Fee Name

Fee (excl. GST)

Year 22/23 GST Amount

Fee (incl. GST)

Legislation

Review of Documentation submitted to Consent Conditions Determine if operational consent active (Deferred commencement conditions)

$360.00

$0.00

$360.00

Determine if documentation submitted to satisfy condition is compliance

$360.00

$0.00

$360.00

Application Fee Refunds / Fee Waiver Application Fee Refunds - Proportion as to time spent assessing the application up to time of withdrawal/ cancellation. - Additional Percentage Refund can be applied where the Manager Development and Building, Director Environment & Planning or General Manager determines that Council error identified or significant failure in customer service level occurred

100% - where no assessment has occurred Max 80% - where preliminary assessment has been undertaken and no report has been prepared Max 50% - where complete assessment has been undertaken and no report has been prepared Max 25% - where assessment and report have been completed 100% of Notification/advertising fee if not occured

Applications that Fee Waivers Apply Full or Partial Fee Waiver / Refund can be applied where the Manager Development and Building, Director Environment & Planning or General Manager determines that Council error identified or significant failure in customer service level occurred

Up to 100% of Application Fee

Site Compatibility Certificate and site verification certificates under SEPPs Fee

n/a

Current fee as set out in clause 262A of EPA Reg 2000: (1) The maximum fee for an application to the Director-General for a site compatibility certificate (SEPP Housing 2021) is $310, plus $42 for each dwelling in the development in respect of which the certificate was issued. (2) The maximum fee for an application to the Director-General for a site compatibility certificate (SEPP Transport 2021) is $310, plus $265 for each hectare (or part of a hectare) of the area of the land in respect of which the certificate was issued. (3) The maximum fee for an application to the Director-General for a site compatibility certificate (SEPP Resources and Energy 2021 Part 2.4) is $4,370.

Design Review Panel Fee (not required if advice provided at Pre Development stage) Estimated Cost of Construction (per application)

$3,110.00

$0.00

$3,110.00