Energy and Mines Magazine - Issue 41

Page 22

8

Pilbara Energy (Generation) Pty Ltd [Subsidiary: Fortescue Future Industries] Uaroo Renewable Energy Hub Solar, wind, battery storage Announcement Date: February 15, 2022

P

ilbara Energy (Generation) Pty Ltd, a subsidiary of Fortescue Future Industries, plans to construct and operate the Uaroo Renewable Energy Hub, a renewable energy generation project in the Pilbara, to power the Fortescue Metals Group (FMG) mining operations. The project is located approximately 120 km south of Onslow and 170 km west of the FMG operated Eliwana Mine Site in the Shire of Ashburton and in the Thalanyji Native Title Determination Area, on land used predominantly for cattle grazing. The massive project will consist of up to 340 wind turbines (2.04 GW) and a solar farm (3.33 GW), or a

22

ENERGY AND MINES MAGAZINE


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.