Architect certified by the National Superior School of Architecture of Nantes in France Erwan Eveno
Portfolio 2009 / 2019 Gathering an extract of my projects realized at school and in agency
Solar European Decathlon....................................................................................6 European competition in Versailles, prototyping 2nd place Master project.......................................................................................................16 Media Library 3rd place at the beach Crossed landscapes, invented landscapes.....................................................24 Urban sewing, reconciliation of Les Iles de Trentemoult in Rezé. Design process.....................................................................................................30 Garden Gravity Chair
***
Middle school Jean Jaurès, Bannalec in France............................................36 Restoration and extension of the teaching center Town Hall of Larmor Baden................................................................................42 Restructuration et extension of the Town Hall Analysis Laboratory of Muzillac........................................................................48 Conception and Interior design
« All the graphic pieces present in this portfolio have been designed by myself excepted two graphic pièces »
1
Solar Decathlon Europe
6
Solar DĂŠcathlon European (2nd place in final) Project : European competiton in Versailles, prototyping
Phileas is the project of the French Atlantic Challenge team at the Solar Decathlon Europe 2014 international student competition held in Versailles. Our project is based on the island of Nantes in the middle of the city center of Nantes, which is currently undergoing urban renewal, the purpose of which is to revalue what already exists. How to reduce urban sprawl? How to avoid the artificialisation of soils? How to welcome newcomers to an existing social fabric? Following the urban, vegetal, energy and social analyzes carried out on the Bas-Chantenay district, a building particularly caught the attention of the Atlantic Challenge team to embody the concept of ÂŤFertile CityÂť: Cape 44. We chose to work on this building which corresponded to our approach: a neglected building revealing however a great potential as for its location on the edge of the city and close
to the Loire and as for its particular structure Hennebique which allows him to be classified among the buildings remarkable.
PhilĂŠas
Axonometry of Bas-Chantenay
N
Récupération des eaux de pluies pour l’arrosage des jardins
S
Panneaux solaires intégrés Culture maraichère Captage CO2 air vicié
Compost Espace bioclimatique
Logements traversants favorisant la ventilation naturelle
Echange thermique période diurne
Jardins d’hiver
Parois coulissante permettant une régulation de la ventilation naturelle Végétation Parois coulissante permettant une régulation de la ventilation naturelle
Transparence des RDC Porosité visuelle Phytoépuration des eaux grises
*** « Graphic piece doesn’t make by myself »
Ground floor
Floor 4
Floor 8
Floor 3
Floor 7
Floor 2
Floor 6
Floor 1
Floor 5
15
16
2
Beach’s Media Library
ARCHITECTURAL CONCEPTION Project : Media Library 3rd place at the beach
The plot has a vertical drop that could afford to encase a media library.The first wish was to be able to bring the beach into the media library and to encourage tourists to come to settle in flexible spaces dedicated to the library. The complexity was to be able to have an embedded media library, whose roof is a public space. But how to enter the public space in the library? The first idea was to have in the public space maybe a cubic modular workspace studio and outdoor seating, and so playing with seasonal time scales ... In the latter case, it could be possible to open the studio by a wall / sliding shelf allowing the view of the horizon. This studio would extend into the library to contain other workspaces. The goal would be to have exits onto the roof of the library, on the public space, which allows a
clear visual access to the sea and the horizon. During this option for the project, the study focused on the operation and the operation of a 21st Century library. I re-examined the people, the universe, the possible actions within a library. Understanding what the public expects to propose a new way to ÂŤcrossÂť the library. Defining the actions to redefine the spaces inviting readers and other persons into this cultural venue. Creating a chart allowed me to clarify my ideas. It follows from the upstream work on how we plannned the library usage. It is a tool that can be modified as and when the project is being done. It is a base that we can us to trial the potential of a site according to our program, and also to trial the potential of a prgoram on the said site. It is an evolving tool that can change according to the needs of the site. The chart gives us space for interpretation. Existing state
Floor 1 Public space
Skylights Witness of entrance Seasonal kiosks Skylights (light sensor and tourist)
Mediatheque
Universe bubble (Light diffuseur)
Librairie
Commerces
Patio
Parvis Ground floor
Pornic
Entrance of the Médiatheque Library / Shops (Hairdresser, Bakery, Lounger) Pedestrian street linking the town center to the beach
La Mairie Parking Souterrain
Floor poured
Concrete /waxed Insulation Steel pan
Structure
Girders Metal honeycomb beams Metal / concrete posts
Entrée
Patio Hall
La scène Parvis Les Moutiers en Retz
18
Le Square Bellevue
Programmatric axonometry
View from the public space to infinity
Lantern
Public space
Médiathèque
Constructive detail of the light device
Heart of the mediatheque
21
F-1 Médiathèque 1:200°
Ground Floor 1:200°
Public space 1:200°
Zoom
Longitudinal section
23
24
3
Urban sewing Reconciliation Of the islands
Territoires traversés, paysages inventés Project : Urban sewing, reconciliation of the Trentemoult islands in Rezé.
This workshop addresses the issue of the city project and contemporary areas by taking into account their complex realities, how thinking scales fit into each other, but also by immersion, the emotive path and artistic transcription. The objective here is to invent new procedures of urban building projects, without prejudging in advance, their formalization and their scales. After studying the area, my analysis has focused on the requalification of the road from Pornic, a route that has no real purpse. The goal is to bring together the territory to clear the road from Pornic which no longer has it’s primary function and mark a town access by various processes. This operation results in the fusion of land, a
requalification of the road to free land on both sides as well as more connections between the island and Trentemoult Rezé .
Urban Couture: Reconciliation of Les Iles deTrentemoult in RezĂŠ.
Loire
Campus
Le Campus St lupien : a land for all
«The Needles question, by their size, the very notion of impact of the footprint of human activity on the Earth’s fabric. Metaphorically, space «sewn» becomes a living skin, fragile, thinner or accusing the reality of the territory and the concept of borders.» Armelle Blary, plasticienne.
27
The commercial zone: exploit the external space
28 Shared Gardens: Nature in the City
The roundabout of the bridge
Commercial zone
Campus
Multimodal Pole
Esplanade
Roadway
Property
Football field
Roadway
Shared gardens / Parc
ArchĂŠological site St Lupien (Gallo-Roman)
Town of municipality of RezĂŠ
29
30
4
Garden Gravity Chair
Design Process Project : Garden Gravity Chair
This brand new course at school was offered to design an object whatever it may be. I chose to bring together two concepts around my project - that of gravity and that of the drape. I was able to make a concrete fabric armchair with the properties of the fabric and strength of concrete. It all began by the inspiration which occurred by the discovery of the work «Zero Gravity» by Nikolay Tikhomirov, with the desire to experience the «levitation» in a process that would mix human body and draped fabric. My goal is to design a apropriate reading chair while selecting a context in order to mix the project site. The Botanical Garden of Nantes quickly became the perfect site. Placing this project on an extent of perfectly mowed lawn reinforced the idea of stopping to contemplate and read, an idea to freeze in time. The site plays its importance in this project since it imposes a constraint, that of the «forbidden turf».
«Zero Gravity» de Nikolay Tikhomirov
Located on the lawn and away from the passage of pedestrians, this sculptural work is set to intrigue tourists, it encourages them to approach for cocooning. Thus the walkers will enjoy this reading lamp in a peaceful artistic setting. This chair is currently located on the roof of the ENSAN (National Superior School of Architecture of Nantes).
DUIT
u béton trouvera sa place dans sODUIT un espace spacieux à la fois u béton trouvera sa place dans s un espacecontemplatoire. spacieux à la fois lpture Son asulpture contemplatoire. Son asement les ligne pour du corps pour ement lesdu corps ligne éal dédié à la détente. Il a été ant. dédié à la détente. Il a été al ant. tatique
.
anvas atique
velles proportions. J’ai ensuite construit des accoudoirs différents pour adopter des diverses postures.
34
Four young Britons born in Brest, Evreux, Lilacs, Landerneau and Saint Etienne, currently in exile, came to Nantes to the BarBar festival. Scenography of « Bantam Lyons» around the «Garden Gravity Chair» on the roof of the National Superior School of Architecture of Nantes.
35
36
5
Middle School Jean Jaurès
Middle school jean jaures Project : Middle school Agency : Richard Faure
In order to solve the problem of accessibility and the lack of surface of the rooms of classes, the coursive becomes the distribution vector of all class spaces.
I designed this project from the beginning and made all the graphic pieces that constitute the file for the contest.
Covered at the last level by a polycarbonate roof, they protect the students of bad weather during intercourse expectations. On the ground floor, they form a courtyard over the entire length of the faรงades building A and the new building. They give its new identity to the interior facade and thus to the college. A mesh of vertical wooden boards consistent with the fence of the facade on the street, unfolds along the level 1 corridor. It acts as a filter to bad weather, it closes the space, offering a feeling of protected space. Fishnet is less dense at the passage in front of the south wing of Building A, thus showing the most interesting facade of the old building.
37
RUE
ACCèS DE LIVRAISON
IC
AD
LAG
KER
96.82 96.13 96.63
COUR MINéRALE
96.79
MAIRIE
97.04
96.12
ESPACE PAYSAGer
PRéAU COUVERT 96.15
RU
95.51
ED
EQ
96.97
UI
M
PE
RL
E RDC 96.26
LA Grande Allée 96.34 97.37
N
ENTRéE PRINCIPALE DU COLLèGE
ABRIS BUS TRAJECTOIRE DE BUS RUE DU CIMETIèRE
38
PLACE PIERRE BOËDEC
PLONGE BATTERIE 14.2 m²
RUE
ADIC 19.8 m²
3.9 m²
LEGUMERIE / DEBOITAGE
RESERVES EPICERIE ET BOISSONS 20.2 m²
C.F. LEGUMES
C.F. BOF
C.F. VIANDES
4.3 m²
12.9 m²
SELF SERVICE 37.1 m²
ESPACE DETENTE 76.9 m²
SANITAIRES 4.8 m²
S.A.S
3.6 m²
CIRC.
2.8 m²
SANITAIRES
14.4 m²
2.6 m²
DEPOSE PLATEAU
LOCAL MENEGE
16.7 m²
16.0 m²
VESTIAIRES SANITAIRES FEMME CUISINE
42.0 m²
36.8 m²
PREPARATIONS FROIDES
C.F. SURGELES
SALLE DE DETENTE DES AGENTS
VESTIAIRES SANITAIRES HOMME CUISINE
LAVERIE VAISELLE
PREPARATIONS CHAUDES
LAG
KER
RESERVES 5.0 m² TUBERCULES RESERVES 2.9 m² ENTRETIEN
2.6 m²
10.2 m²
CARTABLERIE
3.0 m²
9.9 m²
10.2 m²
CIRC.
4.1 m²
LOCAL DECHETS
BUREAU DU CHEF HALL DE LIVRAISON
6.7 m²
7.0 m²
S.A.M. ELEVES
HALL
VIDE SUR HALL
SANITAIRES ELEVES
182.8 m²
52.8 m²
11.9 m²
5.2 m²
LINGERIE
SAS
RESERVE MATERIELS USAGE UNIQUE
9.1 m²
10.1 m²
3.0 m²
S.A.M. COMMENSEAUX 28.6 m²
FOYER DES ELEVES 74.9 m²
SALLE ARTS PLASTIQUES
PREAU EXISTANT
COUR
77.2 m²
LOCAL MENAGE 7.2 m²
SALLE BANALISEE 06 67.5 m²
DEPÔT
14.7 m²
SALLE DE TECHNOLOGIE SALLE BANALISEE 03
25 m²
CIRCULATION
56.8 m²
BUREAU AGENT DE MAINTENANCE 27.6 m²
10.24 m²
SALLE DE MUSIQUE 71.9 m²
SALLE DE TECHNOLOGIE 76,97 m²
SANITAIRES /VESTIAIRE SALLE DE TECHNOLOGIE
7.4 m²
49.2 m²
DEPÔT
STOCKAGE
14.5 m²
10.76 m²
SALLE BANALISEE 05 56.3 m²
SALLE BANALISEE 02 58.9 m²
SALLE MULTIMEDIA 101 m²
SALLE BANALISEE 01 59.5 m²
PREAU
229.5 m²
LOCAUX TECHNIQUES / SOUS STATION 27.4 m²
SANITAIRES ELEVES
SANITAIRES ELEVES
16.9 m²
COUR PRIVATISEE ADM
3.8 m²
5.1 m²
SANITAIRES ELEVES
LOCAUX VMC
46.8 m²
13.9 m²
LOCAUX TGBT 3.8 m²
DEPÔT
20.7 m²
LOCAUX INFO
LOCAL DETENTE 8.0 m²
BUREAU CPE
SALLE DE TECHNOLOGIE
15.2 m²
SANITAIRES
100.7 m²
5.1 m²
SANITAIRES
ESPACE DE PREPARATION 15 m²
3.8 m²
BUREAU SURVEILLANTS
SAS
20.1 m²
6.9 m²
SALLE DE PERMANENCE
5.1 m²
90.7 m²
HALL D'ENTREE
LOCAL MENAGE
90.4 m²
10.9 m²
SALLE DE REPOS ELEVE 10.0 m²
RU
E
GESTIONNAIRE 18.2 m²
DE
QU
15.10 m²
PE
RL
E
80.0 m²
LOCAL MENAGE 11.2 m²
8.1 m²
SECRETARIAT GESTION
IM
SALLE DE SCIENCES 01
DEPÔT/ STOCKAGE
SALLE DE RENCONTRE
DEPÔT
12.0 m²
SALLE DE REUNION ADM
27.0 m²
15.6 m²
REPROGRAPHIE 8.0 m²
BUREAU PRINCIPAL
SALLE DE SCIENCES
18.1 m²
80.0 m²
02
SECRETARIAT 20.1 m²
En
tré
ABRI VELOS
ed
67.8 m²
eC
oll
èg
e
ABRI / ATTENTE CAR
RUE DU CIMETIERE
Ground floor Administration + Classrooms + Restaurant
Plan RDC -PL1/200 - 18/05/17 AC E PIE
RR
E
BO
Floor 1 Classrooms + Gangway Plan RDC - 1/200 - 18/05/17
Floor 2 Classrooms
ËD
EC
39
*** « Graphic piece doesn’t make by myself execpted the modeling »
41
42
6
Town Hall Larmor Baden
Town Hall of Larmor Baden Statut : Restructuration and extension Place : Larmor Baden in France Project : Town Hall Agency : Richard Faure
The town hall needed to expand its premises and benefit from a larger wedding hall. The locals were desperate and lacked brightness.
State before project
Given the configuration of the town hall, the latter being composed of two separate buildings we decided to link these two entities by extensions. These three extensions house the wedding hall, the new offices of the mayor, and a remarkable entrance hall. This sewing allowed us to clear the back of the building a private area for administration that we could call garden.
43
44 04 Juillet 2017
PLAN PROJET RDC ech : 1/150
MAIRIE DE LARMOR BADEN REAMENAGEMENT ET EXTENSION DE LA MAIRIE LARMOR BADEN
45
04 Juillet 2017
46
PLAN PROJET R+1 ech : 1/100
Under level
MAIRIE DE LARMOR BADEN REAMENAGEMENT ET EXTENSION DE LA MAIRIE LARMOR BADEN
Section BB’
47
48
7
Analysis Laboratory Muzillac
49
03
P93/H204
ALU 16
02
Bureau AS
26
3/H
P9
4 20
15.2m² HSP : 250 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x60
INFO 2.5m² HSP : 250 SOL : Revêtement PVC U4P3 MURS : BA 13 peint Porte PL.: Dalle 60x60
Bureau Médecin 1
15.9m² HSP : 250 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x60
ALU 30
JD
Joint de dilatation
Chaufferie EPSM
+31.30 ngf
16.6m² HSP : 250 SOL : Peinture de sol MURS : Peinture sur béton PL. : Peinture sur béton
PP100/H215 CF 1h
Ouv 90x220 - ALL 00
ALU 15
PV90/H214 PV50/H214
ALU 25 Ouv+Fixe 437x220 - ALL 00 Fixe 40x210 - ALL 00 Vitrage opale
PV93/H214
ALU 15
ALU 15 Ouv 90x220 - ALL 00
Ouv 90x220 - ALL 00 Ouv 90x220 - ALL 00
ALU 15
P93/H204
Porte 06
Meuble prélèvement Voir détail 03 ALU 15
ALU 15 Ouv 90x220 - ALL 00
Ouv 90x220 - ALL 00 Ouv 90x220 - ALL 00
ALU 15
eil cu ac toir 02 mp tail Co ir dé Vo PV90/H280
ALU 23 Ouv+Fixe 392x220 - ALL 00
ALU 20
Ac cu
Ouv+Fixe 482x220 - ALL 00
ALU 14 ALU 13
eil Ha nd .
PP100/H215
Accès préleveur externe
01 Main courante
Accès personnnel
CANIVEAU
PV90/H215
VB - VH
Lames de bois ajourées fixées sur ossature en acier galvanisé
Archivage 12.5m² HSP : 312 SOL : Béton brut MURS : Peinture sur béton PL. :Peinture sur béton
CF1h
TARIF JAUNE
03 02 01
VB - VH
P93/H204
Ouv+Fixe 362x220 - ALL 00
P93/H204
ALU 11
ALU 26 Fixe 383x285 - ALL 00
Ouv+Fixe 492x220 - ALL 00
PV50/H280
ALU 10
VB - VH P93/H204 CF 1/2h + Ferme porte
Vestiaire perso
Porte 12
TGBT
Porte 16
Blouses souillées
Blouses propres Rgt affaires de ville
12.8m² HSP : 250 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x60
Porte 15
+30.92 ngf
Juillet 2017
50 m²
JARDIN + TERRASSE
Seuil PMR + Grille Caillebotis
Ouv+Fixe 243x220 - ALL 00
Bandeau
Cantine
Porte 14
Vitrage 80x94 - ALL 110
Zone technique
Zone dispatching
Accueil prélevements Ext
Info
2.7m² HSP : 250 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x120
Porte 02
12.6m² HSP : 250 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x120
25.8m² HSP : 250 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x120
Centrifugeuses
88.2m² HSP : 250 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x120
14.4m² HSP : 250 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x120
Porte 12
Porte 08
Passe plat 40x60 - ALL 100
ALU 12
RAMPE 8%
CF1h
18.4m²
PATIO 03
Bureau biologiste
00
Fixe 129x285 - ALL 00
Bandeau
Stockage (+ dechets)
Porte 01
PV93/H214
54.9m² HSP : 254/312 SOL : Béton brut MURS : Peinture sur béton PL. :Peinture sur béton
Porte 11
Porte 07
13.1m² HSP : 250 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x120
15.8m²
ALU 17b
Ouv 60x120 - ALL 100 Vitrage opale
PATIO 02
- ALL
16.3m²
220
ALU 21
375x
Accueil / secrétariat / attente
Main courante
Rgt
2.9m² HSP : 250 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x120
Sol en béton balayé
MAITRE D'OUVRAGE
Garde corps métallique à bareaudage vertical
P93/H204
P93/H204
Prelevement
PV93/H214
9.6ml
89.6m² HSP : 250 / 285 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x120 + Rigitone
Banque appel préleveur
Fixe
PATIO 01
9.5m² HSP : 250 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x120
PV93/H214
47.4m² HSP : 220 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle largeur 60
+31.30 ngf
RAMPE 4.7%
SCCV NATU
Muzillac
50
+31.28 ngf
Livraison / Stockage
CANIVEAU
P93/H204 CF 1/2h + Ferme porte
P9 3
/H 20
4
Porte 04
P90/H204
Porte vitrée coulissante h=285
Sas
Accès patients OCEALAB
CF2h
+31.30 ngf
P93/H204
CF 1/2h + Ferme porte Stockage prélèvement
CF1h
4.1m² HSP : 254 SOL : Béton brut MURS : Peinture sur béton PL. :Peinture sur béton CF 1/2h + Ferme porte
Laverie + stockage inter cons
SOFFITE EN PLACO
13.8m² HSP : 235 SOL: Grès cérame 30x30 R10 MURS : BA 13 peint et/ou Faience PL.: Dalle 60x60 lavable
CF1h Toilettes perso 2.8m² HSP : 220 SOL : Grès cérame 30x30 R10 MURS : BA 13 peint PL. :Dalle 60x60 lavable
SOFFITE EN PLACO
Prelevement G 9.0m² HSP : 235 SOL : Revêtement PVC U4P3 MURS : BA 13 peint P93/H204 PL.: Dalle 60x120
Prelevement
SOFFITE EN PLACO
P93/H204
6.6m² HSP : 235 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x120
Prelevement
SOFFITE EN PLACO
P93/H204
6.6m² HSP : 235 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x120
SOFFITE EN PLACO
Prelevement
P93/H204
6.6m² HSP : 235 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x120
Prelevement
SOFFITE EN PLACO
P93/H204
6.6m² HSP : 235 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x120
WC Public 11.5m² HSP : 220 SOL : Grès cérame 30x30 R10 MURS : BA 13 peint PL.: Dalle 60x60 lavable
Porte 05
Attente 25 places 25.2m² HSP : 220 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Dalle 60x120
SOFFITE EN PLACO
Espace café
6.9m² HSP : 220 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL.: Rigitone
+31.28 ngf
Console
JF
P50/H204
Console
JF JF JF JF
P93/H204 P93/H204
CF2h CANIVEAU CANIVEAU
ALU 27
Garde corps métallique à bareaudage vertical
CF1h
JF JF
Visiophone Centrale incendie
Fixe 492x220 - ALL 00
Poutre 30x40 ALU 24
P90/H204 Fixe 437x220 - ALL 00
ALU 22
Console Porte 17
CF1h
CF1/2h
Porte 13 P93/H204 CF 1/2h + Ferme porte
Vitrage 200x150 - ALL 100 Vitrage 192x150 - ALL 100
Etagères Etagères
Etagères Etagères Etagères
3/H214
P50/H204 Fixe 40x210 - ALL 00 Vitrage opale
Porte 10 Porte 09
CF 1/2h + Ferme porte
3.4m² HSP : 285 SOL : Revêtement PVC U4P3 MURS : BA 13 peint PL. : Rigitone
03 02
01
CF1h
4
P50/H204
PP50/H215
20
Fixe 481x220 - ALL 00
Poutre 30x40
3/H
Vitrage opale
P90/H204
Porte 06 Fixe 40x210 - ALL 00
Porte 06
ALU 17b ALU 17b ALU 17b ALU 17b
Fixe 40x210 - ALL 00 Vitrage opale
ALU 17a ALU 17a
PP90/H215 Ouv 60x120 - ALL 100 Vitrage opale Ouv 60x120 - ALL 100 Vitrage opale
Meuble prélèvement Voir détail 04 Ouv 60x120 - ALL 100 Vitrage opale Ouv 60x120 - ALL 100 Vitrage opale Ouv 60x120 - ALL 100 Vitrage opale Ouv 60x120 - ALL 100 Vitrage opale
Porte 06 Fixe 40x210 - ALL 00 Vitrage opale
Porte 06
Fixe 40x210 - ALL 00 Vitrage opale
Porte 06
Fixe 40x210 - ALL 00 Vitrage opale
Porte 03
Mobilier bas Ht. 85
PV9
Garde corps métallique à bareaudage vertical
E RDC - OCEALAB
CANIVEAU
P9
Meuble prélèvement Voir détail 03 ALU 17b ALU 18 ALU 19
Ouv 60x120 - ALL 100 Vitrage opale Ouv+Fixe 411x170 - ALL 50 Ouv+Fixe 556x170 - ALL 50
EPSM + OCEALAB + 11 LOGEMENTS
Ouv+Fixe 367x220 - ALL 00
51
Portfolio 2009 / 2019 Erwan Eveno Architect