Cad work for CSA

Page 1

300

eq

eq

All drawings to be read in conjunction with structural engineer’s and service engineer’s

N

information

A3

FCL +2700mm

PROPOSED FCL +2530mm AFF

Note: Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing.

NOTE: For location, arrangement & setting D104_3

equipment,refer to GD-L design spec

Switch plates @

Architecture Ltd immediately.

Kitchen design

out of TV outlets & AV D104_3

All discrepancies to be reported to Clive Sall

NOTE:For

Full height

& associated

mirrors

M&E items

This drawing is to be read in conjunction with all related consultants drawings and any other related information.

refer to GD-L

+1200mm AFF

DESIGN INTENT

design spec

Sockets +450mm AFF

Step +125mm AFF Positioning & height of all M+E 70mm square edge MDF skirt

1 152_6104_1

2

Elevation 1 Room 104_1 Scale 1:50 @ A3

152_6104_1

D1

equipment TBC by GD-L

Elevation 2 Room 104_1 Scale 1:50 @ A3

D1: for detail refer to 152_6104_3

Bulkhead slot diffuser. Requirements TBC by M&E consultant.

NOTE:For

NOTE:For

Kitchen design

Kitchen design

& associated

& associated

M&E items

M&E items

refer to GD-L

refer to GD-L

design spec

design spec

D104_1 C2

21.07.15

Small power & layout update

C1

01.05.15

Setting out information

Rev

Date

Note

Acoustic Engineer

Gillieron Scott Acoustic Design

D104_5

Outlets @ Interior Design

+450mm AFF

Gordon-Duff + Linton

3

1

Elevation 3 Room 104_1

4 104_1 2

152_6104_1

70mm square

Project Management / Quantity Surveyor

edge MDF Skirt

Stace LLP Services

Scale 1:50 @ A3

Synergy Consulting

3

Structures

Fluid Structures Client

Linton Property Developments Ltd The Linton Group,

300

14 Basil Street, Knightsbridge, London, SW3 1AJ

Project title

Location

Entry phone

Bathroom

Thermostat and

TBC by GDL

TBC by GDL

thermostat

FCU control

LINTON HOUSE Drawing Title

D104_3

ROOM 104_1

Scale @ A3

150

1:50

Project No.

D104_2 Switch plates @

eq

eq

eq

eq

152

+1200mm AFF D104_3

D104_3

30

Drawing no.

Revision

1200

30

6104_1 C2

Status

Date of Issue

CONTRUCTION

JUL 2015

Fused spur towel rail

TR

Outlets @ D104_1

eq

+450mm AFF

eq

Outlets @

eq eq

+450mm

5

Plan Room 104_1 - Livingroom

4

Sub Woofer

Elevation 4 Room 104_1

outlet location TBC

Clive Sall Architecture Ltd. 2 Providence Yard Ezra Street

152_6104_1

Scale 1:50 @ A3

152_6104_1

Scale 1:50 @ A3

London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


tiles, Cabinet & toilet

All drawings to be read in

Wall tiles set out from the

Set out center line for Wall

conjunction with structural

centre of the shower tray

C L

engineer’s and service engineer’s

N

information

C L

A3

PROPOSED

FCL +2700mm Note:

Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing. All discrepancies to be reported to Clive Sall Architecture Ltd immediately. This drawing is to be read in conjunction with all related consultants drawings and any other related information.

Terminate wall tiles Align

@ +2055mm AFF

DESIGN INTENT Mirror with demister

To be read with the sanitaryware 915

915

heating pad.

specification + bathroom cabinet schedule supplied by GD-L.

Glass shower door

Wall mounted heated towel rail

Positioning & height of all M+E equipment TBC by GD-L

D104_2 Outline of door projection in open position

Reinforce wall to receive hand wash

Align

opposite wall

1140

below. Align center with W/C on

1140

basin with wall mounted vanity unit

1

2

Elevation 1 Room 104_2

Elevation 2 Room 104_2

Align centerline of tile set 152_6104_2

Scale 1:25 @ A3 C L

152_6104_2

out with centerline of

eq

C L

375

Scale 1:25 @ A3

cabinet & lavatory eq eq

375

C L

eq 21.07.15

Annotation update

C1

01.05.15

Setting out information

Rev

Date

C2

FCL +2700mm FCL +2700mm

Note

Acoustic Engineer

Gillieron Scott Acoustic Design Interior Design

Wall mounted shower head

Gordon-Duff + Linton

+2300mm AFF Project Management / Quantity Surveyor

Stace LLP

Terminate tiling @ Align

Align

+2055mm AFF

Services

Align shower head &

Synergy Consulting

610

niche with center

Structures

915

of shower enclosure

Fitted bathroom cabinet(s)

Fluid Structures

Recessed medicine cabinet

Wall mounted mirror

refer to GD-L schedule

Please refer to GD-L schedule

with demisted heat pad

Client

Linton Property Developments Ltd The Linton Group,

Align centerline of cabinet & lavatory

C L

2300

400mm x 305mm

305

14 Basil Street, Knightsbridge, London, SW3 1AJ

Shower niche

Electric shave outlet

Align

Align

LINTON HOUSE Drawing Title

Dual flush plate centered on joint

Deck mounted faucet

Toilet roll holder

546

Project title

ROOM 104_2

1140

4 104_2 2

1140

1060

Wall mounted heated towel rail

3

700

900 650

1100

Wall mounted vanity

Scale @ A3

with storage unit below

Project No.

Flex outlet 50 400

1

D104_2

170

Wall mounted Lavatory

1:25/1:50

152

Drawing no.

Revision

6104_2 C2

Status

Date of Issue

CONSTRUCTION

JUL 2015

750

5 152_6104_2

Plan Room 104_2 Scale 1:50 @ A3

3 152_6104_2

Elevation 3 Room 104_2 Scale 1:25 @ A3

4 152_6104_2

Elevation 4 Room 104_2 Scale 1:25 @ A3

Clive Sall Architecture Ltd. 2 Providence Yard Ezra Street London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


Wall tiles set out from the

Wall tiles set out from the

centre of the bath

edge of the bath

All drawings to be read in conjunction with structural engineer’s and service engineer’s

N

information

A3

PROPOSED FCL +2700mm

FCL +2700mm Note: Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing. All discrepancies to be reported to Clive Sall Architecture Ltd immediately.

Shower head

This drawing is to be read in conjunction with all related consultants drawings and any other related

+2300mm

information.

Terminate tiling

Top of tiles

+2055mm AFF

+2055mm

DESIGN INTENT To be read with the sanitaryware

Height of glass shower screen to

specification + bathroom cabinet

align with tiling termination

schedule supplied by GD-L. Glass screen Positioning & height of all M+E equipment TBC by GD-L

Wall mounted heated towel rail D104_4

Mixer plate located centrally to bath

1 152_6104_4

2

Elevation 1 Room 104_4 Scale 1:25 @ A3 C L 990

152_6104_4

Elevation 2 Room 104_4 Scale 1:25 @ A3

C L 375

C L

C L Center heated towel rail on

375

Wall tiles set out from the centre of the bath

bathroom entery door

21.07.15

C2

FCL +2700mm

Centerline setout for

FCL +2700mm

tiles, mirror &

C1

01.05.15

Rev

Date

Annotation updates Setting out information Note

Acoustic Engineer

Gillieron Scott Acoustic Design

washbasin Center line set out for wall

Interior Design

tiles, overall cabinet center &

Gordon-Duff + Linton

toilet

Shower head +2300mm Terminate tiling +2055mm AFF

& mirror with the top

Stace LLP

Align Top of tiling

& niche along the Align medicine cabinet

Fitted bathroom cabinet(s)

Align shower head

+2055mm

centerline of the shower 610

Align

Project Management / Quantity Surveyor

enclosure

edge of the tile layout

Services

Synergy Consulting Structures

with shaver socket within.

Fluid Structures

Heated towel rail

Please refer to GD-L schedule

Client

Linton Property Developments Ltd

Wall mounted mirror with

Mirror with demister

The Linton Group,

demister heating pad

14 Basil Street, Knightsbridge, London, SW3 1AJ

305

heating pad.

400mm x 305mm

2055

Shower Niche

ROOM 104_4

610

800

along centerline Hand rinse basin with wall mounted vanity unit below 1140

Scale @ A3

835

box 530

495

Flex outlet 50 400

495

1:25/1:50

Project No.

152

Drawing no.

Revision

6104_4 C2

Status

Date of Issue

CONSTRUCTION

JUL 2015

480

750

D104_4

3

920

1 4 104_4 2

150

LINTON HOUSE Drawing Title

Flush plate located

Loo roll holder

Project title

5 152_6104_4

Plan Room 104_4 Scale 1:50 @ A3

3 152_6104_4

Elevation 3 Room 104_4 Scale 1:25 @ A3

4 152_6104_4

Elevation 4 Room 104_4 Scale 1:25 @ A3

Clive Sall Architecture Ltd. 2 Providence Yard Ezra Street London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


All drawings to be read in conjunction with structural

Extent of joinery projection 300

accross window opening

eq

engineer’s and service engineer’s

eq

N

information

A3

PROPOSED FCL +2575mm

FCL +2575mm

Note: Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any

section behind

shop drawing.

above the apartment, due to the

All discrepancies to be reported to Clive Sall

Switches

structural step in the framework. Ceiling

+1200mm

throughout apartment remains level.

2575

Obstructed window

NOTE: FFL in this room is raised 125mm

D1

joinery

850

Architecture Ltd immediately. This drawing is to be read in conjunction with all related consultants drawings and any other related information.

850

DESIGN INTENT

Thermostat Switch plates +700mm AFF Sockets +450mm AFF Positioning & height of all M+E equipment TBC by GD-L

Scale 1:50 @ A3

152_6104_5

Elevation 2 Room 104_5 Scale 1:50 @ A3

1300

FCL +2575mm Locate double power outlet and TV outlet to inside face of nib wall.

2575

TV Sockets +1600mm AFF

60

152_6104_5

2

Elevation 1 Room 104_5

100

70mm square edge

C2

21.07.15

Small power & layout update

C1

01.05.15

Setting out information

Rev

Date

Note

MDF skirt Acoustic Engineer

D1

Sockets

Gillieron Scott Acoustic Design

+450mm AFF Interior Design

Gordon-Duff + Linton Project Management / Quantity Surveyor

Stace LLP Services

3

D1

Elevation 3 Room 104_5

Setting out detail

Synergy Consulting Structures

152_6104_5

Scale 1:50 @ A3

152_6104_5

Scale 1:10 @ A3

Fluid Structures Client

300

Linton Property Developments Ltd The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

Project title

1 FCL +2575mm

4 104_5 2

LINTON HOUSE Drawing Title

Curtain pocket

ROOM 104_5

3 2575

1

D1 D104_5

Scale @ A3

1:50

Project No.

152

Drawing no.

Status

D104_5

Revision

6104_5 C2 Date of Issue

CONSTRUCTION ISSUE JUL 2015

5

Plan Room 104_5 Master Bedroom

4

Clive Sall Architecture Ltd. Elevation 4 Room 104_5

2 Providence Yard Ezra Street

152_6104_5

Scale 1:50 @ A3

152_6104_5

Scale 1:50 @ A3

London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


All drawings to be read in conjunction with structural engineer’s and service engineer’s

N

information

PROPOSED

FCL +2700mm

FCL +2530mm

A3

FCL +2530mm NOTE: for location arrangement

AFF

Note: Do not scale from this drawing.

& setting out information of TV &

All dimensions to be verified on site prior to the

AV outlets & equipment refer to

commencement of any work or the production of any

GD-L Design info

shop drawing.

Switches +1200mm

All discrepancies to be reported to Clive Sall Architecture Ltd immediately.

D1

This drawing is to be read in conjunction with all related consultants drawings and any other related information.

D109_2

Thermostat and controller

300

for AC fan coil unit

eq

eq

eq

DESIGN INTENT

eq

70mm square edged MDF skirting

Positioning & height of all M+E equipment TBC by GD-L

Sockets +450mm

1

2

Elevation 1 Room 109_2

NOTE: for Kitchen design and

Elevation 2 Room 109_2

M&E items within kitchen area refer to GD-L design information

152_6109_2

Scale 1:50 @ A3

152_6109_2

Scale 1:50 @ A3

D1

Wall mounted slot diffuser

FCL +2700mm

FCL +2700mm

AFF

AFF

60

To centre on the bulkhead

Switches +1200mm

NOTE: for Kitchen design & associated M&E items refer to GD-L design spec 21.07.2015

C2

Small power & layout update

C1

01.05.15

Setting out information

Rev

Date

Note

Acoustic Engineer

Gillieron Scott Acoustic Design Interior Design

Gordon-Duff + Linton Project Management / Quantity Surveyor

3 152_6109_2

D1

Elevation 3 Room 109_2 Scale 1:50 @ A3

152_6109_2

Setting out detail

Stace LLP

Scale 1:50 @ A3

Services

Synergy Consulting Structures

Fluid Structures Client

170

Linton Property Developments Ltd

1

The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

Project title

4 109_2 2

LINTON HOUSE

3 300

Drawing Title

FCL +2530mm

ROOM 109_2

D109_2

D1

Scale @ A3

1:50

Project No.

152

Drawing no.

Status

CONSTRUCTION 150

Location TBC by GD-L

Revision

6109_2

C2

Date of Issue

JUL 2015

300

30

30

Sockets +450mm

Subwoofer outlet

5

Plan Room 109_2 Livingroom

4

Elevation 4 Room 109_2

TBC if required

Clive Sall Architecture Ltd. 2 Providence Yard Ezra Street

152_6109_2

Scale 1:50 @ A3

152_6109_2

Scale 1:50 @ A3

London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


C L

Wall tile layout should align with

C L

C L

vanity center 375

375

375

375

400

Wall tile layout should align

All drawings to be read in

with center line of enclosure.

conjunction with structural engineer’s and service engineer’s

N

information

400

A3

PROPOSED FCL +2700mm

FCL +2700mm

Note: Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing. All discrepancies to be reported to Clive Sall Architecture Ltd immediately. This drawing is to be read in conjunction with all

Terminate wall tiles

related consultants drawings and any other related information.

@ +2055mm AFF

Align

Align

Align shower head with niche

Align medicine cabinet

DESIGN INTENT

& enclosure centerline

& mirror with top

To be read with the sanitaryware

edge of tile layout.

specification and bathroom cabinet Fixed wall mounted 400

schedule supplied by GD-L.

mirror with demister

Recessed bathroom cabinet

heating pad beneath

Align tile joint with lower Align

edge of mirror & edge

Align

Shower niche 2300

305

fitted with shaver outlet

of niche & medicine cabinet

Heated towel rail

Fixed glass

200

shower enclosure Dual flush plate Toilet roll holder

1140

Toilet roll holder 50

700

Flex outlet box

Reinforce wall to recieve wall

Wall mounted toilet

400

Wall mounted toilet

hung wash basin & vanity unit

382.5

1 152_6109_3

2

Elevation 1 Room 109_3 Scale 1:25 @ A3 C Wall tiles set out L

152_6109_3

Elevation 2 Room 109_3 Scale 1:25 @ A3 Terminate the layout in

from centre of the

line with the shower

shower enclosure wall

Annotation update

21.07.15

C2

tray

C1

01.05.15

Setting out information

Rev

Date

Note

Acoustic Engineer

FCL +2700mm

Gillieron Scott Acoustic Design

FCL +2700mm

Interior Design

Gordon-Duff + Linton Project Management / Quantity Surveyor

Wall mounted

Stace LLP

overhead shower Services

Synergy Consulting

Terminate tile layout

Terminate tile layout

@ +2055mm AFF

Structures

@ +2055mm AFF

Fluid Structures

Wet wall framed

Glass shower screen

forward into

Heated towel

Client

rail

Linton Property Developments Ltd The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

bathroom Project title

D109_3

2200

750

LINTON HOUSE D109_3

Drawing Title

ROOM 109_3

Shower mixer and

1

hand shower

4 109_3 2

750

3

Scale @ A3

1:25/1:50

1140

Project No.

152

Drawing no.

800

Status

5 152_6109_3

Plan Room 109_3 Scale 1:50 @ A3

CONSTRUCTION

3 152_6109_3

Elevation 3 Room 109_3 Scale 1:25 @ A3

4 152_6109_3

Elevation 4 Room 109_3 Scale 1:25 @ A3

Revision

6109_3 C2 Date of Issue

JUL 2015

Clive Sall Architecture Ltd. 2 Providence Yard Ezra Street London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


All drawings to be read in

eq

eq

conjunction with structural

170

300

engineer’s and service engineer’s

N

information

A3

PROPOSED FCL +2700mm

FCL +2700mm

Note: Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing. All discrepancies to be reported to Clive Sall Architecture Ltd immediately.

D1

This drawing is to be read in conjunction with all

Switches +1200mm

D109_5

related consultants drawings and any other related information.

DESIGN INTENT

BathroomThermostat Thermostat and AV controller T 700

Positioning & height of all M+E

Fused spur for towel rail

TR

Sockets

equipment TBC by GD-L

Sockets +450mm

+450mm 850

1

2

Elevation 1 Room 109_4

152_6109_4

Scale 1:50 @ A3

152_6109_4

850

Elevation 2 Room 109_4 Scale 1:50 @ A3

Slot diffuser central

60

to door opening

FCL +2700mm

Locate double power outlet and TV outlet to inside face of nib wall. D1

D109_4

100

Small power & layout update

C2

21.07.2015

C1

01.05.15

Setting out information

Rev

Date

Note

Acoustic Engineer

Sockets Gillieron Scott Acoustic Design

+450mm

Interior Design

Gordon-Duff + Linton

TV outlet & double socket

Project Management / Quantity Surveyor

Stace LLP

3

Elevation 3 Room 109_4

D1

Setting out detail

Services

Synergy Consulting

152_6109_4

Scale 1:50 @ A3

152_6109_4

Scale 1:10 @ A3 Structures

Fluid Structures Client

Linton Property Developments Ltd The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

170

1 4 109_4 2

Project title

LINTON HOUSE 3 FCL +2700mm

Drawing Title

FCL +2530mm

ROOM 109_4

Scale @ A3

D1 Full height mirror

1:50

Project No.

152

Drawing no.

Revision

6109_4 C2

D109_5 Status

Joinery design by subcontractor

CONSTRUCTION

Date of Issue

JUL 2015

70mm square D109_4

5

Plan Room 109_4 Bedroom

edged MDF skirting

4

Clive Sall Architecture Ltd. Elevation 4 Room 109_4

2 Providence Yard Ezra Street

152_6109_4

Scale 1:50 @ A3

152_6109_4

Scale 1:50 @ A3

London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


from corner

in recess

with center of vanity 750

Wall tiles set out

Align shower head

Wall tile layout to align

1070

All drawings to be read in conjunction with structural engineer’s and service engineer’s

800

N

information

A3

PROPOSED FCL +2700mm

FCL +2700mm

Note: Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing.

C L

All discrepancies to be reported to Clive Sall Architecture Ltd immediately. This drawing is to be read in conjunction with all

Terminate wall tiles

related consultants drawings and any other related information.

@ +2055mm AFF Align Align medicine cabinet

DESIGN INTENT

& mirror with top To be read with the sanitaryware

edge of tile layout.

specification and bathroom cabinet schedule supplied by GD-L.

Glass shower screen

Heated towel rail

Mirror with demister

2300

heating pad

Recessed medicine cabinet fitted with electric shaver outlet 375

375

Align

Align medicine cabinet & mirror with top

200

edge of tile layout. Toilet roll holder 50

Reinforce wall to

400

400

Wall mounted toilet

530

& vanity

700

Flex outlet box

700

receive wash basin

1

2

Elevation 1 Room 109_5

152_6109_5 Recessed section of

Scale 1:25 @ A3 C L Wall tiles aligned with centerline

tub enclosure

Elevation 2 Room 109_5

152_6109_5

Scale 1:25 @ A3

of complete wall section eq

Wall tiles set out from

eq

21.07.15

Annotation updates

C1

01.05.15

Setting out information

Rev

Date

Note

C2

edge of bathtub

Acoustic Engineer

FCL +2700mm

FCL +2700mm

Gillieron Scott Acoustic Design Interior Design

Gordon-Duff + Linton Project Management / Quantity Surveyor

800

Stace LLP

Wall mounted shower head mounted on

Services

recessed section of Top of tiles +2055mm

bath tub

Synergy Consulting

Top of tiles +2055mm

Structures

Fluid Structures

Glass shower screen

Heated towel

Client

rail

Linton Property Developments Ltd The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

Project title

D109_5 Shower mixer

ROOM 109_5

and thermostat

Scale @ A3

305

1140

1070

3

152

835

Shower hand

Plan Room 109_5 Scale 1:50 @ A3

Drawing no.

CONSTRUCTION

530

3 152_6109_5

Elevation 3 Room 109_5 Scale 1:25 @ A3

4 152_6109_5

Elevation 4 Room 109_5 Scale 1:25 @ A3

Revision

6109_5 C2

Status

800

5 152_6109_5

1:25/1:50

Project No.

1140

4 109_5 2

D109_5

Drawing Title

610

1

2300 2055

750

LINTON HOUSE

Date of Issue

JUL 2015

Clive Sall Architecture Ltd. 2 Providence Yard Ezra Street London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


Entry intercom phone height &

Light switch plates eq

eq

position to be confirmed by

Light switch

eq

FCL @

conjunction with structural engineer’s and service engineer’s

GD-L

& Thermostat

All drawings to be read in

N

information

A3

eq

PROPOSED

+2700mm Note:

Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing. All discrepancies to be reported to Clive Sall Architecture Ltd immediately. This drawing is to be read in conjunction with all related consultants drawings and any other related

D111_3

information.

Sub-Woofer outlet

D111_2

(TBC)

Switch cover plates

117 mm from SO

@ +1200mm

DESIGN INTENT

Outlet coverplate Positioning & height of all M+E

@ +450mm AFF

equipment TBC by GD-L

1 152_6111_1

2

Elevation 1 Room 111_1 Scale 1:50 @ A3

152_6111_1

Tel/ Data &

Fused spur

electrical outlet

& socket

Electrical socket

70mm square edge MDF skirting

Elevation 2 Room 111_1 Scale 1:50 @ A3

Wall mounted discharge slot diffuser located in front face of soffit

Joinery design by sub-contractor Co-ordinated kitchen

Co-ordinated kitchen

& M&E with GD-L design package

D111_1

Water tank location

D111_1

& M&E with GD-L design package eq

eq Electrical outlets 21.07.2015

450

C2

D111_5

70mm square edge MDF skirting

Small power & layout update

C1

01.05.15

Setting out information

Rev

Date

Note

Acoustic Engineer

Gillieron Scott Acoustic Design Interior Design

1 4 111_1

Gordon-Duff + Linton

2

3

3

152_6111_1

Elevation 3 Room 111_1

Project Management / Quantity Surveyor

Stace LLP

Scale 1:50 @ A3

Services

Synergy Consulting Structures

Fluid Structures Client

Linton Property Developments Ltd The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

Project title

LINTON HOUSE D111_3

Drawing Title

ROOM 111_1

Scale @ A3

Wall section to D111_2

Co-ordinated kitchen

receive full height

& M&E requirements

mirror panels

1:50

Project No.

D111_2

eq

eq

with GD-L spec

152

Drawing no.

Revision

6111_1 C2

Status

Date of Issue

CONTRUCTION

JUL 2015

D111_1 Raise architrave & door to accomodate change in level with adjacent bedroom

5

Plan Room 111_1 - Hallway

4

Elevation 4 Room 111_1

For TV & AV equip spec,

Hold curtain pocket depth

location, & setting out

300mm from framed out

info refer to GD-L spec.

face of middle window pier

Clive Sall Architecture Ltd. 2 Providence Yard Ezra Street

152_6111_1

Scale 1:50 @ A3

152_6111_1

Scale 1:50 @ A3

London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


All drawings to be read in

C L

conjunction with structural

C L

Align with

engineer’s and service engineer’s

N

information

basin centerline

A3

PROPOSED

FCL @ +2700mm

eq

eq

AFF Note: Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing.

Shower +2300 AFF

All discrepancies to be reported to Clive Sall Architecture Ltd immediately. This drawing is to be read in conjunction with all related consultants drawings and any other related information.

Terminate tile layout @ +2055mm AFF

Recess to receive

DESIGN INTENT

tiles on all sides To be read with the sanitaryware specification + bathroom cabinet schedule supplied by GD-L.

Glass shower enclosure

Heated towel rail

to sit on side of tub

Thermostat & shower control

Deck mounted faucet Shower mixer & thermostat

Reinforce wall to receive wall mounted washbasin & vanity 50

Flex box aligned with lower edge of electrified

Hand held shower

Align first full row of 400

towel rail. Hold 50mm off edge of rail.

1 152_6111_2

wall tiles with top

2

Elevation 1 Room 111_2 Scale 1:25 @ A3 C L

Tub to sit in recess area

surface of bath tub

152_6111_2

C L

Elevation 2 Room 111_2 Scale 1:25 @ A3

C L

21.07.15

C2

FCL +2700mm AFF FCL +2700mm Primary setting out of tiles should

C1

01.05.15

Rev

Date

Annotation update Setting out information Note

Acoustic Engineer

Gillieron Scott Acoustic Design

align with center of bathtub Locate secondary setting out point

Interior Design

1125mm from entry wall & align center Shower +2300 AFF

1125

Gordon-Duff + Linton

of mirror & vanity along axis Project Management / Quantity Surveyor

525 Terminate tile layout at Align

Mirror with demister

Stace LLP

+2055mm AFF & align

Align

heating pad.

top edge of med cabinet

Services

& mirror

Synergy Consulting Structures

Align shower head with

Recessed medicine cabinet to butt up 915

centerline of tub & enclosure

Fluid Structures

flush with edge of mirror

Client

Linton Property Developments Ltd

Trim tiles as required between

The Linton Group,

Recessed medicine cabinet

glass shower enclosure & wall

14 Basil Street, Knightsbridge, London, SW3 1AJ

with electric shaver outlet

to achieve width of tiled area

Project title

mounted within

above tub

LINTON HOUSE D111_2

Tile layout should align with centerline of mirror & vanity

Drawing Title

Align washbasin surface top

ROOM 111_2

1140

edge of flush with grout line

D111_2

Toilet roll holder Scale @ A3

1:25/1:50

Project No.

1 4 111_2 2

152

Center wall mounted lavatory &

3

Drawing no.

Revision

6111_2 C2

400

dual flush plate with centerline

5 152_6111_2

Plan Room 111_2 Scale 1:50 @ A3

3 152_6111_2

Elevation 3 Room 111_2 Scale 1:25 @ A3

of medicine cabinet above

4 152_6111_2

Elevation 4 Room 111_2 Scale 1:25 @ A3

Status

Date of Issue

CONSTRUCTION

JUL 2015

Clive Sall Architecture Ltd. 2 Providence Yard Ezra Street London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


All drawings to be read in conjunction with structural engineer’s and service engineer’s

N

information

FCL @ +2700mm

A3

PROPOSED

AFF

FCL @ +2530mm AFF 300

eq

Note:

eq

Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing.

Thermostat and controller for the AC fan coil unit

All discrepancies to be reported to Clive Sall Architecture Ltd immediately. This drawing is to be read in conjunction with all related consultants drawings and any other related

D1

information.

D114_4 850

Switch coverplates

850

DESIGN INTENT

@ +1200mm AFF

Positioning & height of all M+E

Bathroom thermostat 700

Outlet coverplates @ +450mm AFF

equipment TBC by GD-L

TR

Fused spur to towel rail

1

2

Elevation 1 Room 111_3

152_6111_3

Scale 1:50 @ A3

152_6111_3

Elevation 2 Room 111_3 Scale 1:50 @ A3

FCL +2700mm ME Slot diffuser centered above door

D1

Joinery design by subcontractor D111_3

C2

21.07.2015

Small power & layout update

C1

01.05.15

Setting out information

Rev

Date

Note

60

Acoustic Engineer

Gillieron Scott Acoustic Design Interior Design

Gordon-Duff + Linton

1

Project Management / Quantity Surveyor

Stace LLP

4 111_3 2

3

3

D1

Elevation 3 Room 104_3

Setting out detail

Services

Synergy Consulting

152_6111_3

Scale 1:50 @ A3

152_6111_3

Scale 1:10 @ A3 Structures

Fluid Structures

eq

eq

300

Client

Bulkhead for

Linton Property Developments Ltd

slot diffuser

The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

Project title

FCL +2700mm

LINTON HOUSE

FCL +2530mm

Drawing Title

ROOM 111_3 TV outlets @ +1600mm AFF D111_4

Note: for location arrangement &

Full height

setting out of TV outlets and AV

Scale @ A3

equipment refer to GD-L design

Project No.

specification

wall mirrors

1:50

152

Drawing no.

Status

70mm square D1

edged MDF skirting

Revision

6111_3 C2 Date of Issue

CONSTRUCTION ISSUE JUL 2015

D111_3

5

Plan Room 111_3 Bedroom

4

Clive Sall Architecture Ltd. Elevation 4 Room 111_3

2 Providence Yard Ezra Street

152_6111_3

Scale 1:50 @ A3

152_6111_3

Scale 1:50 @ A3

London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


All drawings to be read in conjunction with structural engineer’s and service engineer’s

N

information

FCL +2700mm AFF

A3

PROPOSED

FCL +2700mm AFF Note:

Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing. All discrepancies to be reported to Clive Sall

Overhead light

Architecture Ltd immediately.

recessed above sink

This drawing is to be read in conjunction with all related consultants drawings and any other related information.

Bulkhead above sink +2055 AFF

DESIGN INTENT

C L

To be read with the sanitaryware Wall mounted mirror 915

Outline of open door projection

specification + bathroom cabinet

with demister behind

schedule supplied by GD-L.

center section Wall mounted electric

2055

305

heated towel rail

Align lower edge of mirror with full tile joint Wall mounted mirror washbasin with vanity & deck mounted faucet

835

centered in recess

50

Align lower edge of flex box with lower

400

edge of towel rail eq

eq

Hold 50mm clear of side of towel rail

1 152_111_4

2

Elevation 1 Room 111_4 Scale 1:25 @ A3 eq

C L

152_111_4

eq

eq

C L

Elevation 2 Room 111_4 Scale 1:25 @ A3

eq 21.07.15

C2 C1

01.05.15

Rev

Date

Annotation update Setting out information Note

FCL +2700mm AFF Acoustic Engineer

Gillieron Scott Acoustic Design

Center tile layout between shower enclosure and

Interior Design

bulkhead

Gordon-Duff + Linton

Shower +2300 AFF Project Management / Quantity Surveyor

Align top of cabinet with tile

Stace LLP

edge & bulkhead

Wall mounted mirror with

Terminate tile layout

Services

+2550mm AFF with

Synergy Consulting

one full tile

overhead light

Structures

Fluid Structures

Align tile layout with Center recessed medicine cabinet along center axis

center of shower

Client

enclosure

Linton Property Developments Ltd The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

Project title

Electric shaver outlet

wall

Reinforce wall to receive wall

Wall mounted mixer/ diverter

mounted washbasin & vanity

for handheld overhead shower

LINTON HOUSE 2055

D111_4

mounted within cabinetry

2300

Shower enclosure

Drawing Title

D111_4

ROOM 111_4

Deck mounted faucet Glass shower door Scale @ A3

Dual flush centered above 1

1:25/1:50

Project No.

Toilet roll holder

toilet

152

Drawing no.

Revision

6111_4 C2

4 104_4 2

Shower tray

3

Wall mounted toilet

Status

Date of Issue

CONSTRUCTION

JUL 2015

Trim first row to achieve full height tile runs above

5 152_111_4

Plan Room 111_4 Scale 1:50 @ A3

3 152_111_4

Elevation 3 Room 111_4 Scale 1:25 @ A3

4 152_111_4

Elevation 4 Room 111_4 Scale 1:25 @ A3

Clive Sall Architecture Ltd. 2 Providence Yard Ezra Street London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


All drawings to be read in conjunction with structural engineer’s and service engineer’s

300

N

information

A3

PROPOSED FCL +2575mm

FCL +2575mm AFF

Note: Do not scale from this drawing.

NOTE:

All dimensions to be verified on site prior to the

Reduced FCL accounted for in the raised FFL

commencement of any work or the production of any shop drawing.

+125mm structural step above the apartment

All discrepancies to be reported to Clive Sall

FFL. Ceiling level to remain level in all areas.

Architecture Ltd immediately.

Switches +1200mm

This drawing is to be read in conjunction with all related consultants drawings and any other related

D1

information.

Lightswitch

DESIGN INTENT

Thermostat

Positioning & height of all M+E equipment TBC by GD-L

1 152_6111_5

2

Elevation 1 Room 111_5 Scale 1:50 @ A3

Elevation 2 Room 111_5

152_6111_5

Scale 1:50 @ A3

Locate AV outlets & associated framing

1300

adjacent to bedhead wall.

Locate double power outlet and TV outlet to inside face of nib wall.

FCL @ +2575mm AFF

Outline of wadrobe projection into room TV Outlets @

60

+1600mm AFF

C2

21.07.15

Small power & layout update

C1

01.05.15

Setting out information

Rev

Date

Note

Acoustic Engineer

Outlets @

Gillieron Scott Acoustic Design

+450mm AFF

D1

Interior Design

70mm square edge

Gordon-Duff + Linton

MDF skirt Project Management / Quantity Surveyor

Stace LLP

3

D1

Elevation 3 Room 111_5

Setting out detail

Services

Synergy Consulting

152_6111_5

Scale 1:50 @ A3

152_6111_5

Scale 1:10 @ A3 Structures

Fluid Structures

eq

eq

Client

300

Linton Property Developments Ltd The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

1 FCL +2575mm AFF

Project title

LINTON HOUSE

4 111_5 2

Drawing Title

3 ROOM 111_5

D1

Scale @ A3

1:50

Project No.

800

D111_5

800

152

Drawing no.

Status

Switch plates +700mm AFF

.01

5

.02

.03

.04

.05

.06

Plan Room 111_5 Master Bedroom Scale 1:50 @ A3

Date of Issue

CONSTRUCTION ISSUE JUL 2015

4

Clive Sall Architecture Ltd. Elevation 4 Room 111_5

2 Providence Yard Ezra Street

152_6111_5

Revision

6111_5 C2

152_6111_5

Scale 1:50 @ A3

London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


Slot diffuser centered

controller for the AC

in wall above joinery

300 150

Thermostat and fan coil unit

All drawings to be read in conjunction with structural engineer’s and service engineer’s

N

information

A3

FCL +2700mm

PROPOSED

FCL +2550mm Curtain Pocket 850

Note: Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing. All discrepancies to be reported to Clive Sall

NOTE: for Kitchen M&E items refer to

600

design & associated

Architecture Ltd immediately.

NOTE: For

GD-L design spec

This drawing is to be read in conjunction with all

Kit design

related consultants drawings and any other related

& M&E items

information.

refer to GD-L spec 900

eq

Framed out pier section

eq

between windows

Sub woofer outlet

DESIGN INTENT Positioning & height of all M+E equipment TBC by GD-L

location GD-L to verify if needed

Duplex & 5amp convienience outlets

1 152_6112_2

to remain on exterior

Elevation 1 Room 112_2

wall

2 152_6112_2

Scale 1:50 @ A3

Elevation 2 Room 112_2 Scale 1:50 @ A3

Ventilation TBC by

60

GD-L

FCL +2700mm D1

Small power & layout update

21.07.15

C2 C1

01.05.15

Rev

Date

Setting out Information Note

Acoustic Engineer

D112_2

Gillieron Scott Acoustic Design

70mm square edge

Interior Design

MDF skirting

Gordon-Duff + Linton

1

3

4 112_2 2 3

152_6112_2

Elevation 3 Room 112_2 Scale 1:50 @ A3

3

Detail setting out

152_6112_2

Scale 1:10 @ A3

Project Management / Quantity Surveyor

Stace LLP Services

Synergy Consulting Structures

Fluid Structures Client

Linton Property Developments Ltd

150

300

The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

Project title

Curtain Pocket

LINTON HOUSE FCL +2700mm FCL +2550mm

Framed out pier section

Drawing Title

ROOM 112_2

between windows Scale @ A3

117 from SO

Switches coverplates

NOTE: for Kitchen design & associated

+1200mm AFF

D112_2

NOTE: For location,arrangement &

30

setting out info, of TV outlets & AV

M&E items refer to

1:50

Project No.

152

Drawing no.

Revision

6112_2 C2

GD-L design spec Status

Date of Issue

CONSTRUCTION

JUL 2015

1000

equipment, refer to GD-L specs Sockets +450mm AFF 1000

D1

70mm square edge MDF skirting

5 152_6112_2

Plan Room 112_2 Livingroom Scale 1:50 @ A3

4 152_6112_2

Elevation 4 Room 112_2 Scale 1:50 @ A3

Clive Sall Architecture Ltd. 2 Providence Yard Ezra Street London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


All drawings to be read in conjunction with structural engineer’s and service engineer’s

N

information

A3

PROPOSED FCL +2700mm Note: Do not scale from this drawing.

Slot diffuser

All dimensions to be verified on site prior to the

Location by eq

eq

commencement of any work or the production of any

M&E, TBC

shop drawing. All discrepancies to be reported to Clive Sall

TV Sockets +1600mm AFF 100

100

Joinery design

Architecture Ltd immediately.

by subcontractor

This drawing is to be read in conjunction with all related consultants drawings and any other related information.

Switches coverplates +1200mm AFF

D112_6

D112_5

DESIGN INTENT Thermostat & Controller for AC & FCU Positioning & height of all M+E

Bathroom thermostat Slot diffuser

TR

Sockets +450mm

equipment TBC by GD-L

Location by M&E, TBC

AFF

Fuse Spur for towel rail eq

1

eq

2

Elevation 1 Room 112_5

152_6112_5

Scale 1:50 @ A3

Elevation 2 Room 112_5

152_6112_5

Scale 1:50 @ A3

Locate double power outlet and TV outlet to inside face of nib wall.

D1 152_6112_5

Setting out detail

70mm square edged MDF skirting

Scale 1:10 @ A3

C2

21.07.15

Small power & layout update

C1

01.05.15

Setting out Information

Rev

Date

Note

Acoustic Engineer

Gillieron Scott Acoustic Design Interior Design

Gordon-Duff + Linton D112_6

Project Management / Quantity Surveyor

D112_5

3 152_6112_5

Elevation 3 Room 112_5

Stace LLP

Scale 1:50 @ A3

Services

Synergy Consulting Structures

Fluid Structures Client

Linton Property Developments Ltd The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

Project title

LINTON HOUSE

1 4 112_5

2

Drawing Title

eq

eq

3

ROOM 112_5

Scale @ A3

1:50

Project No.

152 1000

Revision

Status

Date of Issue

CONSTRUCTION

JUL 2015

700

1000

Drawing no.

6112_5 C2

Sockets +450mm D1

5

Plan room 112_5 Master Bedroom

4

Clive Sall Architecture Ltd. Elevation 4 Room 112_5

2 Providence Yard Ezra Street

152_6112_5

Scale 1:50 @ A3

152_6112_5

Scale 1:50 @ A3

London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


Align wall tile

Align medicine cab

layout with center of

& lavatory along

shower enclosure &

centerline of tile

center shower head

layout

C L

eq

eq

eq

Align tile layout & center of vanity

All drawings to be read in conjunction with structural

with center of niche

C L

engineer’s and service engineer’s

N

information

A3

eq

PROPOSED Note:

FCL +2700mm

FCL +2700mm

Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing. All discrepancies to be reported to Clive Sall

Wall mounted Terminate tile

Architecture Ltd immediately. This drawing is to be read in conjunction with all

overhead shower

525

related consultants drawings and any other related

layout @

information.

+2055mm Align

DESIGN INTENT

Recessed medicine cabinet

915

610

To be read in conjunction with the

400

Wall mounted

sanitaryware & bathroom cabinetry

mirror with

specification package from GD-L

demister 150

2300

305

Recessed shower niche eq

Align shower

eq

70

niche & along tile joint

2055

showerhead Align

Shaver socket

Align

Shower mixer & hand shower

wall mounted vanity

835

835

hand rinse basin with

300

1140

Reinforce wall to receive

1140

Dual flush plate

unit below Toilet roll holder

1

200

400

Wall mounted toilet

2

Elevation 1 Room 112_6

152_6112_6

Elevation 2 Room 112_6

152_6112_6

Scale 1:25 @ A3

Scale 1:25 @ A3

Centered on shower

C tray L

opposite

C2

21.07.2015

Annotation update

C1

01.05.15

Setting out information

Rev

Date

Note

Acoustic Engineer

Gillieron Scott Acoustic Design

FCL +2700mm

FCL +2700mm

Interior Design

Gordon-Duff + Linton Project Management / Quantity Surveyor

Stace LLP

Terminate tile

Services

layout @ +2055mm

Synergy Consulting Structures

1100

800

Fluid Structures

Glass shower door

915

Client

Heated towel rail

525

Linton Property Developments Ltd The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

250

700

Project title

LINTON HOUSE Drawing Title

D112_6

213

ROOM 112_6

900

Scale @ A3

1140

1

152

Drawing no.

Revision

6112_6 C2

Status

Date of Issue

CONSTRUCTION

JUL 2015

400

900

3

100

50

4 112_6 2

1:25/1:50

Project No.

D112_6

Flex outlet box

5 152_6112_6

Plan room 112_6 Ensuite Scale 1:50 @ A3

3 152_6112_6

Elevation 3 Room 112_6 Scale 1:25 @ A3

4

Elevation 4 Room 112_6

Clive Sall Architecture Ltd. 2 Providence Yard Ezra Street London E2 7RJ

152_6112_6

Scale 1:25 @ A3

Copyright CLIVE SALL ARCHITECTURE LTD


Entry phone

Slot diffuser as

position TBC

per ME specs

300

Curtain pocket

All drawings to be read in conjunction with structural engineer’s and service engineer’s

by GD-L

N

information

FCL @ +2700mm

FCL @ +2700mm

AFF

AFF

A3

PROPOSED

Hold 150mm off corner

Note: Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any

NOTE:For Switch coverplates @+1200mm AFF

shop drawing.

Kitchen design

Projection of

& associated

pier into room

All discrepancies to be reported to Clive Sall Architecture Ltd immediately. This drawing is to be read in conjunction with all

M&E items

related consultants drawings and any other related

refer to GD-L

information.

design spec DESIGN INTENT

Thermostat and

70mm square edge

controller for AC

MDF skirting

Positioning & height of all M+E

fan coil unit

equipment TBC by GD-L Outlet coverplates @ +450mm AFF

1 152_6113_1

2

Elevation 1 Room 113_1

Elevation 2 Room 113_1

152_6113_1

Scale 1:50 @ A3

Scale 1:50 @ A3

60

Curtain pocket

300

Projection of the opposite wall,

1200

width of sitting room area

NOTE: For location, arrangement & setting out

FCL @+2700mm

of TV outlets & AV equipment,

AFF

refer to GD-L design spec

Sub woofer outlet location TBC if required

D1 152_6113_1

Setting out detail Scale 1:10 @ A3

eq

eq

D113_2

Small power & layout update

C2

21.07.2015

C1

01.05.15

Construction

Rev

Date

Note

Acoustic Engineer

Outlets @ +450mm AFF

Gillieron Scott Acoustic Design Interior Design

Gordon-Duff + Linton

3 152_6113_1

Elevation 3 Room 113_1

Project Management / Quantity Surveyor

Stace LLP

Scale 1:50 @ A3

Services

Synergy Consulting Structures

Fluid Structures Client

Linton Property Developments Ltd The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

D1

Project title

LINTON HOUSE FCL +2700mm FCL +2550mm

Drawing Title

ROOM 113_1 NOTE: For kitchen design & Scale @ A3

associated M&E items

1 4 113_1 2

spec

D113_1

3

1:50

Project No.

refer to GD-L design D113_2

152

Drawing no.

Revision

6113_1 C2

Status

Date of Issue

CONSTRUCTION

JUL 2015

D113_1

5 152_6113_1

Plan Room 113_1 Livingroom Scale 1:50 @ A3

4 152_6113_1

Elevation 4 Room 113_1 Scale 1:50 @ A3

Clive Sall Architecture Ltd. 2 Providence Yard Ezra Street London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


All drawings to be read in conjunction with structural engineer’s and service engineer’s

N

information

A3

PROPOSED FCL +2700mm

FCL +2700mm Note:

1100

Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing. All discrepancies to be reported to Clive Sall Architecture Ltd immediately.

Full height mirror

This drawing is to be read in conjunction with all related consultants drawings and any other related information.

D113_2

D113_4

DESIGN INTENT Switches +1200mm Positioning & height of all M+E equipment TBC by GD-L

1

2

Elevation 1 Room 113_2 Scale 1:50 @ A3

152_6113_2

Elevation 2 Room 113_2 Scale 1:50 @ A3

152_6113_2

FCL +2700mm

150

150

Switches +1200mm Hallway Bathroom thermostat

Thermostat 70mm square edged

21.07.2015

Small power & layout update

01.05.15

Construction Issue

Rev

Date

Note

Acoustic Engineer

TR

MDF skirting

C2 C1

Socket +450mm AFF Fused spur towel rail outlet

Gillieron Scott Acoustic Design Interior Design

Gordon-Duff + Linton Project Management / Quantity Surveyor

3 152_6113_2

Elevation 3 Room 113_2

Stace LLP

Scale 1:50 @ A3

Services

Synergy Consulting Structures

Fluid Structures Client

Linton Property Developments Ltd The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

Project title

LINTON HOUSE FCL +2700mm

Drawing Title

ROOM 113_2 D113_4

D113_5

Scale @ A3

4 113_2 2

D113_3

5

152

D113_5

Drawing no.

D113_2

Plan Room 113_2 - Hallway

4

Status

Date of Issue

CONTRUCTION

JUL 2015

Clive Sall Architecture Ltd. Elevation 4 Room 113_2

2 Providence Yard Ezra Street

152_6113_2

Revision

6113_2 C2

Switches +1200mm

3 D113_3

1:50

Project No.

1

Scale 1:50 @ A3

152_6113_2

Scale 1:50 @ A3

London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


All drawings to be read in

Wall tiles set out

conjunction with structural engineer’s and service engineer’s

from edge of shower tray

N

information

A3

PROPOSED FCL @ +2700mm AFF Note: Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing. All discrepancies to be reported to Clive Sall Architecture Ltd immediately. This drawing is to be read in conjunction with all related consultants drawings and any other related information.

DESIGN INTENT

C L eq

To be read in conjunction with the eq

sanitaryware specification and bathroom cabinet schedule supplied by GD-L.

Recess above vanity to

Position & height of all M&E

receive mirror panel

equipment to be co-ordinatesd with GD-L specification

D113_3

Heated towel rail

Reinforce wall to receive Heated towel rail

wall mounted vainty with intergrated wash basin & deck mounted

50

faucet mounted in recess

400

Flex outlet box Wall mounted toilet

1 152_6113_3

2

Elevation 1 Room 113_3 Scale 1:25 @ A3

Elevation 2 Room 113_3

152_6113_3

Wall tiles set out

Wall tiles set out

from centre of shower tray

Scale 1:25 @ A3 C L

C L

Wall tiles set out

C L

Annotation Update

21.07.15

C2

from centre of basin

from centre of shower tray

C1

01.05.15

Construction Issue

Rev

Date

Note

Acoustic Engineer

Gillieron Scott Acoustic Design

FCL @ +2700mm AFF

Interior Design

Align top edge of

C L

Gordon-Duff + Linton

Med Cabinet & Mirror with tile edge

Project Management / Quantity Surveyor

Stace LLP

Wall mounted

eq

eq

525

eq

shower head

eq

Services

Synergy Consulting

Terminate tile layout Align

@ +2055 AFF

Structures

Recessed medicine cabinet fitted with shaver socket

610

Fluid Structures Client

Linton Property Developments Ltd The Linton Group,

Glass shower screen

Glass shower screen

14 Basil Street, Knightsbridge, London, SW3 1AJ

400

Project title

Mirror with demister

850

1 4 113_3 2

LINTON HOUSE

heating pad 305

205.7

2300

994.3

D113_3

235.7

Heated towel rail

Drawing Title

Shower niche

ROOM 113_3 Shower mixer and hand shower

Align

Reinforce wall to recieve wall hung

Align

wash basin with storage unit below Scale @ A3

Dual flush plate

mounted vanity unit below

1300

750

152

1140

Hand rinse basin with wall

1:25/1:50

Project No.

Toilet roll holder

525

800

3

Drawing no.

Revision

6113_3 C2

Status

Date of Issue

CONSTRUCTION

JUL 2015

Wall mounted toilet

Raised shower tray

5

Plan room 113_3

3

152_6113_3

Scale 1:50 @ A3

152_6113_3

Elevation 3 Room 113_3

4

Clive Sall Architecture Ltd. Elevation 4 Room 113_3

2 Providence Yard Ezra Street

Scale 1:25 @ A3

152_6113_3

Scale 1:25 @ A3

London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


All drawings to be read in conjunction with structural engineer’s and service engineer’s

N

information

A3

PROPOSED FCL +2700mm

FCL +2700mm Note: Do not scale from this drawing. All dimensions to be verified on site prior to the

Joinery design

commencement of any work or the production of any

by subcontractor

shop drawing. All discrepancies to be reported to Clive Sall Architecture Ltd immediately. This drawing is to be read in conjunction with all related consultants drawings and any other related information.

70mm square edged MDF skirting 850

850

DESIGN INTENT

Switches

Positioning & height of all M+E

700

70mm square edged MDF skirting

equipment TBC by GD-L Sockets +450mm

1

2

Elevation 1 Room 113_4

152_6113_4

Scale 1:50 @ A3

Elevation 2 Room 113_4

152_6113_4

Scale 1:50 @ A3

FCL +2700mm Joinery design by subcontractor

NOTE: For location, arrangement & setting out of TV outlets AV

Door projection

equipment requirements, refer to GD-L design spec

150

1200

Thermostat

Small power & layout updates

C2

21.07.2015

C1

01.05.15

Construction Issue

Rev

Date

Note

Acoustic Engineer

Gillieron Scott Acoustic Design

Sockets +450mm Interior Design

Gordon-Duff + Linton

70mm square edged MDF skirting Project Management / Quantity Surveyor

3 152_6113_4

Elevation 3 Room 113_4

Stace LLP

Scale 1:50 @ A3

Services

Synergy Consulting Structures

Fluid Structures Client

Linton Property Developments Ltd The Linton Group, 14 Basil Street, Knightsbridge, London, SW3 1AJ

Project title

FCL +2700mm

LINTON HOUSE

1 Drawing Title

4 113_4 2

ROOM 113_4 3 Switches +1200mm Scale @ A3

1:50

Project No.

D113_4

152

Drawing no.

Revision

6113_4 C2

Status

Date of Issue

CONSTRUCTION

JUL 2015

D113_4

4 5

Elevation 4 Room 113_4 Clive Sall Architecture Ltd.

Plan room 113_4

152_6113_4

Scale 1:50 @ A3

2 Providence Yard Ezra Street

152_6113_4

Scale 1:50 @ A3

London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


All drawings to be read in conjunction with structural

150

engineer’s and service engineer’s

N

information

A3

PROPOSED FCL +2700mm

FCL +2700mm Note: Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing. All discrepancies to be reported to Clive Sall

Joinery design

Architecture Ltd immediately. This drawing is to be read in conjunction with all

by subcontractor

related consultants drawings and any other related information.

D113_5

DESIGN INTENT

70mm square edged MDF skirting

Positioning & height of all M+E equipment TBC by GD-L

1

2

Elevation 1 Room 113_5

152_6113_5

Elevation 2 Room 113_5

152_6113_5

Scale 1:50 @ A3

Scale 1:50 @ A3

NOTE: for the location, arrangement & settings

Locate double power outlet

out of TV sockets and

and TV outlet to inside face

AV equipment refer to

Slot diffuser

GD-L design information

of nib wall. FCL +2700mm

Switches +1200mm

D113_6

Bedroom Thermostat Bathroom Thermostat FCU

21.07.2015

C2

Small power & layout update

C1

01.05.15

Construction Issue

Rev

Date

Note

Acoustic Engineer

TR

Outlet @

Gillieron Scott Acoustic Design

+450mm AFF

Sockets +450mm Interior Design

Fused spur towel rail outlet eq

eq

eq

eq

Mount convienience

Gordon-Duff + Linton Project Management / Quantity Surveyor

duplex on outside

Stace LLP

face of cabinetry return

3

Services

Elevation 3 Room 113_5

Synergy Consulting

152_6113_5

Scale 1:50 @ A3 Structures

Fluid Structures Client

Linton Property Developments Ltd

150

The Linton Group,

eq

eq

14 Basil Street, Knightsbridge, London, SW3 1AJ

Project title

LINTON HOUSE

1 4 113_5

FCL +2700mm

2

3

Drawing Title

ROOM 113_5

Scale @ A3

1:50

Project No.

152 1000

1000

D113_5

70mm square edged MDF skirting

Drawing no.

Revision

6113_5 C2

Status

Date of Issue

CONSTRUCTION

JUL 2015

Switchplates @ 700mm AFF D113_6

Outlets @ +450mm AFF

5

Plan room 113_5 Master Bedroom

4

Clive Sall Architecture Ltd. Elevation 4 Room 113_5

2 Providence Yard Ezra Street

152_6113_5

Scale 1:50 @ A3

152_6113_5

Scale 1:50 @ A3

London E2 7RJ Copyright CLIVE SALL ARCHITECTURE LTD


All drawings to be read in conjunction with structural

Wall tiles set out

Wall tiles set out

from centre of basin

from egde of bath

engineer’s and service engineer’s

N

information

A3

PROPOSED Note:

FCL +2700mm

FCL +2700mm

Do not scale from this drawing. All dimensions to be verified on site prior to the commencement of any work or the production of any shop drawing.

C L

C L

All discrepancies to be reported to Clive Sall Architecture Ltd immediately.

eq

eq

This drawing is to be read in conjunction with all

750

related consultants drawings and any other related information.

DESIGN INTENT

Top of tiles +2055mm To be read with the sanitaryware Mirror with demister

specification and bathroom cabinet

heating pad

schedule supplied by GD-L.

Positioning & height of all M+E

Fitted bathroom cabinet

equipment TBC by GD-L Shaver socket

D113_6

Dual flush plate

Hand rinse basin with wall

Hand rinse basin with wall

mounted vanity unit below

mounted vanity unit below

Toilet roll holder

Wall mounted toilet

1 152_6113_6

Wall mounted toilet

2

Elevation 1 Room 113_6 Scale 1:25 @ A3

Elevation 2 Room 113_6

152_6113_6

Wall tiles set out

Scale 1:25 @ A3

Align finish edge with

from centre of tub

eq

C L

side of tub

eq

C2

21.07.2015

Annotation Update

C1

01.05.15

Construction Issue

Rev

Date

Note

Acoustic Engineer

Gillieron Scott Acoustic Design Interior Design

Gordon-Duff + Linton

Wall mounted shower head in Project Management / Quantity Surveyor

recess @ +2300mm AFF

Stace LLP Services

Synergy Consulting

C L

Terminate walltile layout 50

800

620

Structures

Fluid Structures

+2055mm AFF

250

Client

Linton Property Developments Ltd D113_6

The Linton Group,

Top edge of tub to 900

14 Basil Street, Knightsbridge, London, SW3 1AJ

Heated towel rail

recieve glass shower

Project title

nib extension

LINTON HOUSE Drawing Title

1

3

ROOM 113_6 750

4 113_6 2

Scale @ A3

1:25/1:50

750

Project No.

152

Drawing no.

Revision

6113_6 C2

50 Status

Date of Issue

CONSTRUCTION

JUL 2015

Recessed wall to receive bathtub Flex outlet box

shower enclosure

Clive Sall Architecture Ltd.

5 152_6113_6

3 Scale 1:50 @ A3

152_6113_6

Elevation 3 Room 113_6 Scale 1:25 @ A3

4

Elevation 4 Room 113_6

2 Providence Yard Ezra Street London E2 7RJ

152_6113_6

Scale 1:25 @ A3

Copyright CLIVE SALL ARCHITECTURE LTD


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.