Cowlairs Urban Village - IGI Design Study

Page 1

Cowlairs Urban Village Design study


Cowlairs Urban Village

Design Study

Employer:

On behalf of:

Glasgow City Council in partnership with the Scottish Environment Protection Agency (SEPA); Glasgow and Clyde Valley Green Network Partnership (G&CVGNP); Scottish Water; Scottish Natural Heritage; Forestry Commission (Scotland); South Lanarkshire Council, and Renfrewshire Council. City Property (Glasgow) LLP

Agent: Collective Architecture 26 Gallowgate Glasgow G1 5AB Prepared by: ............................................... Jude Barber Director

In association with: ............................................... Peter Robinson Associate Director, AECOM Approved by: ............................................... John Grierson MGSDP Client Manager Status:

Final issue

Date:

January 2011

Prepared in accordance with the terms and structure of Glasgow City Council’s Framework Agreement / SFA99 dated 11th December 2009.


Cowlairs Urban Village. Hillside dwellings, Collective Architecture 2010.


Contents

Foreword

Chapter

01 Approach p 7

02 Context p 13

03 Constraints p 25

04 Strategic drainage p 35

05 Place-making p 43

06

Cowlairs Urban Village - Case study 1

07

Cowlairs Eco Village - Case study 2

p 53

p 65

08 Next Steps p 75

09 Appendix p 87


Mission statement Provide integrated solutions Create a deliverable and innovative approach to surface water management for each site. Provide a set of collaborative applications of spatial and water planning. Provide a shift in perception Promote a positive picture of living in and around water and its value for surface water management. Provide a shift in perception of the purpose and process of urban design. Inform best practice Inform best practice delivery to the Project Board and set baseline standards for each site. Promote biodiversity Promote biodiversity and habitat networks and a more sustainable use of natural resources. Improve population health Improve population health by recognising the role the physical environment can play in addressing health issues. Encourage economic development Create infrastructure required to enable both future economic development and socially sustainable places. Reinforce partnership working Reinforce the existing partnership commitments to inclusive design and place-making. Transform each site Transform each site into an innovative, vibrant place to live through the delivery of a fully integrated and inclusive urban vision.

COWLAIRS URBAN VILLAGE


04 / 05

Foreword Cowlairs Design Study offers City Property (Glasgow) LLP two urban case studies that both promote the value and benefits of sustainable community placemaking by providing a real opportunity for creating an outstanding human-centred legacy. The project aims to improve quality of life by delivering the broadest range of environmentally based social benefits as part of a strategically planned and interconnected blue and green network. This celebrates natural approaches to managing the sources and pathways of surface water in the urban frame. Attitudes and behaviours are ready to accept a business case for this small-scale but highly significant inner city regeneration project based upon the vision for implementing infrastructure comes first sustainable and fully serviced development plots. The introduction of an inter-disciplinary urban framework promotes the re-establishment and connectivity of greenspace, and places emphasis on the importance of the garden as a thriving patch of local ecology that can fill the suburban space with visual variety. Integrated urban design is directed through a detailed site analysis of the topography, geology, hydrology, building typologies, densities, and public realm. Risks and opportunities recognised limitations associated with the site’s surface water carrying capacity, and proximity to a watercourse. Understanding the challenges associated with the site development also extended to the analysis of key spatial and functional relationships with Keppoch Primary Campus, Possilpark Town Centre, and the canal.

Project Board

INTEGRATED URBAN INFRASTRUCTURE


APPROACH

Interpolis Garden, Tilburg, The Netherlands, by West 8 Interpolis Garden, Tilburg, The Netherlands


06 / 07

01

Approach Infrastructure comes first

Governance - description of project partners

p 09

Policy and advice p 11

“To maintain and improve the quality of the rivers, lochs, estuaries, coastal waters and groundwater areas. To focus on local actions highlighting the opportunities for partnership working to ensure that we all benefit from improvements in the water environment, which will contribute to the goals of the draft River Basin Management Plans that have been produced for both of Scotland’s River Basin Districts.” Clyde Draft Area Management Plan, Extract, 2009 - 2010, SEPA and the Clyde Advisory Group.


SEPA

01 Project Board

Glasgow City Council, Scottish Water, South Lanarkshire Council, Renfrewshire Council, SEPA, Scottish Natural Heritage, GCV Green Network Partnership

MGSDP

Metropolitan Glasgow Strategic Drainage Partnership

Project Manager reports to Project Board

02 Project Manager

Glasgow City Council (DRS) Architect to liaise with project manager regarding stakeholder involvement and local engagement

Architect to report directly, and only, to Project Manager

03 Architect Lead Consultant

Special advisor 1 GVA Grimley

Collective Architecture Lot 4 Framework Consultant

Architect and Strategic Drainage consultant to liaise with Geotechnical team regarding geotechnical / environmental assessments

Geotechnical & Testing AECOM Lot 2 Framework Consultant

Planning Consultants

Architect and Strategic Drainage consultant to liaise to provide coordinated integrated urban drainage strategy and options

Strategic Drainage

AECOM in-house

Fig 1.1 Stakeholder mapping. Collective Architecture, 2009. APPROACH

Landscape Architect AECOM in-house

Best Practice

Special advisor 3 Robert Huxford

AECOM Lot 1 Framework Consultant

H+S, Legal Advice

AECOM to draw on inhouse capabilities to address landscape, ecology and transport matters.

Ecologist

Special advisor 2 Chris Jefferies

Transport Engineer AECOM in-house


01 08 / 09

Governance The Integrated Urban Infrastructure project aims to demonstrate best practice in sustainable urban drainage and inclusive urban planning by developing a series of feasibility studies for six candidate sites across three regions in the western central belt of Scotland. The project organisation, resource commitment, direction and decision making was managed by Glasgow City Council (The Employer). Figure 1.1: Stakeholder mapping shows the organisational matrix for the project at three strategic levels: Green Network, Integrated Urban Infrastructure, Communication Plan The Communication Plan, approved by the Project Board, sets out the organisational project components, along with project team mapping specific to the delivery of outputs required by the commission.

01 Project board The Project Board was chaired by the Scottish Environment Protection Agency’s (SEPA) SuDS Co-ordinator, supported by a Board of Directors which included local authority representation. The Project Board formed the highest level of decision making and direction. 02 Project manager Day-to day planning, risk monitoring, cost and staged control was handled by Glasgow City Council’s Project Manager within the controlled project environment. The Project Manager reported directly to the Project Board. 03 Project team Collective Architecture (Lead Consultant and Architect) managed the delivery of design services. Strategic drainage and geotechnical sub-consultancy services were provided by AECOM Limited. The Project Team also included a number of specialist advisors.

INFRASTRUCTURE COMES FIRST


Greenspace Quality Guide The Greenspace Quality Guide has been prepared to assist those involved in greenspace planning to share and better understand best practice in developing a co-ordinated approach to greenspace provision based on a Greenspace Strategy.

Designing Streets/Designing Places Designing Streets was implemented as a policy document by the Scottish Government in 2010, and aims to place people before the movement of motor vehicles, and represents a step change in established practices in street design.

Sewers for Scotland A design and construction guide for developers. Developed in conjunction with Sewers for Adoption, this provides a definitive guide for use by developers for the provision of sewerage. It details the procedures and provides guidance for the design and construction of such infrastructures.

Read in conjunction with Designing Streets, Designing Places marks the Scottish Executive’s determination to raise standards of urban and rural development.

The SuDS Manual This guidance provides best practice guidance on the planning, design, construction, operation and maintenance of Sustainable Drainage Systems (SuDS) to facilitate their effective implementation within developments.

Scottish Planning Policy Scottish Planning Policy (SPP) is the statement of the Scottish Government’s policy on nationally important land use planning matters. This places Planning in the wider context of Scottish Government’s aims and clarifies the Government’s expectations of the system and planning services.

The guidance supersedes previous general guidance on SuDS and addresses landscaping, biodiversity issues, public perception and community integration as well as water quality treatment and sustainable flood risk management.

Scottish Sustainable Communities Initiative The Scottish Sustainable Communities Initiative aims to bring innovation into our settlements and promote exemplars of how communities could live in future.

Equally Well This Scottish Government and National Health Service briefing focuses on socio-economic inequalities that exist within Scottish communities and how they affect population health. Examples include access to education, labour markets, health, housing and environmental quality.

It aims to inspire Local Authorities, landowners and developers to play their part and contribute to the future sustainable growth of Scotland.

Core Paths Plan The Land Reform (Scotland) Act 2003 requires Scottish local authorities to draw up a plan for a system of paths, known as Core Paths, sufficient for the purpose of giving the public reasonable access throughout their area. The Glasgow plan will link into and support the wider network of other paths that already exist around the city.

APPROACH

SuDs for Roads SuDS for Roads is intended to further advance our knowledge of the interaction between roads and drainage within an urban context where roads are now multifunctional. The purpose of the document is to guide the reader through the design of roads incorporating SuDS.


01 10 / 11

Policy and advice The design study has taken cognisance of key Scottish Government and Local Government policy documents. Those of particular relevance are noted overleaf. Ruchill Keppoch New Neighbourhood Local Development Strategy “The Local Development Strategy (LDS) seeks to establish a framework for development and regeneration which will enhance the quality of life in the Ruchill Keppoch New Neighborhood Initiative (RKNNI) area for existing and new residents and increase the attractiveness of the area as a location for people to invest in.”

National level The National Planning Framework 2 (NPF2) sets out a strategy for Scotland’s development to 2030, with a central purpose of promoting economic growth. It also places the Central Scotland Green Network as a national priority, as promoted by Glasgow and Clyde Valley Green Network Partnership and the Integrated Urban Infrastructure Board. In 2006 the Scottish Government published People and Places: Regeneration Policy Statement, which aimed at transforming places in order that they might realise their full social and economic potential. Regional level The Glasgow and Clyde Valley Structure Plan 2006 sets out the long term development strategy for Glasgow and the Clyde Valley. Local level Glasgow City Council has a series of guidance documents outlining aspirations for the site to meet Scottish Government policy. Key documents include Ruchill Keppoch New Neighbourhood Local Development Strategy, The Core Paths Plan, Forth and Clyde Canal Local Development Strategy. The Ruchill Keppoch New Neighbourhood Local Development Strategy (2003) recommendation for the design study area outlines that the following issues should be addressed: • • • • • •

Population and Housing Choice; Access to Employment and Services; Development of Vacant Land; Transport Issues; Improvements to the Town Centre; and The integration of development with the Forth and Clyde Canal. INFRASTRUCTURE COMES FIRST


CONTEXT

Jackton and the Gill Burn Valley Productive Landscapes, 2010 Collective Architecture Cowlairs site as existing


12 / 13

02

Context Understanding the site

Site context

p 15

Planning context p 17 Historical context p 19 Site description p 21


River Clyde

•

Cowlairs relative to River Clyde

River Clyde

Forth and Clyde Canal

design study area

Fig 2.1 Comparative mapping. Town Centre and design study area. Collective Architecture 2010. Not to scale. Š Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510 CONTEXT


02 14 / 15

Site context Cowlairs is located north of Glasgow City Centre. The area has a long association with the North British Locomotive Company. It is currently home to a diesel maintenance depot at Eastfield and a signalling centre at Cowlairs, which controls trains from Glasgow Queen Street High Level Station. Figure 2.1: Comparative mapping shows the relationship between the city and the design study area. The site is largely undeveloped and covers an area of approximately 30 hectares. It is bounded by Keppochhill Road to the south and Carlisle Street to the east. The western site boundary is formed by various residential and nonresidential developments lying adjacent to Saracen Street. In comparison to the surrounding areas, the topography is very high, with the elevation varying from 81m to 53m across the design study area. There are no watercourses located on the site, however the Forth and Clyde Canal runs close to the south west of the site. Historically the surrounding area was generally industrial with coal and ironstone mining and metal working being the primary industries. There is a strong transport network to the western edge of the site with good pedestrian links and reasonable public transport connections. The remainder of the site boundary is classed as “below base accessibility� within City Plan 2.

Fig. 2.2 Aerial photograph of design study area. UNDERSTANDING THE SITE


Š Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510 Indicative town centre regeneration area

design study area

N

Fig 2.3 Map extract, Ruchill/Keppoch New Neighbourhood Urban Design Framework. Glasgow City Council 2010. Not to scale.

CONTEXT


02 16 / 17

Planning context The Cowlairs study area sits within the boundary of The Ruchill Keppoch New Neighbourhood Local Development Strategy (2005). The Local Development Strategy is in the early stage of reappraisal and may include installation of infrastructure prior to future development. Figure 2.3: Map extract identifies the study area as one of four key sites identified within the Local Development Strategy. Other key sites include Saracen Street/Stonyhurst Street, Hugo Street/Shuna Street and Ruchill Hospital. The Local Development Strategy promotes the concept of wellbeing and healthy living achieved through integrated urban solutions to green network planning, water management, and movement planning. The strategy sets out the following aspirations for the Ruchill Keppoch area: • • • • •

The area will remain a mixed inner city district; The regeneration of the area will see the development of large amounts of new housing, particularly private sector housing; The wider regeneration ambitions include plans to improve Possilpark Town Centre (Saracen Street); The provision of improved transport links to adjacent areas including a more extensive, and appropriate greenspace and footpath network, and Promoting the provision of new and improved community, shopping and education facilities within the New Neighbourhood area.

The new spatial structure for Ruchill Keppoch will therefore be determined by the inter-related aspects of land use and function, infrastructure (particularly drainage, transport and greenspace networks), and housing type and density. The City Plan’s Strategy for People includes ”The delivery of the brownfield housing programme, the promotion of New Neighbourhoods and Selective Greenfield land release for family housing”. The City Plan also recognises that “The development of New Neighbourhoods, with significant numbers of houses for owner occupation, will increase the choice of house type and size, reverse localised population loss, tackle deprivation and encourage social inclusion in line with joint Structure Plan Targets”. Glasgow City Council Ruchill Keppoch New Neighbourhood Local Development Strategy UNDERSTANDING THE SITE


© Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510

Fig 2.4 Historical OS Map Extract 1896

© Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510

Fig 2.5 Historical OS Map Extract 1914

Fig 2.6 Historical OS Map Extract 1938 Fig 2.7 Historical OS Map Extract 1956 © Crown copyright and database right 2012. © Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510 All rights reserved. Ordnance Survey Licence Number 1000332510

N

CONTEXT


02 18 / 19

Historical context Historically the majority of the Cowlairs site lay, as it is today, undeveloped whilst the surrounding area was generally industrial. Figures 2.4-2.7: Historical map extracts dated 1896 to 1956 show the undeveloped design study area in relation to off-site industrial developments. Significant to the site are: Aerial photograph 1948

Craighall Station 1898

The Star Pottery located to the centre of the site;

Trinity Church to the south east of the site;

A small school to the south;

Craighall Station (goods and mineral) to the south west;

Possil Iron Works immediately off-site to the north west;

Craighill Iron works immediately off-site to the west, and

Cowlairs Works (North British Railway) immediately off-site to the north east.

Photographs from this period identify the site and surrounding environment as a bustling and industrious area of Glasgow. Residential development occupies the northern half of the site from 1938 (Figures 2.6 and 2.7). The majority of the southern half is shown as “Cowlairs Park”. During the 1990s the development was demolished. Today, all that remains is the existing road infrastructure.

21-23 Canal Street 1963

UNDERSTANDING THE SITE


Town centre regeneration

Forth and Clyde Canal

Existing garage

Keppoch Campus (Primary School)

Phoenix House

Existing roads/ Warehouse infrastructure

Terraced area Playing fields (playing fields) Š Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510

N

Fig 2.8 Site map as existing. Collective Architecture 2010. Not to scale. CONTEXT

Sighthill Cemetery


02 20 / 21

Site description The study area is located to the north of Glasgow City Centre and represents 30 hectares. The undulating topography of the vast open site is bounded by a fragmented urban fabric encompassing a variety of both long and restricted views. Figure 2.8: Site map as existing indicates the northern boundary defined by a strong residential grid with restricted views looking onto the site. The town centre action plan area is within a short distance from the site on Saracen Street. To the north east, the existing warehouses are confronted by a complete visual barrier in the form of a steep embankment. The south edge of the site represents the industrial past of the surrounding area, overlooking what are largely industrial sites. However, despite the restricted views to the periphery, the views within the site offer fantastic aspects of the surrounding city. Keppoch Campus (Primary School) is located in the north-west corner of the site and is presently isolated from the urban grain.

Surrounding high rise housing development

UNDERSTANDING THE SITE


Fig 2.9 View across site from existing Killearn Street

Keppoch Campus (multiplex school, 2004)

CONTEXT

derelict road infrastructure

Existing low rise housing development

Existing high rise development


02 22 / 23

undulating topography

existing high rise development

Existing paths

Entrance to site, Saracen Street

Varied topography

UNDERSTANDING THE SITE


CONSTRAINTS

Design study area as existing, 2010 Collective Architecture Cowlairs site as existing


24 / 25

03

Constraints Informing the approach

Surface water connections

p 27

Natural topography p 29 Access p 31 Site ownership p 33 Contamination p 33


© Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510 "This document has been prepared by AECOM Limited for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and terms of reference agreed between AECOM and the Client. Any information provided by third parities and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM." 17

14 12

11

100

23

108

4

6

112

102

Centre

Tank

70

50

22 37

BARDOWIE STREET

49

111

109

248

FIN

BARDOWIE STREET

l5

52.7m

SLOY SLO Y STREET

39

29

85

83

244

121 to 127 141 to 149

246

Police

4 2 33

YMCA

Nursing Home

105

238

234

Station

240

50

242

235 to 249

6

BARDOWIE STREET

Masonic Hall

5

PH

LB

Hall

47 4 7

45

31

Bank

STR EET

COURT

54.6m

STREET

LAS

Posts BARDOWIE

57.7m

Legend

LOCHSLOY LOCHSLO Y

30

54.9m

172

ll

174

7

180

1

Hall

Mission

53.3m 170 182 184

188 206

6

80

23

6

230

8

ll

5

7

19

3

216

3

218

Warehouse

Fruin Place

222

101

21

DENMARK STREET

8

224

l5

104

226

40 211 to 207

BRAEMORE GARDENS

7

228 Centre

l

232

Resource

TCB

3

2

212

214

2

199 to 205

2

208

210

30

El Sub Sta

204

ARDOCH STREET

PH

21 TCB 27

FRUIN STREET

54.9m

l

STREET BURMO LA BURMOLA

59.3m

192

198

196

Exchange

Telephone

2

6 l

12

90

192

194

25

22

202

33

FRUIN STREET

14

2

Flood Depth (m):

3

16

184

24

186

28

2 12

10

120

Tanks

15

170

124

0.000 to 0.0 0.020 to 0.1 0.100 to 0.5 0.500 to 1.0 1.000 to 6.8

9

172

174

4

61.5m

Warehouse

11

COULIN GARDENS

LENDARVEL GARDENS GLENDARVEL G G ARDENS

GARDENS

LENTROOL GLENTROOL G

18a

ASHFIELD STREET

l8b

BARLOCH STREET

20

175

22

ll

176

173

30

1

9

178

Health Centre

7

10

180

10

171

26

188

5

190

181 to 187

2

16

1

CARBETH STREET

Leisure Centre

118

134 132

54.6m

54.3m

ALLANDER STREET

58.5m

ALLANDER STREET

61.6m

119

113

107

103

162

Byshot Path

54.9m

127

160

CK STREET TANNOCK TANNO

99

156

89

53

18

65.8m

79

158

Post

ALLANDER STREET

101 45

23

67

144

67.7m

142

87 16

140

El Sub Sta

85 138

37

81

148

83

150

SARACEN STREET

66.8m

69

154 136 128

120

110

11

29

130

116

Kinbuck Passage

15

Sports Ground

STREET

61.9m

TCBs

CARLISLE

Library

106

8

104

102

96 88 80

7

53.9m

STONYHURST

STREET

105

109

19

101

141

Possilpark

89

79

Parish

PO

REDNOCK STREET

STONYHURST STREET 60.5m 63.2m

Church

Posts

67 ESS

STONYHURST STREET

209

215

217

223

BYSHOT STREET

207

225

205 6

201

5

231

5

74

2

110

112 El Sub Sta

Keppoch Campus

1

80

3

3

KINBUCK STREET

68

92

90

110

88

56 208

222

57.3m 53.3m

KILLEARN STREET

72.2m

KILLEARN STREET

131

91

65

63

61

59

57

77

75

73

71

69

67

79

81

83

85

87

135

95

149

89

197 237

245

251

65.8m

93

KILLEARN STREET

98

62.8m

98

96 25 75.0m

92 96

31

90

7

Cowlairs Park

(Recreation Ground)

(Recreation Ground)

Ward

37

GARDENS

33

HAMILTONHILL GARDENS

Cowlairs

1

HAMILTONHILL

Bdy

Presbytery

92 P Const

38

Bdy

Path

Path

El Sub Sta

Path

70

Pa th

Pat h

32

Presbytery

70 El Sub Sta

ENDRI

1

18

24

T STREE

206 204

T CK STREE

URIE INVER

2

2

HAMILTONHILL GARDENS

76

74

52.7m

212

4 214 21

11

32

17

St Teresa's Primary

7 80

St Teresa's

RC School 29

Nursing Home

62

37

1

RC Church

220

29

KESSOCK PLACE

GOUR

STR STRE EET ET

Path

T STREE

28

LAY

22 4 224

232

2

24 0 240

SARACEN STREET

59

170

176

239 ICK ENDR

241 68

68 268 2

262

245

42

25

235

8

76

24 8 248 256

Cowlairs Park (recreation ground)

20

KEPP

OCH

Works

184

LB

STRE

198

ET

24 7 247

251

LE LE CARLIS

NAR STREET MONAR MO

Cowlairs Park

52.4m

24

STRE

61.6m

ET

50

(recreation ground)

48

21

Path

11

15

T D STREE ALFOR

20

Path

KESSOCK DRIVE

5

97

25

Works

7

259

38

61.0m

Mast (Telecommunication)

1

222

232 6 44

2

240

5

4

MONAR

5

PLACE

Cowla C owlair irss Inclin e

59.4m

250

TCB

1

11 Path 252

MONAR DRIVE

Garage

3

POSSIL CROSS

1 1

7

Garage 52.1m Garage PO SSIL

630

ROAD

626

55.0m

Client

Sighthill Cemetery 52.1m

Path

304 Pat

Pat

h

h

183

57.6m Path

54.3m

56.7m

Path

Bdy Ward R OAD ROAD

582

OCH HILL

578

FB

177

KEPP

574

SIL

P Cons CR C R C onst t Bdy

296

Phoenix House 586

52.7m 48.8m

Path

D ROA

KEPP

PEATHILL

OCH HILL

POS

STREET

R OAD

E

ROAD

173

85

56.1m

PLAC SON DAW

HALL

SCO

CRAIG

171

59.7m

169

ET

S TRE

Path

NE

27

Bakery

inw nta Fou

54.9m

PH

DAWS

h Pat

to

STREET

Warehouse

ROAD

Project

54.6m 49.4m

PLACE

CO LDSTREAM

Inte

ell

ROY

482

474

480

ON

54.3m

4b

10

4a

ell Place Fountainw

439

441

445

447

MA MASTERT STERTON ON STRE STREET ET

Stone 53.0m

449

453

455

Path

Martyr's

53.9m Depot

75

131

2

20

469

431 Primary

School

Warehouse

PINKS

D

Sta

28

469 450

Tank 56.1m

37

Works El Sub Sta

FOUNTAIN WELL AVENUE

LL

ROA

461

68

STREET

ROAD

IGHA

Tank

TON

CRA

POC KEP

El Sub Sta

XHILL STREET COXHILL CO

50.6m

El Sub

E

51.5m L DRIV HHIL

El Sub Sta 56.7m

BO RRON

FOUN TAINW

465

47 to 67

9

Legend

Site

ELL

124

PLAC E

Garage

49

Sighthill

50.6m

24 28

Mast (Telecommunication)

4 43-

459

36

57.0m 54.9m 53.6m

Playing Field

S TREET

Title

BORRON

45.1m

48.8m t Bdy

23 Dismantled

ons

nst Co

C rgh

gh

DRIVE Railway

Playground

Works

Bu

Bd y Bdy

Playground

KEPPOCHHILL

7

Bdy

5

25

Burgh

Pluvial Fl

25

Bur

Const Bdy Bd y gh Bur

Works

MP

3 STREET

TCB HHIL

Bdy

Bdy

Port Dundas

Playground

45

POC KEP

EAGLE

st

rd Wa

Con

Reeds

10

Bdy Ward

PLACE

Ward Wa rd

L

Industrial Estate

29

27 11

25

4

PLA

15

1

2 6

14

E C CE

100

AVENUE

11 17

FOUNTAINWELL

Sta

10

FOUNTAINWELL

El Sub

29

Ref

99

1

ET EAGLE

SL

STRE

60.4m Subway

ETL

-

D

Date

June '10

C

2 73 69

10

20 71

63

SM

59

MR

55 57 49 45

BORRON

41 ROA

D

43

TAIN WELL FOUN

Bd y Ward

Bdy P Const

STRE

64

61

8

STREET

6

54.9m

D DFOR BROA

MR

35

Gantry

MR

ET Sighthill Presby

School

N

Fig. 3.1 Existing site, pluvial flooding. AECOM Ltd 2010. Not to scale.

6 328

0.000 to 0.020 Pluvial flood depth (m) 0.020 to 0.100 0.100 to 0.500 0.500 to 1.000 1.000 to 6.817

332

57.0m Tanks

REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. © CROWN COPYRIGHT AND DATABASE RIGHT 2010. ALL RIGHTS RESERVED. ORDNANCE SURVEY LICENCE NUMBER 100023379. THIS MAP IS REPRODUCED FROM © INTERMAP TECHNOLOGIES INC. ALL RIGHTS RESERVED 100023379 (2010).

CONSTRAINTS

Nursery

El Sub Sta

Tanks

90

40 to 50

Flood Depth (m):

arehouse

Scale

68

Gate

39

71.3m

Safety

37

ment of AECOM."

Depot


03 26 / 27

Surface water modelling

Pluvial modelling of the catchment upstream of the branch of the Canal has been carried out to determine potential runoff that is likely to drain to the canal during extreme events. When the capacity of drainage systems is exceeded, overland runoff is generated; this will naturally drain to the canal. This modelling indicates that inflows to the canal will be of the order of ~ 4m3/s, which will drain along the canal to overflow structures.

Whilst the canal is likely to be subjected to the extreme flows, the change in drainage regime will have an impact on the canal system for more frequent, less extreme events, when under the existing situation; run off would be drained by the combined system.

The greatest effect on the Canal system can be assumed to be broadly during the events up to the 3.33% Annual Exceedance Probability (AEP) events and may have an impact on the general operation and use of the canal, by affecting navigation.

Within the development of the water management for the future site, options should be developed which consider the management of surface water, with attenuation provided to limit flows to the equivalent greenfield runoff rates and options with significantly lower rates.

Any potential for increased mitigation for higher attenuation during frequent events should be considered to minimise the effect on the Canal system.

Surface water connections The site is part of the Dalmuir catchment area and is land locked without direct access to a watercourse. Notwithstanding this, the nearby Forth and Clyde Canal is a potential option. The site has historically been served by a combined sewer for the area in the north where infrastructure remains. This incorporates roads, utilities and drainage. Due to the topography of the site, runoff will drain from the highest points in all directions, but predominantly to the east and south. To the north of the site, the Possil Burn historically drained the site and surrounding catchment, however, over time this has been culverted and become a combined sewer. There no longer exists a strategic surface water drainage system to the north. To the south of the site is situated the Glasgow branch of the Forth and Clyde Canal, which forms a substantial hydrological barrier in the catchment, with a number of hydraulic pathways, consisting of under bridges and utilities. Recently, British Waterways have recognised that the canal systems may be utilised as a drainage asset to unlock development potential in land locked areas. It has been recognised that there is a limited understanding of the performance of the canal system during extreme rainfall events, however, British Waterway intend undertaking further modelling of the canal system to improve understanding of the potential future use in surface water management. Through consideration of the site, it is recognised that options for discharging surface water are limited to the existing combined system, (which is substantially constrained with existing deficiencies) or to utilise the canal system. Cowlairs surface water issues are only part of a wider problem within the north catchment of the city. Surface water traditionally discharged to the combined system (run by Scottish Water) is discharged to the River Clyde at Dalmuir treatment works. This system can no longer cope with the volumes of surface water and discharge to other destinations are to be investigated. The design study project proports the view of discharge to the Forth and Clyde extension. However, wider discharge issues still remain and Glasgow City Council and key partners are considering a full scale masterplan study of the north Glasgow sub-catchment with a view to improving water solutions in the wider area. Initial consultation with British Waterways has identified that the canal system may be utilised for a number of potential developments within land locked areas, and that the limits on discharge to the canal may be more constrained than allowing existing greenfield run off rates to discharge to the canal. INFORMING THE APPROACH


Elevation (MAOD)

Š Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510

N

Fig. 3.2 Existing topography. AECOM Ltd 2010. Not to scale. CONSTRAINTS


03 28 / 29

Natural topography The site is characterised by steep embankments to its perimeter with large terraced areas to the centre, formerly playing fields within Cowlairs Park. Figure 3.2: Existing topography identifies specific levels, with orange representing high ground and blue low ground. The steep edges act as significant barriers between the study area and residential neighbourhoods. This situation has been further aggravated by the demolition of former council housing at Allander Street/Killearn Street, Carbeth Street/Sunnylaw Street and at Hugo Street, opening up large gaps in the urban fabric. 52 .5 0

65.00

52.50

Existing road within design study area

62.50 60.00

60.00 62 .50

50.00

65.00 0 .5 62

62.50

52.50

65.00

.00 65

50 .00 50.00

62.50

The natural site topography provides the following key issues:

50.00

0 .5 62

50 .00

60.00

Any development along Keppochhill Road would have poor visual and physical connections to the rest of the site; 0 .5 57

60.00

57.50

55.00

55.00

52.50

55 .00

55.00

52.50

57.50

55.00 52.50

60.00

67.50

62 .50

.00 55

0 70.0

Whilst views from adjacent areas are very limited there are likely to be extensive distant views of any new development which should be considered in the design process, and 52.50 0 .5 52

52.50

65.00

75.00

.50 77

72.50

80.00

52.5 0

50.00

0 .0 60

57.50

60.00 57.50

.50 57

55.00

.50 52

Long panoramic views from the higher ground are an attractive feature of the site and selected long views should be retained were possible. 57.50 57.50 57.5 0

0 .5 57

52.50

55.00 55.00

Steep edge to residential neighbourhood

55.00 55.00

0 .0 55

0 .00 50.0 50

0 .0 55

60 .00

55.00

55.00

0 .5 57

60.00

55.00

.00 55 55.00

60.00

57.50 57.50 60.00 62.50 65.00

60.00 62.50

72 .50

55.00

67.50

65.00

75.00

75.00 .00 70

70.00

72.50

77 0 77.5 .5 0 .50 72

.00 75

67.50

75.00

77.50 77.50

0 .5 67

77.50 75.00

60.00

60.00

72.50

75.00

72.50

77.50

72 .50

70.00

.50 77 77 .5 77.500

60.00

65.00

67.50 62.50

Former playing fields within Cowlairs Park

70.00

75.00

80 .0 0

77.50

75.00

80.00

72.50

67.50

70 .00

77.50

57 .50

60.00

65.00

55.00

52.50

52.50

57 .50

55.00

60.00

60.00

60.00

.50 62

65.00

62 .50

.50 82

60.00

57 .5 0

55 .00

0 .5 77

62.50

0 .0 55

.00 55

52.50

52.50

50.0 0

55.00

57.50

50 .0 0 4750.00 .50

Fig. 3.3 Existing plan with contours. Collective Architecture 2010. Not to scale. © Crown copyright and database right 2012. All rights reserved. INFORMING THE APPROACH Ordnance Survey Licence Number 1000332510 .00 55

0 .0 50

47 .5 0

.00 65

50.00

45.00

47.50

60.00

62.50

52.50

57.50

67 .5 0

42.50

52.50

40 .00

52.50

0.0 0 0

0 .5 37

.00 50

55.00

70.00 .50 72

.00 75

0 .0 65

0 .0 60

60.00

57.50

80.00

67 .50

0 .0 65

70 .0 0

72.5 0 70.00

67.50

65.00 62 .50

72.50

55.00

57 .5 0 75.00

67 .5 0

65.00

62.50 57 .5 0

55.00 57.50 60 .00 62 .50

75 .00 72 .5 0 70 .00 67.50

65 .0 0 65.00

70.00

67.50

52.50

40.00 42.50

47.50

0 .0 55

.00 65

50.00

.00 45

.50 37

67.50

.50 62

0 .0 65

67 .50

0 .0 70

0 .0 60

77.50 80.00

0 .0 70

80.00

80.00

60 6 57 .50 .0 2.5 0 0

60.00

.00 60

65.00

75.00

75.00

.50 72

67.50

55.00

72.50

72.50

70.00 0 .5 62

57.50

70.00

70.00

62.50

60.00

70.00

67.50

67.50

65.00

60.00

67.50

67 .5 0

65.00

0 .5 62

.50 57

72.50

0 62.50 .0 65

.00 60

0 .0 70

60 .00

57.50 67 .5 0

62.50 65.00

70.00

50.00

52.50 55.00

50.00 50.00

55.00

.00 55

55.00

57.50


Existing bus routes

400m walking distance - acceptable to bus stop

Existing cycle routes

800m walking distance - acceptable to train station

Aspirational links that could be core paths Existing paths that could be core paths

Stronend Street

Garscube Road

Possil Road

Saracen Street

Hawthorn Street

Keppochhill Road

Carlisle Street

Sighthill Cemetery

Š Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510

N

Figure 3.4 Access map, Collective Architecture, 2010. Not to scale. CONSTRAINTS


03 30 / 31

Access Limited existing connections and poor visual connections restrict access across the site. Stonyhurst Street has been stopped up at the Saracen Street junction and therefore provides for through pedestrian travel only. Allander Street and Killearn Street are open to both pedestrian and vehicular through travel. Existing access from Keppochhill Road

Sections of Carlisle Street are in private ownership with some areas not built to “adoptable” standards. The only remaning vehicle access into the site is from Keppochhill Road to an existing redundant car park. The area has historically experienced a relatively low car ownership ratio. Road closures were introduced in the 1980’s and 1990’s to prevent non-local traffic “rat-running” through the area. These road closures consequently make it difficult for vehicles to travel efficiently within the Possilpark and Hamiltonhill areas.

Existing access from Carlisle Street

Figure 3.4: Access map indicates Glasgow City Council’s Core Path’s Strategy and highlights aspirational links that could connect across the site. Additional links might also be established across the site from Sighthill Cemetery through Cowlairs Park to Saracen Street. Such connectivity would encourage people to walk to schools, shops and leisure facilities, which are all within 1600m of the site. Current, existing and aspirational pedestrian links (as per the Glasgow Core Paths Plan) will likely be removed/ upgraded/ replaced as and when the site is redeveloped. Key points relating to access: •

Good pedestrian links exist from Keppochhill Road to Carlisle Street;

West of the site has good public transport provision with more than 12 buses per hour within the catchment, and

Natural topography may rule out vehicular access from Keppochhill Road.

Access to the existing school from Saracen Street along either Ashfield Street or Allander Street should be retained.

Bus stop to Keppochhill Road

INFORMING THE APPROACH


DENMARK STREET

21

7

5

19

l5

216

3

2

212 214

GLASG DEVEL REGEN

Warehouse 3

218

Fruin Place

ll

7

3

101

l

222

40

211 to 207

BRAEMORE GARDENS 8

Resource Centre

8

104

226 228 224

TCB

12

l

Tanks

170

2

15

10

11

9

172 174

4

120

COULIN GARDENS

2

6

12

14 16

2

l8b 18a

Telephone Exchange

GLENDARVEL GARDENS

20

176

ll

178

GLENTROO L GARDENS

22

9

180

ASHFIELD STREET

24 1

7

10

BARLOCH STREET

2

1

5

184 186

Health Centre

3

188 190

10

124

134

229 Geor Director Steve Inc

l

192 194

181 to 187

33

FRUIN STREET

26

90

196 198

16

175

27

FRUIN STREET

192 202

22 171 173

21

TCB

28

204

PH

30

199 to 205

2

2

208 210

30

ARDOCH STREET

54.9m

El Sub Sta

118

-

132

ALLANDER STREET

61.6m

65.8m

101 99

69 23

67 45

144 150 142 148

87

83

El Sub Sta

104

102

96

7

80

STONYHURST STREET 105

109

19

101 89

79

141

Possilpark Parish Church

Glasg

88

53.9m

67

ESS

STONYHURST STREET

5

6 2

110

KINBUCK STREET

5

74

1

80

Keppoch Campus

3

68

92

Glasg (Parti

Posts

BYSHOT STREET

106

8

110

11

128 130

29

15

136

Kinbuck Passage

138

37

85

81

16

140

116 120

STONYHURST STREET

PO

Post

67.7m

REDNOCK STREET

127

154

SARACEN STREET

66.8m ALLANDER STREET

COWLA

CARLISLE

53

18

156

89

119

113

107

103

61.9m

TCBs

158

Sports Ground

Byshot Path

54.9m

79

162 160

Library

54.3m

STREET

54.6m

ALLANDER STREET

58.5m

90 88

Privat

56

57.3m 53.3m

KILLEARN STREET

72.2m

57

59

61

67

65

63

69

71

75

73

77

79

81

83

85

87

91

89

131

95

135

149

93

65.8m

KILLEARN STREET

62.8m 98

75.0m 96

Cowlairs Park

90

Cowlairs (Recreation Ground)

(Recreation Ground)

Presbytery 92

Pa

th

Path Path

Pa th

Path

Presbytery 74

76

ET

1

RE

214

11 17

ET 62

29

220

SARACEN STREET

Y ST URLA GO

224

Path

29

204

212

STRE

80

St Teresa's Primary RC School

St Teresa's RC Church

Nursing Home

REET

232

76

248

239 241

262

245

68

268

Cowlairs Park (recreation ground)

EN DR

256

ICK

247

251

61.0m

24

STRE

259 20

ALFO

25

ET

Path

STRE

48

21

RD

Path

5

61.6m

50

97

ET

SLE

Cowlairs Park (recreation ground)

STRE

CA RLI

Mast (Telecommunication)

52.4m

59

240

235

Works

El Sub Sta

206

ICK

IE ST ER UR

EN DR

INV

70

52.7m

2 22

ET

2 23

44

line

4

0 24

wlair s Inc

59.4m 0 25

TCB

Co

11

Pa

th 2 25

Garage

POSSIL CROSS

PO SS

IL RO

Garage

52.1m

AD

630

Garage 626

304

Path 183

57.6m th Pa

Pa th

Pa th

Path

PP O CH

PEATHILL

HIL

LR

y

CR P Co

FB

KE

177

57 4

Bd

OA D LR HIL PP O CH

578

KE

Wa rd

56.7m

Pa th

582

nst

Phoenix House

586

Bd

y

54.3m

52.7m

STREET

OA D 85

59.7m

59

235

EET 5

Path tainw Foun

PL

AC

E

469

LL

PP

DR

IN WE

ILL

IVE

TA

HH OC

FO UN

465

461

ell Place

MAS TERTON STR EET

469

K STR RIC END

line

28

62

Inc

68

EET

irs

KE

Sighthill Primary School

482

COLD STREA M PLAC E 20

431

Tank

10

K STR

wla

h

70

232 240

at

76

74

CONSTRAINTS

450

Council (Partial interest)

El Sub Sta

61.6m

AD N RO TO

Glasgow City Council Glasgow City (Partial Interest)

Fig. 3.5 Site ownership. Glasgow City Council 2010. Not to scale.

2 22

KS

Council

204

EET STR

El Sub Sta

PIN

Glasgow City Glasgow City Council

212

AY

51.5m

COXHILL STREET

© Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510 Tank

56.1m

N

URL GO

47 to 67

50.6m

1:4,50

lP el

Garage

9

Private Ownership Private ownership

206

75

El Sub Sta

BORRON STREE T

J6326

w in ta

ET ROY STRE

439

441

445

447

449

53.0m

50.6m

COWLAIRS KEY

214

Martyr's Stone

53.9m

xx 56.7m

49.4m

54.3m

453

12 4

229 George Street, Glasgow G1 1QU Director Steve Inch BSc Hons Dip TRP

REF SCALE

un

54.9m

PH 54.6m

455

GLASGOW CITY COUNCIL DEVELOPMENT AND REGENERATION SERVICES

arehouse

ET

Warehouse

474 to 480

Fo

RE

169

ST

Path

E ON SC

CR

171

173

AIG HA LL RO AD

56.1m

27

DRAWN BY warkj

© Crown Copyrigh All rights reserved number 10002337


03 32 / 33

Site ownership Figure 3.5 Site ownership indicates that the majority of the site is within Glagow City Council ownership. A number of sites within the design study area are within private ownership, most significantly the area to the south western corner and the square site to the eastern boundary. These privately owned areas should be considered in relation to future development opportunities for the overall site.

Contamination Whilst Ruchill and Keppoch is known for its industrial past, the majority of the Cowlairs study area was undeveloped prior to the 1930s. The Engineering Envirocheck Report (refer to Appendix A CD) indicates that the Craigbank Ironstone pit formally operated on site. However, due to the dip of the strata, it is unlikely that mining extended under the site. Sources of contaminates offsite include garage services, petrol filling stations, dry cleaners, printers and paint manufacturers. Ground stability hazards on site are noted to be very low or pose no identifiable hazard. Figure 3.6 Geotechnical and geoenvironmental hazards provides a summary of geotechnical and geoenviromental aspects of the site.

Former Craigbank Ironstone Pit Made Ground

Site boundary

Former Saw Mill

Cowlairs Works

Star Pottery Former Iron Works

Potentially contaminative land use

Made Ground

Potential for shallow mine workings Potential for landfill gas

offsite mining

Fig. 3.6 Geotechnical and geoenvironmental hazards. AECOM 2010. Not to scale. Š Crown copyright and database right 2012. All rights reserved. INFORMING THE APPROACH Ordnance Survey Licence Number 1000332510


Manor and Castle Green Estate, Sheffield, UK Westerpark, Amsterdam, Netherlands


34 / 35

04

Strategic drainage Water management

Water management p 37 Forth and Clyde Canal

p 37

Drainage areas p 39 The water journey p 41

“The Scottish Environment Protection Agency (SEPA), in partnership with Glasgow and Clyde Valley Green Network Partnership (GCVGNP), Glasgow City Council, Scottish Water, and Scottish Natural Heritage promotes the growing international recognition of our strength in developing a 21st Century City based on principles of quality design, smart growth and integrated urban infrastructure, creating sustainable places of character, distinction, and well-being.� Integrated Urban Infrastructure Project Board, 2009.


KEY Underground drainage system Open watercourse for drainage and swales

Forth and Clyde Canal drainage routes to canal Š Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510

N

Fig 4.1 Site relative to the Forth and Clyde Canal. Collective Architecture/AECOM Ltd 2010. Not to scale.

STRATEGIC DRAINAGE


04 36 / 37

Water management Figure 4.1: Site relative to Forth and Clyde Canal indicates that the site is restricted with regards to surface water runoff and drainage routes into existing watercourses and river systems. The Forth and Clyde Canal is the nearest watercourse to the study area, separated by the urban grain.

Rainwater harvesting

The design study area lies within the north Glasgow sub-catchment, with no existing surface water systems or watercourses in close proximity. Historically the site will have drained to the Dalmuir wastewater network, however, due to incapacity of the system and sustainable objectives to reduce surface water in wastewater networks, this option is no longer suitable for the future development. The wider constraints are subject to a wider strategic study to determine future surface water provision within the catchment. It is therefore proposed that the entire area be self-sustaining and contained with respect to surface water management. Increased plot to house ratios and large areas of open space will reduce water runoff and allow for slow conveyance. On-site water runoff is used in a sustainable way and recycled, where possible, using water butts, rainwater harvesting and suchlike. This approach will reduce off-site runoff to minor events only.

Forth and Clyde Canal

Forth and Clyde Canal, Firhill Basin

The Forth and Clyde Canal is the nearest watercourse to the study area. British Waterways are currently undertaking modelling of the Forth and Clyde canal, which is due for completion by the Autumn of 2010. The purpose of this is to assess the capacity of the canal to accept surface water runoff from surrounding development plots. The available capacity of the canal is considered to be relatively small, due to low velocities and small freeboards within the canal system and a consequence of discharging surface water runoff into the canal, may lead to an increase in flood risk at certain locations. However, this capacity is currently being modelled by British Waterways and appropriate discharge rates will be determined for developments which can drain to the Canal.

THE WATER JOURNEY






































© Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510 



 















  

 

























 





 









   

  



























 



































 



 

 

 



















 

































 

























 







1



 

























  







































 

















 

















































 



2

















 





 

 

 





 







   





   

  

 

 

 











  



 





  













  



  





   

   

  















 









3

























 

4



  





 





 

  

  



















   













 

      



     



































  









 

 



  









 









 

















 

Drainage area 1   Drainage area 2  Drainage area 3  Drainage area 4

N

Fig 4.2 Drainage areas. AECOM Ltd 2010. Not to scale. STRATEGIC DRAINAGE

 

  

 

detention basin (attenuation area) 





  



 







  



wet pond 

 









 























  

 







   










04 38 / 39

Design standards The primary principles for future surface water drainage within the study area are as follows: •

Design for 0.5% Annual Exceedance Probability (AEP) event with climate change; Ensure surface water is kept and managed on the surface; Ensure no increased discharge into the Forth and Clyde Canal; Maximise potential for environmental benefit and enhancement;

Ensure any in-curtilage spaces are retained as permeable surfaces to minimise runoff;

Prevent an increase from the natural runoff from occurring by using soft landscaping and incorporating appropriate surface types, and

Utilise porous paving, green roofs and water butts within the development. Consider generous plot to house ratios and large areas of open space to reduce water runoff and slow down conveyance of residual runoff.

Drainage areas The design study has been developed in conjunction with the hydrological cycle to provide a holistic approach to the overall design. Figure 4.2: Drainage areas indicates that the study area has been arranged into four strategic drainage areas. These relate to the existing topography, proposed building typology and associated water journey. Drainage area 1 Contains the main attenuation area for the site in the form of a large wet pond to the low-lying south eastern edge. Drainage area 2 Identifies land for normal residential development with the opportunity for large areas of landscaped greenspace and mixed use buildings. Drainage area 3 Allows for individual house plots on existing terraces. Runoff for these areas will be fed into channels or swales running along the terraces. Drainage area 4 This is drained separately from the other areas due to the topographic contraints of the site to a seperate detention basin to the south west of the site. Rainfall at source will be captured in features such as permeable paving and green roofs. Where possible, landscaping should be kept permeable to maximise the potential to soak into the ground and reduce the need for larger attenuation areas. Conveyance systems will transfer excess surface water runoff to retention areas. The conveyance systems consist of channels through which the water is conveyed and is also treated. The main retention area is a wet pond to the east of the site and from there the water is proposed to be discharged to the Forth and Clyde Canal. Initially this will run through a piped conveyance system, but with longer term potential for open surface water courses through further redevelopment downstream.

THE WATER JOURNEY


2A 2

2B

251 to 259

4

8

8

1

RR GARDENS TORR TO G ARDENS

2

3

3

16

1 17

14

12

11

100

23

4

6 108

5

4

112

102

Centre

6

TORR PLACE

1

2

Playground

5

260

El Sub Sta

6

ASHFIELD STREET

7

Bardowie Industrial Estate

12

10

PH

118

10

7

12

55.6m

Health

6

14 16

10

Hall

Mission

18

SARACEN STREET

red by AECOM Limited for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and terms of reference agreed between AECOM and the Client. Any information provided by third parities and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement

Tank

70

53.3m

50

170

30 22

54.9m Posts

COURT

54.6m

37

BARDOWIE STREET

BARDOWIE

49

FIN

BARDOWIE STREET

111

109

248

l5

52.7m

SLOY SLO Y STREET

o 127 121 tto 141 to 149

39 238

234

Police

4 2

33

240 Station

242

50

235 to 249

29

85

83

244

246

Masonic Hall

LB

Hall

6

BARDOWIE STREET

5

PH

1

Bank

47 47

45

31

STREET

STR EET

172

LAS

174

ll

180

7

182

LOCHSLO LOCHSLOY Y

Nursing Home

105

YMCA

6

80

23

6

230

232

8

5

19

l5

ll

7 3

216

3

218

Warehouse

Fruin Place

222

101

21

DENMARK STREET

8

224

Centre

l

104

226

40

211 to 207

BRAEMORE GARDENS

7

228 Resource

TCB

3

2

212

214

2

199 to 205

2

208

210

30

204

ARDOCH STREET

21 TCB 27

FRUIN STREET

54.9m

192

198

196

90

186

184

Telephone

2

6

188

12

190

Exchange

FRUIN STREET

l

192

2

14 Leisure Centre

181 to 187

16

24

26

5 28

2 LENDARVEL GARDENS GLENDARVEL G G ARDENS

GARDENS

18a

12

COULIN GARDENS

LENTROOL GLENTROOL G

ASHFIELD STREET

BARLOCH STREET

l8b

Tanks

15

10

175

20

173

22

11

TENEMENT BLOCK 1 - MAX VOL = 250 M3 MAX WATER DEPTH = 0.407M

54.3m

9

170 54.6m

30

1

172

174

132

ALLANDER STREET

TENEMENT BLOCK 3 - MAX VOL = 259 M3 MAX WATER DEPTH = 0.432M

TENEMENT BLOCK 2 - MAX VOL = 255 M3 MAX WATER DEPTH = 0.425M

118

ll

176 120

9

178

Health Centre

4 124 134

7

10

180

10

171

2

3

16

61.5m

58.5m

1

CARBETH STREET

194

25

22

202

33

l

59.3m

El Sub Sta

PH

TENEMENT BLOCK 4 - MAX VOL = 262 M3 MAX WATER LEVEL = 0.437M

ALLANDER STREET

61.6m

119

113

107

103

162

Byshot Path

54.9m

127

160 61.9m

TCBs

101

66.8m 69

Post

ALLANDER STREET

23

154

67

45

144

67.7m

142

87

16

140

85

37

138

1

El Sub Sta

81

148

83

150

SARACEN STREET

STREET

99

156

89

53

18

65.8m

79

158 136 128

120

11

29

130

116

Kinbuck Passage

15

Sports Ground

110

106

CARLISLE

Library

8

104

102

96 88 80

7

53.9m

STONYHURST

STREET

REDNOCK STREET

STONYHURST STREET 109

105

19

101

60.5m 141

Possilpark

89

79

Parish PO Church

Posts

67 ESS

STONYHURST STREET

209

215

5

201

5

2

110

El Sub Sta

3

3

KINBUCK STREET

68

92

2

Keppoch Campus

1

80

90

88

POTENTIAL FOR DRAINAGE CASTLEGREEN BUSINESS PARK TO DRAIN THROUGH SITE

BYSHOT STREET

207 205

6

POND/DETENTION BASIN 2 1550M3 ATTENUATION

74

56

57.3m 53.3m

KILLEARN STREET

72.2m

131

91

65

63

61

59

57

77

75

73

71

69

67

79

81

83

85

87

135

95

149

89

197

65.8m

93

KILLEARN STREET 62.8m

98

25

PERMEABLE PAVING SHOUL BE USED WHERE POSSIBLE

75.0m

96

31

90

33

HAMILTONHILL GARDENS

Cowlairs

7

Cowlairs Park

(Recreation Ground)

(Recreation Ground)

37

Presbytery

92

38 Path

Path

Path

Pa th

Pat h

32

Presbytery

HAMILTONHILL GARDENS

74

76

52.7m

70

1

ET IE STRE RUR INVE

204

212

21 4 214

11 17

62

St Teresa's Primary

18

3

RC School

St Teresa's

Path

29

RC Church

Works

29

80

Nursing Home

206

EET STR

7

El Sub Sta

I CK ENDR

24

POND/DETENTION BASIN 3 SCENARIO 1 - 1660M3 ATTENUATION SCENARIO 2 - 2215M3 ATTENUATION VT = 513M3

220

ET STRE

RLAY GOU

22 4 224

232

0 24 240 8

235 239

SARACEN STREET

59

76 24 8 248 256

RICK END

Cowlairs Park

241 262 245

68

68 268 2

(recreation ground)

POND 1 - SCENARIO 1 - 6060M3 ATTENUATION SCENARIO 2 - 16100M3 ATTENUATION VT = MIN 2340M3 MAXIMUM LAND TAKE = 8400M2 STR

EET

ISL E ISLE CARL

24 7

251

61.0m

Mast (Telecommunication)

ALFO

Path

20

25

50

(recreation ground)

5

97

259

Cowlairs Park

52.4m

24

EET STR

Works

7

RD

STR

Path

21

EET

48

222

232 6

44 240

4

4

ne

59.4m

0

C owla Cow lairs irs Incli

25

TCB

11 Pat

h

25

2

Garage

POSSIL CROSS Garage

52.1m

PO SSIL

Garage

630

ROAD

626

52.1m

Path

304

th Pa

Pat

h

183

57.6m

Path

54.3m

56.7m

Path

War d Bdy

P Con C onst st Bdy

CR CR

96 296 2

Phoenix House

586 52.7m

582

KEP POC HHI LL

ROA

D

578

177

574

FB

Path

KEP POC HHI

PEATHILL

LL

STREET

R OAD

ROAD

173

85

56.1m

IGHA

ON SC

CRA

171

LL

59.7m

E

169

T EE

Path

S TR

27

w tain un Fo

N

54.9m

th Pa

to

STREET

480

Warehouse

ell

ROY

482

474

PH

49.4m

PLACE

CO LDSTREAM

54.6m

54.3m

10

Martyr's

Path nwell Place

Fountai

STRE STREE ET T

439

441

445

447

75

ASPIRATIONAL OPEN WATER DRAINAGE ROUTE OUT OF SITE TO THE FORTH AND CLYDE CANAL

School Primary

20

469

131

Stone 53.0m

449

453

press written agreement of AECOM."

455

MA MASTE STERT RTON ON

53.9m Depot

431 50.6m

Legend

ILL HH

IVE DR

NTA

51.5m

FOU

465

47 to 67

INW

ELL

124

PLA

CE

Sighthill

Garage

9

POC KEP

El Sub Sta

PINK

© Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510

IGH ALL

CRA

Tank

XHILL STREET COXHILL CO

461

D

STREET

N ROA

ROA

Sub Sta

56.7m

BO RRON

50.6m

STO

D

El

68

28

KEY

469 Tank

450

Warehouse Mast (Telecommunication)

56.1m

Works

El Sub Sta

57.0m

4 43-

54.9m

53.6m

T TREET STREE NS BORRO

459

Playing Field

7

5

plain/detention basin 23

45.1m

KEPPOCHHILL Dismantled

DRIVE Railway

25

Works

25

Surface Waterwater Floodplain/ Surface flood Detention Basin

Works

48.8m

MP

3 10

STREET

KE

45

PP OC

TCB

HH

Port Dundas

ILL

Industrial Estate

PLACE

EAGLE

29

27

11

29

El Sub Sta

AC PL E

100

Wetpond Wet pond

FOUNTAINWELL

217

OTENTIAL SUB-SURFACE DRAINAGE OUTE OUT OF SITE TO THE FORTH AND LYDE CANAL

25

11 17

15

1

EAGLE

EET STR

99

1

Tanks

Site boundary

Site Boundary

SL 60.4m Subway

71.3m

2

RMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. Drainage © CROWN COPYRIGHT Underground System AND DATABASE RIGHT 2010. ALL RIGHTS RESERVED. ORDNANCE SURVEY LICENCE NUMBER 100023379.

Underground drainage system

Open Watercourse for Drainage/Swales

Open watercourse for drainage/swales

Outlets and Controls

Outlet and controls

Fig 4.3 The water journey through drainage areas. AECOM 2010. Not to scale. STRATEGIC DRAINAGE


04 40 / 41

The water journey Figure 4.3 Water journey through drainage areas identifies the surface water management strategy as four distinct parts. These align with identifed drainage areas, topography and building typologies.

Swales, Junction 4, M8, UK

Green Streets, Chicago, USA

Drainage area 1 - Urban edge A large pond to the south east of the site is fed by not only drainage area 1 but areas 2 and 3. It provides attenuation and treatment before discharging via an open water course to the Forth and Clyde Canal. Conveyance is provided throughout area 1, the surface water runoff will be diverted to a small water channel that runs down the centre of the development blocks. Within each of the development blocks there is an area of grassland that can be used as a surface water floodplain. Within this area, community spaces are designed to flood during extreme conditions to create surface water flood plains, thereby holding back run off. These areas act to alleviate the requirements of site retention areas. Drainage area 2 - Central landscape This area contains mixed use buildings and terraced landscapes, hence the requirement for the treatment of water may be higher. For the purposes of this study the area will be taken as normal developed land. The potential requirement for runoff from any mixed use building may have to be drained to the foul sewer system.

Wetland, Dumfermline, Fife

Drainage area 3 - Terraced plots It is proposed that this area be separated into individual plots for low density housing. It is recognised that it may be difficult to control the prevention and source control measures to be put in place, however these measures should be built into legal land purchase agreements and title deeds. Runoff from these plots will be fed into channels running along the top of the terraces or via swales. These will be kept half full on a day-to-day basis with the remaining half for storm water attenuation in the event of extreme rainfall. The swales/ channels would then feed into the pond located in drainage area 1 and discharge to the Canal at the appropriate rates. Storage of water will be designed in accordance with Health and Safety legislation. Drainage area 4 - Cowlairs Park and Hillside Prevention and source control measures for this area are to be as per drainage area 3. However, this area is drained separately due to the topographic constraints of the site, to a detention basin to the south west of the site. Again, where possible, water should be kept on the surface in the form of swales and exceedance routes. THE WATER JOURNEY


COWLAIRS URBAN VILLAGE

Eaglesham village Wetland, Dunfermline, Scotland UK


42 / 43

05

Place-making Cowlairs Urban Village Character areas p 45 Case studies 1 and 2

p 47

Access and parking p 49 Heating and power p 49 Habitat p 51

‘The (Ruchhill Keppoch New Neighbourhood) Local Development Strategy seeks to establish a framework for development and regeneration which will enhance the quality of life in the Ruchhill Keppoch New Neighbourhood Initiative (RKNNI) area for existing and new residents and increase the attractiveness of the area as a location to visit and in which to invest.’ Glasgow City Council, Ruchhill Keppoch New Neighbourhood Local Development Strategy, 2005.


Š Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510

Reintroduce housing to

Infras

the north of site

Carlisle Stre

Saracen Street

et

3

1 3

provide strong edge to Carlisle Street

DATE - BY -

1 3

C

NOTES -

2

DO NOT SCALE ! ALL DIMENSION OF ANY WORK ! REFER TO ENG HEATING, LIGH DRAINAGE AND ! ALL BUILDING W CURRENT BUIL IS LOCATED.! ! ! CLIENT ! !

CITY PROP

PROJECT -

Rein

forc

COWLAIRS

eK

DRAWING -

epp

och

INFRASTRU

4

hill R

oad

DATE -

Dec 2010

JOB NO -

0927

Keppochhill Ro

ad

Exploit views N

1 2 3 4 5

Green corridor Low rise housing to existing terraced landscape Terraced houses and tenements Hillside dwellings Mixed use Gateway building

N

Fig 5.1 Cowlairs Urban Village character areas, Collective Architecture, 2010. Not to scale. COWLAIRS URBAN VILLAGE

0

50m

100m

200m

300m

TOP FLOOR, M


05 44 / 45

Character areas Figure 5.1: Cowlairs Urban Village Character Areas indicates four distinct areas with identifiable character. These takes into consideration the hydrological constraints, the site topograhy and proposed water journey. Interpolis gardens, Tilburg, Netherlands

The challenging topography is addressed via a series of building typologies that respond to their immediate landscape to form a series of clearly identifiable character areas.

Green corridor

A new gateway building is provided to the entrance into the site from Saracen Street. This is surrounded by large areas of open space and sculpted landscapes which form a green corridor connecting with existing path networks to surrounding areas. This space forms a local focus providing educational and social benefits. La Hague, West 8, Netherlands

Housing to stepped terraces

Low rise housing forms a tapestry of gardens within the existing terraced area of the site. These homes might vary in colour, style and character. It is anticipated that these properties will attract families or those seeking inner city garden space.

Defining the urban edge Terraced housing, Scotstoun, Glasgow

Terraced housing and tenement blocks bound the site in response to the existing surrounding housing. The northern edge follows the existing street pattern with lower density terraces to the eastern edges. This housing is tightly formed with clearly defined terraced gardens and shared tenemental back courts.

Hillside dwellings

The hillside dwellings sit above steep embankments and enjoy fantastic views and southerly light. These properties might house sheltered accommodation or generous split level homes with south facing balconies overlooking the city. Hillside dwellings, Alvaro Siza, Portugal

PLACE-MAKING


Fig. 5.2 Case Study 1 - Cowlairs Urban Village. Collective Architecture 2010.

Fig. 5.3 Case Study 2 - Cowlairs Eco Village. Collective Architecture 2010.

COWLAIRS URBAN VILLAGE


05 46 / 47

Case studies 1 and 2 This design study takes the proposed character areas outlined on page 45 and has interpreted them into two case studies. The case studies have developed to address the principle that infrastructure comes first whilst responding to varying housing markets and social demands. Both case studies adhere to the hydrological strategy outlined within Chapter 4 and the place-making principles within Chapter 5. Figure 5.2: Case study 1 - Cowlairs Urban Village is based on the principle that surface water be retained on site and above ground as far as possible to create an inner city landscape of swales, sculpted shared open space and large retention areas including a wet pond. A new gateway building and associated terraced landscape sit to the centre of the site to form a green corridor between existing and new neighbourhoods. Figure 5.3: Case study 2 - Cowlairs Eco Village is further based on the principle that surface water be retained on site as far as possible by the creation of self-build eco-plots. These form a tapestry of gardens within the existing terraces with land for growing and cultivation. A City farm and small holdings are located to the centre of the site. Each case study provides a strong urban edge in the form of terraces and tenements to the north, east and western edges of the site and hillside dwellings to the south. Case study 1 - Cowlairs Urban Village will be described in more detail within Chapter 06. Case study 2 - Cowlairs Eco Village will be described in more detail within Chapter 07.

PLACE-MAKING


Ground Source Heat Pump (GSHP) (trenches)

Carlisle Street

Sarcen Street

Ground Source Heat Pump (GSHP) (open loop)

KEY

Keppoc

hhill Ro

proposed core paths

ad

core residential road

N

GSHP (boreholes)

N

GSHP (open loop)

0

50m

100m

Potential heat sinks in wetland

Š Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510 Fig 5.4 Proposed road and pedestrian network. Collective Architecture 2010. Not to scale. COWLAIRS URBAN VILLAGE

200m

300m


05 48 / 49

Access and parking The site approach offers the potential to promote alternative lifestyles with regards to transport and movement. It is proposed that the terraced plots and hillside dwellings could sustain shared on-street parking with reduced parking to tenements and terraces. Craigmillar, Edinburgh, Scotland UK

Fig. 5.4: Proposed road and pedestrian network indicates that the existing street pattern to the north of the site has been retained to avoid unnecessary service diversions wherever possible. A new core residential road passes from the north of the site from Saracen Street along the eastern edge and onto Keppochhill Road Access is provided for service and emergency vehicles to other housing areas from the new core residential road. The new road consists of shared surfaces, communal parking and soft landscaping. Precedents include the Drum in Bo’Ness, Fife, Uplands Development, Stroud and PARC Craigmillar in Edinburgh.

Reinforce existing path and cycleways

Pedestrian routes are retained up through the hillside to connect the north and south of the site to tie into the wider core path network and access to the Forth and Clyde Canal. A series of secondary routes running east to west link the existing graveyard, new wetland and western pathway.

Heating and Power The design study proposes that all homes within the new development are designed to consume as little energy as possible.

Urban wetland and surrounding housing

The approach towards inner city development sits well with the growing requirement to positively act on climate change and to motivate the wider community and developers into action with regards to sustainable heating and power. It is proposed that district heating systems, solar water heating, passive ventilation, thermal mass and super insulation are incorporated into any new development. The proposed wetland offers enormous potential for heat sinks. The ambition should be to achieve EcoHomes Excellent ratings by 2016 and to reduce carbon emissions beyond the continually improving regulatory requirements, which are; a 30% reduction in C02 emission by October 2010 (based on 2007 regulations), a 60% reduction by 2013 and the construction of all new homes to net zero carbon standard by 2016/17. PLACE-MAKING


This document has been prepared by AECOM Limited for the sole use of our Client (the “Client”) and in accordance with generally accepted principles, the budget for fees and terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in thebeen document. Noby third party may relyfor upon and express written agreement of AECOM. This document has prepared AECOM Limited thethis soledocument use of ourwithout Client the (theprior “Client”) and in accordance with generally accepted principles, the budget for fees and terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM. This document has been prepared by AECOM Limited for the sole use of our Client (the “Client”) and in accordance with generally accepted principles, the budget for fees and terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM.

Legend

© Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510

Legend

© Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510 Site Boundary 500m Buffer

Woodland Generalist Habitat

Woodland Generalist 500m Network

Site Boundary 500m Buffer

Mineral Wetland Habitat

Mineral Wetland 500m Network

Woodland Generalist 2km Network

Mineral Wetland 2km Network

Client

$

0

Fig. 5.5 Woodland pre-development

$

Client

Green Networks Integrated Urban Infrastructure 6 Candidate Sites

Project

Site

Cowlairs

Title

Glasgow and Clyde Valley Integrated Habitat Networks Woodland Generalist

Project

Ref

0.125

0.25

0.5 Kilometres

Legend

© Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510

Figure 6.2

Scale

1:7,500

Drawn by

JM

Date

March '10

Chk'd by

BAC

Rev. 0

$

Client

Green Networks Integrated Urban Infrastructure 6 Candidate Sites

Project

Site

Cowlairs

Site

Title

Glasgow and Clyde Valley Integrated Habitat Networks Mineral Wetland

Ref

0.125

Fig. 5.6 Mineral wetland pre-development

0.25

Title

Figure 6.5

Scale

1:7,500

Drawn by

JM

Date

March '10

Chk'd by

BAC

Ref Rev. -

0.5 Kilometres

Fig. 5.7 Wetland pre-development

0

0.125

0.25

BASED ON ORDNANCE SURVEY MAPPING WITH PERMISSION OF THE CONTROLLER OF HER MAJESTY’S STATIONARY OFFICE (C) CROWN COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN COPYRIGHT AND MAY LEAD TO CIVIL PROCEEDINGS. BASED ON ORDNANCE SURVEY MAPPING WITH PERMISSION OF THE CONTROLLER OF HER MAJESTY’S STATIONARY OFFICE (C) CROWN COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN COPYRIGHT ANDON MAY LEAD TO CIVIL PROCEEDINGS. BASED ORDNANCE SURVEY MAPPING WITH PERMISSION OF THE CONTROLLER OF HER MAJESTY’S STATIONARY OFFICE (C) CROWN COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN COPYRIGHT AND MAY LEAD TO CIVIL PROCEEDINGS. LICENCE NO. 100020730 LICENCE NO. 100020730 LICENCE NO. 100020730

Use native species only when planting at large pond. Graded banking suitable for wildlife.

Biodiversity area.

Opportunity to provide native planting of species. © Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510 Fig. 5.8 Habitat observations. Scottish Natural Heritage and G&CVGNP 2010. Not to scale. COWLAIRS URBAN VILLAGE

0.5 Kilometres

Scale

1:

Date

M


05 50 / 51

Considerations •

Additional tree planting along terrace embankments could help to integrate new developments, enhancing the capacity of existing topography to limit local views;

The long panoramic views from higher ground are a particularly attractive feature of the site and selected long views should be retained where possible;

Consideration could be given to creating additional road links into the centre of the site from Carlisle Street where a natural dip slopes down to the road;

There is an opportunity to retain, refurbish and redevelop the steep wooded area to create an attractive linear park as a public amenity and buffer zone to potential new housing areas;

No statutory designations were found within 2km of the site;

Within areas of retained greenspace it would be desirable to improve sightlines along footpaths and clear heavily overgrown and hidden areas to discourage anti-social behaviour;

The area of protected green space would benefit from the retention of mature trees and management of existing woodlands;

Within a 2km buffer of the site a Site of Special Scientific interest, a site of importance for nature conservation and two green corridors were identified, and

Notable species include badgers.

Habitat The Glasgow and Clyde Valley Green Network Partnership, in partnership with Scottish Natural Heritage and Forestry Commission Scotland, has identified key areas for habitat restoration and expansion. These provide linked corridors within Glasgow and the Clyde Valley for the re-establishment and dispersal for numerous local and national species. It aims to prevent further fragmentation and improve connectivity between notable habitats to create functioning habitat networks that benefit the majority of species. Two main habitat networks were identified within the study area: • •

Woodland generalist and broadleaved, and Wetland generalist and mineral wetland.

Results from the ecological desk-based survey show that protected species have been recorded within the vicinity of the site. Indications of preferred habitat types have been made using aerial photographs and the following surveys have been recommended: • • • •

Badger; Bats; Breeding bird habitat survey; and Phase 1 habitat survey.

Surveys should be undertaken prior to any works on site and at appropriate times of the year. Figures 5.5-5.7 indicates pre-development modelling of generalist woodland, mineral wetland and wetland habitat. Mineral wetlands are characterised by rich mineral soils, and include marshlands, wetlands and swamps areas. Figure 5.8 provides an inital observations regarding the impact of the the design study proposal from Scottish Natural Heritage in partnership with Glasgow and Clyde Valley Green Network Partnership. This highlights that native species should be provided to sloped southern embankments and the south-western corner of the site offers potential for biodiversity.

PLACE-MAKING


Accorida, Cambridge, UK, Fielden Clegg Bradley. Image:Tim Croker.


52 / 53

06

Cowlairs Urban Village Case study 1

Cowlairs Urban Village p 55 Defining the urban edge p 57 Building on the hillside

p 59

Forming terraced plots p 61 Gateway and green corridor p 63


0 .5 57

52.50

55.00 55.00 0 .0 55

55.00 55.0 0

existing primary school

terraced housing

gateway and greenspace

0 .0 55

60 .00

55.00

.00 55

55.00

55.00 55.00 .00 55 0 55.0

60.00

55.00

57.50 57.50

60.00 62.50

60.00 62.50 65.00

67.50

67.50

70.00

65.00

60.00

70.00

0 62.5

67.50

65.0 0

75.00

0 75.0

75.00

.50 72

67.50

.00 75

70.00

.50 72

67.50

75.0 0

0 77.5 77.50 0 .5 67

77.50

77.50 80.00

75.00

0 .0 70

80.0 0

80.00

0 .0 65

72.50 77.50

70.00

75.00

77.50

80 .0 0

80.00

0 75.0

77.5 0

72.50

70 .00

67.50

65.00

57 .5 0

60.0 0

55.0 0

52.50

52.50

.50 62

55.00

75.00

.50 62

67 .50

60.0 0

Carlisle Street

72.5 0

0 .0 60

Saracen Street

.00 75

60.00

72.50

77 .50 77 .5 0

60.00

0 .0 70

60.00

55.00

72.50

72.50

0 70.0

57.50

67 .5 0

65.0 0

0 .5 62

.50 57

70.00

0 55.0

0 62.5.00 65

.00 60

60 .00

57.50

0

72 .50

70.00

0 .5 77 77 .5 77.500

60.00

65.0 0 62.50

.50 67

65 .0 62 0 .5 0

62.50

0 60.0

60.00

55 .0 0

57 .5 0

57.5 0

.00 55

0 .0 55

KEY

55.0 0 6507.50 .0 0 62 .50

55.00

67.50 0 .0 65

0 .0 60

57 .5 0

75.00

72.5 0 70.00 65 .0 0 65 .00

65.0 0

62.5 0

67 .5 0

72 .5 0 70 .00 67.5 0

57 .5 0

75 .00

52.5 0

flats/terraces

52.50

Keppochhill Road

hillside development 60.00

0 .0 55

62.50

N

0

50m

100m

200m

47.5 0

Mixed use gateway semi-detached houses

50.0 0

55.0 0

57.50

50 .0 0 .00 4750 .50

.00 65

50.00

57 .5 0

existing school playing fields

N

wet pond hillside dwellings semi-detached plots Š Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510

Fig 6.1 Case Study 1 - Cowlairs Urban Village site layout. Collective Architecture 2010. Not to scale. COWLAIRS URBAN VILLAGE

0 .0 65


06 54 / 55

Cowlairs Urban Village - Case study 1 Figure 6.1: Cowlairs Urban Village site layout is based around the following key principles:

Defining the urban edge

The north, west and eastern edges of the site are intensively developed to create a strong urban edge. A series of terraced and tenemental dwellings, linked by back courts and homezones, define these site boundaries.

Hillside dwelling

Hillside dwellings sit above steep embankments and enjoy fantastic views and southerly light. These properties might form generous split level homes with south facing balconies overlooking the city.

Formation of terraced plots

Semi detached house plots are formed within the existing terraced area to the centre of the site. The gridded street pattern reflects the existing site topography with linear swales to new roads and corridors.

Gateway site

A new mixed use gateway building is located at the northern vehicular entrance into the site adjacent to the existing primary school. This might house a local creche, small work or retail units with associated courtyards and open space. The site falls to the east in the form of sculpted landscapes and public pathways.

CASE STUDY !


north terrace option 1

Fig 6.2 Cross section through tenemental blocks, Collective Architecture 2010, Not to scale. COWLAIRS URBAN VILLAGE


06 56 / 57

Defining the urban edge A series of terraced and tenemental houses define the urban edge between existing dwellings and the central greenspace.

Ekostaden Augustenborg, Sweden

The street pattern and back courts are arranged to provide a route for surface water, which runs from the north of the site to the southeast and western edge. The terraced housing has front and rear gardens with a shared surface street arrangement designed to the principles of the Scottish Government’s recently published ‘Designing Streets’ 2010. Tenemental housing is arranged in blocks, which step down the sloped topography to the east. These blocks are also stepped in section to provide level back courts with undercroft parking from Allander Street. A wet pond sits to the south east corner, acting as a retention area for discharge to the Forth and Clyde Canal in the event of an extreme flood. It also provides amenity benefits and links to a pedestrian route running from east to west across the site.

Tenemental back court, Collective Architecture, 2010. CASE STUDY !


Fig. 6.3 Section through hillside dwellings, Collective Architecture 2010. Not to scale. COWLAIRS URBAN VILLAGE


06 58 / 59

Building on the hillside The south facing slopes onto Keppochhill Road provide the opportunity for stepped housing typologies, which might not require large areas of associated land. This will allow trees and parkland to pass around and below. Kawanishi Cottage, Nicolas Pople, Japan

A series of linear dwellings, accessed from the rear, step down the slope. These look towards Glasgow City Centre and offer the opportunity for spectacular views via large windows and external balconies. The south facing aspect lends itself to solar collection and passive heating and ventilation. These generous, desirable dwellings would be suited to a variety of residents ranging from the eldery to young couples. There is also a clear association between the hillside dwellings and the terraced plots.

South facing balconies, Germany

It is proposed that pedestrian routes be retained up through the hillside to connect the north and south of the site to tie into the wider core path network and access to the Forth and Clyde Canal.

Hillside dwellings, Collective Architecture 2010. CASE STUDY !


Fig 6.4 Section through terraced plots and swales (existing site in red). Collective Architecture, 2010. Not to scale. COWLAIRS URBAN VILLAGE


06 60 / 61

Forming terraced plots The large flat areas of land to the centre of the site form a series of stepped terraces. It is proposed that these areas be used to provide a series of streets and swales overlooked by semi-detached houses.

Swales, Upton, England UK

Swales run north to south down each road to form a natural conveyance route for surface water. These are planted and contain small bridges allowing pedestrian passage from side to side. Incurtilage parking is provided to the front of houses with permeable paving. All garden areas and permeable surfaces form part of the wider strategic drainage proposal and must remain permeable. Figure 6.4: Section through stepped terraced plots and swales outlines the sectional arrangement of the proposed houses relative to the road layout and swales. The existing ground levels (shown in red) are followed as closely as possible to prevent the need for costly earthworks. It is proposed that a stepped house type be provided at existing changes in level to provide level access from street level and level gardens to the rear.

Housing and swales to terraced plots, Collective Architecture, 2010. CASE STUDY !


Existing school

Fig 6.5 Gateway and green corridor, Collective Architecture 2010. Not to scale. COWLAIRS URBAN VILLAGE

primary

Gateway building


06 62 / 63

Gateway and green corridor A green corridor of open space and pathways connects the east and west of the site. The open space is sculpted to provide a dymanic landscape of paths, terraces and courtyards.

Rottonrow Gardens, Glasgow, UK

New and existing roads feed into the green corridor to provide a network of blue-green routes which connect into the surrounding path network and neighbourhoods. The site is within close proximity to the Possilpark Town Centre. Nevertheless, it is proposed that a new mixed use gateway building is located at the northern vehicular entrance into the site adjacent to the existing primary school to provide immediate local facilities. This might house a local creche, small work or retail units with associated courtyards and open space with a relationship to the existing school and green corridor.

Gateway and green corridor, Collective Architecture 2010. CASE STUDY !


Bridgend Community Garden, Islay, Scotland Eaglesham village UK


64 / 65

07

Cowlairs Eco Village Case study 2

Cowlairs Eco Village p 67 Introducing Urban Farming Forming self-build eco-plots

p 71

Self-sufficient dwelling

p 69 p 73


0 52.5

55 .00

52.5 0 52.50 0 .5 52

52.50 52.50

.00 55

0 55.0

0 .0 60

57.50

60.00 57.50

.50 52

57.5 0 0 57.5 57 .50

0 .5 57

52.50

Š Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510 55.00 55.00

0 .0 55

55.00 55.0 0

existing primary school

school playing fields

terraced housing

city farm

0 .0 55

60 .00

55.00

.00 55

55.00

55.00

55.00

60.00

55.00

.00 55 0 55.0

57.50 57.50

60.00 62.50

60.00 62.50 65.00

67.50

67.50

70.00

65.00

60.00

70.00

0 62.5

67.50

65.0 0

75.00

0 75.0

75.00

.50 72

67.50

0 75.0 70.00

72.50

77.50 77 .5 0 .50 72

67.50

0 .5 67

75.0 0 77.50

77.50 80.00

75.00

0 .0 70

80.0 0

80.00

0 .0 65

72.50 77.50

70.00

75.00

77.50

72 .50

70.00

.50 77 77 .5 0 77.50

60.00

65.00

0 67.5

62.50

80 .0 0

80.00

0 75.0

77.5 0

72.50

70 .00

67.50

60.0 0

65.00

57 .50

55.0 0

52.50

52.50

.50 62

55.00

75.00

.50 62

67 .50

60.0 0

Carlisle Street

60.00

72.5 0

0 .0 60

Saracen Street

.00 75

0 77.5 77.50

60.00

.00 70

60.00

55.00

72.50

72.50

0 70.0

57.50

67 .5 0

65.0 0

0 .5 62

.50 57

70.00

0 55.0

0 62.5 .00 65

.00 60

60 .00

57.50

65 .0 0 65.0 0 0 .0 65

0 .0 60

67.50

57 .5 0

65.0 62 0 .50

62.50

0 60.0

60.00

55 .00

57 .5 0

57.5 0

52.50

.00 55

0 .0 55

KEY

0 .0 65

70 .0

72.5 0 70.00

62.50

67 .50

67 .5 0

75.00

65.0 0

55.00

57 .5 0

72 .5 0 70 .00 67.5 0

55.0 0 657 0.0.50 0 62 .50

75 .00

52.5 0

Keppochhill Road

flats/terraces hillside development

50.0 0

55.0 0

50 .0 0 .00 4750 .50 47.5 0

57.50

60.00

.00 55

steadings/urban farms self build plots 62.50

50.00

.00 65

52.5 0

0 57.5

67 .5 0

N

hillside dwellings

self-build eco-plots

wet pond

0 52.5

52.50

.00 50

55.00

Fig 7.1 Cowlairs Eco-Village site layout. Collective Architecture 2010. Not to scale. COWLAIRS ECO VILLAGE

0 .5 57

70.00 70.00

0 .5 42

47.5045.00 42.50

0 70.0

72.50

75.00

0 75.0

45 47 50.0 .00 .50 0

0 70.0 .50 72

57.50


07 66 / 67

Cowlairs Eco-Village Figure 7.1: Cowlairs Eco-Village site layout is based around the following key sustainable principles:

Urban farming

A new city farm is located at the heart of the development adjacent to the existing primary school. This might also house a number of steadings or small holdings with land for growing.

Formation of eco-plots

Individual self-build house plots are formed within the existing terraced area to the centre of the site. These plots are allocated for self-build homes with sufficient land for growing to support a family. A series of water storage walls are provided between the terraces for irrigation.

Car free housing

It is proposed that the central areas of the site are car free, with vehicular access for service and emergency vehicles only. A new residential road passes from to the north-west at Saracen Street to the south east onto Keppochhill Road.

Defining the urban edge

The treatment of boundaries and urban edges are similar to those outlined within Case Study 1. The north, west and eastern edges of the site are intensively developed to create a strong edge to these boundaries. A series of terraced and tenemental dwellings, linked by back courts and homezones, define these site boundaries. The steep southerly edge is punctuated by linear dwellings, which step down the hillside.

CASE STUDY 2


Existing school

60.00 62.50

60.00 62.50 65.00

67 .5 0

65.0 0

67.50

67.50

70.00

65.00

60.00

70.00

Š Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510 67.50

72.50

75.00

0 75.0

0 70.0

65.0 0

72.50

70.00

75.00

Fig. 7.2 indicates the location of the proposed City Farm. This sits immediately adjacent to the existing Primary School.

.50 72

67.50

0 75.0 .00 70

70.00

72.50

77.50 77 .5 0 .50 72

.00 75

67.50

75.0 0

0 77.5 77.50 0 .5 67

77.50

75.00

60.00

72.5 0

0 .0 65

0 67.5

0

72.50

77.50

70.00

COWLAIRS ECO VILLAGE

75.00

77.50

80 .0 0

80.00

0 75.0

Fig 7.2 Cowlairs Eco-Village, productive landscape. City Farm. Collective Architecture 2010. Not to scale.

77.5 0

72.50

70 .00

67.50

65.00

75.00

.50 62

67 .50

60.0 0

0 .0 60

77.50 80.00

0 .0 70

80.0 0

80.00

The relationship between the existing school and the city farm offers the potential for educational and social benefits to young people and the surrounding community. 60.00

0 62.5

60.00

0 .5 62

.50 57

0 62.5 .00 65

.00 60 0 55.0

City Farm

60 .00

57.50

primary


07 68 / 69

Introducing urban farming Urban agriculture is the practice of cultivating, processing and distributing food in, or around a village, town or city2 and can also involve animal husbandry, aquaculture, agro-forestry and horticulture.

Victoria Garden Allotments, Glasgow

In the UK the Federation of City Farms and Community Gardens supports, represents and promotes community-managed farms, gardens, allotments and other green spaces. City Farms, such as Gorgie Farm in Edinburgh and Heeley City Farm in Sheffield, are run by a management committee of local people in partnership with local authorities. The success of such farms relies on local input and involvement. Most projects provide food-growing activities, training courses, school visits, community allotments and community businesses. In addition, some provide play and sports facilities and after school and holiday schemes.

Bridgend Community Gardens, Islay

2. Bailkey, M. and J. Nasr. 2000. From Brownfields to Greenfields: Producing Food in North American Cities. Community Food Security News. Winter 2000.

Heeley City Farm, Sheffield

• •

Community-growing projects reconnect people with nature and promote local action on global environmental issues through composting, the use of organic methods, wildlife areas and local food production; The presence of hands-on food growing experiences on our doorsteps promotes uptake of healthier diets and bridges the gap from field to plate; Community farms and gardens provide opportunities for exercise and learning in alternative outdoor settings, acting as stepping-stones to wider path networks; Plants and animals can be used to engage individuals with learning difficulties and disaffected young people, instilling a sense of responsibility and providing routes into education and/or employment; Social opportunities provided at these facilities instigate the development of support networks and strengthen communities, promoting integration and inclusion; Community farms and gardens have a positive impact on the local economy through local spending and employment opportunities, and Community farms and gardens support the delivery of government agendas relating to social inclusion, health, climate change, education, regeneration and local economies.

‘The true value of community farms and gardens: social, environmental, health and economic’ Research paper by the Federation of City Farms and Community Gardens 2007. CASE STUDY 2


Fig 7.3 Section through terraces and self-build plots. Collective Architecture, 2010. Not to scale. COWLAIRS ECO VILLAGE


07 70 / 71

Forming self-build eco-plots The formation of generous self-build eco-plots within the terraced area of the site suggests an alternative form of urban dwelling.

Self build unit by Hebridean Homes.

The demand for family housing with associated land continues to increase. Families with sufficient income are relocating from city centres to the suburbs and greenbelts in search of larger gardens and open space. Glasgow City Council operates 24 allotment sites across the city, with a total of 1320 plots. Demand is such that waiting lists are high, with waiting times of more than seven years for a plot on the most popular sites3.

Allotments, Glasgow.

The proposed self-build plots and gardens create an agricultural tapestry within the centre of the development. The area is predominantly car-free and is publicly accessible by foot and bicycle. The stepped terraces hold irrigation channels which collect surface water runoff. 3. Glasgow City Council Land and Environmental Services figures of August 2007.

Cowlairs Eco Village self-build plots, Collective Architecture, 2010. CASE STUDY 2


Calculation of plot sizes and arrangement The following diagrams outline the method used to calculate plot sizes and arrangement. These are based on information provided by ZEDfactory Limited (www.zedstandards.com) and the National Society of Allotment and Leisure Gardeners Limited (www.nsalg.org.uk).

Minimum planning standards for typical house to plot arrangement.

Minimum plot sizes required to annually feed a family.

Minimum number of homes per hectare (15) plus plot sizes required to feed a family (250sqm, 125sqm) equals min. layout per hectare.

Possible site arrangements for 15 homes within one hectare.

Fig. 7.4 Self-build eco-plot size investigation. Collective Architecture 2010. Not to scale. COWLAIRS ECO VILLAGE


07 72 / 73

Self-sufficient dwelling Figure 7.4: Self-build eco-plot size investigation identifies the method used for calculating eco-plot sizes within the design study. This provides approximately 50 homes and associated land. Eco-village precedents include Findhorn Community Eco-Village in Morayshire, Scotland, The Lighthouse zero-carbon home and the Highland Housing Expo in Inverness. Findhorn Eco-Village is a long established collection of self-sufficient dwellings based around an existing community. It has expanded in the last ten years to include individual sustainable homes with shared power, solar water heating and green roofs.

Lighthouse, Sheppard Robson Architects

The Lighthouse is the UK’s first net zero-carbon house that also meets Level 6 (the highest level) of the Code for Sustainable Homes – the standard to which all new homes must be constructed by 2016 within England and Wales. It is designed to provide a way of living that encourages lifestyles which are inherently ‘light’ on the world’s resources. Findhorn Eco-Village, Morayshire

77.50 80.00

75.00

0 .0 70

80.0 0

The Highland Housing Expo 2010 is a recently planned community just outside Inverness showcasing over fifty innovative and sustainable houses built to achieve Scottish Ecohomes ‘Excellent’ rating. 72.5 0

0 .0 65

72.50

77.50

Highland Housing Expo, Inverness 2010

70.00

75.00

77.50

72 .50

.50 77

77 .5 77.500

70.00

65.00

0 67.5 62.50

80 .0 0

80.00

75.00

.50 62

67 .50

65.0 0

62.50

67.50

Fig. 7.5 Self-build eco-plot arrangement, Collective Architecture 2010, Not to scale. © Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510 65.0 62 0 .50

0 60.0

57.5 0

62.50

60.00

57 .5 0

57 .5 0

0 .0 65

0 .0 60

Highland Housing Expo, Inverness 2010

75.00 72.5 0 70.00

65 .0 0 65.0 0

72 .5 0 70 .00 67.5 0

67 .5 0

75 .00

CASE STUDY 2


NEXT STEPS

Highland Housing Expo, Inverness, Scotland UK Findhorn Community, Morayshire, Scotland


74 / 75

08

Next steps Recommendations

Accommodation schedule - Case study 1

p 77

Accommodation schedule - Case study 2

p 79

Infrastructure p 81 Operational framework p 83 Recommendations p 85


A1 ( 4.05 Ha) B1 (2.64 Ha)

C1 (0.59 Ha)

E1 (1.55 Ha)

C1 (1.47Ha)

1

D1 (5.84Ha)

F1 (0.71 Ha)

E1 (0.95Ha) E1 (0.71Ha)

F1 (0.34 Ha) F1 (0.15 Ha)

E1 (1.55Ha)

N

Š Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510

N

Fig 8.1 Schedule of accommodation schematic - Case Study 1. Collective Architecture 2010. NEXT STEPS

0

50m

100m

200m


08 76 / 77

Accommodation schedule - Case study 1 The following schedule of accommodation has been prepared to provide an indicative housing mix and probable unit numbers based on the site schematic shown (Fig 8.1).

Plot

Area (ha)

House Type

No. of units

A1

4.05

Two storey terraces

124

B1 2.64 Tenement (4-storey) 220 C1

1.76

Mixed use

50

D1

5.84

Semi-detached (2-4 bed)

152

E1

4.61

Hill-side (3-4 bed)

105

F1 1.20 Tenements (4-storey) 100 TOTAL UNITS

750

RECOMMENDATIONS


A2 (3.64 Ha) B2 (2.64 Ha)

C2 (2.54 Ha)

G2 (0.59 Ha) G2 (0.71 Ha)

D2 (7.97 Ha)

F2 (0.73 Ha)

E2 (0.77 Ha)

F2 (0.37 Ha) F2 (0.12 Ha)

E2 (1.38 Ha)

N

Š Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 100033251050m

N

Fig 8.2 Schedule of accommodation schematic - Case Study 2. Collective Architecture 2010. NEXT STEPS

0

100m

200m

300


08 78 / 79

Accommodation schedule - Case study 2 The following schedule of accommodation has been prepared to provide an indicative housing mix and probable unit numbers based on the site schematic shown (Fig 8.2).

Plot

Area (ha)

House Type

No. of units

A2

3.64

Two storey terraces

130

B2 2.64 Tenement (4-storey) 220 C2

2.54

City Farm

0

D2

7.97

Self build eco-plots

60

E2

2.15

Hill-side (3-4 bed)

50

F2

1.22

Tenements (4-storey)

85

G2

1.30

Two storey terraces

60

TOTAL UNITS

605

RECOMMENDATIONS


0 .5 57

52.50

Retaining wall (within house type)

0 .0 55 55.00 55.0 0

New road network (6m width and 3m at swales)

© Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510

Existing road infill / resurfaced and new footways

0 .0 55

60 .00

55.00

.00 55

55.00

55.00

55.00 .00 55 55.00

Developer roads & parking (allow 70% permeable paving)

60.00

55.00

Swales & retention areas 57.50

60.00 62.50 65.00

70.00

70.00

67.50

65.0 0

75.00

0 75.0

0 70.0

60 .00

75.00

.50 72

67.50

57 .5 0

Existing road resurfaced with new footways

72.50

72.50

60.00

0 62.5

Developer roads and parking (70% permeable)

.00 75

70.00

72.50

77 50 77. .5 0

Swales and retention areas

.50 72

.00 75

67.50

75.0 0

0 77.5 77.50

Open green space (landscaped)

0 .5 67

77.50

60.00

0 .0 70

60.00

55.00

57.50

67.50

67.50

65.00

60.00

75.00

60.00

72.50

0 .0 65

.50 67 65.0 0 62.50

60.00

65 .0 0 65 .00

72.50

67 .50

55.00

57 .5 0

0 .0 55

57 .5 0

55 .0 0

.00 55

0 .0 55

55.00 55.0 0

DATE -

BY -

SCALE -

Dec 2010

SB

1-2500 @ A2

0927

JBa

(PR)03

0 .0 55

.00 65

60.00

50m

0

Existing road infill / resurfaced and new footways

50 .0 0 0 4750.0 .50

N

0 .0 55

62.50

55.00

50.00

55.00

55.00 .00 55 55.00

100m

200m

47.50

55.00

60 .00

.00 55

55.00

60.00

300m

57.50

65.0 0

75.00

0 75.0

57.50

60.00

60

.00

75.00

.50 72

67.50

Existing road resurfaced with new footways

72.50

72.50

0 70.0

Developer roads and parking (70% permeable)

.00 75

70.00

Swales and retention areas

.50

.00 75

72

67.50

60.00

72.50

77 50 77. .5 0

80.00

75.00

72.50

60.0 0

0 .0 60

77.50 80.00

0 .0 70

80.0 0

Open green space (landscaped)

0 .5 67

77.50

60.00

75.0 0

0 77.5 77.50

60.00

0 .0 70

57 .5 0

57 .5 0

70.00

67.50

Open green space (landscaped)

70.00

70.00

0 62.5

New road network (6m width and 3m swales)

67.50

67.50

65.00

55.00

WEB WWW.COLLECTIVEARCHITECTURE.CO.UK! !

60

67 .5 0

65.00

0 .5 62

60.00

EMAIL INFO@COLLECTIVEARCHITECTURE.CO.UK!

Swales & retention areas

0 57.5

0 55.0

.50 57

0 62.5.00 65

.00 60

Permeable Paving (for emergency access only) TELEPHONE +44(0)141 552 3001 FAX +44(0)141 552 3888!

KEY

50.00

57.50 60.00 62.50 65.00

60.00 62.50

TOP FLOOR, MERCAT BUILDING, 26 GALLOWGATE, GLASGOW, G1 5AB, UK!

.00

57.50

-

Retaining wall (within house type)

New road network (6m width and 3m at swales)

Fig 8.3. Case Study 1 Infrastructure Schematic, Collective Architecture 2010, Not to scale. 55.00

REV -

CHKD - DRWG NO network JOB NO Infrastructure & Green

52.50

57.50

.50 82

INFRASTRUCTURE / GREEN NETWORK

60.00

57.50

0 .5 77

COWLAIRS URBAN VILLAGE - CASE STUDY 1

DRAWING -

62.50

60.00

55.00 55.00

CITY PROPERTY (Glasgow) LLP

PROJECT -

0 .0 75

0 .5 57

65 .0 62 0 .5 0

70 .0 0

0 .0 65

0 .0 65

57 .5 0

52.50

52.50

55.00 657 0.0.50 0 62 .50

75.00 72.50

70.00

67.50

0 .0 60

N

67 .5 0

67.5 0

65.0 0

62.50

80.00

72 .50

DO NOT SCALE FROM DRAWING! ! ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO THE START OF ANY WORK AND ANY DISCREPANCIES NOTIFIED IN WRITING.! ! REFER TO ENGINEERS' DRAWINGS FOR ALL STRUCTURAL, HEATING, LIGHTING, POWER, EXTERNAL AND UNDERGROUND DRAINAGE AND VENTILATION INFORMATION! ! ALL BUILDING WORKS TO COMPLY IN ALL RESPECTS TO CURRENT BUILDING STANDARDS FOR COUNTRY IN WHICH SITE IS LOCATED.! ! ! CLIENT ! !

75 .00

72 .5 0 70 .00

REVISION NOTE -

NOTES -

70.00

0 .5 77

77 .5 0 77.50

CHKD - REV -

DATE - BY -

85.00

72.50 77.50

70.00

75.00

77.50

80 .0 0

80.00

75.00

72.50

77.50

70 .00

67.50

65.00

57 .5 0

55.0 0

60.0 0

52.50

52.50

.50 62

55.00

75.00

.50 62

67 .50

60.0 0

0 .0 60

77.50 80.00

0 .0 70

80.0 0

80.00

Open green space (landscaped)

New road network (6m width and 3m swales)

70.00

0 .5 62

.50 57

67 .5 0

65.00

0 62.5.00 65

0 55.0

KEY

57.50

60.00 62.50

.00 60

60 .00

57.50

.00

70.00

77.50

72.50

75.0 0

77.50

.50

67

65.0 0 62.50

DATE - BY -

60.00

DO NOT SCALE FROM DRAWING! ! ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO THE START OF ANY WORK AND ANY DISCREPANCIES NOTIFIED IN WRITING.! ! REFER TO ENGINEERS' DRAWINGS FOR ALL STRUCTURAL, HEATING, LIGHTING, POWER, EXTERNAL AND UNDERGROUND DRAINAGE AND VENTILATION INFORMATION! ! ALL BUILDING WORKS TO COMPLY IN ALL RESPECTS TO CURRENT BUILDING STANDARDS FOR COUNTRY IN WHICH SITE IS LOCATED.! ! ! CLIENT ! !

COWLAIRS URBAN VILLAGE - CASE STUDY 2

65 .0 0

.00

65

DRAWING -

60.00 57 .5 0

INFRASTRUCTURE / GREEN NETWORK

0 .0 55

.00

55

DATE -

BY -

SCALE -

Dec 2010

SB

1-2500 @ A2

0927

JBa

(PR 2) 03

JOB NO -

52.50

Fig 8.4. Case Study 2 Infrastructure Schematic, Collective Architecture 2010, Not to scale. N All rights reserved. © Crown copyright and database right 2012. 50m 100m 200m NEXT STEPS 0 Ordnance Survey Licence Number 1000332510

REV -

CHKD - DRWG NO -

-

85.0 0

.50

55 .0 0

62.50

82

57.50

CITY PROPERTY (Glasgow) LLP

PROJECT -

0 .5 77

60.00

0 .0 75

65 .0 62 0 .5 0

72.50

.50 67

0 .0 65

70 .0 0

55.00 657 0.0.50 0 62 .50

55.00

72.50

70.00

67.50

0 .0 65

0 .0 60

N

75.00

67 .5 0

65.0 0 62.50

57 .5 0

57 .5 0

75 .00 72 .5 0 70 .00 67.5 0

REVISION NOTE -

80.00

72 .50

70.00

0 .5 77

77 .5 0 77.50

CHKD - REV -

NOTES -

85.00

80.00

75.00

72.50

77.50

67.50

65.00

57 .5 0

55.0 0

60.0 0

50.00

0 .0 55

62.50

.00 65

50 .0 0 0 4750.0 .50

50.00

55.00

57.50

60.00

47.50

52.50

.50 62

52.50

75.00

.50

62

0 .0 65

67 .50

70 .00

80 .0 0

57 .5 0

Infrastructure & Green network 55.00 55.00

300m

TOP FLOOR, MERCAT BUILDING, 26 GALLOWGATE, GLASGOW, G1 5AB, UK! TELEPHONE +44(0)141 552 3001 FAX +44(0)141 552 3888! EMAIL INFO@COLLECTIVEARCHITECTURE.CO.UK! WEB WWW.COLLECTIVEARCHITECTURE.CO.UK! !

0 57.5


08 80 / 81

Infrastructure Figures 8.3 and 8.4: Infrastructual schematics outline the scope of infrastructure that might be put in place to enable the development of Case Study 1 and Case Study 2. The following assumptions have been made when producing the schematics: • • • • • • •

The existing road infrastructure to the north of the site can be retained, repaired and resurfaced with new footways provided; Existing pathways to the south and west of the site will be retained and reused as far as possible; Retaining walls required for individual plots and house typologies would be provided by housing developers; Ground conditions will not be problematic; Any shared parking or developer-provided road surfaces allows for 70% permeable paving; That access to the Forth & Clyde Canal can be achieved, and That public utilities exist adjacent to the site and no new primary infrastructure is required.

The schematics are ‘high level’ only and aim to give an order of the extent of the proposed site infrastructure which may be required to implement a sustainable urban drainage system at the site.

RECOMMENDATIONS


Fig 8.5 Terraced plots and swales - Case Study 1. Collective Architecture 2010, Not to scale.

Fig 8.6 Forming self-build eco-plots - Case Study 2. Collective Architecture 2010, Not to scale. NEXT STEPS


08 82 / 83

Operational framework The design study builds upon the existing park and core path networks to create a high quality and animated environment containing significant new character areas. These require a robust operational and maintenance framework. Discussion is required with the Local Authority to establish controlled on-street parking (where applicable) and associated maintenance within public areas. The operational framework will rely on both Glasgow City Council and Scottish Water committing under a legal agreement to responsibilities for management and maintenance. The framework would see the capital and operational roles for the area divided between Glasgow City Council and Scottish Water. The precise breakdown of these responsibilities will depend on, and to some extent will shape, the integrated landscape design. The general arrangement for operational maintenance activities would be for Scottish Water to take responsibility for maintaining below-ground structures, and those functional parts, which are hydraulically required for the continued operation of the system. Glasgow City Council would then take responsibility for the wider amenity and landscape maintenance, such as inspection, vegetation management and litter removal. Agreements would also be required between Glasgow City Council and the Local Education Authority or any community trust that might be established to manage any public buildings. For capital maintenance, where structural repair or replacement might be needed, the costs incurred are likely to be more significant. Design coding shall play a significant part in the selection and control of material use to reduce operational maintenance risks. It may be necessary to define a mechanism whereby costs can be attributed to each agency for defined tasks.

RECOMMENDATIONS


Fig. 8.7 Cowlairs Urban Village, Case Study 1, Collective Architecture 2010. NEXT STEPS


08 84 / 85

Recommendations 1. City Property (Glasgow) LLP are invited to consider the following recommendations made by the design study; 2. Inform the publication of Supplementary Planning Policy; namely Ruchill Keppoch New Neighbourhood Local Development Strategy; 3. Preparation of a joint venture Business Case to procure masterplanning and full design services adopting a strategic project approach of “infrastructure comes first� inclusive of: -------------

urban spatial analysis; sustainability; strategic drainage - surface water management strategy; catchment modeling to inform a surface water management plan; traffic analysis; design coding; ecological studies including Integrated Habitat Modelling; environmental impact assessment, field/geotechnical investigations, technical reporting; assignation of Collateral Warranties; community engagement, and cost management including commercial appraisals;

4. Early consideration of adoption and maintenance strategies by Glasgow City Council and Scottish Water; 5. City Property (Glasgow) LLP should explore all suitable deliverability mechanisms that would ensure the regeneration of the site, which may include entering into a Joint Venture with an agreed developer or consortium over the period of the project; 6. Invite audit from Architecture and Design Scotland, and 7. Seek community response through engagement, most particularly with the Joint Community Consultative Group (JCCG) and Keppoch Campus (local primary school).

RECOMMENDATIONS



09 86 / 87

Appendix

A

Consultants’ reports (CD-Rom)

Cowlairs Urban Village - Design study, 2010 Collective Architecture. Cowlairs - Surface water managment strategy, 2010 AECOM. Cowlairs - Technical baseline assessments, 2010 AECOM.