Digital design 23

Page 1

Digital Design

Work samples Filipa Ferreira

DADAAB REFUGEE SETTLEMENT

GARISSA . KENYA

LEGEND:

1. DAGAHALEY REFUGEE CAMP

2. IFO REFUGEE CAMP

3. DADAAB

4. HAGADERA REFUGEE CAMP

AERIAL PHOTOGRAPHY

DRAWING 01

WERNER SCHELLENBERG

01/09/2014

N 1
4
2
3

DADAAB REFUGEE SETTLEMENT

GARISSA KENYA

LEGEND:

1. FOOD DISTRIBUTION CENTRE

2. RUB HALL COMPOUND

3. NEW ARRIVALS

4. RECREATION

5. CAMP ADMINISTRATION

6. HEALTH CENTRE

7. WATER TREATMENT

8. STAFF HOUSING AREA

SERVICES SECTION

SCALE 1 / 1 000

DRAWING 04

WERNER SCELLENBERG

THE BOUNDARIES AND NAMES SHOWN AND THE DESIGNATIONS USED ON THIS MAP DO NOT IMPLY OFFICIAL ENDORSEMENT OR ACCEPTANCE BY THE UNITED NATIONS.
01/09/2014
N 2 1 3 4 5 6 7 8
MILLION SHELTER + NFI PROJECTS BENEFECIAIRES
5.7
Expansion land officially allocated by Agric. Expansion land expected by UNHCR Dam NAMPULA CAMP EXTENSION LEGEND LOCATION MAP DRAWING NUMBER RESPONSE COUNTRY PROJECT DRAWING TITLE SCALE PAGE of DATE REVISION DATE DRAWN BY THE BOUNDARIES AND NAMES SHOWN AND THE DESIGNATIONS USED ON THIS DRAWING DO NOT IMPLY OFFICIAL ENDORSEMENT OR ACCEPTANCE BY THE UNITED NATIONS MARATANE REFUGEE CAMP MOZAMBIQUE INAR - INSTITUTO NACIONAL DE APOIO AO REFUGIADO 07-12-2016 07-12-2016 1/100,000 UNHCR FF 2 2 2 Scale: 1/100,000
Food warehouse & distribution centre (WFP) UN UNHCR Police station Children and Women support Camp Administration Borehole Vocational training centre (INFP) Social Affairs office NFIs warehouse (UNHCR) Transit Centre Police post Food warehouse (WFP) Primary & Secondary school Kindergarten Recreational area Health Centre H Church Nutrition centre (Scalabrini) INAR Protection office Agricultural Department Refugee Committee Market Host community Maratane camp & Zones delimitation Access road Existing internal earth roads Water tower Transit center Water hand pump Toilet 2 1 UN 3 4 5 ZONE A ZONE C ZONE B ZONE D H P P SITE PLAN LAYOUT NOTES Surface of site: approx. 100 Ha Current population: approx. 8,543 LEGEND LOCATION MAP DRAWING NUMBER RESPONSE COUNTRY PROJECT DRAWING TITLE SCALE PAGE of DATE REVISION DATE DRAWN BY THE BOUNDARIES AND NAMES SHOWN AND THE DESIGNATIONS USED ON THIS DRAWING DO NOT IMPLY OFFICIAL ENDORSEMENT OR ACCEPTANCE BY THE UNITED NATIONS MARATANE REFUGEE CAMP MOZAMBIQUE INAR - INSTITUTO NACIONAL DE APOIO AO REFUGIADO 07-12-2016 08-12-2016 1:7000 UNHCR FF 1 1 1 MARATANE CAMP SITE LAYOUT Scale: 1/7000

Forest land at disposal (approx. 500 Ha)

RESPONSE

PARIANG COUNTY, AJOUNG THOK SITE COUNTRY

SOUTH SUDAN OPERATION

Proposal location for borehole

Water distribution point

Child friendly spaces

Women centre

Community centre

Christian cemetery

Muslim cemetery

Police post P

Police station P

Existing cemetery

Church Mosque

Health post H

Distribution centre

Vocational training centre 1

Feeding centre

School yard included sport field

Market

Welfare council office

Internal roads to be built

Main access road to be rehabilitated

Sport fields

Free spaces

NOTES

Surface of site: approx. 1,300 Ha

Max. capacity authorized by GoSS: 20,000 persons

Number of zones: 8

Number of blocks: 60

Number of family compound: 480

Number of family plot: 5,760

Main access road to be built from Jamjang: 8 Km

Internal road to be built: approx. 8 Km

Surface of airstrip: 6 Ha

Forest land (Host community)

January 2013

BY

0 meters 500 1000 P P H UN - NGOs yard UN NGOs yard WFP RECEPTION CENTRE P Airstrip
zone 500 m (forest land) Grass land (periodic flooded area)
Buffer
3 Km 3 Km 3.6 Km LEGEND LOCATION MAP DRAWING
NUMBER
PROJECT DRAWING TITLE CAMP DEVELOPMENT PROPOSAL AJOUNG THOK SITE SITE PLAN LAYOUT 1/15000 SP-2 N SCALE AJOUNG THOK CAMP SITE LAYOUT Scale
1/15000
PAGE 1 of 6 THE BOUNDARIES AND NAMES SHOWN AND THE DESIGNATIONS USED ON THIS DRAWING DO NOT IMPLY OFFICIAL ENDORSEMENT OR ACCEPTANCE BY THE UNITED NATIONS DATE
REVISION
DRAWN
DATE

WINTERIZATION OPTION FOR RUBBHALL WAITING AREAS FOR TRANSITIONING PURPOSES

Resting area (2X24m)

(Timber pallet, plywood, plastic sheeting and thermal sleeping mat)

PLAN VIEW. SCALE 1/250

Sitting area (Plastic chairs and free standing indoor gas heater type)

RESPONSE

MEDITERRANEAN REFUGEE CRISIS

COUNTRY

EUROPE

GENERAL

Only in exceptional and extreme circumstances should Rubhalls be used for over night accommodation.

Resting area (2X24m)

(Timber pallet, plywood, plastic sheeting and thermal sleeping mat)

Sitting area (Plastic chairs and free standing indoor gas heater type)

TRANSVERSAL SECTION. SCALE 1/100

Resting area (2X24m)

(Timber pallet, plywood, plastic sheeting and thermal sleeping mat)

FIRE SAFETY

Ensure national fire safety regulations compliance. Allow for the provision of fire fighting equipment, escape signage and maintenance of escape routes. Gas bottle heaters are preferred over liquid fuel. The heaters should be manufactured for indoor use, CE certified and include anti-tilt cut off and oxygen depletion safety device.

WINTERIZATION

These recommendations are part of a broader winterization strategy but focus on a rubbhall enclosure only. In addition equal focus should be placed in the provision of hot drinks, thermal clothing, mats and blankets.

TYPICAL WINTERIZATION OPTION FOR RUBHALL WAITING AREAS

Plastic sheeting

Plywood (to ensure all gaps from the pallet are covered)

Timber pallet

Elevated sub-base 150-200mm

TRANSVERSAL SECTION. SCALE 1/50

DETAIL A. SCALE 1/20

UNHCR Plastic sheeting

RHU plastic bolt and wing nut

RHU cross bracing

A B C

RESPONSE

MEDITERRANEAN REFUGEE

CRISIS

COUNTRY

EUROPE 2015/2016

LOCATION MAP

DETAIL B. SCALE 1/20

RHU plastic sheet for the floor

RHU plastic bolt and wing nut

Insulation foam

Concrete slab

RHU cross bracing

Concrete cap

Candy shaped peg

DETAIL C. SCALE 1/20

PROJECT

BILL OF QUANTITIES

TRANSVERSAL SECTION. SCALE 1/20

PAGE 1 OF 1

WINTERIZATION OPTION FOR REFUGEE HOUSING UNIT

DRAWING TITLE

SECTION AND DETAILS

PERSPECTIVE, PLAN AND ELEVATION

SCALE

DATE 1/50 1/20 October 2015

DRAWING NUMBER

PAGE 1 OF 1

THE BOUNDARIES AND NAMES SHOWN AND THE DESIGNATIONS USED ON THIS MAP DO NOT IMPLY OFFICIAL ENDORSEMENT OR ACCEPTANCE BY THE UNITED NATIONS NOTE LOCATION MAP SCALE DRAWING NUMBER PROJECT DRAWING TITLE PSP FLOOR PLAN, SECTION AND DETAIL DATE 1/250 1/100 1/20 October 2015
Plastic sheeting thikness in the drawings is only figurative
NOTE:

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.