HALF ROUND WOOD PLATFORM FOR INSTRUCTOR, 8" HIGH A82 EDGE WITH RUBBER FLOORING. SEE DETAILS. 30 D22 OFFICE D42 D42 "R P27 CUSTOM CURVED WALL LEVEL 5 FINISH. B116 P28 TYPICAL WALL SCOPE IN SHOWER AREA: MOISTURE RESISTANT CEMENTITIOUS TILE BACKER, D41 A81 A81 SHOWER 6" ABOVE CEILING. FULL HEIGHT TILE ALL WALLS, TILE ON UNDERSIDE OF THEA82 A82 FLOOR TO BE BUILT UP TO DRAIN, HALF CEILINGS. ALL GROUT TO BE EPOXY GROUT. SHOWER TOILETS AND MOSAIC TILE AT SHOWER. CUSTOM INSET TILE NICHE RECEPTION A41 D42 MEN'S LOCKER HOLLYWOOD D42 MARBLE THRESHOLD ALIGN D42 A42 PER SHOWER FOR TOILETRIES. SEE ELEVATIONS AND DETAIL PLANS OF THIS AREA. 3" B105 B110 B103 A82 CORE FOR PLUMBING OR ELECTRICAL WORK. AT EACH P29 NEW 4" DIAMETER STRUCTURAL CORE, ENTRY A42 A82 A82 GC TO OWN GROUND PENETRATINGD22 RADAR FOR TOP REBAR AT DROP PANELS AND BOTTOM A42 B102 REBAR. A81 REBAR IN BETWEEN TO LOCATION PENETRATIONS TO AVOID INTERRUPTING A42 P30 EXISTING STRUCTURAL CORE TO BE REUSED FOR PLUMBING PIPING. A42 D41 P31 PROVIDE CUSTOM FULL HEIGHT BLOCKING IN WALL FOR MOUNTING TRX ALIGN EQUIPMENT ANDD12 D42 PUNCHING BAGS. FULL LENGTH OF WALL, FACE WALL IN PLYWOOD BEHING GWB FINISH. GWB FINISH IN THIS AREA TO BE HIGH IMPACT RESISTANT. D22 D22 WOOD WALL FINISH. D22 WALL CONSTRUCTION AS NOTED, EXCEPT REPLACE GWB P32 SPECIALTY D11 FACE WITH 1/2" CONT. PLYWOOD. SEE DETAILS. A82 D42 P33 CUSTOM METALD22 PANEL, MOZ BRAND. SEE SPECIFICATIONS. D42 A42 D42 P34 PROVIDE NEW GWB SURROUND AT DOOR AS REQUIRED. MATCH EXISTING WALL TYPE. A31 A82 P35 PROVIDE NEW LGMF BRACING ABOVE DOOR AS REQUIRED. A31 KEYPLAN P36 D42 NEW OVERSIZED ACESS PANEL, 36"X96" WITH KD FRAME, WRAP ADJACENT DRYWALL BACK UP TOILETS D42 D42 D42 TO NEW KD FRAME. PROVIDE HW-4 HARWARE SET ON O.A.P. SPECIFICATION SIMILAR TO DOOR B107 A81 B123A. ALTERNATE SCOPE. SEE ALTERNATE LIST
E08
E26
E09
P05 P06
O
P19
P21
E08
FEC
E09
E05/06
P
E29
5' - 0"
B119
P33
P03 P04
RESEARCH LIBRARY 118
SPIN STUDIO
B122 P19
3'-0"
LIN E
P21
STORAGE
8' - 7 1/2"
O
P33
LIGHTING DESIGNERS
295 Huntington Ave, Suite 305 Boston, MA 02210 INSTRUCTOR (617) 267 9500 PLATFORM
4' - 11"
P19
B121
E28
M
-8
LIM IT O FW OR K
ALL EXISTING TO REMAIN WALLS AND DOORS IN SCOPE OF WORK SHALL BE PATCHED AND REPAIRED. GC TO PREPARE ALL SURFACES AND RECEIVE NEWTO FINISHES AS SCHEDULED BUILD D12 WALL AS TIGHT D12 U.O.N. ALL PARTITIONS SHALL BE TYPE A41. ALL COLUMN ASPARTITIONS POSSIBLE IN RESTROOMS, SHOWER ROOMS, TOILET ROOMS AND ANY PARTITION ADJUSTMENTS TO PLUMBING FIXTURES SHALL HAVE MOISTURE RESISTANT GREENBOARD IN THE SPECIFIED WALL TYPE. REFER TO SHEET D12 A82 A61-01 FOR PARTITION TYPESMULTIPURPOSE AND DETAILS. 4' - 4" MIN GC TO FURRD32 OUT WALLS AS REQUIRED TO ACCOMMODATE NEW LAYOUT STUDIO D12 GC IS RESPONSIBLE FOR PATCHING AND REPAIRING ANY HOLES AND OPENINGS LEFT OVER FROM DEMO WORK SUCH AS BUT NOTB121 LIMITED TO REMOVAL OF WALL PANELS, EMERGENCY TELEPHONES, SWITCHES, THERMOSTATS, HARDWARE, SPEAKERS, FIRE EXTINGUISHERS STORAGE CABINETS AND DRINKING FOUNTAINS. B122 REFER TO OWNERS RFP FOR INFORMATION ABOUT PROJECT ALTERNATIVES.
P02
FRB - FITNESS
P01
6"
MULTIPURPOSE STUDIO
118
LIM IT FW SLADEN FEINSTEIN O INTEGRATED OR K LI INC. LIGHTING, NE
A42
P26
M RESEARCH LIBRARY
D42
D11
PARTITION PLAN NOTES
L
1 A43-03
E08
9' -
P33 SOFFIT ABOVE
27 Wormwood St, Suite 200 Boston, MA 02210 (617) 250 4100
D42
6' - 10 3/4"
E28
L
D11
D11
3' - 2"
K
32'
P18
33
225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 www.perkinswill.com
EXISTING PARTITION TO REMAIN
101
GAYOEN YOU
26
24
WALL TILE
IMOLA CERAMICA
WALL TILE
WT-2
WALL TILE
STATEMENTS TILE
WOW SUBWAY LA
WOOD WOOD
WD-1 WD-2
WT-1
WOOD WALL PANEL VENEER WOOD PANEL
STILE
SMOKED 180, MED RIFT CUT, SLIPMA
KOSHI 366
EXERCISE ZONE The area is divided into two distinct zones: Weight Training and Cardio equipment. Cardio area includes 32% expansion of equipment and replacement of outdated equipment, entertainment wall with multiple screens showing cable TV with self audio capabilities. Safety improved by less overcrowding, increased occupancy and ability to move safely.
GAYOEN YOU FRB - FITNESS
STRENGTH & CARDIO AREA [Photography]
SPIN STUDIO [Photography]
SPIN STUDIO [Photography]
FRB - FITNESS
A dedicated spin studio is designed with high energy. The instructor bike is located on a raised platform. Room layout allows participants to focus on the instructor, improving instruction quality and reducing injury risk. A personal storage area within the room and bench are provided for changing shoes. Multiple scenes, options for the color change, and dimming lights add even more energy to the dynamic environment.
GAYOEN YOU
COLOR CHANGING LIGHT
CLEAN MODERN LOCKER ROOM New modern appearance with light wood lockers not only improved flow but also the privacy. Enlarged room provides day use lockers and monthly rentable lockers. Restrooms have more showers with private charging areas, glass shower doors, tile walls, and floors. Clean and dirty towel areas are added to add convenience.
WOMEN’S LOCKER [PHOTOGRAPHY]
GAYOEN YOU FRB - FITNESS
05 THE PLACE
(2016)
TYPE RESTAURANT DESIGN SIZE 15,000 SF SITE
SAN FRANCISCO, CA
NOTES
UNIVERSITY OF WISCONSIN - MADISON
HOST STAND [Revit]
BREEZE Place is a Modern California Cuisine specialized in wine pairing. As it is located in downtown San Francisco, the owner strived to make a strong connection to the Bay Area. The color gold was selected for San Francisco’s history of the gold rush. Floor plan and many design elements were inspired by wave motif to bring the ambiance of the bay area.
KITCHEN
FLOOR PLAN [Revit]
1
Floor Plan 1/16" = 1'-0"
GAYOEN YOU THE PLACE
REFLECTED CEILING PLAN [Revit]
CURVE From the two-dimensional floor pattern to bar and seating, curved shapes continue throughout the space. It not only reflects the shape of the wave in the Bay Area but also helps the luxurious fine dining restaurant with relaxed ambiance.
GAYOEN YOU THE PLACE
INDOOR BAR [Revit]
MAIN DINING AREA [Revit]
MAIN DINING AREA Dropped ceilings frame the mural and set the main dining area as a stage.
GAYOEN YOU THE PLACE
DINNING AREA [Revit]
SECTION VIEW OF THE WALL TO OUTDOOR SPACE [Revit]
2. Window 1/4" = 1'-0"
12/9/2016 1:20:32 AM
3
OUTDOOR LOUNGE [Revit]
CALIFORNIA ARCHITECTURE Another way of bringing California into the space is by incorporating characteristics of California’s architecture. California’s architecture puts a huge emphasis on the connection of indoor and outdoor space. By extending the ceiling plane out to the outdoor area, it successfully ties the spaces as a whole.
GAYOEN YOU THE PLACE
OUTDOOR BAR [Revit]
WINE GLASS MOSAIC Lights are inserted in wine bottles and placed as a mosaic in a shape of a wave, which reemphasizes the connection to the Bay Area.
06 LINE (2016) GRID MANIPULATION NOTES
PROJECT DONE FROM
SOUTHERN CALIFORNIA INSTITUTE OF ARCHITECTURE
FOLDED GRID The Grid is an organizing and measuring device, but it can be a problem of literal flatness. Working through the manipulation and photography of orthogonal grids on folded surfaces, they were translated into physical structures with materials properties.
You_G_1
A.
GRID
B.
FOLDED GRID
2D PROJECTION
You_G_3
You_G_2
C.
Three different grids A, B, and C were created. They were folded to provide geometry and depth. Then, it was photographed to transfer as a two-dimensional surface. The photos were translated into the three-dimensional surface with wooden sticks and wire.
A.
B.
C.
PROJECTED GRID [Museum Board]
As they are photographed in with shadows, 2D projections were transformed into three-dimensional surfaces. The photos are traced and turned into to another two-dimensional object projected grid.
GAYOEN YOU LINE | GRID | MANIPULATION
FINAL PRODUCT [Museum Board]
Then, structures of those objects are studied by folding and placing in an environment with shadow. Finally, three projected grids were combined to form a single object.
07 SURFACE TEXTURE SHADE NOTES
(2016)
PROJECT DONE FROM
SOUTHERN CALIFORNIA INSTITUTE OF ARCHITECTURE
PLEATS [16 x 24” Museum Board]
This project examined the line, its segment and length, as it relates to surface, texture, and depth. First, it was started with the single articulation of line. Museum boards were folded into peaks and valleys, which act as grids in a third dimension. Then, through the alignments, overlaps, and slippages, different patterns were produced. By examining the tone and texture, spatial ambiguities were studied.
A.
B.
C.
PATTERNS [Photoshop]
FINAL PRODUCT [16 x 24” Museum Board]
Through the interpretation of the composite images of pleated surfaced, half-toned drawings were created. In the science of lights, white is a mix of various colors. By using “bitmap” in Photoshop, RGB colors were offset. Bitmap implies one bit per pixel.
GAYOEN YOU SURFACE | TEXTURE | SHADE
FINAL PRODUCT TEXTURE [Photoshop]