Application Method
De s c ri p ti o n :
w ith a b lend o f marble. It fo rms a lon g -la s tin g rub b er l aye r r e sis t ant to weather con d iti o ns a n d ul t ra-viol e t r ays t h a t p r event water leakage to s ur fac e s a n d h e lps s ave e ner gy by
Recommended Use:
Recommended fo r all n ew or ol d ex terior su r face s su ch a s
Concrete, Gal vani zed Steel a nd P U Foam. I t c a n b e us e d a s well t o i n sulate W C ’ s, k it ch e ns a nd b alc o nie s b e for e til e s i n s t allati o n as well as on fa c a des t o p r even t m o is tur e an d r a i n water (In this ca s e, Roof Gua r d s ho u ld b e t op co a t e d w it h S torm Shiel d Premium To p Coa t to pr eve n t dirt p i ck- u p ) Fea tu re s :
- High adhe s ion proper t y
- E xcellent we ather resis t a n ce p r ope r tie s
- E xcellent UV resis t anc e
- Anti-Sli p
- E xcellent p rotection again s t algae and fun g u s
sur face s eve n in l ow temper a tur e s
1 2 HOURS
trati 1 7 - 8 M 2 / L
Re c omme n d ed Appli c ati o n Sys tem : Numb e r o f C o a t s S p r ea d i n g Rat e 1 1.4 - 1.8 M 2 /L * Storm Shield Roof Guard (Not Diluted) 1
Note: In the case of cracks, it is recommended, after applying white cement, soft sand and water in equal proportions and ensure that they are fully dr y before initiating the application process.
- Stir the paint well before application.
Primer (Clea 8 - 11 M 2 / L Using fresh water 1st coat 30% 2nd coat no dilution
Note:
- Air must be free of dust during application and dr ying time.
- Ensure the substrate is not subject to water leakage and is not in direct cont act with water until fully dr y
- Do not paint on unsettled concrete surfaces, all substrates must be at least 10 days dr y before application.
- The surface temperature should not be less than 5°C
6 7 5 4 8
- Ap p l y o ne coa t of St o rm S h iel d N an o Pen e tr ati n g Pr im e r (Cl ea r) with 10 0 % dilu t io n u s in g f re s h wa t e r
4
تﻮﻛ
Hours Full dr y 24** Hours at 25°C Brush Roller Airless Spray Gun Storage life Touch dr y 12 Hours at 25°C **
**Do not walk on sur faces painted with Storm Shield Roof Guard before 96 hours of applying the final coat
Spreading rate 30% diluted 7 – 8M 2 /L No dilution 1.4 – 1.8 M 2 /L
Application Method
1 - Th e s u r fa ce m u s t b e t r ea t e d by r e m ovi n g a ll for m s o f im pu ri t i es a n d pr ot ru si on s t o ge t a s u i t ab l e s ur fac e for a p p lic a tio n
with 3 0 % d ilutio n u s i n g fre s h wa t e r e s ur e t h a t the p rod u c t is mi xed a nd s ti rr e d we ll o u ch d r y tim e i s 12 ho u r s a n d d r y t o re c o a t 2 4 h o u r s
2 - M a ke su r e t h at th e s u r fa ce is c le a n , f r e e fr om du s t , oil , g r ea s es a nd s a l t
* * n d m a ke s u r e t h a t t h e p ro d u c t is mi xe d a n d s t i rr e d
3 - Th e c o rn e r s s ho ul d b e t r e a t e d wit h a c eme n t mix tu r e t h a t sh o u ld b e a pp li ed wi t h a 4 5 de g r e e a ng le
Since its establishment in Egypt, GLC paints has been a leading coatings manufacturer in Africa and the Middle East, providing excellent products to protect and beautify our world. We deliver full paint solutions that cater to all market segments.