ASSESSING RISK TO INFRASTRUCTURE OUTSIDE OF PROJECT AREA
A screening level assessment for buildings outside of the project area and within the 2070 0.1% flood extent indicates:
2030
As soon as 2030, 10% AEP water level could flood nearly half of Main St. and virtually all of Merchant's Way.
2050
In 2050, the 10% AEP water level would produce more severe flooding, impacting all Merchant's Way and about two-thirds of Main St. within the project area (up to Fire Station).
2070
2070 and beyond, a 10% AEP water level would flood both streets across the entire project area.
The buildings are colored according to the highest probability (and lowest intensity) AEP that would impact the building at the Finished Floor Elevation (FFE).