Architectural Technology Portfolio

Page 1

01

SESC TETUAN PROJECT TYPE

Academic

LOCATION

Tetuan, Madrid, Spain

YEAR

2021

INDEX

I

Section

II Fire Sectors III Constructive Details IV Constructive Details V Constructive Details


NORTH-SOUTH SECTION Scale 1.100 Adjacent Housing Building

South

North 5.53

4.97

1.00

[X]

7.89

1.72

5.75

0.68

Description

33.34

0.92

8.73

3.90

3.60

[D]

[T]

6.29

8.73

Adjacent public parking building

Calle- Muro cortina exterior: 5.60m

3.00

3.61

14.13

2.74

Calle - Carpintería Solar: 5.40m

Street level

Construction Details to Show

4.05

4.00

3.00

2.60

3.00

4.05

3.89

[X] - Connection: Space Frame Beam - Tie Beam Concrete Slab [D] - Double-Height Community hall with hanging net on top 2.28

3.07

3.76

6.05

19.37

[T] - Plumbing Connections and Inner Facades

Escuela Técnica Superior de Arquitectura de Madrid

3.33

Multi-storey housing building

22.00

3.69

1.88

This project is my final Master exam. It is located in a 1200m2 plot in Tetuan, a densely populated area in Madrid City. The housing building in this plot was demolished in 2012, the families have yet been compensated. The project emerges as a critic to this issue, emphasizing the architects' social compromise. The plot has 3 adjacent buildings, therefore the strategy and the building program of the project can be easily replicated in other cases around the city. The project is conceived as a public service to the neighbourhood. It contains 2 parking floors (p-2, p-3); co-working spaces, workshops and leisure (p-1,p-0); meeting spaces for neighbours associations (p-1); two floors of social housing (p-1,p-2); a big free multi-use space (p-3). 3 vertical shafts run through all the floors, providing natural light to the whole building. The project is built con steel and concrete. 4 main spacial steel beems act as the 'ribs' of the building. The building is wraped in a continuous glass envolope that covers the south facade, the roof, and the north facade. This glass envolope originates in the public space in front of the southern face. This envolope insulates the whole building thanks to the 1 meter thick air layer that separates the outer and inner layers of the envolope. This big glass facade is sustained by a curtain wall that is connected with the buildings steel 'ribs'.

PROYECTO DE SISTEMAS TECNOLÓGICOS & CONSTRUCTIVOS

PLANO

Seccion Constructiva

PROYECTO

Edificio público-social entremedianerías

LOCALIZACIÓN

Barrio de Tetuán · Madrid · España

Alfredo Alvarez Curran

13011

GRUPO: J Alfonso García Santos

08.06.2019

32.87

A-2


FIRE PROTECTION SECTORS Basement Floors P-2/P-3 · Parking and Technical Space

Basement Floor P-1 · Leisure & Work Space

SECTOR

Superficie (m2)

Uso

S1

617

Aparcamiento

S2

98

S3 S4

Ocupación Proyecto

Resistencia al fuego

SECTOR

Superficie (m2)

Uso

40

16

EI 120

S1

32

Aparcamiento

Cuartos técnicos

-

-

EI 90

S5

30+30

Escaleras

-

-

EI 120

139

Almacenes

40

4

EI 90

Ocupación CTE (m2/p)

Ground Floor P-0 · Open Spaces & Workshops

Ocupación Proyecto

Resistencia al fuego

SECTOR

x

EI 120

S5

508 Pública concurrencia2

254

EI 120

S5

196

131

EI 120

S5

38

Aseos públicos

3

13

EI 90

S3

30+30

Escaleras

-

-

EI 120

S6

68

Servicio

10

7

EI 90

Ocupación CTE (m2/p) x

Cafetería (sentado)1,5

Superficie (m2)

Uso

Ocupación CTE (m2/p)

Ocupación Proyecto

Resistencia al fuego

289 Pública concurrencia2

145

EI 120

S5

243

Aulas y talleres

5

49

EI 120

S3

30+30

Escaleras

-

-

EI 120

SECTOR

Superficie del sector (m2)

Uso

Resistencia al fuego

S1

617

Aparcamiento

EI 120

S5

1.610 (P-1+P0) 501 (P3) TOTAL: 2.111

Pública concurrencia

EI 120

S7

753

Residencia pública

EI 90

PARKING BUILDING

ADJACENT MULTI-STOREY BUILDING

CENT

ADJA DING

EY BUIL

-STOR

MULTI

STREET

Mezzanine P0-P1 · Public Meeting Space

SECTOR

Superficie

Uso

(m2)

Ocupación

Ocupación

Resistencia

CTE (m2/p)

Proyecto

al fuego

Pública concurrencia2 (plantas inferiores)

S5

x

S5

336 Espacio de reuniones2

S3

30+30

Escaleras

Floors P-1/P-2 · Community Public Residence

SECTOR

Superficie

Uso

Ocupación CTE (m2/p)

(m2)

Residencial público20

Roof Deck P3 · Open Office Space

Ocupación Proyecto

Resistencia al fuego

SECTOR

Superficie (m2)

Uso

Ocupación CTE (m2/p)

Ocupación Proyecto

Resistencia al fuego

12 ->28

EI 90

S8

463

Oficinas

10

50

EI 120

(anteriores plantas) EI 120

S7

230

168

EI 120

S7

177

Sala común

2

89 ->60

EI 90

S8

38

Aseos públicos

3

13

EI 120

-

EI 120

S7

58

Aseos y duchas

3

20

EI 90

S3

30+30

Escaleras

-

-

EI 120

-

S3

PARKING BUILDING

30+30

Escaleras

-

-

EI 120

PARKING BUILDING

PARKING BUILDING

SECTOR

Superficie del sector (m2)

Uso

Resistencia al fuego

S1

649

Aparcamiento

EI 120

S2

98

S3

480

EI 90

Cuartos técnicos Escaleras

EI 120 EI 90

S4

139

Almacenes

S5+S8

1.610 (P-1+P0) 501 (P3)

Pública concurrencia

y oficinas

EI 120

S6

68

Zona de servicio

EI 90

S7

753

Residencia pública

EI 90

TOTAL: 2.111

ADJACENT MULTI-STOREY BUILDING

CENT DING

EY BUIL

-STOR

MULTI

STREET

ADJA

DING

EY BUIL

-STOR

MULTI

DING

EY BUIL

-STOR

MULTI

ADJACENT MULTI-STOREY BUILDING

CENT

ADJA

ADJACENT MULTI-STOREY BUILDING

CENT

ADJA

STREET

STREET

Escuela Técnica Superior de Arquitectura de Madrid

PROYECTO DE SISTEMAS TECNOLÓGICOS & CONSTRUCTIVOS

PLANO

Sectorizacion

PROYECTO

Edificio público-social entremedianerías

LOCALIZACIÓN

Barrio de Tetuán · Madrid · España

Alfredo Alvarez Curran

13011

GRUPO: J Alfonso García Santos

08.06.2019

A-1


SPACE BEAM DETAILING

[X] Connection: Space Frame Beam - Tie Beam - Slab | 1:15 Axonometry B| 1:30 Item Breakdown

Axonometry C| 1:30 Assmebly breakdown

1 2

0.12

3

1

1

5

0.25

4

0.20

2

2

[X]

0.08 0.25

6 7

3

1.30

8

4

9

3

0.77

0.64

Ø20

4

0.8 0

10

Ø80

0.98 6 6- Mallazo de reparto | Ø10 cada 20cm

2- Macarrón de acero del tensor | 2 UF 120.5

7- Armado superior e inferior de la losa HA-25 Armada Ø10 cada 20cm

3- Vidrio que contiene luminarias alrededor del macarrón (idea sin diseñar)

7

Leyenda Axonometría B | Despiece elementos

0.79

1- Línea de la envolvente vertical | Muro cortina

6

0.59

0.25

5 5

8- Conectores y IPE-80 de transición cercha-losa

4- Línea de envolvente horizontal | Madera

9- Cercha espacial triangular

5- Zuncho de borde | 10 Ø16

10- Pieza especial de unión que da continuidad al tensor y a las vigas (ver despiece)

7

Axonometry A | 1:30 Assemble Piece - 2 beams

1- Tensor continuo en toda el conjunto de elementos 2- Macarrón de acero del tensor | 2 UF 120.5 3- Rigidizadores del macarrón soldados a placa 4- Placa de anclaje a losa del forjado 5- 2UF 120.5 soldados protegen al tensor através de la losa 6- 6 perfiles UF.60.3 dirección OE 7- 6 perfiles UF.60.3 dirección NS 8- Pieza de unión 4 vigas-tensor (ver axonometría C) 9- Apoyo y soldado vigas dirección Norte-Sur 10-Apoyo y soldado vigas dirección Oeste-Este 11- Chapa de transición soldada a la pieza de unión

8

Leyenda Axonometría B | Despiece elementos Tensor de acero continuo 0.93

4

8

Elementos dentro de la losa HA-25

9 10

2

Vigas espaciales O-E

Pieza de unión

11

1- Tensor continuo en toda la pieza 2- Perfil rectangular #120.60.6 3- 4 Perfiles L100. En ellos se sueldan los cordones superiores 4- Perfil cuadrado #80.6 donde se sueldan las L100 5- Perfil cilíndrico de 80cm de longitud y 8cm de espesor 6- 16 piezas rigidizadoras soldadas a las piezas [7] y al cilindro 7- Láminas de acero de 4cm de espesor. Dan rigidez a la pieza 8- 4 Perfiles L100. En ellos se suelda el cordón inferior 9- Chapa de cierre de la pieza soldada a cilindro y a perfiles 10- Cono de presión del tensor

Escuela Técnica Superior de Arquitectura de Madrid

PROYECTO DE SISTEMAS TECNOLÓGICOS & CONSTRUCTIVOS

3

9

Vigas espaciales N-S

2 10

1

PLANO

Detalles

PROYECTO

Edificio público-social entremedianerías

LOCALIZACIÓN

Barrio de Tetuán · Madrid · España

Alfredo Alvarez Curran

13011

GRUPO: J Alfonso García Santos

08.06.2019

A-3


[D] Double-height community hall with hanging net on top | 1:20

0.50

0.50

Ancho total de la red: 3.90m | Longitud total: 12m | Área útil: 42m2

1

1.20

7

18

0.14

17 1.25

2

0.60

0.60

1.00

8

0.35

11

10

6 0.10

ENVELOPE DETAILING

[D2] Tie Beam Inner Courtyard | 1:5

7 0.93

3

6 17

0.50

12

14

13

15

1.25

0.60

3.75

3.60 0.32

0.58

0.50 0.60 0.50

0.50 0.60 0.50

0.74

Altura líbre mínima del salón comunitario: 3.70m | Altura libre máxima: 9.60m

0.55

0.60

Ancho fachada: 1.70m 0.60

9

0.50

0.50

0.60

5

[D]

13

8

0.85

0.50

4

Leyenda 24 1- Carpintería solar de costilla estructural (ver C2) 2- Muro cortina exterior sin tapeta y doble vidrio

0.60

0.60

[D1]

22 17

0.60

0.60

3- Pletina metálica continua de soldadura de 4mm 4- Abrazaderas soldadas a (3) (ver C2) 5- Costilla estructural: cercha espacial rectangular

1.25

0.50

0.50

21

18 25

[D2]

26

6- Muro cortina interior sin tapeta y doble vidrio 7- Muro cortina de las viviendas: vidrio translúcido 8- Muro cortina de las viviendas: vidrio transparente 9- Montante del muro cortina de las viviendas 10- Red sobre el salón anclada a vigas (ver lateral) 12- Escalera metálica de acceso a la red 13- Luminaria circular oculta bajo zuncho circular 14- Pieza de unión vigas-tensor (ver B14) 15- Macarrón metálico del tensor de acero (Ver B14) 16- Envolvente de vidrio del tensor con luminarias 17- Perfil L 80.40.5 lineal en toda la fachada

[D1] Facade Curtain Wall / Interior Curtain Wall / Tie beam finishing for end of floor" | 1:10

6

0.32

21- Placa de anclaje para soldaduras y pernos

8

0.14

16

22- Perfil de 3mm de ocultamiento atornillado

0.25

23- Espacio registrable para cableado

17

0.13

18

1.20

1

0.74

0.55

0.10

Ancho fachada: 1.70m

18- Perfil tubular rectangular #60.40.4 19- Conectores viga-losa 20- Viga espacial triangulada E-O | IPE-80 soldados

17

1.00

2

9

0.25

3

0.15

7

24- Luminaria lineal para luz difusa. Soldada a perfil especial triangular y rematada con perfil de 3mm de espesor atornillado a dicho perfil 25- Perfil en U para enganche tipo clip 26- Perfil especial de inclinación de la carpintería del patio central (ver C5)

0.08

Escuela Técnica Superior de Arquitectura de Madrid

19

PROYECTO DE SISTEMAS

1.25

0.50

0.50

4

20

0.23 0.8 0

0.60

0.60

21

0.64

14

18 24

22 23

PLANO

Detalles

PROYECTO

Edificio público-social entremedianerías

LOCALIZACIÓN

Barrio de Tetuán · Madrid · España

0.77

5

TECNOLÓGICOS & CONSTRUCTIVOS

Ø20

Ø80

Alfredo Alvarez Curran

13011

GRUPO: J Alfonso García Santos

08.06.2019

A-4


ENVELOPE DETAILING

[T] Plumbing connections and inner Facades 2.00 2.77 1.45

1.15

1.20

13

[T]

14

7

17

1.00

15

16

18

20

8

19

1.41

21

9 10 11 11 11

1.00

12

12

12

11

12

23

Leyenda

22

13 24

1- Panel de ladrillo+aislamiento (ver C3) 2- Subestructura metálica de IPE-100 (ver C3) 3- Espacio para instalaciones | Bajante Ø100 4- IPE-100 soldados a (2) y anclados a (5)

0.36

5- Viga de hormigón del muro medianero

3.00

6- Bloques de termoarcilla 30x29x19cm sobre vigas hormigón 7- Aislamiento térmico colocado tras zuncho de borde

2.00 1.45

1.20

1.15

8- Tubo metálico perdido en forjado que permite el paso de bajante Ø100 9- Panel (1) especial de final de muro | Perforado por bajante 10- Conducto de extracción de los aseos

1

11- Perfil tubular cuadrado #120.6 soldado a (12) y anclado a forjado superior

4.54

2

12- Perfil tubular cuadrado #120.6 soldado a (11) y recibido sobre (13) 13- Tabique de una hoja de ladrillo hueco doble 24x11,5x5cm recibido

3

14- Pilar IPE-100 a modo de subestructura del (13) de la última planta

3.63

16- Placa de anclaje a losa de hormigón para (14) 17- Barandilla de vidrio circular de los patios | 1m de alto 18- Sistema de anclaje a zuncho de borde circular 19- Perfil metálico de 3mm continuo que proetege y oculta la carpintería

3.12

3.36

5

15- Tubo metálico perdido en forjado que permite el paso de derivación de

3.69

4

20- Perfil tubular rectangular #60.40.4 perimetral de remate 21- Vidrio traslúcido 22- Remate de zuncho de borde (ver C7)

6

23- Luminaria lineal para luz difusa. Soldada a perfil especial triangular 24- Vidrio transparente

25 26

25- Acabado del suelo STC | Madera 2cm 26- Mortero STC | 10cm 27- Aislamiento térmico | 13cm 28- Losa HA-25 | Ø10 cada 20cm

27 28

0.48

Escuela Técnica Superior de Arquitectura de Madrid

PROYECTO DE SISTEMAS TECNOLÓGICOS & CONSTRUCTIVOS

PLANO

Detalles

PROYECTO

Edificio público-social entremedianerías

LOCALIZACIÓN

Barrio de Tetuán · Madrid · España

Alfredo Alvarez Curran

13011

GRUPO: J Alfonso García Santos

08.06.2019

A-5


02

PRIMERA PARADA PROJECT TYPE

Professional

LOCATION

Barranco, Lima, Peru

YEAR

2020

INDEX

I

Axonometric View

II Floor 02 III Foundation Plan IV Foundation Details V Domestic Cold Water VI Sanitary Installation


AXONOMETRIC VIEW - CONTEXT

BUILDING USE Floor

-02

-01

00

+01

+02

+03

m2

500

500

725

640

550

550

Parking

Office

Office Commercial

Office Commercial

Housing

Housing

Use

PROJECT DESCRIPTION

The building is located in the heart of Barrranco, Lima's most touristic district. This area is popular for its colonial buildings dating more than 100 years old. The proximity to the beach, the restaurants, art galleries, museums, make this neighbourhood a vibrant, international and cultural area. In this context, Grupo Osma, a partnership conforming three different business owners, embarked on a journey to build an innovative mixed-use building in the heart of Barranco. The project offers 470m2 of office spaces for the young entrepeneurs of the area, together with a wide variety of culinary experiences on ground level floor. The upper 2 floors host x appartments aimed at students and tourists. The architect in charge of designing the building, Alfonso Martinez-Barona, is also one of the members of Grupo Osma, therefore he was both developer and architect of the project. I was hired by Alfonso in the beginning of the project on August 2019 in order to build a BIM model of the design in order to coordinate with the different engineering teams involved in the structural design and technical equipment installations. The design process lasted 6 months, from August 2019 until January 2020, when the building process started. Unfortunately, the COVID pandemic struck and I had to return to Spain to finish my Architecture Master. However, during this process I learned about the importance of BIM management and was able to see the results of such methodology.

PROYECTO:

Primera Parada

CLIENTE:

Grupo Osma

LOCALIZACION:

Av. 28 de Julio, Barranco, 13495 Lima, Peru.

ARQUITECTO:

Alfonso Martinez-Barona CAP 2233

FECHA:

Enero 2020

A-1


FLOOR -01 FLOOR -01 ( OFFICES )

Esc.1 : 175

A

Ducto de inyección

AA

Local 5 Área de trabajo Aforo de local : 22 PC 5 -0

Proyección

Depósito

ventana alta

14 13

9

11

V -3

12 10 9 8 7

PC -08

PC -08

6 5

PC

4 2

Ventilación mecánica

BUILDING USE

Almacén

5 -0

Ventilación a doble altura

1

PC

2

PC

Ventilación mecánica 08

PC -05

Ductos de extracción

PC -08

SH Mujeres

PC -08

PC

4

5

6

7

1

2

3

SH Hombres

PC

Floor

-02

-01

00

+01

+02

+03

m2

500

500

725

640

550

550

Parking

Office

Office Commercial

Office Commercial

Housing

Housing

5

Depósito

5 -0

6

Ventilación mecánica

7

SH Hombres

8

5 -0

3

PC

4

5 -0

Puerta c/ rejillas de ventilación

5 -0

PC

1

Aforo de local : 39

3

Local 3

SH Mujeres

-

8 -0

PC -04

Sube Extr . PC

Ducto IIEE

PC

8 -0

Use

8 -0

Ventilación mecánica Puerta plegable

Sube Extr .

PROJECT DESCRIPTION

Rejilla de drenaje

Ingreso de personal 24

23

22

21

20

19

18

04 P-

17

16

Ductos de inyección

Escalera Servicio

15

11.61 %

14

13 PC

-04

The building is located in the heart of Barrranco, Lima's most touristic district. This area is popular for its colonial buildings dating more than 100 years old. The proximity to the beach, the restaurants, art galleries, museums, make this neighbourhood a vibrant, international and cultural area.

12 11

10 9

mecánica

8

Depósito

PC -07

PC -08

PC -08 PC -08

PC -07

3

2

1

In this context, Grupo Osma, a partnership conforming three different business owners, embarked on a journey to build an innovative mixed-use building in the heart of Barranco. The project offers 470m2 of office spaces for the young entrepeneurs of the area, together with a wide variety of culinary experiences on ground level floor. The upper 2 floors host x appartments aimed at students and tourists.

SH Hombres

Rampa vehicular

Ducto de extracción

The architect in charge of designing the building, Alfonso Martinez-Barona, is also one of the members of Grupo Osma, therefore he was both developer and architect of the project. I was hired by Alfonso in the beginning of the project on August 2019 in order to build a BIM model of the design in order to coordinate with the different engineering teams involved in the structural design and technical equipment installations.

PCF -01

R

The design process lasted 6 months, from August 2019 until January 2020, when the building process started. Unfortunately, the COVID pandemic struck and I had to return to Spain to finish my Architecture Master. However, during this process I learned about the importance of BIM management and was able to see the results of such methodology.

R

Sumidero PC -09

CLC -01

Zona Común

22

Cocina

Local 2 - Patio

23 39

38

37

36

35

34

33

32

31

30

29

28

27

26

25

24

Local 2 - Jardín

PCF

SH PCF -02 Conserjería

IIEE Comunic . Ascensor

Ascensor

P -05

P -06

2

3

1

PCF

21

4

Área de mesas Aforo de local : 168

20

5

Local 2

19

PC -04

SH Mujeres

18

SH Disc .

PC -08

4

5

6

7

mecánica

17

Ventilación

Ventilación

Depósito

PROYECTO:

Primera Parada

CLIENTE:

Grupo Osma

LOCALIZACION:

Av. 28 de Julio, Barranco, 13495 Lima, Peru.

Ventilación mecánica Ductos de extracción

Ductos de ventilación

A

ARQUITECTO:

Alfonso Martinez-Barona CAP 2233

FECHA:

Enero 2020

A-2


3 PLANO DE CIMENTACION

FOUNDATION PLAN A

A

METRADO DE ZAPATAS 2 .0

Esc.1 : 175

3

3.1 9

)

cm

50

1.

CC

cm

-1 m

5c

V-02 (0.40m x 0.60m)

7

@2

3.08

18.74

C-4

cm

x

25 @

0m

4 (0.

12.49

m

Z-4

mm 16

02

V-

221

)

6m

16

Ø

m)

0 0.6

DOSIFICACION UNACEM - VOL SUELTOS CEMENTO ARENA (m3) PIEDRA (m3) 0.68 1.02 0.68 1.02 0.68 1.02 0.68 1.02 0.68 1.02 0.68 1.02 0.68 1.02 0.68 1.02 0.68 1.02 0.68 1.02 0.83 1.25 1.59 2.38 0.90 1.35 0.90 1.35 0.90 1.35 0.59 0.89

4.2

0

V-

cm 25 @

Ø1

cm

mm

12 12 12 12 12 12 12 12 12 12 15 28 16 16 16 10

5cm

25

Ø

VOLUMEN 1.35 m³ 1.35 m³ 1.35 m³ 1.35 m³ 1.35 m³ 1.35 m³ 1.35 m³ 1.35 m³ 1.35 m³ 1.35 m³ 1.66 m³ 3.17 m³ 1.80 m³ 1.80 m³ 1.80 m³ 1.18 m³

(e2

@

C-4

.60 x0

CANTIDAD 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

AA Section Esc.1 : 500

-2

mm

0

5 1.

m

40

0. 2(

CUADRO DE ESPECIFICACIONES TECNICAS CONCRETO CICLOPEO CIMIENTOS CORRIDOS : CONCRETO CICLOPEO 1:10 (CEMENTO-HORMIGON MAS 30% PG (6"max.) SOBRECIMIENTOS : CONCRETO CICLOPEO 1:8

M-1 (e20cm)

CC-1 4.73

CC-1

4.48

7.3

MC-2 (e25cm)

Alfredo A. Curran

MC

16

5.84

PROFESIONAL A...

Grand total: 16

D m)

50

Ø

cm Ø 16mm @25 cm

E

(

C-4

Z-4

C-5

A

02

V-

cm

50

1.

25

mm

25

x

0 0.6

1.

16

@

m

0 0.4

@

cm

Ø

1.

25

cm

Z-4

mm

25

@

V-02 (0.40m x 0.60m)

30

@

25

16

16

mm

16

30

1.

mm

16

@

cm 25 @

Ø

Ø

30 1.

C-5

16

Ø

mm

.60 x0

.58 00 7.

25

@

m)

Z-1

Z-1

Ø

56 5.

mm

(

m

0 0.4

16

mm

2

02

V-

Ø

m 5c

30

@

mm

30

1.

1.

16

m)

Z-1

C-5

-1

Ø

cm

16

cm 25 (e

CC

57 3.

25

@

mm

16

Ø

1a

Ø

30 1.

97 4.

2 C-

Concreto para Zapatas

OSMA ARQ.

MODELO Z-1 Z-1 Z-1 Z-1 Z-1 Z-1 Z-1 Z-1 Z-1 Z-1 Z-2 Z-3 Z-4 Z-4 Z-4 Z-5

C

M

TITULO DE ITEM

CLIENTE

5 6.

2

9 .6 20

01.06.01.03

B

8

1

ITEM

3

15.05

B

C

(CEMENTO-HORMIGON MAS 25% PG (3"max.)

CONCRETO ARMADO CONCRETO ACERO REFUERZO

D

: f'c = 210 Kg/cm2 : fy = 4200 Kg/cm2

RECUBRIMIENTOS VIGAS PERALTADAS Y COLUMNAS VIGAS CHATAS ESCALERAS Y ALIGERADOS ZAPATAS

7.91

M-1 (e20cm) VC-0

2 (0.2

0m x

0.60m

0

2 (0.2

M-1 (e20cm)

)

VC-0

)

.60m mx0

: 4 Cm : 2.5 Cm : 2 Cm : 7 Cm S/C : INDICADA EN LOS PLANOS DE ALIGERADOS

SOBRECARGAS :

4.65

.30

Ø 16mm @25 cm

29

1.30

C-4

C-4

CC-1

1.30

Z-5 2.80

CC

CC-1

( -2

0.10

3/8"

0.45

0.55

0.55

0.15

1/2"

0.50

0.60

0.60

5.00

5

4.65

6

1.30

C-3

Ø 16mm @25 cm

1.30

V-01 (0.30m x 0.60m)

Ø 16mm @25 cm

3.05

Ø 16mm @25 cm

M-3 (e15cm)

M-3 (e15cm)

1.60

cm

Z-3

3.25

7

7a

5.00

8

:f'm 55 Kg / Cm2

ESPESOR MINIMO

: e min. = 0.14m , 0.24m

% MAXIMO DE VACIOS

: 25%

MORTERO P1-C

: 1:1:4 (CEMENTO : CAL NORMALIZADA : ARENA )

ESPESOR DE JUNTAS DE MORTERO

: e min: =0.9 Cm : e max : =1.5 Cm

J

PROYECTO:

Primera Parada

CLIENTE:

Grupo Osma

LOCALIZACION:

Av. 28 de Julio, Barranco, 13495 Lima, Peru.

CC-1 m)

MC-2 (e25c

5.00

8a

Z

UNIDAD ( LADRILLO TIPO IV )

Z-1

A

5.17 40.75

0.75 0.80

C-3

m) MC-2 (e25c

J 5.01

Ø 16mm @25

M-3 (e15cm)

LC-2

V-01 (0.30m x 0.60m)

Ø 16mm @15 cm

MC-2 (e25cm)

Ø 16mm @25 cm

Ø 16mm @15 cm

1.30

MC-2 (e25cm)

3.98

I

M-3 (e15cm)

1.30

0.75 0.80

6

Ø 16mm @15 cm

CC-1

C-2 Z-2

m

Ø 16mm @25 cm

LC-2

0m

0.3

1(

V-0

5c

1.30

C-1

m)

.60

x0

@2

1.30

C-1 7.45

1.30

Ø 16mm @25 cm

C-1 Z-1

V-01 (0.30m x 0.60m)

mm

C-1 Z-1

Ø 16mm @25 cm

V-01 (0.30m x 0.60m)

0.60 0.70

CARACTERISTICAS DE LA ALBAÑILERIA CONFINADA :

5.0

Ø 16mm @25 cm

1.30

V-01 (0.30m x 0.60m)

I

1.30 Ø 16mm @25 cm

5/8" 3/4"

OBSERVACIONES :

16

C-1 Z-1

Ø 16mm @25 cm

2

V-0

Ø 16mm @15 cm

m)

.60

x0

Ø

Ø 16mm @25 cm

V-01 (0.30m x 0.60m)

45°

m

Ø 16mm @25 cm

ESTRIBOS (Z)

0.55

NORMAS TECNICAS DE EDIFICACION E-020, E-030, E-050, E-060, E070

3 4.3 )

Ø 16mm @25 cm

m

40 (0.

5c e2

14.87 7.65

MC

Ø 16mm @25 cm

1.30

4

SOLAPES

0.55

TERRENO CAPACIDAD PORTANTE : 2.70 Kg/cm2 ESPECIFICACIONES DE DISEÑO Y CONSTRUCCION : NORMAS DE DISEÑO SISMO RESISTENTE

-1

4.27

V-01 (0.30m x 0.60m)

TRASLAPES

0.45

1.30

C-1 Z-1

1.30

Ø 16mm @25 cm

1.30

Ø 16mm @25 cm

1.30

Ø 16mm @25 cm

C-1 Z-1

V-01 (0.30m x 0.60m)

M-1 (e20cm)

H

ANCLAJE

2

1.30

V-01 (0.30m x 0.60m)

7.3

C-1 Z-1

V-01 (0.30m x 0.60m)

m) .60

V-01 (0.30m x 0.60m)

Losa de cimentacion de la Cisterna (nivel -9.00m)

Ø 16mm @25 cm

x0

Ø 16mm @25 cm

m

20

(0.

Ø 16mm @25 cm

V-01 (0.30m x 0.60m)

Ø

cm

-02

3.25

5 @2

VC

Ø 16mm @15 cm

: 200 Kg / m2

1/4"

CC-1

Ø 16mm @25 cm

G

m

MC-2 (e25cm)

F

: 200 Kg / m2 : 200 Kg / m2

ESCALERA LONGITUDES MINIMAS DE ANCLAJE Y TRASLAPE DE ARMADURAS

G

6m

5.00

Ø1

5.01

7

Ø 16mm @15 cm

6

14.66

AZOTEA RESTO

5

5

5.2

4

LC-2

3

7.68

9

ARQUITECTO:

Alfonso Martinez-Barona CAP 2233

FECHA:

Enero 2020

S-1


ZAPATA Z-1 (CORTE)

FOUNDATION DETAILS

ZAPATA Z4 (PLANTA) A

Esc. 1 : 20

Esc. 1 : 20 AA Section Esc.1 : 500

C-1 (0.60m x 0.30m) Ø 9.5mm @25 cm

-6.60m

Ø 16mm

Losa Aligerada h=25cm Viga de Hormigon Armado 30cm x 60cm 1.50

0.40

Ø 0.50

Compactado de Grava -7.30m

Zapata de Hormigon Armado 1.30m x1.30m Ø 16mm @25 cm CUADRO DE ESPECIFICACIONES TECNICAS

Zapata de Hormigon Armado 1.50m x1.50m

C-4 (0.5m Ø)

CONCRETO CICLOPEO CIMIENTOS CORRIDOS : CONCRETO CICLOPEO 1:10 (CEMENTO-HORMIGON MAS 30% PG (6"max.) SOBRECIMIENTOS : CONCRETO CICLOPEO 1:8

Ø 9.5mm @10 cm

CONCRETO ARMADO

Ø 16mm @25 cm

Ø 16mm

CONCRETO ACERO REFUERZO

Viga de Hormigon Armado 40cm x 60cm

-8.10m

(CEMENTO-HORMIGON MAS 25% PG (3"max.)

: f'c = 210 Kg/cm2 : fy = 4200 Kg/cm2

RECUBRIMIENTOS

Subsuelo

VIGAS PERALTADAS Y COLUMNAS VIGAS CHATAS ESCALERAS Y ALIGERADOS ZAPATAS

ZAPATA Z3 (CORTE)

: 4 Cm : 2.5 Cm : 2 Cm : 7 Cm S/C : INDICADA EN LOS PLANOS DE ALIGERADOS

SOBRECARGAS : AZOTEA RESTO

Esc. 1 : 20

: 200 Kg / m2 : 200 Kg / m2

ESCALERA LONGITUDES MINIMAS DE ANCLAJE Y TRASLAPE DE ARMADURAS

C-1 (0.60m x 0.30m)

Viga de Hormigon Armado 30cm x 60cm

C-3 (0.30m x 0.30m)

Ø 19mm Ø 9.5mm @25 cm

-6.60m

Ø 9.5mm @10 cm

Ø 16mm

Ø

ANCLAJE

TRASLAPES

SOLAPES

ESTRIBOS (Z)

1/4"

0.45

0.55

0.55

0.10

3/8"

0.45

0.55

0.55

0.15

1/2"

0.50

0.60

0.60

Ø 9.5mm @15 cm

Ø 16mm Ø 9.5mm @25 cm

: 200 Kg / m2

5/8"

0.60

0.75

0.75

3/4"

0.70

0.80

0.80

45°

Z

TERRENO CAPACIDAD PORTANTE : 2.70 Kg/cm2 ESPECIFICACIONES DE DISEÑO Y CONSTRUCCION : NORMAS DE DISEÑO SISMO RESISTENTE

Losa Aligerada h=25cm

NORMAS TECNICAS DE EDIFICACION E-020, E-030, E-050, E-060, E070 OBSERVACIONES :

Compactado de Grava

CARACTERISTICAS DE LA ALBAÑILERIA CONFINADA :

-7.30m

UNIDAD ( LADRILLO TIPO IV )

:f'm 55 Kg / Cm2

ESPESOR MINIMO

: e min. = 0.14m , 0.24m

% MAXIMO DE VACIOS

: 25%

MORTERO P1-C

: 1:1:4 (CEMENTO : CAL NORMALIZADA : ARENA )

ESPESOR DE JUNTAS DE MORTERO

: e min: =0.9 Cm : e max : =1.5 Cm

Zapata de Hormigon Armado 1.30m x3.05m 0.80

Subsuelo

A

-8.10m

3.05

PROYECTO:

Primera Parada

CLIENTE:

Grupo Osma

LOCALIZACION:

Av. 28 de Julio, Barranco, 13495 Lima, Peru.

ARQUITECTO:

Alfonso Martinez-Barona CAP 2233

FECHA:

Enero 2020

S-6


DOMESTIC COLD WATER

Axonometric Diagram of Cold Water Supply Esc.

Water Tank 750 l

09 M-

17 V-

-03 PV

85

84

83

81

86

82

93

94

87

91

92

89

90

88

-03 PV

CONNECTION TO HOUSEHOLD DETAIL (Section view)

Ø

H

1/2"

0.25

3/4"

0.25

1"

0.30

.10 min

17

7

8 6

5

4

18

9

3

10

11

12

11

9

%%uPERFIL

2

1

General Valve

LEYENDA ork

ly Netw ater Supp

Public W

Water Pump FRE(S)32-110 400V

1

MATRIZ DIAMETRO VARIABLE

10

LLAVE DE PASO

2

ABRAZADERA DIAMETRO VARIABLE PERFORADA

11

NIPLE STANDARD CON TUERCA

3

LLAVE DE TOMA (Corporation) TUERCA Y NIPLE CON PESTANA DE 0.05 m

12 13

MEDIDOR O NIPLE

4

CACHIMBA O CURVA 90° DE DOBLE UNION - PRESION

14

TAPA FIERRO GALVANIZADO

5

TUBERIA DE CONDUCCION

15

LOSA DE CONCRETO f'c = 140 kg/cm2

6

FORRO TUB. 100 mm (Ø4")

16

CAJA DE MEDIDOR

7

CODO DE 45°

17

8

NIPLE LONGITUD MINIMA = 0.30 m.

SOLADO DE CONCRETO f'c = 140 kg/cm2

9

UNION PRESION ROSCA

MARCO FIERRO GALVANIZADO

PROYECTO:

Primera Parada

CLIENTE:

Grupo Osma

LOCALIZACION:

Av. 28 de Julio, Barranco, 13495 Lima, Peru.

ARQUITECTO:

Alfonso Martinez-Barona CAP 2233

FECHA:

Enero 2020

I-1


Axonometry View

Section AA'

Esc.

Esc.1 : 40

SANITARY INSTALLATION

3rd Floor Plan (Green region shows the area described in this sheet)

09 M-

6.30m Viga HA 60cm x 30cm

Losa h = 30cm

1%

Pilar C-2 50cm x 30cm

I

17 V-

Viga HA 60cm x 30cm

-03 PV

A

85

84

83

81

86

82

93

94

87

91

92

89

90

Plan View

G

88

-03 PV

Esc.1 : 40

DETALLE DE TUBO COLECTOR DE DERIVACION EN YEE 0.65

C

B

H B

D

0.55 0.81

0.25

18

0.

G

A

Sujecion mediante abrazadera metalica

A' 0.

1.

01

E

49

F

G

0.74

0.74

0.69

ESPECIFICACIONES TECNICAS - LAS TUBERIAS DE DESAGUE SE LLENARÁN DE AGUA, DESPUES DE TAPONEAR LAS SALIDAS, PERMANECIENDO EN DUCTO (24hrs.) SIN PERMITIR ESCAPES. - SE VERIFICARÁ EL FUNCIONAMIENTO DE CADA APARATO SANITARIO. - LAS TUBERIAS DE DESAGUE SERAN DE PVC - SAP Y SERÁN SELLADOS CON PEGAMENTO ESPECIAL. - LAS TUBERIAS DE VENTILACION SERÁN DE PVC - SAL Y SERÁN SELLADOS

A

B

C

D

E

F

G

H

CON PEGAMENTO ESPECIAL.

I

- LAS MONTANTES DE DESAGUE Y LAS TUBERIAS DE VENTILACION QUE LLEGUEN A LA AZOTEA , DEBERAN SER PROLONGADAS POR ENCIMA DEL PISO TERMINADO HASTA UNA ALTURA NO MENOR DE 1.80m, POR TRATARSE DE UNA AZOTEA ACCESIBLE.

Registro Roscado 4'' (

Sumidero de regsitro 2'' (

Union en TEE paso de 4'' a 2''

Union tipo TEE vertical de 4'' a 4'' (Conexion con bajante)

PVC Codo de 45 grados 4''

PVC Codo de 90 grados 4''

PVC codo de 90 grados 2''

Union tipo YEE 4''

PVC Trampa tipo PEE 2''

PROYECTO:

Primera Parada

CLIENTE:

Grupo Osma

LOCALIZACION:

Av. 28 de Julio, Barranco, 13495 Lima, Peru.

ARQUITECTO:

Alfonso Martinez-Barona CAP 2233

FECHA:

Enero 2020

I-2


03

PÅKHUSET - RØDBY PROJECT TYPE

Professional

LOCATION

Rødby, Sjælland, Danmark

YEAR

2022

INDEX

I

Axonometric View

II Plan / Section III Constructive Detail


PROJECT DESCRIPTION

As part of my Master in Technology on Building Surveying and Project Planning and Aalborg University, I joined NORRØN Architects for a six month internship in 2022. Given my previous experience on Heritage Buildings, the team counted on me for developing a BIM model of an on going project they had been developing with Rødby Kommune to restore the old local Påkhus. My tasks included on-site visits to gather data on the constructuiveelements' state, measuring, drawing and updating the BIM model through revit. As part of the renovation, we designed a second floor built on topof the existing structure. The proposal aimed at transforming the Påkhuset into a community building, able to host gatherings of all sort. For this purpose, I carried out a study on the insulation of the building and the installation of new iron windows, trying to respect the original building's image at all times.

PÅKHUSET - RØDBY DOKUMENTNAVN

Axonometri

BYGHERRE

Forening ofr Påkhusets Forskønnelse

ARKITEKT

NORRØN, Tagensvej 22B, 2100 N Kbh

08.01.2023

A-1


PLAN / SECTION Units in m

Highlighted in blue is the intervention we designed to make the second floor accessible and transfrom it into a stand for shows. It also serves as a platform for contemplating the richness of this architectural heritage.

0.25

12.64

6.63

0.17

19.68

PÅKHUSET - RØDBY DOKUMENTNAVN

Plan -

BYGHERRE

Forening ofr Påkhusets Forskønnelse

ARKITEKT

NORRØN, Tagensvej 22B, 2100 N Kbh

08.01.2023

A-2


CROSS SECTION DETAIL

1

The following detail gives a clear description of how our intervention interacts and enhances the buildings performance.

2 3 4 5

6 7 8

9 10 11

1 2 3 4 5

12 6 7 8 9

13

10 11 12 13 14 15 16 17 18

existing roof tiles existing battens timber rafters and insulation railing for new floor new flooring wood planks existing end batten iron window iron plate 5mm existing timber 12cm x 12cm existing brick wall white plywood internal cladding insulation new staircase existing stacked fieldstone wall new screed floor with underfloor heating new leveling clay mortar new glass gravel compacted earth

14

PÅKHUSET - RØDBY 15 16 0 17

300mm

DOKUMENTNAVN

Plan -

BYGHERRE

Forening ofr Påkhusets Forskønnelse

ARKITEKT

NORRØN, Tagensvej 22B, 2100 N Kbh

08.01.2023

18

A-3


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.