Meeting Agenda
Welcome & Consultant Team Update 20 min
Watershed Plan Update – Vision, Goals & Objectives 35 min
Project Schedule & Next Steps 5 min

Project Schedule

2023 2024 Task Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 1. Quality Assurance Project Plan QAPP Approved - Task Completed 2. Project Advisory Committee Meetings 3. Design Development of Priority GI Projects 4. Watershed Plan Update 5. Public Outreach & Community Engagement 6. Project Meetings and Management 12 Months 8 Months 1 2 3 4 5 6 1 2 3 4 5 6 7 11 Months Advisory Committee Project Partners 8 9 Data Gathering & Review Project Screening & Selection Preliminary Design Permit Level Design

Consultant Team Update

Task 3 – Green Infrastructure Design Development

Analysis & Concept Phase

1. Data Gathering & Review

• Compile GIS mapping

• Inventory public and institutional properties

• Identify existing GI

• Identify planned capital improvements

2. Project Screening & Selection

• Desktop screening

• Property owner interviews

• Field inventories (20 to 40 sites)

• Green infrastructure concepts (up to 15)

• Technical Memo

3. Preliminary Design

• 5 projects

• Field survey

• Test pits & infiltration testing

• Wetland delineation

• Preliminary layout

• Opinion of cost

• Technical Memo

3. Permit Level Design

• 3 projects

• Level of detail to support local/state permitting

Consultant Team Update

Green Infrastructure Screening

• Inventory of public (municipal and state) and institutional properties

Consultant Team Update

Green Infrastructure Screening

• Public & institutional properties, 98 potential parcels identified

• Green Stormwater Infrastructure (GSI)

− 0.5 acre or more of impervious area

− All soil types considered

• Riparian Corridor Green Infrastructure

− Parcels within 300-foot riparian corridor

• Further refinement to target up to 40 sites for field inventories

Consultant Team Update

Green Infrastructure Screening

Consultant Team Update

Task 3 – Design Development (Next Steps)

• Refine GI site screening

− Areas of observed flooding (MDC)

− Ongoing & planned projects and capital improvements

− Property owner coordination

• Plan and start field work (20 to 40 sites) by end of October

• Select up to 15 sites for GI concept development

Consultant Team Update

Task 4 – Watershed Plan Update

• Draft update in progress

− Refined watershed mapping

− Reviewed status of 2010 plan recommendations

• New project website

STREAMS & SUBWATERSHEDS

28.6 SQUARE MILES

TOTAL WATERSHED AREA

14 SUBWATERSHEDS

4 MAJOR TRIBUTARIES

5.4 MILES NORTH BRANCH MAINSTEM (ABOVE GROUND)

0.5 MILES NORTH BRANCH MAINSTEM (BURIED)

Consultant Team Update

2010 Plan Recommendations – Major Accomplishments

Consultant Team Update

Key Recommendations Not Fully Implemented

Consultant Team Update New Project Website

Project website link

Consultant Team Update

Task 5 –

Public Outreach & Community Engagement

Community Engagement Update

• September 19th – West End Farmers Market

• September 23rd – North Branch Cleanup/Source to Sea Cleanup

• Upcoming Activities

Watershed Plan Survey/Questionnaire

October 24th Farmers Market

Additional bioretention maintenance projects

Writing of the Land (Spring 2024 publication)

Task 5 – Public Outreach & Community Engagement

September 23rd river cleanup and removal of invasive plants

Hartford International University for Religion and Peace, Interreligious Ecojustice Network, West End & Asylum Hill Neighborhood Association, Park Watershed

Consultant Team Update

September 25th Flooding

Consultant Team Update

September 25th Flooding

Watershed Management Plan Update

Plan Vision, Goals, and Objectives

• 2010 Watershed Management Plan Goals & Objectives

GOAL A: PLAN IMPLEMENTATION (CAPACITY BUILDING)

Establish Watershed Organization

Conduct Additional Field Assessments

GOAL B: WATER QUALITY

Reduce or Eliminate CSO Discharges

Implement LID and Green Infrastructure

Identify and Eliminate Illicit Discharges

Protect and Restore

Riparian Buffers

Implement Water Quality Monitoring Program

GOAL C: HABITAT PROTECTION & RESTORATION

Enhance In-stream and Riparian Habitat

Protect and Enhance Forests and Urban

Tree Canopy and Restore Understory

Vegetation Control Invasive

Species

GOAL D: SUSTAINABLE

GROWTH & LAND USE

Promote Smart Growth

Protect Open Space

Promote Low-Impact, Context-Sensitive

Greenways

Increase Public Access to the River

GOAL E: PUBLIC EDUCATION & STEWARDSHIP

Create Education & Stewardship Network

Campus Facility Managers Outreach

Residential Outreach

Municipal and Business Outreach

Watershed Management Plan Update

Plan Vision, Goals, and Objectives

• 2024 Watershed Management Plan Update

− Develop clear vision for the plan

− Help inform the plan update (goals, objectives, actions)

− Guide the stakeholders responsible for implementing the plan (municipal leaders, MDC, CT DEEP, other agencies, Park Watershed, etc.)

Watershed Management Plan Update

• Plan Vision Statement

Examples: Plan Vision, Goals, and Objectives

− Should have a water quality focus, by definition (to satisfy EPA watershed planning requirements)

− What else do the watershed stakeholders value and want as outcomes?

− What current priorities (desires/aspirations) might shape the vision for the future of the North Branch Park River watershed and its communities?

Water Quality Flooding River Access Open Space Protection Recreation Climate Resilience & Extreme Heat Community Amenities Responsible Growth Equity Education

Watershed Management Plan Update

Plan Vision, Goals, and Objectives

• Need your input (Advisory Committee members) and the broader watershed community (residents, municipalities, businesses, etc.)

− Water quality and related issues that should be addressed in the plan update and desires/aspirations for the NBPR and its watershed

• Developing survey/questionnaire for the Advisory Committee members and Project Partners, also for use with upcoming engagement events to help gather feedback from the community

Plan Vision, Goals, and Objectives Group Discussion Watershed Management Plan Update

1. What are the problems?

What are the most important issues that should be addressed in the 2024 North Branch Park River Watershed Management Plan Update?

2. What is the big picture vision?

What are outcomes you would most like to see in the 2024 Plan Update?

3. How can you or your organization support this process?

Provide information about your neighborhood/property, host an event, send us photos, share the survey with your network, etc.

Next Steps

• GI Design Development

− Conduct field inventories of potential GI sites (late October)

− Develop GI concept designs (November)

• Watershed Plan Update

− Continue to refine plan vision, goals, objectives

• Stakeholder Engagement

− Watershed Plan Survey/Questionnaire

− October 24th Farmers Market

• Next Advisory Committee Meeting (December 7th)

Considering joint Advisory Committee & Project Partners meeting

North Central Conservation District

Questions and Discussion

Contacts:

Joanna Shapiro jshapiro@conservect.org

Erik Mas emas@fando.com

Mary Rickel Pelletier maryp@parkwatershed.org

Brian Martin Brian.Martin@tpl.org

Walker Holmes walker.holmes@tpl.org

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.