A Tale of Two Floods...And a Cyclone!

Page 1

A Tale of Two Floods.. And a Cyclone! Brigadier Peter Jeffrey


Reserve commitment within a wider ADF commitment    

 

11th Brigade January 2011 Response Observations The Way ahead Reserve Military Engineers


Joint Task Force 637 was established  

 

Headquarters 1st Division (initially) Headquarters 7th Brigade

11th Brigade provided forces to JTF637 RAAF and RAN


Queensland’s Army Reserve

Coolangatta to Cairns 1950 part-time/150 full-time Infantry (3x battalions – 1300) Logisticians (1x battalion – 300) Engineers (1x squadron – 100) Signallers (1x small squadron – 40) Others (360)

Keenness to help!

     


CAIRNS TOWNSVILLE AYR MOUNT ISA MACKAY EMERALD ROCKHAMPTON GLADSTONE

YANDINA

BUNDABERG

CABOOLTURE

MARYBOROUGH

BRISBANE

GYMPIE

LOGANLEA SOUTHPORT GATTON TOOWOOMBA WONDAI DALBY ROMA WARWICK STANTHORPE


Floods   

Rockhampton Toowoomba-Grantham Brisbane

TC Yasi 

North Queensland


Northern   

Command and control Liaison Aviation support (primarily helicopter)

Southern      

Workers! Transport Command and control Liaison Search Security


   

Prevention Preparation Response Recovery


Theodore water supply  

First solution: supplement with water purification unit Second solution: rehabilitate town supply


Safety  

Leadership  

Community ‘looks to Army’ Every soldier a leader

Mobility 

Culture Willingness to help

Vehicle fleet/capable drivers

Engineers 

Force multiplier/skill sets


Defence White Paper 2009 Army to re-balance

Plan Beersheba

 

To be finalised An embedded concept – Reserve HQs taking a more formalised responsibility for Disaster Relief


11th Brigade 

Currently

1x Engineer Squadron (NQ)

Planned

1x Engineer Regiment Comprised of: 1x Headquarters (SQ) 2x Squadrons (SQ) 1x Squadron (NQ)




 

Are there better ways for managing engineering resources to deliver improved humanitarian outcomes? What role is there for defence engineers in domestic disasters? Could the engineering community be better prepared to undertake recovery from domestic disasters Does the risk of disaster and cost associated with recovery demand an improved regime of preparedness of engineering capacity?


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.