GAYOEN YOU PERKINS & WILL - BOSTON (2017 - PRESENT) UNIVERSITY OF WISCONSIN - MADISON INTERIOR ARCHITECTURE (2012 - 2016) SOUTHERN CALIFORNIA INSTITUTE OF ARCHITECTURE (2016)
TABLE OF CONTENTS
01 GOOGLE 8CC Workplace Perkins&Will
You_G_3
05 01 THE PLACE GOOGLE 8CC Restaurant Workplace UW-Madison Perkins&Will
02 BLUEROCK Workplace & Lab Perkins&Will
06 02 LINE | GRID | MANIPULATION BLUEROCK Making + Meaning Workplace & Lab Sci-Arc Perkins&Will
03 FRB BOSTON Seminar Room Perkins&Will
07 03 SURFACE | TEXTURE | SHADE FRB BOSTON MakingCenter + Meaning Fitness Sci-Arc Perkins&Will
04 FRB BOSTON Fitness Center Perkins&Will
You_G_3
04 THE PLACE Restaurant UW-Madison
05 LINE | GRID | MANIPULATION Making + Meaning Sci-Arc
01 GOOGLE 8CC (2019 - 2021) TYPE
WORKPLACE RENOVATION
SIZE
152,000 SF
SITE
CAMBRIDGE, MA
PHASE
Pre-Design ~ CA
NOTES
LEED GOLD; 9 floors with 9 distinctive designs
8CC-1 RECEPTION LOBBY [Photography]
MOVEMENT A JOURNEY TO 9 DIFFERENT SPACES
8CC is inspired by the movement of people and culture in Cambridge. It’s not your typical touristy Cambridge but instead, what is thriving below the surface of Cambridge. Each floor represents a different neighborhood and sub culture. We adventure out into the neighborhoods to discover hidden gems and unexpected destinations.
TWO TYPICAL FLOOR PLANS // FLOW & DISPERSE There are two different types of floor plans to reflect characteristics of each floor’s subculture theme
DISPERSE plan is the reminiscence of the crowd’s movement towards a commercial area and disperse back home afterward.
FLOW plan reminds the pull of the current and the natural movements of the water. The organic shape guides users through a pathway of discovery.
THE JOURNEY THROUGH CAMBRIDGE Starting from the Charles River. Each floor represent (9) popular neighborhoods in Cambridge.
LEVEL 9 - FLOW - STRAWBERRY HILL (WELLNESS) LEVEL 8 - FLOW - NORTH CAMBRIDGE (HOME) LEVEL 7 - DISPERSE - AGASSIZ (PERFORMANCE ART) LEVEL 6 - DISPERSE - MID CAMBRIDGE (HISTORY) LEVEL 5 - DISPERSE - CAMBRIDGEPORT (HUB) LEVEL 4 - DISPERSE - THE PORT (SCIENCE & TECH) LEVEL 3 - FLOW - EAST CAMBRIDGE (LIFESTYLE) LEVEL 1 - FLOW - CHARLES RIVER (LIFESTYLE)
8CC-1 CHARLES RIVER // LIFESTYLE The 1st floor is inspired by the curves and movement of the Charles River. It is the starting point of our journey North through Cambridge and is planned with the “Flow” space planning concept. The curves help guide the users and visitors into the space and up the stairs or to the elevators to begin their journey.
8CC-1 LOBBY [Photography]
IMPACT RESISTANT GWB CLADDING LEVEL 5 FINISH
3'-6"
IMPACT RESISTANT GWB CLADDING LEVEL 5 FINISH
EXISTING STEEL SUPPORT
3'-0"
EXISTING STEEL SUPPORT STRUCTURE TO REMAIN
REMOVE EXISTING CAULK, POWER CLEAN TREAD AND INSTALL NEW CAULK AT DISSIMILAR MATERIAL JOINTS
GAYOEN YOU
REMOVE EXISTING CAULK, INSTALL NEW CAULK AT DIS
METAL TRIM ANGLE
METAL TRIM ANGLE
EXISTING TREAD AND RISER, POWER CLEAN
EXISTING TREAD AND RISER
INSTALL BLACK FINISH SHEET METAL AT BACKSIDE OF EXISTING RISER TO SEAL WD CAP, PTD PT1A SOLID HOLES PRIOR TO GWB CEILING INSTALL, TYP ALL RISERS
1/4"
REVEAL
INSTALL BLACK FINISH SHE HOLES PRIOR TO GWB CEIL
REVEAL EXISTING STRINGER, PTD PT1B
EXISTING STRINGER, PTD P
1/4"
1"
1"
SOLID WD CAP, PTD PT1A
BLOCKING AS REQUIRED
BLOCKING AS REQUIRED
GOOGLE 8CC
0' - 1 1/2" TYP.
1 1/2" SOLID WHITE OAK WD HANDRAIL
1 1/2" SOLID WHITE OAK WD HANDRAIL PTD STL HAND RAIL SUPPORT
PTD STL HAND RAIL SUPPORT NEW BLOCKING FROM STRINGER TO STRINGER
PLYWOOD SUBSTRATE THICKNESS: AS REQUIRED
PLYWOOD SUBSTRATE THICKNESS: AS REQUIRED GWB FINISH AT UNDERSIDE
IMPACT RESISTANT GWB CLADDING LEVEL 5 FINISH
IMPACT RESISTANT GWB CLADDING LEVEL 5 FINISH
NEW BLOCKING FROM CARY GWB FINISH TO STRINGER TO STRINGER CAFE LEVEL, REFER TO LEVE 2 DWGS
LEVEL 02 15' - 0"
GWB FINISH AT UNDERSIDE
3'-6"
REFER TO STRUCTURAL DWGS FOR SLAB EDGE CONDITION
EXISTING STEEL SUPPORT STRUCTURE TO REMAIN
3'-0"
EXISTING STEEL SUPPORT STRUCTURE TO REMAIN
REMOVE EXISTING CAULK, POWER CLEAN TREAD AND INSTALL NEW CAULK AT DISSIMILAR MATERIAL JOINTS
REMOVE EXISTING CAULK, POWER CLEAN TREAD AND INSTALL NEW CAULK AT DISSIMILAR MATERIAL JOINTS
METAL TRIM ANGLE
METAL TRIM ANGLE
EXISTING TREAD AND RISER, POWER CLEAN
4'-0"
LOBBY STAIR SECTION
5
1 1/2" = 1'-0"
EXISTING TREAD AND RISER, POWER CLEAN
K FINISH SHEET METAL AT BACKSIDE OF EXISTING RISER TO SEAL HOLES PRIOR TO GWB CEILING INSTALL, TYP ALL RISERS
INSTALL BLACK FINISH SHEET METAL AT BACKSIDE OF EXISTING RISER TO SEAL HOLES PRIOR TO GWB CEILING INSTALL, TYP ALL RISERS 5/8" GWB
EXISTING STRINGER, PTD PT1B
EXISTING STRINGER, PTD PT1B
BLOCKING AS REQUIRED
BLOCKING AS REQUIRED
NEW BLOCKING FROM STRINGER TO STRINGER
NEW BLOCKING FROM STRINGER TO STRINGER
MTL C STUDS
HANGER ROD
BLOCKING, AS REQUIRED
ACT-3
GWB FINISH AT UNDERSIDE
MIN. 18"H
GWB FINISH AT UNDERSIDE
CLEAR ANODIZED ALUMINUM TOP CHANNEL, BURRIED IN DRYWALL HEADER
REVEAL TRIM
1/2" THK. TEMPERED GLASS DR
5/8" GWB
8CC-1 LOBBY [Rendering]
LOBBY STAIR SECTION
CEILING DETAIL AT LOBBY AT OPEN S
4
1 1/2" = 1'-0"
1 1/2" = 1'-0"
FLOOR OPENING, GWB FASCIA WALL PTD CEILING WHITE
COORDINATE WITH ARCHITECT PRIOR TO INSTALL
0' -
SEE RCP FOR LIGHTING DESIGN IN GWB CEILING
LT39
9"
9"
GLASS DRAFT STOPS
2' -
5
0' - 2 3/8"
WHITE OAK WOOD HANDRAILS GWB OUTSIDE, PT1A FINISH
1' - 2"
0' - 4"
8' -
GWB INTERIOR, PT1B FINISH
LT39
0"
3
1/4" = 1'-0"
9" 1' - 0 "
6" 4' -
6" 1' -
0"
LT77
EQ
TY P.
LEVEL 01 STAIR LT77 ELEVATIONLEVEL 01 STAIR ELEVATION - WEST WEST
2
1/4" = 1'-0"
LT77
1' - 3 "
2' 7"
LT77
3' - 5" LT81
LT39
11 "
EQ
4' -
10 " EQ
ETR EXTERIOR CURTAINWALL
LT77
8'
EX METAL SUPPORT PTD PT1A
4' -
4' -
ROCK GARDEN, 12" H METAL GARDEN BED, CONTAINING ROCKS AND POTTED PLANTS
LT77
3'
-8 "
EQ LT39
EQ
2' -
10 "
not to scale NOTES: 1. CENTER STARS ALONG STAIR RUN 2. LT7A (18) TO BE RANDOMLY PLACED WITHIN THE REFERENCE AREA
6"
LT77
2' -
THE HIDDEN GEM UNDER THE STAIR // LIBRA Lights are placed under the stair to LEVEL 01 - DIMENSIONED RCP STAIR STAR LIGHTS Google’s birth constellation. 2represent 3/4" = 1'-0"
3 2
LEVEL 01 - DIMENSIONED RCP @ LOBBY 1/4" = 1'-0"
2.18
3
3' - 9
3.9
LT
LT77
0"
4' -
+/-
5' -
LT81
+/1
0"
GWB ENCLOSURE, PTD PT1A
LT72A (18)
LT81
3' -
BEYOND, SOLID WHITE OAK WD HANDRAIL, LT77TO METAL TURNDOWN FLOOR AT BOTH LEVEL ENDS OF RAILING
LT81
0"
0"
LT77
LT77 TURNSTILE
EQ
1' -
C B.95
LT39 LT81
LT81
2' 1' -
MAX GAP 6"
FIRST RISER TO MATCH EXISTING PERF METAL W/ BLACK METAL BACKPLATE
LEVEL 01 STAIR ELEVATION - NORTH
6"
LT77
6"
3' 15
4' -
"
6" 1' -
CANE DETECTION
9"
3' 6"
1 1/2 1' - 1
5' -
71 /2"
1/2"
" 1' - 2
LT81
LT39
WHITE OAK WOOD 1' - 6" HANDRAILS
LT72 (7)
6' -
1/2" GLASS DRAFT STOP
LT39
TURNSTILE
2' -
6"
LT39
LT39
GWB INTERIOR, PT1B FINISH
HANDRAILS
HANGING ARTWORK
LT81
3' -
1' - 8
1' - 11"
LT39
LT39
1/4" = 1'-0"
not to scale
GLASS DRAFT STOPS
GWB OUTSIDE, PT1A FINISH
7' 6"
3
LT39
3' -
LEVEL 01 STAIR ELEVATION - NORTH LEVEL 01 STAIR ELEVATION - NORTH
FLOOR OPENING, GWB FASCIA WALL PTD CEILING WHITE
SEE RCP FOR LIGHTING DESIGN IN GWB CEILING
CANE DETECTION
6"
1/2"
7/22/2020 11:11:29 PM
TURNSTILE
FIRST RISER TO MATCH EXISTING PERF METAL W/ BLACK METAL BACKPLATE
81 /2"
1' - 6
0' - 10"
HANDRAILS
0' -
1/2"
1' - 7"
BIM 360://Google - CAM 8CC/ARCH_Google CAM_ 8CC.rvt
0' - 8
0' - 5"
LT39
4
8CC-5 CAMBRIDGEPORT // HUB The 5th floor represents the Cambridgeport neighborhood, home of Central Square and Cambridge city hall. Perfectly positioned in the center of the building, 8CC-5 offers a space for everyone. Its colorful inclusive spirit makes everyone feel welcome and energized. This is a community floor designed with bold colors and a lot of heart. The micro kitchen is designed like a small Cambridge record shop. Explore this floor for a massage room, a community room and a public book share.
GAYOEN YOU GOOGLE 8CC
8CC-5 MICRO-KITCHEN [Photography]
8CC-5 ELEVATOR LOBBY [Photography]
2" 1"
PT6E
1/2"
LOBBY CUSTOM DESIGNED CEILING
0
GHD
An acrylic ceiling feature that was inspired by the famous central square graffiti wall
YAH MAP
TBD
E6-2A
RECESSED EVACUATION CHAIR, PAINT TO MATCH WALL
6TH FLOOR ELEV LOBBY DISPLAYS
14
1/4" = 1'-0"
GHD
4.18
5
4.18
5
GHD YAH MAP GHDF
GHDF 627
RECESSED EVACUATION CHAIR, PAINT TO MATCH WALL
DOORS AND FRAMES PT6
B.95
Y DISPLAYS
6TH FLOOR ELEVATOR LOBBY - WEST
EQ
LT33
1/4" = 1'-0"
12
5'-7"
13
5'-2"
B.95
EQ
6TH FLOOR ELEVATOR LOB 1/4" = 1'-0"
PT6A GHD
DEC38A
ELEVATOR LOBBY EQ
600 LT33
GHDF
GHDF
GHDF GF1
627
GHDF 600
GF1
LOBBY - WEST
5'-2"
12
4'-0"
5'-2"
4'-0"
EQ
DEC38B
DOORS AND FRAMES PT6
EXP1 DOORS AND FRAMES PT6 12' - 10"AFF LT33
3'-7"
6TH FLOOR ELEVATOR LOBBY - SOUTH
6TH FLOOR ELEVATOR LOBBY - EAST
11
1/4" = 1'-0"
10
1/4" = 1'-0"
6TH FLOOR ELEVATOR 1/4" = 1'-0"
7'-3"
DEC38C
HD
LT33 LT45s
EQ
B 2' - 10" GHDF
7' - 0"
EQ
7' - 0"
6' - 6"
GHDF
EQ
PT5A
600
LT33
LT33
LT33
LT33
EQ
LT33
GHDF
GHDF 500B
DOORS AND FRAMES PT6
LOBBY - EAST
10
6TH FLOOR ELEVATOR LOBBY - NORTH
9
1/4" = 1'-0"
7
LEVEL 06 -ELEVATOR LOBBY ENLARGED RCP
8
1/4" = 1'-0"
LEVEL 06 - ENLARGE 1/4" = 1'-0"
5TH FLOOR ELEV LOBBY - SOUTH 1/4" = 1'-0"
4.18
5 GHD
4.18
PT5A TYP A4 A62-50
GHDF
GHD 500A
B.95
ACRYLIC CEILING AXON
LEVEL 05 - ENLARGED RCP @ ELEVATOR LOBBY
not to scale
not to scale
B.95 8
ELEVATOR LOBBY EQ
500
8' - 0"
EQ
DOORS1' AND - 9" FRAMES PT2
6
OUTH
1' - 9" AC1: STEEL ASYMMETRIC "PITCHED ROOF" FRAME SUSPENDED FROM DECK, WITH 1/4" = 1'-0" ACRYLIC PANELS BY ACRYLITE OR EQUAL FRAME IS WELDED ANGLE STEEL, RAW FINISH
5TH FLOOR ELEV. LOBBY - EAST
5
1/4" = 1'-0"
5TH FLR ELEV. LOBBY -
GHDF
GHDF
DOORS AND FRAMES PT2
AST
5
5THFLOOR FLR ELEV. LOBBY - NORTH 5TH ELEVATOR LOBBY - NORTH 1/4" = 1'-0"
not to scale
2/25/2020 4:47:59 PM
500A
LIGHTS ARE ABOVE "ROOF" CEILING. IDEA IS THAT LIGHT SHINES THROUGH COLORED ACRYLIC PANELS AND CASTS COLORFUL SHADOWS ON THE CONCRETE BELOW.
GHD
LOCAL PRECEDENT TO REFERENCE: GRAFFITI ALLEY, CAMBRIDGE
AC1 9' - 6"AFF LT45
LT45
26'-10"
GHD
C:\Temp\Google Cam_ 8CC_Level 2-9_R19_farrells.rvt
LT45s
E5-2A
7'-11"
LINEAR DIFFUSERS AND RETURNS TO BE PLACED ON SIDES
DOWN
DOORS AND FRAMES PT2
4
5TH FLOOR ELEV. LOBBY - WEST 5TH FLOOR ELEVATOR LOBBY - WEST
3
1/4" = 1'-0"
ELEVATION @ ELEVAT 1/4" = 1'-0"
not to scale
2' - 3"
B EXP-2 CUSTOM ACRYLIC CEILING DETAIL [CD] EQ
GHD
1' - 6"
0' - 5"
3' - 0"
GHD
2' - 6"
TYP
LT37
LT35
J LT38
EQ
J
LT35
YAH MAP E5-2A
6' - 6"
LT38
LT38
LT38
LT38
LT38
LT35
LT37
2' - 0"
8CC-9 STRAWBERRY HILL // WELLNESS The 9th floor is inspired by the Strawberry Hill neighborhood near Alewife and Fresh Pond. This landscape inspired floor feels healthy and fresh with a palette of wood, greens and natural materials. Full of biophilia, 8CC-9 really connects the user with nature and provides an exciting bright destination at the top of the building. Explore this floor for the game room, makerspace and a living room off the MK.
GAYOEN YOU GOOGLE 8CC
8CC-9 MICRO-KITCHEN [Photography]
8CC-9 FOCUS ROOM [Photography]
BUILT-IN PLANTERS
Biophilia is an important element of design in Google 8CC for Googler’s wellbeing. Not only movable planters but also builtin planters are placed throughout the spaces. Planters in Flow floors are built with gypsum wallboard when Disperse floors have millwork with wood appearance plastic laminates.
PROJECT
PROJECT
GOOGLE 8CC
PLANTER - TYPE D
not to scale
not to scale
GYP PLANTER
ISSUED FOR CONSTRUCTION
OCTOBER 25, 2019
not to scale
ISSUE CHART
ISSUED FOR CONSTRUCTION
KEYPLAN
KEYPLAN
BUILT-IN PLANTER DETAILS [CD] NO
ISSUE
ISSUE
Checker Approver
Approved NO
DATE
156154.000
Job Number Checked
DATE
TITLE
ARCHITECTURAL 156154.000 Checker Checked WOODWORK & Approver Approved DETAIL TITLE MILLWORK ARCHITECTURAL PLANTER WOODWORK & SHEET NUMBER DETAIL MILLWORK PLANTER Job Number
ISSUE CHART
PROJECT
GOOGLE CAM 8CC - F0ZF, FLOORS 1,3-9
OCTOBER 25, 2019
p\Google Cam_ 8CC_Level 2-9_R19_farrells.rvt
8CC_Level 2-9_R19_farrells.rvt
2019 12:23:53 PM
not to scale
not to scale
WOOD PLANTER
TABLE WITH BUILT-IN PLANTER
SHEET NUMBER
not to scale
M
TITLE
GOOGLE 8CC
GOOGLE 8CC
Checker Approver
ARCHITECTURAL WOODWORK & DETAIL MILLWORK PLANTER
MILLWORK SECTION @ MK BUILT-IN PLANTER
DATE
156154.000
A50-07 MILLWORK SECTION @ MILLWORK SECTION @
MILLWORK SECTION @ BAR
ISSUE
Checked Approved
NO
Job Number
PROJECT
GOOGLE CAM 8CC - F0ZF, FLOORS PROJECT 1,3-9 GOOGLE CAM 8CC - F0ZF, FLOORS 1,3-9
ISSUED FOR CONSTRUCTION
OCTOBER 25, 2019 ISSUE CHART
A50-06
A50-06
KEYPLAN
PLANTER - TYPE A
not to scale
A50-06
SHEET NUMBER
not to scale
SHEET NUMBER TITLE
SHEET NUMBER
GOOGLE 8CC
TITLE
TITLE SHEET NUMBER
A50-06
PLANTER - TYPE B
Checker Approver
ARCHIECTURAL 12/20/2019 DATE WOODWORK & 156154.000 DETAIL - GYP Checker Approver PLANTER
ARCHIECTURAL ARCHIECTURAL WOODWORK & WOODWORK & DETAIL - GYP DETAIL - GYP PLANTER PLANTER
12/20/2019 DATE
156154.000
12/20/2019 3 BULLETIN #02 ARCHIECTURAL DATENO ISSUE WOODWORK & 156154.000 Job Number DETAIL Checker Checked - GYP Approver Approved PLANTER
Checked Approved
Job Number
TITLE
3 BULLETIN #02 NO ISSUE
PLANTER - TYPE C
Job Number
GOOGLE CAM 8CC - F0ZF, FLOORS 1,3-9
3 BULLETIN #02 3 BULLETIN #02 12/20/2019 NO ISSUE NO ISSUE DATE Job Number 156154.000 Checked Checker Checked Approved Approver Approved
PROJECT
C:\Temp\Google Cam_ 8CC_Level 2-9_R19_davisj.rvt
12/20/2019 7:26:22 PM
C:\Temp\Google Cam_ 8CC_Level 2-9_R19_davisj.rvt
12/20/2019 7:26:22 PM
C:\Temp\Google Cam_ 8CC_Level 2-9_R19_davisj.rvt
12/20/2019 7:26:22 PM
ISSUE CHART
C:\Temp\Google Cam_ 8CC_Level 2-9_R19_davisj.rvt
12/20/2019 7:26:22 PM
ISSUE CHART
OCTOBER 25TH, 2019
ISSUE CHART
OCTOBER 25TH, 2019
OCTOBER 25TH, 2019
ISSUED FOR ISSUED FOR CONSTRUCTION CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUE CHART
OCTOBER 25TH, 2019
KEYPLAN
KEYPLAN
GOOGLE 8CC
KEYPLAN
not to scale
KEYPLAN
PLANTER - TYPE E
GOOGLE 8CC
GOOGLE 8CC
PROJECT
GOOGLE CAM 8CC GOOGLE CAM 8CC - F0ZF, FLOORS - F0ZF, FLOORS 1,3-9 1,3-9
PROJECT
GOOGLE CAM 8CC GOOGLE CAM 8CC - F0ZF, FLOORS - F0ZF, FLOORS 1,3-9 1,3-9
A50-07
SHEET NUMBER
GOOGLE 8CC
KEYPLAN
02 BLUEROCK - CORPORATE HEADQUARTER (2020 - 2022) TYPE
WORKPLACE & LABORATORY RENOVATION
SIZE
74,000 SF (20,000 SF WORKPLACE & 54,000 SF LAB)
SITE
CAMBRIDGE, MA
PHASE
Pre-Design ~ CD
NOTES
LEED GOLD
BRIDGE CONNECTOR TO LAB [In-House Rendering]
TRANSFORM CREATIVE COLLISIONS
BlueRock believes in making the impossible possible. The company is innovative and the science is cutting edge. The future of cell+gene science is who BlueRock is. “Transformation” takes the space we have and transforms it into a vibrant, smart, inspirational workplace. The materials are sleek, contemporary and yet, warm. Honoring BlueRock culture, brand and forward thinking approach and creating a space for science and innovation.
0
1/2"
1"
2"
OFFICE TOWER
AV
CP U
2"
2"
LAB TOWER
225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 www.perkinswill.com
CONSULTANTS
CONSULTANTS
2"
1/2" 0
1"
1/2" 0
1"
TRUE NO
225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 www.perkinswill.com
MEPFP
MEPFP
5802 Research Park Blvd. Madison, WI 53719 t 608.238.2616
5802 Research Park Blvd. Madison, WI 53719 t 608.238.2616
CODE CONSULTANTS
CODE CONSULTANTS
0
BIM 360://BlueRock Therapeutics - 238 Main Street/ARCH_238 MAIN_BLUEROCK.rvt
AEI
JENSEN HUGHES
JENSEN HUGHES
1661 Worcester Road, Suite 501 Framingham, MA 01701 t 508.620.8900
1661 Worcester Road, Suite 501 Framingham, MA 01701 t 508.620.8900
ACOUSTIC ENGINEERS
ACOUSTIC ENGINEERS
30 Moulton Street Cambridge, MA 02138 t 617.499.8000
30 Moulton Street Cambridge, MA 02138 t 617.499.8000
STRUCTURAL ENGINEERS
STRUCTURAL ENGINEERS
ACENTECH
90
90
.0 0°
.0 0°
1' - 6"
1' - 6"
AWP2, DIRECT GLUE 09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
AWP2, DIRECT GLUE 09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
?09 30 13.E2
?09 30 13.E2
08 71 00 00.XX DOOR HARDWARE
11
11
5.0
5.0
ACENTECH
McNAMARA SALVIA
McNAMARA SALVIA
101 Federal Street, Suite 1100 Boston, MA 021110 t 6177370040
101 Federal Street, Suite 1100 Boston, MA 021110 t 6177370040
LIGHTING
08 71 00 00.XX DOOR HARDWARE
08 0880 8000 00.C CLEAR GLAZING
08 0880 8000 00.C CLEAR GLAZING
0880 8000 00.F 08 GLAZING SEALANT, SILICONE
0880 8000 00.F 08 GLAZING SEALANT, SILICONE
LIGHTING
LAM PARTNERS
LAM PARTNERS
84 Sherman Street Cambridge, MA 02140 t 617-352-4502
84 Sherman Street Cambridge, MA 02140 t 617-352-4502
0°
0°
2/24/2021 9:51:51 AM
1/2"
1"
AEI
AUDIO VISUALS
AUDIO VISUALS
77 Accord Park Unit B10 Norwell, MA 02061 t 781-741-5959
77 Accord Park Unit B10 Norwell, MA 02061 t 781-741-5959
CONSULTANT ENGINEERS
CONSULTANT ENGINEERS
ACT
AWP2, DIRECT GLUE 09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
AWP2, DIRECT GLUE 09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
2' - 8"
2' - 8"
?09 30 13.E2
?09 30 13.E2
FULL BUILDING PLAN [Presentation Plan] 1' - 7
90 .0 0°. 08 08 81 81 13 13.A3 DECORATIVE GLAZING
08 08 81 81 13 13.A3 DECORATIVE GLAZING
SOFFIT ABOVE
SOFFIT ABOVE
1' - 7
3/4"
13
0.0
0°
3/4"
13
0.0
0°
?09 30 13.E2
90.0 0°.
90.0 0°.
?09 30 13.E2
AWP2, DIRECT GLUEWALL PANEL 09 72 72 20 20.A1 09 ACOUSTIC
07 0792 9200 00.A JOINT SEALANT
AWP2, DIRECT GLUEWALL PANEL 09 72 72 20 20.A1 09 ACOUSTIC
PROJECT
2"
07 0792 9200 00.A JOINT SEALANT
4"
4"
PROJECT90.0
BLUEROCK KENDALL SQ PROJECT PHASE I/II
PLAN DTL @ MEETING ROOM 3151 PLAN DTL @ MEETING ROOM 3151 ENTRY ENTRY B1 B1 1 1/2" = 1'-0" 1 1/2" = 1'-0"
BLUEROCK KENDALL SQ PROJECT PHASE I/II
0°.
08 08 81 81 13 13.A3 DECORATIVE GLAZING SOFFIT ABOVE
1/2"
1"
AHA ENGINEERS 700 Technology Square, Suite 402 Cambridge, MA 02139 t 781.402.6000
AWP2, DIRECT GLUE 09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
?09 30 13.E2
PLAN DTL @ MEETING ROOM 3151 PLAN DTL @ MEETING ROOM 3151 B2 B2 1 1/2" = 1'-0" 1 1/2" = 1'-0"
AHA ENGINEERS 700 Technology Square, Suite 402 Cambridge, MA 02139 t 781.402.6000
1' - 6"
.0 0°.
1' - 6"
90
ACT
0
07 0792 9200 00.A JOINT SEALANT
4"
B2
09 0929 2900 00.A INTERIOR GYPSUM BOARD PT2 FROM TOP OF SLAT TO BOTTOM OF DECK
09 0929 2900 00.A INTERIOR GYPSUM BOARD ON ALL SURFACES
09 0929 2900 00.A INTERIOR GYPSUM BOARD ON ALL SURFACES
PAINTED ALUM SHEET 4"X1/8"
PAINTED ALUM SHEET 4"X1/8"
MOUNT FIXTURE TO THE OUTER FACE OF LIP
MOUNT FIXTURE TO THE OUTER FACE OF LIP 10' - 0"
4"
4 1/2"
POCKET SCREW
09 72 72 20 20.A3 09 ECOUSTIC EDGING PROFILE 0.47"
09 72 72 20 20.A3 09 ECOUSTIC EDGING PROFILE 0.47"
09 0965 6513 13.A RESILIENT BASE AS SCHEDULED
09 0965 6513 13.A RESILIENT BASE AS SCHEDULED
9 1/2"
MIN
MIN
080880800000.J GLAZING CHANNEL
08 08 81 81 13 13.A3 DECORATIVE GLAZING
08 08 81 81 13 13.A3 DECORATIVE GLAZING
09 09 29 29 00 00.D1 PLASTIC CORNER BEAD 09 0929 2900 00.A INTERIOR GYPSUM BOARD
08 08 81 81 13 13.A3 DECORATIVE GLAZING
08 08 81 81 13 13.A3 DECORATIVE GLAZING
09 68 13 13.XX TILE CARPETING
08 0880 8000 00.H GLAZING SHOE
08 0880 8000 00.H GLAZING SHOE
POCKET SCREW
DISPLAY
.10 PAINTED 14 23.A1ACRYLIC LOGO (TO FOLLOW CLIENT BRAND AND SIGNAGE GUIDELINE), BY OTHERS
.10 PAINTED 14 23.A1ACRYLIC LOGO (TO FOLLOW CLIENT BRAND AND SIGNAGE GUIDELINE), BY OTHERS
05 05 50 50 00 00.A1 ALUMINUM ANGLE
POCKET SCREW
SECTION @ THE EGG SLATS
CONCRETE FLOOR
A2
ISSUE CHART
MOUNT FIXTURE TO THE OUTER FACE OF LIP
AWP2, DIRECT GLUE 09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
DISPLAY
POWDER COATED WHITE
1/2" 7 71/2"
1/2"
SEC. DTL MEETING RM 3151 GLASS SEC. DTL MEETING RM 3151 GLASS WALL TYP. WALL TYP. A2 1 1/2" = 1'-0" 1 1/2" = 1'-0"
POWDER COATED WHITE
A1
4"
.0 0°.
09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
4"
B1
SHEET NUMBER PLAN DTL @ MEETING ROOM 3151 09 68 13 13.XX TILE CARPETING ENTRY 1 1/2" = 1'-0" 08 0880 8000 00.H GLAZING SHOE
A44-02
POCKET SCREW
09 72 72 20 20.A3 09 ECOUSTIC EDGING PROFILE 0.47"
Checker
CONCRETE DECK
09 09 22 22 16 16.B1 STUD
CONCRETE COLUMN BEYOND
12 12 22 22 00 00.A2 RECESSED DRAPERY TRACK
9'-0"
6" 080880800000.J GLAZING CHANNEL
9'-6"
0°
Approver
TITLE
SHEET NUMBER
A44-02
CONCRETE FLOOR
SEC. DTL MEETING RM 3151 VIEW SLATS A3 1 1/2" = 1'-0"
MOUNT FIXTURE TO THE OUTER FACE OF LIP
09 54 13.A11 13 PERFORATED METAL CEILING EDGE TRIM, SAS TCA 0879
9 1/2" 13 MIN0.0
SEC. DTL MEETING RM 3151 GLASS WALL TYP. A2 1 1/2" = 1'-0"
ISLAND DETAILS [CD]
10' - 0"
3/4"
7 1/2"
09 0965 6513 13.A RESILIENT BASE AS SCHEDULED
not to scale
DATE
09 0929 2900 00.A INTERIOR GYPSUM BOARD ENLARGE ENLARGE 08 08 81 81 13 13.A3 DECORATIVE GLAZING DETAILS MEETING DETAILS MEETING ROOM 3151 ROOM 3151
09 0992 29 2900 00 00.A INTERIOR GYPSUM BOARD 07 07 92 00.A JOINT SEALANT
PAINTED ALUM SHEET 4"X1/8"
4 1/2"
Checked
Approver Approved POCKET SCREW 09 09 29 29 00 00.D1 PLASTIC CORNER BEAD
SEC. DTL@ FABRIC WRAPPED PANELS MEETING ROOM 3151 A4 3" = 1'-0"
ISSUE
Job Number
Checker
Checked Approved
09 0929 2900 00.A INTERIOR GYPSUM BOARD ON ALL SURFACES
4"
NO
TITLE
09 0929 2900 00.A INTERIOR GYPSUM BOARD PT2 FROM TOP OF SLAT TO BOTTOM OF DECK
1/2"
DATE
Job Number
08 08 81 81 13 13.A3 DECORATIVE GLAZING
09 22 22 16 16.B1 09 STUD
09 09 72 72 20 20.A3 ECOUSTIC EDGING PROFILE 0.47"
1' - 7
09 54 13.A10 13 PERFORATED METAL CEILING ISSUE
PLAN DETAIL @ THE EGG
not to scale
9'-6"
4 1/2"
NO
PLAN DTL @ MEETING ROOM 3151 AXON VIEW @ 238 MAIN LEVEL 03 AXON VIEW @ 238 MAIN B2 LEVEL 03 SOUTHEAST RECEPTION SOUTHEAST RECEPTION 1 1/2" = 1'-0" A1
SECTION @ TYP GLASS WALL
6"
09 54 13.A11 13 PERFORATED METAL CEILING EDGE TRIM, SAS TCA 0879
?0909 093072 7213.E2 20 20.A3 ECOUSTIC EDGING PROFILE 0.47"
05 05 50 50 00 00.A1 ALUMINUM ANGLE
7 1/2"
2' - 8"
10' - 0"
SOFFIT ABOVE
7 1/2" CONCRETE FLOOR
CONSTRUCTION DOCUMENTS
2021.03.12 09 0929 2900 00.A INTERIOR GYPSUM BOARD ON ALL SURFACES PAINTED ALUM SHEET 4"X1/8"
90
09 68 13 13.XX TILE CARPETING
TRUE NORTH 09 0929 2900 00.A INTERIOR GYPSUM BOARD PT2 FROM TOP OF SLAT TO BOTTOM OF DECK
2021.03.12
POCKET SCREW
09 09 29 29 00 00.D1 PLASTIC CORNER BEAD
09 22 22 16 16.B1 09 STUD
ISSUE CHART
9 1/2"
09 0929 2900 00.A INTERIOR GYPSUM BOARD
SEC. DTL MEETING RM 3151 VIEW SEC. DTL MEETING RM 3151 VIEW SEC. DTL@ FABRIC WRAPPED PANELS SEC. DTL@ FABRIC WRAPPED PANELS SLATS SLATS MEETING ROOM 3151 MEETING ROOM 3151 A4 A3 A3 3" = 1'-0" 3" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"
not to scale
080880800000.J GLAZING CHANNEL
BIM 360://BlueRock Therapeutics - 238 Main Street/ARCH_238 MAIN_BLUEROCK.rvt
09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
9'-6"
3/12/2021 1:46:40 PM
09 09 72 72 20 20.A1 ACOUSTIC WALL PANEL
.0 0°
CONSTRUCTION DOCUMENTS
4"
09 0929 2900 00.A INTERIOR GYPSUM BOARD
90
09 54 13.A10 13 PERFORATED METAL CEILING
4" 4"
09 0929 2900 00.A INTERIOR GYPSUM BOARD
9'-0"
6"
1/2" REVEAL
9'-6" 1/2"
09 54 13.A10 13 PERFORATED METAL CEILING
9'-0"
6" 09 54 13.A11 13 PERFORATED METAL CEILING EDGE TRIM, SAS TCA 0879
1/2" REVEAL
1/2" REVEAL
4 1/2"
12 12 22 22 00 00.A2 RECESSED DRAPERY TRACK
KEYPLAN
TRUE NORTH
4"
BIM 360://BlueRock Therapeutics - 238 Main Street/ARCH_238 MAIN_BLUEROCK.rvt
3/12/2021 1:46:40 PM
BIM 360://BlueRock Therapeutics - 238 Main Street/ARCH_238 MAIN_BLUEROCK.rvt
A4
4"
12 12 22 22 00 00.A2 RECESSED DRAPERY TRACK
KEYPLAN
1' - 6"
3/12/2021 1:46:40 PM
1/2" REVEAL
1/2"
CONCRETE COLUMN BEYOND
0°
09 09 72 72 20 20.A3 ECOUSTIC EDGING PROFILE 0.47"
09 09 22 22 16 16.B1 STUD
CONCRETE COLUMN BEYOND
238 Main Street Cambridge, MA 02142
5.0
09 09 72 72 20 20.A3 ECOUSTIC EDGING PROFILE 0.47"
09 09 22 22 16 16.B1 STUD
238 Main Street Cambridge, MA 02142
11
10' - 0" 09 54 13.A11 13 PERFORATED METAL CEILING EDGE TRIM, SAS TCA 0879
CONCRETE DECK
90.0 0°.
09 0929 2900 00.A INTERIOR GYPSUM BOARD PT2 FROM TOP OF SLAT TO BOTTOM OF DECK
CONCRETE DECK
4"
09 22 22 16 16.B1 09 STUD
BlueRock
1' - 6"
09 22 22 16 16.B1 09 STUD
PLAN DTL @ MEETING ROOM 3151 1 1/2" = 1'-0"
BlueRock
08 08 81 81 13 13.A3 DECORATIVE GLAZING
09 54 13.A10 13 PERFORATED METAL CEILING
9 1/2" MIN DISPLAY
AV
AV
AV AV
AV
CP U
CAFE LAYOUT [Presentation Plan]
CP U
ALL HANDS LAYOUT [Presentation Plan]
FLEXIBILITY The central Cafe located behind the reception desk is not only the central gathering space but also a large meeting area which can accommodate 92 people. Dropdown AV and stackable lightweight furniture enables the maximum flexibility.
F
“Creative Collisions”
PORTAL CONCEPT SKETCH
BLUEROCK
With the unexpectedly unique design, the arrival promotes creative collisions and an immersive experience for visitors. It also celebrates transparency and views into space with strong brand visibility from the first floor courtyard.
GAYOEN YOU
ARRIVAL // THE PORTAL
OFFICE TOWER RECEPTION [In-House Rendering]
BLUE CEILING The deck above the white metal ceiling is painted in BlueRock’s branding blue to provoke a continuous immersive experience from the arrival portal. With the white metal ceiling and lights placed above, the brand experience becomes less intensive to increase comfort within the space.
GAYOEN YOU BLUEROCK
OFFICE TOWER CAFE [In-House Rendering]
OFFICE TOWER PORTAL [In-House Rendering]
Reception
LAB TOWER PORTAL [In-House Rendering]
n
Elevators PORTAL RCP [Presentation RCP]
OFFICE TOWER [In-House Rendering]
OFFICE TOWER [In-House Rendering]
OFFICE TOWER MEETING ROOM SECTION [In-House Rendering]
LABORATORY [In-House Rendering]
LABORATORY CORRIDOR [In-House Rendering]
GAYOEN YOU BLUEROCK
LAB COLORED PORTALS Color-coded portals strengthen not only BlueRock’s branding and connection to the workspace but also wayfinding throughout the lab space.
04 THE PLACE
(2016)
TYPE RESTAURANT DESIGN SIZE 15,000 SF SITE
SAN FRANCISCO, CA
NOTES
UNIVERSITY OF WISCONSIN - MADISON
HOST STAND [Revit]
BREEZE Place is a Modern California Cuisine specialized in wine pairing. As it is located in downtown San Francisco, the owner strived to make a strong connection to the Bay Area. The color gold was selected for San Francisco’s history of the gold rush. Floor plan and many design elements were inspired by wave motif to bring the ambiance of the bay area.
KITCHEN
FLOOR PLAN [Revit]
1
Floor Plan 1/16" = 1'-0"
GAYOEN YOU THE PLACE
REFLECTED CEILING PLAN [Revit]
CURVE From the two-dimensional floor pattern to bar and seating, curved shapes continue throughout the space. It not only reflects the shape of the wave in the Bay Area but also helps the luxurious fine dining restaurant with relaxed ambiance.
GAYOEN YOU THE PLACE
INDOOR BAR [Revit]
MAIN DINING AREA [Revit]
MAIN DINING AREA Dropped ceilings frame the mural and set the main dining area as a stage.
GAYOEN YOU THE PLACE
DINNING AREA [Revit]
SECTION VIEW OF THE WALL TO OUTDOOR SPACE [Revit]
2. Window 1/4" = 1'-0"
12/9/2016 1:20:32 AM
3
OUTDOOR LOUNGE [Revit]
CALIFORNIA ARCHITECTURE Another way of bringing California into the space is by incorporating characteristics of California’s architecture. California’s architecture puts a huge emphasis on the connection of indoor and outdoor space. By extending the ceiling plane out to the outdoor area, it successfully ties the spaces as a whole.
GAYOEN YOU THE PLACE
OUTDOOR BAR [Revit]
WINE GLASS MOSAIC Lights are inserted in wine bottles and placed as a mosaic in a shape of a wave, which reemphasizes the connection to the Bay Area.
05 LINE (2016) GRID MANIPULATION NOTES
PROJECT DONE FROM
SOUTHERN CALIFORNIA INSTITUTE OF ARCHITECTURE
FOLDED GRID The Grid is an organizing and measuring device, but it can be a problem of literal flatness. Working through the manipulation and photography of orthogonal grids on folded surfaces, they were translated into physical structures with materials properties.
You_G_1
A.
GRID
B.
FOLDED GRID
2D PROJECTION
You_G_3
You_G_2
C.
Three different grids A, B, and C were created. They were folded to provide geometry and depth. Then, it was photographed to transfer as a two-dimensional surface. The photos were translated into the three-dimensional surface with wooden sticks and wire.
A.
B.
C.
PROJECTED GRID [Museum Board]
As they are photographed in with shadows, 2D projections were transformed into three-dimensional surfaces. The photos are traced and turned into to another two-dimensional object projected grid.
GAYOEN YOU LINE | GRID | MANIPULATION
FINAL PRODUCT [Museum Board]
Then, structures of those objects are studied by folding and placing in an environment with shadow. Finally, three projected grids were combined to form a single object.
06 SURFACE TEXTURE SHADE NOTES
(2016)
PROJECT DONE FROM
SOUTHERN CALIFORNIA INSTITUTE OF ARCHITECTURE
PLEATS [16 x 24” Museum Board]
This project examined the line, its segment and length, as it relates to surface, texture, and depth. First, it was started with the single articulation of line. Museum boards were folded into peaks and valleys, which act as grids in a third dimension. Then, through the alignments, overlaps, and slippages, different patterns were produced. By examining the tone and texture, spatial ambiguities were studied.
A.
B.
C.
PATTERNS [Photoshop]
FINAL PRODUCT [16 x 24” Museum Board]
Through the interpretation of the composite images of pleated surfaced, half-toned drawings were created. In the science of lights, white is a mix of various colors. By using “bitmap” in Photoshop, RGB colors were offset. Bitmap implies one bit per pixel.
GAYOEN YOU SURFACE | TEXTURE | SHADE
FINAL PRODUCT TEXTURE [Photoshop]