/day

Page 1

HIDROENERGIA 2008 BLED SLOVENIA


BRIGL & BERGMEISTER HP STATION II A REHABILITATION AND UPGRADING PROJECT AT THE RIVER MURA

R. Faast, 13.06.08

www.vatech-hydro.com

R. Faast–

ANDRITZ VA TECH HYDRO

E. Walch –

ANDRITZ VA TECH HYDRO

A. Warnecke –

WARNECKE CONSULT

2


Location of the power station

Brigl II

R. Faast, 13.06.08

www.vatech-hydro.com

3


Hydrolocical Data

• River Mur • MQ 85.4 m³/s • HQ5 550 m³/s • HQ100 950 m³/s

R. Faast, 13.06.08

www.vatech-hydro.com

4


flushing canal

Original status 1906

unit 4

unit 3

direction of water flow

unit 2

unit 1

trash rack

power house ground section

R. Faast, 13.06.08

www.vatech-hydro.com

5


Original status 1906 Turbine data: 4 Francis- flume type turbines Supplier: Voith St. Pรถlten

unit 1 and unit 2 generating electricity Qr = 10 [m3/s] Hr = 4,9 [m] n = 72 [1/min] Pr = 375 [kW]

unit 3 and unit 4 powering grindig machines Qr = 8 [m3/s] Hr = 4,9 [m] n = 77 [1/min] Pr = 300 [kW]

Total installed capacity 1906: 1.350 [kW]

R. Faast, 13.06.08

www.vatech-hydro.com

6


unit 5

trash rack

R. Faast, 13.06.08

flushing canal

unit 6

flushing canal

Power house extension 1924

unit 4

direction of water flow

www.vatech-hydro.com

unit 3

unit 2

unit 1

trash rack

7


Power house extension 1924 Turbine data: 2 Francis- flume type turbines Supplier: Voith St. Pรถlten unit 5 and unit 6 Qr = 8,9 [m3/s] Hr = 5,7 [m] n = 77 [1/min] Pr = 393 [kW]

unit 5: generating electricity and interchangable powering a grinding machine unit 6: directly powering a grinding machine Total installed capacity 1924: 2.136 [kW]

R. Faast, 13.06.08

www.vatech-hydro.com

8


First refurbishment and upgrading 1992 Unit No. 2 was replaced by a bevel gear bulb turbine in 1992, unit No. 1 was put out of service. Supplier: ANDRITZ VATECH HYDRO Qr = 30,1 Hr = 6,7 n = 195,9/600 Pr = 1.818

[m3/s] [m] [1/min] [kW]

A step up gear is installed between the turbine runner and the generator.

R. Faast, 13.06.08

www.vatech-hydro.com

9


First refurbishment and upgrading 1992

generator bevel gear

bulb turbine

R. Faast, 13.06.08

www.vatech-hydro.com

10


Second refurbishment and upgrading 2006/2007

Feasibility study

unit 5

flushing canal

unit 6

flushing canal

How to proceed unit 4

unit 3

trash rack

direction of water flow

R. Faast, 13.06.08

www.vatech-hydro.com

11


Second refurbishment and upgrading 2006/2007 Replacement of unit No. 5 and No. 6 by a Kaplan bulb turbine. Supplier: ANDRITZ VATECH HYDRO Commissioning year: 2007 Qr = 31,5 Hr = 6,53 n = 187,5 Pr = 1.869

[m3/s] [m] [1/min] [kW]

water flow

The turbine runner with the turbine shaft is directly coupled to the generator.

R. Faast, 13.06.08

www.vatech-hydro.com

12


Cross section bulb turbine inlet gate

upper access shaft generator cover guide vanes trash rack

draft tube gate runner

bulb draft tube

generator lower access shaft servo motor

R. Faast, 13.06.08

www.vatech-hydro.com

hydraulic governor

13


Second refurbishment and upgrading 2006/2007

turbine inlet gate

cross section

draft tube gate

trash rack bulb turbine draft tube

R. Faast, 13.06.08

www.vatech-hydro.com

14


Second refurbishment and upgrading 2006/2007 bulb turbine

draft tube trash rack

sheet pile wall

flushing canal 2 sheet pile wall flushing canal 1

R. Faast, 13.06.08

www.vatech-hydro.com

ground section

15


Second refurbishment and upgrading 2006/2007 unit No. 5

unit No. 6

start of construction works February 2006 R. Faast, 13.06.08

www.vatech-hydro.com

16


Second refurbishment and upgrading 2006/2007

yellow = remaining structure

red = demolished structure

R. Faast, 13.06.08

www.vatech-hydro.com

17


Construction pit

yellow = remaining structure

grey = new structure

upstream

sheet pile wall

sheet pile wall

R. Faast, 13.06.08

www.vatech-hydro.com

18


Draft tube section

R. Faast, 13.06.08

www.vatech-hydro.com

19


Draft tube section

R. Faast, 13.06.08

www.vatech-hydro.com

20


Turbine inlet section

R. Faast, 13.06.08

www.vatech-hydro.com

21


Construction pit

R. Faast, 13.06.08

www.vatech-hydro.com

22


Turbine installation

R. Faast, 13.06.08

www.vatech-hydro.com

23


Turbine installation

R. Faast, 13.06.08

www.vatech-hydro.com

24


Turbine installation

R. Faast, 13.06.08

www.vatech-hydro.com

25


Turbine installation

R. Faast, 13.06.08

www.vatech-hydro.com

26


Generator installation

R. Faast, 13.06.08

www.vatech-hydro.com

27


Commissioning work

start of commissioning February 2007 R. Faast, 13.06.08

www.vatech-hydro.com

28


BRIGL & ERGMEISTER POWER STATION II • • • • •

energy production increase 1906: 1.350 kW 1924: 2.136 kW 1992: 3.204 kW 2007: 4.287 kW

R. Faast, 13.06.08

www.vatech-hydro.com