Using Aveva’s Suite of Applications to Deliver Project Savings October, 2007


02/06/2009

2

AMEC Introduction


02/06/2009

3

AMEC – Areas of Operation mining


02/06/2009

4

AMEC at a Glance

AMEC is a leading international project management, engineering and services company. We design, deliver and support clients’ assets, from local technical services to international landmark projects.

 

AMEC's Natural Resources, Power and Process and Earth and Environmental businesses employ over 23,000 people in more than 30 countries globally. Worldwide annual revenues of over US$4.6 billion


02/06/2009

5

AMEC Paragon at a Glance

AMEC Paragon is AMEC’s hub for oil and gas operations based in Houston, Texas, providing engineering, materials management, and construction management services to the oil and gas, pipeline, and midstream industries.

  

More than 700 people Completed more than 4,000 projects in 30 countries for over 260 clients. 28 Year History of Excellence in Houston


02/06/2009

6

Integrated Project Execution

What Is IPE?


02/06/2009

7

What Is IPE ? AMEC Paragon uses Aveva’s Suite of Applications in an environment which…

…enables the collaboration …of all parties …and all applications

…involved in an EPC project …executed from multiple locations

…safely, efficiently and effectively


02/06/2009

8

Challenges of a Design Project 

The design model must reflect reality (what is to be built)

 

Document changes must be controlled

 

Information must be readily available to all

Changes in one document must be reflected in all documents

The pieces must fit together when fabricated


02/06/2009

9

Solutions to Design Challenges  

The design model must reflect reality (What is to be built) – Design model must be dynamically linked to P&ID’s and procurement

Document changes must be controlled – Electronic approvals required for revisions

Changes in one document must be reflected in all documents – Documents, models and other engineering deliverables must be linked and “red flagged” when a change is made

Information must be readily available to all – Internet access required – Documents must be linked for quick reference

The pieces must fit together when fabricated – Design model must include everything (actual structure, pipe supports, cable trays, realistic valves and controls)


02/06/2009

10

Description of IPE IPE

Industry Standard

Trained staff using a common work process

Each project organized differently

Intelligent P&IDs linked to 3-D Model, engineering deliverables and procurement & expediting databases

Separate stand alone databases and spread sheets

Automatic consistency check between P&ID, procurement and 3-D Model

Not possible

Electronic control requiring approvals for issuing revisions

Manual approvals based on signature block. Revisions can be issued without proper sign-off

Latest revision automatically available on electronic document management system

Manual checking is necessary to assure the paper document being used is latest issue. Not possible to assure destruction of all out of date documents.


02/06/2009

11

Description of IPE (Continued) IPE

Industry Standard

Historical tracking of drafts and revisions

Manual tracking possible only if old copies kept and everyone manually records each change made

All changes “red flagged” on all other effected documents

Not possible

All documents searchable and crossreferenced by metadata (e.g. tag number, PO, line number, etc.)

Not possible

Design done in 3-D Model. Drawings printed from 3-D Model

Model built from 2-D drawings

3-D Model includes all pipe, pipe supports, cable trays and controls

Model includes major pipe

3-D Model includes proper coping of structural joints

Structural members carried to centerline of joint

All data shared over Internet

Not possible


02/06/2009

12

IPE System Diagram Convero PROJECT MANAGEMENT, PROJECT ACCOUNTING, HOME OFFICE MANAGEMENT, CONSTRUCTION MANAGEMENT, & DOCUMENT CONTROL

Estimating System Fusion DOCUMENT MANAGEMENT FOR ALL PROJECT DOCUMENTS, PROCESS WORKFLOW, & COLLABORATION

STATUS REPORTING

AMEC Paragon Systems Summary • Convero provides project cost, progress, time entry, and document control. • Fusion provides document management with bi-directional integration to Convero. • VPID provides intelligent P&IDs with native integration to VPE and PDMS using Model Object Manager. • VPE is the engineering database providing datasheets, major equipment list, line list, and specialty items list with native integration with VPRM. • INtools is the instrument database providing datasheets, loops, and the instrument index with custom integration to VPE for basic tag data management. • VPRM is the material management system used to create requisitions, purchase orders, material tracking and expediting with status reporting to Convero. • VPD / PDMS is the 3D design system that will be used with native integration to VPE and VPRM as noted above.

TAGGED ITEMS INDEXES

VPID CONTROLLING ENGINEERING DOCUMENT

VPE H O L D

ENGINEERING DATABASE

P&IDs

INtools P&IDs SPECIFICATIONS

INSTR. DATABASE

VPRM H O L D

ENGINEERING

H O L D

PROCUREMENT

MATERIAL CATALOG

MATERIAL MANAGEMENT

PDMS SPECIFICATIONS

MTO & REQUISITIONS

VPD 3D MODEL (PDMS) ALL NON-TAGGED BILLS OF MATERIALS


02/06/2009

13


02/06/2009

14

Aveva Provides the Framework that delivers IPE: • Reliable and repeatable work processes • Common technical database across multiple projects areas, eliminating duplicated effort & producing consistent results • Common configuration across multiple projects, resulting in consistent design and execution • Consistent basis for progress tracking & reporting • Improved quality management • Improvements in communication and collaborative work effort between multiple work sites • Consistent material requisitions, awards and tracking of procured equipment and material • Quicker and more consistent conveyance and storage of deliverables and other project documents


02/06/2009

15

Integrated Project Execution

Delivering Measurable Projects Savings


02/06/2009

16

Overview of Project #1

To help provide a magnitude to the size and scope of this project here are some brief statistics: – – – – –

Existing offshore gas platform West Coast of Africa 100,000 man-hour project $10MM engineering High pressure (3000 psig), large bore pipe routing


02/06/2009

17

“Before” Pictures of the Existing Platform


02/06/2009

18

Existing Area Looking East


02/06/2009

19

Existing Area Looking West


02/06/2009

20

PDMS Model Illustrations


02/06/2009

21

PDMS Model View


02/06/2009

22

PDMS Model View


02/06/2009

23

PDMS Model View


02/06/2009

24

PDMS Model View


02/06/2009

25

“After” Pictures of the Installation


02/06/2009

26

Blowdown Line tie-in to Flare Scrubber


02/06/2009

27

Incoming Gas


02/06/2009

28

Looking South


02/06/2009

29

Looking Southeast


02/06/2009

30

Looking Northeast


02/06/2009

31

Looking North


02/06/2009

32

Looking North / Injection Line


02/06/2009

33

Looking West / Maintenance Cart Path Markings / Incoming 16 Inch Gas Line


02/06/2009

34

Looking Southwest


02/06/2009

35

West Side of Firewall


02/06/2009

36

Looking Southeast


02/06/2009

37

Delivering Measurable Projects Savings (Continued)

Offshore project using laser scanning integrated with PDMS design were cutting edge efforts. The following benefits were obtained :

     

20% reduction in spool piping field welds 0% rework of piping and structural clashes within the new installation. Project saved approximately one month of offshore hook-up time at completion 5% reduction of material waste due to lack of interferences, clashes, rerouting, etc. Reduced Engineering time by up to 10% Reduced Offshore Visits by up to 70%


02/06/2009

38

Overview of Project #2

The magnitude, size and scope of this project here are some brief statistics: – – – – –

New build offshore gas platform 6000 ton topsides West Coast of Africa 100,000 man-hour project $12MM engineering


02/06/2009

39

Delivering Measurable Projects Savings (Continued)

Offshore project using VPE, VPRM, and PDMS integration had measurable value. AMEC Paragon obtained the following benefits:

50% reduction in Procurement group man-hours for major equipment packages.

90% reduction in Procurement group man-hours for bulk material packages.

50% reduction in Document Control man-hours for client handover.

95% reduction in reprographic costs related to client handover.

Creation of weight management reports in less than 5 minutes instead of 4 hours.


02/06/2009

40

Integrated Project Execution

Review


02/06/2009

41

In Summary

IPE uses Aveva’s Suite of Applications as an integral part of an environment which enables the collaboration of all parties and all applications involved in an EPC project executed from multiple locations safely, efficiently and effectively.

 

IPE delivers documented results and savings IPE delivers a competitive advantage and strengthens AMEC Paragon’s ability to deliver quality projects to our customers.