Portfolio - Ethan Hudhud

Page 1

POR TFOL IO

E T H A N

H U D H U D

SELECTED WORKS


PROJECTS P R OFE S S I ON AL WOR K D o h a , Qata r D o h a , Qata r D o h a , Qata r D o h a , Qata r R i ya dh , K S A D o h a , Qata r B u r n a by, B C, Ca n a da Su r rey, B C, Ca n a da Hawa i i , US A To ro nto, ON , Ca n a da D o h a , Qata r M o scow, R u ssi a Ada n a , Tu r key M o scow, R u ssi a K i r k u k , I ra q M i ch i ga n , US A D o h a , Qata r D o h a , Qata r

BUSINESS PARK AL SADD COMPLEX AL SABAN TOWER STUDENT AFFAIRS BUILDING, QATAR UNIV E RSIT Y C LEMENC EAU MEDIC AL C ENTER AL MANA TO WERS C ANADIAN FOO D INSPEC TIO N AGENC Y RESIDENTIAL DE VELOPMENT IN SURRE Y SC IENC E LABOR ATORIES AT BYU COMMER C IAL KITC HEN, TO R ONTO PENTHOUSE, THE PEARL QATAR C AFE SUBLIME ADANA HEALTH C ARE C AMPUS HOMELAND KIRKUK MALL KRUIZENGA AR T MUSEUM EX TENSION ABD ELQADER RESIDENC E ABU KHALIFA RESIDENC E

S C H O O L P R OJE C TS S an Fra n ci sco, C A , USA S an Fra n ci sco, C A , USA S an Fra n ci sco, C A , USA

FIRE STATION WALL OF EQ UILIBRIUM T V STUDIO


BUSINESS PARK Company: Arab Engineering Bureau Project type: MixedUse Role: Site Architect

Client: Mohamed Bin Hamad Holding Location: Najma, Doha, Qatar Plot area: 23,711m² Built up area: 116,420m² Components: 6 Office Buildings, 1 Hotel, 1 Service Apartment Building, 1 Conference & Exhibition Center Guest rooms: 378 Scope: Design & Supervision Cost: QR 700 M Status: Completed (2012)


AL SADD COMPLEX

AL SABAN TOWER

Company: Arab Engineering Bureau

Company: Arab Engineering Bureau

Project type: MixedUse Role: Site Architect

Project type: Residential Role: Site Architect

LOCATION: Al Sadd, Doha, Qatar

Client: Khalid Mohd. Al Rabban

Client: Barwa

Location: West Bay, Doha, Qatar

Location: Al Sadd, Doha, Qatar

Built up area: 36,013m²

Plot area: 27,673m²

Floors: B + G + 27F

Built up area: 202,996m²

Scope: Design

Components: 5 Apartment Buildings

Cost: QR 110 M

3 Office Buildings

Status: Completed (2012)

1 Hotel 1 Recreation Center 1 Car Park Building Guest rooms: 232 Scope: Design & Supervision Cost: QR 1.5 B Status: Completed (2011)


STUDENT AFFAIRS BUILDING, QATAR UNIVERSITY Company: Khatib & Alami Project type: Education Role: Detail facade drawings and solving Revit model errors Client: Qatar University Built-up Area: 300,000 m²


CLEMENCEAU MEDICAL CENTER Company: Khatib & Alami Project type: Hospital Role: Interio modeling and detail drawings

Client: Rana Investment Co. Location: Kingdom of Saudi Arabia Project Specifications Built-up Area: 62,845 m² / 155 beds Construction Cost: $ 76 Million Design Completion Date: 2016


AL MANA TOWERS Company: Khatib & Alami Project type: Retail

LOCATION: Doha, Qatar CLIENT: Al Mana Group GLA: 1,707 sqm Software used: Revit

Room

Reception and Elevator Lobby Offices Private Offices Think-Pod Area WOMEN WC Men WC Meeting Rooms Waiting Lounge Server Room Total

Count

sqm

2 55 12 2 6 6 4 1 1

167 1,147 64 61 33 41 107 57 14 1,707

Room

Reception and Elevator Lobby Offices Private Offices Think-Pod Area WOMEN WC Men WC Meeting Rooms Waiting Lounge Server Room Total

Count

sqm

2 55 12 2 6 6 4 1 1

167 1,147 64 61 33 41 107 57 14 1,707

WOMEN WC MEN WC Server room

2 m² WOMEN WC Office

2 m² WOMEN WC

Office

28 m²

2 m²

2 m² WOMEN WC 2 m²

WOMEN WC

WOMEN WC

21 m²

Office

4 m²

Office

Office

14 m²

Office

MEN WC

Office

16 m²

11 m² 14 m²

3 m²

41 m²

Office

12 m²

MEN WC

41 m²

Office

Office MEN WC

2 m²

28 m²

Office

Office

13 m²

MEN WC

Office

18 m²

31 m²

Office

20 m²

28 m²

2 m² MEN WC

26 m²

26 m²

Office

2 m²

Office

Office

28 m² 41 m²

Pantry

14 m²

Office

Office 20 m² 14 m²

28 m² Office Office

Office

Office

25 m²

28 m²

25 m²

26 m²

Office 27 m²

Reception

Waiting Lounge

Office

57 m²

Meeting Room

Meeting Room

Reception

28 m²

29 m²

107 m²

89 m²

Office

25 m²

27 m²

Office

Office 25 m²

Office

Office

Office

Office

Office

Office

Office

Office

30 m²

22 m²

22 m²

22 m²

22 m²

22 m²

22 m²

30 m²

25 m²

Meeting Room

Meeting Room

Office

18 m²

17 m²

27 m²

Private Office

Private Office

Private Office

Private Office

Private Office

Private Office

Private Office

5 m²

5 m²

5 m²

5 m²

5 m²

6 m²

6 m²

Private Office Private Office 5 m²

5 m²

Private OfficePrivate Office 5 m²

5 m²

Private Office 5 m²

Office

Reception

28 m²

107 m²

Office

Office 23 m²

28 m²

Office Office

27 m²

Think-Pod Area

Office

21 m²

34 m²

Office 21 m²

Office 21 m²

Office 18 m²

Office 18 m²

Office

Office

Office

Office Office

18 m²

18 m²

18 m²

Office

Think-Pod Area

18 m² 21 m²

21 m²

Office 25 m²

6 m²

Private Office Private Office 5 m²

5 m²

Private OfficePrivate Office 5 m²

5 m²

Private Office 5 m²

21 m² 34 m²

28 m²

Private Office

Office

PROPOSAL FOR A BUSINESS CENTER FIRST FLOOR ALMANA TWIN TOWERS

Office

Office

23 m²

28 m²


CANADIAN FOOD INSPECTION AGENCY Contract with CTA Project type: Laboratories Role: drawing and coordinating MEP and architectural drawings

RESIDENTIAL DEVELOPMENT IN SURREY Contract with Wilson Chang Architects Project type: Residential Role: Units layout options and facade

Client: City of Burnaby

Client: City of Surry

Location: Burnaby, BC, Canada

Location: Surry, BC, Canada Size: 5 city blocks

SCIENCE LABORATORIES AT BYU Contract with CTA Project type: Laboratories Role: Program layout and furniture and equipment arrangement Client: Brigham Young University Location: Hawaii


COMMERCIAL KITCHEN, TORONTO Contract with MMC Project type: Commercial Kitchen Role: Schematic Program Design

LOCATION: Toronto, ON, Canada CLIENT: Mahmood Khadoora, MMC Software used: Revit

Existing Kitchen Walk-In Freezer Walk-In Fridge Toilets

Office

5 Workstations

Office Office

Office

Screen 3 Workstations


PENTHOUSE, THE PEARL QATAR Client: The Hadid family

Software used: •

Revit

Photoshop

Vernacular Habitable zones: Traffic Zones: • Living room • Entrance • Dining room • Corridor • Kitchen • Bed zones

Cozy

Low ceiling

Wood

Temperature Controle The design concept is a formula for creating zones with varying spatialtemperatures. Each zone demands certain spacial-temperature which will be created with a combination of materials, ceiling heights and colors. Formulas

Stone High ceiling

Sparse Metal

Zone Temperature

Habitable zones (warm) = wood + low ceiling + warm colors Traffic zones (cool) = stone or metal + high ceiling


Recessed enclosure

N

Raised grass pad BBQ: Annual wind direction (North-East to South-West)

Guest Room

Source: https://www.windfinder. com/windstatistics/doha

15 m²

Book shelves and a LCD TV

Terrace bar

Bath 5 m² Living/Dining 104 m²

P.R.

Shower

4 m²

Balcony

Ground Lights

20 m²

Ground lights

Fish tank

Raised grass pad Terrace

Parquate

75 m²

Ground lights

Stairs independent risers

Dog house

Storage Bath 5 m²

Security camera (Intercom system)

Maid's Room

2 m²

10 m²

1

2

Laundry

1

Ground 3m

1 : 100

Kitchen 31 m²

3 m²

0

Tanning bed

Kitchen bar Gray tile


Ground Floor - Perspective - Living room

Ground Floor - Perspective - Living room


First Floor - Perspective - Walk In Closet

First Floor - Perspective - Man Cave Bath

First Floor - Perspective - Man Cave


First Floor - Perspective - Master Bedroom


CAFE SUBLIME While working with C Concept Design, Netherlands Completion: November 2015 LOCATION: Moscow, Russia CLIENT: TPS Investment Group GLA: 240 sqm Software used: •

Revit

Photoshop

Illustrator

InDesign


Cafe Sublime, Interior perspective


ADANA HEALTH CARE CAMPUS Company: C Concept Desinger Project type: Hospital, Retail and Hotel LOCATION: Adana, Turkey Retail: Ground floor 6.600 m2 Mezzanine 2.650 m2 Total 9.250 m2 Retail: +/- 10.000m2 GLA @ 3pp / 100 m2 = 300pp Dormitory: 4.000 students @ 2% with cars =80pp staff and visitors = 20pp. Total 100pp Clinic: 40pp for staff + 40pp for visitors. Total 80pp Hotel: 30pp for staff and guests TOTAL: 510 PARKING PLACES Design: 130pp surface + 380pp underground TOTAL: 510 PARKING PLACESRENAISSANCE Software used: SketchUp, Photoshop, Illustrator, InDesign


HOMELAND While working with C Concept Design, Netherlands Completion: December 2015 LOCATION: Moscow, Russia

Software used:

CLIENT: Rodina Group

Revit

RESIDENTIAL BUILDING: Type A 93,600 sqm, Type B 40,300 sqm

Photoshop

ART AND SPORT FACILITIES: 9,250 sqm

Illustrator

TOTAL GBA FACILITIES 14,000 sqm

InDesign

TOTAL LAND AREA: 13 Ha


Homeland (Aerial perspective)


KIRKUK MALL

While working with C Concept Design, Netherlands Completion: Januar y 2016 LOCATION: Kirkuk, Iraq CLIENT: HEWA Holding

Kirkuk Mall (Ground Floor)

Software used: •

Revit

Illustrator

InDesign


Kirkuk Mall (Site plan)

Kirkuk Mall (Aerial perspective)


KRUIZENGA ART MUSEUM EXTENSION While working with C Concept Design, Netherlands January 2016 LOCATION: Michigan, USA CLIENT: Hope College

Software used: •

Revit

Illustrator

InDesign



ESIDENCE







Perspective - Ground Floor - Kitchen


Perspective - Ground Floor - Entrance


SIDENCE






FIRE STATION

FIRE STATION AT LOMBARD AND FILLMORE Studio 653, Spring 2011 The design responds to the midcentury modern buildings which surround the site. This influence is articulated in the “butterfly roof.” The facade of the building is indicative of the program behind it. This adds the element of transparency to the fire station.

Scool Project

Software used: •

Revit

AutoCAD



ALIGN W/ EDGE OF HEAD

1" INSULATED GLAZING UNIT

D E TA I L # 1

PARTIAL SEC TION #1 DETAIL #5

DETAIL #1

1/4" EXPANSION ANCHORE

DETAIL #6

1" INSULATED GLAZING UNIT

18" DEEP CONCRETE BEAM, SSD

F

1/8" THK. EXTRUDED ALUMINUM TRIM

SOLID SHIM W/ BAIT INSULATION IN BETWEEN

E

D

D

E

SEALANT & BACKER ROD

SEALANT & BACKER ROD

SEALANT & BACKER ROD

1" INSULATED GLAZING UNIT 2-1/4" DEEP THERMAL FRAME

1/8" THK. EXTRUDED ALUMINUM TRIM

DETAIL #2

3" DEEP THERMAL HEAD RECEPTOR 2-1/4" DEEP THERMAL FRAME

1

2-1/4" DEEP OUTSWING THERMAL CASEMENT

1/4" JOINT W/ SEALANT & BACKER ROD, TYP

3"X1/2"X1/16" THK. ALLUMINUM BENT PLATE CLOSURE. ADHERED TO HEAD W/ VHB TAPE SEALANT & BACKER ROD ALIGN W/ EDGE OF HEAD

2-1/4" DEEP THERMAL FRAME

3"X1/2"X1/16" THK. ALLUMINUM BENT PLATE CLOSURE. ADHERED TO HEAD W/ VHB TAPE ALIGN W/ EDGE OF HEAD

4

2

6

1" INSULATED GLAZING UNIT

1" INSULATED GLAZING UNIT CHIEF'S OFFICE 27' - 0"

CHIEF'S OFFICE 27' - 0"

COMUNICATION 24' - 0"

1" INSULATED GLAZING UNIT

COMUNICATION 24' - 0"

1" INSULATED GLAZING UNIT

DETAIL #1

D E TA I L # 2

ALUMINUM WATER COLLECTION CHANNEL

RECREATION AND DORMS

DETAIL #5

RECREATION AND DORMS

DETAIL #6

3

15' - 0"

15' - 0"

GYM 12' - 0"

1/4" EXPANSION ANCHORE

GYM 12' - 0"

1" INSULATED GLAZING UNIT

18" DEEP CONCRETE BEAM, SSD

DETAIL #3 F

SEALANT & BACKER ROD 1/8" THK. EXTRUDED ALUMINUM TRIM 1/8" THK. EXTRUDED ALUMINUM TRIM

DEEP THERMAL 2-1/4" DEEP 3" THERMAL FRAMEHEAD RECEPTOR 2-1/4" DEEP THERMAL FRAME

DETAIL #2

1" INSULATED GLAZING3"X1/2"X1/16" UNIT THK. ALLUMINUM BENT PLATE CLOSURE. ADHERED TO HEAD W/ VHB TAPE ALIGN W/ EDGE OF HEAD

D

D

E GROUND Ground

Ground 0' - 0"

0' - 0" 2-1/4" DEEP THERMAL FRAME

SEALANT & BACKER ROD 2-1/4" DEEP OUTSWING THERMAL CASEMENT

2-1/4" DEEP OUTSWING THERMAL CASEMENT

3"X1/2"X1/16" THK. ALLUMINUM BENT PLATE CLOSURE. ADHERED TO HEAD W/ VHB TAPE 1/4" JOINT W/ SEALANT & BACKER ROD, TYP ALIGN W/ EDGE OF HEAD

1" INSULATED GLAZING UNIT

E

SEALANT & BACKER ROD

SEALANT & BACKER ROD

WATER TANK -8' - 0 1/2"

WATER TANK -8' - 0 1/2"

1 4

1" INSULATED GLAZING UNIT

2

1" INSULATED GLAZING UNIT 2 6

RAINWATER COLLECTION SYSTEM #2 1/4" = 1'-0"

1

1" INSULATED GLAZING UNIT SEALANT & BACKER ROD

D E TA I L # 3

DETAIL #4

CHIEF'S OFFICE 27' - 0"

CHIEF'S OFFICE 27' - 0"

COMUNICATION 24' - 0"

1" INSULATED GLAZING UNIT

DETAIL #1

RAIN WATER COLLECTION SYSTEM #1 1/4" = 1'-0"

COMUNICATION 24' - 0"

PARTIAL SEC#6 TION # 2 DETAIL

DETAIL #5

ACADEMY of ART UNIVERSITY

FADI HUDHU

ARH 653, PIERLUIGI SERRANO

RECREATION AND DORMS 15' - 0"

ALUMINUM WATER COLLECTION CHANNEL

E

D

GYM 12' - 0"

GYM 12' - 0"

SPRING 2

3

RECREATION AND DORMS 15' - 0"

F

1/8" THK. EXTRUDED ALUMINUM TRIM

DETAIL #3

D

E

SEALANT & BACKER ROD 1" INSULATED GLAZING UNIT 2-1/4" DEEP THERMAL FRAME

D E TA I L # 4

DETAIL #2TRIM 1/8" THK. EXTRUDED ALUMINUM

3"X1/2"X1/16" THK. ALLUMINUM BENT PLATE CLOSURE. ADHERED TO HEAD W/ VHB TAPE ALIGN W/ EDGE OF HEAD

1

GROUND Ground 0' - 0"

SEALANT & BACKER ROD

Ground 0' - 0"

4

2

6

2-1/4" DEEP OUTSWING THERMAL CASEMENT

SEALANT & BACKER ROD

WATER TANK -8' - 0 1/2"

1" INSULATED GLAZING UNIT

WATER TANK -8' - 0 1/2"

CHIEF'S OFFICE 27' - 0"

CHIEF'S OFFICE 27' - 0"

COMUNICATION 24' - 0"

1" INSULATED GLAZING UNIT 2

COMUNICATION 24' - 0"

RAINWATER COLLECTION SYSTEM #2 1/4" = 1'-0"

1

RAIN WATER COLLECTION SYSTEM #1 1/4" = 1'-0"

RECREATION AND DORMS

DETAIL #4

RECREATION AND DORMS

15' - 0"

ALUMINUM WATER COLLECTION CHANNEL

3

15' - 0" GYM 12' - 0"

GYM 12' - 0"

D E TA I L # 6

DETAIL #3 ACADEMY of ART UNIVERSITY

FADI HUDHUD

ARH 653, PIERLUIGI SERRANO

1/8" THK. EXTRUDED ALUMINUM TRIM

GROUND Ground 0' - 0"

Ground 0' - 0"

SPRING 2011

SEALANT & BACKER ROD 2-1/4" DEEP OUTSWING THERMAL CASEMENT WATER TANK -8' - 0 1/2"

WATER TANK -8' - 0 1/2"

1" INSULATED GLAZING UNIT 2

RAINWATER COLLECTION SYSTEM #2 1/4" = 1'-0"

1

RAIN WATER COLLECTION SYSTEM #1 1/4" = 1'-0"

DETAIL #4

ACADEMY of ART UNIVERSITY ARH 653, PIERLUIGI SERRANO

F I R E S TAT I O N

SOLID SHIM W/ BAIT INSULATION IN BETWEEN

1/8" THK. EXTRUDED ALUMINUM TRIM

FADI HUDHUD SPRING 2011



WALL OF EQUILIBRIUM

THE WALL NORTH OF GOLDEN GATE PARK S t u d i o 6 0 8 , Fa l l 2 0 1 2 In San Francisco there are two extremes; the park is the natural world, the city a man-made metropolis. The wall is designed to achieve an environmental equilibrium while addressing the need of an individual to reconnect with nature while maintaining his or her connection to society. The design of the wall also strives to solve problems of waste, homelessness, and hunger in the city.

Scool Project

Software used: •

Revit

Photoshop

Illustrator

Sketchup


SITE MAP

FARM PLAZA RESIDENTIAL BUILDINGS ROOF FARMS AGRICULTURAL SCHOOL MARINE BIOLOGY SCHOOL

CIRCULATION

DORMS

BUS STOP PADESTRAIN VEHICLE

RETAIL/RESTAURANTS /COFFEE SHOPS OFFICES

GRAY/BLACK/SEWAGE WATER TREATMENT PLANTS GARDEN SOLAR POWER COLLECTORS GREENS

HOMELESS REHABILITATION CENTER ELEVATED GREENHOUSE Agriculture Farm

CONTINUES MEZZANINE LEV

Park/Lawn

BUILDINGS

CENTRAL ENTERTAINMENT C water and waste recycling c

MAJOR CIRCULATORY ROUTE WALL

x2 PROGRAMS

Population density in San Fran

Relocating 29,870 People Residencial(Multi)

Commercial(Residencial)

Residencial(Single)

Commercial

Residencial(Family)

Public( University, museum, gallery, etc)

Residencial(Farming)

Public utilities

Farm land to supo

The reclaimed farm lan

SOURCE: http://www.city-data.com/city/San-Franci


SITE PROGRAM

Commercial

Housing

Hotel

Vertical circulation

University

Office

Roof Collection

Irrigation

Building System

Fog Collection

Surface Collection

Cistern/ Storage

Public Drinking Water

Landscape (water fall)

APARTMENTS

APARTMENTS

VERTICAL TUBULAR FARMS

RETAI

RESTAURANTS & COFFEESHOPS

FARMERS MARKET

FARMERS MARKET

PLAZA

RESTAURANTS & COFFEESHOPS

RETAI



TV STUDIO

TV STUDIO FOR EXTREME PLASTIC SURGERY SHOW S t u d i o 6 0 9 , Fa l l 2 0 1 2 This project is a television studio for a show that sheds light on extreme facial plastic surgery. The form of this building is the result of associating “modifiers” such as the rate of plastic surgeries performed in the city of San Francisco and a spatial component. The spatial components were developed originally for a wearable prosthesis which correspond to the conditions of a shoulder and a wing. With the process of association and elimination the components started to evolve with the force of “modifiers” and “anchors” in a chosen site in the city of San Francisco.

Scool Project

SF 1500 D 1500 D 1500

Software used: •

3Ds Max

Photoshop

Illustrator

e

Unemployment rates in SF Rush hour

7% 10% 5.25% 2.10%

-

8%

5% 3.75% 1.50%

I Want a Famous Face Dr. 90210 Extreme Makeover Nip/Tuck

Skin & Hair Breast Fat Face and hair Rest of body

4%

2%

8

6

$2500 4

100% 0.6m

4% 25.0% 3.00% 1.20% $2000 0.45m 3% 2.25% 2.90% 2% 1.5% 1.60%

Cheek implants

$4000

6% 4.50% 1.80%

0.00% 0.3m

$1500 25.0%

1% 0.75% $1000 0.30%

Rhinoplasty 1997

0 0 0

01:00

ea Ko r th So u

ee ce

02:00

Gr

ly

03:00

Ita

il

bia lom Co

04:00

az

05:00

Br

06:00

1998

Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan

1999

US

an

07:00

Ta iw

Ja pa

n

08:00

09:00

e

ex ico M

na d

a

10:00

2000

Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan

2001

Fr an c

11:00

Ca

Ve ne zu ela

ain

lan ds he r Ne t

Sp

ali a

12:00

13:00

2002

Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan

2003

Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan

2004 14:00

Au str

rk

ey

15:00

Tu

y

16:00

an

bia ra ud iA Sa

m

2005

Ge rm

17:00

18:00

an ia

19:00

2006

Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan

2007

Ro

ita in

20:00

Br

d

21:00

Th ail an

ia

22:00

Ru ss

Ch

dia In

ina

23:00

24:00

2008

Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan

2009

Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan

2010

100%

0.15m

100% 0m

2 0 1.0 0.0 3 1 0 3 1 0 0.5 0.0


Stomy Erasure ACxCy++

Stretching Migration ECxCy++

Stretching Migration ECxCy++


Connection between COM-3 and AUG-4 Connection between STR-4 and STO2-3-SD

Connection between COM-3 and STO2-3

Connection between STO1-4 and COM-4 -SD

Connection Areas

Connection between STR-4 and STO2-3-SD

Movement of the prosthetic and it’s growth around the site

Component density; when noise increases the aggregation scale gets larger. When noise decreases the aggregation scale Cat Walk StudioCat Walk Studio

Entrances

Entrances

Circulation” Thought out the Prosthetic “ Circulation” Throughout the Prosthetic “

Circulation “Ramp” Thought out the Prosthetic “ Circulation “Ramp” Throughout the Prosthetic “

Studio

Prosthetic Connection between the Spaces


THANK YOU FOR YOUR CONSIDERATION

ethan.hudhud@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.