178
11
>04.10.2008
12
14
17
15
DIARIO DI CANTIERE
SITE DIARY
11. ARMATURA DEL PRIMO SOLAIO DEL BRACCIO OVEST 12. CARPENTIERI AL LAVORO AL PRIMO ORIZZONTAMENTO DEL BRACCIO OVEST 13. LAVORI DURANTE IL TURNO NOTTURNO 14. STAFF ARCHEA E GIA.FI. IN CANTIERE 15. VISTA AEREA DEL CANTIERE 16. DETTAGLIO DEL CANTIERE DALL’ALTO: SCAVO DEL TUNNEL PER LA SPA 17. BRACCIO OVEST: GETTO IN OPERA DEL SECONDO ORIZZONTAMENTO 18. LA “CASA DEL PRETE” SUL BORDO DELLO SCAVO DEL TUNNEL PER LA SPA 19.-20. STAFF ARCHEA IN CANTIERE
179
11. REINFORCING THE FIRST FLOOR SLAB OF THE WEST WING 12. CARPENTERS AT WORK, FIRST LOFT, WEST WING 13. WORKS DURING THE NIGHT SHIFT 14. ARCHEA AND GIA.FI. STAFF AT THE WORKSITE 15. AERIAL VIEW OF THE WORKSITE 16. DETAIL OF THE WORKSITE FROM ABOVE: EXCAVATION OF SPA TUNNEL 17. WEST WING: POURING OF SECOND LOFT 18. STRUCTURE ON THE EDGE OF THE SPA TUNNEL EXCAVATION 19.-20. ARCHEA STAFF AT THE WORKSITE
13
>03.10.2008
16
18
19
20