Evaluator
Type of the plant
rated discharge
Date
river
rated head
Comments
-0.33
A2
Output
A3
A4 -1.00
Risks
0.25
Chemicals needed for operation
-0.50
Water consumption Emissions towards the cpmpartments water, air and soil
-0.75
-1.00
Tolerance towards failure (technically)
-1.00
A7
Waterproofing the ground due to construction works and roads
+ 1.0 - 0.5 - 1.0 + 0.5 - 1.0
Amount of water [l/a] Kind of water [ground-/drink-/industrial water]
- 0.5 - 1.0
Spezific emissions [mg/MWh] Intensity of sound emmissions [dB]
- 1.0
Kind of disposal [waterproof yes/no]
-0.5
-1
Value Indicator
Yield factor [1] Energy demand for transport purpose [l/km] Toxicity of chemicals [LD 50] Chemicals are biodegradeable [yes/no] Chemicals to be substituted [yes/no]
Measures of sound insulation [yes/no]
A6
0
Explanations
Name
Value Criteria
Total energy consumption and portion of non RE
-1.00
A5 -1.00
Indicators
Waste, particularly hazardous waste and ist treatment
-0.59
1
Area
-0.38 A8
-0.25
Inundation and flood protection
1
-0.5
-1
-1
-1
-1
0.5
0.5
0.5
0.5
-1
-1
-1
-1
-0.5
-0.5
-0.5
-1
-1
-1
-1
-1
-1
-0.5
-1
-1
-1
0
Specific amount of waste [l oil/MWh*a]
- 1.0
Precautionary measures [yes/no]
- 1.0
Specific area [m²/MWh]
- 0.5
-0.25
Degree of flood protection [a] Flooded area [m²]
+ 0.5 - 1.0
0
Measures [yes/no]
+ 0.5
Amount and duration of delievery [% von MQ] Functioning bypass system [yes/no] Alteration of groundwater level [m] Alteration of groundwater quality [increase/decrease]
- 1.0 + 0.5 - 1.0 - 1.0
-1
-1
-1
0
0
0
-1
-1
-1
-1
-1
-1
-1
-0.5
Rivermorphology and flora
0.50
A10
Safeguarding the river continuum
-0.25
Protection of groundwater
1
-0.5
- 1.0
-0.50
A9
A11
1
-0.5
-0.5
-1
Waterbody
A Impacts concerning health and environment
Input
A1
Name
Number
Criteria
Value Cluster
Cluster
Name
Value Categories
Name
Category
+1
MQ:
+0,5
name of the plant
-1.00
-0.5
-0.5
-0.5
0.5
0.5
0.5
0.5
-1
-1
-1
-1
0.5
0.5
0.5
0.5
-1
-1
-1
-1
0.5
0.5
0.5
0.5
-1
-1
-1
-1
-1
-1
-1
-1
Plant Actors
-0.33 -0.17
B1
-1.00
-0.50
-1.00
Regionalwirtschaft Resources to be created und Regional-
Existing resources -0.88
Kulturelle und individuelle Identität
-0.48
-0.33
Safety at work
-0.50
B2
Quality of employment
-0.50
B3
Safeguarding and creating qualified jobs
-1.00
B4
technical profitability Akteursefficiency of the plant interaktionen
B Safeguarding and quality of work C Know how G F E Stakeholders Technical D Regional development Profitability interaction concerns
-0.50
C1
C2
Gender aspects Documentation / application / transfer of existing know how Need for additional qualification of workforce in the plant
1.00 -0.33
-0.75
-0.63 C3
-0.88
0.00
-1.00
-0.50
D1
Support of regional infrastructure
-0.75
D2
Remaining regional profits
-1.00
D3
Conservation of the cultural landscape as good to be protected
- 1.0 + 1.0 - 1.0 - 1.0
Working conditions and -hours [discourse]
- 0.5
Qualifications necessary [operator]
- 1.0
Regional manufacturing firm [yes/no]
- 1.0
Equal treatment [yes/no]
+ 1.0
Documentation [yes/no resp. much/few]
- 1.0
Using the results of documentation [yes/no or much/few]
+ 0.5
Transfer [yes/no]
- 0.5
Necessity of additional qualification [yes/no]
- 1.0
Possibilities for further education [yes/no]
- 0.5
Monitoringconcepts [yes/no]
- 0.5
R&D portion [compared to turnover in %] Extension of traffic network with common profit [yes/no]
- 0.5 - 0.5
Extension of electrical grid with common profit [yes/no]
- 1.0
Portion of total investment remainig in the region [%]
-1.0
Involvement of (landscape) architects [yes/no]
- 1.0
Consideration of characteristic regional design [yes/no] -1.00
Transparent participation process [yes/no]
- 1.0
E2
Creation of social resources
-1.00
measures [yes/no]
- 1.0
E3
Multifunctionality of the plant
-1.00
measures [yes/no]
- 1.0
Diverse Indicators for the profitability of the plant
Payback period [a]
- 0.5
F1
-0.50 Specific investment [€/kWh oder €/kW]
- 0.5
Effective use of water as a resource
-1
-1
1
1
1
1
-1
-1
-1
-1
-1
-1
-1
-1
-0.5
-0.5
-0.5
-0.5
-1
-1
-1
-1
-1
-1
-1
-1
1
1
1
1
-1
-1
-1
-1
0.5
0.5
0.5
0.5
-0.5
-0.5
-0.5
-0.5
-1
-1
-1
-1
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
1
1
1
1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-1
-1
-1
-1
-1
-1
-1
-1
+ 1.0
Participation of parties concerned during licensing and operation
G1
-1
-1
0.00
E1 -1.00
-0.50
Accompanying research during operation of the plant
Measures of precaution [yes/no] Accidents/a [number] Reason for accident [discourse] Kind of accident [discourse]
Efficiency of the plant [%]
- 1.0
Hydraulic losses [% of total head]
- 1.0
-1.00