01
SESC TETUAN PROJECT TYPE
Academic
LOCATION
Tetuan, Madrid, Spain
YEAR
2021
INDEX
I
Section
II Fire Sectors III Constructive Details IV Constructive Details V Constructive Details
NORTH-SOUTH SECTION Scale 1.100 Adjacent Housing Building
South
North 5.53
4.97
1.00
[X]
7.89
1.72
5.75
0.68
Description
33.34
0.92
8.73
3.90
3.60
[D]
[T]
6.29
8.73
Adjacent public parking building
Calle- Muro cortina exterior: 5.60m
3.00
3.61
14.13
2.74
Calle - Carpintería Solar: 5.40m
Street level
Construction Details to Show
4.05
4.00
3.00
2.60
3.00
4.05
3.89
[X] - Connection: Space Frame Beam - Tie Beam Concrete Slab [D] - Double-Height Community hall with hanging net on top 2.28
3.07
3.76
6.05
19.37
[T] - Plumbing Connections and Inner Facades
Escuela Técnica Superior de Arquitectura de Madrid
3.33
Multi-storey housing building
22.00
3.69
1.88
This project is my final Master exam. It is located in a 1200m2 plot in Tetuan, a densely populated area in Madrid City. The housing building in this plot was demolished in 2012, the families have yet been compensated. The project emerges as a critic to this issue, emphasizing the architects' social compromise. The plot has 3 adjacent buildings, therefore the strategy and the building program of the project can be easily replicated in other cases around the city. The project is conceived as a public service to the neighbourhood. It contains 2 parking floors (p-2, p-3); co-working spaces, workshops and leisure (p-1,p-0); meeting spaces for neighbours associations (p-1); two floors of social housing (p-1,p-2); a big free multi-use space (p-3). 3 vertical shafts run through all the floors, providing natural light to the whole building. The project is built con steel and concrete. 4 main spacial steel beems act as the 'ribs' of the building. The building is wraped in a continuous glass envolope that covers the south facade, the roof, and the north facade. This glass envolope originates in the public space in front of the southern face. This envolope insulates the whole building thanks to the 1 meter thick air layer that separates the outer and inner layers of the envolope. This big glass facade is sustained by a curtain wall that is connected with the buildings steel 'ribs'.
PROYECTO DE SISTEMAS TECNOLÓGICOS & CONSTRUCTIVOS
PLANO
Seccion Constructiva
PROYECTO
Edificio público-social entremedianerías
LOCALIZACIÓN
Barrio de Tetuán · Madrid · España
Alfredo Alvarez Curran
13011
GRUPO: J Alfonso García Santos
08.06.2019
32.87
A-2
FIRE PROTECTION SECTORS Basement Floors P-2/P-3 · Parking and Technical Space
Basement Floor P-1 · Leisure & Work Space
SECTOR
Superficie (m2)
Uso
S1
617
Aparcamiento
S2
98
S3 S4
Ocupación Proyecto
Resistencia al fuego
SECTOR
Superficie (m2)
Uso
40
16
EI 120
S1
32
Aparcamiento
Cuartos técnicos
-
-
EI 90
S5
30+30
Escaleras
-
-
EI 120
139
Almacenes
40
4
EI 90
Ocupación CTE (m2/p)
Ground Floor P-0 · Open Spaces & Workshops
Ocupación Proyecto
Resistencia al fuego
SECTOR
x
EI 120
S5
508 Pública concurrencia2
254
EI 120
S5
196
131
EI 120
S5
38
Aseos públicos
3
13
EI 90
S3
30+30
Escaleras
-
-
EI 120
S6
68
Servicio
10
7
EI 90
Ocupación CTE (m2/p) x
Cafetería (sentado)1,5
Superficie (m2)
Uso
Ocupación CTE (m2/p)
Ocupación Proyecto
Resistencia al fuego
289 Pública concurrencia2
145
EI 120
S5
243
Aulas y talleres
5
49
EI 120
S3
30+30
Escaleras
-
-
EI 120
SECTOR
Superficie del sector (m2)
Uso
Resistencia al fuego
S1
617
Aparcamiento
EI 120
S5
1.610 (P-1+P0) 501 (P3) TOTAL: 2.111
Pública concurrencia
EI 120
S7
753
Residencia pública
EI 90
PARKING BUILDING
ADJACENT MULTI-STOREY BUILDING
CENT
ADJA DING
EY BUIL
-STOR
MULTI
STREET
Mezzanine P0-P1 · Public Meeting Space
SECTOR
Superficie
Uso
(m2)
Ocupación
Ocupación
Resistencia
CTE (m2/p)
Proyecto
al fuego
Pública concurrencia2 (plantas inferiores)
S5
x
S5
336 Espacio de reuniones2
S3
30+30
Escaleras
Floors P-1/P-2 · Community Public Residence
SECTOR
Superficie
Uso
Ocupación CTE (m2/p)
(m2)
Residencial público20
Roof Deck P3 · Open Office Space
Ocupación Proyecto
Resistencia al fuego
SECTOR
Superficie (m2)
Uso
Ocupación CTE (m2/p)
Ocupación Proyecto
Resistencia al fuego
12 ->28
EI 90
S8
463
Oficinas
10
50
EI 120
(anteriores plantas) EI 120
S7
230
168
EI 120
S7
177
Sala común
2
89 ->60
EI 90
S8
38
Aseos públicos
3
13
EI 120
-
EI 120
S7
58
Aseos y duchas
3
20
EI 90
S3
30+30
Escaleras
-
-
EI 120
-
S3
PARKING BUILDING
30+30
Escaleras
-
-
EI 120
PARKING BUILDING
PARKING BUILDING
SECTOR
Superficie del sector (m2)
Uso
Resistencia al fuego
S1
649
Aparcamiento
EI 120
S2
98
S3
480
EI 90
Cuartos técnicos Escaleras
EI 120 EI 90
S4
139
Almacenes
S5+S8
1.610 (P-1+P0) 501 (P3)
Pública concurrencia
y oficinas
EI 120
S6
68
Zona de servicio
EI 90
S7
753
Residencia pública
EI 90
TOTAL: 2.111
ADJACENT MULTI-STOREY BUILDING
CENT DING
EY BUIL
-STOR
MULTI
STREET
ADJA
DING
EY BUIL
-STOR
MULTI
DING
EY BUIL
-STOR
MULTI
ADJACENT MULTI-STOREY BUILDING
CENT
ADJA
ADJACENT MULTI-STOREY BUILDING
CENT
ADJA
STREET
STREET
Escuela Técnica Superior de Arquitectura de Madrid
PROYECTO DE SISTEMAS TECNOLÓGICOS & CONSTRUCTIVOS
PLANO
Sectorizacion
PROYECTO
Edificio público-social entremedianerías
LOCALIZACIÓN
Barrio de Tetuán · Madrid · España
Alfredo Alvarez Curran
13011
GRUPO: J Alfonso García Santos
08.06.2019
A-1
SPACE BEAM DETAILING
[X] Connection: Space Frame Beam - Tie Beam - Slab | 1:15 Axonometry B| 1:30 Item Breakdown
Axonometry C| 1:30 Assmebly breakdown
1 2
0.12
3
1
1
5
0.25
4
0.20
2
2
[X]
0.08 0.25
6 7
3
1.30
8
4
9
3
0.77
0.64
Ø20
4
0.8 0
10
Ø80
0.98 6 6- Mallazo de reparto | Ø10 cada 20cm
2- Macarrón de acero del tensor | 2 UF 120.5
7- Armado superior e inferior de la losa HA-25 Armada Ø10 cada 20cm
3- Vidrio que contiene luminarias alrededor del macarrón (idea sin diseñar)
7
Leyenda Axonometría B | Despiece elementos
0.79
1- Línea de la envolvente vertical | Muro cortina
6
0.59
0.25
5 5
8- Conectores y IPE-80 de transición cercha-losa
4- Línea de envolvente horizontal | Madera
9- Cercha espacial triangular
5- Zuncho de borde | 10 Ø16
10- Pieza especial de unión que da continuidad al tensor y a las vigas (ver despiece)
7
Axonometry A | 1:30 Assemble Piece - 2 beams
1- Tensor continuo en toda el conjunto de elementos 2- Macarrón de acero del tensor | 2 UF 120.5 3- Rigidizadores del macarrón soldados a placa 4- Placa de anclaje a losa del forjado 5- 2UF 120.5 soldados protegen al tensor através de la losa 6- 6 perfiles UF.60.3 dirección OE 7- 6 perfiles UF.60.3 dirección NS 8- Pieza de unión 4 vigas-tensor (ver axonometría C) 9- Apoyo y soldado vigas dirección Norte-Sur 10-Apoyo y soldado vigas dirección Oeste-Este 11- Chapa de transición soldada a la pieza de unión
8
Leyenda Axonometría B | Despiece elementos Tensor de acero continuo 0.93
4
8
Elementos dentro de la losa HA-25
9 10
2
Vigas espaciales O-E
Pieza de unión
11
1- Tensor continuo en toda la pieza 2- Perfil rectangular #120.60.6 3- 4 Perfiles L100. En ellos se sueldan los cordones superiores 4- Perfil cuadrado #80.6 donde se sueldan las L100 5- Perfil cilíndrico de 80cm de longitud y 8cm de espesor 6- 16 piezas rigidizadoras soldadas a las piezas [7] y al cilindro 7- Láminas de acero de 4cm de espesor. Dan rigidez a la pieza 8- 4 Perfiles L100. En ellos se suelda el cordón inferior 9- Chapa de cierre de la pieza soldada a cilindro y a perfiles 10- Cono de presión del tensor
Escuela Técnica Superior de Arquitectura de Madrid
PROYECTO DE SISTEMAS TECNOLÓGICOS & CONSTRUCTIVOS
3
9
Vigas espaciales N-S
2 10
1
PLANO
Detalles
PROYECTO
Edificio público-social entremedianerías
LOCALIZACIÓN
Barrio de Tetuán · Madrid · España
Alfredo Alvarez Curran
13011
GRUPO: J Alfonso García Santos
08.06.2019
A-3
[D] Double-height community hall with hanging net on top | 1:20
0.50
0.50
Ancho total de la red: 3.90m | Longitud total: 12m | Área útil: 42m2
1
1.20
7
18
0.14
17 1.25
2
0.60
0.60
1.00
8
0.35
11
10
6 0.10
ENVELOPE DETAILING
[D2] Tie Beam Inner Courtyard | 1:5
7 0.93
3
6 17
0.50
12
14
13
15
1.25
0.60
3.75
3.60 0.32
0.58
0.50 0.60 0.50
0.50 0.60 0.50
0.74
Altura líbre mínima del salón comunitario: 3.70m | Altura libre máxima: 9.60m
0.55
0.60
Ancho fachada: 1.70m 0.60
9
0.50
0.50
0.60
5
[D]
13
8
0.85
0.50
4
Leyenda 24 1- Carpintería solar de costilla estructural (ver C2) 2- Muro cortina exterior sin tapeta y doble vidrio
0.60
0.60
[D1]
22 17
0.60
0.60
3- Pletina metálica continua de soldadura de 4mm 4- Abrazaderas soldadas a (3) (ver C2) 5- Costilla estructural: cercha espacial rectangular
1.25
0.50
0.50
21
18 25
[D2]
26
6- Muro cortina interior sin tapeta y doble vidrio 7- Muro cortina de las viviendas: vidrio translúcido 8- Muro cortina de las viviendas: vidrio transparente 9- Montante del muro cortina de las viviendas 10- Red sobre el salón anclada a vigas (ver lateral) 12- Escalera metálica de acceso a la red 13- Luminaria circular oculta bajo zuncho circular 14- Pieza de unión vigas-tensor (ver B14) 15- Macarrón metálico del tensor de acero (Ver B14) 16- Envolvente de vidrio del tensor con luminarias 17- Perfil L 80.40.5 lineal en toda la fachada
[D1] Facade Curtain Wall / Interior Curtain Wall / Tie beam finishing for end of floor" | 1:10
6
0.32
21- Placa de anclaje para soldaduras y pernos
8
0.14
16
22- Perfil de 3mm de ocultamiento atornillado
0.25
23- Espacio registrable para cableado
17
0.13
18
1.20
1
0.74
0.55
0.10
Ancho fachada: 1.70m
18- Perfil tubular rectangular #60.40.4 19- Conectores viga-losa 20- Viga espacial triangulada E-O | IPE-80 soldados
17
1.00
2
9
0.25
3
0.15
7
24- Luminaria lineal para luz difusa. Soldada a perfil especial triangular y rematada con perfil de 3mm de espesor atornillado a dicho perfil 25- Perfil en U para enganche tipo clip 26- Perfil especial de inclinación de la carpintería del patio central (ver C5)
0.08
Escuela Técnica Superior de Arquitectura de Madrid
19
PROYECTO DE SISTEMAS
1.25
0.50
0.50
4
20
0.23 0.8 0
0.60
0.60
21
0.64
14
18 24
22 23
PLANO
Detalles
PROYECTO
Edificio público-social entremedianerías
LOCALIZACIÓN
Barrio de Tetuán · Madrid · España
0.77
5
TECNOLÓGICOS & CONSTRUCTIVOS
Ø20
Ø80
Alfredo Alvarez Curran
13011
GRUPO: J Alfonso García Santos
08.06.2019
A-4
ENVELOPE DETAILING
[T] Plumbing connections and inner Facades 2.00 2.77 1.45
1.15
1.20
13
[T]
14
7
17
1.00
15
16
18
20
8
19
1.41
21
9 10 11 11 11
1.00
12
12
12
11
12
23
Leyenda
22
13 24
1- Panel de ladrillo+aislamiento (ver C3) 2- Subestructura metálica de IPE-100 (ver C3) 3- Espacio para instalaciones | Bajante Ø100 4- IPE-100 soldados a (2) y anclados a (5)
0.36
5- Viga de hormigón del muro medianero
3.00
6- Bloques de termoarcilla 30x29x19cm sobre vigas hormigón 7- Aislamiento térmico colocado tras zuncho de borde
2.00 1.45
1.20
1.15
8- Tubo metálico perdido en forjado que permite el paso de bajante Ø100 9- Panel (1) especial de final de muro | Perforado por bajante 10- Conducto de extracción de los aseos
1
11- Perfil tubular cuadrado #120.6 soldado a (12) y anclado a forjado superior
4.54
2
12- Perfil tubular cuadrado #120.6 soldado a (11) y recibido sobre (13) 13- Tabique de una hoja de ladrillo hueco doble 24x11,5x5cm recibido
3
14- Pilar IPE-100 a modo de subestructura del (13) de la última planta
3.63
16- Placa de anclaje a losa de hormigón para (14) 17- Barandilla de vidrio circular de los patios | 1m de alto 18- Sistema de anclaje a zuncho de borde circular 19- Perfil metálico de 3mm continuo que proetege y oculta la carpintería
3.12
3.36
5
15- Tubo metálico perdido en forjado que permite el paso de derivación de
3.69
4
20- Perfil tubular rectangular #60.40.4 perimetral de remate 21- Vidrio traslúcido 22- Remate de zuncho de borde (ver C7)
6
23- Luminaria lineal para luz difusa. Soldada a perfil especial triangular 24- Vidrio transparente
25 26
25- Acabado del suelo STC | Madera 2cm 26- Mortero STC | 10cm 27- Aislamiento térmico | 13cm 28- Losa HA-25 | Ø10 cada 20cm
27 28
0.48
Escuela Técnica Superior de Arquitectura de Madrid
PROYECTO DE SISTEMAS TECNOLÓGICOS & CONSTRUCTIVOS
PLANO
Detalles
PROYECTO
Edificio público-social entremedianerías
LOCALIZACIÓN
Barrio de Tetuán · Madrid · España
Alfredo Alvarez Curran
13011
GRUPO: J Alfonso García Santos
08.06.2019
A-5
02
PRIMERA PARADA PROJECT TYPE
Professional
LOCATION
Barranco, Lima, Peru
YEAR
2020
INDEX
I
Axonometric View
II Floor 02 III Foundation Plan IV Foundation Details V Domestic Cold Water VI Sanitary Installation
AXONOMETRIC VIEW - CONTEXT
BUILDING USE Floor
-02
-01
00
+01
+02
+03
m2
500
500
725
640
550
550
Parking
Office
Office Commercial
Office Commercial
Housing
Housing
Use
PROJECT DESCRIPTION
The building is located in the heart of Barrranco, Lima's most touristic district. This area is popular for its colonial buildings dating more than 100 years old. The proximity to the beach, the restaurants, art galleries, museums, make this neighbourhood a vibrant, international and cultural area. In this context, Grupo Osma, a partnership conforming three different business owners, embarked on a journey to build an innovative mixed-use building in the heart of Barranco. The project offers 470m2 of office spaces for the young entrepeneurs of the area, together with a wide variety of culinary experiences on ground level floor. The upper 2 floors host x appartments aimed at students and tourists. The architect in charge of designing the building, Alfonso Martinez-Barona, is also one of the members of Grupo Osma, therefore he was both developer and architect of the project. I was hired by Alfonso in the beginning of the project on August 2019 in order to build a BIM model of the design in order to coordinate with the different engineering teams involved in the structural design and technical equipment installations. The design process lasted 6 months, from August 2019 until January 2020, when the building process started. Unfortunately, the COVID pandemic struck and I had to return to Spain to finish my Architecture Master. However, during this process I learned about the importance of BIM management and was able to see the results of such methodology.
PROYECTO:
Primera Parada
CLIENTE:
Grupo Osma
LOCALIZACION:
Av. 28 de Julio, Barranco, 13495 Lima, Peru.
ARQUITECTO:
Alfonso Martinez-Barona CAP 2233
FECHA:
Enero 2020
A-1
FLOOR -01 FLOOR -01 ( OFFICES )
Esc.1 : 175
A
Ducto de inyección
AA
Local 5 Área de trabajo Aforo de local : 22 PC 5 -0
Proyección
Depósito
ventana alta
14 13
9
11
V -3
12 10 9 8 7
PC -08
PC -08
6 5
PC
4 2
Ventilación mecánica
BUILDING USE
Almacén
5 -0
Ventilación a doble altura
1
PC
2
PC
Ventilación mecánica 08
PC -05
Ductos de extracción
PC -08
SH Mujeres
PC -08
PC
4
5
6
7
1
2
3
SH Hombres
PC
Floor
-02
-01
00
+01
+02
+03
m2
500
500
725
640
550
550
Parking
Office
Office Commercial
Office Commercial
Housing
Housing
5
Depósito
5 -0
6
Ventilación mecánica
7
SH Hombres
8
5 -0
3
PC
4
5 -0
Puerta c/ rejillas de ventilación
5 -0
PC
1
Aforo de local : 39
3
Local 3
SH Mujeres
-
8 -0
PC -04
Sube Extr . PC
Ducto IIEE
PC
8 -0
Use
8 -0
Ventilación mecánica Puerta plegable
Sube Extr .
PROJECT DESCRIPTION
Rejilla de drenaje
Ingreso de personal 24
23
22
21
20
19
18
04 P-
17
16
Ductos de inyección
Escalera Servicio
15
11.61 %
14
13 PC
-04
The building is located in the heart of Barrranco, Lima's most touristic district. This area is popular for its colonial buildings dating more than 100 years old. The proximity to the beach, the restaurants, art galleries, museums, make this neighbourhood a vibrant, international and cultural area.
12 11
10 9
mecánica
8
Depósito
PC -07
PC -08
PC -08 PC -08
PC -07
3
2
1
In this context, Grupo Osma, a partnership conforming three different business owners, embarked on a journey to build an innovative mixed-use building in the heart of Barranco. The project offers 470m2 of office spaces for the young entrepeneurs of the area, together with a wide variety of culinary experiences on ground level floor. The upper 2 floors host x appartments aimed at students and tourists.
SH Hombres
Rampa vehicular
Ducto de extracción
The architect in charge of designing the building, Alfonso Martinez-Barona, is also one of the members of Grupo Osma, therefore he was both developer and architect of the project. I was hired by Alfonso in the beginning of the project on August 2019 in order to build a BIM model of the design in order to coordinate with the different engineering teams involved in the structural design and technical equipment installations.
PCF -01
R
The design process lasted 6 months, from August 2019 until January 2020, when the building process started. Unfortunately, the COVID pandemic struck and I had to return to Spain to finish my Architecture Master. However, during this process I learned about the importance of BIM management and was able to see the results of such methodology.
R
Sumidero PC -09
CLC -01
Zona Común
22
Cocina
Local 2 - Patio
23 39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
Local 2 - Jardín
PCF
SH PCF -02 Conserjería
IIEE Comunic . Ascensor
Ascensor
P -05
P -06
2
3
1
PCF
21
4
Área de mesas Aforo de local : 168
20
5
Local 2
19
PC -04
SH Mujeres
18
SH Disc .
PC -08
4
5
6
7
mecánica
17
Ventilación
Ventilación
Depósito
PROYECTO:
Primera Parada
CLIENTE:
Grupo Osma
LOCALIZACION:
Av. 28 de Julio, Barranco, 13495 Lima, Peru.
Ventilación mecánica Ductos de extracción
Ductos de ventilación
A
ARQUITECTO:
Alfonso Martinez-Barona CAP 2233
FECHA:
Enero 2020
A-2
3 PLANO DE CIMENTACION
FOUNDATION PLAN A
A
METRADO DE ZAPATAS 2 .0
Esc.1 : 175
3
3.1 9
)
cm
50
1.
CC
cm
-1 m
5c
V-02 (0.40m x 0.60m)
7
@2
3.08
18.74
C-4
cm
x
25 @
0m
4 (0.
12.49
m
Z-4
mm 16
02
V-
221
)
6m
16
Ø
m)
0 0.6
DOSIFICACION UNACEM - VOL SUELTOS CEMENTO ARENA (m3) PIEDRA (m3) 0.68 1.02 0.68 1.02 0.68 1.02 0.68 1.02 0.68 1.02 0.68 1.02 0.68 1.02 0.68 1.02 0.68 1.02 0.68 1.02 0.83 1.25 1.59 2.38 0.90 1.35 0.90 1.35 0.90 1.35 0.59 0.89
4.2
0
V-
cm 25 @
Ø1
cm
mm
12 12 12 12 12 12 12 12 12 12 15 28 16 16 16 10
5cm
25
Ø
VOLUMEN 1.35 m³ 1.35 m³ 1.35 m³ 1.35 m³ 1.35 m³ 1.35 m³ 1.35 m³ 1.35 m³ 1.35 m³ 1.35 m³ 1.66 m³ 3.17 m³ 1.80 m³ 1.80 m³ 1.80 m³ 1.18 m³
(e2
@
C-4
.60 x0
CANTIDAD 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
AA Section Esc.1 : 500
-2
mm
0
5 1.
m
40
0. 2(
CUADRO DE ESPECIFICACIONES TECNICAS CONCRETO CICLOPEO CIMIENTOS CORRIDOS : CONCRETO CICLOPEO 1:10 (CEMENTO-HORMIGON MAS 30% PG (6"max.) SOBRECIMIENTOS : CONCRETO CICLOPEO 1:8
M-1 (e20cm)
CC-1 4.73
CC-1
4.48
7.3
MC-2 (e25cm)
Alfredo A. Curran
MC
16
5.84
PROFESIONAL A...
Grand total: 16
D m)
50
Ø
cm Ø 16mm @25 cm
E
(
C-4
Z-4
C-5
A
02
V-
cm
50
1.
25
mm
25
x
0 0.6
1.
16
@
m
0 0.4
@
cm
Ø
1.
25
cm
Z-4
mm
25
@
V-02 (0.40m x 0.60m)
30
@
25
16
16
mm
16
30
1.
mm
16
@
cm 25 @
Ø
Ø
30 1.
C-5
16
Ø
mm
.60 x0
.58 00 7.
25
@
m)
Z-1
Z-1
Ø
56 5.
mm
(
m
0 0.4
16
mm
2
02
V-
Ø
m 5c
30
@
mm
30
1.
1.
16
m)
Z-1
C-5
-1
Ø
cm
16
cm 25 (e
CC
57 3.
25
@
mm
16
Ø
1a
Ø
30 1.
97 4.
2 C-
Concreto para Zapatas
OSMA ARQ.
MODELO Z-1 Z-1 Z-1 Z-1 Z-1 Z-1 Z-1 Z-1 Z-1 Z-1 Z-2 Z-3 Z-4 Z-4 Z-4 Z-5
C
M
TITULO DE ITEM
CLIENTE
5 6.
2
9 .6 20
01.06.01.03
B
8
1
ITEM
3
15.05
B
C
(CEMENTO-HORMIGON MAS 25% PG (3"max.)
CONCRETO ARMADO CONCRETO ACERO REFUERZO
D
: f'c = 210 Kg/cm2 : fy = 4200 Kg/cm2
RECUBRIMIENTOS VIGAS PERALTADAS Y COLUMNAS VIGAS CHATAS ESCALERAS Y ALIGERADOS ZAPATAS
7.91
M-1 (e20cm) VC-0
2 (0.2
0m x
0.60m
0
2 (0.2
M-1 (e20cm)
)
VC-0
)
.60m mx0
: 4 Cm : 2.5 Cm : 2 Cm : 7 Cm S/C : INDICADA EN LOS PLANOS DE ALIGERADOS
SOBRECARGAS :
4.65
.30
Ø 16mm @25 cm
29
1.30
C-4
C-4
CC-1
1.30
Z-5 2.80
CC
CC-1
( -2
0.10
3/8"
0.45
0.55
0.55
0.15
1/2"
0.50
0.60
0.60
5.00
5
4.65
6
1.30
C-3
Ø 16mm @25 cm
1.30
V-01 (0.30m x 0.60m)
Ø 16mm @25 cm
3.05
Ø 16mm @25 cm
M-3 (e15cm)
M-3 (e15cm)
1.60
cm
Z-3
3.25
7
7a
5.00
8
:f'm 55 Kg / Cm2
ESPESOR MINIMO
: e min. = 0.14m , 0.24m
% MAXIMO DE VACIOS
: 25%
MORTERO P1-C
: 1:1:4 (CEMENTO : CAL NORMALIZADA : ARENA )
ESPESOR DE JUNTAS DE MORTERO
: e min: =0.9 Cm : e max : =1.5 Cm
J
PROYECTO:
Primera Parada
CLIENTE:
Grupo Osma
LOCALIZACION:
Av. 28 de Julio, Barranco, 13495 Lima, Peru.
CC-1 m)
MC-2 (e25c
5.00
8a
Z
UNIDAD ( LADRILLO TIPO IV )
Z-1
A
5.17 40.75
0.75 0.80
C-3
m) MC-2 (e25c
J 5.01
Ø 16mm @25
M-3 (e15cm)
LC-2
V-01 (0.30m x 0.60m)
Ø 16mm @15 cm
MC-2 (e25cm)
Ø 16mm @25 cm
Ø 16mm @15 cm
1.30
MC-2 (e25cm)
3.98
I
M-3 (e15cm)
1.30
0.75 0.80
6
Ø 16mm @15 cm
CC-1
C-2 Z-2
m
Ø 16mm @25 cm
LC-2
0m
0.3
1(
V-0
5c
1.30
C-1
m)
.60
x0
@2
1.30
C-1 7.45
1.30
Ø 16mm @25 cm
C-1 Z-1
V-01 (0.30m x 0.60m)
mm
C-1 Z-1
Ø 16mm @25 cm
V-01 (0.30m x 0.60m)
0.60 0.70
CARACTERISTICAS DE LA ALBAÑILERIA CONFINADA :
5.0
Ø 16mm @25 cm
1.30
V-01 (0.30m x 0.60m)
I
1.30 Ø 16mm @25 cm
5/8" 3/4"
OBSERVACIONES :
16
C-1 Z-1
Ø 16mm @25 cm
2
V-0
Ø 16mm @15 cm
m)
.60
x0
Ø
Ø 16mm @25 cm
V-01 (0.30m x 0.60m)
45°
m
Ø 16mm @25 cm
ESTRIBOS (Z)
0.55
NORMAS TECNICAS DE EDIFICACION E-020, E-030, E-050, E-060, E070
3 4.3 )
Ø 16mm @25 cm
m
40 (0.
5c e2
14.87 7.65
MC
Ø 16mm @25 cm
1.30
4
SOLAPES
0.55
TERRENO CAPACIDAD PORTANTE : 2.70 Kg/cm2 ESPECIFICACIONES DE DISEÑO Y CONSTRUCCION : NORMAS DE DISEÑO SISMO RESISTENTE
-1
4.27
V-01 (0.30m x 0.60m)
TRASLAPES
0.45
1.30
C-1 Z-1
1.30
Ø 16mm @25 cm
1.30
Ø 16mm @25 cm
1.30
Ø 16mm @25 cm
C-1 Z-1
V-01 (0.30m x 0.60m)
M-1 (e20cm)
H
ANCLAJE
2
1.30
V-01 (0.30m x 0.60m)
7.3
C-1 Z-1
V-01 (0.30m x 0.60m)
m) .60
V-01 (0.30m x 0.60m)
Losa de cimentacion de la Cisterna (nivel -9.00m)
Ø 16mm @25 cm
x0
Ø 16mm @25 cm
m
20
(0.
Ø 16mm @25 cm
V-01 (0.30m x 0.60m)
Ø
cm
-02
3.25
5 @2
VC
Ø 16mm @15 cm
: 200 Kg / m2
1/4"
CC-1
Ø 16mm @25 cm
G
m
MC-2 (e25cm)
F
: 200 Kg / m2 : 200 Kg / m2
ESCALERA LONGITUDES MINIMAS DE ANCLAJE Y TRASLAPE DE ARMADURAS
G
6m
5.00
Ø1
5.01
7
Ø 16mm @15 cm
6
14.66
AZOTEA RESTO
5
5
5.2
4
LC-2
3
7.68
9
ARQUITECTO:
Alfonso Martinez-Barona CAP 2233
FECHA:
Enero 2020
S-1
ZAPATA Z-1 (CORTE)
FOUNDATION DETAILS
ZAPATA Z4 (PLANTA) A
Esc. 1 : 20
Esc. 1 : 20 AA Section Esc.1 : 500
C-1 (0.60m x 0.30m) Ø 9.5mm @25 cm
-6.60m
Ø 16mm
Losa Aligerada h=25cm Viga de Hormigon Armado 30cm x 60cm 1.50
0.40
Ø 0.50
Compactado de Grava -7.30m
Zapata de Hormigon Armado 1.30m x1.30m Ø 16mm @25 cm CUADRO DE ESPECIFICACIONES TECNICAS
Zapata de Hormigon Armado 1.50m x1.50m
C-4 (0.5m Ø)
CONCRETO CICLOPEO CIMIENTOS CORRIDOS : CONCRETO CICLOPEO 1:10 (CEMENTO-HORMIGON MAS 30% PG (6"max.) SOBRECIMIENTOS : CONCRETO CICLOPEO 1:8
Ø 9.5mm @10 cm
CONCRETO ARMADO
Ø 16mm @25 cm
Ø 16mm
CONCRETO ACERO REFUERZO
Viga de Hormigon Armado 40cm x 60cm
-8.10m
(CEMENTO-HORMIGON MAS 25% PG (3"max.)
: f'c = 210 Kg/cm2 : fy = 4200 Kg/cm2
RECUBRIMIENTOS
Subsuelo
VIGAS PERALTADAS Y COLUMNAS VIGAS CHATAS ESCALERAS Y ALIGERADOS ZAPATAS
ZAPATA Z3 (CORTE)
: 4 Cm : 2.5 Cm : 2 Cm : 7 Cm S/C : INDICADA EN LOS PLANOS DE ALIGERADOS
SOBRECARGAS : AZOTEA RESTO
Esc. 1 : 20
: 200 Kg / m2 : 200 Kg / m2
ESCALERA LONGITUDES MINIMAS DE ANCLAJE Y TRASLAPE DE ARMADURAS
C-1 (0.60m x 0.30m)
Viga de Hormigon Armado 30cm x 60cm
C-3 (0.30m x 0.30m)
Ø 19mm Ø 9.5mm @25 cm
-6.60m
Ø 9.5mm @10 cm
Ø 16mm
Ø
ANCLAJE
TRASLAPES
SOLAPES
ESTRIBOS (Z)
1/4"
0.45
0.55
0.55
0.10
3/8"
0.45
0.55
0.55
0.15
1/2"
0.50
0.60
0.60
Ø 9.5mm @15 cm
Ø 16mm Ø 9.5mm @25 cm
: 200 Kg / m2
5/8"
0.60
0.75
0.75
3/4"
0.70
0.80
0.80
45°
Z
TERRENO CAPACIDAD PORTANTE : 2.70 Kg/cm2 ESPECIFICACIONES DE DISEÑO Y CONSTRUCCION : NORMAS DE DISEÑO SISMO RESISTENTE
Losa Aligerada h=25cm
NORMAS TECNICAS DE EDIFICACION E-020, E-030, E-050, E-060, E070 OBSERVACIONES :
Compactado de Grava
CARACTERISTICAS DE LA ALBAÑILERIA CONFINADA :
-7.30m
UNIDAD ( LADRILLO TIPO IV )
:f'm 55 Kg / Cm2
ESPESOR MINIMO
: e min. = 0.14m , 0.24m
% MAXIMO DE VACIOS
: 25%
MORTERO P1-C
: 1:1:4 (CEMENTO : CAL NORMALIZADA : ARENA )
ESPESOR DE JUNTAS DE MORTERO
: e min: =0.9 Cm : e max : =1.5 Cm
Zapata de Hormigon Armado 1.30m x3.05m 0.80
Subsuelo
A
-8.10m
3.05
PROYECTO:
Primera Parada
CLIENTE:
Grupo Osma
LOCALIZACION:
Av. 28 de Julio, Barranco, 13495 Lima, Peru.
ARQUITECTO:
Alfonso Martinez-Barona CAP 2233
FECHA:
Enero 2020
S-6
DOMESTIC COLD WATER
Axonometric Diagram of Cold Water Supply Esc.
Water Tank 750 l
09 M-
17 V-
-03 PV
85
84
83
81
86
82
93
94
87
91
92
89
90
88
-03 PV
CONNECTION TO HOUSEHOLD DETAIL (Section view)
Ø
H
1/2"
0.25
3/4"
0.25
1"
0.30
.10 min
17
7
8 6
5
4
18
9
3
10
11
12
11
9
%%uPERFIL
2
1
General Valve
LEYENDA ork
ly Netw ater Supp
Public W
Water Pump FRE(S)32-110 400V
1
MATRIZ DIAMETRO VARIABLE
10
LLAVE DE PASO
2
ABRAZADERA DIAMETRO VARIABLE PERFORADA
11
NIPLE STANDARD CON TUERCA
3
LLAVE DE TOMA (Corporation) TUERCA Y NIPLE CON PESTANA DE 0.05 m
12 13
MEDIDOR O NIPLE
4
CACHIMBA O CURVA 90° DE DOBLE UNION - PRESION
14
TAPA FIERRO GALVANIZADO
5
TUBERIA DE CONDUCCION
15
LOSA DE CONCRETO f'c = 140 kg/cm2
6
FORRO TUB. 100 mm (Ø4")
16
CAJA DE MEDIDOR
7
CODO DE 45°
17
8
NIPLE LONGITUD MINIMA = 0.30 m.
SOLADO DE CONCRETO f'c = 140 kg/cm2
9
UNION PRESION ROSCA
MARCO FIERRO GALVANIZADO
PROYECTO:
Primera Parada
CLIENTE:
Grupo Osma
LOCALIZACION:
Av. 28 de Julio, Barranco, 13495 Lima, Peru.
ARQUITECTO:
Alfonso Martinez-Barona CAP 2233
FECHA:
Enero 2020
I-1
Axonometry View
Section AA'
Esc.
Esc.1 : 40
SANITARY INSTALLATION
3rd Floor Plan (Green region shows the area described in this sheet)
09 M-
6.30m Viga HA 60cm x 30cm
Losa h = 30cm
1%
Pilar C-2 50cm x 30cm
I
17 V-
Viga HA 60cm x 30cm
-03 PV
A
85
84
83
81
86
82
93
94
87
91
92
89
90
Plan View
G
88
-03 PV
Esc.1 : 40
DETALLE DE TUBO COLECTOR DE DERIVACION EN YEE 0.65
C
B
H B
D
0.55 0.81
0.25
18
0.
G
A
Sujecion mediante abrazadera metalica
A' 0.
1.
01
E
49
F
G
0.74
0.74
0.69
ESPECIFICACIONES TECNICAS - LAS TUBERIAS DE DESAGUE SE LLENARÁN DE AGUA, DESPUES DE TAPONEAR LAS SALIDAS, PERMANECIENDO EN DUCTO (24hrs.) SIN PERMITIR ESCAPES. - SE VERIFICARÁ EL FUNCIONAMIENTO DE CADA APARATO SANITARIO. - LAS TUBERIAS DE DESAGUE SERAN DE PVC - SAP Y SERÁN SELLADOS CON PEGAMENTO ESPECIAL. - LAS TUBERIAS DE VENTILACION SERÁN DE PVC - SAL Y SERÁN SELLADOS
A
B
C
D
E
F
G
H
CON PEGAMENTO ESPECIAL.
I
- LAS MONTANTES DE DESAGUE Y LAS TUBERIAS DE VENTILACION QUE LLEGUEN A LA AZOTEA , DEBERAN SER PROLONGADAS POR ENCIMA DEL PISO TERMINADO HASTA UNA ALTURA NO MENOR DE 1.80m, POR TRATARSE DE UNA AZOTEA ACCESIBLE.
Registro Roscado 4'' (
Sumidero de regsitro 2'' (
Union en TEE paso de 4'' a 2''
Union tipo TEE vertical de 4'' a 4'' (Conexion con bajante)
PVC Codo de 45 grados 4''
PVC Codo de 90 grados 4''
PVC codo de 90 grados 2''
Union tipo YEE 4''
PVC Trampa tipo PEE 2''
PROYECTO:
Primera Parada
CLIENTE:
Grupo Osma
LOCALIZACION:
Av. 28 de Julio, Barranco, 13495 Lima, Peru.
ARQUITECTO:
Alfonso Martinez-Barona CAP 2233
FECHA:
Enero 2020
I-2
03
PÅKHUSET - RØDBY PROJECT TYPE
Professional
LOCATION
Rødby, Sjælland, Danmark
YEAR
2022
INDEX
I
Axonometric View
II Plan / Section III Constructive Detail
PROJECT DESCRIPTION
As part of my Master in Technology on Building Surveying and Project Planning and Aalborg University, I joined NORRØN Architects for a six month internship in 2022. Given my previous experience on Heritage Buildings, the team counted on me for developing a BIM model of an on going project they had been developing with Rødby Kommune to restore the old local Påkhus. My tasks included on-site visits to gather data on the constructuiveelements' state, measuring, drawing and updating the BIM model through revit. As part of the renovation, we designed a second floor built on topof the existing structure. The proposal aimed at transforming the Påkhuset into a community building, able to host gatherings of all sort. For this purpose, I carried out a study on the insulation of the building and the installation of new iron windows, trying to respect the original building's image at all times.
PÅKHUSET - RØDBY DOKUMENTNAVN
Axonometri
BYGHERRE
Forening ofr Påkhusets Forskønnelse
ARKITEKT
NORRØN, Tagensvej 22B, 2100 N Kbh
08.01.2023
A-1
PLAN / SECTION Units in m
Highlighted in blue is the intervention we designed to make the second floor accessible and transfrom it into a stand for shows. It also serves as a platform for contemplating the richness of this architectural heritage.
0.25
12.64
6.63
0.17
19.68
PÅKHUSET - RØDBY DOKUMENTNAVN
Plan -
BYGHERRE
Forening ofr Påkhusets Forskønnelse
ARKITEKT
NORRØN, Tagensvej 22B, 2100 N Kbh
08.01.2023
A-2
CROSS SECTION DETAIL
1
The following detail gives a clear description of how our intervention interacts and enhances the buildings performance.
2 3 4 5
6 7 8
9 10 11
1 2 3 4 5
12 6 7 8 9
13
10 11 12 13 14 15 16 17 18
existing roof tiles existing battens timber rafters and insulation railing for new floor new flooring wood planks existing end batten iron window iron plate 5mm existing timber 12cm x 12cm existing brick wall white plywood internal cladding insulation new staircase existing stacked fieldstone wall new screed floor with underfloor heating new leveling clay mortar new glass gravel compacted earth
14
PÅKHUSET - RØDBY 15 16 0 17
300mm
DOKUMENTNAVN
Plan -
BYGHERRE
Forening ofr Påkhusets Forskønnelse
ARKITEKT
NORRØN, Tagensvej 22B, 2100 N Kbh
08.01.2023
18
A-3