1 minute read

LOWER INCOME GROUP

Next Article
INSTALLATION

INSTALLATION

The lower income group have family annaual income is 2 laksh to 4 laksh. They mostly doing jobs in cab drivers,small scale empolyees , factory workers, industrial workers supervisiors , etc. Each floor has 8 units, each cluster has g+4 Each block 32 units are there in the block. Total We have 2 blocks in lig clusters.

Advertisement

SCALE 1:200

Middle Income Group

The mig people have annual income is 4 laksh to 6 laksh . Their jobs are governmet sector and private sector , central government employees, small scale businessesreal estates, shops , etc. And we give 4 blocks in site, each block is g+5 , every block Has 40 units, 4 blocks have 160 units in the mig site.

RC CONCRETE SLAB THICKNESS 150 MM

WINDOW

BRICK WALL

AREA 100 SQ M

MIG TYPICAL FLOOR PLAN

WOODEN MAIN DOOR 1000MM * 2100 MM

COLUMN THICKNESS

300MM*450MM

CONCRETE FLOORING 150 MM THICKNESS

Higher Income Group

The hig people annual has above 6 laksh , maximum hig people aredoing businesses. And also some are industrialists. Every floor has 8 units, each block has 9 units, 1 block has 72 Units. We give 2 blocks

This article is from: