/Sustainable_criteria

Page 1

Evaluator

Type of the plant

rated discharge

Date

river

rated head

Comments

-0.33

A2

Output

A3

A4 -1.00

Risks

0.25

Chemicals needed for operation

-0.50

Water consumption Emissions towards the cpmpartments water, air and soil

-0.75

-1.00

Tolerance towards failure (technically)

-1.00

A7

Waterproofing the ground due to construction works and roads

+ 1.0 - 0.5 - 1.0 + 0.5 - 1.0

Amount of water [l/a] Kind of water [ground-/drink-/industrial water]

- 0.5 - 1.0

Spezific emissions [mg/MWh] Intensity of sound emmissions [dB]

- 1.0

Kind of disposal [waterproof yes/no]

-0.5

-1

Value Indicator

Yield factor [1] Energy demand for transport purpose [l/km] Toxicity of chemicals [LD 50] Chemicals are biodegradeable [yes/no] Chemicals to be substituted [yes/no]

Measures of sound insulation [yes/no]

A6

0

Explanations

Name

Value Criteria

Total energy consumption and portion of non RE

-1.00

A5 -1.00

Indicators

Waste, particularly hazardous waste and ist treatment

-0.59

1

Area

-0.38 A8

-0.25

Inundation and flood protection

1

-0.5

-1

-1

-1

-1

0.5

0.5

0.5

0.5

-1

-1

-1

-1

-0.5

-0.5

-0.5

-1

-1

-1

-1

-1

-1

-0.5

-1

-1

-1

0

Specific amount of waste [l oil/MWh*a]

- 1.0

Precautionary measures [yes/no]

- 1.0

Specific area [m²/MWh]

- 0.5

-0.25

Degree of flood protection [a] Flooded area [m²]

+ 0.5 - 1.0

0

Measures [yes/no]

+ 0.5

Amount and duration of delievery [% von MQ] Functioning bypass system [yes/no] Alteration of groundwater level [m] Alteration of groundwater quality [increase/decrease]

- 1.0 + 0.5 - 1.0 - 1.0

-1

-1

-1

0

0

0

-1

-1

-1

-1

-1

-1

-1

-0.5

Rivermorphology and flora

0.50

A10

Safeguarding the river continuum

-0.25

Protection of groundwater

1

-0.5

- 1.0

-0.50

A9

A11

1

-0.5

-0.5

-1

Waterbody

A Impacts concerning health and environment

Input

A1

Name

Number

Criteria

Value Cluster

Cluster

Name

Value Categories

Name

Category

+1

MQ:

+0,5

name of the plant

-1.00

-0.5

-0.5

-0.5

0.5

0.5

0.5

0.5

-1

-1

-1

-1

0.5

0.5

0.5

0.5

-1

-1

-1

-1

0.5

0.5

0.5

0.5

-1

-1

-1

-1

-1

-1

-1

-1


Plant Actors

-0.33 -0.17

B1

-1.00

-0.50

-1.00

Regionalwirtschaft Resources to be created und Regional-

Existing resources -0.88

Kulturelle und individuelle Identität

-0.48

-0.33

Safety at work

-0.50

B2

Quality of employment

-0.50

B3

Safeguarding and creating qualified jobs

-1.00

B4

technical profitability Akteursefficiency of the plant interaktionen

B Safeguarding and quality of work C Know how G F E Stakeholders Technical D Regional development Profitability interaction concerns

-0.50

C1

C2

Gender aspects Documentation / application / transfer of existing know how Need for additional qualification of workforce in the plant

1.00 -0.33

-0.75

-0.63 C3

-0.88

0.00

-1.00

-0.50

D1

Support of regional infrastructure

-0.75

D2

Remaining regional profits

-1.00

D3

Conservation of the cultural landscape as good to be protected

- 1.0 + 1.0 - 1.0 - 1.0

Working conditions and -hours [discourse]

- 0.5

Qualifications necessary [operator]

- 1.0

Regional manufacturing firm [yes/no]

- 1.0

Equal treatment [yes/no]

+ 1.0

Documentation [yes/no resp. much/few]

- 1.0

Using the results of documentation [yes/no or much/few]

+ 0.5

Transfer [yes/no]

- 0.5

Necessity of additional qualification [yes/no]

- 1.0

Possibilities for further education [yes/no]

- 0.5

Monitoringconcepts [yes/no]

- 0.5

R&D portion [compared to turnover in %] Extension of traffic network with common profit [yes/no]

- 0.5 - 0.5

Extension of electrical grid with common profit [yes/no]

- 1.0

Portion of total investment remainig in the region [%]

-1.0

Involvement of (landscape) architects [yes/no]

- 1.0

Consideration of characteristic regional design [yes/no] -1.00

Transparent participation process [yes/no]

- 1.0

E2

Creation of social resources

-1.00

measures [yes/no]

- 1.0

E3

Multifunctionality of the plant

-1.00

measures [yes/no]

- 1.0

Diverse Indicators for the profitability of the plant

Payback period [a]

- 0.5

F1

-0.50 Specific investment [€/kWh oder €/kW]

- 0.5

Effective use of water as a resource

-1

-1

1

1

1

1

-1

-1

-1

-1

-1

-1

-1

-1

-0.5

-0.5

-0.5

-0.5

-1

-1

-1

-1

-1

-1

-1

-1

1

1

1

1

-1

-1

-1

-1

0.5

0.5

0.5

0.5

-0.5

-0.5

-0.5

-0.5

-1

-1

-1

-1

-0.5

-0.5

-0.5

-0.5

-0.5

-0.5

-0.5

-0.5

-0.5

-0.5

-0.5

-0.5

-0.5

-0.5

-0.5

-0.5

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

1

1

1

1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-0.5

-0.5

-0.5

-0.5

-0.5

-0.5

-0.5

-0.5

-1

-1

-1

-1

-1

-1

-1

-1

+ 1.0

Participation of parties concerned during licensing and operation

G1

-1

-1

0.00

E1 -1.00

-0.50

Accompanying research during operation of the plant

Measures of precaution [yes/no] Accidents/a [number] Reason for accident [discourse] Kind of accident [discourse]

Efficiency of the plant [%]

- 1.0

Hydraulic losses [% of total head]

- 1.0

-1.00


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.