EVE NNAJI ARCHITECTURAL WORKS 2015-18
IN
This is where the beginning of the end begins.
8 Hotel
Forward IMAGE Pixelate Simply Put: Touch Even Bag Even Trek: Concerete rulers
DEX
Background Design Drawings Concept Diagrams Plans . Sections . Elevations Renderings Furniture + Installations Clients + Partnerships
Experience JAN - MAY
2014
EVE
Education
(of Bravo channel’s Yours
Sourced and tracked all production Sourced and coordinated contract w Drafted moodboards On-site project overseer Edited and updated floor plans Executed most impromptu tasks
Intern: CEO’s assistant
Fabricated structures for events (ie Fabricated sets for photo shoots (ie Sourced materials for fabrication Set up and break down team Shot and edited photos for website
Cumulative GPA: 3.9 Graduation level: Distinguished Achievement
Texas A&M University College Station, TX, US
18 Herbert Macaulay Cr, GRA Ikeja Lagos, Nigeria +2348177999000 Eve@evendesigned.com
Intern: assistant to CEO, Taylor Spe
Hatch Creative Studio
Lutheran High School North Houston, TX, USA
NNAJI
August Black NYC
Cumulative GPA: 3.447
JAN - AUG
Related Coursework:
architectural design I - V (studios) design composition I & II (studios) architectural history I & II integrated structures (studio) foundation structures integrated systems physics business math
Achievements Organizations and Awards
KKG: Kappa Kappa Gamma
2015 SOFTWARE Autocad: Proficient Sketchup: Proficient 3ds Max: Proficient
Even Trek Design Partner: Cofounder + Designer
Business accountant, manager, and Designed concrete rulers for Texas Fabricated and produced all produc Sourced and funded materials and Sold 100+ concrete rulers Designed competition proposals
EVEN Designed
CEO: Founder + Designer (ongoing)
Business accountant, manager, and
2015 SOFTWARE
s, Mine, & Ours)
n orders workers
os
e, Adobe Launch) e; Jimmy Choo)
MAY - AUG
2014
Microsoft Works: Proficient Word Excel Powepoint
2015
APRIL - APRIL MOE+ Art Architecture
2016/17
Architectural Designer: Design team (ongoing) Designed residential + commercial systems Completed competition proposals Drafted and edited floor plans + working drawings Created realistic renderings for proposed projects Contracted workers per project Created + published a series of theoretical representations of all projects
AWCA Creative Agency
MAY - NOW
MAY - NOW
Business accountant, manager, and strategist Landed contracts with various stores Designed all products and content Established mass production system Established sales representative team Sourced and funded all development Taught workshop sponsored by British Council Maker Library
Illustrator InDesign Photoshop
d marketer s A&M Architecture AIAS cts equipment
d strategist
CEO: Founder + Designer (ongoing)
Adobe : Poficient
e
)
EVEN Designed
Autocad: Proficient Sketchup: Proficient 3ds Max: Proficient Rhino: Intermediate Revit: Intermediate
ellman
Business accountant, manager, and marketer Designed concrete rulers for Texas A&M Architecture AIAS Fabricated and produced all products Sourced and funded materials and equipment Sold 100+ concrete rulers Designed competition proposals
Creative Lead: Design Team(ongoing)
OCT - NOW
2017
Developed brand identities + strategies for clients Oversaw in-house creative direction Proposed and produced brand engagement for clients Established in-house content production system guidelines
DESIGN DEVELOPMENT
UPDC Pool
PROPOSED PLAN AND ATTRIBUTES
PROJECT TYPE: RERENOVATION PHASE: CONCEPT DESIGN YEAR: 2015
SCULPTURAL POOL SHOWERS
FIRM: MOE+ AA
WIDE STEPS
LEKKI, LAGOS
DESIGN DRAWINGS
MATERIAL CONSISTENCY SPACIAL INTERGRATION MOVABLE SEATING GREENERY ADEQUATE SHADING SCREEN WALL Wrapping the pool is a woven screen and upon entrance, an array of light trees leads to grand steps. The floor material moves seamlessly from the clubhouse deck to the pool deck. The pool lines flows endlessly onwards along with the open space.
L AYO U T
MATERIAL MOODBOARD Honest materials, refined
Sheet Size
Rev. no
A3
DESIGN SUMMARY
Revision note
Date
Drawn Author
Signature
DESIGN SUMMARY Checked Checker
NOTES
GREEN WALL GREEN WALL
PROPOSED
STAIR TO NEW SPECTATOR STAND WATER FEATURE 4180
5500
1450
2500
1450
WATER FEATURE
LEGEND 3975
EXISTING WALL NEW WALL
Polo Club
6000
DEMOLISHED WALL
ADMIN LOUNGE 10500
3824
PHASE: CONCEPT DESIGN
ENTRANCE STATEMENT PIECE
52 m²
4550
PROJECT TYPE: RERENOVATION
SCREEN WALL
RECEPTION / LOUNGE
YEAR: 2015 FIRM: MOE+ AA
1399
RECEPTION
WALKWAY
IKOYI, LAGOS
WAITING LOBBY 7 m²
MANAGER'S OFFICE
2380
16 m²
W.C.
2221
2221
1456
ADMIN
OFFICE
750
9 m²
7200
11250
1900
2283
3600
DESIGN DRAWINGS
1515
STORAGE
1650
FEATURE WALL
ENTRANCE STATEMENT PIECE
FEATURE WALL
JOB TITLE PROPOSED RECEPTION AND BAR REMODELLING 1 RIBADU CLOSE, IKOYI, LAGOS
CLIENT POLO CLUB, LAGOS FILENAME
DATE 10/05/16
SCALE 1 : 75
Obalende Bridge PROJECT TYPE: URBAN REVAMP PHASE: CONCEPT DESIGN YEAR: 2018
DESIGN DRAWINGS
OBALENDE, LAGOS
PROJECT VISUALIZATION
car park & elevated water tower
M
115
legend i ax
WASH BASINS
ow
fl
t
FLAG POLES
SEATING GREENERY
m
19
PLANTERS COLUMNS BUS STOP
FLAG POLES
WAITING ZONES
TAXI DRIVERS PASSENGERS SECURITY
40m
CLEAR FENCING
BILLBOARDS (2)
WATER TANK *WIDTH BETWEEN COLUMNS : 17.5M *WIDTH OF FLYOVER ; 10.5M
VENDOR SPACES
17.4m
ACTIVATION SPACE
WATER TANKS SOCCER
18m
10.
5m
43.5m
MALE&FEMALE WCs (2) WITH SOAKAWAYS
FENCED OFF BLOCK WALL STRUCTURE WITH GENERATOR & STORAGE
Author
OAS Heliport PROJECT TYPE: COMMERCIAL PHASE: CONCEPT DESIGN
YEAR: 2017
MMA, LAGOS
DESIGN DRAWINGS
PROPOSED HANGAR PLAN 1
Level 0 Dimensions 1 : 200
OAS HELIPORT
Captain Everest Nnaji
01/20/07
MMA 1, IKEJA
LEVEL 0 - DIM
DESIGN DRAWINGS
DESIGN SUMMARY
STRUCTURE
STEEL STRUCTURE CORRUGATED METAL EXTERIOR
BACK ELEVATION
FRONT ELEVATION
MOEAA Website PROJECT TYPE: VISUALIZATION PHASE: LAUNCHED YEAR: 2018
www.moeaa.com
CONCEPT DIAGRAMS
OAS Heliport PROJECT TYPE: COMMERCIAL PHASE: DESIGN DRAWINGS YEAR: 2018
MMA, LAGOS
PLANS . SECTIONS ELEVATIONS
LEGEND MTN PARKING Blocks Seating Gravel Greenery Vertical Vines
Date
Rev. No
Revision note
B
HEIGHT OF ROW J REDUCED BY 150mm
Drawn by
Signature
NOTES
Checked
O. DOSEKUN
LEGEND 250mm Deep Foundation
SEATING LEVELS
150mm Block Walls
LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 LEVEL 5
PERFORMANCE AREA (1)
ROW A
ROW B
ROW C
ROW D
ROW E
ROW F
ROW G
ROW H
ROW I
ROW J (VIEWING PLATFORM)
ROW K
ROW L
ROW M
ROW N
PERFORMANCE AREA (2)
39725
Layer of Rocks
Layer of Crushed Rubble
Vertical vines
LEVEL 6
LEVEL 7 : 1650mm
Marine Ply Formwork
LEVEL 6 : 1500mm 8530
940
940 60
940 60
940
3440
940
60
60
940 60
940 60
940 60
940 60
940 60
940 60
940 60
940
APPROXl 5050
Gabion Metal Mesh Cage
60
LEVEL 6.5 : 1350mm LEVEL 5 : 1200mm
1900
LEVEL 5.5 : 1050mm
1540
Electrical Sleeve
LEVEL 4 : 900mm LEVEL 4.5 : 750mm
2440
500
3000
LEVEL 3 : 600mm LEVEL 3.5 : 450mm
3200
LEVEL 2 : 300mm +1050mm
LEVEL 1 : 150mm
150
150
CONTAINER
-150mm
75
-150mm
75
DATUM: 0mm -150mm
LEVEL 0 : 0mm
HEIGHT: 150mm
HEIGHT: 150mm HEIGHT: 150mm
HEIGHT: 150mm HEIGHT: 300mm
HEIGHT: 300mm HEIGHT: 450mm
HEIGHT: 450mm HEIGHT: 600mm
HEIGHT: 600mm HEIGHT: 750mm
HEIGHT: 750mm HEIGHT: 900mm
HEIGHT: 900mm HEIGHT: 1050mm
HEIGHT: 1050mm HEIGHT: 1200mm
HEIGHT: 1200mm HEIGHT: 1200mm
HEIGHT: 1200mm HEIGHT: 1050mm
HEIGHT: 1050mm HEIGHT: 750mm
HEIGHT: 750mm HEIGHT: 450mm
HEIGHT: 450mm HEIGHT: 150mm
HEIGHT: 150mm
Xeriscaping with gravel
STRUCTURAL SECTION (WITHOUT MODULES)
ISSUED FOR INFORMATION ONLY JOB TITLE
FALOMO BRIDGE, IKOYI PUBLIC ART / PUBLIC SPACE
CLIENT
ALAKIJA STUDIO / LAGOS STATE DRAWING NUMBER
DATE
M16/006/101
SCALE
31/03/2017 DRWG. TITLE
DARAJA DESIGNS LIMITED
* SITE DIMENSIONS ARE INDICATIVE ONLY. ALL DIMENSIONS ARE TO BE VERIFIED BY CONTRACTOR ON SITE
JOB NO.
1:75 @ A1
FOUNDATION AND BLOCK WALL SETTING OUT SECTION EDITION
SHEET NO.
M16 - 006
Xeriscaping with concrete
ROUNDABOUT Plant integration with blocks
ISSUED FOR INFORMATION ONLY JOB TITLE
CLIENT
NORTH
Falomo Underbridge PROJECT TYPE: REVAMP PHASE: BUILT
PLANS . SECTIONS ELEVATIONS
YEAR: 2017
IKOYI, LAGOS
Forward PROJECT TYPE: ACADEMIC PHASE: PROJECT COMPLETED YEAR: 2015
PLANS . SECTIONS ELEVATIONS
MMA, LAGOS
25’
Forward facade to slab connecting c-channel
dow styrofoam insulation
root stop
hydroflex
moisture retention mat
garden drain
system filter
litetop extensive growing media
facade panel support
operable rotational facade arm
3’x --’ steel sheet panel
10’x4’x0.25” mirror double glazing
spider glass connection
glazing support steel column
2”x1.25” wood joint
glazing to roof wall mullion connection
hydrogaurd monolithic membrane gypsum board
bonding adhesive
flex flash
metal coping lap sealant
steel fiber tension cables
rebar
tension cable drop ceiling mount
metal decking
2” polished concrete floor finish nelson stud
10’ tall W4 steel column
w24 x 84 steel beam
3’4” pile footing
1’6” piles, 4’ on center
3’x10’ concrete pile cap
2’ deep grade beam
1’6” site cast concrete column
1’6” site cast post-tensioned concete beam
10’ concrete column
1’2” site cast post-tensioned concrete beam
rebar
1’ thick concrete foundation slab
10’x4’x0.25” clear double glazing
carton form
tension cable drop ceiling mount
2” polished concrete floor finish
glazing to concrete connection
rebar
4” cast in place concrete
Various Projects UPDC POOL ACCESS BANK FIN-TECH OAS HELIPORT
LAGOS, NIGERIA
RENDERINGS
RENDERING
Reception Desk PROJECT: LAGOS MOTOR BOAT CLUB PHASE: BUILT
FURNITURE & INSTALLATIONS
YEAR: 2017
IKOYI, LAGOS
Reception Desk PROJECT: LAGOS POLO CLUB PHASE: BUILT YEAR: 2017
IKOYI, LAGOS
FURNITURE & INSTALLATIONS
End of works
OAS Helicopters Texas A&M University
Access Bank
UNDER MOE+ ART ARCHITECTURE
American International School Lagos UNDER MOE+ ART ARCHITECTURE
The Milican Reserve Texas Uber Lagos UNDER MOE+ ART ARCHITECTURE
UPDC Estate Lekki UNDER MOE+ ART ARCHITECTURE
Domino’s Pizza UNDER AWCA
Lagos Motor Boat Club UNDER MOE+ ART ARCHITECTURE
Lagos Polo Club UNDER MOE+ ART ARCHITECTURE
Lagos State Government UNDER MOE+ ART ARCHITECTURE
Clients & Partners
Eve Nnaji eve@evendesigned.com Evendesigned.com US | NG