AMEC Introduction
02/06/2009
3
AMEC – Areas of Operation mining
02/06/2009
4
AMEC at a Glance
AMEC is a leading international project management, engineering and services company. We design, deliver and support clients’ assets, from local technical services to international landmark projects.
AMEC's Natural Resources, Power and Process and Earth and Environmental businesses employ over 23,000 people in more than 30 countries globally. Worldwide annual revenues of over US$4.6 billion
02/06/2009
5
AMEC Paragon at a Glance
AMEC Paragon is AMEC’s hub for oil and gas operations based in Houston, Texas, providing engineering, materials management, and construction management services to the oil and gas, pipeline, and midstream industries.
More than 700 people Completed more than 4,000 projects in 30 countries for over 260 clients. 28 Year History of Excellence in Houston
02/06/2009
6
Integrated Project Execution
What Is IPE?
02/06/2009
7
What Is IPE ? AMEC Paragon uses Aveva’s Suite of Applications in an environment which…
…enables the collaboration …of all parties …and all applications
…involved in an EPC project …executed from multiple locations
…safely, efficiently and effectively
02/06/2009
8
Challenges of a Design Project
The design model must reflect reality (what is to be built)
Document changes must be controlled
Information must be readily available to all
Changes in one document must be reflected in all documents
The pieces must fit together when fabricated
02/06/2009
9
Solutions to Design Challenges
The design model must reflect reality (What is to be built) – Design model must be dynamically linked to P&ID’s and procurement
Document changes must be controlled – Electronic approvals required for revisions
Changes in one document must be reflected in all documents – Documents, models and other engineering deliverables must be linked and “red flagged” when a change is made
Information must be readily available to all – Internet access required – Documents must be linked for quick reference
The pieces must fit together when fabricated – Design model must include everything (actual structure, pipe supports, cable trays, realistic valves and controls)
02/06/2009
10
Description of IPE IPE
Industry Standard
Trained staff using a common work process
Each project organized differently
Intelligent P&IDs linked to 3-D Model, engineering deliverables and procurement & expediting databases
Separate stand alone databases and spread sheets
Automatic consistency check between P&ID, procurement and 3-D Model
Not possible
Electronic control requiring approvals for issuing revisions
Manual approvals based on signature block. Revisions can be issued without proper sign-off
Latest revision automatically available on electronic document management system
Manual checking is necessary to assure the paper document being used is latest issue. Not possible to assure destruction of all out of date documents.
02/06/2009
11
Description of IPE (Continued) IPE
Industry Standard
Historical tracking of drafts and revisions
Manual tracking possible only if old copies kept and everyone manually records each change made
All changes “red flagged” on all other effected documents
Not possible
All documents searchable and crossreferenced by metadata (e.g. tag number, PO, line number, etc.)
Not possible
Design done in 3-D Model. Drawings printed from 3-D Model
Model built from 2-D drawings
3-D Model includes all pipe, pipe supports, cable trays and controls
Model includes major pipe
3-D Model includes proper coping of structural joints
Structural members carried to centerline of joint
All data shared over Internet
Not possible
02/06/2009
12
IPE System Diagram Convero PROJECT MANAGEMENT, PROJECT ACCOUNTING, HOME OFFICE MANAGEMENT, CONSTRUCTION MANAGEMENT, & DOCUMENT CONTROL
Estimating System Fusion DOCUMENT MANAGEMENT FOR ALL PROJECT DOCUMENTS, PROCESS WORKFLOW, & COLLABORATION
STATUS REPORTING
AMEC Paragon Systems Summary • Convero provides project cost, progress, time entry, and document control. • Fusion provides document management with bi-directional integration to Convero. • VPID provides intelligent P&IDs with native integration to VPE and PDMS using Model Object Manager. • VPE is the engineering database providing datasheets, major equipment list, line list, and specialty items list with native integration with VPRM. • INtools is the instrument database providing datasheets, loops, and the instrument index with custom integration to VPE for basic tag data management. • VPRM is the material management system used to create requisitions, purchase orders, material tracking and expediting with status reporting to Convero. • VPD / PDMS is the 3D design system that will be used with native integration to VPE and VPRM as noted above.
TAGGED ITEMS INDEXES
VPID CONTROLLING ENGINEERING DOCUMENT
VPE H O L D
ENGINEERING DATABASE
P&IDs
INtools P&IDs SPECIFICATIONS
INSTR. DATABASE
VPRM H O L D
ENGINEERING
H O L D
PROCUREMENT
MATERIAL CATALOG
MATERIAL MANAGEMENT
PDMS SPECIFICATIONS
MTO & REQUISITIONS
VPD 3D MODEL (PDMS) ALL NON-TAGGED BILLS OF MATERIALS
02/06/2009
13
02/06/2009
14
Aveva Provides the Framework that delivers IPE: • Reliable and repeatable work processes • Common technical database across multiple projects areas, eliminating duplicated effort & producing consistent results • Common configuration across multiple projects, resulting in consistent design and execution • Consistent basis for progress tracking & reporting • Improved quality management • Improvements in communication and collaborative work effort between multiple work sites • Consistent material requisitions, awards and tracking of procured equipment and material • Quicker and more consistent conveyance and storage of deliverables and other project documents
02/06/2009
15
Integrated Project Execution
Delivering Measurable Projects Savings
02/06/2009
16
Overview of Project #1
To help provide a magnitude to the size and scope of this project here are some brief statistics: – – – – –
Existing offshore gas platform West Coast of Africa 100,000 man-hour project $10MM engineering High pressure (3000 psig), large bore pipe routing
02/06/2009
17
“Before” Pictures of the Existing Platform
02/06/2009
18
Existing Area Looking East
02/06/2009
19
Existing Area Looking West
02/06/2009
20
PDMS Model Illustrations
02/06/2009
21
PDMS Model View
02/06/2009
22
PDMS Model View
02/06/2009
23
PDMS Model View
02/06/2009
24
PDMS Model View
02/06/2009
25
“After” Pictures of the Installation
02/06/2009
26
Blowdown Line tie-in to Flare Scrubber
02/06/2009
27
Incoming Gas
02/06/2009
28
Looking South
02/06/2009
29
Looking Southeast
02/06/2009
30
Looking Northeast
02/06/2009
31
Looking North
02/06/2009
32
Looking North / Injection Line
02/06/2009
33
Looking West / Maintenance Cart Path Markings / Incoming 16 Inch Gas Line
02/06/2009
34
Looking Southwest
02/06/2009
35
West Side of Firewall
02/06/2009
36
Looking Southeast
02/06/2009
37
Delivering Measurable Projects Savings (Continued)
Offshore project using laser scanning integrated with PDMS design were cutting edge efforts. The following benefits were obtained :
20% reduction in spool piping field welds 0% rework of piping and structural clashes within the new installation. Project saved approximately one month of offshore hook-up time at completion 5% reduction of material waste due to lack of interferences, clashes, rerouting, etc. Reduced Engineering time by up to 10% Reduced Offshore Visits by up to 70%
02/06/2009
38
Overview of Project #2
The magnitude, size and scope of this project here are some brief statistics: – – – – –
New build offshore gas platform 6000 ton topsides West Coast of Africa 100,000 man-hour project $12MM engineering
02/06/2009
39
Delivering Measurable Projects Savings (Continued)
Offshore project using VPE, VPRM, and PDMS integration had measurable value. AMEC Paragon obtained the following benefits:
50% reduction in Procurement group man-hours for major equipment packages.
90% reduction in Procurement group man-hours for bulk material packages.
50% reduction in Document Control man-hours for client handover.
95% reduction in reprographic costs related to client handover.
Creation of weight management reports in less than 5 minutes instead of 4 hours.
02/06/2009
40
Integrated Project Execution
Review
02/06/2009
41
In Summary
IPE uses Aveva’s Suite of Applications as an integral part of an environment which enables the collaboration of all parties and all applications involved in an EPC project executed from multiple locations safely, efficiently and effectively.
IPE delivers documented results and savings IPE delivers a competitive advantage and strengthens AMEC Paragon’s ability to deliver quality projects to our customers.